  • May 2014Application Reference EN020001

    Hinkley Point C Connection Project

    Design Drawings 400kV Substations

    Regulation 5(2)(o) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

    4.8.4Document

  • 217000

    144000

    110000

    72000

    ab

    c

    A11

    B11

    C11

    AB

    CA

    BC

    ab

    c

    A11

    B11

    C11

    Meeting /

    Records R

    oo

    m

    Office

    Entrance Lobby

    Disable

    dToilet

    Toilet

    Kitchen /

    Mess

    Dryin

    g / Sho

    wer

    Roo

    m

    Main

    Entrance

    M

    eado

    w

    Westleigh

    Depot

    NY

    E

    RO

    AD

    Mead Farm

    Westm

    ead

    C

    roft

    Dingle

    Dorvic

    Tennis

    ME

    AD

    LA

    NE

    Muritai

    Northfield

    Farm

    Coo

    mbe

    Westfield

    Ashc

    ot

    ETL

    Silo

    The Oaks

    Pond

    Track

    Ponds

    Pond

    Drain

    Drain

    D

    rain

    Pond

    Pond

    Drain

    Pond

    5.5m

    15.6m

    Bridge Farm

    Droveway

    Drain

    Hardm

    ead

    Rhyn

    e

    Pond

    Drain

    Droveway Bridge

    D

    rain

    DR

    OV

    E

    WA

    Y

    Pond

    D

    rain

    Pond

    Drain

    MEAD LANE

    Pond

    T

    rack

    17.2m

    6.1m

    Pond

    ET

    L

    Drain

    Pond

    NY

    E

    RO

    AD

    Dis

    mantle

    d

    Rail

    way

    Farm

    D

    r

    a

    in

    Drain

    D

    rain

    Drain

    Trac

    k

    Hardm

    ead

    Rhyn

    e

    Drain

    Pond

    D

    rain

    C

    heddar

    V

    alley

    R

    ail

    w

    ay

    W

    alk

    Drain

    Drain

    Sl

    P

    at

    h

    Track

    Birchwood House

    Track

    Track

    Birchwood House

    P

    ath

    Track

    West Leigh Farm

    Drain

    Track

    Resr

    Resr

    T

    rac

    k

    Track

    Drain

    Pond

    Pond

    National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc

    1:750

    0 75m15

    AB

    NO

    RM

    AL L

    OA

    D A

    CC

    ES

    S R

    OA

    D

    C C

    D D

    B

    B A

    A

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No.

    Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

    DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    Site Map

    CAD

    A1

    1:75013/NG/0251

    21535

    SHEET 1 OF 1 SHEET 1 OF 1

    EN020001

    PINS SHEET 30 OF 70

    PM JB PB

    DESIGN DRAWINGS(REGULATION 5 (2)(o))

    SHEET 30 OF 70

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    NORTH SOMERSET COUNCIL

    - NEW EQUIPMENT- ELECTRIFIED FENCELINE

    1 - SHUNT REACTOR 2 - SUPERGRID TRANSFORMER 3 - DUMP TANK FOR HYDROCARBON CONTAINMENT 4 - WATER TANK 5 - DIESEL GENERATOR 6 - TEMPORARY DIESEL GENERATOR 7 - CONTROL BUILDING 8 - AMENITY BUILDING 9 10

    - WORKSHOP

    11- EARTH STORE- LVAC

    - CABLE

    CABLE ROUTE SHOWN IS INDICATIVE ONLY.5.

    THIS DRAWING IS FOR PLANNING PURPOSES ONLY.4.

    13/J2M/3840001.BASED ON ORIGINATORS DRAWING No: 3.

    SUBSTATION.IMPEDE THE FUTURE DEVELOPMENT OF THE MAINTAINED. ANY PROPOSED CHANGES MUST NOT PROVIDED THAT THE SPECIFIED CLEARANCES ARE ADJUSTED TO SUIT MANUFACTURER'S EQUIPMENT ALL DIMENSIONS SHOWN ARE TYPICAL AND MAY BE 2.

    OTHERWISE STATED.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS 1.

