4‘; department ofhealth southern philippines … · -equipment rm-wash rm-scrub areae. recovery...

6
Republic of the Philippines 4‘; Department of Health . x SOUTHERN PHILIPPINES MEDICAL CENTER J.P. LAUREL Ave, Bajada, Davao City PROJECT REQUIREMENTS/PARAMETERS Project Title: DESIGN AND BUILD OF 7-STOREY EYE INSTITUTE, DERMATOLOGY INSTITUTE, INFORMATION TECHNOLOGY & RESEARCH INSTITUTE, AND MEDICAL ARTS BUILDING Location: SPMC COMPOUND, J.P. LAUREL AVE., BAJADA, DAVAO CITY Scheme: DESIGN & BUILD Project Duration: 720 CALENDAR DAYS General Parameter: DESIGN AND BUILD OF 7-STOREY EYE INSTITUTE, DERMATOLOGY INSTITUTE, INFORMATION TECHNOLOGY & RESEARCH INSTITUTE, AND MEDICAL ARTS BUILDING Specific Requirements: 1. Details of the design shall include, but not limited to, the following hospital requirements (Total Floor Area = 9,275 sq.m.): I. GROUND FLOOR: Total Floor Area = 1,400 sq.m. 1. COMMON AREAS a. MAIN LOBBY - COFFEE SHOP b, ELEVATOR LOBBY A & B - STAIRS - ELEVATORS c. TOILET MALE / FEMALE d. ATM MACHINES e. OFFICE HALLWAYS f. RAMP 2. PHARMACY a. DISPLAY AREA b. STORAGE AREA c. OFFICE A - TOILET d. OFFICE B e. REFRIGERATION ROOM 3. BILLING & ACCOUNTING OFFICE a. LOCKER ROOM b. CASHIER ROOM c. ACCOUNTING HEAD OFFICE 4. ADMINISTRATION OFFICE a. ADMIN. HEAD OFFICE - PANTRY & TOILET 5. CONFERENCE ROOM STORAGE ROOM 6. ANIMAL LABORATORY a. WASH & DRY b. LABORATORY AREA c. OFFICE d. TOILET 7. RESTAURANT AREA a. DINING AREA b. TOILET c. KITCHEN Page 1 of 6

Upload: others

Post on 15-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 4‘; Department ofHealth SOUTHERN PHILIPPINES … · -equipment rm-wash rm-scrub areae. recovery room f. pre-operating room-toiletg.watcher's anteroom-toilet3. ophtha equipment storage

Republic of the Philippines 4‘;Department of Health . x

SOUTHERN PHILIPPINES MEDICAL CENTERJ.P. LAURELAve, Bajada, Davao City

PROJECT REQUIREMENTS/PARAMETERS

Project Title: DESIGN AND BUILD OF 7-STOREY EYE INSTITUTE, DERMATOLOGYINSTITUTE, INFORMATION TECHNOLOGY & RESEARCH INSTITUTE, ANDMEDICALARTS BUILDING

Location: SPMC COMPOUND, J.P. LAURELAVE., BAJADA, DAVAOCITY

Scheme: DESIGN & BUILD

Project Duration: 720 CALENDAR DAYS

General Parameter: DESIGN AND BUILD OF 7-STOREY EYE INSTITUTE, DERMATOLOGYINSTITUTE, INFORMATION TECHNOLOGY & RESEARCH INSTITUTE, ANDMEDICALARTS BUILDING

Specific Requirements:

1. Details of the design shall include, but not limited to, the following hospitalrequirements (Total Floor Area = 9,275 sq.m.):

