Toledo Refinery
Site Technical Practices EP 8-1-1C
TEMA Shell and Tube Heat Exchangers Inspection Checklist
April 2008 Revision 0.1
Page 1 of 8
Maintained by E2G – Shaker Heights, OH
PROJECT
PROJECT NO.
INQUIRY NO.
LOCATION
UNIT
EQUIPMENT ID
JOB NO.
DOCUMENT NO.
DATA ISSUED FOR
IN-HOUSE REVIEW
TOLEDO REFINERY APPROVAL
QUOTATION
PURCHASE
CONSTRUCTION
THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGINAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY.
ALL DATA SHEETS ATTACHED
REVISED DATA SHEET(S) ONLY ATTACHED
REV. DATE BY CHECK APPROVALS REMARKS
SECTION PROJECT TOLEDO REFINERY
Toledo Refinery
Site Technical Practices EP 8-1-1C
TEMA Shell and Tube Heat Exchangers Inspection Checklist
April 2008 Revision 0.1
Page 2 of 8
Maintained by E2G – Shaker Heights, OH
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
THE MANUFACTURER OF EQUIPMENT PURCHASED BY THE TOLEDO REFINERY SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF SITE TECHNICAL PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A TOLEDO REFINERY REPRESENTATIVE.
REFERENCES
THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN
SITE TECHNICAL PRACTICES EP 7-1-1 PRESSURE VESSELS EP 7-1-3 HEAVY WALL AND SPECIAL SERVICE PRESSURE VESSELS EP 7-1-4 SUPPLEMENTAL REQUIREMENTS FOR PRESSURE VESSELS EP 7-1-5 WELDING REQUIREMENTS FOR PRESSURE VESSELS EP 7-1-6 METAL LINING AND CLADDING EP 7-1-7 PRESSURE VESSEL DETAILS EP 8-1-1 TEMA SHELL AND TUBE HEAT EXCHANGERS EP 8-1-8 TUBE TO TUBESHEET JOINTS EP 8-1-9 TUBE MATERIAL AND SELECTION EP 10-2-2 SUPPLEMENTAL REQUIREMENTS FOR METALLIC MATERIALS EP 10-2-3 MATERIAL HARDNESS REQUIREMENTS EP 10-3-1 PAINTING EP 10-3-7 INTERNAL LINING AND RESIN REPAIR EP 15-1-4 POSITIVE MATERIAL IDENTIFICATION (PMI)
FREQUENCY OF CONTACT BY THE INSPECTOR (CHECK ONE)
LEVEL l: ON CALL BY FABRICATOR
LEVEL 2: ONCE EVERY TWO WEEKS
LEVEL 3: EVERY WEEK
LEVEL 4: DAILY
LEVEL 5: RESIDENT
LEVEL 6. OTHER, SPECIFY
LEVEL OF INSPECTION BY THE INSPECTOR (CHECK ONE)
LEVEL l: PREFABRICATION MEETING, DOCUMENT REVIEW, AND FINAL INSPECTION
LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW. REVIEW ITEMS. AND FINAL INSPECTION
LEVEL 3: PREFABRICATION MEETING. DOCUMENT REVIEW, REVIEW ITEMS. WITNESS POINTS, AND FINAL INSPECTION
LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION
LEVEL 5. OTHER, SPECIFY
Toledo Refinery
Site Technical Practices EP 8-1-1C
TEMA Shell and Tube Heat Exchangers Inspection Checklist
April 2008 Revision 0.1
Page 3 of 8
