EXISTING 50th STREET ȭ PROFILE 668 672 676 680 684 688 692 696 668 672 676 680 684 688 692 696 0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700 55 AVENUE 52 AVENUE WHITEMUD DRIVE 50 STREET 50 STREET WHITEMUD DRIVE 55 AVENUE LIMIT OF PROJECT SIGN STRUCTURE & PANELS TO BE RELOCATED (PROTECTION IS REQUIRED) BUS STOP 2013 ADV. WARNING SIGNAL TO BE RELOCATED (PROTECTION IS REQUIRED) RELOCATED CLOSE EXISTING ACCESS LIMIT OF PROJECT LIMIT OF PROJECT LIMIT OF PROJECT R60 REMOVE EXISTING WALK BE RELOCATED 3.0m MULTI-USE TRAIL 3.95 3.70 4.45 3.70 3.70 4.20 3.70 3.70 3.95 3.55 4.20 4.45 3.70 3.70 3.70 3.95 3.95 7.65 3.55 3.95 3.95 3.70 3.70 4.45 7.65 3.70 60m TAPER RELOCATED 3.95 EXISTING BUS STOP 2279 7.65 RELOCATED RELOCATED 6.0 50m BAY R15 50m BAY 4.20 4.45 7.65 R60 R35 3.0m MULTI-USE TRAIL 90m BAY R15 R15 R15 BUS STOP 2751 80m BAY EX. TAPER EX. TAPER 85m BAY 3.75 3.70 3.95 4.25 4.00 BUS STOP 2818 REMOVE EXISTING WALK REMOVE EXISTING WALK REMOVE EXISTING WALK BUS STOP 2464 SIGNAL TO 7.65 R15 EXISTING BUS STOP 3697 R15 R15 4.45 100m BAY PROPOSED RIGHT IN/ RIGHT OUT ACCESS 7.65 ADV. WARNING 4.45 (SEE NOTE #3) 7.65 7.65 (PROTECTION IS REQUIRED) EX. TAPER R15 PROPOSED JOINT ACCESS (CROSS LOT AGREEMENT REQ'D; SEE NOTE #3) LIMIT OF PROJECT REMOVE EXISTING WALK 6.00 5.75 5.75 7.25 7.25 6.00 EXISTING 50th STREET ȭ 53 AVE 59 ST 59 ST 50 ST 48 ST 74 AVE 50 ST 68 AVE 68 AVE ELENIAK RD 72 AVE 52 ST 50 ST 44A ST 76 AVE 54 ST 59 AVE 72A AVE 56 AVE 52 AVE 55 AVE 67 AVE 59 ST 51 AVE 54 ST ROPER RD 76 AVE SHERWOOD PK FWY MORR IS ROAD C P RAIL 50 ST WHYTE (82) AVE 46 STREET 84 AVE 90 AVE 90A AVE WHITEMUD DR WHITEMUD DR CN SPUR LINE 49 ST 50 STREET DESIGN SPEED POSTED SPEED 70 km/h 60 km/h 7.65 3.00 3.95 4.20 3.70 3.70 3.55 0.65 1.2 7.65 3.00 3.95 3.70 4.45 3.0m MULTI-USE TRAIL 19.10 12.10 2.0% 2.0% 2.5% 2.5% PROPOSED WEST PROPERTY LINE PROPOSED EAST PROPERTY LINE 8.75 5.49 EXISTING WEST PROPERTY LINE EXISTING EAST PROPERTY LINE 33.46 NOT TO SCALE A-A SECTION 50TH STREET - STA 0+560 RELOCATED POWER POLE RELOCATED LIGHT STANDARD RELOCATED LIGHT STANDARD 2.15 1.5m WALK PROP. GAS EX. GAS EX. WATER EX. TV EX. U/G ELEC. EX. GAS PROP. GAS EXISTING LIGHT STANDARD EXISTING LIGHT STANDARD EXISTING POWER POLE 1.00 1.00 IF NECESSARY, GRADING ON PRIVATE PROPERTY TO BE DETERMINED AT PRELIMINARY STAGE OF DESIGN SUITE 200, 10345 - 105th STREET EDMONTON, AB, CANADA T5J 1E8 Tel. 780.430.4041 Fax. 780.435.3538 www.urban-systems.com Client/Project Date Title/Station Range Client/Project Figure Date Scale STA 0+000.00 TO STA 0+700.00 WHITEMUD DR TO 90th AVENUE R-01 MAY 2010 1:1000 50TH STREET ROADWAY CONCEPT DESIGN 1 CITY OF EDMONTON 50TH STREET CONCEPTUAL DESIGN N.T.S. A A Scale: 1:1000 (Horiz) 1:200 (Vert) Transportation Legend: Proposed R.O.W. Existing Traffic Signal Proposed Asphalt Resurfacing Existing Walk Proposed Curb & Gutter Directional Arrows Only Proposed Pavement Markings Manager, Transportation Planning Director, Facility and Capital Planning Director, Development Planning and Engineering Proposed Asphalt Widening Notes: 1. All existing data displayed on this plan was taken form city as-builts and field inspected. 2. Typical sections are based upon City of Edmonton Guidelines. Proposed Asphalt M.U.T. Director, Sustainable Transportation Existing Conc. Median Manager, Transportation Operations Proposed Landscaped Area 3. Prop. access locations, widths and overall design to be confirmed at the redevelopment and preliminary stage. Existing R.O.W. 4. All existing accesses "to be closed" shall also be removed. Proposed Traffic Signal P Prop. Conc. Walk/Pad/Median Surplus R.O.W. Proposed Access PERMIT TO PRACTICE 1. EXISTING PROFILE IS BASED ON EXISTING CITY OF EDMONTON CONTOUR SEPTEMBER 2008; 2. VERTICAL CURVE INFORMATION TO BE CONFIRMED AT PRELIMINARY STAGE. VERTICAL PROFILE NOTES: SUBJECT TO PRELIMINARY DESIGN

