5 ways to increase productivity through bim

37
016 InEight Inc. All rights reserved. 5 Ways to Increase Productivity through BIM

Upload: michelle-scifers-mba

Post on 15-Apr-2017

72 views

Category:

Technology


1 download

TRANSCRIPT

PowerPoint Presentation

2016 InEight Inc. All rights reserved.5 Ways to Increase Productivity through BIM

1

Introduction

Current challenges

Solution - InfinyD

Agenda

2

Introduction to InEightInEight combines proven ability with a unified vision to help companies visualize, estimate, control and connect all aspects of their capital and maintenance projects, from the back office to the jobsite, across the project lifecycle. Helping project-driven companies since 1989More than 20,000 users in more than 500 companies across 33 countries

3

Sample CustomersMining

Oil & Gas

Utilities

Infrastructure

Building

4

Speaker Introduction

Andy KayhanfarVice President of Product Management

Former Director of Virtual Construction (Kiewit)Development and implementation of ERP-centric VDC programInitiation of a corporate VDC business as a shared service

5

BIM Adoption is Increasing

6

Why Stop There?

Source: McGraw-Hill Construction, The Business Value of BIM in North America Multi-Year Trend Analysis and User Ratings (2007-2012)

7

Current Challenges

8

5 Key Construction Management ChallengesLack of interoperability between systems hinders visibility

Missing data because each stakeholder focused only on their own requirements

Business and model data needs to be validated to avoid surprises

Project team works from multiple data sources with various outputs, leading to miscommunication and duplicative effort

Quantities need to be tracked and managed over time to avoid quantity creep

9

Challenge #1

Model File FormatsProject DataQuantitiesProcurementSchedulingProject ControlsResourcesField ManagementAsset ManagementLack of interoperability between systems hinders visibility

10

Missing data because each stakeholder focused only on their own requirementsChallenge #2

Source: The Information Economy A Study of Five Industries June 2014

CONSTRUCTION

Manufacturing

Financial Services

Media and Entertainment

S\\Software

11

Business and model data needs to be validated to avoid surprisesChallenge #3

12

Project team works from multiple data sources with various outputs, leading to miscommunication, duplicative effort and training of sustainable product.Challenge #4

Project Progress

Owner

13

Quantities need to be tracked and managed over time to avoid quantity creepChallenge #5

14

Solution - InfinyD

15

Fundamentals of BIMGather = Data Acquisition and HarmonizationFederates models from various design partners and discipline specific 3-D product platformsCatalogs your companies 3-D models and data in a BIM database (not a file)Generate = Data Augmentation Introduces Dimensions, the ability to add managed properties or metadata to the modelPerforms Custom Data Operations to automate existing property manipulation Reinforces a mature business system integration strategy to enable BIM for your enterprise and projectsAnalyze = Data ManagementMaintains version control of model submissions and business system informationProvides advanced search methods answering hundreds of questions from a single source Communicate = VisualizationSingle truth for model and data synchronization across the Windows, web and mobile clientsIndustry-leading approach to model, metadata and business system reporting Realize = Utilization to Improve OperationsFlexible 4-D user experience enables advanced VDC processes such as Just in Time deliveryField status the model data with MobilyD, reducing time and risk associated with dual data entry

Federates models from various design partners and discipline specific 3-D product platformsCatalogs your companies 3-D models and data in a BIM database (not a file)Introduces Dimensions, the ability to add managed properties or metadata to the modelPerforms Custom Data Operations to automate existing property manipulation Reinforces a mature business system integration strategy to enable BIM for your enterprise and projectsMaintains version control of model submissions and business system informationProvides advanced search methods answering hundreds of questions from a single source Single truth for model and data synchronization across the Windows, web and mobile clientsIndustry-leading approach to model, metadata and business system reporting

Flexible 4-D user experience enables advanced VDC processes such as Just in Time deliveryField status the model data with MobilyD, reducing time and risk associated with dual data entry

16

Typical Workflow

17

InfinyD Workflow

18

Model File FormatsProject DataQuantitiesProcurementSchedulingProject ControlsResourcesField ManagementAsset Management

Challenge #1Lack of interoperability between systems hinders visibilitySolution: Gather = Data Acquisition and Harmonization

19

Gather - Data Acquisition & Harmonization

Missing data because each stakeholder focused only on their own requirementsChallenge #2Solution: Generate = Data Augmentation

ProcureScheduleField DataCollectionEstimate

21

ProcureScheduleEstimate

Field DataCollectionDimensions

Generate - Data Augmentation

22

Business and model data needs to be validated to avoid surprisesChallenge #3Solution: Analyze = Data Management

23

Analyze - Data Management

24

Analyze - Data Management

Not DeliveredDeliveredInstalled

25

Project team works from multiple data sources with various outputs, leading to miscommunication, duplicative effort and training of sustainable product.Challenge #4Solution: Communicate = Visualization

26

Communicate Visualization

27

Communicate Visualization

Quantities need to be tracked and managed over time to avoid quantity creepChallenge #5Solution: Realize = Utilization to Improve Operations

29

Realize Utilization to Improve Operations

Realize Utilization to Improve Operations

Design Submission 1Design Submission 2491 L.F.464 L.F.

31

Improve Operations- Procurement Process

32

Project Information Model (PIM) and Asset Information Model (AIM)Procure

Construct

CommissionEngineer

Define

Maintain

Design Authoring

Procurement

Project Execution

Asset Management

Facility Maintenance

ContractorsOwner/OperatorsEngineeringIndustrySolutionCoverage

33

Procure

Construct

CommissionEngineer

Define

Maintain

Design Authoring

procurement

Project Execution

Asset Management

Services &maintainance

ContractorsOwner/OperatorsEngineeringCoverage

GatherGenerateGenerateAnalyzeAnalyzeCommunicateRealizeRealizeGenerateAnalyzeRealizeProject Information Model (PIM) and Asset Information Model (AIM)

34

From the back office to the jobsite, InEight solutions can be leveraged across all steps of the project lifecycle to provide the visibility and control needed to achieve business success.Single Version of the TruthBi-directional integration with Primavera P6 and Microsoft Project schedules enables time-phased estimates and schedule analysisIntegrations available across leading project accounting and ERP platforms Create quantity-based estimates and budgetsChange order costingBenchmarkingShort interval planning, claiming and commissioningPlan progress and quantities consumedEquipment inspection and maintenanceEstablish resource plans in preparation for interval planningQuantity-based planning and executionQuantity-based measurement and reporting

Comprehensive 4-D,5-D, and n-D visual reportingAll as-built details captured in single viewerOwner benefits from unified visual model with complete as-built details and documentationEnterprise reports and dashboards across the project lifecycle

Various design models leveraged to create unified model

Bi-directional integration with Microsoft Excelenables embedding of custom calculations and company best practices for more accurate estimates

Quantity and Material Take-off (QTO/MTO) speeds creation of accurate estimatesQuickly build estimates based on standard cost libraries

35

Respond to the post-webinar survey

Contact us for more details

[email protected](800) 637-7496(480) 776-2900www.ineight.comNext Steps

36

Thank You!

37