6.5cm 2.5cm gold stamping 3.6cm silver stamping · 2015. 12. 11. · site plan ad arrival plaza 1....

60

Upload: others

Post on 04-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

6.5cm

2.5cmGOLD STAMPING

SILVER STAMPING3.6cm

Page 2: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival
Page 3: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

S i m s U r b a n O a s i s i s t h e l a r g e s t

c o n d o m i n i u m d e v e l o p m e n t i n a

c i t y - f r i n g e a r e a t h a t i s e v o l v i n g i n t o

S i n g a p o r e ’s n e x t l i f e s t y l e e n c l a v e .

H e r e , y o u c a n b e c l o s e t o t h e c i t y c e n t r e ,

w h i l e e n j o y i n g a l l t h a t t h e v i b r a n t

s u r r o u n d i n g s h a v e t o o ff e r. A n d w i t h

o v e r 5 0 f a c i l i ti e s a n d a d i v e r s i t y o f u n i t

c h o i c e s , S i m s U r b a n O a s i s i s t h e o n e

r e s i d e n c e t h a t i s p e r f e c t f o r e v e r y o n e .

Page 4: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival
Page 5: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

C O N N E C T E D C I T Y L I V I N G

Page 6: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

A W E L L - P O S I T I O N E D I N V E S T M E N TJ u s t 1 0 m i n u t e s f r o m t h e c i t y c e n t r e , S i m s U r b a n O a s i s p r e s e n t s a r a r e

i n v e s t m e n t o p p o r t u n i t y t o o w n a b e a u ti f u l l y c o n c e p t u a l i z e d h o m e .

Page 7: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

ARTIST ’S IMPRESSION

Page 8: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

B e a t t h e d y n a m i c h e a r t o f f o u r m a j o r g r o w t h a r e a s . F u t u r e d e v e l o p m e n t s

w i l l t r a n s f o r m a n d r e s h a p e t h e e n ti r e p r e c i n c t .

P O T E N T I A L F O R G R O W T H

Page 9: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

• T h e n e w P a y a L e b a r C e n t r a l w i l l c o m p r i s e

a 1 2 - h e c t a r e c l u s t e r o f o ffi c e s , r e t a i l ,

F & B , e - c o m m e r c e a n d p u b l i c s p a c e s

• T h e r e j u v e n a ti o n o f G e y l a n g S e r a i w i t h a

n e w c i v i c c e n t r e t h a t w i l l o ff e r c o m m u n i t y

f a c i l i ti e s , a r t s s p a c e s a n d e v e n t s

• O n e K M a n d K a l l a n g W a v e M a l l , t o g e t h e r

w i t h e x i s ti n g m a l l s l i k e C i t y P l a z a a n d

L e i s u r e P a r k K a l l a n g , w i l l c r e a t e a m o r e

e x c i ti n g s h o p p i n g e x p e r i e n c e f o r a l l

• T h e f u t u r e n e i g h b o u r h o o d a t t h e

u p c o m i n g B i d a d a r i d e v e l o p m e n t t h a t w i l l

i n t e g r a t e w i t h a H e r i t a g e W a l k , c o m m u n a l

s p a c e s a n d a 1 0 - h e c t a r e p a r k a r o u n d t h e

b e a u ti f u l A l k a ff L a k e

• T h e e m e r g e n c e o f S i n g a p o r e ’s n e x t

e d u c a ti o n h u b w h i c h i n c l u d e s W D A

L i f e l o n g L e a r n i n g I n s ti t u t e a n d t h e

n o t a b l e J a m e s C o o k U n i v e r s i t y t h a t w i l l

e x p a n d i t s e n r o l m e n t t o 7 , 5 0 0 i n 2 0 1 9 u p

f r o m 3 , 4 0 0 s t u d e n t s i n 2 0 1 4

S U R R O U N D E D B Y

N E W G R O W T H A R E A S

B i d a d a r iE s t a t e

N e w G r o w t h A r e a

7 - M I N D R I V E

P a y a L e b a rS u b R e g i o n a l

C e n t r eN e w G r o w t h A r e a

3 - M I N D R I V E

5 - M I N D R I V EC i t y C e n t r e / C B D

N e w G r o w t h A r e a

5 M R T S T O P S

K a l l a n gR i v e r s i d eN e w G r o w t h

A r e a

S i m s D r

Pa

ya

Le

ba

r R

d

Alj

un

ied

Rd

N i c o l l H i g h w a y

A L J U N I E DM R T

S p o r t sH u b

J a m e s C o o kU n i v e r s i t y

P A N - I S L A N D E X P R E S S W A Y ( P I E )

