6.22 change orders and contract...
TRANSCRIPT
6.22 Change Orders and Contract Amendments
1. The Purchaser may at any time order the supplier/ selected bidder through Notice in
accordance with clause “Notices” above, to make changes within the general scope
of the Contract where the goods & services are to be provided by the supplier/
selected bidder.
2. Prices to be charged by the supplier/ selected bidder for any related services that
might be needed but which were not included in the Contract shall be agreed upon
in advance by the parties and shall not exceed the prevailing rates charged to other
parties by the supplier/ selected bidder for similar services.
Page 1 of 15
7.2 Service Level Requirements/ Agreement for Operations & Maintenance
Sub Clause: 7 - Penalty Clauses
If the selected bidder fails to deliver the required services due to reasons attributable to
selected bidder like non-accessibility of the web portal/ application, non-availability/
attrition of the technical personnel/ operational manpower, etc. the cumulative penalty,
as applicable, would be imposed as mentioned below while processing the payment for
respective milestone.
a. Penalty for Downtime of Application S/w
Table 7.3: Penalty for Downtime
S.
No
Measurement Parameter Downtime in a
Quarter Penalty
1
Cumulative number of hours the Integrated Raj e-Office Application (Web Application or Web Portal) is non-functional/ non-accessible/ non-available/ non-responsive in each case of outage
0-2 Hours No Penalty
2 2-4 Hours 2 % of applicable quarterly payment
3 4-8 Hours 4 % of applicable quarterly payment
4 8-12 Hours 6 % of applicable quarterly payment
5 12-24 Hours 8 % of applicable quarterly payment
6 24-36 Hours 10 % of applicable quarterly
payment
7 36-48 Hours 12% of applicable quarterly payment
8 >48 Hours 15% of applicable quarterly payment
The penalty shall be calculated above the permissible downtime hours for maintenance
or other reasons as approved by RISL.
b. Penalty for delay in response/ resolution time: for incidents like defect/ bud fixing,
minor changes in the software, content updation, etc.:
Table 7.4: Penalty for delay in Response/ Resolution time
S.
No
Type of
Incident
Response Time Resolution Time SLR Penalty for delay in
resolution time
1 Critical 15 minutes from
call logged
<= 2 Hours Rs 1000 per incident
per hour delay
2 Medium 30 minutes from
call logged
<=1 Day from the time of
incident logged at the
Helpdesk
Rs 500 per incident
per day
3 Low 45 minutes from
call logged
<=2 Days from time of
response logged
Rs 200 per incident
per day
Page 2 of 15
c. Penalty for non-availability of deployed personnel/ resources/ manpower
during O&M Period: A maximum of 18 leaves per year (4.5 per quarter on prorate
basis) shall be allowed for resource deployed. In case resource needs to take
off/leave from the duty, he has to take due approval from Project Coordinator of
RISL. In case, the total leaves taken in a year by resource deployed is less than 18,
than the balance leaves will be carry forward to next year. In case total number of
leaves exceed the maximum allowed leaves, penalty as mentioned below shall be
levied, starting from the date of Go-live of phase-II of Integrated Raj e-Office
Application:
Table 7.5: Penalty for non-availability of deployed manpower during O&M Period
S. No.
Resource Type Penalty
1. Business Analyst cum Project Manager
Rs 4000 /- per day of absence.
2. Team Lead Rs 4000 /- per day of absence.
3. System Administrator Rs 3000 /- per day of absence.
4. Database Administrator (DBA)
Rs 2500 /- per day per absent resource. At least one DBA resource is required to be present, else penalty of Rs 3000/- per day shall be levied on all DBAs.
5. Senior Software Developer & Software Developer
Rs 2000 /- per day per absent resource. At least Four developer resources are required to be present, else penalty of Rs 2500/- per day shall be levied on all absent developers.
6. Tester Rs 2000 /- per day per absent resource
7. Training Manager cum Technical Writer
Rs 1500 /- per day of absence.
8. Helpdesk Manager Rs 1500 /- per day per absent resource.
9. Help Desk Resources
Rs 500 /- per day per absent resource. At least four Help Desk resources are required to be present else penalty of Rs 1000/- per day shall be levied on all absent Help desk resources.
