4222 miller bottom road conyers, ga 30052...proposed rear elevation 1/8" = 1'-0" 3...
TRANSCRIPT
ROCK WALL WATERFALL
WATERFALL TO
POOL
BRIDGE TOHOT TUB
BRIDGE TOHOT TUB
POOL
HOT TUBISLAND
POOL
INFINITI EDGE INFINITI EDGE
MEC
H. ELEV.
WORKOUT ROOM
CHANGINGROOM
MASSAGEROOM
DW
SPORTS BAR
BOURBON WALL FLAT SCREEN TV
BUILT
-INS
BUILT-INS
SHOWER
STORAGE/
SLAB ABOVE
HOME THEATER
WINEROOM
REC.AREA
BEV
.REF.
WETBAR
THEATERUTILITY ROOM
PROJECTORABOVE
SCREEN
DUMB-WAITER
BENCH
HALL
BEV.
OUTDOORKITCHEN
FIRE-PLACE
WATERFALL PUMP MECH.
ENTERTAINMENTAREA
CUSTOM RANGEHOOD ABOVE
OUTDOORLIVINGAREA
MECH.ROOM
SAUNA
FLAT
SCRE
EN T
V
SLAB ABOVE
BENCH
BENCH
BENCH
BENCH
BENCH
DW
THEATERVESTIBULE
POKERTABLE
BOURBON WALL
SHOWER
K-3591PORTRAITTOILETVITREOUS CHINA
+7 STEP
+7 STEP
+7 STEP
+7 STEP
+7 STEP
+7 STEP
CLST.
1 PROPOSED TERRACE LEVEL FLOOR PLAN1/8" = 1'-0"
42
22
Mille
r Bot
tom
Road
Con
yers
, G
a 3
00
52
REVISED
DOCUMENT PHASE
PERMIT PACKETRELEASED FORCONSTRUCTION
SHEET TITLE
PROPOSEDTERRACE LEVEL
MARCH 31, 2020
BONSAI DESIGN
JUSTIN MIZELL - 404.903.0124
DRAWN BY:JUSTIN MIZELL
PROJECT MANAGER:
STAMP & SEAL:
K-3591PORTRAITTOILET
VITREOUS CHINA
K-3591 PORTRAITTOILETVITREOUS CHINA
3'-0"
3'-0
"
3'-0"
3'-0
"
3
'
-
0
"
3
'
-
0
"
KEEPING
DW
REF.
BREAKFASTTURRETNOOK
BUTLER'SPANTRY
ISLANDW/ UPPERBUILT-INS
COVEREDBREEZE WAY
KITCHEN
TERRACE
TERRACE
UPPERSUPPERS UPPERS24" HVAC AIR DUCTS
UPPE
RS
TERRACE
COVERED PORCH
AWNINGABOVE
DINING
COVERED PORCH
SIDEENTRY
SIDEENTRY
FOYER
CONSERVATORY/CONTEMPLATION
ROOM
CHASE:
OFFICE
3
'
-
0
"
3
'
-
0
"
AWNINGABOVE
FOUNTAIN
COVEREDBREEZE WAY
TERRACE
UPPERS
FRONTENTRY
HEADER ABOVE
ARCHED HEADER ABOVE
REAR 2NDFLOOR LANAI
GUESTBEDROOM
#2K-3591PORTRAITTOILET
VITREOUS CHINA
24" HVACAIR DUCTS
MASTERBEDROOM
SUITE
48" SLOPED TREY
24" STEPPED TREY
72" SLOPED TREY
BEN
CH
ARCHEDHEADER
ARCHEDHEADER
ARCHE
D H
EAD
ER
ARCHE
D H
EAD
ER
ARCHED HEADER
24" STEPPED TREY
12"