5 - M I NWA L K

5 - M I N D R I V E

Page 10: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

Marina BayGolf Course

Singapore Flyer

Marina Barrage

PAYA LEB

AR

RD

GUILLEMARD RD

MOUNTBATTEN RD

TANJO

NG

KATON

G R

D

VICTORIA

ST

SERANGOON RD

NICOLL HIGHWAY

SIMS AVE

GEYLANG RD

SIMS DR

GEYLANG EAST CENTRAL

PAN-ISLAND EXPRESSWAY (PIE)

EAST COAST PARKWAY (ECP)

BUKIT TIMAH RD

MARINA COASTAL EXPRESSWAY (MCE)

ALJU

NIE

D R

D

Gardensby the Bay

ORCHARDSHOPPING BELT

(12-MIN DRIVE)

Kallang

SingaporeSports Hub

One KM

ORCHARD RD

Ubi(U/C)

Mattar(U/C)

Geylang Bahru(U/C)

Bendemeer(U/C)

Jalan Besar(U/C)

Telok Ayer

Downtown

CITYCENTRE

PAYA LEBARSUB-REGIONAL

CENTRE(3-MIN DRIVE)

Geylang MethodistPri Sch

James CookUniversity

KampongBugis

Lavender

Bugis

BUGIS-BRAS BASAH

Rochor(U/C)

Dhoby GhautSomerset

Singapore Management

University

Orchard

Clarke Quay

Chinatown

RafflesPlace

Bayfront

MARINABAY

Esplanade

Esplanade

Farrer Park

Boon Keng

Paya Lebar

MacPherson

Mountbatten

Dakota

NicollHighway

Stadium

PromenadeCity Hall

Bras Basah

Bencoolen(U/C)

GeylangSerai Mkt

Kallang Wave Mall

Aljunied

Kong Hwa Sch

(5-MIN DRIVE)

KALLANGRIVERSIDE

KALL

ANG

-PAY

A LE

BA

R E

XP

RE

SS

WAY

(K

PE

)

Marina BayFinancial Centre

Fort Canning(U/C)

PAN-ISLAND EXPRESSWAY (PIE)

TO AIRPORT

15-MIN DRIVE

Marina Bay

Marina South Pier

Little India

CENTRAL BUSINESSDISTRICT

(10-MIN DRIVE)

FUTUREBIDADARIESTATE

KALLANG-PAYA LEBAR EXPRESSWAY (KPE)

NEW GROWTH AREA• Future Bidadari Estate• Paya Lebar Sub-Regional Centre • Kallang Riverside• City Centre

SHOPPING AREA• Orchard Shopping Belt• Bugis - Bras Basah

North South Line

East West Line

Downtown Line

Circle Line

North East Line

500 m 1 km0

CENTRAL EXPRESSWAY (CTE)

- 3 M R T s t o p s t o c i t y c e n t r e

- 5 m i n s ’ w a l k t o A l j u n i e d M R T s t a ti o n

- 3 m i n s ’ c y c l e t o P e l t o n C a n a l P a r k C o n n e c t o r

- 8 m i n s ’ c y c l e t o S i n g a p o r e S p o r t s H u b

- 1 0 m i n s ’ d r i v e t o C e n t r a l B u s i n e s s D i s t r i c t

T H E N E W E P I C E N T R E T OL I V E , W O R K A N D P L A Y

Page 11: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

I n a d d i ti o n t o a m y r i a d o f

e n t e r t a i n m e n t , d i n i n g a n d

s h o p p i n g o p ti o n s , y o u c a n l o o k

f o r w a r d t o n e w f a c i l i ti e s ,

c o m m u n a l p l a z a s , a s w e l l a s a

s p l e n d i d w a t e r f r o n t p r o m e n a d e .

C O N N E C T I V I T Y

C o n v e n i e n t l y l o c a t e d a t i d y l l i c

S i m s D r i v e , e a r m a r k e d f o r

d e v e l o p m e n t t o b e c o m e t h e n e x t

i c o n i c l i f e s t y l e e n c l a v e , y o u a r e

n e a r t o w h a t m a tt e r s . T h e M a r i n a

B a y, C B D , S i n g a p o r e S p o r t s H u b ,

C h a n g i A i r p o r t , r e p u t a b l e s c h o o l s ,

P a y a L e b a r C e n t r a l a n d A l j u n i e d

M R T s t a ti o n .

Page 12: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

S H O P P I N G

B e p a m p e r e d b y a s p e c t a c u l a r a r r a y o f

s h o p p i n g d e l i g h t s a t b o t h t h e n e w e s t

a n d t r e n d i e s t s h o p p i n g m a l l s , a s w e l l

a s f e s ti v e b a z a a r s .