I. GROUND FLOOR: Total Floor Area = 1,400 sq.m.1. COMMON AREAS

a. MAIN LOBBY- COFFEE SHOP

b, ELEVATOR LOBBY A & B

- STAIRS- ELEVATORS

c. TOILET MALE / FEMALEd. ATM MACHINESe. OFFICE HALLWAYSf. RAMP

2. PHARMACYa. DISPLAY AREAb. STORAGE AREAc. OFFICE A

- TOILETd. OFFICE B

e. REFRIGERATION ROOM3. BILLING & ACCOUNTING OFFICE

a. LOCKER ROOMb. CASHIER ROOMc. ACCOUNTING HEAD OFFICE

4. ADMINISTRATION OFFICEa. ADMIN. HEAD OFFICE

- PANTRY & TOILET5. CONFERENCEROOM

— STORAGE ROOM6. ANIMAL LABORATORY

a. WASH & DRYb. LABORATORY AREAc. OFFICEd. TOILET

7. RESTAURANT AREAa. DININGAREAb. TOILETc. KITCHEN

Page 1 of 6

Page 2: 4‘; Department ofHealth SOUTHERN PHILIPPINES … · -equipment rm-wash rm-scrub areae. recovery room f. pre-operating room-toiletg.watcher's anteroom-toilet3. ophtha equipment storage

- TOILET8. UTILITY ROOM9. ELECTRICAL ROOM10. MECHANICAL ROOM11. GENERATOR ROOM

ll. MEZZANINE FLOOR: Total Floor Area = 1,020 sq.m.1. COMMON AREAS

a. ELEVATOR LOBBY A & B

- ELEVATORS- STAIRS

b. TOILETSc. HALLWAYSCI. RAMP

2. RECEPTION AREA- LOCKER ROOM- INFO. RECEIVING AREA

3. REPAIR AREAa. TECHNICAL RECEPTION ROOMb. REPAIR ROOM

- TERRACE- STORAGE ROOM

b. PANTRY- TOILET

4. DNM OFFICE- DNM HEAD OFFICE

a. IHOMP HEAD OFFICEb. CONSU LE

5. SSD OFFICE- SSD HEAD OFFICE

a. UPS ROOMb. RECORDS ROOMC. SERVER ROOMd. MAIN STORAGE

6. KM OFFICE- KM HEAD OFFICE

a. COMPUTER LABORATORYb. CONFERENCEROOM

7. UTILITY ROOM8. ELECTRICAL ROOM9. MECHANICAL ROOM

Ill. SECOND FLOOR: Total Floor Area = 1,015 sq.m.1. COMMON AREAS

a. ELEVATOR LOBBY A & B

- ELEVATOR- STAIR

b. HALLWAYSc. RAMP

2. OPHTHA OPERATING ROOMa. ANTEROOM (entry)

- LOCKER w/ TOILETb. NURSE‘S STATION & WORK AREA

— MEDICAL ROOM- PANTRY

c. CENTRAL SUPPLY AREA- WASHING ROOM- PACKING RM— REVERSE OSMOSIS/EO. RM-H|GH & LOW TEMP MACHINE RM-STER|LE STORAGE- REALEASING RM- UTILITY & TOILET RM

d. 2 - OPERATING ROOMS

Page 2 of 6

Page 3: 4‘; Department ofHealth SOUTHERN PHILIPPINES … · -equipment rm-wash rm-scrub areae. recovery room f. pre-operating room-toiletg.watcher's anteroom-toilet3. ophtha equipment storage

- EQUIPMENT RM- WASH RM- SCRUB AREA

e. RECOVERY ROOMf. PRE-OPERATING ROOM

- TOILETg. WATCHER'S ANTEROOM

- TOILET3. OPHTHA EQUIPMENT STORAGE ROOM3. RADIOLOGY AREA

- WORK STATION RM- STORAGE ROOM

4. TELEMEDICINE AREA-WORK STATION AREA- TELE PSYCHIATRY- TELE DERMATOLOGY- TELE CONSULTANCY

6. CONFERENCEHALL7. UTILITY ROOM8. ELECTRICAL ROOM9. MECHANICAL ROOM

IV. THIRD FLOOR: TotaI Floor Area =1,120 sq.m.1. COMMON AREAS

a. ELEVATOR LOBBY- ELEVATOR— STAIR

b. TOILETS MALE / FEMALE0. HALLWAYSd. WAITING AREAS0. CPD REGISTRATION AREAd. INFORMATION AREA

. CASHIER PHIC. SOCIAL SERVICE3. VISUAL ACUITY & REFRACTION

a. EXAM ROOMS4. DIAGNOSTIC & EMR INFRA.

