CREATING NEW PROJECT
PT. Yokogawa IndonesiaWisma Aldiron Dirgantara 2nd floor, suite 202-209Jl. Jend. Gatot Subroto Kav.72 Jakarta 12780
Phone : 021-799 0102, Fax : 021-799 0070
CREATING NEW PROJECT
Engineering Course
-
7/23/2019 5. VPEG Project Creation IOM (1)
2/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
Engineering Work Flow
Start
Start System View
Step 1: Project Creation
Create necessary folders for target system
Step 2: Defining Project Common Item
Define security function
Define operation marks
Step 3: Defining FCS Control Functions
Define FCS station configuration
Define Process I/O modules
Define Software I/O
Define Messages Define Regulatory Control Functions
Define Sequence Control Functions
Step 4: Defining HIS Control Funct ions
Define HIS station configuration
Define HIS constants
Define Function Keys assignment Scheduler Function
Trend Recording Functions
Define Sequence Message
Define User-defined windows
Define Help Dialog
Step 5: Conduct ing Test Function
Run a Virtual Test Function Page B4
-
7/23/2019 5. VPEG Project Creation IOM (1)
3/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
Specification Review
Review the I/O list, process controlmethods and necessary hardware.
Basic Design
Using organized and structuredwindows to realize the desired control
functions (regulatory control, sequence
control and unit supervision) and the
operation and monitoring functions.
Detailed Design
Design detailed items (program
configuration, creation of data list) forthe regulatory control, sequence
control, unit supervision and the
operation and monitoring windows
according to the basic design.
Engineering Work Flow
-
7/23/2019 5. VPEG Project Creation IOM (1)
4/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
System GenerationConstruct a system using various
builders based on the basic design and
detailed design.
Unit TestCheck the control loop operation as well
as the operation and monitoring
windows by using the virtual test
function.
Integration Test
Using the actual FCS, check the overall
validity of functions and execution
timings that were checked individually
through the unit test.
Engineering Work Flow
-
7/23/2019 5. VPEG Project Creation IOM (1)
5/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
Start UpInstall and wire the target machine,
carry out test operation and then
normal operation.
Maintenance
Back up engineering data, inspect
hardware, etc.
Expansion and Modification
Expand the station, as well as add and
change functions.
Review the I/O list, process control
methods and necessary hardware.
Engineering Work Flow
-
7/23/2019 5. VPEG Project Creation IOM (1)
6/37PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
Project Creation
ProjectProjects Attribution Utilitys Attribution Utility
Click
Click
In the Yokogawa Centum Menu selectProjects Attribution Utility
-
7/23/2019 5. VPEG Project Creation IOM (1)
7/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
ProjectProjects Attribution Utilitys Attribution Utility
A B C
D E F G
A.A. Project nameProject nameShows the projects that have beenregistered.
B.B. LocationLocationShows the location/directory wherethe project file reside
C.C. Project AttributeProject AttributeShows the attribute of the
registered projects.D.D. RegisterRegister
Button used to register newprojects.
E.E. ChangeChangeButton used to change projects
attribute.
F.F. DeleteDeleteButton used to remove projectsregistration information
G.G. ExitExitButton used to finish/exit projectregistration utility.
Project Creation
-
7/23/2019 5. VPEG Project Creation IOM (1)
8/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
Registering Project DatabaseRegistering Project Database
Locate your project database file, folder name mustnot contain space.
Click
Select your project
Project name registered isshown here
Select projectattribute *
* For active project, select Current Project
1
2
3
4
Project Creation
-
7/23/2019 5. VPEG Project Creation IOM (1)
9/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
Registering Project DatabaseRegistering Project Database
Project has beenregistered !
Project Creation
-
7/23/2019 5. VPEG Project Creation IOM (1)
10/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
Changing Project Database AttributeChanging Project Database Attribute
Select/highlight theproject its attributeyou want to change.
Select attribute
1
2
3
4
5
Project Creation
-
7/23/2019 5. VPEG Project Creation IOM (1)
11/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
Default Current User-defined
Created the first time when theSystem View starts
Yes - -
Virtual test with the FCS simulator. Yes Yes but target test Yes
Can be downloaded to the FCS of the
target system
Yes but off line Yes but on line No
Can be downloaded to HIS. Yes Yes No
Multiple projects can be created inSystem View.
No No Yes
Page C1
When any one of the FCSs created in default project is successfully downloaded, theattribute changes to a current project.
Project Attribute - Differences
-
7/23/2019 5. VPEG Project Creation IOM (1)
12/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION
To create a project for the first time, start the Sy s t em V ie w .
Microsoft WindowsStart button
-
7/23/2019 5. VPEG Project Creation IOM (1)
13/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION
This message windowpops up if theres no aproject registered. Itwill also pops up whencreating project for thefirst time.
Respond by clicking
Yes button.
-
7/23/2019 5. VPEG Project Creation IOM (1)
14/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION
Fill in the user and project information
below. Project information should not be leftblank, otherwise project creation willterminate.
Create a name for your project name. A project name is analphanumeric character string, maximum 8 characters. The first
character of a project must be an alphabet.
