  • 8/2/2019 5.4 Standard Operations

    1/17

    Kaizen

    Standard Operations

  • 8/2/2019 5.4 Standard Operations

    2/17

    n r i r i n

    Operationssafelycarriedoutwithalltasksorganisedinthebestknownsequenceandbyusingthemosteffectivecombination

    of

    resources.

    Resources

    , , ,Conditions

    Consistent and repeated operations

    Operations adjusted for human ease andeffectiveness

    Equipment and resources well maintained

  • 8/2/2019 5.4 Standard Operations

    3/17

    Std Ops eliminate human work waste to...

    ...ensure the effectiveness and increase the efficiency

    Effectiveness:

    obtain the desired results

    Efficiency:

    obtain the results in an "economical" manner

  • 8/2/2019 5.4 Standard Operations

    4/17

    Standard Work Objective

    Eliminate waste related to

    the flow of material

    machine work and human work

    Thisis

    the

    objective

    of

  • 8/2/2019 5.4 Standard Operations

    5/17

    Waste from no standardisation

    Deviations and Proliferations

    50recipe

    documented

    50 results Quality the(deviations) rs me

    (no variation)

  • 8/2/2019 5.4 Standard Operations

    6/17

    Document human work

    omp e e Simple

    Visual

    Document the line Document the operators work

    Document the operations:* work sequence, work contents (safetynotices, quality norms, etc.)

    = a unique recipe

    = a training tool= an improvement tool

  • 8/2/2019 5.4 Standard Operations

    7/17

    Constructing a Std Op

    1. ANALYSE THE JOB (OPERATIONANALYSIS):-

    5. IDENTIFY THE KEY POINTS:-For each Main Step, write in the subtle

    - -blow account of the activities performed;manual, visual, mental etc., including all

    steps necessary to guarantee quality,efficienc and safet . If there are different

    tr c s o t e o w c ensure t atquality, safety and efficiencyrequirements are met.

    way of doing the job, all are analysed.

    2. IMPROVE TO GENERATE THE BESTCURRENT METHOD:-Think over these ste s:

    . :-Try out the method again, just followingthe Main Steps and Key Points to besure that they are, by themselves,

    - How can the job be made easier or quicker.- How can we make it difficult to get wrong(Quality and Safety).Then write in any improvements.

    .

    Correct any errors or sections left out.

    7. COMPLETION:-

    3. CONFIRM THE METHOD (A):-Try out the improved method, to check that it

    is quicker/easier and that quality standards

    helpful or necessary and details such astooling, tolerances, protective clothing,training notes, etc.

    .out.

    4. DIVIDE INTO MAIN STEPS:-Summarise and write the main stages of thejob.

    Describe each stage or Main step in a briefand straightforward way; What you do, towhat? with what?

  • 8/2/2019 5.4 Standard Operations

    8/17

    Wh Standardised O erations ?

    .

    Visually provide useful information for the.

    Promotes ownership by being drawn up bysho floor eo le.

    Promotes root cause problem solving directly onthe shop floor.

  • 8/2/2019 5.4 Standard Operations

    9/17

    Three Elements of Standard Work

    Cycle timeWIP

    WIPWIP

    WIP

    Standard work in Sequenceof work

    WIP

    Finished goods

    Cycle time

  • 8/2/2019 5.4 Standard Operations

    10/17

    Determine the standard work-in-process

    Minimum quantityof parts in-process for acontinuous low o operations

    ea y: par per s ep o e process

    Reality: optimal batch based onreject forecastmachine stoppage forecastrhythmical machine capacity (flow)

    set-up timeetc.

  • 8/2/2019 5.4 Standard Operations

    11/17

    Calculate the standard work-in process

    OP 10 OP 20 OP 30 OP 40

    10ACTUAL 10 10 1053 1 1 10 1

    OBJECTIVE0 5 5 0

    0 0 0 04 1 1 11

  • 8/2/2019 5.4 Standard Operations

    12/17

    STANDARD WORK IN PROGRESS

    OP OP OP OP OP OP OP OP OP OP OP OP

    Objective

    Ideal

  • 8/2/2019 5.4 Standard Operations

    13/17

    Information Content

    METHODOperation flow chart

    MATERIAL

    Part numbers

    LocationsStock in rocess

    EQUIPMENT

    Equipment identificationLocation

    TOOLING Tool identificationDescription

    Quality check operationsCare points

    Safet o erations

    TIME

    Safety devices to be used

    Customer cycle timeProcess C cle time

  • 8/2/2019 5.4 Standard Operations

    14/17

    Standard Operation Sheet

    STANDARD OPERATION SHEET

    SUPPOR WELD

    GET SUPPORT PLATE

    T PLATE M/CREINFORC

    EMENTPLATE

    M/C, GET NUT, PLACE INWELD M/C. GET ASSY.