    REFERENCE DRAWINGS

    ORDNANCE SURVEY. OS LICENCE NO. 100048471 CROWN COPYRIGHT HER MAJESTY'S STATIONERY OFFICE.

    OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER REPRODUCED FROM ORDNANCE SURVEY MAPS. BY PERMISSION

    N044/22/012

    SITE PLAN

    A AUG '13 FOR S.42 & S.47 CONSULTATION

    MAY '14 FOR DCO SUBMISSION CFK

    CSE

    CSE

    1

    2

    2

    1

    8

    11

    3

    8564

    7

    9

    ES

    PI

    SA CT VTDC/ES

    CBDC/ES

    SA

    SA

    ES

    CBPIDC/ES

    DC/ESPI

    PIPI

    SA

    SA

    ESCB

    DC/ES

    DC/ES

    (CB/DC/ES)HIS

    CB

    CT DC ES

    PI SA VT

    CSE

    HIS

    - CIRCUIT BREAKER- CABLE SEALING END- CURRENT TRANSFORMER- DISCONNECTOR- EARTH SWITCH- HIGHLY INTEGRATED SWITCHGEAR- POST INSULATOR- SURGE ARRESTOR- VOLTAGE TRANSFORMER

    VT/CSE)(CB/CT/

    HIS

    AC

    CE

    SS

    RO

    AD

    SANDFORD 400kV/132kV SUBSTATION

    SUBSTATION 13/NG/0252 (PINS SHEET 31)SITE ELEVATIONS, SANDFORD 400kV/132kV

    10

    B

    B LD JB

  • Tank

    Chy

    Tanks

    WB

    Drain

    Tanks

    WA

    S

    H

    ING

    P

    OO

    L

    Furnace

    D

    rain

    Drain

    Tank

    Drain

    SEVERN ROAD

    Foot Bridge

    Tank

    Tank

    D

    rain

    D

    r

    a

    in

    Tank

    LANE

    (TK)