a. DIAGNOSTIC ROOMSb. LASER ROOMS

5. DR. OFFICESa. LIBRARYb. CONFERENCEROOMc. LOUNGE AREAd. 2 BEDS OPERATING ROOMS

6. NEORO. OPTHA/ STRABISMUSa. SUB SPEC 1 /ORBIT CLINICSb. No

7. PEDIA OPTHAa. REFRACTIONb. UVIETISc. CORNIAd. ED

8. CATARACTa. CONSULTATION ROOMS

9. ORTHOPTICSa. PEDIATRICS EXAM ROOMSb. CONSULTATION ROOMSc. RETINA

10. UTILITY ROOM11. ELECTRICAL ROOM12. MECHANICAL ROOM

M

V. FOURTH FLOOR: Total Floor Area = 1,120 sq.m.1. COMMON AREAS

a. ELEVATOR LOBBY A & B

- ELEVATOR

Page 3 of6

Page 4: 4‘; Department ofHealth SOUTHERN PHILIPPINES … · -equipment rm-wash rm-scrub areae. recovery room f. pre-operating room-toiletg.watcher's anteroom-toilet3. ophtha equipment storage

- STAIRSb. TOILET MALE / FEMALEc. HALLWAYSd. WAITING AREA

RECEPTION AREA2. CONSULTATION ROOMS

- INFECTIOUS ROOM- PHOTO DOCUMENTATION RM

a. DERM SURGERY— STORAGE ROOM

3. CONFERENCE ROOM (45 Person capacity)4. DERMATOLOGY LIBRARY & COMPUTER ROOM

- RECORD ROOM5. DERMPATH AREA

. PHOTOTHERAPYb. TOILETc. CLINIC‘Sd. LASER ROOM'Sef.

{D

. CONTACT DERMDOCTOR'S OFFICE

g. LABORATORY- STAINING- DARK ROOM

6. DOCTOR'S LOUNGE- PANTRY- TOILET

7. UTILITY ROOM8. MECHANICAL ROOM9. ELECTRICAL ROOM

VI. FIFTH FLOOR: Total Floor Area = 1,050 sq.m.1. COMMON AREAS

a. ELEVATOR LOBBY A & B

- ELEVATOR- STAIR

b. TOILET MALE / FEMALE0. HALLWAYS

2. ENDOSCOPYAREA— ENDOSCOPYRM w/ TOILET

a. ANTEROOM- LOCKER ROOM W/TOILET

b. RECOVERY ROOM— TOILET—NURSE STATION & OFFICE

c. EQUIPMENT WASH AREA- PANTRY- TOILET

5. CONFERENCEROOM (65 Person Capacity)5. CONFERENCE ROOM (65 Person Capacity)6. DEPT. HEAD OFFICE

a.. SECRETARY/RECEIVINGB. OFFICE LOUNGE0.. CONFERENCEROOM6. OFFICE

- PANTRY- TOILET

6. SIMULATION AREAa.OB SIMULATOR ROOM 1&2b. CONTROL ROOM0. VIEWING AREA (50 Person Capacity)d. SHRUB ROOMd. OR ANESTHESIA ROOM

7. STOCK ROOM

Page 4 of 6

Page 5: 4‘; Department ofHealth SOUTHERN PHILIPPINES … · -equipment rm-wash rm-scrub areae. recovery room f. pre-operating room-toiletg.watcher's anteroom-toilet3. ophtha equipment storage