Upload: others

Post on 14-Mar-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

EXISTING 50th STREET PROFILE

668

672

676

680

684

688

692

696

668

672

676

680

684

688

692

696

0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700

55 A

VEN

UE

52 A

VEN

UE

WH

ITEM

UD

DR

IVE

50 STREET50 STREET

WH

ITEM

UD

DR

IVE

55 A

VEN

UE

LIM

IT O

F PR

OJE

CT

SIGN STRUCTURE & PANELSTO BE RELOCATED

(PROTECTION IS REQUIRED)

BUS STOP 2013

ADV. WARNING SIGNALTO BE RELOCATED

(PROTECTION IS REQUIRED)

RELOCATED

CLOSE EXISTING ACCESS

LIMIT OF PROJECT LIMIT OF PROJECT

LIMIT OF PROJECT

R60

REMOVEEXISTING WALK

BE RELOCATED

3.0m MULTI-USE TRAIL

3.953.704.45

3.703.704.203.70

3.703.95

3.55

4.20

4.45

3.70

3.70

3.70

3.95

3.957.65

3.55

3.95

3.95

3.70

3.70

4.457.65

3.70

60m TAPER

RELOCATED

3.95

EXISTING BUS STOP 2279

7.65

RELOCATEDRELOCATED

6.0

50m BAY

R15 50m BAY

4.20

4.457.65

R60

R35

3.0m MULTI-USE TRAIL

90m BAYR15

R15

R15

BUS STOP 2751

80m BAYEX. TAPER

EX. TAPER 85m BAY

3.753.703.95

4.254.00

BUS STOP 2818

REMOVE EXISTING WALK REMOVE EXISTING WALK

REMOVE EXISTING WALK

BUS STOP 2464

SIGNAL TO

7.65

R15

EXISTING BUS STOP 3697

R15R154.45

100m BAY

PROPOSED RIGHT IN/RIGHT OUT ACCESS

7.65

ADV. WARNING

4.45

(SEE NOTE #3)

7.65

7.65

(PROTECTIONIS REQUIRED)

EX. TAPER

R15

PROPOSED JOINT ACCESS(CROSS LOT AGREEMENTREQ'D; SEE NOTE #3)

LIMIT OF PROJECT

REMOVE EXISTING WALK

6.00

5.7

5

5.7

5

7.2

5

7.2

5

6.00

EXISTING 50th STREET

53 A

VE

59 ST

59 ST

50 ST

48 ST

74 A

VE

50 ST

68 A

VE

68 A

VE

ELENIAK RD

72 A

VE

52 ST

50 ST

44A ST

76 A

VE

54 ST

59 A

VE

72A

AV

E

56 AVE

52 A

VE

55 A

VE

67 A

VE

59 ST

51 A

VE

54 ST

RO

PER RD

76 A

VE SH

ERW

OO

D PK FW

Y

MO

RRIS ROAD

CP RAIL

50 ST

WH

YTE (82) A

VE

46 STREET

84 A

VE

90 AVE

90A

AV

E

WH

ITEM

UD

DR

WH

ITEM

UD

DR

CN

SPU

R LINE

49 ST

50 STREET

DESIGN SPEED POSTED SPEED

70 km/h 60 km/h

7.65

3.003.954.203.703.703.55 0.65

1.27.65

3.00 3.953.704.45

3.0m MULTI-USE TRAIL

19.1012.10

2.0%2.0%

2.5% 2.5%

PROPOSEDWEST

PROPERTYLINE

PROPOSEDEAST

PROPERTYLINE

8.755.49

EXISTINGWEST

PROPERTYLINE

EXISTINGEAST

PROPERTYLINE

33.46

NOT TO SCALE

A-A SECTION 50TH STREET - STA 0+560

RELOCATEDPOWER

POLE

RELOCATEDLIGHTSTANDARDRELOCATED

LIGHTSTANDARD

2.15

1.5m WALK

PROP. GAS EX. GAS EX. WATER EX. TV EX. U/GELEC.

EX. GASPROP. GAS

EXISTINGLIGHT

STANDARD

EXISTINGLIGHT

STANDARD

EXISTINGPOWERPOLE

1.00 1.00

IF NECESSARY, GRADING ON PRIVATE PROPERTY TO BEDETERMINED AT PRELIMINARY STAGE OF DESIGN

SUITE 200, 10345 - 105th STREETEDMONTON, AB, CANADA T5J 1E8Tel. 780.430.4041Fax. 780.435.3538www.urban-systems.com

Client/Project

Date

Title/Station Range

Client/Project

FigureDateScale

STA 0+000.00 TO STA 0+700.00WHITEMUD DR TO 90th AVENUE

R-01MAY 20101:1000

50TH STREET ROADWAY CONCEPT DESIGN 1CITY OF EDMONTON

50TH STREET CONCEPTUAL DESIGN

N.T.S.

A

A

Scale: 1:1000 (Horiz) 1:200 (Vert)

Transportation Legend:

Proposed R.O.W.

Existing Traffic Signal

Proposed Asphalt Resurfacing

Existing WalkProposed Curb & GutterDirectional Arrows Only

Proposed Pavement Markings Manager, Transportation Planning

Director, Facility and Capital Planning

Director, Development Planning and Engineering

Proposed Asphalt WideningNotes:1. All existing data displayed on this plan

was taken form city as-builts and fieldinspected.

2. Typical sections are based upon Cityof Edmonton Guidelines.

Proposed Asphalt M.U.T.

Director, Sustainable Transportation

Existing Conc. Median

Manager, Transportation Operations

Proposed Landscaped Area

3. Prop. access locations, widths andoverall design to be confirmed at theredevelopment and preliminary stage.

Existing R.O.W.

4. All existing accesses "to be closed"shall also be removed.

Proposed Traffic SignalP

Prop. Conc. Walk/Pad/Median

Surplus R.O.W.

