7311 STEVENS CROFT WOOD BURNING POWER PLANT THE UK’s LARGEST BIOMASS PLANT

Upload: mark-johnston

Post on 09-Apr-2017

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 7311 STEVENS CROFT PRESENTATION

7311 STEVENS CROFT

WOOD BURNING POWER

PLANT

THE UK’s LARGEST BIOMASS

PLANT

Page 2: 7311 STEVENS CROFT PRESENTATION

UHN

The

Stack

85M HIGH

45M HIGH

Page 3: 7311 STEVENS CROFT PRESENTATION

KEY ROLES

• CLIENT - E-on

• JOINT VENTURE: • CIVILS DELIVERY COMPANY – SIEMENS

• M&E DELIVERY COMPANY – METSO

• DELIVERY OF THE CIVILS WORKS: • 95% ALFRED McALPINE

• 5% Re-Bau (UK division ceased trading)

Page 4: 7311 STEVENS CROFT PRESENTATION

SOME FACTS AND FIGURES

• OVERALL PROJECT VALUE – £90m

• AMPS ELEMENT – £5.6m

• AT PEAK LOAD THE PLANT WILL PRODUCE –

50MW OF POWER OF WHICH 5MW WILL BE

RETAINED ON SITE

• ENOUGH POWER FOR 70,000 HOMES

• THE PLANT WILL BURN 220,000T OF OVEN DRIED

WOOD EACH YEAR (OR 235m3/hr) TO MEET ITS

RENEWABLE FUEL TARGET

Page 5: 7311 STEVENS CROFT PRESENTATION

PRINCIPLE QUANTITIES

• TOTAL CONCRETE PLACED – 7,000M3

• TOTAL REINFORCEMENT FIXED – 900T

• TOTAL FORMWORK INSTALLED – 11,500M2

Page 6: 7311 STEVENS CROFT PRESENTATION

KEY PROGRAMME DATES

• CONTRACT AWARD DATE: 06 April 06

• START ON SITE: 24 April 06

Page 7: 7311 STEVENS CROFT PRESENTATION

MILESTONE DATES

STRUCTURE MILESTONE MILESTONE

DATE

COMPLETION

DATE

UMA Turbine foundation finalised:

LD – £25k/wk 23 June 06 23 June 06

UHA/UGD Ready for erection of steelwork on

finalised foundation: LD – £20k/wk 26 July 06 26 July 06

UBA Ready for erection of walls and

columns on finalised foundation:

LD – £10k/wk

04 Aug 06 04 Aug 06

UMA Ready for erection of steelwork

and turbine on finalised

foundation: LD – £35k/wk

15 Sept 06 26 July 06

UBA Ready for erection of electrical

installation: LD – £15k/wk 13 Nov 06 13 Nov 06

UEA Ready for erection of mechanical

parts: LD – £10k/wk 08 Dec 06 22 Dec 06

Page 8: 7311 STEVENS CROFT PRESENTATION

ARRIVAL ON SITE

Page 9: 7311 STEVENS CROFT PRESENTATION
Page 10: 7311 STEVENS CROFT PRESENTATION

UMA

TURBINE BUILDING

Page 11: 7311 STEVENS CROFT PRESENTATION
Page 12: 7311 STEVENS CROFT PRESENTATION
Page 13: 7311 STEVENS CROFT PRESENTATION
Page 14: 7311 STEVENS CROFT PRESENTATION
Page 15: 7311 STEVENS CROFT PRESENTATION
Page 16: 7311 STEVENS CROFT PRESENTATION
Page 17: 7311 STEVENS CROFT PRESENTATION
Page 18: 7311 STEVENS CROFT PRESENTATION
Page 19: 7311 STEVENS CROFT PRESENTATION
Page 20: 7311 STEVENS CROFT PRESENTATION
Page 21: 7311 STEVENS CROFT PRESENTATION
Page 22: 7311 STEVENS CROFT PRESENTATION
Page 23: 7311 STEVENS CROFT PRESENTATION

UHA/UGD

BOILER HOUSE/ WATER DEMIN

BUILDING

Page 24: 7311 STEVENS CROFT PRESENTATION
Page 25: 7311 STEVENS CROFT PRESENTATION
Page 26: 7311 STEVENS CROFT PRESENTATION
Page 27: 7311 STEVENS CROFT PRESENTATION
Page 28: 7311 STEVENS CROFT PRESENTATION
Page 29: 7311 STEVENS CROFT PRESENTATION
Page 30: 7311 STEVENS CROFT PRESENTATION
Page 31: 7311 STEVENS CROFT PRESENTATION

UHN

THE STACK

Page 32: 7311 STEVENS CROFT PRESENTATION
Page 33: 7311 STEVENS CROFT PRESENTATION

UEA

FUEL STORAGE BUILDING

Page 34: 7311 STEVENS CROFT PRESENTATION
Page 35: 7311 STEVENS CROFT PRESENTATION
Page 36: 7311 STEVENS CROFT PRESENTATION
Page 37: 7311 STEVENS CROFT PRESENTATION
Page 38: 7311 STEVENS CROFT PRESENTATION
Page 39: 7311 STEVENS CROFT PRESENTATION
Page 40: 7311 STEVENS CROFT PRESENTATION
Page 41: 7311 STEVENS CROFT PRESENTATION
Page 42: 7311 STEVENS CROFT PRESENTATION
Page 43: 7311 STEVENS CROFT PRESENTATION
Page 44: 7311 STEVENS CROFT PRESENTATION
Page 45: 7311 STEVENS CROFT PRESENTATION
Page 46: 7311 STEVENS CROFT PRESENTATION
Page 47: 7311 STEVENS CROFT PRESENTATION
Page 48: 7311 STEVENS CROFT PRESENTATION
Page 49: 7311 STEVENS CROFT PRESENTATION
Page 50: 7311 STEVENS CROFT PRESENTATION
Page 51: 7311 STEVENS CROFT PRESENTATION
Page 52: 7311 STEVENS CROFT PRESENTATION
Page 53: 7311 STEVENS CROFT PRESENTATION
Page 54: 7311 STEVENS CROFT PRESENTATION
Page 55: 7311 STEVENS CROFT PRESENTATION
Page 56: 7311 STEVENS CROFT PRESENTATION

ADDITIONAL WORKS

THE FIRE AND DOMESTIC MAIN

Page 57: 7311 STEVENS CROFT PRESENTATION
Page 58: 7311 STEVENS CROFT PRESENTATION

THE TEAM Project Director – Stuart Cameron

Commercial Manager – Chris Notman

Project Manager – Mark Johnston

Site Support – Steve Murray

Site Support – Bob Meadows

GF – Dave Pickering

QS – Colin Irving

Senior Engineer – Brian Baguley

Site Engineer – Robert Conn

Office Manager – Jannette Young

Assistant Office Manager – Lorette Anderson

Formwork And Concrete – Tom Osprey Joiners

Reinforcement – Henderson Rebar

Structural Steel And Cladding - Polimex