In case of non-availability of more than 10 resources in a day deployed as O&M
Team for 5 times in a month without a permission from Project Coordinator of RISL,
payment due for that quarter shall not be made. Additionally, penalties as mentioned
above for non-availability of resources (as applicable) shall be levied.
d. Penalty for attrition of key resources during the O&M period:
The Selected Bidder shall make sure that the key personnel involved in the study,
design, development, testing, deployment and operation & maintenance of the
Page 3 of 15
software solution are designated to the project for the entire project duration. In case,
any key person listed below leaves the project without one months’ notice and
approval from RISL, the following penalties shall be applicable:
Table 7.6: Penalty for attrition of key resources during the O&M period
S. No.
Resource Type Penalty
1. Business Analyst cum Project Manager
Rs 50,000 /- on second change and thereafter on every change.
2. Team Lead Rs 30,000 /- on second change and thereafter on every change.
3. System Administrator Rs 30,000 /- on second change and thereafter on every change.
4. Database Administrator Rs 30,000 /- on second change and thereafter on every change.
5. Senior Software Developer & Software Developer
Rs 25,000 /- on second change and thereafter on every change.
6. Tester Rs 25000 /- on second change and thereafter on every change.
7. Training Manager cum Technical Writer
Rs 2500/- on second change and thereafter on every
change.
8. Helpdesk Manager Rs 2500/- on second change and thereafter on every change.
9. Help Desk Resources Rs 2500 /- on third change and thereafter on every change.
However, for any resource replacement, if the selected bidder provides a better
resource in terms of profile and experience, the applicable penalty may be waived off
at complete discretion of RISL.
e. The review committee shall thoroughly examine the case before calculation of
penalty and reasons thereof. Delay in performance/ delivery of services for reasons
non-accountable to the selected bidder or due to reasons beyond control, may be
dealt with accordingly.
f. The maximum total penalty in any quarter (excluding non-availability of deployed
manpower/ resources/ personnel) shall not be more than 15% of the total amount
due for the quarter. Imposition of penalties amounting to 15% of the quarterly
contract value for a continuous period of 2 quarters shall be treated as non-
performance and beyond which the tendering authority may initiate action as per
RFP terms and condition for breach of SLA if not satisfied with the response given by
the selected bidder for reasons thereof. The tendering authority may also forfeit the
Page 4 of 15
PSD and also debar the Selected Bidder from bidding (for all types and form of bids)
for at least three years in RISL and DoIT&C.
8.2 ANNEXURE-2: RESOURCE DEPLOYMENT
1. Software Solution Development phase: The selected bidder shall deploy minimum
following resources at Onsite and Offshore for the development of Integrated Raj e-
Office Application within 15 days from the date of issuance of work order for the
period as specified in below Table Ann 2.1.
Table Ann 2.1: Development Team S.
No. Role
(Category)
No of Resour
ces
Experience Minimum number of
resource as part of
Onsite Dev. Team
Minimum number of
resource as part of
Offshore Dev. Team
1 Project Manager (A)
1 • B.E/ B.Tech/ MCA or higher degree in IT
• Having at least 10 years of post-qualification relevant work experience in design and development of customized IT applications
• 5+ years of project management experience working through the design, development, release (SDLC) cycle delivering software application projects & should have managed the projects in following technologies:
o RDBMS (SQL, Oracle, My SQL, Postgress SQL etc.)
o Web Technology: J2EE/ Advanced Java/ Microsoft .Net/ Sharepoint etc.
• Must have good understanding of Government Processes and IT automation initiatives in e-Governance Domain
1
Deploy 1 Project
Manager from project initiation till the Go-live of Phase-III of Integrated Raj e-Office Application
0
2 Business Analyst (A)
2 • B.E/ B.Tech/ MCA or higher degree in IT
• Having at least 10 years of post-qualification relevant work experience in design and development of customized IT applications
2
Deploy 1 Business
Analyst from project
initiation till
0
Page 5 of 15
Table Ann 2.1: Development Team S.