The project position is the volume / folder where your project folder(database) is located in the hardisk.The default position isC: \ CEN TUMVP \ ENG \ B KPROJECT \ X X XXXXXX
-
7/23/2019 5. VPEG Project Creation IOM (1)
15/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
-
7/23/2019 5. VPEG Project Creation IOM (1)
16/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
-
7/23/2019 5. VPEG Project Creation IOM (1)
17/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
-
7/23/2019 5. VPEG Project Creation IOM (1)
18/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
-
7/23/2019 5. VPEG Project Creation IOM (1)
19/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION
A project appears in the
System View when it iscreated and registered.
Next step is to createfirst FCS.
Select the type of the FCS(you may have to consultthe label attached to theFCS panel for the stationtype).
Select database type for yourFCS. Most of the time
Ge n e r a l - P u r p o s e is selected.
Define the correct domain and stationnumber. This is the address of yourstation in the system. The number sethere must correspond to the address setby hardware.
Additional information for the FCS.If left blank, will not impact system performance.
Click to finish. Whenclicked, the new FCSwill be generated.
http://7.%20vp%20common%20definition.ppt/#-1,9,Slide%209 -
7/23/2019 5. VPEG Project Creation IOM (1)
20/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION
Newly created FCS andother builder items areshown.
Next step is to create
first HIS/EWS.
Select the type of the HIS.Available types are:- PC with operation &
monitoring functions.- Enclosed display style
console type HIS.- Open display style
console type HIS.- Server type for remote
monitoring HIS.
Define the correct domain and stationnumber. This is the address of yourstation in the system. The number sethere must correspond to the address setby hardware.
Additional information for the FCS.If left blank, will not impact system performance.
Click to finish. Whenclicked, the new HIS
will be generated.
-
7/23/2019 5. VPEG Project Creation IOM (1)
21/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION
Newly created HIS andother builder items areshown.
You just have created a minimum configuration of aproject.
-
7/23/2019 5. VPEG Project Creation IOM (1)
22/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Adding New Station)
To add some other stations, you may right click on any icon/folder under System Viewfolder then select Cr e a t e N e w option. Pick a station type from the menu that pops up.
Click to add new FCS
Click to add new HIS
Click to add new BCV
Click to add new CGW
Click to add new SCS(ProSafe)
Click to add newother station type
-
7/23/2019 5. VPEG Project Creation IOM (1)
23/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Adding I/O Node)
To add I/O node: Expand the FCS folder, right-click IOM folder
Create new
Node
-
7/23/2019 5. VPEG Project Creation IOM (1)
24/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Adding I/O Node)
Select node type, either Lo c a l orR em o t e type.
Define the node number.This number corresponds to node
address hardware setting.
This section is used only in case ofremote node.
Setting for node power supplies.
Additional information for the node.
Click to finish. Whenclicked, the new I/O nodewill be generated.
-
7/23/2019 5. VPEG Project Creation IOM (1)
25/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Adding I/O Node)
Newly created Node isdisplayed after
generation.
Up to 10 nodes can beassigned in an FCS.
When a node is created and ready,you can now add I/O modules tothat node.
-
7/23/2019 5. VPEG Project Creation IOM (1)
26/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Adding I/O Module)
To add I/O module: Expand the IOM folder, right-click NODEXXXX folder
Create new
IOM
-
7/23/2019 5. VPEG Project Creation IOM (1)
27/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Adding I/O Module)
To add I/O module: Expand the IOM folder, right-click NODEXXXX folder
Create new
IOM
Select I/O module type. This mustconfirm with your field signal type.
Slot number of the I/O module.
Check this option if you assign aredundant I/O module.
Check this option for high speedreading.
Additional information(commentary) for the I/O module.
Click to finish. When clicked,the new I/O module will begenerated.
-
7/23/2019 5. VPEG Project Creation IOM (1)
28/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Creating I/O Module)
Newly created I/Omodule is displayed.
Up to 8 modules canbe assigned in a nodeunit if FCS is KFCS.
List of I/O modulesassigned in a node.
-
7/23/2019 5. VPEG Project Creation IOM (1)
29/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Creating I/O Module Tag Name)
To create I/O module tag name, double click on the I/Omodule to open its builder. In this example, lets createanalog & digital I/O module tag name (AAI143-S [Slot 1] andADV151-P [Slot 3]).
-
7/23/2019 5. VPEG Project Creation IOM (1)
30/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Creating I/O Module Tag Name)
I/O Module Builder (Analog)Click this button (Show/HideDetailed Setting Items) to show
this portion of builder.
L a b e l is the item that will be used in the control drawing.Analog I/O module tag name must have %% symbol as
prefix and followed by alphanumeric identifier. Note thatalphabet must come right after %% symbol.
Example%%TT101
Correct%%100TT101
Wrong (numeric comes after %% symbol)%%TT-101
Correct
Download
Download when finish creating
I/O module tag name.