Maintained by E2G – Shaker Heights, OH
EQUIPMENT ID JOB NO. DOCUMENT NO. REV. DOCUMENT REVIEW (SHOP INSPECTOR SHALL REVIEW)
DOCUMENT DESCRIPTION
(REFERENCES TO EP 7-1-1, UNLESS OTHERWISE NOTED)
INSPECTOR’S INITIALS (REVIEW
COMPLETE) DATE
TOLEDO REFINERY PURCHASE DOCUMENTS
DRAWINGS AND SPECIFICATIONS
DOCUMENTATION (EP 7-1-4, 6.0)
QUALITY CONTROL MANUAL (EP 7-1-4: 5.3)
QUALITY CONTROL PLAN (5.0, EP 7-1-4: 5.3.3)
MATERIAL RECEIVING SIGN-OFF
MATERIAL REQUISITIONS (6.1)
MATERIAL TEST REPORTS
UT REPORT OF PLATE (EP 7-1-3: 6.2)
UT REPORTS OF FORGINGS AND THICK PLATE (EP7-1-3:6.2)
TEST EQUIPMENT CALIBRATION CERTIFICATIONS
WELDING PROCEDURE SPECS (EP 7-1-5:7.0)
WELDER QUALIFICATION RECORDS (EP 7-1-5: 9.0)
NDE PROCEDURES
NDE TEST REPORTS
NDE PERSONNEL CERTIFICATION
FAB. PLAN/SHOP TRAVELER
IDENTIFICATION OF CRITICAL DIMENSIONS
DAILY COATING INSPECTION REPORT (EP 10-3-1)
SUB-CONTRACTOR Q/C REPORTS
AS-BUILT DATA SHEET (4.1)
NAME PLATE RUBBINGS AND/OR CODE
PRESSURE VESSEL DATA BOOK (EP 7-1-4:6.3)
PWHT PROCEDURES ( 8.5)
AUTHORIZED WAIVERS AND/OR DEVIATIONS REVIEW
REVIEW OF SUBORDERS OF UNPRICED PURCHASE ORDERS TO SUB-VENDORS FOR COMPLIANCE WITH THE ENGINEERING PRACTICE
Toledo Refinery
Site Technical Practices EP 8-1-1C
TEMA Shell and Tube Heat Exchangers Inspection Checklist
April 2008 Revision 0.1
Page 4 of 8
Maintained by E2G – Shaker Heights, OH
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
GENERAL FABRICATION INSPECTION REQUIREMENTS (ALL FABRICATED EQUIPMENT)
R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPECTOR OR SUBCONTRACTED INSPECTOR.
W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEMS DURING FABRICATION SHOP SHALL NOTIFY INSPECTOR 2 DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.
H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEMS DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS AND IMPROVES FABRICATION AFTER INDICATED INSPECTION.
R W H INSPECTION/TESTING ACTIVITY
(REFERENCES TO EP 7-1-1 UNLESS OTHERWISE NOTED)
INSPECTOR’S INITIALS (REVIEW
COMPLETE)
DATE
SPECIAL MATERIAL REQUIREMENTS (EP 10-2-2)
PWHT STEP COOLING REQUIREMENTS (EP 10-2-2)
SPECIAL MATERIAL TENSILE AND IMPACT TESTING REQUIREMENTS (EP 10-2-2)
FIT-UPS WELD ROOTS/WELD BEVELS
SPECIAL FORGINGS TESTING REQUIREMENTS
GENERAL FABRICATION CHECKS (8.1)
GENERAL WELDING FABRICATION CHECKS (8.2)
HEAD AND TRANSITION SECTION THICKNESS REQUIREMENTS (8.3)
REINFORCING PAD GAP ALLOWANCE (8. 3)
SPECIAL FORGING FORMING REQUIREMENTS (8.4)
PWHT PREPARATIONS (8.5)
REVIEW OF COLD WORKED PARTS PWHT REQUIREMENTS
NAMEPLATE REQUIREMENTS (8.6)
DIMENSIONAL CHECKS (8.7)
TEMPLATE CHECK (8.7)
CLEANLINESS CHECK PRIOR TO FINAL INSPECTION (9.1)
PMI OF ALL APPLICABLE MATERIALS (EP 15-1-4)
RT LOCATION SELECTION
RT REVIEW (9.2)
RT OF WELDS IN COLD WORKED PARTS (9.2)
UT OF NOZZLES IN THICK SHELLS (9. 3)
WFMT OF WELDS IF VESSELS IN AES (9.4)
MT/PT OF DOUBLE WELDED GROOVE JOINTS (9.4)
MT/PT OF SPECIFIED AREAS (9.4)
MT/PT OF SPECIFIED AREAS OF 100% RT VESSEL (9.4)
NOZZLE REQUIREMENTS (7.7)
GIRTH FLANGE CONTACT SURFACE REQUIREMENTS (7.11.1)
NON-STANDARD FLANGE GASKETING REQUIREMENTS (7.11.1)
FLANGE REQUIREMENTS FOR CLAD VESSELS (7.11.1)
MT/PT OF UNRADIOGRAPHICABLE NOZZLES (9.4)
Toledo Refinery
Site Technical Practices EP 8-1-1C
TEMA Shell and Tube Heat Exchangers Inspection Checklist
April 2008 Revision 0.1
Page 5 of 8
Maintained by E2G – Shaker Heights, OH
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
GENERAL FABRICATION INSPECTION REQUIREMENTS (ALL FABRICATED EQUIPMENT)
R W H INSPECTION/TESTING ACTIVITY
(REFERENCES TO EP 7-1-1 UNLESS OTHERWISE NOTED)
INSPECTOR’S INITIALS (REVIEW
COMPLETE)
DATE
ALL MAJOR REPAIRS PERFORMED IN ACCORDANCE WITH ACCEPTED PROCEDURES (10.0)
ALL OTHER REPAIRS PERFORMED IN ACCORDANCE WITH ACCEPTED PROCEDURES (10.0)
HYDROSTATIC LEAK TEST (11.0)
CHLORIDE CONTENT OF HYDROTEST FOR STAINLESS STEEL (11.0)
REINFORCING PAD PRESSURE TEST (11.0)
PROGRESSIVE FORMING/MACH.
ASSEMBLY AND MATCH MARKS
REMOVAL OF TEMPORARY ATTACH. AND NDE INSPECTION OF AFFECTED AREA
SURFACE CLEANLINESS/PROFILE
FINAL SHIPPING PREPARATION/CLEANLINESS/PRESERVATION (EP 7-1-4: 5.5)
STAMPING AND MARKING (EP 7-1-4: 5.4)
WELDING INSPECTION (SEE EP 7-1-5)
WELDING PROCESS REQUIREMENTS (6.0)
WELDER PERFORMANCE QUALIFICATION TESTS (7.0)
WELD JOINT DESIGN (8.0)
PREHEAT AND INTERPASS REQUIREMENTS (9.1)
FILLER METAL REQUIREMENTS (9.0)
WELDING TECHNIQUE REQUIREMENTS (9.0)
WELDER IDENTIFICATION (9.0
PRODUCTION TEST PLATE QUALIFICATION (9.0)
PWHT REPORT - ASME CODE (10.0)
PWHT - AES SERVICE (11.0)
WELD HARDNESS REQUIREMENTS AFTER PWHT (EP 10-2-3)
Toledo Refinery
Site Technical Practices EP 8-1-1C
TEMA Shell and Tube Heat Exchangers Inspection Checklist
April 2008 Revision 0.1
Page 6 of 8
Maintained by E2G – Shaker Heights, OH
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
SHELL AND TUBE HEAT EXCHANGER INSPECTION AND TESTING
R W H INSPECTION/TESTING ACTIVITY