No. Role
(Category)
No of Resour
ces
Experience Minimum number of
resource as part of
Onsite Dev. Team
Minimum number of
resource as part of
Offshore Dev. Team
• 5+ years of experience in requirement gathering & analysis, capturing existing business process of government & process re-engineering, preparation of SRS document.
the Go-live of Phase-II
of Integrated Raj e-Office Application
+ Deploy 1 Business
Analyst from project
initiation till approval of
SRS of Phase-III of Integrated
Raj e-Office Application
of Integrated Raj e-Office Application
3 Team Lead (A)
1 • B.E/ B.Tech/ MCA or higher degree in IT
• Having at least 7 years of post-qualification relevant work experience in design and development of customized IT applications
• 3+ years of experience in leading a project through the design, development, release (SDLC) cycle delivering software application projects & should have experience in following technologies:
o RDBMS (SQL, Oracle, My SQL, Postgress SQL etc.)
o Web Technology: J2EE/ Advanced Java/ Microsoft .Net/ Sharepoint etc.
1
Deploy 1 Team Lead from project initiation till the Go-live of Phase-II
of Integrated Raj e-Office Application
0
4 System Administrator (B)
1 • BE/ B.Tech/ MCA with minimum 5 Years of working experience as system administrator
1
Deploy 1 System
Admin. from
0
Page 6 of 15
Table Ann 2.1: Development Team S.
No. Role
(Category)
No of Resour
ces
Experience Minimum number of
resource as part of
Onsite Dev. Team
Minimum number of
resource as part of
Offshore Dev. Team
SRS Approval of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
5 Database Administrator (B)
2 • BE/ B.Tech/ MCA with minimum 5 Years of working experience as database administrator
• Oracle/Microsoft certified Database Administrator
1
Deploy 1 Database
Admin. from SRS
Approval of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
1
Deploy 1 Database
Admin from SRS
Approval of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
6 Senior Software Developer (B)
5 • BE/ B.Tech/ MCA with minimum 5 Years of development experience in J2EE/ Advanced Java, .net etc.
2
Deploy 1 Sr. Software
Developer from SRS
Approval of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
3
Deploy 1 Sr. Software
Developer from the
SRS approval of Phase-I till the Go-Live of Phase-III of Integrated Raj e-Office Application.
+ Deploy 1 Senior
Developer from the
SRS approval of Phase-II till the Go-Live of Phase-II
of Integrated Raj e-Office
Page 7 of 15
Table Ann 2.1: Development Team S.
No. Role
(Category)
No of Resour
ces
Experience Minimum number of
resource as part of
Onsite Dev. Team
Minimum number of
resource as part of
Offshore Dev. Team Application.
+ Deploy 1 Senior
Developer from the
SRS approval of Phase-III till the Go-Live of Phase-III of Integrated Raj e-Office Application.
7 Software Developer (B)
11 • BE/ B.Tech/ MCA with minimum 3 Years of development experience in J2EE/ Advanced Java, .net etc.
5
Deploy 5 Software
Developer from SRS
Approval of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
6
Deploy 2 Software
Developer from the
SRS approval of Phase-I till the Go-Live of Phase-III of Integrated Raj e-Office Application.
+ Deploy 2 Software
Developer from the
SRS approval of Phase-II till the Go-Live of Phase-II
of Integrated Raj e-Office Application.
+ Deploy 2 Software
Developer from the
SRS
Page 8 of 15
Table Ann 2.1: Development Team S.
No. Role
(Category)
No of Resour
ces
Experience Minimum number of
resource as part of
Onsite Dev. Team
Minimum number of
resource as part of
Offshore Dev. Team approval of Phase-III till the Go-Live of Phase-III of Integrated Raj e-Office Application.
8 Test Lead (B)
1 • BE/ B.Tech/ MCA with minimum 7 Years of testing experience
• Must have experience in online & offline testing tools, load testing, regression testing & other prominent black & white box testing techniques
0 1
Deploy 1 Test Lead from SRS
Approval of Phase-I till the Go-live of Phase-III of Integrated Raj e-Office Application
9 Tester (B) 2 • BE/B.Tech./MCA with minimum 4 Years of testing experience
• Must have experience in online & offline testing tools, load testing, regression testing & other prominent black & white box testing techniques
1
Deploy 1 Tester from
SRS Approval of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
1
Deploy 1 Tester from
SRS Approval of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
10 Help Desk Manager (B)
1 • Any Graduation with minimum 4 Years of experience in managing helpdesk of handling similar profiles in providing IT related services
• Diploma/ certificate course confirming computer/IT literacy (eg. RSCIT)
1
Deploy 1 Helpdesk Manager
from Go-Live of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
0
11 Helpdesk Resources (B)
2 • Graduate in any discipline
• Diploma/ certificate course confirming computer/IT literacy (eg. RSCIT)
2
Deploy 2 Helpdesk
0
Page 9 of 15
Table Ann 2.1: Development Team S.