SLO
PED
TREY
ARCH
ED HE
ADER
ABOVE
ARCHED HEADER
ABOVE
ARCHED HEADER
ABOVE ALCOVE
ARCHE
D H
EAD
ERAR
CHE
D H
EAD
ER
ARCHE
D H
EAD
ERAR
CHE
D H
EAD
ER
ARCHED HEADER
DW
BEN
CH
&BUI
LT-I
NS
ARCHEDHEADER
HALL
BEN
CH
&BUI
LT-I
NS
FLO
ATIN
G S
HELV
ES
SKYL
IGHT
SKYLIGHT
ROCK WALL WATERFALL
WATERFALL TO
POOL
BRIDGE TOHOT TUB
BRIDGE TOHOT TUB
POOL
HOT TUBISLAND
POOL
INFINITI EDGE INFINITI EDGE
GREAT ROOM
MASTERBATHROOM
SUITE
MASTERW.I.C.'S
HISHER'S
SHOES/BUILT-INS
ISLAND ISLAND
MEC
H. ELEV.
VESTIBULE
ATRIUM
BALCONY ABOVE
TV
K-3591 PORTRAITTOILET
VITREOUS CHINA
KITCHEN
UPPERS UPPERS
UPPE
RS
24" HVAC AIR DUCTSCHASE:
OFFICE
TERRACE
TERRACE
EAST SIDECOVERED PORCH
AWNINGABOVE
SIDEENTRY
FRONTENTRY
FOYER
DINING
ARCHED HEADER ABOVE
HEADER ABOVE
ARCHED HEADER
ARCH
ED HE
ADER
ABOVE
ARCHED HEADER
ABOVE ALCOVE
ARCHE
D H
EAD
ERAR
CHE
D H
EAD
ER
ARCHE
D H
EAD
ER
ARCHEDHEADER
VESTIBULE
ATRIUM
BALCONY ABOVE
3
'
-
0
"
3
'
-
0
"
EASTSIDE
ENTRYHALL
ARCHED HEADER
ABOVE ALCOVE
OPTION B:
MUD-ROOM
ATVGARAGE
MAINGARAGE
SPORTGARAGE
HALL
HALL
HALL
HALL
MSTR.ENTRY
DUMB-WAITER
CUSTOM RANGEHOOD ABOVE
FIREPLACE
FIREPLACE
RAINFAUCET
RAINFAUCET
BENCH
BENCH
2 PROPOSED MAIN FLOOR PLAN - PLAN "B"1/8" = 1'-0" 1 PROPOSED MAIN FLOOR PLAN - PLAN "A"
1/8" = 1'-0"
SHOWER
BATH
42
22
Mille
r Bot
tom
Road
Con
yers
, G
a 3
00
52
REVISED
DOCUMENT PHASE
PERMIT PACKETRELEASED FORCONSTRUCTION
SHEET TITLE
PROPOSEDMAIN LEVEL
MARCH 31, 2020
BONSAI DESIGN
JUSTIN MIZELL - 404.903.0124
DRAWN BY:JUSTIN MIZELL
PROJECT MANAGER:
STAMP & SEAL:
MEC
H. ELEV.
W.I.C.
UPSTAIRSLOFT
FLAT
SCRE
EN T
V
LAUNDRY
ELEV.VESTIBULE
DEAD SPACE(LOW ROOF)
DEAD SPACE(LOW ROOF)
DW
K-3591PORTRAITTOILETVITREOUS CHINA
K-3591PORTRAITTOILETVITREOUS CHINA
K-3591PORTRAITTOILETVITREOUS CHINA
K-3591PORTRAITTOILETVITREOUS CHINA
ISLA
ND
K-3591PORTRAITTOILETVITREOUS CHINA
BENCH
PEDESTALW.I.C.
W.I.C.
W.I.C.
LINEN
LINEN
LINEN
CLST
CLST
OPEN RAILINGBALCONY
FOYERBELOW
SHOWER
SHOWER
SHOWER
SHOWER
SHOWER
K-3591PORTRAITTOILETVITREOUS CHINA
SHOWER
PEDESTAL
BEDROOM#3
BEDROOM#5
BEDROOM#3
BEDROOM#6
BEDROOM#7
BEDROOM#4
BATH
BATH
BATH
BATH
BATH
BATH
W.I.C.