- P a y a L e b a r S q u a r e

- O n e K M

- K a l l a n g W a v e M a l l

- C i t y P l a z a

- G e y l a n g S e r a i P e d e s t r i a n M a l l

- A p e r i a S h o p p i n g M a l l

- K a l l a n g L e i s u r e M a l l

L E A R N I N G H U B

T h e n e e d f o r q u a l i t y e d u c a ti o n i s w e l l

c a t e r e d f o r. T h e r e w i l l a l s o b e a d e m a n d

f o r s t u d e n t s f r o m t h e s e e d u c a ti o n a l

i n s ti t u ti o n s f o r a c c o m m o d a ti o n n e a r

t h e i r s c h o o l s .

- J a m e s C o o k U n i v e r s i t y

- G e y l a n g M e t h o d i s t P r i m a r y S c h o o l

- K o n g H w a S c h o o l

- W D A L i f e l o n g L e a r n i n g I n s ti t u t e

- N a ti o n a l C o n ti n u i n g E d u c a ti o n

Tr a i n i n g C a m p u s ( U p c o m i n g )

WDA LifelongLearning Institute Artist’s Impression

Page 13: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

C U L T U R E &

C U I S I N E

L i v e i n t h e f u t u r e o f c o v e t e d r e s i d e n ti a l

a r e a s w h e r e c u l t u r e m e e t s m e t r o p o l i s .

S a ti s f y y o u r c r a v i n g f o r l o c a l d e l i g h t s a t

n o s t a l g i c S i m s V i s t a M a r k e t & F o o d C e n t r e ,

a n d G e y l a n g S e r a i M a r k e t . D i s c o v e r

t r a d i ti o n a s y o u s t r o l l a l o n g c o l o n i a l

s h o p h o u s e s a t Ta n j o n g K a t o n g . I m m e r s e

y o u r s e l f i n t h e p r e s e n t , w i t h v i s i t s t o c h i c

c a f e s a n d s w a n k y g a s t r o b a r s i n t h e v i c i n i t y.

- The Tuckshop

- Cafe Melba

- Char

- Maple and Market

S P O R T S &

L E I S U R E

S i m s U r b a n O a s i s i s d e s i g n e d t o b e a

s m a r t c o m m u n i t y h u b t h a t f o s t e r s a n

a c ti v e l i f e s t y l e . I t s v i s i o n f o r a n a c ti v e

c o m m u n i t y i s c o m p l e m e n t e d b y i t s

a c c e s s i b i l i t y t o a c y c l i n g n e t w o r k v i a

t h e n e a r b y P e l t o n C a n a l P a r k C o n n e c t o r

a s w e l l a s r e v a m p e d c a n a l s t h a t o ff e r

e v e n m o r e o p p o r t u n i ti e s f o r o u t d o o r

a c ti v i ti e s f o r a l l a g e s .

- S i n g a p o r e S p o r t s H u b

- K a l l a n g R i v e r s i d e P a r k

- P e l t o n C a n a l P a r k C o n n e c t o r

- G a r d e n s B y T h e B a y

- M a r i n a B a y G o l f C o u r s e

- G e y l a n g P a r k C o n n e c t o r

- E a s t C o a s t P a r k

Page 14: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

S e e t h e c i t y r e v e a l i t s b r e a t h t a k i n g s p l e n d o u r

f r o m t h e 1 9 t h s t o r e y s k y p a r k .

A N O A S I S I N T H E S K Y

Page 15: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

ARTIST ’S IMPRESSION

Page 16: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

E n c o m p a s s i n g a s i z e a n d s c a l e r a r e i n S i n g a p o r e , S i m s U r b a n O a s i s f e a t u r e s l a r g e o p e n

s p a c e s t h a t s t r e t c h i n t o t h e h o r i z o n , p r o v i d i n g a w i d e s p a c e f o r o u t d o o r a c ti v i ti e s .

S P R A W L I N G R E C R E A T I O N A L S P A C E S

Page 17: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

ARTIST ’S IMPRESSION

Page 18: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

L o u n g e o n t h e O a s i s A q u a B e d s b y t h e s p a r k l i n g

w a t e r s o f t h e 5 0 m l a p p o o l .

U L T I M A T E R E L A X A T I O N A N D R E J U V E N A T I O N

Page 19: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

ARTIST ’S IMPRESSION

Page 20: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

B e s u r r o u n d e d b y m e ti c u l o u s l y - d e s i g n e d l a n d s c a p i n g t h a t u n i fi e s l u s h g r e e n e r y

w i t h s e r e n e w a t e r s . H o s t a n a l f r e s c o g r i l l s o i r e e b y t h e p a r t y p o o l a n d t h e

a d j o i n i n g p a r t y s p a p o o l , a n d c r e a t e a n e v e n i n g t o r e m e m b e r.

L U S H A R E A S F O R B O N D I N G

Page 21: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

ARTIST ’S IMPRESSION

Page 22: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

C h o o s e f r o m a v a r i e t y o f l u s h v e n u e s t h a t a r e i d e a l f o r a n y e v e n t t h a t

b r i n g s t o g e t h e r f a m i l y a n d f r i e n d s . T h e G r a n d L a w n i s t h e i m p r e s s i v e

p l a c e f o r a g a r d e n p a r t y. H e r e , y o u r g u e s t s c a n f e a s t a n d m i n g l e w h i l e

t h e c h i l d r e n e n j o y e n d l e s s h o u r s o f f u n a t t h e K i d ’s P l a y P a r k .

M Y R I A D C H O I C E S F O R C E L E B R A T I O N S

Page 23: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

ARTIST ’S IMPRESSIONARTIST ’S IMPRESSION

Page 24: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

S I T E P L A N

ALJ

UN

IED

RO

AD

ARRIVAL PLAZA1. Drop-off Point

2. Guard House

3. Arrival Water Feature

4. Arrival Pavilion

5. Arrival Lawn

6. Childcare Centre

7. Shops

HANGOUT8. Outdoor Fitness Area

9. Kid’s Play Park

10. Lawn Hangout Seats

11. Grand Lawn

12. Changing Room

13. Hangout Area

14. Steam Room

15. The Club

16. Gymnasium

WELLNESS17. Wellness Pod

18. Zen Pod

19. Spa Pod

20. Wellness Pavilion

21. Garden Fitness Pavilion

22. Tennis Court

URBAN EDGE23. Garden Pavilion

24. Urban Pavilion

25. Meeting Pod

26. Urban Edge Pool

27. Urban Deck

SIDE WALK28. Side Walk Alfresco

29. Convening Pavilion

30. Side Gate

31. Shops

OASIS32. Oasis Aqua Bed

33. 50m Lap Pool

34. Oasis Chill Out Deck

35. Oasis Spa

36. Oasis Pavilion

37. Oasis Bubble Jet

FAMILY38. Family Wet Deck

39. Family Lounge Deck

40. Family Sun Deck

41. 50m Family Fun Pool

42. Sun Cabanas

43. Children’s Wading Pool

44. Children’s Play Pool

45. Family Alfresco Area

46. Family BBQ Pavilion

47. Jogging Trail

SKY PARK48. Sky Pavilion

49. Celebration Deck

50. Celebration Pavilion

51. Sky Fitness Pavilion

PARTY TERRACE52. Party Spa Pool

53. Swing Pod

54. BBQ Party Pavilion

55. 20m Party Pool

Page 25: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

PAN ISLAND EXPRESSWAY

SIMS DRIVE

N

SKY PARK

ARTIST ’S IMPRESSION

Page 26: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

A t S i m s U r b a n O a s i s , a h o m e i s m o r e t h a n a d w e l l i n g . A h o m e i s w h e r e h a r m o n i o u s f a m i l y l i f e

i s f o s t e r e d , l a s ti n g f r i e n d s h i p s a r e f o r g e d a n d m e m o r a b l e m o m e n t s a r e c r e a t e d . T h o u g h tf u l l y

d e s i g n e d , t h e a m e n i ti e s c r e a t e o p p o r t u n i ti e s f o r i n t e r a c ti o n . W h e t h e r i t ’s a f a m i l y w i t h

c h i l d r e n , a s i n g l e o r a c o u p l e , t h i s i s a r e s i d e n c e f o r e v e r y o n e .

T H E P E R F E C T H O M EF O R E V E R Y L I F E S T Y L E

Page 27: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

ARTIST ’S IMPRESSION

Page 28: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

D e s i g n e d t o m a x i m i s e s p a c e e ffi c i e n c y i n a c o s y s e tti n g .

S U I T E S

Page 29: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

W i t h h i g h c e i l i n g s a n d a m p l e s p a c e , y o u c a n

u n l e a s h y o u r c r e a ti v i t y a n d d e s i g n t h e h o m e

y o u h a v e a l w a y s d r e a m e d o f.

L O F T

Page 30: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

T h e p e r f e c t f a m i l y r e s i d e n c e w i t h g e n e r o u s s p a c e f o r

c h i l d r e n t o g r o w. A l s o i d e a l f o r m u l ti - g e n e r a ti o n

f a m i l i e s , w i t h o u t c o m p r o m i s i n g o n p r i v a c y f o r a l l .