Proposed AccessPERMIT TO PRACTICE

1. EXISTING PROFILE IS BASED ON EXISTING CITYOF EDMONTON CONTOUR SEPTEMBER 2008;

2. VERTICAL CURVE INFORMATION TO BECONFIRMED AT PRELIMINARY STAGE.

VERTICAL PROFILE NOTES:

SUBJECT TO PRELIMINARY DESIGN

LIMIT OF PROJECT

REMOVE EXISTING WALK

RO

PER R

OA

D

50 STREET

RO

PER

RO

AD

50 STREET50 STREET

PROPOSED ACCESS(SEE NOTE #3)

LIMIT OF PROJECT

PROPOSED ACCESS(SEE NOTE #3)

ADV. WARNING SPECIALTO BE RELOCATED

(PROTECTION IS REQUIRED)

R60

4.0

0

3.7

5

4.2

03

.95

4.4

53

.95

PROPOSED RIGHT IN/

4.45

3.703.70

3.95

3.50

4.20

3.953.70

4.45

3.70

3.703.95

3.50

3.95

3.70

60m TAPER

4.45

3.70

3.953.70

7.65

7.65

3.95

3.0m MULTI-USE TRAIL

7.653.0m MULTI-USE TRAIL

RELOCATED BUS STOP 2968

CLOSE EXISTING ACCESS

6.0

50m BAY

6.0

6.0

CLOSE EXISTING ACCESS

PROPOSED JOINT ACCESS

7.653.0m MULTI-

R60

R60

R35

R60

R60

R35

R60

R60

R60

R35

60m TAPER

60m TAPER

50m TAPER85m BAY

EX. TAPER

RELOCATED BUS STOP 2309

3.50

USE TRAIL

25:1 TAPER

3.7

0

3.5

53

.30

4.2

04

.20

REMOVEEXISTING WALK

REMOVE EXISTING WALK

6.0

4.20

R35

RIGHT OUT ACCESSGRADES TO BE EVALUATED;

150m BAY4.45

60m TAPER

7.657.65

3.5

54

.20

RELOCATEDFENCE LINE

R1000

R1000

SEE NOTE #3)(SEE NOTE #3)

(CROSS LOT AGREEMENT REQ'DPROPOSED JOINT ACCESS(CROSS LOT AGREEMENTREQ'D; SEE NOTE #3)

50m BAY 3.5540m TAPER 105m BAY

50m TAPER

PROPOSED FIREHALL ACCESS(SEE NOTE #3)

RELOCATED BUSSTOP 2774

3.50

EXISTING 50th STREET

53

AV

E

59 ST

59 ST

50 ST

48 ST

74

AV

E

50 ST

68

AV

E6

8 A

VE

ELENIA

K RD

72

AV

E

52 ST

50 ST

44A ST

76 A

VE

54 ST

59

AV

E

72

A A

VE

56 AVE

52

AV

E

55

AV

E

67

AV

E

59 ST

51

AV

E

54 ST

ROPER RD

76

AV

E SHERW

OO

D PK

FWY

MO

RRIS ROAD

CP RAIL

50 ST

WH

YTE (82) A

VE

46 STREET

84

AV

E

90 AVE

90

A A

VE

WH

ITEM

UD

DR

WH

ITEM

UD

DR

CN

SPUR LIN

E

49 ST

7.65

3.004.453.95 0.653.00 3.953.704.45

3.0m MULTI-USE TRAIL

12.10

2.0% 2.0%

2.5% 2.5%

PROPOSEDEAST

PROPERTYLINE

4.78

7.65

EXISTINGWEST

PROPERTYLINE

EXISTINGEAST

PROPERTYLINE

3.70

4.50 12.10

37.25

NOT TO SCALEB-B SECTION 50TH STREET - STA 1+305

EXISTINGPOWER

POLE

RELOCATEDLIGHT

STANDARD

RELOCATEDLIGHTSTANDARD

PROPOSEDWEST

PROPERTYLINE

2.15

1.97

EX. WATEREX. U/GELEC. EX. TV EX. GASEX.

TELEPHONEEX. U/GELEC.

EX.SANITARY

EX. STORM

EXISTINGLIGHT

STANDARD

EXISTINGPOWERPOLE

EXISTINGLIGHT

STANDARD

1.00 1.00

1.5m WALKIF NECESSARY, GRADING ON PRIVATE PROPERTY TO BEDETERMINED AT PRELIMINARY STAGE OF DESIGN

EXISTING 50th STREET PROFILE

672

676

680

684

688

692

696

700

672

676

680

684

688

692

696

700

0+700 0+800 0+900 1+000 1+100 1+200 1+300 1+400

+2.40%

-0.65%

-2.50%

50 STREET

DESIGN SPEED POSTED SPEED

70 km/h 60 km/h

SUITE 200, 10345 - 105th STREETEDMONTON, AB, CANADA T5J 1E8Tel. 780.430.4041Fax. 780.435.3538www.urban-systems.com

Client/Project

Date

Title/Station Range

Client/Project

FigureDateScale

STA 0+700.00 TO STA 1+400.00WHITEMUD DR TO 90th AVENUE

R-02JULY 20101:1000

50TH STREET ROADWAY CONCEPT DESIGN 1CITY OF EDMONTON

50TH STREET CONCEPTUAL DESIGN

N.T.S.

B

B

Scale: 1:1000 (Horiz) 1:200 (Vert)

Transportation Legend:

Proposed R.O.W.

Existing Traffic Signal

Proposed Asphalt Resurfacing

Existing WalkProposed Curb & GutterDirectional Arrows Only

Proposed Pavement Markings Manager, Transportation Planning

Director, Facility and Capital Planning

Director, Development Planning and Engineering

Proposed Asphalt WideningNotes:

1. All existing data displayed on this planwas taken form city as-builts and fieldinspected.

2. Typical sections are based upon Cityof Edmonton Guidelines.

Proposed Asphalt M.U.T.

Director, Sustainable Transportation

Existing Conc. Median

Manager, Transportation Operations

Proposed Landscaped Area

3. Prop. access locations, widths andoverall design to be confirmed at theredevelopment and preliminary stage.

Existing R.O.W.