HALLHALLHALL
HALLHALL
REAR 3RDFLOOR LANAI
1 PROPOSED 3RD FLOOR PLAN1/8" = 1'-0"
42
22
Mille
r Bot
tom
Road
Con
yers
, G
a 3
00
52
REVISED
DOCUMENT PHASE
PERMIT PACKETRELEASED FORCONSTRUCTION
SHEET TITLE
PROPOSEDUPPER LEVEL
MARCH 31, 2020
BONSAI DESIGN
JUSTIN MIZELL - 404.903.0124
DRAWN BY:JUSTIN MIZELL
PROJECT MANAGER:
STAMP & SEAL:
1 PROPOSED ROOF PLAN1/8" = 1'-0"
42
22
Mille
r Bot
tom
Road
Con
yers
, G
a 3
00
52
REVISED
DOCUMENT PHASE
PERMIT PACKETRELEASED FORCONSTRUCTION
SHEET TITLE
PROPOSEDROOF PLAN
MARCH 31, 2020
BONSAI DESIGN
JUSTIN MIZELL - 404.903.0124
DRAWN BY:JUSTIN MIZELL
PROJECT MANAGER:
STAMP & SEAL:
1 PROPOSED FRONT ELEVATION1/8" = 1'-0"
2PROPOSED REAR ELEVATION1/8" = 1'-0"
3 1/8" = 1'-0"
PROPOSED LEFT SIDE ELEVATION
42
22
Mille
r Bot
tom
Road
Con
yers
, G
a 3
00
52
REVISED
DOCUMENT PHASE
PERMIT PACKETRELEASED FORCONSTRUCTION
SHEET TITLE
PROPOSEDELEVATIONS
MARCH 31, 2020
BONSAI DESIGN
JUSTIN MIZELL - 404.903.0124
DRAWN BY:JUSTIN MIZELL
PROJECT MANAGER:
STAMP & SEAL:
ROCK WALL WATERFALL
MEC
H. ELEV.
WORKOUT ROOM
CHANGINGROOM
MASSAGEROOM
DW
SPORTS BAR
BOURBON WALL FLAT SCREEN TV
BUILT
-INS
BUILT-INS
SHOWER
STORAGE/
SLAB ABOVE
HOME THEATER
WINEROOM
REC.AREA
BEV
.REF.
WETBAR
THEATERUTILITY ROOM
PROJECTORABOVE
SCREEN
DUMB-WAITER
BENCH
HALL
BEV.
OUTDOORKITCHEN
FIRE-PLACE
WATERFALL PUMP MECH.
ENTERTAINMENTAREA
CUSTOM RANGEHOOD ABOVE
OUTDOORLIVINGAREA
MECH.ROOM
SAUNA
FLAT
SCRE
EN T
V
SLAB ABOVE
BENCH
BENCH
BENCH
BENCH
BENCH
DW
THEATERVESTIBULE
POKERTABLE
BOURBON WALL
SHOWER
K-3591PORTRAITTOILETVITREOUS CHINA
+7 STEP
+7 STEP
+7 STEP
+7 STEP
+7 STEP
+7 STEP
CLST.
1 PROPOSED TERRACE LEVEL FLOOR PLAN1/8" = 1'-0"
17'-11516" 13'-0"
8'-6"
Ø27'-0"
19'-1 18"
31'-8 18" 28'-7 11
16" 31'-978"
22'-1
316
"
12'-6"
27'-6"
15'-
0"
13'-3 14 "
7'-7
18
"
8'-0
516
"
12'-01516"
5'-
37 8
"
81'-31316"
45'-734"
17'-11 34 "
5'-
0"
26
'-5
11 16"
24'-10 14"
13'-
03 4"
9'-6" 7'-1916" 13'-3316"
SPEAKER
7'-1516"16'-0316"
14'-
117 8
"16
'-2
3 4"
26
'-117 8
"9
'-0
"
24'-5516" 17'-9 1
2"6'-0" 15'-1" 19'-10916" 13'-9" 27'-0"
19'-6 916 "
48'-11 34 "
16'-334"22'-11 1
4"13'-0 14"
Ø17'-0
"
123'-11716"
25
'-6
"
34'-158"
21'
-71 8"
42
22
Mille
r Bot
tom
Road
Con
yers
, G
a 3
00
52
REVISED
DOCUMENT PHASE
PERMIT PACKETRELEASED FORCONSTRUCTION
SHEET TITLE
TERRACE LEVELDIMS
MARCH 31, 2020
BONSAI DESIGN
JUSTIN MIZELL - 404.903.0124
DRAWN BY:JUSTIN MIZELL
PROJECT MANAGER:
STAMP & SEAL:
K-3591
PORTRAITTOILETVITREOUS CHINA
K-3591 PORTRAITTOILETVITREOUS CHINA
3'-0"
3'-0
"
3'-0"
3'-0
"
3
'
-
0
"
3
'
-
0
"
KEEPING
DW
REF.