D E L U X E

Page 31: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

L u x u r y h a s a n e w m e a n i n g . A r r i v e h o m e t o a c h i c

c o n t e m p o r a r y a b o d e l a v i s h e d w i t h t h o u g h tf u l l y

c r e a t e d a n d f u n c ti o n a l s p a c e s .

G R A N D

Page 32: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

Type A2bL43 sq m/ 463 sq ft

TOWER 12#02-44 to #14-44#05-48 to #14-48

#02-45 to #14-45 (mirror)

1 - B E D R O O M L O F T

Type A2bL-P43 sq m/ 463 sq ft

TOWER 12#01-44 and #04-48

#01-45 (mirror)

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

SECTION

UPPER DECK

SECTION

UPPER DECK

Page 33: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

Type A1L45 sq m/ 484 sq ft

TOWER 12#05-49 to #14-49#05-51 to #14-51

#05-50 to #14-50 (mirror)#05-52 to #14-52 (mirror)

1 - B E D R O O M L O F T

Type A2bL-R57 sq m/ 614 sq ft(inclusive of 14 sq m void)

TOWER 12#15-44, #15-46 and #15-48

#15-45 (mirror)

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

SECTION

UPPER DECK

Page 34: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

Type A1L-P45 sq m/ 484 sq ft

TOWER 12#04-49 and #04-51

#04-50 and #04-52 (mirror)

Type A1L-R61 sq m/ 657 sq ft(inclusive of 16 sq m void)

TOWER 12#15-49 and #15-51

#15-50 and #015-52 (mirror)

1 - B E D R O O M L O F T

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

UPPER DECK

SECTION

Page 35: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

1 - B E D R O O M L O F T

Type A2aL-R59 sq m/ 635sq ft(inclusive of 16 sq m void)

TOWER 12#15-54

Type A2aL43 sq m/ 463 sq ft

TOWER 12#02-54 and #14-54

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

SECTION

UPPER DECK

Page 36: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

1 - B E D R O O M L O F T

Type A2cL43 sq m/ 463 sq ft

TOWER 12#02-46 and #14-46

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

Page 37: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

Type B1L-P66 sq m/ 710 sq ft

TOWER 12#01-47 and #04-53

2 - B E D R O O M L O F T

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

Type B1L66 sq m/ 710 sq ft

TOWER 12#02-47 to #14-47#05-53 to #14-53

Page 38: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

Type B1L-R82 sq m/ 883 sq ft(inclusive of 16 sq m void)

TOWER 12#15-47#15-53

2 - B E D R O O M L O F T

Type B2L65 sq m/ 700 sq ft

TOWER 12#02-55 to #14-55

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

SECTION

UPPER DECK

Page 39: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

Type B2L-P66 sq m/ 710 sq ft

TOWER 12#01-55

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

2 - B E D R O O M L O F T

Type B2L-R81 sq m/ 872 sq ft(inclusive of 16 sq m void)

TOWER 12#15-55

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

SECTION

UPPER DECK

Page 40: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

Type A1-R52 sq m/ 560 sq ft(inclusive of 14 sq m void)

TOWER 10#18-33 and #18-37

#18-34 and #18-38 (mirror)

1 - B E D R O O M S U I T E S

Type A3a-R54 sq m/ 581 sq ft(inclusive of 13 sq m void)

TOWER 2#19-04 and #19-06

#19-05 (mirror)

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

SECTION

UPPER DECK

UPPER DECK

SECTION

Page 41: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

1 - B E D R O O M S U I T E S

Type A3b41 sq m/ 441 sq ft

TOWER 2#03-12 to #18-12

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

Type A3b-R54 sq m/ 581 sq ft(inclusive of 13 sq m void)

TOWER 2#19-12

SECTION

UPPER DECK

Page 42: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

Type B1-P63 sq m/ 678 sq ft

TOWER 2 & 10#02-13, #02-17, #01-41and #01-43

#02-01, #02-14, #01-30and #01-42 (mirror)

Type B162 sq m/ 667 sq ft

TOWER 2 & 10#03-13 to #18-13#03-17 to #18-17#02-41 to #17-41#02-43 to #17-43

#03-01 to #18-01 (mirror)#03-14 to #18-14 (mirror)#02-30 to #17-30 (mirror)#02-42 to #17-42 (mirror)

2 - B E D R O O M S U I T E S

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

Page 43: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

Type B1-R77 sq m/ 829 sq ft(inclusive of 15 sq m void)

TOWER 2 & 10#19-13, #19-17, #18-41 and#18-43

#19-01, #19-14, #18-30 and#18-42 (mirror)

2 - B E D R O O M S U I T E S

Type B258 sq m/ 624 sq ft

TOWER 2 & 10#02-07 to #18-07#02-11 to #18-11#03-15 to #18-15#05-35 to #17-35

#02-03 to #18-03 (mirror)#02-08 to #18-08 (mirror)#03-16 to #18-16 (mirror)#05-36 to #17-36 (mirror)

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

SECTION

UPPER DECK

Page 44: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

Type B2-R74 sq m/ 797 sq ft(inclusive of 16 sq m void)

TOWER 2 & 10#19-07, #19-15 and #18-35

#19-03, #19-16 and #18-36 (mirror)

Type B2-P58 sq m/ 624 sq ft

TOWER 2#01-07 and #01-11

TOWER 2 & 10#01-03, #01-08, #02-16and #04-36 (mirror)

2 - B E D R O O M S U I T E S

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

SECTION

UPPER DECK

Page 45: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

3 - B E D R O O M S U I T E S

Type Cc176 sq m/ 818 sq ft

TOWER 2#03-02 to #18-02

Type Cc1-P77 sq m/ 829 sq ft

TOWER 2#02-02

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

Page 46: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

3 - B E D R O O M S U I T E S

Type Cc1-R93 sq m/ 1001 sq ft(inclusive of 17 sq m void)

TOWER 2#19-02

Type Cc2 DK89 sq m/ 958 sq ft

TOWER 10#02-31 to #17-31#05-39 to #17-39

#05-32 to #17-32 (mirror)#02-40 to #17-40 (mirror)

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

SECTION

UPPER DECK

Page 47: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

3 - B E D R O O M S U I T E S

Type Cc2 DK-P89 sq m/ 958 sq ft

TOWER 10#01-31 and #04-39

#04-32 and #01-40 (mirror)

Type Cc2 DK-R105 sq m/ 1130 sq ft(inclusive of 16 sq m void)

TOWER 10#18-31 and #18-39

#18-32 and #18-40 (mirror)

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

SECTION

UPPER DECK

Page 48: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

2 - B E D R O O M D E L U X E

Type B3 DK73 sq m/ 786 sq ft

TOWER 8#04-28 to #17-28

TOWER 6#04-23 to #17-23 (mirror)

Type B3 DK-R89 sq m/ 958 sq ft(inclusive of 16 sq m void)

TOWER 8#18-28

TOWER 6#18-23 (mirror)

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

SECTION

UPPER DECK

Page 49: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

3 - B E D R O O M D E L U X E

Type C389 sq m/ 958 sq ft

TOWER 6 & 8#04-24 and #17-24#04-29 and #17-29

#04-22 and #17-22 (mirror)#04-27 and #17-27 (mirror)

Type C3-R110 sq m/ 1184 sq ft(inclusive of 21 sq m void)

TOWER 6 & 8#18-24 and #18-29

#18-22 and #18-27 (mirror)

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

SECTION

UPPER DECK

Page 50: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

3 - B E D R O O M D E L U X E

4 - B E D R O O M D E L U X E

Type C295 sq m/ 1023 sq ft

TOWER 4#04-20 to #18-20

#04-21 to #18-21 (mirror)

Type Dc192 sq m/ 990 sq ft

TOWER 4#05-19 to #18-19

#05-18 to #18-18 (mirror)

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

Page 51: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

5 - B E D R O O M D E L U X E

Type E1161 sq m/ 1733 sq ft

TOWER 8#04-26 to #17-26

Type E1-R189 sq m/ 2034 sq ft(inclusive of 28 sq m void)

TOWER 8#18-26

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

UPPER DECK SECTION

Page 52: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

3 - B E D R O O M G R A N D

Type C196 sq m/ 1033 sq ft

TOWER 16 & 18#02-57 to #17-57#02-61 to #17-61#02-63 to #17-63

#02-58 to #17-58 (mirror)#02-60 to #17-60 (mirror)#02-62 to #17-62 (mirror)

Type C1-P99 sq m/ 1066 sq ft

TOWER 16 & 18#01-57, #01-61 and #01-63

#01-58, #01-60 and #01-62 (mirror)

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

Page 53: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

3 - B E D R O O M G R A N D

Type C1-R123 sq m/ 1324 sq ft(inclusive of 27 sq m void)

TOWER 16 & 18#18-57, #18-61 and #18-63

#18-58, #18-60 and #18-62 (mirror)

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

SECTIONUPPER DECK

Page 54: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

4 - B E D R O O M G R A N D

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

Type D1112 sq m/ 1206 sq ft

TOWER 16#02-59 to #17-59

#02-56 to #17-56 (mirror)

Type D1-P116 sq m/ 1249 sq ft

TOWER 16#01-59

#01-56 (mirror)

Page 55: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

Type D1-R143 sq m/ 1539 sq ft(inclusive of 31 sq m void)

TOWER 16#18-59

#18-56 (mirror)

4 - B E D R O O M G R A N D

LEGEND: F - Fridge DB/ ST - Distribution Board W - Washing Machine cum Dryer A/C Ledge - Aircon Ledge

TOWER 8

TOWER 6

TOWER 18

TOWER 16

TOWER 10

TOWER 12

TOWER 4

TOWER 2

32 33 34 3536 37 38

39

31 3043

4241

40

48 49 5052

5153

47 46 45 44 5554

59

5658

5762

61

63

60

2

1213

14 1516

171

34567

8910

1118 19

2021

27

29

22

24

28

23

26

25

PAN ISLAND EXPRESSWAY (PIE)

ALJUN

IED R

OAD

SIMS DRIVE

0 1 2 3 4 5M

All areas stated herein include PES (private enclosed space), PRT (private roof terrace), balcony, A/C Ledge and void where applicable. All areas and measurements stated herein are approximate and subject to adjustment on �nal survey. Layout/ location of wardrobes, kitchen cabinets, fan coil units, DB, electrical points, door swing directions and plaster ceiling boards are subject to Developer's sole discretion and �nal design. Please refer to the key plan for orientation.

SECTIONUPPER DECK

Page 56: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

Goodwood Residence

Leedon Residence Artist’s Impression

Tanjong Pagar Centre Artist’s Impression

Damansara City Artist’s Impression

About Guocoland

GuocoLand Limited is a public company listed on the Singapore Exchange since 1978. The principal business activities of its subsidiaries

are property development, property investment, hotel operations and property management. As a premier regional property company,

GuocoLand is focused on achieving scalability, sustainability and growth in its core markets through its property development,

investment and management businesses.

Projects in Singapore

In Singapore, GuocoLand has successfully developed and sold 33 residential projects yielding more than 9,000 apartments and homes

over the last 25 years. GuocoLand now holds a portfolio of premium developments in the prime districts of Singapore, its flagship

development being the Tanjong Pagar Centre, a multi-bill ion integrated mixed-use development in the Central Business District (CBD).

To be completed in 2016, it has already achieved the LEED (CS) (Leadership in Energy and Environmental Design) Platinum

Pre-certification. The commercial components have also been presented with the Singapore BCA (Building and Construction Authority)

Green Mark Platinum Award. GuocoLand is also responsible for notably eco-friendly buildings such as the Green Mark award-winning

Goodwood Residence and Sophia Residence. Other projects, such as Tanjong Pagar Centre, Leedon Residence, Ell iot at East Coast, The

Quartz and The Waterline have also won the prestigious award, which is the highest honour for certified green buildings in Singapore.

Projects Overseas

GuocoLand China (GLC), has been active in China since 1994. GLC is an established

property developer in China with a sizeable portfolio of properties in Beijing,

Shanghai, Nanjing and Tianjin, including integrated mixed-use developments

Beijing Guoson Centre and Shanghai Guoson Centre, which have both won awards

at the Asia Pacific International Property Awards 2010.The Group has also

developed properties in Malaysia and Vietnam, most notably mixed-use project

Damansara City, KLCC’s luxury condo The Oval and boutique gated bungalow

community The Rise in Kuala Lumpur, and The Canary, an integrated development

30 minutes away from Ho Chi Minh City.

C r e a ti n g t h o u g h tf u l s p a c e s f o r c o m m u n i ti e s .

Page 57: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

N a m e o f H o u s i n g P r o j e c t : s i m s U r b a n O a s i s • N a m e o f D e v e l o p e r : S i m s U r b a n O a s i s P t e . L t d . ( R e g n o . 1 9 9 5 0 3 1 2 1 C ) • D e v e l o p e r ’s l i c e n c e : C 1 1 5 4 • Te n u r e o f l a n d : L e a s e h o l d o f 9 9 y e a r s c o m m e n c i n g 2 9 J u l y 2 0 1 4 • E n c u m b r a n c e o n l a n d : P r e s e n t l y e n c u m b e r e d t o O v e r s e a - C h i n e s e B a n k i n g C o r p o r a ti o n L i m i t e d ( a s m o r t a g e e a n d s e c u r i t y t r u s t e e ) p u r s u a n t t o a n A s s i g n m e n t a n d M o r t a g e e x e c u t e d - i n - e s c r o w i n f a v o u r o f O v e r s e a - C h i n e s e B a n k i n g C o r p o r a ti o n L i m i t e d ( a s m o r t g a g e e a n d s e c u r i t y t r u s t e e ) • L e g a l d e s c r i p ti o n o f l a n d : L o t 1 0 7 1 3 L o f M u k i m 2 4 a t S i m s D r i v e • E x p e c t e d d a t e o f v a c a n t p o s s e s s i o n : 3 0 J u n e 2 0 2 0 • E x p e c t e d d a t e o f l e g a l c o m p l e ti o n : 3 0 J u n e 2 0 2 3

