Page 1: 7.15.15 RCTC 91 Project Update

91 PROJECT UPDATERiverside County Transportation Commission

Corona City Council Meeting

July 15, 2015

Page 2: 7.15.15 RCTC 91 Project Update

Location: Bridge 25 (SB I-15 to WB SR91 Connector) @ Abut 1 – Facing NortheastDescription: Backfill of abutment. Falsework removal ongoing.

Page 3: 7.15.15 RCTC 91 Project Update

Location: Bridge 27 (EB-91 @ W. Porphyry) – Facing WestDescription: BR-27 worksite. Column installation at Bent 4. CIDH drilling at Bent 5.

BR-27, Bent 4

BR-27, Bent 5

Page 4: 7.15.15 RCTC 91 Project Update

Location: Bridge 20 (EB SR-91) @ East Grand – Facing EastDescription: Pile cap formwork installation for BR-20, Abutment 1.

Retaining Wall Between BR-22 and BR-20

BR-22, Abut 1

BR-20, Abut 1

BR-22 Falsework

BR-20, Abut 2

Page 5: 7.15.15 RCTC 91 Project Update

Location: Bridge 21 (Main St. On-Ramp to I-15 @ East Grand), Abutment 1 & 2 – Facing WestDescription: Wall stem rebar and form installation for BR-21 Abut 1 and Abut 2.

BR-21, Abut 2

BR-21, Abut 1

Page 6: 7.15.15 RCTC 91 Project Update

Location: RW-217A (WB SR-91 Main St. Off-Ramp) – Facing WestDescription: Retaining wall stem installation along North Main Metrolink Park & Ride lot.

Page 7: 7.15.15 RCTC 91 Project Update

Location: Bridge 15 (EB SR-91 @ Buena Vista) – Facing EastDescription: Deck pour complete for BR-15. Prep for post tensioning.

Page 8: 7.15.15 RCTC 91 Project Update

Location: RW-207C (WB SR-91 Autocenter Off-Ramp) – Facing EastDescription: RW-207C stem wall complete.

Page 9: 7.15.15 RCTC 91 Project Update

Location: Bridge 10 (WB-91 Maple St. On-Ramp) – Facing WestDescription: Bridge 10 worksite along WB-91.

BR-10, Abut 1

BR-10, Bent 4L

BR-10, Bent 3

Page 10: 7.15.15 RCTC 91 Project Update

Location: RW-206B (WB SR-91) @ WB-91 Autocenter On-Ramp – Facing WestDescription: MSE panel installation.

Page 11: 7.15.15 RCTC 91 Project Update

Location: AutoCenter Dr./Serfas Club Dr., Stage 1A – Facing SouthDescription: Stage 1A traffic configuration implemented. Utility work along west side of roadway.

Page 12: 7.15.15 RCTC 91 Project Update

Location: Frontage Rd. (Between Ridgeview Terr. & Via Santiago) – Facing WestDescription: Curb & Gutter and aggregate base installed for new Frontage Rd. alignment.

Page 13: 7.15.15 RCTC 91 Project Update

Location: Frontage Rd. at Paseo Grande – Facing EastDescription: New Frontage Rd. realignment to Paseo Grande open to traffic.

Page 14: 7.15.15 RCTC 91 Project Update

Location: EB SR-91 Maple St. On-Ramp – Facing EastDescription: PCC paving along RW-109A for new EB SR-91 Maple St. on-ramp.

Page 15: 7.15.15 RCTC 91 Project Update

Location: Bridge 2 (WB 91/Green River Off-ramp) @ West Prado Rd. – Facing SouthDescription: Removal of falsework between Abutment 1 and Bent 3.

Page 16: 7.15.15 RCTC 91 Project Update

Location: Bridge 2 (WB 91/Green River Off-ramp) @ West Prado Rd. – Facing EastDescription: Falsework installed over Prado Rd. Stem/Soffit installation ongoing between Bent 4 and Abut 6.

Page 17: 7.15.15 RCTC 91 Project Update

Location: RW-200B (WB SR-91 @ Green River Rd.) – Facing WestDescription: Excavation along temp shoring for retaining wall construction.

Page 18: 7.15.15 RCTC 91 Project Update

Location: RW-200 & RW-200A (WB SR-91 @ BR-01) – Facing SouthwestDescription: MSE panel installation complete at BR-01.

Page 19: 7.15.15 RCTC 91 Project Update

Location: ROW Mitigation, EI Corona – Facing WestDescription: Structural steel installation for new building façade.

Page 20: 7.15.15 RCTC 91 Project Update

Upcoming ConstructionRIVERSIDE COUNTY TRANSPORTATION COMMISSION

• EB 91 to SB 15 Connector goes to 2 lanes – June 27• Serfas Club Squeeze 5 month (TBD) duration – June 27• Joy Street (right turn) to E. Grand for 4 months – July 22/(Aug 10)*• SB 71 to EB 91 Conn Lane & Meter 1 month closure – early-Aug*• New Frontage Road and EB Maple On-Ramp – mid-Aug*• Serfas Club EB On-Ramp 15 month closure – mid-Aug*• Serfas Club WB Off-Ramp 2 month closure – late-Aug*• NB 15 to WB 91 Connector Traffic Switch – mid-Aug*• Green River Road WB Off-Ramp Traffic Switch – Sep*

*Dates and durations subject to change

Page 21: 7.15.15 RCTC 91 Project Update

Stay ConnectedRIVERSIDE COUNTY TRANSPORTATION COMMISSION

sr91project.info

877-770-9191

@sr91project

sr91project.com

Real-time traffic updates, ie511.org

Check out our mobile website!

Page 22: 7.15.15 RCTC 91 Project Update