BREAKFASTTURRETNOOK
BUTLER'SPANTRY
ISLANDW/ UPPERBUILT-INS
COVEREDBREEZE WAY
KITCHEN
UPPERSUPPERS UPPERS24" HVAC AIR DUCTS
UPPE
RS
COVERED PORCH
AWNINGABOVE
DINING
COVERED PORCH
SIDEENTRY
SIDEENTRY
FOYER
CONSERVATORY/CONTEMPLATION
ROOM
CHASE:
OFFICE
3
'
-
0
"
3
'
-
0
"
AWNINGABOVE
COVEREDBREEZE WAY
UPPERS
FRONTENTRY
HEADER ABOVE
ARCHED HEADER ABOVE
REAR 2NDFLOOR LANAI
GUESTBEDROOM
#2
K-3591PORTRAITTOILETVITREOUS CHINA
24" HVACAIR DUCTS
MASTERBEDROOM
SUITE
48" SLOPED TREY
24" STEPPED TREY
72" SLOPED TREY
BEN
CH
ARCHEDHEADER
ARCHEDHEADER
ARCHE
D H
EAD
ER
ARCHE
D H
EAD
ER
ARCHED HEADER
24" STEPPED TREY
12"
SLO
PED
TREY
ARCH
ED HE
ADER
ABOVE
ARCHED HEADER
ABOVE
ARCHED HEADER
ABOVE ALCOVE
ARCHE
D H
EAD
ERAR
CHE
D H
EAD
ER
ARCHE
D H
EAD
ERAR
CHE
D H
EAD
ER
ARCHED HEADER
DW
BEN
CH
&BUI
LT-I
NS
ARCHEDHEADER
HALL
BEN
CH
&BUI
LT-I
NS
FLO
ATIN
G S
HELV
ES
SKYL
IGHT
SKYLIGHT
GREAT ROOM
MASTERBATHROOM
SUITE
MASTERW.I.C.'S
HISHER'S
SHOES/BUILT-INS
ISLAND ISLANDM
ECH. ELEV.
VESTIBULE
ATRIUM
BALCONY ABOVE
TV
MUD-ROOM
MAINGARAGE
SPORTGARAGE
HALL
HALL
HALL
HALL
MSTR.ENTRY
DUMB-WAITER
CUSTOM RANGEHOOD ABOVE
FIREPLACE
FIREPLACE
RAINFAUCET
RAINFAUCET
BENCH
BENCH
1 PROPOSED MAIN FLOOR PLAN - PLAN "A"1/8" = 1'-0"
SHOWER
32'-738"
43'-11916"
81'-31316"
29'-7 1116"30'-8 1
8" 30'-978"
8'-5
916
"
28
'-9
7 8"
2'-4
"
6'-0"
2'-4
"
10-0
"
22'-4
38
"
8'-17 8
"
3'-
57 16
"
4'-0916"
4'-0
12
"
15'-
45 8
"
12'-5 1516 "
20'-0
"
9'-
31 16"
22'-9
12
"5'-1 1
4"
5'-134"
6'-
0"
5'-
01 2"
6'-
0"
15'-0"19'-0"6'-0"22'-5516"5'-11 1
2"16'-0 12"22'-11 1
4"13'-0 14"
20
'-11"
35'-11 12" 7'-0" 17'-97
16"
15'-
45 8
"
12'-
117 8
"
3'-
117 8
"
6'-10 116" 4'-77
8"
7'-9716"
3'-9716"
11'-0
"9
'-0
" 4'-6"
SHOWER
BATH
9'-6"
19'-6 916 "
13'-0 14 "
22'-11 14 "
13'-0 14 "
14'-2
12
"
18'-
51 2"
20'-11"
26'-11
18
"
10'-4
516
"
11'-738"
18'-9 116" 15'-9" 25'-0"
10'-4516"
236'-538"
179'-101516"
26
'-11"
45
'-117 8
"
66
'-3
5 16"