W h i l e e v e r y r e a s o n a b l e c a r e h a s b e e n t a k e n i n p r e p a r i n g t h i s b r o c h u r e , n e i t h e r t h e D e v e l o p e r n o r i t s a g e n t s w i l l b e h e l d r e s p o n s i b l e f o r a n y i n a c c u r a c i e s o r o m i s s i o n s a r i s i n g f r o m a n y c h a n g e o f f a c t s o r c i r c u m s t a n c e s o c c u r r i n g a ft e r t h e d a t e o f p r i n t o f t h i s b r o c h u r e . A l l i n f o r m a ti o n a n d s p e c i fi c a ti o n s a r e c u r r e n t a t t h e ti m e o f g o i n g t o p r e s s a n d a r e s u b j e c t t o s u c h c h a n g e s a s m a y b e r e q u i r e d b y t h e D e v e l o p e r a n d / o r a p p r o v e d b y t h e r e l e v a n t a u t h o r i ti e s a n d n o ti fi e d t o t h e D e v e l o p e r a ft e r t h e d a t e o f p r i n t o f t h i s b r o c h u r e . A l l p l a n s a n d m o d e l s a r e d r a w n t o s c a l e b u t a r e s u b j e c t t o a n y a m e n d m e n t s w h i c h a r e r e q u i r e d b y t h e D e v e l o p e r a n d / o r a p p r o v e d b y t h e r e l e v a n t a u t h o r i ti e s a n d n o ti fi e d t o t h e D e v e l o p e r a ft e r t h e d a t e o f p r i n t . A l l r e n d e r i n g s a n d i l l u s t r a ti o n s a r e a r ti s t ’s i m p r e s s i o n s o n l y a n d p h o t o g r a p h s a r e o n l y d e c o r s u g g e s ti o n s a n d c a n n o t b e r e g a r d e d a s r e p r e s e n t a ti o n s o f f a c t . W h i l e d r a w n t o s c a l e , a l l a r e a s a n d o t h e r m e a s u r e m e n t s a r e a p p r o x i m a t e o n l y a n d s u b j e c t t o fi n a l s u r v e y a n d / o r a n y a m e n d m e n t s w h i c h a r e r e q u i r e d b y t h e D e v e l o p e r a n d / o r a p p r o v e d b y t h e r e l e v a n t a u t h o r i ti e s a n d n o ti fi e d t o t h e D e v e l o p e r a ft e r t h e d a t e o f p r i n t . F u l l r e f e r e n c e m u s t b e m a d e t o t h e F o r m 3 I n f o r m a ti o n P a c k a g e w h i c h w i l l b e s h o w n u p o n r e q u e s t w h e r e a v a i l a b l e . T h e S a l e a n d P u r c h a s e A g r e e m e n t e m b o d i e s a l l t h e t e r m s a n d c o n d i ti o n s b e t w e e n t h e D e v e l o p e r a n d t h e p u r c h a s e r a n d s u p e r s e d e s a n d c a n c e l s i n a l l r e s p e c t s a l l p r e v i o u s r e p r e s e n t a ti o n s , w a r r a n ti e s , p r o m i s e s , i n d u c e m e n t s o r s t a t e m e n t s o f i n t e n ti o n , e x p r e s s i o n s o f o p i n i o n , w h e t h e r w r i tt e n o r o r a l m a d e b y t h e D e v e l o p e r a n d / o r t h e D e v e l o p e r ’s a g e n t w h i c h a r e n o t e m b o d i e d i n t h e S a l e a n d P u r c h a s e A g r e e m e n t .

E n q u i r i e s : 6 2 2 5 9 0 0 0

w w w. s i m s u r b a n o a s i s . c o m . s g

Page 58: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival

N O T E S :

Page 59: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival
Page 60: 6.5cm 2.5cm GOLD STAMPING 3.6cm SILVER STAMPING · 2015. 12. 11. · SITE PLAN AD ARRIVAL PLAZA 1. Drop-off Point 2. Guard House 3. Arrival Water Feature 4. Arrival Pavilion 5. Arrival