    Drain

    Drain

    Tank

    GP

    AB

    LE

    TO

    N

    LA

    NE

    Tank

    Chy

    Drain

    Works

    Tank

    Tank

    Tank

    Drain

    Tank

    D

    rain

    Tank

    Tanks

    Tank

    D

    rain

    6.4m

    Stuppill

    Rhine

    D

    rain

    Tank

    CH

    ITT

    EN

    ING

    RO

    AD

    Crook's Marsh

    6.4m

    Tank

    Chys

    Tank

    D

    rain

    Tank

    Tank

    Works

    Tank

    Tank

    Tanks

    Drain

    D

    rain

    Works

    Drain

    Drain

    D

    r

    a

    in

    Tank

    CH

    ITT

    EN

    ING

    RO

    AD

    WB

    Drain

    SE

    VER

    N

    RO

    AD

    Drain

    Drain

    Pipe Line

    Drain

    GR

    EE

    NSP

    LO

    TT

    RO

    AD

    Drain

    7.0m

    Drain

    Pipelin

    e

    D

    rain

    6.7m

    Drain

    Drain

    Stuppill

    Rhine

    Drain

    Drain

    Drain

    Tank

    Red

    Rhine

    Drain

    Tk

    Pipe

    Line

    Drain

    6.7m

    Crook's Marsh

    Drain

    D

    rain

    Dra

    in

    D

    r

    a

    in

    Drain

    Drain

    s

    Seabank Power Station

    D

    rain

    M

    ean

    MP 13.25

    W

    arth

    Mud

    C

    hittening

    9.4m

    P

    ipe

    L

    ine

    Wa

    t

    e

    r

    Seabank Power Station

    Drain

    D

    rain

    9.4m

    D

    rain

    SP

    H

    igh

    SE

    VE

    RN

    RO

    AD

    Tanks

    Drain

    Chy

    Seabank Power Station

    6.7m Drain

    Crook's Marsh

    Drain

    Drain

    Tk

    D

    rain

    T

    rav

    C

    D

    rain

    Drain

    ETL

    ETL

    Pond

    D

    rain

    7.0m

    Drain

    s

    MP 13.5

    SE

    VE

    RN

    Drain

    D

    rain

    Pond

    Drain

    7.6m

    Drain

    Drain

    Drain

    RO

    AD

    Drain

    Seabank Power Station

    Drain

    D

    rains

    9.1m

    Pond

    P

    ip

    e

    L

    in

    e

    Drain

    ABLE

    TON

    LANE

    Drain

    6.4m

    D

    rain

    D

    rain

    D

    rain

    Drain

    Drain

    Drain

    6.4m

    Tanks

    El Sub Sta

    Pond

    Tank

    Pond

    Pond

    Pond

    Mast

    Pond

    Depot

    Pond

    P

    ath

    Depot

    Depot

    Depot

    Depot

    Drain

    D

    r

    a

    in

    Drain

    RH

    Bo

    r

    o

    Cons

    t

    &

    UA

    Bdy

    SD

    Co

    Cons

    t

    &

    CP

    Bdy

    De

    f

    SD

    SD

    SD

    Und

    Und

    Co

    Const

    &

    CP

    Bdy

    0.30m

    FF

    Boro

    Const

    &

    UA

    Bdy

    Co

    Const

    &

    CP

    Bdy

    Boro

    Const

    &

    UA

    Bdy

    FF

    0.30m

    FF

    Co

    Const

    &

    CP

    Bdy

    Boro

    Const

    &

    UA

    Bdy

    Boro

    Const

    &

    Co

    Const

    & CP

    Bdy

    UA

    Bdy

    SD

    FF

    C

    o

    C

    onst

    &

    C

    P

    B

    dy

    B

    oro

    C

    onst

    &

    UA

    B

    dy

    RH

    BP

    T

    anks

    6.

    7

    m

    T

    k

    Drain

    M

    ast

    D

    epot

    c1b1

    a1n

    abc

    ABC N

    RBY

    N

    c1

    b1a1

    n

    a b c

    CBA N

    1:5000 10m 20m 30m

    A

    C

    A

    B

    C

    B

    SEABANK 400kV SUBSTATION

    - FLOOD WALL

    - EXISTING EQUIPMENT

    - CAPACITOR VOLTAGE TRANSFORMERCVT

    - EARTH SWITCHES

    - SURGE ARRESTERSA

    - SUPER GRID TRANSFORMERSGT

    - GAS INSULATED BUSBARGIB

    - NEW EQUIPMENT

    5. CABLE ROUTE SHOWN IS INDICATIVE ONLY.

    13/J2M/2040014. BASED ON ORGINATORS DRAWING No;

    3. THIS DRAWING IS FOR PLANNING PURPOSES ONLY.

    SUBSTATION.IMPEDE THE FUTURE DEVELOPMENT OF THE MAINTAINED. ANY PROPOSED CHANGES MUST NOT PROVIDED THAT THE SPECIFIED CLEARANCES ARE ADJUSTED TO SUIT MANUFACTURER'S EQUIPMENT 2. ALL DIMENSIONS SHOWN ARE TYPICAL AND MAY BE

    OTHERWISE STATED.1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No.

    Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

    DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    Site Map

    CAD

    A1

    1:50013/NG/0254 N056/22/006

    20898

    SITE PLAN

    SHEET 1 OF 1 SHEET 1 OF 3

    EN020001

    PINS SHEET 32 OF 70

    AG JB PB

    DESIGN DRAWINGS(REGULATION 5 (2)(o))

    SHEET 32 OF 70BRISTOL CITY COUNCIL

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc

    ETL

    A AUG '13 FOR S.42 & S.47 CONSULTATION

    MAY '14 CFK

    Reference Drawings

    GIB

    GIB

    GIB

    SGT1 SGT2

    NEW EQUIPMENT

    AIB

    CT - CURRENT TRANSFORMER

    - AIR INSULATED BUSHING

    SANDFORD

    AIBAIB

    AIB

    SA

    CVT

    AIBAIB

    AIB

    SA

    ES

    CVT CVT

    CT

    AIBAIB

    CT CT CT

    AIB

    AIB

    AIBAIB

    AIB

    AIB AIB

    CVT CVT

    HINKLEY POINT

    SA

    CVT

    SA SA

    ES

    CVT CVT

    CT SACT

    SA

    AIB

    SA

    SA

    ES

    CVT

    ES ES

    ACCESS ROAD

    M.K.