123
'-713 16
"
78'-0 516 "
Ø17'-0"
Ø15
'-4
5 8"
Ø13'-0"
5'-
0"
12'-
6"
15'-
1015 16
"
34
'-75 8
"
24'-10316"
35'-51516"
5'-
91 16"
5'-6"
27'-
41 8"
7'-
0"
4'-0"
16'-
0"
8'-11716"
20'-0"6'-058"
16'-958"
4'-
0"
10'-
0"
13'-
0"
14'-
103 4"
42
22
Mille
r Bot
tom
Road
Con
yers
, G
a 3
00
52
REVISED
DOCUMENT PHASE
PERMIT PACKETRELEASED FORCONSTRUCTION
SHEET TITLE
MAIN LEVELDIMS
MARCH 31, 2020
BONSAI DESIGN
JUSTIN MIZELL - 404.903.0124
DRAWN BY:JUSTIN MIZELL
PROJECT MANAGER:
STAMP & SEAL:
MEC
H. ELEV.
W.I.C.
UPSTAIRSLOFT FL
AT S
CRE
EN T
V
LAUNDRY
ELEV.VESTIBULE
DEAD SPACE(LOW ROOF)
DEAD SPACE(LOW ROOF)
DW
K-3591PORTRAITTOILETVITREOUS CHINA
K-3591PORTRAITTOILETVITREOUS CHINA
K-3591PORTRAITTOILETVITREOUS CHINA
K-3591PORTRAITTOILETVITREOUS CHINA
ISLA
ND
K-3591PORTRAITTOILETVITREOUS CHINA
BENCH
PEDESTALW.I.C.
W.I.C.
W.I.C.
LINEN
LINEN
LINEN
CLST
CLST
OPEN RAILINGBALCONY
FOYERBELOW
SHOWER
SHOWER
SHOWER
SHOWER
SHOWER
K-3591PORTRAITTOILETVITREOUS CHINA
SHOWER
PEDESTAL
BEDROOM#3
BEDROOM#5
BEDROOM#3
BEDROOM#6
BEDROOM#7
BEDROOM#4
BATH
BATH
BATH
BATH
BATH
BATH
W.I.C.
HALLHALLHALL
HALLHALL
REAR 3RDFLOOR LANAI
1 PROPOSED 3RD FLOOR PLAN1/8" = 1'-0"
6'-558" 7'-1134"8'-0"
3'-8"
5'-
6"
22'-5516"6'-0"
3'-378"9'-75
16"
12'-11316"
6'-0" 19'-0" 15'-0" 18'-9 18" 13'-7 11
16" 9'-878"
23'-4916"58'-9 1
8"
123'-6 14"
5'-
117 8
"
13'-
3"
5'-
81 2"
10'-
41 2"
12'-11 14" 24'-3 1
8" 16'-6516" 6'-03
4" 28'-458"
27'-
41 16"
7'-0" 4'-3 18"
11'-11 14"
41'-378"
30'-0 116"
87'-2516"
23'-4 1116"
16'-8916"
11'-1
03 4"
19'-
27 16
"
28
'-11 4
"
8'-
103 4
"
16'-
71 2"
4'-
119 16
"9
'-115 8
"
29
'-4
"
4'-
0"
4'-0" 9'-3716" 10'-178" 4'-0"
49
'-7"
58
'-7"
73
'-2
11 16"
42
22
Mille
r Bot
tom
Road
Con
yers
, G
a 3
00
52
REVISED
DOCUMENT PHASE
PERMIT PACKETRELEASED FORCONSTRUCTION
SHEET TITLE
UPPER LEVELDIMS
MARCH 31, 2020
BONSAI DESIGN
JUSTIN MIZELL - 404.903.0124
DRAWN BY:JUSTIN MIZELL
PROJECT MANAGER:
STAMP & SEAL: