74096 loa schedule - swr.indianrailways.gov.in l… · stone ballast from stacks collected on...

40
South Western Railway (Construction) Annexure -I LOA No. W496/GGHG/157 Date : 26/02/2016 of UCC Code :74096 Print Date : 26/02/2016 Name of Work : Linking of track,Regrading of track and other miscellaneous works for yards and both sides of the yards at Kudagi, Minchnal, IndiRoad, Lachayan & Tadval between Gadag‐Sholapur stations. Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS ABSTRACT Sl. No. Departmental Value as per Tender Contractor % Schedule Total Schedule Description 1 H Items of Track works 1,47,39,459.00 Indv. Rate 1,47,39,459.00 2 I Items of Linking works 2,73,96,800.00 Indv. Rate 2,73,96,800.00 3 J Items of miscellaneous works 3,59,63,725.00 Indv. Rate 3,59,63,725.00 Total Value : 7,80,99,984.00 Discount 0 % 0.00 7,80,99,984.00 Net Value : ( Rupees Seven Crore Eighty Lakh Ninety Nine Thousand Nine Hundred and Eighty Four ONLY) 1

Upload: others

Post on 24-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

South Western Railway (Construction)

Annexure -I

LOA No. W496/GGHG/157 Date : 26/02/2016 of UCC Code :74096

 Print Date : 26/02/2016

Name of Work :

Linking  of  track,Regrading  of  track  and  other  miscellaneous  works  for  yards  and  both  sides  of  the  yards  atKudagi, Minchnal, IndiRoad, Lachayan & Tadval between Gadag‐Sholapur stations.  

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

ABSTRACT

Sl. No.

Departmental Value asper Tender

Contractor % ScheduleTotal

Schedule

Description

1

H

Items of Track works 1,47,39,459.00 Indv. Rate 1,47,39,459.00

2

I

Items of Linking works 2,73,96,800.00 Indv. Rate 2,73,96,800.00

3

J

Items of miscellaneous works 3,59,63,725.00 Indv. Rate 3,59,63,725.00

Total Value : 7,80,99,984.00

Discount 0 % 0.00

7,80,99,984.00

Net Value :

( Rupees Seven Crore Eighty Lakh Ninety Nine Thousand Nine Hundred and Eighty Four ONLY)

1

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Work : Linking  of  track,Regrading  of  track  and  other  miscellaneous  works  for  yards  and  both  sides  of  the  yards  at  Kudagi,Minchnal, IndiRoad, Lachayan & Tadval between Gadag‐Sholapur stations.  

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1a

214348

Leading  and  dumping  of  Railway stone  ballast  from  stacks  collected on  either  side  of  BG  formation  at yards  /top  of  cutting  /toe  banks ,including  crossing  of  track  if required  spreading  the  ballast  on the formation, levelling uniformly to specified  thickness  boxing  profiling the ballast after linking the BG track, to  specification  BG  ballast frofile,with  all  leads  and  lifts  .using contractor's  own  men  tool plants  &  machinery  etc. complete.(payment  will  be  done  as per  stack measurement)          a)  Lead 

45533.00

98.00

1 CUM 44,62,234.00

( Rupees  Ninety Eight )

 

Contractor's % : 0       Discount : 0

1b

214349

Extra For lead more than 150 m and up to 750 m 

29733.00

70.00

1 CUM 20,81,310.00

( Rupees  Seventy )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

2

214350

Leading  and  dumping  of  Railway stone  ballast  by  rail  lorries  from stacks  collected  on  either  side  of formation/on  proposed  BG doubling/  new  formation  /at  yards at  top  of  cuttings/toe  of banks,including crossing of tracks, if required,  loading  into  rail  lorries, unloading  on  the  track,  spreading the  ballast  clear  of  the  sleeper, boxing,loadings,  men  materials  etc with  all  lifts &  leads  beyond 750 m and up to a miximum lead of 5000m using  contractor's  own men,tools,  plant  &  machinery  etc complete  during  block/  non‐block perio  (payment will  be  done  as  per stack  measurement).  ballast  by  rail lorries  from  stacks  collected  on either  side  of  formation/on proposed  BG  doubling/  new formation /at yards at top of 

15067.00

150.00

1 CUM 22,60,050.00

( Rupees  One Hundred and Fifty )

 

Contractor's % : 0       Discount : 0

2

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

cuttings/toe  of  banks,including crossing  of  tracks,  if  required, loading  into  rail  lorries,  unloading on  the  track,  spreading  the  ballast clear of the sleeper, boxing,loadings, men  materials  etc  with  all  lifts  & leads  beyond  750  m  and  up  to  a miximum  lead  of  5000m  using contractor's  own  men,tools, plant  &  machinery  etc  complete during  block/  non‐block  perio (payment will  be  done  as  per  stack measurement). 

3

214351

Consolidation  of  already  spread Ballast  with  road  roller  of  8/10 tonne  to  the  required  profile  with contractors Road  rollers,  fuel,  other consumables,  labour,tools,  plant  all leads,  lifts,  etc  complete  as  per specification  and  as  directed  by  the Engineer  in  ‐charge.  (For  rolling  in turn‐out  portions  1.50  times  the length of T/O shall be considered for payment purpose.) 

25375.00

15.00

1 TRM 3,80,625.00

( Rupees  Fifteen )

 

Contractor's % : 0       Discount : 0

4

065831

Manual Packing of points & crossing on  PSC  sleeper  layout  for consolidation  of  ballast  by  giving two  rounds  of  packing  in  stages  to facilitate  relaxing  of  speed restriction  from  15  kmph    with contractors  labour,  tools,  plant complete  including  attending  to slack packing as and when required as  per  the  p.way  manual  provision under  traffic  condition.(a)  For  1  in 12  layout. 

22.00

4,000.00

1 SET 88,000.00

( Rupees  Four Thousand )

 

Contractor's % : 0       Discount : 0

5

218333

b)Same  as  4,  above  for  1  in  8  1/2 layout. 

6.00

4,000.00

1 SET 24,000.00

( Rupees  Four Thousand )

 

Contractor's % : 0       Discount : 0

6

065837

Fabrication and  fixing of check rails for  trolley  path/level  crossing  with 52  kg/90R  rails  on  PSC  sleepers duly drilling of holes in PSC sleepers 

150.00

450.00

1 M 67,500.00

( Rupees  Four Hundred and Fifty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates 

3

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

16mm dia as directed for fixing chck rails  with  all  operations  such  as cutting,bending  the  52kg/90R  rails to  the  proper  size  along with  fixing contractors  grip  expansion  bolt  and nut  and  heavy  duty washers  as  per drawing  no.302/04/R  of  size 16x140x150. 

for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

7

065835

Slewing existing or newly assembled track  on  PSC/Wooden/CST‐9 sleepers  under  line  block  to  the correct  locations  and  alignement and  attedning  to  one  round  kutcha packing  during  line  block  or  non‐block  periods  as  directed  by  the Engineer‐in‐cjharge( Maximum slew will be 2.00m) 

2000.00

150.00

1 M 3,00,000.00

( Rupees  One Hundred and Fifty )

 

Contractor's % : 0       Discount : 0

8

065872

Assembling  of  swithches  and crossings and  slewing and  inserting the pre‐assembled swithches  in  line block  and  inserting  the  special  size PSC  sleeprs  inlead  portion  and turnout  at  contractor's  supply  of rubber  pads  including  wherver required  duly  cutting  the  approach rails  and  replacing  the  rails  during the  line  block  with  contractor's labour,  tools  and  plants  duly dismanting  the eixsting  track  to  the required  length  and  connecting  the poiints  and  corssings  in  runing  line to  the  correct  alignment,  level,  3 rounds of packing with  contractor's supply  of  complete  as  directed  by engineer‐in‐charge No claim shall be admissible  if  the  line  block  is conacelled  or  postponed  at  a  short notice.    All  permanent  way  Fittings and  other        released  Materials release  on  insertion  are  to  be euacked out by the contractor to the nearest PWI stores depot at Mysore.  a) 1 in 12 PSC Layout. 

22.00

70,000.00

1 SET 15,40,000.00

( Rupees  Seventy Thousand )

 

Contractor's % : 0       Discount : 0

4

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

9

065873

b) 1 in 8.5 PSC layout. 

4.00

65,000.00

1 SET 2,60,000.00

( Rupees  Sixty Five Thousand )

 

Contractor's % : 0       Discount : 0

10

065886

Gas  cutting  of  rails  /  rail  post  of various section and releasing the rail posts  ,  all with  contractor's  labour  , tools  &  plants  ,  machinery  , consumables  ,  etc..,  complete  as directed  by  the  Engineer  ‐  in  ‐charge.                                  This item includes  Transportation  of  released Rails  to  specified  P.Way  stores Depot  at  MYA/MNGT/MYS/Y  as directed by engineer in charge. 

2000.00

90.00

1 EACH 1,80,000.00

( Rupees  Ninety )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

11

065887

Replacement  of  metal  liners  in running  track  by  providing  GFN liners  as  required  for  proposed track  circuting  purpose  ,  including removing  ,  cleaning  of  ER  clips  and re  ‐  driving  the  same  ER  clips  , greasing  of  ER  clips  with contractor's  supply  of  grease graphite  of  approved  quality  ,  with all  lead  and  lift  ,  transportation  of GFN liners from at nominated depot to  workspot  ,  transportation  and handing  over  released  metal  liners to  specified  P.Way  depot    ,  all  with contractor's  tools  and  plants  , complete  as  directed  by  Engineer  ‐in  ‐  charge.  Note: GFN Liners will be supplied by Railways  and    Released  Metal linears  to  be  handed  over  to specified  P.Way  stores  at MYA/MYS/MNGT. 

5000.00

10.00

1 EACH 50,000.00

( Rupees  Ten )

 

Contractor's % : 0       Discount : 0

12

065890

Provision  of  covered accommodation by water proof tent (similer type ) of approximate size 3 x 3m including fixing at the required location with required location with two  tables  ,  four  chair  and  pure drinking water in 20 ltr / daily  , one pedestal electrical fan , providing 

10.00

1,500.00

1 PERDAY

15,000.00

( Rupees  One Thousand Five Hundred )

 

Contractor's % : 0       Discount : 0

5

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

electrical  power    duly  with contrators  generator  of  required capacity four tube lights with in and out  side  the  tent  with  required switch  boards,  elecrical  wires,  etc., all  ascents,  descents,  taxes  octroi, cess,  fees,  duties  with  contractor's tools  and  plants  materials, consumables,  labour,  crew machineryies   with all  lead and  lifts etc.,  complete  as  per  special conditions/specification/ regulations  and  as  directed  by Engineer‐in‐charge.Note: 1. Stand by gnerator  has  to  be  available  in  the tent apart from the runing generator for  ensuring  round  the  clock  power supply. 

13

065920

Manufacturing  and  supply    at  site winch  for  lifting  barriers  as  per Drg.No.  SA  8132A  with  all  fittings and        fastening  with    contractor's Materials ,labour, machinery  tools & plants, consumables, transportation, lead lift etc., complete as directed by the Engineer‐in‐charge. 

4.00

35,000.00

1 NOS 1,40,000.00

( Rupees  Thirty Five Thousand )

 

Contractor's % : 0       Discount : 0

14

065921

Manufacturing  and  supply  at  site lifting  barrier  of  suitable  length (suitable  for  interlocked/non‐interlocked)  with  all  accessories including  painting  of  LB  with  two coats  of  enamel  paints  of  approved colours  andquality  over  one  coat  of primer  with  all  contractor's materials,  labour,machinery, tools & plants,  consumables, transtportation,  lead  lift  etc. completed  and  as  directed  by  the Engineer‐In‐Charge.      8 metre  clear length as per Drg. No.SA‐ 8844. 

4.00

1,45,000.00

1 SET 5,80,000.00

( Rupees  One Lakh Forty Five Thousand )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

15

065922

Fabrication,  supplying  and  erection of steel wicket gate for level crossing withcontractor's  supply  of  all materials like flats, MS. Pipes, MS 

4.00

10,000.00

1 SQM 40,000.00

( Rupees  Ten Thousand )

 

Contractor's % : 0       Discount : 0

6

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

rods,  steel  rods  angles,  pipes,  bolts and  nuts,  revetiting,  welding, drelling  of  holes,  cutting  of  rails, earth work  in  all  soils  for  fixing  the rail  post  in  CC  1:4:8  mix  with contractor's  supply  of  etc.,  Painting of  iron  work  with  two  coats  of enamel paint of approved colour and quality  over  on  coat  of  primer with all  contractor's  mterials,    labour, tools & plats,  consumables,  lead,  lift etc.,  complete  as  directed  by  the Engineer‐in‐charge.  (  Only  rails  of required  length will  be  qupplied  by the  railway  in  available  length  at SE/P/Way depot  or  at  a  convenient place and the contractor has to make his  own  arrangement  for transportation  of  the  same  to  the work spot at his own cost.) 

16

065923

Installing,  testing  and commissioning  of  Railway's  new Lifiting  Barries  supplied  vide  item No.25,  as  per  Railway's  approved Drawings  including  casting  of concrete  pedestal/foudation  for winch,meeting  posts,  lifting  barrier support  frame,  wheel  base  etc., supplying  and  running  wire  ropes from,  winch  to  lifting  barries through pullleys, oiling and greasing of  working  gears,  adjusting  and testing  for  satisfactory  operation, and  making  platform  for  operation using  released  rails  fixed  in  cement concrete  1:4:8  mix  in  footings  of various  size  including  earth  work excavation  in  all  types  of  soils  , casting  and  spreading  precast  RCC slab  of  75  mm  thick  made  up  with CC  1:2:4  mix  with  nominal reinforcement  over  the  staging evenly  including  painting  of  all structural  steel  members  with  two coats  of  enamel  paint  of  approved colour  and  quality  over  on  coat  of primer  with  contractor's  supply  of cement,  aggregate,  steel reinforcement, base plates, welding, 

4.00

75,000.00

1 SET 3,00,000.00

( Rupees  Seventy Five Thousand )

 

Contractor's % : 0       Discount : 0

7

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

cutting of Rails, drilling holes etc, as may  be  needed  as  per  specification and drawings, and as directed by the Engineer‐in  ‐charge  and  fixing  the winch  supplied  vide  Item  No.25, with  all  necessary  fittings  and fasteneings  with  all  contractor's tools  &  plats,  consumables machinery,  labour  etc.,  complete  as directed  by  the  Engineer‐in‐charge (rails  to  required  extent  will  be supplied by the   Railway in availabe lengths at   convenient place and the same  has  to  be  transported  by  the conractor at his own cost).  The rate quoted is  inclusive of cost of 7 x 7 x 19mm  strands  as  per  IRS‐T  wire rope of required length forthe work, However, 'A' bases, pulleys and rails to  the  required  extent will  be  given free  by  railway  or  arranged  under various  items  of  this  schedule.    The covering  for  roof  of winch  platform will be paid separately.8mm / 26. 

17

065924

Supply of  turn out wheel horizontal double wire (2 way) of requird size, with  contractor's  labour,  men material,  machinery,  consumable T&P,  crew  fuel  etc.,  complet incuding  all  lead  and  lift  and  as directed by the Engineer‐in‐charge. 

4.00

2,000.00

1 EACH 8,000.00

( Rupees  Two Thousand )

 

Contractor's % : 0       Discount : 0

18

065925

Supply  of  turn  out  wheel  vertical wire  (single  way)  of  requird  size with  contractor's  labour,  men, material,  machinery,  consumable  T &  P  ,  crew  fuel  ecte  complete including  all  lead  and  lift  and  as directed by the Engineer‐in‐charge 

4.00

1,800.00

1 EACH 7,200.00

( Rupees  One Thousand Eight Hundred )

 

Contractor's % : 0       Discount : 0

19

065926

Supply  of  CI/CS  'A'  base cvonforming to Drg. NO. 739 FA 00 ( A type foundation) with contractor's labour,  men,  material,  machinery consumable  T  &  P,  crew,  fuel  etc., complelte including all lead and lift 

4.00

5,000.00

1 EACH 20,000.00

( Rupees  Five Thousand )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

8

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

and  as  directed  by  the  Engineer‐in‐charge. 

20

065927

Supply of galanized tension adjuster with  contractor's  labour,  men, material,  machinery,  consumable,  T &  P  crew,  fuel  etc.,  complete incuding  all  lead  and  lift  and  as directed by the Engineer ‐in‐charge. 

4.00

500.00

1 EACH 2,000.00

( Rupees  Five Hundred )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

21

065928

Supply of bolts and nuts of required size  and  any  other  fittings  required for commissioning and installing the LC  gate  with  contractor's  labour,men,materail,  machinery, consumable,  T  &  P,  crew,  fuel  etc., complete  including  all  lead  and  lift and as directed by the Engineer ‐ in‐charge 

4.00

110.00

1 KG 440.00

( Rupees  One Hundred and Ten )

 

Contractor's % : 0       Discount : 0

22

065929

Dismantling  of  old  level  crossing gate  leaves/lifting barriers,  removal of  check  rails  with  all  fittings  and fastening  etc.,  complete  leading, transportation  and  stacking  the released  materials  at JE/W/CN/MYS.  Depot  and  with contractor's  labour,  men,  material, machinery, consumbles T & P, crew, fuel etc.,  complete  including all  lead and  lift  and  as  directed  by  the Engineer ‐ in‐ charge 

4.00

15,000.00

1 SET 60,000.00

( Rupees  Fifteen Thousand )

 

Contractor's % : 0       Discount : 0

23

065930

Construction  of  Ac  sheet  roofing  to the winch  platform made  up  of  ISA 75  x  75x  8mm  (2  Nos.)  as  purlins and  ISA  50  x  50x  8mm  as  rafter  as shown  in  the  drawing  including painting  of  frames  with  on  coat  of primer  and  two  coats  ofenamel paint, supplying and fixing approved quality of  corrugated AC  sheet with J‐bolts,  nuts,  bitumen washers with all  contractor's  materials,  labour, tools & plants,  consumable, lead lift etc., complete as directed bythe 

4.00

2,100.00

1 SQM 8,400.00

( Rupees  Two Thousand One Hundred )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

9

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

Engineer‐in‐charge,(  payment  will be  based  on  area  of  AC  sheet  used for roofing excluding over laps). 

24

065931

Manufacturing,  supplying and  fixing fringes  for  lifting  barrier  booms  of various  lengths made  up  of  MS  flat 25  x  6  mm  horizontally  and vertically and fixing the same to the boom,  painting  the  iron  work  with two  coats  of  enamel  paint  of approved  colour  and  quality  over one  coat  of  primer  withall contractor's  materials,  labour,  tools & plants, consumables,  lead,  lift etc., complete  as  directed  by  the Engineer‐in‐charge  (  One  set consists  of  two  nos.  of  boom)  For 8m/26' lifting barrier booms 

4.00

7,000.00

1 SET 28,000.00

( Rupees  Seven Thousand )

 

Contractor's % : 0       Discount : 0

25

065932

Supplying  and  fixing  of  G.I.  pipe 20mm  dia  75cm  long  for  planting the flag rods by the side of rails at a distance of 5m from the gate withall lead  and  lift  etc.  complete  and  as directed  by  the  Engineer  ‐in‐charghe. 

4.00

300.00

1 NOS 1,200.00

( Rupees  Three Hundred )

 

Contractor's % : 0       Discount : 0

26

065933

Manufacturing,  Fabrication,  supply and erection of Railway Engineering indicator  boards  for  level  crossings made  of  Reto‐reflective  sheeting  of "High  Intensity  Grade""  ( Encapsulated  lens  type) conforming to  ASTM  D  4956  specifications  on 2mm  thick  aluminium  alloy  sheet (14 gauge minimum) conforming  to I.S.737  in  required  size  and  shape. The  sheeting  shall  either  have  a pressure  sensitive  adhesive  of  the aggressive‐tack  type  requiring  no heat,  solvent  or  other  preparations for  adhesion  to  a  smooth  clear surface  ,  or  a  tack  free  adhesive activted  by  heat  applied  in  a  heat‐vacum  application  only  including screqn printing of all lettering/signs 

4.00

5,000.00

1 NOS 20,000.00

( Rupees  Five Thousand )

 

Contractor's % : 0       Discount : 0

10

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

on  reflective  sheet  bases, manufacturing  and  fixing  of  back support of 25 x 25 x 3 mm angle iron including  cutting,  reventting  and fixing  the  angel  iron  supports withtwo  coats  one  coat  of  primer, fixing  the  boards  in  foundation  of size. 0.30x 30x0.45  in C.C. 1:4:8 mix in  stable  ground  with  contractor's materials,  lead  lift  transportation, labourk,  machinery,  consumables, tools  &  plants  etc.,  complete.    The indicator  board  should  confirm  to the specification/testing outlined by RDSD  Lucknow  for  Engineering indicators  and  as  per  relevent para/Annexure  of  IRPWM/  Railway drawings  and  as  directed  by  the Engineer‐in‐charge.   (a)  Level  crossing  indicator  for manned LCs as per SK ‐ 2 

27

065941

Provision  of  emergency  chain  post at  level  crossing  duly  cutting  the rails  to  suitable  length  and  drilling holes,  providing  hooks  and  links with  necessary  lacing  arrangement to fix the emergency chain in proper way,  duly  excavating  the  pit  and fixing  the  rail  post  in  vertical position with the cement concrete of size 0.45 x 0.45 x 0.6m using 40mm granite  stone  aggregate,  CC:1:3:6 including  painting  two  coats  with paint of approved quality and colour over on coat of  red  led primer with all  lead  and  lift  complete  and  asdirected  by  the  engineer  ‐in‐charge (All  labour,  materials  including cement  except  rails,  which  will  be supplied  by  Railway  in  available length and section. Contractor has to lead  the  same  to  site of work at his own cost) 

4.00

1,200.00

1 EACH 4,800.00

( Rupees  One Thousand Two Hundred )

 

Contractor's % : 0       Discount : 0

11

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

28

065942

Supply  and  fixing  safety  chain  of approved  quality  and  dia  for  fixing in  level  crossings  gates  during emergency  including  drilling  holes/ providing  hooks  in  the  rail    posts with  contractor's  labour  tools  & plants,  materials  including  all  lead and lift etc., complete and a directed by the Engineer in‐charge. 

4.00

175.00

1 KG 700.00

( Rupees  One Hundred and Seventy Five )

 

Contractor's % : 0       Discount : 0

29

065945

Supplying  and  providing  & commission  inter  locking arrangements  including  excavation of  pit  for  concreting  'A'  type foundation  and  fixing  single  lever frame  as  per  Drg.  No.SG/CN/7 including  concreting  'A'  type foundation,  fixing  of  HP  lock  and connecting  the  ground  lever  frame with HP lock using MS point rods in LC  gates,  including  fabrication, supply and fixing of required Nos. of pole  lock  to  lifting  barrier  to  Drg. No.SA/8139/M,  bottom  roller stands to Drg.No.S‐3414/AM,'A' type bases  to  Drg.  No.S‐3534/M,bottom rollers  to  Drg.No.S‐68/M,  vertical cranks  to  Drg.NO.S‐3412/M  solid joints 33mm to Drg/ No.8‐Engg/SA‐6050/M, M/S. pont rods 18""‐0' long approximte  to  Drg.No.83635/MA, interlocking  ground  lever  frame (single  lever)  to    Drg.  No.  SA‐9229/M  along  with  installtion, adjustement,  testing  LC  lever locking arangenments, applying two coat  of  approved  synthetic  paint over  red  oxide  primer  and  making thelever  locking  arrangements functioning  satisfactorily  etc. complete  with  contractor's materials,  labour,  tools  and  plants, consumables  including  all  lead  and lift  and  as  directed  by  the  Enigeen‐in‐charge.    (The  rate  is  inclusive  of all items of work including supply of materials).   Note:  1)  Cement  sand,  metal  of 20/25mm  size  of  approved  quality, 

4.00

95,000.00

1 NOS 3,80,000.00

( Rupees  Ninety Five Thousand )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

12

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

materials  required  forthe  work should  be  supplied  by  the contractor.  2) The tendere should inspect all the LCs  before  quoting  his  rates.  3)  Any  other  small  fittings,  bolts, nuts etc.  requied  for  the work areto be  supplied  and  fixing  by  the contractor  and  no  extra  payment will be made to the contractor. 

30

046561

Construction of Hexogonal type Gate lodges as per plan No. 650‐96  in all respect  above  plinth.  level  except foundation  works.  This  work consists  the  following  :‐i)  Brick  masonry  in  stock bricks/country  bricks  in  CM  1:6. ii)  Cement  concrete  flooring  with 1:3:6 mix  and  smooth  finishingwith CM  1:3. iii)  Steel  doors  and  windows. iv)  RCC  intels  and  sloped  roof. v)  Weathering  course  and  water proof  machine  pressed  tiles  over roof.  vi)  Internal  shelf  as  per  type  plans. vii)  Painting  LC  particulars,  duty roster  and  protection  diagram  etc., on  gate  lodge. viii) White washing, colour washing, painting  in  all  respects  as  per  plan with  contractor's  cement  complete and  as  directed  by  the  Engineer‐in‐Charge.  The  steel  only  will  be  paid separately under Schedule "D". 

6.00

30,000.00

1 NOS 1,80,000.00

( Rupees  Thirty Thousand )

 

Contractor's % : 0       Discount : 0

13

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

31

001997

Manufacturing  supplying  and  fixing RCC  pale  fencing  (5?‐6?  high) including  posts  using  15  to  20mm granite metal as per drawing and as directed  by  the  Engineer‐in‐charge with smooth  finish and sharp edges by  using  contractor's  own  moulds including  curing  in  water  pools  to required  periods,  transporting  and fixing  at  site  of work  in  position  to correct line and level including earth work  in  excavation  and  plains cement  concrete  with  40mm  300  x 300  x600m  in metal  in  foundations with  shuttering,  cutting  of foundation  concrete  and  fixing  as directed  including  loading,  leading and unloading charges etc., complete with  all  lead  and  lift  the  rates includes snowcem washing the pales one  coat  over  one  coat  of  white washing  etc.,  completewith  contractor's  labour  and materials  as  directed  by  the engineer‐in‐charge. 

500.00

2,500.00

1 MTR 12,50,000.00

( Rupees  Two Thousand Five Hundred )

 

Contractor's % : 0       Discount : 0

1,47,39,459.00

(No. of Items 32 ONLY)

Schedule H Departmental Value : 

0.00

1,47,39,459.00

Schedule H Total :

Rupees in Words ( Rupees  One Crore Forty Seven Lakh Thirty Nine Thousand Four Hundred and Fifty Nine And Paise  

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: FLAT NO.007, DIVYA‐MSR GATEWAY, NEAR MATHIKERE FLYOVER, GOKULA EXTENSION BANGALORE

14

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name  of  the  Work  :Linking  of  track,Regrading  of  track  and  other  miscellaneous  works  for  yards  and  both  sides  of  the  yards  at  Kudagi,Minchnal, IndiRoad, Lachayan & Tadval between Gadag‐Sholapur stations.  

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

214352

Manual  assembling  and  linking  of BG  track  with  60  Kg/52Kg  /90R single/3 or 10 or 20 rail panels and 52Kg/ 60 Kg PSC Sleepers density of 1540/1660  per  km  with  all  and fittings  fastenings  including  linking on level crossings and duly leading/ lifting      the  rails/  rail  panels  and sleepers  from  the  stacks  available near  LCs/yards/mid‐section alongside the alignment on dip lorry or  by  any  other  approved  means with in a lead of 1 KM for Sleepers/ Rails  including  lateral/longitudinal shifting  or  crossing  of  track  if  any and  providing  fish  plate  and  bolts duly  greased  and  oiled,  providing suitable expansion gap at  rails ends using  all  fittings  and  aligning, levelling and attending one round of kutcha  packing,  greasing  of  E.  R. Clips  and  inserts  with contractor's  supplyof  Grease No.'O'  Graphited (Aluminum  soap)  to  IS408‐1981 after  second  round  of  machine packing  which  has  been  procured from  RDSO  approved  firms,  etc.  for the  safe  passage  of  trains  at  20 kmph,  all  withcontractor's road cranes,labour ,tools and plants, vehicles,crew,consumables, etc, with all  lead and lift, etc complete and as directed  by  the  Engineer  in‐charge. Note    1) 35% on skeleton linking of tracks  by  clipping  rails  to  sleepers over  compacted  Ballast  layer  with all  fastenings,  fish  plating. 2) 35% on lifting and initial packing. 3)  15%  on  correcting  track geometry  to  tolerances  as  specified in  the  special  Conditions  for  track work for passing  trains @ 20kmph. 4)  10%  after  greasing  /  oiling  of fittings and attending to rectification of Ballast cushion/ curves/ sleeper 

25375.00

240.00

1 TRM 60,90,000.00

( Rupees  Two Hundred and Forty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

15

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

spacing  and  ballast  boxing  and profiling  etc. 5)  5%  after  clearing  the  site  and returning  surplus/  released materials  to  nearest  depot  as  per conditions  in  contract. 6)The  contractor  has  to  lead  Rails and  sleepers  stacked  along  side  of formation  at  convenient  location. Any  lead  beyond  1  KM  of  Rails/ Sleepers  will  be  paid  separately.  7) No  extra  payment  will  be  given  for shifting  of  track  fittings  like  ERCs, Liners,  Fish‐Plates,fish‐bolts  and nuts  rubber  pads,  GFN  liners, Cclamps  Joggled  fish  ‐plates  etc  for leading  from  the  yard/mid  section between block stations 

2

214353

Extra  for  Trucking  out  /  leading  of rails  using  dip‐lorry  or  any  other means  including  loading  and unloading  from  road  point  /  mid section/  yard  where  lead  coming more than 1 Km and upto additional 5  Km  (dip  lorry  will  given  free  of charge  if  available  and  class  II  rails will  be  paid  5%  less  weight compared  with  standard  weight) Note‐  A)  The  above  items  will  be operated for           a) Extra leading of rails  beyond  1  KM  from  yards/Mid section  for  track  linking  work.b) Extra  leading  of  released  rails beyond  1KM  from  through  Rail Renewal  location  and  leading  up  to nearest yard of the block section. 

1800.00

250.00

1 T 4,50,000.00

( Rupees  Two Hundred and Fifty )

 

Contractor's % : 0       Discount : 0

3a

214354

Assembling  in position BG PSC  turn outs  at  various  location  with contractor's  supply  of  rubber pads,  as  per  approved  RDSO drawing,duly  fabricating  lead  rails with all cutting and drilling of holes and  fixing  of  all  fittings  and fastenings,  lubrication  of  rail  joints and  E.R.  Clips/inserts  with contractor's  supply  of  Grease No.RDSO approved firms, including 

22.00

75,000.00

1 SET 16,50,000.00

( Rupees  Seventy Five Thousand )

 

Contractor's % : 0       Discount : 0

16

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

leading of switch rails, PSC Sleepers, crossing, etc.,from stacks available in the  yard  and  transporting  all  other fittings  and  fastenings  from  the specified  P.Way  depot, with  all  lead and  lift,  complete as directed by  the Engineer‐in‐charge.     NOTE‐ Up  to a maximum  lead  of  500  meters  for Sleeper/railway/fittings  and fastenings etc.              a) 1 in 12 

3b

214355

1 in 8.5 

6.00

55,000.00

1 SET 3,30,000.00

( Rupees  Fifty Five Thousand )

 

Contractor's % : 0       Discount : 0

3c

214356

Trap    switch Note  1) The rate includes correction of  fabrication defects of  fittings and alteration  to  tie  plates,  spherical washers,  etc.,which  may  become nessary at site.        2) Rate includes kuttcha packing of B.G. track on PSC layout  assembly  duly  attending  to alignment, surfacing of sleeper,etc. 

5.00

20,000.00

1 SET 1,00,000.00

( Rupees  Twenty Thousand )

 

Contractor's % : 0       Discount : 0

4a

214357

Manual  through  packing  of  B.G. track  on  PSC  layout  of  1540/1660 density,as  per  IRPWM  guidelines and  as  directed,  duly  rectifying  any defects  in  alignment, longitudinal/cross  level required SE for  curve  and  required  180  to  200 mm  cushion,with  all  contractors labour,tools  and  plants,etc., including  boxing  complete  and  as directed  by  the  Engineer‐in‐charge. a) First Round of through packing 

25375.00

30.00

1 TRM 7,61,250.00

( Rupees  Thirty )

 

Contractor's % : 0       Discount : 0

4b

214358

Second Round of through packing 

25375.00

20.00

1 TRM 5,07,500.00

( Rupees  Twenty )

 

Contractor's % : 0       Discount : 0

5a

214359

Manual  packing  of  point  and crossings,IRPWM  guidelines  and  as directed, duly  rectifying any defects in  alignment,  longitudinal/cross level,all with contractors labour,

22.00

6,300.00

1 SET 1,38,600.00

( Rupees  Six Thousand Three Hundred )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule 

17

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

tools  and  plants,  etc.,  complete  as directed  by  the  Engineer‐in‐charge. a)1 in 12 ‐First packing 

quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

5b

214360

1 in 8.5‐ First packing 

6.00

5,000.00

1 SET 30,000.00

( Rupees  Five Thousand )

 

Contractor's % : 0       Discount : 0

5c

214361

1 in 12‐2nd round of packing 

22.00

3,000.00

1 SET 66,000.00

( Rupees  Three Thousand )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

5d

214362

1 in 8.5‐ 2 round of packing 

6.00

3,000.00

1 SET 18,000.00

( Rupees  Three Thousand )

 

Contractor's % : 0       Discount : 0

6

214363

Trucking  out  /  Extra  lead  of  BG Mono‐block PSC Track Sleeper from mid  section  anywhere  in  South Western  Railway  under  trafic conditions  with  contractor's rail  lorries/  Railway  dip  lorries including loading at place of picking and  placing  them  away  from  the running  traffic  after  trucking  with contractor's  labour,tools, plants,  all  leads  and  lifts  etc., complete  including contractor's  men,as  per specifications and as directed by the engineer  in  charge‐  for  a  lead  from 1KM to 5KM. 

42130.00

25.00

1 PSLPR 10,53,250.00

( Rupees  Twenty Five )

 

Contractor's % : 0       Discount : 0

7

214364

Providing  guard  rails  on bridges/RUBs with 52 Kg/90R  rails as  per  provisions  in IRPWM,including  cutting,  bending and  fixing  of  rails  with  all  fittings and  fastenings,  fixing  of  wooden blocks  at  ends  of  guard  rails  on either  end  of  bridges,  etc(excluding drilling of holes in sleeper and fixing of grip expansion bolts and nuts and M.S.  Clips/  washers)  all  with contractor's  labour,tools  and plants consumables, etc., with all 

100.00

400.00

1 TRM 40,000.00

( Rupees  Four Hundred )

 

Contractor's % : 0       Discount : 0

18

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

lead and lift, complete as directed by the Engineer‐in‐charge. 

8

214365

Laying  of  52  Kg.  SEJs  with  PSC  at nominated  locations duly  leading of SEJ and sleeper from the near with a maximum lead up to 500 meters. by yard/depot  to  the  work  spot  with contractor's  transportation, men  and material with  all  lead  and lift  as  directed  by  the  engineer  in charge  either  end  of bridges,etc(excluding  drilling  of holes  in  sleeper  and  fixing  of  grip expansion  bolts  nad  nuts  and  M.S. Clips/washers)  all  with contractor's  labour,tools  and plants  consumables,  etc.,with  all lead and lift, complete as directed by the  Engineer‐in‐charge.  Note‐    1. Rubber  pads  will  be  supplied  by Railways       2) One round of kutcha packing  to  be  done  by  the contractor.    3). One  set  includes  LH and RH of SEJ. 

20.00

4,000.00

1 SET 80,000.00

( Rupees  Four Thousand )

 

Contractor's % : 0       Discount : 0

9a

214366

Carrying  out  pre‐tamping operations  during  the  course  of packing  of  track  and  point  and crossings  by  various  track machines,readjustment  of  ballast, heaping up of ballast in the tamping zone to ensure effective packing and clearing  of  ballast  on  sleeper  to make  them  visible  to  the  operator, correcting  gauge  defects,  if  any,and neat dressing of ballast with proper consolidation  of  ballast  between sleepers,as  per  IRPWM  guide  lines, all  with  contractor's labour,tools  and  plants  etc., complete  as  directed  by  the Engineer  in  charge.    (Unit  of payment  is  per  meter  of  track including  points  and  crossing. Minimum 10men to be arranged per machine  per  day  and  in  case,  men are less, no payment will be made to the  contractor  for  that  stretch  of 

25375.00

5.00

1 TRM 1,26,875.00

( Rupees  Five )

 

Contractor's % : 0       Discount : 0

19

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

a) First round packing. 

9b

214367

Second packing 

25375.00

2.00

1 TRM 50,750.00

( Rupees  Two )

 

Contractor's % : 0       Discount : 0

10a

218363

Carrying  out  post‐tamping operations  during  the  course  of packing  of  track  and  point  and crossings  by  various  track machines,readjustment  of  ballast, squaring  of  sleeper  and  re‐gauge wherever  necessary  and  tightening of  loose  fittings  immediately  after tamping,  replacement  of  broken fittings,  correcting  the  displaced sleepers  to  position  ,correcting gauge  defects,if  any,and  neat dressing  of  ballast  with  proper consolidation  of  ballast  between sleeper to position ,correcting gauge lines,all  with  contractor's labour,  tools  and  plants etc.,complete  as  directed  by  the engineer in charge.(Unit of payment is  per  meter  of  track  including points  and  crossing.  Minimum  10 men to be arranged per machine per day  and  in  case,  men  are  less,  no payment  will  be  made  to  the contractor  for  that stretch of  track). a) First round Packing. 

25375.00

5.00

1 TRM 1,26,875.00

( Rupees  Five )

 

Contractor's % : 0       Discount : 0

10b

214370

Second round Packing 

25375.00

2.00

1 TRM 50,750.00

( Rupees  Two )

 

Contractor's % : 0       Discount : 0

11

214371

Cutting  of  60kg/  52  Kg/90R  Class I/II  Rails  true  to  verttical  with  rail cutting  machine  only,duly  marking the  line,with  contractor's  rail cutting  machine,tools,  labour  and consumables,  ets.complete  as directed  by  the  engineer  in charge.(Gas cutting  is not permitted at  any  case  but  hand  cut  with hacksaw  is  permitted  only  on 

7808.00

100.00

1 NOS 7,80,800.00

( Rupees  One Hundred )

 

Contractor's % : 0       Discount : 0

20

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

it will be paid.) 

12

214372

Drilling of 32/26.5 mm dia fish bolts holes at end of 60kg/52Kg/90 R rail at  correct  location  using  templates with  contractor's  rail  drilling machine,  drill  bits,  labour,tools  and plants,consumables  etc.,complete  as directed by the Engineer in charge. 

15615.00

76.00

1 NOS 11,86,740.00

( Rupees  Seventy Six )

 

Contractor's % : 0       Discount : 0

13

214373

Cutting,  grinding,  milling  ER  Clips and  providing  metal/GFN  liner  at joints  with  contractor's labour,tools  and  plants,  etc., complete  as  directed  by  the Engineer in charge. 

168520.00

3.00

1 NOS 5,05,560.00

( Rupees  Three )

 

Contractor's % : 0       Discount : 0

14

214374

Rebate offered for assembling points and crossing vide item 3(a) if rubber pads  are  supplied  by  Railway  1  in 12. 

22.00

‐10,000.00

1 NOS ‐2,20,000.00

( Rupees  Zero )

 

Contractor's % : 0       Discount : 0

15

214375

Rebate offered for assembling points and crossing vide item 3(c) if rubber pads  are  supplied  by  Railway  1  in 8.5 

6.00

‐9,000.00

1 SET ‐54,000.00

( Rupees  Zero )

 

Contractor's % : 0       Discount : 0

16

214376

Insertion  of  railway's  Glued  joints 60kg/52  Kg,G3L  on  BG  track/point and  crossings  and  connecting cutting  of  rails,leading  of  Glued Joints  from  stacks  available  in  the yard  and  transporting  fitting  from the specified P.Way depot  i, all with contractor's  labour,tools and plants, vehicles,crew,consumables,etc.,with all  lead  and  lift  as  directed  by  the Engineer‐in‐charge. 

600.00

1,000.00

1 NOS 6,00,000.00

( Rupees  One Thousand )

 

Contractor's % : 0       Discount : 0

21

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

17

214377

Fixing of wooden distance pieces for plot  forms  by  cutting  of  Railway 's wooden sleeper BG/MG into blocks by  sawing  to  sizes,  including leading of sleeper from P.Way depot to  site  of  work,  all  with contractor's  labour,  tools  and plant  etc  with  all  lead  and  lift  as directed by the Engineer in charge. 

100.00

50.00

1 NOS 5,000.00

( Rupees  Fifty )

 

Contractor's % : 0       Discount : 0

18

214378

Assembling  and  linking  of  track  for snag  dead  end  BG  with  60kg/52 Kg/90R rail Over PSC sleeper, as per RDSO  PLAN  No.T‐347  ,including lifting  and  packing  the  track  for ramping and construction of sanded dead  and  end,  all  with  contractor labour,  tools  and  plants consumables  etc,with  all  lead  and lift,  complete  as  directed  by  the engineer‐in‐charge.                              Note‐  The  rate  includes  cost  of  all materials  such  as  bricks,  sand  and earth. 

10.00

67,000.00

1 SET 6,70,000.00

( Rupees  Sixty Seven Thousand )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

19

214379

Painting  and  writing  details  of points  and  crossing  such  as  sleeper nos,lead  curve  station nos,versine,switch  and  crossing particular,any  other  details  as specified  colour,labour,  tools  ans plants consumables etc. complete as directed by the Engineer‐in‐charge. 

28.00

900.00

1 SET 25,200.00

( Rupees  Nine Hundred )

 

Contractor's % : 0       Discount : 0

20

214381

providing  temporary  centre  line /level  reference  posts/  pegs  with rails /tie bars of any section and size on  cess  at  25 meter  intervals  or  at specified  intervals  including  leading of  Rails  /tie  bars  from  specified P.Way  depot  with  all  lead  and  lift etc.  complete  an  as  directed  by  the Engineer‐in  ‐charge. NOTE‐      1)  Rate  quotated  is applicable for Rail posts.   2) In case of tie bars only 80% of payment will be made.   3) Contractor shall ensure 

1000.00

200.00

1 EACH 2,00,000.00

( Rupees  Two Hundred )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

22

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

that  the  reference  pegs  so  planted are  Available  till  CRS  inspection. 4)  Contractor  shall  remove  the  rail post/Tie  bars  so  planted  after  CRS inspection  and Hand  over  the  same to  specified  Railway  store  depot.  At nominated depot. Without any extra payment.    5)  Height  of  post  will  be approximately 1.2 to 1.5 meters.    6) Stage payments (a) 50% of rate will be  paid  on  fixing  the  post  and marking necessary marks  at  site.(b) Balance 50% of  rate will be paid on returning  of  post  specific  P.Way depot. 

21

214382

Preparation  of  surface  of  rails  for web  and  bottom  flange  on  gauge face  side  at  liner  contact  area  with de‐rusting  kit  removing  of  all rust,grease  (by  application  of approved  chemical)dust  for making it  fit  for  painting  with  movable generator  /equipment  with  all contractor's  labour,materials ,chemicals  any  external  agents,tools consumables,plant,transportation with,  all  lead  and  lift  including crossing  of  tracks  and  handling  of rails  etc.,  and  as  directed  by  the Engineer in ‐charge.                  Note‐The  rate  includes  cleaning  of  linear contact area. 

25375.00

30.00

1 TRM 7,61,250.00

( Rupees  Thirty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

22

214383

Painting of in‐service rails two coats by  brush  after  surface  preparation with  contractor's  paint  anti‐corrosive  bituminous  black  to  IS 9852‐1981  to  a  thickness  of  100 microns per each coat only on gauge face  side  of  both  rails(i.e.web  and flangesonly)  excluding  rate  of, bottom  surface  of  rail  and  rail surface  on  non  gauge  face  side  of both  the  rails  including  surface preparation  and  painting  of ERC's,  liners  and  outer surface  on  inserts  for  sleeper density of 1540 in PSC sleepers and 

5000.00

35.00

1 TRM 1,75,000.00

( Rupees  Thirty Five )

 

Contractor's % : 0       Discount : 0

23

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

60Kg  rails  with  all  contractors labour,brushes,  tools,  paint, transportation  with  all  lead  and  lift including  surface  preparation  and painting of rails as per the procedure given  in  procedural  order  for painting of rails circulated vide Hqrs letter.No.W.501/17/Vol.  VII, dt.08.04.2004  and  as  specified including  crossing  of  tracks, handling  of  rails  and  as  directed  by the  Engineer‐in‐Charge Note  1) Preparation of surface of rails for web and bottom flange on gauge face side  should  not  be  operated simultaneously.  If  required  to  be operated after a minimum gap of six months  period  to  maintained. 2)  In  case  of  item  No.21  if  are operated  simultaneously  then deduction for linear contact area will be  done  for  item  No.21 3)  In  case  of  1660  numbers  of  PSC sleepers  per  Km  an  extra  rate  of 2.23%  over  the  above  quoted  rate will  be  paid  to  the  contractor. 4) In case of 60 Kg rails an extra rate of  11.15%  over  the  above  quoted rate will  be  paid  to  the    contractor. 5)  In  case  of  station  yards  the painting shall be carried out  in  loop lines  and  main  lines  On  gauge  face and  non  gauge  face  sides  and payment will be made two times the rate  Indicated  above. 6)  In  case  of  lineal  meter  (LM)  for the  purpose  of  payments  is measured  on  the  centre  line  of track,which  includes  rails  on  either side  with  sleepers  and  complete fittings  Including Shoulder and crib ballast. 

23

214384

De‐stressing  of  LWR/CWR  with hydraulic  de‐stressor  or  otherwise under  line  block  at  the  desired  rail temperature  duly  carrying  out  all the  operations  contained  in  LWR manual and as directed by the 

10.00

20,000.00

1 KM 2,00,000.00

( Rupees  Twenty Thousand )

 

Contractor's % : 0       Discount : 0

24

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

Engineer‐in‐charge.  Note  (I)  Sufficient  number  of  men required  for  de‐stressing  each LWR/CWR shall be employed by the contractor  at  site  and  the  work should be completed within he block period of about 3 hours 

24

214385

Fixing  of  52Kg/90  R    rails, SEJ's  reference  pillars  1.2  to 1.5m long for LWR  including cutting of  rail  to  the  required  length, excavation  to  required  depth,fixing in  concrete  with  124  mix (30cmx30cmx60cm  size,30cm above  GL  and  30  cm  below GL)including  painting,  chisel marking on top of rail post and paint marking  on  non  gauge  face  side  of the  rail  on  the  track  as  directed  by Engineer‐in‐charge contractor's  labour,tools  and plants,  paints,  cement  sand aggregate  etc  complete  (  Rails  will be  supplied  at  stores  depot.  The transportation  will  be  paid  to  the contractor  separately). NOTE  one  set  comprises  of  two reference  pillars  on  either  side  of 

20.00

500.00

1 SET 10,000.00

( Rupees  Five Hundred )

 

Contractor's % : 0       Discount : 0

25

214386

Manufacturing,supply,  fixing  and painting of  curve boards,  gang  limit boards,  points  &  crossing  boards, LWR  boards  of  size,  450mmx 600mm with contractor's M.S. Sheet of  thickness 3.15mm and M.S. Angle  of  size  50  x  50  x  6mm,to  a length  of  1.20  M.  and  welding 150mm  length  angle  at  bottom, transporting  the  same  to  the site,excavating of earth pit of size 30 x  30  x45  cm,  concreting  with contractor's  cement  and  all materials  of  136  mix  and  writing required  information/relevant parameters  duly  painting  rail  post with approved enamel paint with all lead  and  lift  labour  tools,  plants, vehicles, crew,machineries as 

100.00

2,300.00

1 NOS 2,30,000.00

( Rupees  Two Thousand Three Hundred )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

25

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

directed  by  the  Engineer  in‐charge. Note  Curve  Indicator/Points  & Crossing  Boards/  LWR/Gang Jurisdiction  Boards  of  size  450m x600  mm  as  per  sketchXEN/YB/CN/BNC/SK/5‐95 

26

214387

Supplying  and  fixing    of  grip expansion  bolt  and  nut  with  MS Clip/washer  in  PSC  Sleepers  as  per specification  for  fixing  check rails/guard rails including drilling of required  holes  in  sleepers  with contractors  labour,  materials,  tools and  plants,  consumables  etc, complete  as  directed  by  the Engineer‐in‐charge. 

50.00

180.00

1 NOS 9,000.00

( Rupees  One Hundred and Eighty )

 

Contractor's % : 0       Discount : 0

27

214388

Painting  and  writing  curve  stations numbers  such  as  versine,  Super elevation  on  the  web  of  the  outer rail  as  directed  by  Engineer  in charge  with  contractor  supply  of approved  quality  ,colour  enamel paint,labour,  tools  and  plants, consumables  with  all  lead  and  lift etc  complete  as  directed  by  the Engineer in‐charge.  Note‐ Two coats of  painting  is  to  be  done  and  any other details as specified etc. with all contractor's  supply  of approved  quality  of  paint  of specifiedcolour. 

200.00

20.00

1 EACH 4,000.00

( Rupees  Twenty )

 

Contractor's % : 0       Discount : 0

28

214389

Manufacturing  ,supplying and  fixing of  B.G.  buffer  stop  as  per  type  plan including paintingand finishing with contractors bolts andnuts , welding , guard  plates  etc.  complete  and  as directed by Engineer in charge. 

15.00

20,000.00

1 EACH 3,00,000.00

( Rupees  Twenty Thousand )

 

Contractor's % : 0       Discount : 0

29

214390

Greasing of Rail  gauge  faces on B.G. track  in  curves  with contractor's  supply  of  grease and  lubricating  oil  of  approved quality to IS specification 508‐1987 

1200.00

40.00

1 RM 48,000.00

( Rupees  Forty )

 

Contractor's % : 0       Discount : 0

26

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

for  grease  Graphite  all  with Contractors  labour's,  tools, etc.complete  as  directed  by  the Engineer  in‐charge. NOTE‐  Payment  will  be  made  per meter of single rail. 

31

214393

Fabrication,  supplying  and  fixing Gang  Tool  Box  of  size  2.20mx0.79x 1.20m  /2.00x1.07x1.20m  and made by  contractor's  MS  Sheet 16SWG  with  MS  angles  at  corners including  2  coats  of  paint  over  one coat  of  primer  and  locking arrangements  includes  welding, riveting,  transportation,  complete and  fixing with  all  ascents,descents, taxes,  octroi,  cess,  fees,  duties, with contractor's  tools  and  plants, materials,  consumables,  labour, crew,  machineries  with  all  leadand lift  etc.,  complete  as  per  special conditions /specifications/regulations  and  as directed by the Engineer‐in‐charge. 

4.00

65,000.00

1 EACH 2,60,000.00

( Rupees  Sixty Five Thousand )

 

Contractor's % : 0       Discount : 0

32

214395

Manufacturing  supplying  and  fixing of  indicator  boards  made  out  of 2mm  thick  aluminium  alloy  sheet confirming to IS‐737 in size & shape etc.,as per Annexure 8/4 of para807 of  IRPWM  with  back  supporting  of 25 x 25 x 3mm angle iron. The entire face  of  the  sign  Board  shall  be covered  and  bonded  with  yellow high  intensity  encapsulated  lens type  retro‐reflective  sheeting  with heat  lamp  vacuum  machine  only. The symbols, borders, & letters shall be  made  by  screen  printing  or  as directed  duly  painting  on  the  back side of the board with grey paint and fixing  the  board  to contractor's  MS  angle  of required height with proper bolts & nuts/welding including transporting of  boards  to  site,  fixing  the  same embedding  in  concrete  base  as  per Drg.  No.  B/GL/646  duly  excavating 

30.00

5,500.00

1 EACH 1,65,000.00

( Rupees  Five Thousand Five Hundred )

 

Contractor's % : 0       Discount : 0

27

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

refilling  complete  with  the  all Contractor's materials. labour, tools.,  plant,  fuel,  consumables, curing etc.,  all  leads and  lifts  and as directed by Engineering‐in‐charge as per  specifications.  TS  &  retro‐reflective  high  intensity  indication board for level crossing made out of 2mm  thick  aluminum  alloy  sheet confirming to IS‐737 in size & shape using heat  lamp vacuum application method with back support MS frame with 25 x 25 x 3mm angle & binding of  high  intensity  encapsulated  lens type  retro‐reflective  sheeting  on entire face of the board duly printing the  symbols,  borders  &  letters  by screen printing or as directed on the high  intensity  sheet  base  duly painting  on  the  back  side  of  the board with grey paint and fixing the board  to  contractors  MS.  angle  of required  height  with  proper  bolts &nuts/welding  including transporting  of  boards  to  site  fixing the  same  by  embedding  with concrete base as DRG.No. D/GL/646 duly  excavating  pit,  refilling, complete  with  all  ascents,  descents, taxes,  octroi,  cess,  fee,  duties  with Contractor's  tools    &  plants, materials  ,  consumables,  labour ,crew,  machineries    with  all  lead& liftetc.,  complete  as  per specialconditions  /specifications /regulations  &  as  directed  by  the Engineer‐in‐charge.  The  indicator boards  Should  be  confirmed  to  the specifications  laid  down  by RDSO/Luck  now  for  Engineering indicators  &  as  per  relevant paras/annexure  of  permanent  way manual/Railway  drawing  (a) Termination  boards  for passengers/goods  trains,  T/P,  T/G and T symbols of  size 1000 mm dia circular  shape. NOTE    Individual  quantities  of  T/P, T/G,  T,  caution  indicator  board, speed  indicator  board,  stop  board will be specified by the Engineer‐in‐charge and the total quantity is as 

28

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

above 

33

214396

Dismantling BG track having any rail &  sleeper  structure,  laid  to  nay sleeper  density,  duly  releasing  all the fittings and levelling the existing BG  ballast  to  the  nominated  level with all contractors labours tools, all leads  and  lifts  complete  as  directed by the  Engineer‐in‐charge 

8000.00

90.00

1 TRM 7,20,000.00

( Rupees  Ninety )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

34a

214397

Dismantling  of  existing  BG  points and crossings And trap switches laid on Wooden/steel/PSC sleepers Duly releasing  all  fittings  And components  etc.,  leading  And stacking  in  yard  item  wise Classification  wise  at  nominated Locations  including  crossing  Of track with all leads and lifts with all contractors  labour,  tools  and plants and  machinery  etc.,  complete  as directed by Engineer‐in‐charge. The loose  fittings  except  switches  Rails and  sleepers  are  to  be  Transported and  stacked  in  DSK  Depot.a) 1 in 12 Points & Crossing. 

15.00

13,000.00

1 SET 1,95,000.00

( Rupees  Thirteen Thousand )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

34b

214398

1 in 8 1/2 Point & crossing 

5.00

5,000.00

1 SET 25,000.00

( Rupees  Five Thousand )

 

Contractor's % : 0       Discount : 0

34c

214399

1 in 8 1/2  trap switch 

4.00

3,000.00

1 SET 12,000.00

( Rupees  Three Thousand )

 

Contractor's % : 0       Discount : 0

35

214400

Disconnecting  the  existing  Main line/Loop  line  and  Connecting  to newly laid Track (Vice  verse) under traffic  Block with  sufficient  batches including  aligning  removing  the existing  Ballast  removing  fish  plate and  Bolts  etc.,complete  with contractors labour,Black smith,tools, plants  and  machinery  as  per specification and as directed by the 

20.00

50,000.00

1 EACH 10,00,000.00

( Rupees  Fifty Thousand )

 

Contractor's % : 0       Discount : 0

29

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

engineer in‐charge. 

36

217954

Regrading  by  lifting  of  existing  BG Track/Turnouts  52kg/60kg/90R rails  over  PSC/Wooden/ST/CST‐9 Sleeper,  under  traffic/  non‐traffic condition,  in  stages,  limiting  lifting per  stage  to  75mm  including  one round  of  through  packing  at  each stage  of  lifting  as  per  IRPWM,  and subsequent  picking  at  each  stage  of lifting  as  per  IRPWM,  and subsequent  picking  of  sags/slcks and  attending  to  misalignment/ cross  level  defects  during  train operation,  providing  required  ramp in  and  ramp  out  for  safe  passenger of trains, all with contractor labours, tools  and  plants  and  machineries, screw,  consumables  etc  with  all ascents,  descents,  taxes  octroi,  cess, fess, duties, etc with all  lead and lift etc COMPLETE as per spl.condition/ specification  /regulation  and  as directed by the Engg‐in‐charge.or up to 0.75m 

22000.00

180.00

1 RMT 39,60,000.00

( Rupees  One Hundred and Eighty )

 

Contractor's % : 0       Discount : 0

37

217957

Proving  of  lighting  arrangement during  night  block  working  to facilitate  execution  of  work  and ensure safety of  track with 10no. of focusing  light  of  about  500  volts with  two  portable  Diesel  Generator of suitable capacity required with all ascents,  descents,  taxes  octroi,  cess, fess, duties, etc with all  lead and lift etc COMPLETE as per spl.condition/ specification  /regulation  and  as directed by the Engg‐in‐charge 

200.00

1,500.00

1 UNIT 3,00,000.00

( Rupees  One Thousand Five Hundred )

 

Contractor's % : 0       Discount : 0

38

217959

Providing  of  Barricading  with contractors  bamboos/casuarinas vertical  post  of  min.  100mm  dia planted  at  every  2m  interval projection  at  least  1.5m  above  the ground level and driven firmly 

6000.00

200.00

1 M 12,00,000.00

( Rupees  Two Hundred )

 

Contractor's % : 0       Discount : 0

30

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

inside  the  ground  and  with  3 horizontal  bamboo/casuarinas  min. 50mm  dia  space  equally  including the  painting  the  verticals  and horizontal  with  red  luminous paints/strips  at  alternative  bay  on the  barricade  removing  the barricades  completely  when  no longer required with all lead and lift etc  COMPLETE  as  directed  by  the Engg‐in  charge  (all  labour, materials,tools,consumables,plants etc to supplied by the contractor) 

39

083597

Dismantling the existing BG track in station  section  /  mid  section  in straight  /  curved  alignment  under traffic  /  block  period with60kg/52kg/90R/  free rails/welded  panels  laid  on  CST9/ Wooden/ Steel/PSC  sleepers  laid  to any  density,  duly  releasing  the rails/sleepers  fittings  such  as  keys, cotters,  spikes,  loose  jaws,  fish plates,  fish  bolts  and  nuts  without causing  any  damage  to  the  P.Way materials  and  keeping  away  the materials,  on  existing  cess/  slope without causing any infringement to the  track  with  all  contractor's labour,  tools,  all  lead  and  lifts,  etc. complete  as  per  special  conditions and specifications and as directed by the  Engineer‐in‐charge. Note:  Before  dismantling,  the inventory  of  the  exg.  P.way materials should be taken jointly by the  contractor  and  PWI.  The contractor  should  sign  on  the inventory  as  a  token  of  his acceptance.    The  contractor  is responsible  for  safe  custody  of released  materials  with  him  until they are handed over to the Railway as per inventory. 

8000.00

140.00

1 TRM 11,20,000.00

( Rupees  One Hundred and Forty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

31

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

40

083598

Heating  the  existing  jammed  ERCs with  MCI  insert  with  contractor's kerosene oil run pressure tank of LP gas  and  removing  the  ERC  and  re‐fixing  back  (to  facilitate sleepers/rail/liners renewal/dismantling  of  track) without  breaking  PSC  sleeper  using contractor?s  labour,  tools, machinery  etc.  and  as  directed  by the  Engineer‐in‐charge.  Note:  This item will be operated if jammed ERC has  to  be  removed.  Removing  the ERC  may  be  necessitated  while operating  any  of  the  items  in  the schedule  (like  changing  the  sleeper, changing  the  liners  from  metal  to GFN or  for  dismantling  track  or  for any  other  reason).  While  operating any  of  the  items  of  the  schedule,  if the ERC is jammed extra (for heating etc.)  to  remove  jammed  ERC, payment  will  be  made  under  this item. 

5000.00

60.00

1 EACH 3,00,000.00

( Rupees  Sixty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

41

083599

Providing  proposed  level  pegs with railway  released  rails  on  the proposed  BG  track  at  a  distance from  central  line  as  specified  by Engineer‐in‐charge  duly  Excavating and  concreting  in  the  formation including  Marking,  Cutting  and transportation  of  tie  bars  with contractor's  paint,  cement,  sand, aggregates,  water  required  for  the work as directed by the Engineer‐in‐charge  (The  rails  shall  be  Supplied by  the Railway at PWI Stores Depot at DVG/HRR/UBL/HPT. 

100.00

180.00

1 EACH 18,000.00

( Rupees  One Hundred and Eighty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

42

083604

Removing,  screening  and  salvaging the existing ballast from the existing track  duly  stacking  the  same  for Measurement  out  side  the  track without muckand as directed by the Engineer‐in‐charge.  It  includes  All labour,  lead  and  lift,  Crossing  of track,  complete  (payment  shall  be done on stack measurement with 

5000.00

175.00

1 CUM 8,75,000.00

( Rupees  One Hundred and Seventy Five )

 

Contractor's % : 0       Discount : 0

32

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

less 8% due to voids). 

43

083622

Cut and connection of track with the existing  running  lines  under  line block condition. 

4.00

30,000.00

1 EACH 1,20,000.00

( Rupees  Thirty Thousand )

 

Contractor's % : 0       Discount : 0

44

083623

Manufacturing  and  supplying  of  CI brackets,  bolts  and  nuts,  MS  plates as  per  the  following  drawings  with contractor's materials,  steel,  labour, tools, plants and machinery with all lead  and  lift  etc.,  complete  and  as directed  by  the  Engineer‐in‐charge. NOTE:  1)  The  material  Shall conform to RDSO Specifications and as  Per    latest  RDSO  drawing.  2)  The  materials  shall  be  procured only  from  manufacturers  approved by  Railways/RDSO  vendors.  3) The  item  includes  transportation of  the material by Contractor's own road  vehicles  including  loading  and unloading,  to  site  as  specified.  4)  All  the  above  finished  material shall  be  supplied  at  PWI  Stores depot  at    KTY  /  Harapanahalli  / Amaravathy  colony   a)  CI  Bracket/chair  (at  LC's)  as  per Drg.No. RDSO/T/4151or 4784. 

20.00

900.00

1 EACH 18,000.00

( Rupees  Nine Hundred )

 

Contractor's % : 0       Discount : 0

45

083624

b)  CI  Distance  Bracket  (at  LC's)  as per Drg. No. RDSO/T/4152 or 4785. 

20.00

120.00

1 HOUR 2,400.00

( Rupees  One Hundred and Twenty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

33

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

2,73,96,800.00

(No. of Items 54 ONLY)

Schedule I Departmental Value : 

0.00

2,73,96,800.00

Schedule I Total :

Rupees in Words ( Rupees  Two Crore Seventy Three Lakh Ninety Six Thousand Eight Hundred And Paise  Twenty 

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: FLAT NO.007, DIVYA‐MSR GATEWAY, NEAR MATHIKERE FLYOVER, GOKULA EXTENSION BANGALORE

34

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name  of  the  Work  :Linking  of  track,Regrading  of  track  and  other  miscellaneous  works  for  yards  and  both  sides  of  the  yards  at  Kudagi, Minchnal, IndiRoad, Lachayan & Tadval between Gadag‐Sholapur stations.  

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1a

213865

Transportation  of    crossings, switches  lead  rails  and  various P.Way  fittings  like  fish  plates,  fish bolts and nuts, ER clips, metal liners, GFN  Liners,  etc.,  from  anywhere  to specified  locations  Kerkalamatti  ‐Kajjidoni  stations  with  contractors trailers/  road  vehicles,machinery, sumables, tools and plants, including loading,  unloading  and  stacking  the same in a countable manner, with all lead  and  lift,  etc.,complete  and  as irected by the Engineer‐in‐charge up to a lead  50 Kms 

820.00

1,200.00

1 TONNE

9,84,000.00

( Rupees  One Thousand Two Hundred )

 

Contractor's % : 0       Discount : 0

1b

213866

Extra  over  item  1(a)above  for  lead beyond 50km and upto 400 kms. 