(REFERENCES TO EP 8-1-1 UNLESS OTHERWISE NOTED)
INSPECTOR’S INITIALS (REVIEW
COMPLETE)
DATE
TUBESHEET DRILLING/MACHINE PROCESS (EP 8-1-8)
TUBE EXPANSION/ROLLING PROCESS(EP 8-1-8: 6.0)
TUBE STRENGTH WELDS WITH THROAT THICKNESS EQUAL TO TUBE THICKNESS (EP 8-1-8: 7.4.4)
TUBE BUNDLE INSERTION/REMOVAL CHECK (8.1)
WELDED TUBE ROLL LEAK TEST (EP 8-1-8: 8.4)
EXCHANGER HYDROSTATIC TEST REQUIREMENTS (8.2)
VERIFY UNIT DRYOUT AFTER HYDROTEST
CLADDING AND WELD OVERLAY INSPECTION WHEN REQUIRED (EP 7-1-6)
INSPECTION REQUIREMENTS FOR CLAD PLATE (11.0)
REQUIREMENTS FOR CLAD PLATE (5.0)
PT OF WELD OVERLAY OF SEAMS (11.0)
RT OF MAIN SEAM AFTER WELD OVERLAY (11.0)
VERIFICATION OF WELD OVERLAY THICKNESS (11.0)
PMI OF WELD OVERLAY (11.0)
PT OF 1ST LAYER OF WELD OVERLAY (11.0)
FINAL PT EXAMINATION OF OVERLAY (11.0)
RT OF P3, P4, AND P5 FOLLOWING PWHT (11.0)
FERRITE CONTENT OF OVERLAYS (11.0)
INSPECTION REQUIREMENTS FOR STRIP LINING (11.0)
Toledo Refinery
Site Technical Practices EP 8-1-1C
TEMA Shell and Tube Heat Exchangers Inspection Checklist
April 2008 Revision 0.1
Page 7 of 8
Maintained by E2G – Shaker Heights, OH
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
HEAVY WALL AND SPECIAL SERVICE VESSEL INSPECTION WHEN REQUIRED
R W H INSPECTION/TESTING ACTIVITY
(REFERENCES TO EP 7-1-3 UNLESS OTHERWISE NOTED)
INSPECTOR’S INITIALS (REVIEW
COMPLETE)
DATE
VESSEL ATTACHMENT WELD REQUIREMENTS (5.4)
SUPPLEMENTAL UT OF PLATE MATERIAL (6.2)
SUPPLEMENTAL UT AND MT OF FORGINGS (6.2)
REPAIRS OF PLATES AND FORGINGS (6.2)
SUPPLEMENTAL RT REQUIREMENTS (8.1)
SUPPLEMENTAL UT REQUIREMENTS (8.2)
SUPPLEMENTAL MT AND PT REQUIREMENTS (8.3)
AE REQUIREMENTS (9.0)
PRODUCTION TEST PLATE QUALIFICATIONS (EP 7-1-5)
EXTERIOR COATING INSPECTION WHEN REQUIRED (SEE EP 10-3-1)
SAND BLASTED SURFACES (10.0)
COATINGS PREPARATION (10.0)
WET FILM THICKNESS MEASUREMENTS (10.0)
DRY FILM THICKNESS MEASUREMENTS (10.0)
HOLIDAY TESTING OF COATING (10.0)
REPAIR AND FINAL INSPECTION
INTERNAL COATING INSPECTION WHEN REQUIRED (SEE EP 10-3-7: 12.0)
INITIAL SURFACE INSPECTION
SAND BLASTING OPERATION
SURFACE PREPARATION PRIOR TO APPLICATION
CONDITION FOR APPLICATION OF COATING
DRY FILM THICKNESS MEASUREMENT
HOLIDAY TESTING OF COATING
REPAIR AND FINAL INSPECTION
INITIALS NAME COMPANY
EQUIPMENT ID JOB NO. DOCUMENT NO.
Toledo Refinery
Site Technical Practices EP 8-1-1C
TEMA Shell and Tube Heat Exchangers Inspection Checklist
April 2008 Revision 0.1
Page 8 of 8
Maintained by E2G – Shaker Heights, OH
SUMMARY: