Supply Chain of Ship Building
Presented ByTamanna
Prashant KumarM.FTECH 2010-12NIFT,Gandhinagar
![Page 2: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/2.jpg)
2
Hull Structures
![Page 3: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/3.jpg)
Roles in Shipbuilding
![Page 4: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/4.jpg)
List of Classification Societies
4
HRS Hellenic Register of Shipping for Greece ICS Iranian Classification Society IRS Indian Register of Shipping IROS International Register of Shipping KR Korean Register of Shipping LR Lloyd's Register NK Nippon Kaiji Kyokai (ClassNK) PRS Polish Register of Shipping (Polski Rejestr Statków) RBNA Registro Brasileiro de Navios (Brazilian Register of Shipping) RINA Registro Italiano Navale TL Turk Loydu SCM Ships Classification (Malaysia) Sdn Bhd
ABS American Bureau of Shipping ACS Asia Classification Society BKI Biro Klasifikasi Indonesia BV Bureau Veritas CCS China Classification Society CR China Corporation Register of Shipping CRS Hrvatski Registar Brodova (Croatian Register of Shipping) DBS Dromon Bureau of Shipping DNV Det Norske Veritas GL Germanischer Lloyd RINAVE Registro Internacional Naval SA RS Russian Maritime Register of Shipping GBS Guardian Bureau of Shipping
![Page 5: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/5.jpg)
Shipbuilding Process
![Page 6: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/6.jpg)
Commercial shipyards
![Page 7: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/7.jpg)
Design Services
India despite having full-fledged design houses like NSDRC(R & D institute), AB Marine(stability booklets and conversion of ship from ocean going vessel to inland vessels), etc. Cochin shipyard and Hindustan shipyard have taken the design from Mastek with the detail engineering.
![Page 8: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/8.jpg)
Equipment.
![Page 9: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/9.jpg)
9
Procurement and Decision-making
The owner selects the main equipment like main engine, auxiliary engine, etc. Some times the shipyard suggests the make and type, and the ship-owner approves it. Public sector yards Required to go through elaborate and clearly defined tendering processes for each vessel Difficult to standardize since each time, a different supplier may secure
the order Cannot establish long-term relations and obtain attractive discount and
credit terms with a group of suppliers because of the tendering processThe decision-making is often slow and payments could be delayed.
Private sector yards Quick decisions are taken based on price, credit terms and project delivery schedules Standardization is possible Efficient Supply Chain Management is possible
![Page 10: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/10.jpg)
10
Key Players.
![Page 11: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/11.jpg)
11
Vessel Types.
![Page 12: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/12.jpg)
12
Layout (HSL)
![Page 13: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/13.jpg)
13
Example of Current Order
![Page 14: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/14.jpg)
14
Indian shipyard Vs foreign shipyards
![Page 15: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/15.jpg)
15
New yards proposed
Pipavav ShipyardAdani ShipyardL&T ShipyardCochin Port Trust plans a large shipyard
![Page 16: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/16.jpg)
16
Shipbuilding equipment & services
Design & consultancy services Naval architecture and marine engineering services CAD/CAM software Design & detailed engineering services Training NC Plasma plate cutting machines Plate and frame bending machines Pipe bending machines Goliath cranes Surface preparation equipment Paint spraying equipment Synchro-lifts Testing and laboratory services R & D
![Page 17: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/17.jpg)
17
Make and countries of manufacture
![Page 18: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/18.jpg)
18
Gear Manufacturers & Desalination Equipment Suppliers
Gear:
Desalination equipment
![Page 19: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/19.jpg)
19
Order Process.
Once the order is placed on the yard, Letters of Credit (LC) are issued in accordance with the prioritization based on production planning and lead-time.
![Page 20: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/20.jpg)
20
The Manufacturing Pyramid
![Page 21: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/21.jpg)
21
Enrollment to approved list of equipment suppliers
The equipments that are fitted on the ship have to be approved by the classification society, which is Indian Register of Shipping (IRS) in India.
If the equipment manufacturer is not in the approved list of manufacturers of IRS, then every time the equipment is fitted on the ship, the yard/manufacturer has to take approval from the IRS. Hence it is wise in manufacturers part that they get themselves listed in IRS approved list.
![Page 22: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/22.jpg)
22
Contact person for equipment approval
Mr. U S KalgadgyPrincipal SurveyorIndian Register of ShippingHead office & Training-Cum-R&D Centre52A, Adi Shankaracharya Marg,Opp. Powai Lake, Powai,Mumbai – 400 072Phone (Direct): 91-22-30519459Phone: 91-22-30519400Grams: IRSCLASSFax: 91-22-25703611E-mail: [email protected]@irclass.orgWebsite: www.irclass.org
![Page 23: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/23.jpg)
23
LIST OF INDIAN COMPANIES ENGAGED IN MANUFACTURING OR SUPPORT OF
MANUFACTURE IN MARINE &
NON-MARINE SECTORS
(QA CERTIFIED BY INDIAN REGISTER OF SHIPPING)
![Page 24: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/24.jpg)
24
![Page 25: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/25.jpg)
25
![Page 26: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/26.jpg)
26
![Page 27: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/27.jpg)
27
![Page 28: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/28.jpg)
28
List of Some Indian Vendors.
![Page 29: 54580166 Ship Construction](https://reader033.vdocuments.net/reader033/viewer/2022061107/544c4912af7959ac438b5b4f/html5/thumbnails/29.jpg)
29
Thank You!
References:Meeting with Virgo marine Mr. Shaker Suman Site Incharge.Telephonic Conversation with Mr Prabhat Kumar
Naval architect, Keppel FELS, Singapore