    WELDM/C

    PLATE

    PLACE ASSY & REINF. IN

    FIXTURE

    SPOT WELD (2)

    WIP

    WIP CUST CYCLE CELL CYCLE SAFETY CHECK

    WEAR SAFETY

    UNCLAMP, LIFT OUT ASSYPUT IN CONTAINER.RETURN TO START

  • 8/2/2019 5.4 Standard Operations

    15/17

    Wheel Change Exercise

  • 8/2/2019 5.4 Standard Operations

    16/17

    Wheel Change

    . pen oo an o a n ac .

    2. Jack up car.

    3. Obtain brace from boot.

    . mu aneous y owheel in place with LH.

    11. and start nuts on studs4. Remove hubcap with brace

    end.with RH.

    12. Tighten nuts with brace..

    aside.6. Remove wheel and place in

    . ep ace u cap.

    14. Lower jack and removefrom car..

    7. Unclip spare wheel retainer.

    8. Life out spare and place on

    15. Replace brace in boot.

    16. Place wheel in well andu .9. Pick up wheel nuts in RH.

    c p re a ner.

    17. Close boot.

  • 8/2/2019 5.4 Standard Operations

    17/17

    IDENTIFY THE KEY POINTS:- NO: MAIN STEPS1. Open drivers door,check handbrake is fully engaged by lifting lever.2. Lift boot lock lever until is felt to open.3. Walk to boot and open lid.

    1 ENSURE HANDBRAKE IS ON

    PRESS SPARE TO ENSURE4. Press spare wheel hard to confirm it is inflated.5. Unclip wheel retainer.6. Lay wheel flat on boot floor and load jack and brace.7. Lift out wheel, carry to wheel arch, squat and lay wheel on ground right

    INFLATEDCARRY TOOLS TO WHEEL

    .

    8. Use flat end of brace lever to prise off hub cap, aside hub cap, concavesurface up.

    9. Slacken wheel nuts off 2 full turnswith brace, aside brace.10. En a e to end of ack to nearest ackin oint, ensure lower end is on

    2 SLACKEN NUTS TWO TURNSBEFORE RAISING CAR

    ENGAGE JACK AS ILLUSTRATEDflat surface and jack is vertical.

    11. Turn jack handle clockwise until wheel is about 2clear of ground.12. Pick up brace and place nuts in hub cap.13. Aside brace andplace nuts in hub cap.

    AT NEAREST POINT

    RAISE WHEEL 2 CLEAR OFGROUND

    14. s ng ot an s, t w ee o stu s an rest aga nst pane to e t o

    wheel arch. PLACE NUTS IN HUBCAP15. PU spare wheel, align with studs and place on hub.16. Holding wheel on hub RH, LH pick up nuts and start on threads top first, then

    3 USE BOTH HANDS TO FIT NUTS

    , .

    17. Simultaneously LH fit remaining nuts, RH. PU brace and run nuts to hub insequence shown. Leave brace on final nut.

    18. Turn jack handle anti clockwise to lower car. Remove jack.

    19. Using both handsfully tighten all nuts in reverse sequence (4 3 2 1).

    HUB

    TIGHTEN IN SEQUENCE

    ILLUSTRATED

    20. PU jack, walk to boot and aside jack and brace.21. Walk back, PU hub cap and centralise over retaining clipson wheel. Push home

    firmly confirming OK condition by click of clips and even gap between hub cap

    4 CENTRALISE CAP OVER CLIPSBEFORE PUSHING ON

    and wheel profile.

    22. PU spare wheel, carry to boot and place in wheel well.23. Clip spare wheel retainer in place; close boot.

    CLIP SPARE IN WHEEL WELL