    132k

    V

    GIS

    SWIT

    CH

    GE

    AR

    CO

    NTR

    OL

    BUIL

    DIN

    G

    BW1 -

    RA

    DSTO

    CK

    T P

    ORTI

    SHE

    AD

    RO

    UTE

    OF

    CABLE

    TO

    BE

    AD

    DE

    D

    G1 -

    CH

    UR

    CHIL

    L T

    AV

    ON

    MO

    UTH

    RO

    UTE

    OF

    CABLE

    TO

    BE

    AD

    DE

    D

    BW2 -

    RA

    DSTO

    CK

    T P

    ORTI

    SHE

    AD

    RO

    UTE

    OF

    CABLE

    TO

    BE

    AD

    DE

    D

    DA2 -

    BR

    ADLE

    Y

    STO

    KE

    RO

    UTE

    OF

    CABLE

    TO

    BE

    AD

    DE

    D

    DA1 -

    IRO

    N

    ACTO

    N

    RO

    UTE

    OF

    CABLE

    TO

    BE

    AD

    DE

    D

    SEABANK 132kV SUBSTATION

    2VL1PYLON

    EXISTING

    SWITCHROOM33kV

    LD132NEW PYLON

    SEABANK 400kV SUBSTATION

    GIB

    GIB

    GIB

    SGT1 SGT2

    G2 -

    WESTO

    N

    RO

    UTE

    OF

    CABLE

    TO

    BE

    AD

    DE

    D

    - FLOOD WALL FOUNDATION

    SEABANK 400kV/132kV SUBSTATION

    13/NG/0255 (PINS SHEET 34)SEABANK 400kV/132kV SUBSTATION ELEVATIONS -

    6.4m APPROXSLIDING ACCESS GATE

    4m APPROXSLIDING ACCESS GATE

    CO

    NTR

    OL

    BUIL

    DIN

    G

    B FOR DCO SUBMISSION LD JB

    B

  • Tank

    Chy

    Tanks

    WB

    Drain

    Tanks

    WA

    S

    H

    ING

    P

    OO

    L

    Furnace

    D

    rain

    Drain

    Tank

    Drain

    SEVERN ROAD

    Foot Bridge

    Tank

    Tank

    D

    rain

    D

    r

    a

    in

    Tank

    LANE

    (TK)