656000.00

3.80

1 PTPKM

24,92,800.00

( Rupees  Three And Paise  Eighty )

 

Contractor's % : 0       Discount : 0

2a

213867

Unloading  of  52  kg.60  Kg  free  rail from  Railway  BG  wagon  of Kerkalmatti‐Kajjidoni  section    using contractors crane without damaging the  rails  in  stipulated  time  as  per norms  vide  para    310(2)(3)  of IRPWM  with  contractors  labour, tools  and  plants  machinery, consumables,  lead  and  lift,  etc., complete  and  as  directed  by  the Engineer  in  charge.  The  contractor shall  mobilise  sufficient  machinery, labour,  etc.,  at  short  notice depending  on  the  placement  of wagon  for  unloading  demurrage  / wharfage  charges,  if  any  shall  be borne  by  the  contractor.  Class.  II rails  will  be  paid  5%  less  weight compared  with  standard  weight.  a) 13 m long 

1750.00

95.00

1 MT 1,66,250.00

( Rupees  Ninety Five )

 

Contractor's % : 0       Discount : 0

35

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

2b

218362

FOR 3 R/ 10 RP / 20RP 

1750.00

525.00

1 MT 9,18,750.00

( Rupees  Five Hundred and Twenty Five )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

3a

213869

Transportation  of  Rails  60  Kg. Cl.I/Cl.II or 52Kg Cl.I/II or 90R/75 R Cl.  II/Cl.  III  from  any  section  in South Western Railway or any other Railways  to  locations  of  work including  loading,  unloading  and stacking  the  same  in  a  countable manner,  with  contractor's  road vehicle,  crew,  labour,  tools, consumable stores with all  lead and lift etc., complete and as directed by the Engineer‐in‐charge. (The weight of  the  rails  for  Cl.II  will  be  98% standard  weightment  of  Cl.I  rails).  a)  For  lead  0‐100  Kms 

175000.00

14.25

1 PTPKM

24,93,750.00

( Rupees  Fourteen And Paise  Twenty Five )

 

Contractor's % : 0       Discount : 0

3b

213870

Extra for lead beyond 100 Kms‐upto 200 Kms 

175000.00

7.00

1 PTPKM

12,25,000.00

( Rupees  Seven )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

3c

213871

Extra for lead beyond 200 Kms‐upto 500 Kms 

525000.00

1.90

1 PTPKM

9,97,500.00

( Rupees  One And Paise  Ninety )

 

Contractor's % : 0       Discount : 0

3d

213872

Extra for lead beyond  500 Kms upto 800  Kms. NOTE  :  1)  The  tenderer  shall    note  the payment  for  each  leads  over  and above  100  km.  Lead  is  calculated CUMLATIVELY  and  paid  through item Nos (b),(c), and (d). Contractor shall  arrange  to  transport  rails  for any variation  in  leads  in  item 1  (b), (c)  and  (d)  upto  25%  of  quantities under item Nos. b, c & d put together irrespective  of  any  variation  in individual  items i.e., variation in 

525000.00

0.01

1 PTPKM

4,987.50

( Rupees  Zero And Paise  One )

 

Contractor's % : 0       Discount : 5

36

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

leads will  be  arrived  over  the  gross total  of  quantities  of  itemNos b,  c & d put  together. No Claim will be entertained for saving in any /all  items  while  transporting materials.  For  the  purpose  of payment  the  shortest  possible  road route  depending  feasibility  will  be considered.  The  decision  in assessing  the  route  is  final  and binding  on  the  contractor  unless otherwise  warranted  and  prior approval  of  DY.CE/In‐  charge  of work  obtained.  In  case  of  damage while  handing materials,  the  cost  of damaged materials as decided by the Railway  administration  shall  be recovered.  No  representation  from the contractor will be entertained in this  regard.  

4a

213873

Transportation  of  BG  Mono‐block PSC  track  sleepers  (like  track/Br. Sleepers  /Slack  gauge  sleepers) from  sleeper  factory/any  other place  to  different  locations  by  road lorry/tractor  trailer  including unloading from contractor's vehicles of any type using road crane placing them  away  from  running  track, traffic,  stacking  the  sleepers  on formation or at nominated places in yards/mid  sections  in  a  systematic manner  including  protection  of track  with  contractor's  flagmen where  ever  required  as  per specifications  including  crossing  of tracks  with  all  lead  and  lift  with contractor's  tools,  plants, consumables,  machineries  and labour  etc.,  complete  as directed by the  engineer  in  charge. a)  Lead  from  0  ‐  50  Km.  

42130.00

118.75

1 PSLPR 50,02,937.50

( Rupees  One Hundred and Eighteen And Paise  Seventy Five )

 

Contractor's % : 0       Discount : 0

37

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

4b

213874

Extra  over  Item No    4(a)  above  for lead  beyond  50  Km.  and  up  to  100 Km. 

2106500.00

2.80

1 PSPKM

58,98,200.00

( Rupees  Two And Paise  Eighty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

4c

213875

Extra over  Item Nos.‐ 4(a) and 4(b) above )for lead beyond 100 Km. and up to 200 Km 

4213000.00

1.80

1 PSPKM

75,83,400.00

( Rupees  One And Paise  Eighty )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

4d

213876

Extra  over  Item Nos.    ‐  4(a)  to  4(c) above  for  lead beyond 200 Km. and up  to  500  Km.Note: 1) In case of transportation of sleepers  from  factory,  loading  of sleepers will be doneby the factory ‐normally  free  of  cost. Note:  2)  If  the  sleepers  are  to  be transported from any other location, the  agency  has  to  makeits  own arrangement  for  loading.  The payment  for  such  loading  will  be made  separately  through  relevant item  of  the  Schedule. Note: 3) The tenderer shall note that the payment for each leads over and above  50  Km.  lead  is  calculated CUMULATIVELY  and  paid  through Item  Nos.4(b)to  4(e) Note: 4) Contractor shall arrange to transport  sleepers  for  any variation in sleepers leads initem Nos. 4(b) to 4(e)  up  to  25%  of  quantities  under Item Nos. 4(b)  to 4(e) put  together. No  claim  will  be  entertained  for saving  in  any/all  items  while transporting  sleepers. Note: 5) For the purpose of payment the  shortest  possible  road  route depending  upon  Feasibility  will  be considered. The decision of railways in  assessing  the  route  is  final  and binding  on  the  contractor  unless otherwise  warranted  with  prior approval  by  Dy  CE. Note: 6) Sleepers shall be stacked in more than one layer as per Para 

12639000.00

0.19

1 PSPKM

24,01,410.00

( Rupees  Zero And Paise  Nineteen )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

38

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1407 of IRPWM 1986 latest reprints duly  leaving  adequate  space  for movement  of  trucks  onformation. Note: 7) Stacking  is  to be done both in  cutting  and  in  embankment  mid section/yards  as  directed  by  the Engineer‐in‐Charge.  Note:  8)  In  case  of  damage  while unloading  of  sleepers,  the  cost  of damaged  materials  as  decided  by Railway  Administration  will  be recovered.  No  representation  from contractor  is  entertained  in  this regard.   

5a

213877

Transportation  of  BG    Mono‐block PSC  Turn‐out/special  sleepers  (like SEJ/Trap  Switch  sleepers  )  from  an place  to  different  locations  by  road lorry/tractor  trailer  including unloading with all  lead and  lift with contractor's  tools  and  plants, consumables  etc. a)  Lead  from  0  ‐  50  Km.  

131400.00

23.75

1 MTKM

31,20,750.00

( Rupees  Twenty Three And Paise  Seventy Five )

 

Contractor's % : 0       Discount : 0

5b

213878

Lead from 50‐100 Km 

131400.00

6.65

1 MTKM

8,73,810.00

( Rupees  Six And Paise  Sixty Five )

 

Contractor's % : 0       Discount : 0

5c

213879

Extra  over  Item  Nos.  5(a)  and  5(b) above  for  lead beyond 100 Km. and up to 200 Km 

262800.00

4.00

1 MTKM

10,51,200.00

( Rupees  Four )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

5d

213880

Extra  over  Item  Nos.  5(a)  to  5(c) above  for  lead beyond 200 Km. and up  to  500  Km.Note: 1) In case of  transportation of sleepers  from  factory,  loading  of sleepers will be done by the factory ‐normally  free  of  cost. Note:  2)  If  the  sleepers  are  to  be transported from any other location, the agency has to make its own 

788400.00

0.95

1 MTKM

7,48,980.00

( Rupees  Zero And Paise  Ninety Five )

SPECIAL RATES which should not be taken as a reference for future tenders and also   the rates for the quantities exceeding the schedule quantities shall be re­fixed through negotiation

Contractor's % : 0       Discount : 0

39

Schedule of Items   LOA No. W496/GGHG/157 Date 26/02/2016 of UCC 74096 

Tender Ref No :-

GGHG/157

Notice Date :-

Original LOA Schedule

19/10/2015

Project : 14534 ‐ SHOLAPUR (HOTGI) ‐ GADAG GAUGE CONVERSION

Dept : ENGINEERING

Name of the Contractor : N0152 ‐ NRK INFRA PROJECTS

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

arrangement  for  loading.  The payment  for  such  loading  will  be made  separately  through  relevant item  of  the  Schedule. Note: 3) The tenderer shall note that the payment for each leads over and above  50  Km.  lead  is  calculated CUMULATIVELY  and  paid  through Item  Nos.  5(b)  to  5(e) Note: 4) Contractor  shall  arrange  to transport  sleepers  for  any  variation in sleepers leads initem Nos. 5(b) to 5(e)  up  to  25%  of  quantities  under Item  Nos.  5(b)  to  5(e)  put together.No  claim  will  be entertained  for  saving  in  any/all items  while  transporting  sleepers. Note: 5) For the purpose of payment the  shortest  possibleroad  route depending  upon  feasibility  will  be considered. The decision of railways in  assessing  the  route  is  final  and binding  on  the  contractor  unless otherwise  warranted  with  prior approval  by  Dy.  CE. Note: 6) Sleepers shall be stacked in more  than  one  layer  as  per  Para 1407 of IRPWM 1986 latest reprints duly  leaving  adequate  space  for movement  of  trucks  on  formation 

3,59,63,725.00

(No. of Items 16 ONLY)

Schedule J Departmental Value : 

0.00

3,59,63,725.00

Schedule J Total :

Rupees in Words ( Rupees  Three Crore Fifty Nine Lakh Sixty Three Thousand Seven Hundred and Twenty Five ONLY )

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: FLAT NO.007, DIVYA‐MSR GATEWAY, NEAR MATHIKERE FLYOVER, GOKULA EXTENSION BANGALORE

40