4. All existing accesses "to be closed"shall also be removed.

Proposed Traffic SignalP

Prop. Conc. Walk/Pad/Median

Surplus R.O.W.

Proposed AccessPERMIT TO PRACTICE

SUBJECT TO PRELIMINARY DESIGN

1. EXISTING PROFILE IS BASED ON EXISTING CITYOF EDMONTON CONTOUR SEPTEMBER 2008;

2. VERTICAL CURVE INFORMATION TO BECONFIRMED AT PRELIMINARY STAGE.

VERTICAL PROFILE NOTES:

ELE

NIA

K RO

AD

68

AV

ENU

E

67

AV

ENU

E

50 STREET 50 STREET

68

AV

ENU

E

REMOVE EXISTINGSERVICE ROAD

LIMIT OF PROJECT

LIMIT OF PROJECT

LIMIT OF PROJECT

LIMIT OF PROJECT

ELE

NIA

K RO

AD

RELOCATED FENCE LINE

CLOSE EXISTING ACCESS

R400

3.70 4.45

3.70

3.703.553.95

4.45

3.703.954.20

3.703.553.95

3.70

4.45

60m TAPER

3.70

3.95

RELOCATED BUS STOP 2008

RELOCATED BUS STOP 2970

7.65

RELOCATED

R15

R15

R15

R1550m BAY

RECONFIGURE EXISTING ACCESS

R15

RELOCATED BUS STOP 2819

RELOCATED BUS STOP 2500

7.65

VARIESVARIES

7.654.453.703.95

3.703.704.45

3.95

3.70

3.55

BUS STOP 2979

40m BAYEX. TAPEREX. TAPER

50m BAY EX. TAPER 65m BAY

7.00

5.0

03

.55

7.0

0REMOVE EXISTING WALK

R15

REMOVE EXISTING WALK & PAD

TIE TO EXISTING WALK

EXISTING WALK TO REMAIN

3.70

3.70

3.70

3.95

60m TAPER

3.55

4.45

3.0m MULTI-USE TRAILR15

30m BAY7.65

60m BAY

7.65

RELOCATED ACCESS

4.20R1545m TAPER

25m BAY

3.95

CLOSE EXISTING ACCESS

(SEE NOTE #3)

REMOVE

EXISTING ACCESSTO REMAIN

EXISTINGWALK

VARIESR15

3.703.95

4.45

R57.65

R5

3.55 60m TAPER

PAVEMENTREMOVAL

4.6

7.0

PROPOSED ACCESS

R15

R15

(SEE NOTE #3)

3.0m MULTI-USE TRAIL3.0m MULTI-USE TRAIL

30m BAY

EXISTING 50th STREET

53 A

VE

59 ST

59 ST

50 ST

48 ST

74 A

VE

50 ST

68 A

VE

68 A

VE

ELENIAK RD

72 A

VE

52 ST

50 ST

44A ST

76 A

VE

54 ST

59 A

VE

72

A A

VE

56 AV

E

52 A

VE

55 A

VE

67 A

VE

59 ST

51 A

VE

54 ST

RO

PER RD

76 A

VE SH

ERW

OO

D PK FW

Y

MO

RRIS ROAD

CP RAIL

50 ST

WH

YTE (82) AV

E

46 STREET

84 A

VE

90 AV

E

90A

AV

E

WH

ITEM

UD

DR

WH

ITEM

UD

DR

CN

SPUR LIN

E

49 ST

7.65

3.004.453.703.703.55 0.65

1.27.65

3.00 3.953.704.45

3.0m MULTI-USE TRAIL

15.4012.10

2.0% 2.0%

2.5% 2.5%

PROPOSEDWEST

PROPERTYLINE

PROPOSEDEAST

PROPERTYLINE

9.00

EXISTINGWEST

PROPERTYLINE

EXISTINGEAST

PROPERTYLINE

33.50 1.50

NOT TO SCALEC-C SECTION 50TH STREET - STA 1+425

RELOCATEDPOWER

POLE

RELOCATEDLIGHTSTANDARD

2.15

RELOCATEDPOWER

POLE

EX.SANITARY

EX.WATER

EX.WATER EX. TV EX. U/G

ELEC.EX. PROP.GAS

EX.WATER

GAS

EXISTINGLIGHT

STANDARD

EXISTINGPOWER

POLE

EXISTINGLIGHT

STANDARD

EXISTINGPOWERPOLE

RELOCATEDLIGHTSTANDARD

1.00 1.00

1.5m WALK

IF NECESSARY, GRADING ON PRIVATE PROPERTY TO BEDETERMINED AT PRELIMINARY STAGE OF DESIGN

EXISTING 50th STREET PROFILE

672

676

680

684

688

692

696

700

672

676

680

684

688

692

696

700

1+400 1+500 1+600 1+700 1+800 1+900 2+000 2+100

+0.70%

-1.78%

50 STREET

DESIGN SPEED POSTED SPEED

70 km/h 60 km/h

SUITE 200, 10345 - 105th STREETEDMONTON, AB, CANADA T5J 1E8Tel. 780.430.4041Fax. 780.435.3538www.urban-systems.com

Client/Project

Date

Title/Station Range

Client/Project

FigureDateScale

STA 1+400.00 TO STA 2+100.00WHITEMUD DR TO 90th AVENUE

R-03MARCH 20101:1000

50TH STREET ROADWAY CONCEPT DESIGN 1CITY OF EDMONTON

50TH STREET CONCEPTUAL DESIGN

N.T.S.

C

C

Scale: 1:1000 (Horiz) 1:200 (Vert)

Transportation Legend:

Proposed R.O.W.

