5.4. 3. 2. 1. - ribble valley · landscaped earth mounds landscaped earth mound 2no vehicle...
TRANSCRIPT
Escape
1.
2.
3.
4.
5. UP
UP
UP
1
2
3
4
5
6
7
8
A
B
D
D
E
F
C
C
G
Refu
se &
Recyclin
g
Cle
aners S
tore
Meetin
g 5
Meetin
g 6
Telepresence R
oom
Meeting 1
Bre
ak o
ut / F
lexib
le
Furn
iture
Sto
re
Com
ms
Meeting 7
Meetin
g 2
Meeting 3
Rise
r 2
Rise
r 4
Riser 1
Incoming S
ervices
Lift 1
Meetin
g 8
Fem
ale
WC
Male
WC
Acc. W
C
Meeting Lobby /
Corrid
or
WC
Lobby
Service
Corrid
or
Stair A
Sta
ir C
Sta
ir B
Lobby
Lift 3
Lift 2
Lift 1
Service Lift
Sto
re
Open P
lan Office
Mist B
ottle
Sto
re
Meeting 4
Clr
Lobby
N 431449696
E 362432653
9
10
11
8a
0b
C2
C3
1a
0a
C4
D1
C1
D2
A1
E1
Atrium
Atriu
m L
ink
Male
Shw
r/Ch
Fem
ale Shw
r/Ch
Sw
itch
Trilogy
Acce
ssible
WC
&
Show
er
AV
Equipm
ent
Furn
iture
Sto
re
DESIGN HAZARD IDENTIFICATION
No significant Hazards have been identified in this
drawing
P01 17/08/18 RD AS
Initial Issue
project
client
drawing title
date
scale@A1
drawn
checked
drawing stage
Job
No
Rev
Purpose of IssueStatus
Drawn by: -Date Checked by: -REV
NOTES All dimensions and levels are to be checked on site.
Any discrepancies are to be reported to the architect beforeany work commences.
This drawing shall not be scaled to ascertain any dimensions.Work to figured dims only.
This drawing shall not be reproduced without express writtenpermission from AEW.
Title overlay drawings and ownership boundaries areproduced using all reasonable endeavors. AEW cannot beresponsible for the accuracy or scale discrepancy of baseplans supplied to them.
S2
P07
B941
3-A
EW-X
X-SI
-DR-
A-0
502
AS
RD
1:500
August 2018
Proposed Site Plan
B9413 Office Building
BAE Systems
Planning
For Comment
N
P02 10/10/18 PMR RD
Amendments made to car park access and alignment toavoid services inspection chambers and enabling works,refer BJP mark up plan . Vehicle charge points added.Landscape mounds added. Accessible parking revised toentrance in accordance with Stakeholders meeting notesfrom meeting of 12/09/18. Drawing becomes Landscape.
PARKING PROVISION WITHIN APPLICATION DEMISE
EXISTING PROPOSEDSTANDARD STANDARDACCESSIBLE ACCESSIBLE
264 2651 15
LANDSCAPED EARTH MOUNDS
LANDSCAPED EARTH MOUND
2No VEHICLECHARGINGPOINTS & 2800mmWIDE PARKING BAYS
ENERGY CENTRE
ELECTRIC ELECTRIC0 2
P03 02/11/18 PMR RD
Vehicle charging spaces revised to 2800mm
TRAFFIC BOLLARDS TO MATCHEXISTING LANDSCAPING
BLOCK PAVING
BLOCK PAVING
TRAFFIC BOLLARDS TO MATCHEXISTING LANDSCAPING
RESIN BONDED PAVING
RESIN BONDEDPAVING
RESIN BONDED PAVING
NEW FOOTPATH WITH 8No.STEPS
P04 02/11/18 PMR RD
Hard landscape surface treatments and areas revised.Bollards added. Footpath and steps added
CYCLE SHELTER 60 BICYCLES
P05 07/12/18 PMR RD
Cycle shelter added for 60 Bicycles.
P06 18/06/19 NC RD
Updated Planning Issue
P07 10/07/19 NC RD
Updated Site Boundary