No. Role
(Category)
No of Resour
ces
Experience Minimum number of
resource as part of
Onsite Dev. Team
Minimum number of
resource as part of
Offshore Dev. Team
Support Engineer
from Go-Live of Phase-I till the Go-live of Phase-II
of Integrated Raj e-Office Application
Total Resources
29 17 12
2. Operations and Maintenance (O&M) phase: The selected bidder shall deploy
minimum following resources at Onsite and Offshore for the Operations & Maintenance
of Integrated Raj e-Office Application for 3 years from the date of Go-live of Phase-II of
Integrated Raj e-Office Application as specified in below Table Ann 2.2.
Table Ann 2.2: Operations & Maintenance (O&M) Team S.
No. Role Minimu
m numbe
r of Resour
ces
Experience Minimum number
of resource as part of
Onsite O&M Team
Minimum number
of resource as part of Offshore
O&M Team
1. Business Analyst/ Project Manager
1 • B.E/ B.Tech/ MCA or higher degree in IT
• Having at least 10 years of post-qualification relevant work experience in design and development of customized IT applications
• 5+ years of experience in requirement gathering & analysis, capturing existing business process of government & process re-engineering, preparation of SRS document
1 0
2. Team Lead
1 • B.E/ B.Tech/ MCA or higher degree in IT
• Having at least 7 years of post-qualification relevant work experience in design and development of customized IT
1 0
Page 10 of 15
Table Ann 2.2: Operations & Maintenance (O&M) Team S.
No. Role Minimu
m numbe
r of Resour
ces
Experience Minimum number
of resource as part of
Onsite O&M Team
Minimum number
of resource as part of Offshore
O&M Team
applications
• 3+ years of experience in leading a project through the design, development, release (SDLC) cycle delivering software application projects & should have experience in following technologies:
o RDBMS (SQL, Oracle, My SQL, Postgress SQL etc.)
o Web Technology: J2EE/ Advanced Java/ Microsoft .Net/ Sharepoint etc.
3. System Administrator
1 • BE/ B.Tech/ MCA with minimum 5 Years of working experience as system administrator
1 0
4. Database Administrator
2 • BE/ B.Tech/ MCA with minimum 5 Years of working experience as database administrator
• Oracle/Microsoft certified Database Administrator
1 1
5. Senior Developer
2 • BE/ B.Tech/ MCA with minimum 5 Years of development experience in J2EE/ Advanced Java, .net etc.
1 1
6. Developer
5 • BE/ B.Tech/ MCA with minimum 3 Years of development experience in J2EE/ Advanced Java, .net etc.
3 2
7. Tester 2 • BE/ B.Tech/ MCA with minimum 4 Years of testing experience
• Must have experience in online & offline testing tools, load testing, regression testing & other prominent black & white box testing techniques
1 1
8. Training Manager cum Technical Writer
1 • Any Graduation with minimum 4 Years of experience in writing manuals/ documentation for IT application & preparation of training material for different users
• Proficiency in Hindi and English
0 1
Page 11 of 15
Table Ann 2.2: Operations & Maintenance (O&M) Team S.
No. Role Minimu
m numbe
r of Resour
ces
Experience Minimum number
of resource as part of
Onsite O&M Team
Minimum number
of resource as part of Offshore
O&M Team
Computer Typing
• Knowledge of development & project lifecycle
9. Helpdesk Manager
1 • Any Graduation with minimum 4 Years of experience in managing helpdesk of handling similar profiles in providing IT related services
• Diploma/ certificate course confirming computer/ IT literacy (eg. RSCIT)
1 0
10. Helpdesk Resources
6 • Graduate in any discipline
• Diploma/ certificate course confirming computer/IT literacy (eg. RSCIT)
6 0
Total Resources
22 16 6
Note 1: The Selected Bidder shall deploy the minimum number of resources which shall
work from onsite and offshore as per deployment plan as mentioned in above tables
(Table Ann 2.1 & Table Ann 2.2). The selected bidder would be allowed to depute
offshore team members to work at onsite. The selected bidder may increase the team
size as per requirement and would be required to depute offshore team members onsite
as and when required to accomplish the task with quality and to meet timelines and
SLA’s without additional cost to purchaser. The Selected bidder would also submit an
undertaking periodically (preferably quarterly) confirming that the resource deployed at
offshore were present in the office and had worked on the Integrated Raj e-Office
Application project.