8. DOCTOR'STOILET9. UTILITY ROOM10. MECHANICAL ROOM11. ELECTRICAL ROOM

VII. SIXTH FLOOR: Total Floor Area = 1,050 sq.m.1. COMMON AREA

a. ELEVATOR LOBBYA & B

- ELEVATOR- STAIR

b. INFORMATION AREAc. WAITING AREAd. TOILET'S MALE & FEMALEe. CANTEENf. HALLWAY'Sg. DOCTOR'STOILET

2. (34 units) DOCTOR'S CLINIC3. UTILITY ROOM4. MECHANICAL ROOM5. ELECTRICAL ROOM

VIII. SEVENTH FLOOR: Total Floor Area = 1,050 sq.m.1. COMMON AREAS

a. ELEVATOR LOBBYA & B

- ELEVATOR- STAIR

b, TOILETS MALE & FEMALE0. INFORMATION AREAd. WAITING AREAe. CANTEENf. HALLWAYSg. DOCTOR'STOILET

2. (27 units) DOCTOR'S CLINIC3. FERTILITY & REPRODUCTIVE HEALTH CLINIC4. UTILITY ROOM5. MECHANICAL ROOM6. ELECTRICAL ROOM

IX. ROOFDECK:Total Floor Area = 450 sq.m.1. COOLING TOWER AND CHILLER DECK2. STAIRS

X. HOSPITAL RAMP (GROUND FLOOR TO SECOND FLOOR) — STANDARD SIZE

XI. COVERED CONNECTING BRIDGE AT SECONDFLOOR (BETWEEN ACUTECARE INSTITUTE AND EYE INSTITUTE): MinimumWidth = 2.5 m

XII. TWO (2) HOSPITAL BED ELEVATORS (GROUND FLOOR TO SEVENTH FLOOR)

2. Design Output 8. Plans:

a. Architectural Requirementsi. Plans

Perspective, Vicinity Map, & Site Development PlanFloor Plans with Area Tabulation & Schedule of FinishesElevations & Sectional Views with SpecificationsReflected Ceiling PlansSchedule of Doors & WindowsStairwells Detailed Plans, Elevations & SectionsElevator Plans, Elevations & SectionsDetailed Plans of Comfort Rooms

. Detailed Plans of Counters & Cabinetsii. Specifications

b. Structural Requirementsi. Soil InvestigationReport

ww~¢wewwe

Page 5 of 6

Page 6: 4‘; Department ofHealth SOUTHERN PHILIPPINES … · -equipment rm-wash rm-scrub areae. recovery room f. pre-operating room-toiletg.watcher's anteroom-toilet3. ophtha equipment storage

Structural Analysis & Design Report1. Superstructure: Steel, Reinforced Concrete, or Composite Framing2. Substructure: ReinforcedConcrete Foundation

PlansConstruction NotesFoundation Plan 8. DetailsSchedule of Columns with DetailsSchedule of Beams with DetailsFloor Framing PlansSchedule of Floor Slabs with Details

. Roof Framing Plan 8. Details

weuewwe

0. Electrical PlanI.

ii,

iii.

iv.v.vi.vii.

d. Mechanical Plansi.

ii.iii.

vi.

General Notes & StandardSpecificationsLighting LayoutPower Layout (Hospital Grade)Schedule of Electrical Load and Design ComputationSingle Line Riser DiagramAuxiliary System

Structural Cabling / LAN LayoutTelephone/PABXSystemSecurity/CCTV SystemFire Alarm SystemPublic Address Paging SystemNurse Call System

mmewwe

General Notes & StandardsSpecificationsFire Protection System & Fixtures

1. Fire Sprinkler Protection Plans & Details2. Water Storage Tank Plan & Details3. Piping & Instrumentation Diagram Design Layout

Medical Gas Lines Layout (Oxygen, Medical Air & Vacuum)1. Piping & InstrumentationDiagram Design Layout

Air-conditioning & Ventilation System (HVAC)1. Mechanical Layout per Floor2. Detail of Mechanical Fixtures3. Schedule of Loads of Mech. Fixtures4. Piping & InstrumentationDiagram Design Layout5. Ducting & Instrumentation Diagram Design Layout

Elevator Design Layout1. Detailed Mechanical Layout2. Machine Roomless

e. Plumbing PlansI.

ii.iii.

iv.v.vi.vii.

Prepared and Submitted By:

Engineering & Facilities Management Head

General Notes & StandardsSpecificationsWaterline LayoutSanitary & Drainage LayoutIsometric LayoutSeptic Vault Plans & DetailsCatch Basin Plans 8. Details

Approved by:

Page 6 of 6