    Drain

    Drain

    Tank

    GP

    AB

    LE

    TO

    N

    LA

    NE

    Tank

    Chy

    Drain

    Works

    Tank

    Tank

    Tank

    Drain

    Tank

    D

    rain

    Tank

    Tanks

    Tank

    D

    rain

    6.4m

    Stuppill

    Rhine

    D

    rain

    Tank

    CH

    ITT

    EN

    ING

    RO

    AD

    Crook's Marsh

    6.4m

    Tank

    Chys

    Tank

    D

    rain

    Tank

    Tank

    Works

    Tank

    Tank

    Tanks

    Drain

    D

    rain

    Works

    Drain

    Drain

    D

    r

    a

    in

    Tank

    CH

    ITT

    EN

    ING

    RO

    AD

    WB

    Drain

    SE

    VER

    N

    RO

    AD

    Drain

    Drain

    Pipe Line

    Drain

    GR

    EE

    NSP

    LO

    TT

    RO

    AD

    Drain

    7.0m

    Drain

    Pipelin

    e

    D

    rain

    6.7m

    Drain

    Drain

    Stuppill

    Rhine

    Drain

    Drain

    Drain

    Tank

    Red

    Rhine

    Drain

    Tk

    Pipe

    Line

    Drain

    6.7m

    Crook's Marsh

    Drain

    D

    rain

    Dra

    in

    D

    r

    a

    in

    Drain

    Drain

    s

    Seabank Power Station

    D

    rain

    M

    ean

    MP 13.25

    W

    arth

    Mud

    C

    hittening

    9.4m

    P

    ipe

    L

    ine

    Wa

    t

    e

    r

    Seabank Power Station

    Drain

    D

    rain

    9.4m

    D

    rain

    SP

    H

    igh

    SE

    VE

    RN

    RO

    AD

    Tanks

    Drain

    Chy

    Seabank Power Station

    6.7m Drain

    Crook's Marsh

    Drain

    Drain

    Tk

    D

    rain

    T

    rav

    C

    D

    rain

    Drain

    ETL

    ETL

    Pond

    D

    rain

    7.0m

    Drain

    s

    MP 13.5

    SE

    VE

    RN

    Drain

    D

    rain

    Pond

    Drain

    7.6m

    Drain

    Drain

    Drain

    RO

    AD

    Drain

    Seabank Power Station

    Drain

    D

    rains

    9.1m

    Pond

    P

    ip

    e

    L

    in

    e

    Drain

    ABLE

    TON

    LANE

    Drain

    6.4m

    D

    rain

    D

    rain

    D

    rain

    Drain

    Drain

    Drain

    6.4m

    Tanks

    El Sub Sta

    Pond

    Tank

    Pond

    Pond

    Pond

    Mast

    Pond

    Depot

    Pond

    P

    ath

    Depot

    Depot

    Depot

    Depot

    Drain

    D

    r

    a

    in

    Drain

    RH

    Bo

    r

    o

    Cons

    t

    &

    UA

    Bdy

    SD

    Co

    Cons

    t

    &

    CP

    Bdy

    De

    f

    SD

    SD

    SD

    Und

    Und

    Co

    Const

    &

    CP

    Bdy

    0.30m

    FF

    Boro

    Const

    &

    UA

    Bdy

    Co

    Const

    &

    CP

    Bdy

    Boro

    Const

    &

    UA

    Bdy

    FF

    0.30m

    FF

    Co

    Const

    &

    CP

    Bdy

    Boro

    Const

    &

    UA

    Bdy

    Boro

    Const

    &

    Co

    Const

    & CP

    Bdy

    UA

    Bdy

    SD

    FF

    C

    o

    C

    onst

    &

    C

    P

    B

    dy

    B

    oro

    C

    onst

    &

    UA

    B

    dy

    RH

    BP

    LP

    ETL

    T

    anks

    6.

    7

    m

    T

    k

    Drain

    M

    ast

    D

    epot

    AIBAIB

    AIB

    SA

    AIB

    ES

    ACCESS ROAD

    132k

    V

    GIS

    SWIT

    CH

    GE

    AR

    CO

    NTR

    OL

    BUIL

    DIN

    G

    2VL1PYLON

    EXISTING

    SWITCHROOM33kV

    ES

    SA

    PI

    FENCEEXISTING BOUNDARY

    SGT1 SGT2

    BO

    UN

    DAR

    Y

    FEN

    CE

    EXIS

    T IN

    G

    SIT

    E

    SEABANK 132kV SUBSTATION

    c1b1

    a1n

    abc

    ABC N

    RBY

    N

    c1b1

    a1

    n

    a b c

    CBA N

    CVT

    GIB

    GIB

    SGT4

    LP

    CAD

    A1

    1:50013/NG/0253 N056/22/006

    20898

    SITE PLAN

    SHEET 1 OF 1 SHEET 2 OF 3

    1:5000 10m 20m 30m

    National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc

    EN020001

    EQUIPMENT TO BE REMOVED

    PINS SHEET 33 OF 70

    A AG JB PB

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No.

    Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

    DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    Site Map

    DESIGN DRAWINGS(REGULATION 5 (2)(o))

    SHEET 33 OF 70BRISTOL CITY COUNCIL

    13/J2M/2040014. BASED ON ORGINATORS DRAWING No;

    3. THIS DRAWING IS FOR PLANNING PURPOSES ONLY.

    SUBSTATION.IMPEDE THE FUTURE DEVELOPMENT OF THE MAINTAINED. ANY PROPOSED CHANGES MUST NOT PROVIDED THAT THE SPECIFIED CLEARANCES ARE ADJUSTED TO SUIT MANUFACTURER'S EQUIPMENT 2. ALL DIMENSIONS SHOWN ARE TYPICAL AND MAY BE

    OTHERWISE STATED.1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS

    - EQUIPMENT TO BE REMOVED- EXISTING EQUIPMENT

    CVT - CAPACITOR VOLTAGE TRANSFORMER AIB - AIR INSULATED BUSHING

    13/NG/0255 (PINS SHEET 34)SEABANK 400kV/132kV SUBSTATION ELEVATIONS -

    ORDNANCE SURVEY. OS LICENCE NO. 100048471 CROWN COPYRIGHT HER MAJESTY'S STATIONERY OFFICE.

    OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER REPRODUCED FROM ORDNANCE SURVEY MAPS. BY PERMISSION

    Reference Drawings

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    AUG'13 FOR S.42 & S.47 CONSULTATION

    MAY '14 CFK

    PI - POST INSULATOR GIB - GAS INSULATED BUSBAR

    SA - SURGE ARRESTOR

    ES - EARTH SWITCH

    C

    B

    B A

    C

    A

    SEABANK 400kV SUBSTATION

    SGT - SUPER GRID TRANSFORMER

    SEABANK 400kV/132kV SUBSTATION

    B FOR DCO SUBMISSION LD JB

    B

  • NATIONAL GRID WORKSWPD WORKS

    REFERENCE DRAWINGS

    - NEW EQUIPMENT- EQUIPMENT BEING REMOVED- EXISTING EQUIPMENT

    1:3000 10m 20m 30m

    National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc

    ORDNANCE SURVEY. OS LICENCE NO. 100048471 CROWN COPYRIGHT HER MAJESTY'S STATIONERY OFFICE.

    OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER REPRODUCED FROM ORDNANCE SURVEY MAPS. BY PERMISSION

    SECTION A - A

    SECTION B - B

    SECTION C - C

    PART SHOWN FOR CLARITYFLOOD DEFENCE WALL SUBSTATION FENCE &

    13000

    11000

    3099

    4000

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No.

    Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

    DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:30013/NG/0255 N056/22/004

    20898

    SHEET 1 OF 1 SHEET 3 OF 3

    EN020001

    PINS SHEET 34 OF 70

    AG JB PB

    A AUG '13 FOR S.42 & S.47 CONSULTATION

    MAY '14 CFK

    SITE ELEVATIONS

    5400

    13000

    11000

    5400

    4000

    4000

    (PINS SHEET 32)13/NG/0253 (PINS SHEET 33) & 13/NG/0254 SEABANK 400kV/132kV SUBSTATION PLAN -

    SEABANK 400kV/132kV SUBSTATION

    G.L. 9.50m A.O.D

    6.75M A.O.DSUBSTATION LEVEL

    THIS DRAWING IS FOR PLANNING PURPOSES ONLY.4.

    13/J2M/2040001.BASED ON ORIGINATORS DRAWING No: 3.

    SUBSTATION.IMPEDE THE FUTURE DEVELOPMENT OF THE MAINTAINED. ANY PROPOSED CHANGES MUST NOT PROVIDED THAT THE SPECIFIED CLEARANCES ARE ADJUSTED TO SUIT MANUFACTURER'S EQUIPMENT ALL DIMENSIONS SHOWN ARE TYPICAL AND MAY BE 2.

    OTHERWISE STATED.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS 1.

    OMITTED FOR CLARITYSGT4 BEING REMOVED

    OMITTED FOR CLARITYSGT4 BEING REMOVED

    BRISTOL CITY COUNCILSHEET 34 OF 70

    (REGULATION 5(2)(o))DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    B FOR DCO SUBMISSION LD JB

    B

    13_NG_0251 Sandford 400_132kV Substation Site Plan13_NG_0252 Sandford 400_132kV Substation Site Elevations13_NG_0253 Seabank 400_132kV Substation Site Plan - Equipment to be Removed13_NG_0254 Seabank 400_132kV Substation Site Plan - New Equipment13_NG_0255 Seabank 400_132kV Substation Site Elevations