Note 2: RISL shall provide working space with necessary furniture, electric and internet
connectivity to the onsite development team. However, the selected bidder shall be
responsible for providing IT infrastructure to be used by its onsite development team
during application development phase.
Page 12 of 15
Note 3: RISL shall provide working space with necessary furniture, electric and internet
connectivity along-with Desktop/Laptop, as per available configuration, to the Operation
& Maintenance team deployed onsite by selected bidder during O&M Phase.
Note 4: All Roles except Tester, Training Manager cum Technical Writer, Helpdesk
Manager and Helpdesk Resources has to be on Bidder’s permanent payroll. The Bidder
may hire Tester, Training Manager cum Technical Writer, Helpdesk Manager and
Helpdesk Resources on contractual payroll for the project. In this regard, the selected
bidder shall submit an HR undertaking on quarterly basis that the resources deployed
onsite & offshore for Integrated Raj e-Office application project are on bidder’s payroll
and their type of payroll.
Note 5: The procuring entity may conduct monthly/ quarterly review meetings to monitor
the development and implementation progress of the Integrated Raj e-Office Application
with key resources deployed at Onsite and Offshore. The Selected Bidder shall ensure
that the key team members participate in the meetings. The travelling and other
expenses towards the Team members of offshore team visiting RISL to participate in
such meetings would be borne by the selected bidder. The Purchaser may also conduct
review meetings with offshore team through video conferencing.
Page 13 of 15
8.3 ANNEXURE-3: TECHNOLOGY STACK
1. It is suggested that the technology stack, available with RISL as part of RSDC
Infrastructure, as mentioned below may be utilized for the purpose of development of
Integrated Raj e-Office Application.
i. MS-Windows Server 2012 R2 w/SP1 x64
ii. MS-SharePoint Server 2013 w/SP1 x64
iii. MS-SQL Server 2014 Enterprise Edition x64
iv. MS-Exchange Server 2013 w/SP1 x64
v. MS-Lync Server 2013 x64
vi. IBM Enterprise Service Bus
vii. Adobe e-Forms Application (mandatory for use in proposed Raj e-Office
application)
2. All necessary licenses of the above mentioned technology stack, available with RISL
as part of RSDC Infrastructure, will be provided by Purchaser. The available
technology stack may be shared with other government applications.
3. Bidder may propose the development of Integrated Raj e-Office Application using
any other similar/ better technology/ products provided:
i. Proposed technology/ products should be capable of meeting requirements
as defined in RFP which will be assessed by Technology Evaluation
Committee during technical bid evaluation phase.
ii. Bidder shall provide enterprise wide perpetual licenses (to be used by citizen
and employees of all state government departments/ organizations) of
proposed technology/ products without any client/ user access license
limitation as well as restriction. Proposed technology/ products licenses, as
applicable, should be in the name of Purchaser and support at least 10,000
concurrent users along with 5 years OEM support from date of Supply/
installation at RSDC, Jaipur.
iii. Bidder must include the cost of proposed technology/ products licenses in the
offered cost of application development cost.
iv. The proposed technology/ products licenses may also be utilised by other
offices/ departments/ organisations of Government of Rajasthan for
development of other applications.
Page 14 of 15
4. Bidder may also propose other better solutions/ COTS application to be integrated
with Integrated Raj e-Office application. In such case bidder shall ensure
i. Proposed solutions/COTS application should be capable of meeting
requirements as defined in RFP which will be assessed by Technology
Evaluation Committee during technical bid evaluation phase.
ii. Bidder shall provide enterprise wide perpetual licenses (to be used by citizens
and employees of all state government departments/ organizations) of
proposed solutions/COTS application without any client/ user access license
limitation as well as restriction. Proposed solutions/COTS application
licenses, as applicable, should be in the name of Purchaser and support at
least 10,000 concurrent users along with 5 years OEM support from date of
Supply/ installation at RSDC, Jaipur.
iii. Bidder must include the cost of proposed solutions/COTS application licenses
in the offered cost of application development cost.
iv. The proposed solutions/COTS application licenses may also be utilised by
other offices/ departments/ organisations of Government of Rajasthan for
development of other applications.
Page 15 of 15