Existing Traffic Signal

Proposed Asphalt Resurfacing

Existing WalkProposed Curb & GutterDirectional Arrows Only

Proposed Pavement Markings Manager, Transportation Planning

Director, Facility and Capital Planning

Director, Development Planning and Engineering

Proposed Asphalt WideningNotes:

1. All existing data displayed on this planwas taken form city as-builts and fieldinspected.

2. Typical sections are based upon Cityof Edmonton Guidelines.

Proposed Asphalt M.U.T.

Director, Sustainable Transportation

Existing Conc. Median

Manager, Transportation Operations

Proposed Landscaped Area

3. Prop. access locations, widths andoverall design to be confirmed at theredevelopment and preliminary stage.

Existing R.O.W.

4. All existing accesses "to be closed"shall also be removed.

Proposed Traffic SignalP

Prop. Conc. Walk/Pad/Median

Surplus R.O.W.

Proposed AccessPERMIT TO PRACTICE

1. EXISTING PROFILE IS BASED ON EXISTING CITY OFEDMONTON CONTOUR SEPTEMBER 2008

2. VERTICAL CURVE INFORMATION TO BECONFIRMED AT PRELIMINARY STAGE

VERTICAL PROFILE NOTES:

SUBJECT TO PRELIMINARY DESIGN

52 STREET

CN

SPUR

LINE

50 STREET

72 AV

EN

UE

P

50 STREET

74 AV

EN

UE

CLOSE EXISTINGACCESSES

75 AV

EN

UE

LIMIT OF PROJECT

LIMIT OF PROJECT

LIMIT OF PROJECTLIMIT OF PROJECT

PROPOSEDCURBLINE WALK

PROPOSED WALKTRANSITION

CLOSEEXISTINGACCESSES

PROPOSED JOINT ACCESS

4.45

3.70

3.70

3.95

4.457.6560m TAPER

60m TAPER

3.95

RELOCATED

3.0m MULTI-USE TRAIL7.65

50m BAY

CLOSE EXISTING ACCESSBUS STOP 2918

CLOSE MEDIAN

60m TAPER

60m TAPER

OPENING

4.20

3.70

3.70

3.553.70

3.95

4.457.65

RELOCATED BUS STOP 2147

7.653.0m MULTI-USE TRAIL

R15

R15

60m BAY

R15R15

3.9570m BAY

(CROSS LOT AGREEMENT

3.70

4.45

3.70

3.70

3.553.95

4.45

3.70

3.70

4.20

5.50

3.703.553.953.70

4.45

5.50

3.9560m TAPER3.70

3.954.20

3.0m MULTI-USE TRAIL

60m TAPER

7.65

50m BAY

R15

50m BAY

120m BAY

7.65

CLOSE EXISTING

CLOSE EXISTING ACCESS

5.50

60m TAPER

3.95

ACCESSES

40m BAY

3.95

(CROSS LOT AGREEMENTREQ'D; SEE NOTE #3)

7.65

RELOCATED FENCE LINE

3.0m MULTI-USE TRAIL

4.45

R15 R15 R15

PROPOSED JOINT ACCESS

50m BAY

RELOCATEDBUS STOP 2598

REQ'D; SEE NOTE #3) CLOSE EXISTING ACCESS

PROPOSED JOINT ACCESS(CROSS LOT AGREEMENTREQ'D; SEE NOTE #3)

3.703.70

4.203.95

3.55

3.703.703.55

4.457.65

PROPOSED JOINT ACCESS(CROSS LOT AGREEMENT

REQ'D; SEE NOTE #3)

3.0m MULTI-USE TRAIL

EXISTING 50th STREET

7.65

3.004.453.703.95 0.65

7.65

3.00 3.953.704.45

3.0m MULTI-USE TRAIL

12.10

2.0% 2.0%

2.5% 2.5%

PROPOSEDWEST

PROPERTYLINE

PROPOSEDEAST

PROPERTYLINE

EXISTINGWEST

PROPERTYLINE

EXISTINGEAST

PROPERTYLINE

5.20

12.104.50

11.50 38.80

NOT TO SCALED-D SECTION 50TH STREET - STA 2+250

RELOCATEDPOWER

POLE

RELOCATEDPOWER

POLE

RELOCATEDLIGHT

STANDARD

2.15

EX.SANITARY EX.

TELEPHONE

EX.WATER

EX.WATER

EX. U/GELEC.

EX.TV

PROP. STORMLEAD

EXISTINGLIGHT

STANDARD

EXISTINGPOWER

POLE

EXISTINGLIGHT

STANDARD

EXISTINGPOWERPOLE

RELOCATEDLIGHT

STANDARD

1.00 1.00

1.5m WALK

IF NECESSARY, GRADING ON PRIVATE PROPERTY TO BEDETERMINED AT PRELIMINARY STAGE OF DESIGN

SURPLUS R.O.W.

53 A

VE

59 ST

59 ST

50 ST

48 ST

74 A

VE

50 ST

68 A

VE

68 A

VE

ELENIAK RD

72 A

VE

52 ST

50 ST

44A ST

76 A

VE

54 ST

59 A

VE

72

A A

VE

56 AV

E

52 A

VE

55 A

VE

67 A

VE

59 ST

51 A

VE

54 ST

RO

PER RD

76 A

VE SH

ERW

OO

D PK FW

Y

MO

RRIS ROAD

CP RAIL

50 ST

WH

YTE (82) AV

E

46 STREET

84 A

VE

90 AV

E

90A

AV

E

WH

ITEM

UD

DR

WH

ITEM

UD

DR

CN

SPUR LIN

E

49 ST

50 STREET

DESIGN SPEED POSTED SPEED

70 km/h 60 km/h

EXISTING 50th STREET PROFILE

664

668

672

676

680

684

688

692

664

668

672

676

680

684

688

692

2+100 2+200 2+300 2+400 2+500 2+600 2+700 2+800

-0.60%

SUITE 200, 10345 - 105th STREETEDMONTON, AB, CANADA T5J 1E8Tel. 780.430.4041Fax. 780.435.3538www.urban-systems.com

Client/Project

Date

Title/Station Range

Client/Project

FigureDateScale

STA 2+100.00 TO STA 2+800.00WHITEMUD DR TO 90th AVENUE

R-04MARCH 20101:1000

50TH STREET ROADWAY CONCEPT DESIGN 1CITY OF EDMONTON

50TH STREET CONCEPTUAL DESIGN

N.T.S.