1
2
3
-
7/23/2019 5. VPEG Project Creation IOM (1)
31/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
PROJECT CREATION (Creating I/O Module Tag Name)
I/O Module Builder (Digital)
Ta g N am e is the item that will be used in the controldrawing. Digital I/O module tag name usescombination of alphanumeric characters. Unlikeanalog I/O module tag name, %% symbol is notnecessary.
ExampleLSL102
Correct100LSL102
Correct100-LSL-102
Correct
Download
Download when finish creating
I/O module tag name.
Define the label forstatus indication here.
Define the color for
status indicationlabel here.
-
7/23/2019 5. VPEG Project Creation IOM (1)
32/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
I/O MODULE CREATION
Loop Diagram (1/5) Analog Input/Output
FieldMarshalling
CabinetDCS
Terminal Board
+_
+_
100-JBA-01
01
02
+_
900-CP-01TB-01
101
102
+_
900-TBA-01F1-AEA4D
01
02
Type AAI143Node 01Slot 01Channel 01
FCS0101
Black
White
+_
+_
100-JBA-01
03
04
+_
900-CP-01TB-01
103
104
+_
900-TBA-01F1-AEA4D
03
04
Type AAI143Node 01Slot 01Channel 02
FCS0101
Black
White
+_
+_
100-JBA-02
01
02
+_
900-CP-01TB-02
101
102
+_
900-TBA-01F2-AEA4D
01
02
Type AAI543Node 01Slot 02Channel 01
FCS0101
Black
White
TIC
101
PIC101
DR0002
DR0002
TT-101
PT-101
PV-101
DCS
I/O Module Software
I
-
7/23/2019 5. VPEG Project Creation IOM (1)
33/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
I/O MODULE CREATION
Loop Diagram (2/5) - Analog Input
FieldMarshalling
CabinetDCS
Terminal Board
+_
+_
100-JBA-01
05
06
+_
900-CP-01TB-01
103
104
+_
900-TBA-01F1-AEA4D
05
06
Type AAI143Node 01Slot 01Channel 03
FCS0101
Black
White
+_
+_
100-JBA-01
07
08
+_
900-CP-01TB-01
105
106
+_
900-TBA-01F1-AEA4D
07
08
Type AAI143Node 01Slot 01Channel 04
FCS0101
Black
White
LI
102
FI101
DR0002
DR0002
LT-102
FT-101
DCS
I/O Module Software
I
-
7/23/2019 5. VPEG Project Creation IOM (1)
34/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
I/O MODULE CREATION
Loop Diagram (3/5) Digital Input
FieldMarshalling
CabinetDCS
Terminal Board
+_
+_
100-JBD-01
01
02
+_
900-CP-02TB-11
103
104
+_
900-TBA-01R1-AEA5D
01
02
Type ADV115Node 01Slot 03Channel 01
FCS0101
Black
White
+_
+_
100-JBD-01
03
04
+_
900-CP-02TB-11
105
106
+_
900-TBA-01R1-AEA5D
03
04
Type ADV115Node 01Slot 03Channel 02
FCS0101
Black
White
LAL
102
LAH102
DR0003
DR0003
LSL-102
LSH-102
DCS
I/O Module Software
NC
NC
I
-
7/23/2019 5. VPEG Project Creation IOM (1)
35/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
I/O MODULE CREATION
Loop Diagram (4/5) Digital Input
FieldMarshalling
CabinetDCS
Terminal Board
+_
+_
100-JBD-01
05
06
+_
900-CP-02TB-11
107
108
+_
900-TBA-01R1-AEA5D
05
06
Type ADV551Node 01Slot 04Channel 03
FCS0101
Black
White
+_
+_
100-JBD-01
07
08
+_
900-CP-02TB-11
109
110
+_
900-TBA-01R1-AEA5D
07
08
Type ADV551Node 01Slot 04Channel 04
FCS0101
Black
White
LALL
102
LAHH102
DR0003
DR0003
LSLL-102
LSHH-102
DCS
I/O Module Software
NC
NC
-
7/23/2019 5. VPEG Project Creation IOM (1)
36/37
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
CS3KEG-Project Creation
PT YOKOGAWA INDONESIA
Training CenterTechnical Support Group
I/O MODULE CREATION
Loop Diagram (5/5) Digital Output
FieldInterposing
Relay CabinetDCS
Terminal Board
+_
+_
100-JBE-01
01
02
4
9
905-CP-02R-01 T-01
01
02
+_
900-TBA-01R4-ARM55W
01
02
Type ADV551Node 01Slot 04Channel 01
FCS0101
Black
White
+_
+_
100-JBE-01
03
04
03
04
+_
900-TBA-01R4-ARM55W
03
04
Type ADV551Node 01Slot 04Channel 02
FCS0101
Black
White
DR0003
SV-101
SV-102
DCS
I/O Module Software
I
905-CP-02R-02 T-01
4
9
110VAC
110VAC
-
7/23/2019 5. VPEG Project Creation IOM (1)
37/37
CS3KEG-Project Creation
PT. Yokogawa IndonesiaWisma Aldiron Dirgantara 2nd floor, suite 202-209
Jl. Jend. Gatot Subroto Kav.72 Jakarta 12780Phone : 021-799 0102, Fax : 021-799 0070