D

D

Scale: 1:1000 (Horiz) 1:200 (Vert)

Transportation Legend:

Proposed R.O.W.

Existing Traffic Signal

Proposed Asphalt Resurfacing

Existing WalkProposed Curb & GutterDirectional Arrows Only

Proposed Pavement Markings Manager, Transportation Planning

Director, Facility and Capital Planning

Director, Development Planning and Engineering

Proposed Asphalt WideningNotes:

1. All existing data displayed on this planwas taken form city as-builts and fieldinspected.

2. Typical sections are based upon Cityof Edmonton Guidelines.

Proposed Asphalt M.U.T.

Director, Sustainable Transportation

Existing Conc. Median

Manager, Transportation Operations

Proposed Landscaped Area

3. Prop. access locations, widths andoverall design to be confirmed at theredevelopment and preliminary stage.

Existing R.O.W.

4. All existing accesses "to be closed"shall also be removed.

Proposed Traffic SignalP

Prop. Conc. Walk/Pad/Median

Surplus R.O.W.

Proposed AccessPERMIT TO PRACTICE

SUBJECT TO PRELIMINARY DESIGN

1. EXISTING PROFILE IS BASED ON EXISTING CITYOF EDMONTON CONTOUR SEPTEMBER 2008;

2. VERTICAL CURVE INFORMATION TO BECONFIRMED AT PRELIMINARY STAGE.

VERTICAL PROFILE NOTES:

SHERW

OO

D PA

RK FREEWA

Y

50 STREET50 STREET

MORRIS ROAD

BUS STOP 2139

RELOCATED BUSSTOP 2331

EXISTING BRIDGE TO BE WIDENED;FUTURE INSPECTION REQUIRED;DETAILS TO BE ADDRESSEDDURING PRELMINARY DESIGN

49 ST.

76

AV

ENU

E

CLOSE EXISTING ACCESSES &CONSTRUCT PROPOSED JOINT ACCESS(CROSS LOT AGREEMENT REQ'D;SEE NOTE #3)

LIMIT OF PROJECT

LIMIT OF PROJECT

LIMIT OF PROJECT

LIMIT OF PROJECT

LIMIT OF PROJECT

LIMIT OF PROJECT

PROPOSED ROAD WIDENING BETWEEN SHERWOOD PARKFREEWAY AND 90TH AVENUE IS SUBJECT TO GRADESEPARATION REQUIREMENTS FOR THE CPR LINE. REFER TOTHE GRADE SEPARATION/CP RAIL CONCEPT DRAWINGS,GS01 & GS02 AND/OR THE "50 STREET RAILWAY GRADESEPARATION CONCEPTUAL PLANNING REPORT, 2009", BYISL FOR THE RECOMMENDED GRADE SEPARATIONCONFIGURATION, CONCEPTUAL VERTICAL ROADWAYDESIGN, ACCESS MODIFICATIONS AND 82ND AVENUECONNECTION TO 50TH STREET MODIFICATIONS.

CP RAIL LINE

RELOCATEDBUS STOP 2239

SIGN STRUCTURE AND PANELS

4.453.70

R5

3.703.553.553.703.70

4.203.703.703.55

3.553.703.704.203.95

4.203.70

3.553.70

3.95

3.70VARIES

EX. TAPER

60m TAPER

70m BAYEX. TAPER

65m BAY

40m BAY

EX. TAPER

EX. TAPER

20m BAY

7.65

4.003.0m MULTI-USE TRAILR5

R5

5.0 MIN.

5.0

MIN

.

4.4

54

.45

4.0

04

.00

R5

R54

.00

4.0

0

4.4

54

.45

5.0

MIN

.

R35

R25 R8

TO BE RELOCATED

(NUMBER TO BE ASSIGNEDPROPOSED BUS STOP

BY ETS)

R100

40m TAPER

EX. TAPER

40m TAPER

R5 3.95

4.454.45

R5

R5

R25

20m BAY

RELOCATEDBUS STOP 2802

3.70

3.70

3.55

3.95

3.70

4.45 3.70

3.55

3.70

4.20

3.70

60m TAPER

3.95

BUS STOP 2362

5.0 MIN.

5.0

MIN

.

5.0

MIN

.5.0 MIN.

CLOSE EXISTING ACCESS

TAPER

3.9

5

3.5

53

.70

4.0

03

.50

R25

40m BAY

4.0

0R25

4.2

0

80m BAY

RELOCATED

7.65

REMOVE EXISTING WALK

R25

R1007.65

4.203.95

3.0m MULTI-USE TRAIL R1007.65

R3535m BAY 3.95

R100

R25 7.65

3.704.20

R200R2

00

3.0m MULTI-USE TRAIL

50m TAPER

7.657.65

PROPOSED BUS STOP

BY ETS)(NUMBER TO BE ASSIGNED

EX. TAPER

60m TAPER 3.554.203.704.45

50m BAY

(PROTECTION IS REQUIRED)

RELOCATED FENCE LINE

CLOSE EXISTING ACCESS

30m BAY

R12

3.704.45

R12

PAVEMENTREMOVAL

PAVEMENT REMOVAL R100

PAVEMENT REMOVAL

R25

PAVEMENTREMOVAL

LANE WIDTHS BETWEENSTA. 3+325 TO STA. 3+920TO BE RECONFIRMED ATPRELIMINARY DESIGN STAGE.

VARIES

5.0 MIN.

R100

3.0m MULTIUSE TRAIL

EXISTING 50th STREET

53 A

VE

59 ST

59 ST

50 ST

48 ST

74 A

VE

50 ST

68 A

VE

68 A

VE

ELENIAK RD

72 A

VE

52 ST

50 ST

44A ST

76 A

VE

54 ST

59 A

VE

72

A A

VE

56 AV

E

52 A

VE

55 A

VE

67 A

VE

59 ST

51 A

VE

54 ST

RO

PER RD

76 A

VE SH

ERW

OO

D PK FW

Y

MO

RRIS ROAD

CP RAIL

50 ST

WH

YTE (82) AV

E

46 STREET

84 A

VE

90 AV

E

90A

AV

E

WH

ITEM

UD

DR

WH

ITEM

UD

DR

CN

SPUR LIN

E

49 ST

3.00 4.45 3.70 VARIES 3.55

2.80

3.004.20 3.70 4.45

3.0m MULTI-USE TRAIL

12.10 15.40

2.0%2.0%

2.5%2.5%

VARIES

NOT TO SCALEE-E SECTION 50TH STREET - STA 3+470

EXISTINGEAST

PROPERTYLINE

EXISTINGWEST

PROPERTYLINE

11.004.45

RELOCATEDPOWER

POLE

RELOCATEDPOWER

POLE

EX. U/GELEC.

EX.GAS & TV

EX. U/GELEC.

EX. GASEX.WATER

EX.STORM

EXISTINGLIGHT

STANDARD

EXISTINGPOWER

POLE

EXISTINGLIGHT

STANDARD

EXISTINGPOWERPOLE

RELOCATEDLIGHTSTANDARD

RELOCATEDLIGHT

STANDARD

1.00 1.00

1.5m WALK

IF NECESSARY, GRADING ON PRIVATE PROPERTY TO BEDETERMINED AT PRELIMINARY STAGE OF DESIGN

SURPLUS R.O.W. MORRIS ROAD7.65 22.15 3.40

EXISTING 50th STREET PROFILE

660

664

668

672

676

680

684

688

660

664

668

672

676

680

684

688

2+800 2+900 3+000 3+100 3+200 3+300 3+400 3+500

-0.60%

-2.55%+0.55%

50 STREET

DESIGN SPEED POSTED SPEED

70 km/h 60 km/h

SUITE 200, 10345 - 105th STREETEDMONTON, AB, CANADA T5J 1E8Tel. 780.430.4041Fax. 780.435.3538www.urban-systems.com

Client/Project

Date

Title/Station Range

Client/Project

FigureDateScale

STA 2+800.00 TO STA 3+500.00WHITEMUD DR TO 90th AVENUE

R-05MARCH 20101:1000

50TH STREET ROADWAY CONCEPT DESIGN 1CITY OF EDMONTON

50TH STREET CONCEPTUAL DESIGN

N.T.S.

E

E

Scale: 1:1000 (Horiz) 1:200 (Vert)

Transportation Legend:

Proposed R.O.W.

Existing Traffic Signal

Proposed Asphalt Resurfacing

Existing WalkProposed Curb & GutterDirectional Arrows Only

Proposed Pavement Markings Manager, Transportation Planning

Director, Facility and Capital Planning

Director, Development Planning and Engineering

Proposed Asphalt WideningNotes:

1. All existing data displayed on this planwas taken form city as-builts and fieldinspected.

2. Typical sections are based upon Cityof Edmonton Guidelines.

Proposed Asphalt M.U.T.

Director, Sustainable Transportation

Existing Conc. Median

Manager, Transportation Operations

Proposed Landscaped Area

3. Prop. access locations, widths andoverall design to be confirmed at theredevelopment and preliminary stage.

Existing R.O.W.

4. All existing accesses "to be closed"shall also be removed.

Proposed Traffic SignalP

Prop. Conc. Walk/Pad/Median

Surplus R.O.W.

Proposed AccessPERMIT TO PRACTICE

SUBJECT TO PRELIMINARY DESIGN

1. EXISTING PROFILE IS BASED ON EXISTING CITYOF EDMONTON CONTOUR SEPTEMBER 2008;

2. VERTICAL CURVE INFORMATION TO BECONFIRMED AT PRELIMINARY STAGE.

VERTICAL PROFILE NOTES:

3.00 4.45 3.70 3.95 4.20

VARIES

3.003.95 3.70 4.45

3.0m MULTI-USE TRAIL

VARIES 12.10

2.0%2.0%

2.5%2.5%

78.00

NOT TO SCALEF-F SECTION 50TH STREET - STA 3+745

EXISTINGEAST

PROPERTYLINE

EXISTINGWEST

PROPERTYLINE

11.75

RELOCATEDLIGHT

STANDARD

11.3 AND VARIES

EX.TV

EX. U/GELEC.

EX.STORMEX. GAS EX.

TELEPHONEEX. U/GELEC.

EX.WATER

EX.STORM

EX.TELEPHONE

EX. U/GELEC.

EX.TELEPHONE

EX.GAS

EXISTINGLIGHT

STANDARD

EXISTINGPOWERPOLE

EXISTINGLIGHT

STANDARD

RELOCATEDLIGHTSTANDARD

RELOCATEDPOWER

POLE

1.00 1.00

1.5m WALKIF NECESSARY, GRADING ON PRIVATEPROPERTY TO BE DETERMINED ATPRELIMINARY STAGE OF DESIGN

SURPLUS R.O.W.

7.65 9.50

3:1

PROPOSEDEAST

PROPERTYLINE

8.00 1.00SERVICE ROAD

VARIES

VA

RIE

S

SLAB-ON MEDIAN

50 STREET

82 AV

ENU

E

84 AV

EN

UE 90

AV

ENU

E

50 STREET

90A

AV

E

CP RAIL LINE

LIMIT OF PROJECT

LIMIT OF PROJECT LIMIT OF PROJECT

LIMIT OF PROJECT

LIMIT OF PROJECT

LIM

IT O

F PR

OJE

CT

8.0m SERVICE ROAD

PROPOSED MID-BLOCK CROSSING(DUE TO CP RAIL CROSSING, THESPECIFIC LOCATION TO BEDETERMINED AT THE PRELIMINARYDESIGN STAGE)

50m BAY

PROPOSED ROAD WIDENING BETWEEN SHERWOOD PARKFREEWAY AND 90TH AVENUE IS SUBJECT TO GRADESEPARATION REQUIREMENTS FOR THE CPR LINE. REFER TOTHE GRADE SEPARATION/CP RAIL CONCEPT DRAWINGS,GS01 & GS02 AND/OR THE "50 STREET RAILWAY GRADESEPARATION CONCEPTUAL PLANNING REPORT, 2009", BYISL FOR THE RECOMMENDED GRADE SEPARATIONCONFIGURATION, CONCEPTUAL VERTICAL ROADWAYDESIGN, ACCESS MODIFICATIONS AND 82ND AVENUECONNECTION TO 50TH STREET MODIFICATIONS.

BUS STOP 2194

4.203.704.45

3.95

6.00

4.20

3.30

3.95

4.45

60m TAPER

30m TAPER

40m BAY

R25

CLOSE EX. ACCESS

RELOCATED

RELOCATED

3.30

3.95

4.25

R15

R15

3.0m MULTI-USE TRAIL 3.0m MULTI-USE TRAIL

R15 R15

4.453.70

3.704.45

R15

4.203.95

3.954.45

BUS STOP 2783

PROPOSED BUS STOP(NUMBER TO BE ASSIGNEDBY ETS)

PROPOSED BUS STOP(NUMBER TO BE ASSIGNEDBY ETS)

3.554.203.70

90m BAY

4.45

3.553.703.70

4.20

3.95

EXISTING ACCESSESTO REMAIN

30:1 TAPER

4.003.70

4.20 4.20

LANE WIDTHS BETWEENSTA. 3+325 TO STA. 3+920TO BE RECONFIRMED ATPRELIMINARY DESIGN STAGE.

7.65

POSSIBLE CLOSE EXISTING ACCESS

POSSIBLE RELOCATED ACCESS

3.95

4.453.703.95

4.453.70VARIES

4.453.703.95

60m TA

PER

3.95

R11

R1

R11

R5

6.00

REMOVE EXISTING SIDEWALKAND BUS STOP 2135

REMOVE EXISTINGPAVEMENT

3.953.704.45

R3

R11

R12

R14

PROPOSED TURN-AROUND

REMOVE EXISTING SERVICE ROAD

(DIRECTLY ACROSS FROM EX.ACCESS TO NORTH)

40m BAY

R11

R18

R1560m TAPER

7.65

4.204.00

3.954.45

EX.

30m TAPER60m BAY

4.45 3.

753.

75

6.00

3.95

4.20

R400

3.954.

20

EX.

EX.

60m BAY

R20

R60

R60

R35

RELOCATED ACCESS TO 84 AVENUE

RELOCATE SERVICEROAD ACCESSES(SEE NOTE #3)

30:1 TAPER4.45

PROPOSED RELOCATEDSERVICE ROAD ACCESS(SEE NOTE #3)

EXISTING 50th STREET

53

AV

E

59 ST

59 ST

50 ST

48 ST

74

AV

E

50 ST

68

AV

E6

8 A

VE

ELENIA

K RD

72

AV

E

52 ST

50 ST

44A ST

76 A

VE

54 ST

59

AV

E

72

A A

VE

56 AVE

52

AV

E

55

AV

E

67

AV

E

59 ST

51

AV

E

54 ST

ROPER RD

76

AV

E SHERW

OO

D PK

FWY

MO

RRIS ROAD

CP RAIL

50 ST

WH

YTE (82) A

VE

46 STREET

84

AV

E

90 AVE

90

A A

VE

WH

ITEM

UD

DR

WH

ITEM

UD

DR

CN

SPUR LIN

E

49 ST

-1.84%

-0.60%

660

664

668

672

676

680

684

688

660

664

668

672

676

680

684

688

3+500 3+600 3+700 3+800 3+900 4+000 4+061.63

-1.84%

-0.60%

50 STREET

DESIGN SPEED POSTED SPEED

70 km/h 60 km/h

SUITE 200, 10345 - 105th STREETEDMONTON, AB, CANADA T5J 1E8Tel. 780.430.4041Fax. 780.435.3538www.urban-systems.com

Client/Project

Date

Title/Station Range

Client/Project

FigureDateScale

STA 3+500.00 TO STA 4+180.40WHITEMUD DR TO 90th AVENUE

R-06OCTOBER 20101:1000

50TH STREET ROADWAY CONCEPT DESIGN 1CITY OF EDMONTON

50TH STREET CONCEPTUAL DESIGN

N.T.S.

F

F

Scale: 1:1000 (Horiz) 1:200 (Vert)

Transportation Legend:

Proposed R.O.W.

Existing Traffic Signal

Proposed Asphalt Resurfacing

Existing WalkProposed Curb & GutterDirectional Arrows Only

Proposed Pavement Markings Manager, Transportation Planning

Director, Facility and Capital Planning

Director, Development Planning and Engineering

Proposed Asphalt WideningNotes:

1. All existing data displayed on this planwas taken form city as-builts and fieldinspected.

2. Typical sections are based upon Cityof Edmonton Guidelines.

Proposed Asphalt M.U.T.

Director, Sustainable Transportation

Existing Conc. MedianProposed Landscaped Area

3. Prop. access locations, widths andoverall design to be confirmed at theredevelopment and preliminary stage.

Existing R.O.W.

4. All existing accesses "to be closed"shall also be removed.

Proposed Traffic SignalP

Prop. Conc. Walk/Pad/Median

Surplus R.O.W.

Proposed AccessPERMIT TO PRACTICE

SUBJECT TO PRELIMINARY DESIGN

1. EXISTING PROFILE IS BASED ON EXISTING CITYOF EDMONTON CONTOUR SEPTEMBER 2008;

2. VERTICAL CURVE INFORMATION TO BECONFIRMED AT PRELIMINARY STAGE.

VERTICAL PROFILE NOTES: