    Rail Program Update

    PowerPoint

  • 7/28/2019 8281 PowerPoint

    2/9

  • 7/28/2019 8281 PowerPoint

    3/9

    Metrolink Service Ex ansion Pro ramCost

    (millions)Project

    Anaheim La over Facilit

    28.20$

    23.90$

    New Control Points & Signals

    Fullerton Turnback Facility

    Laguna Niguel Turnback Facility

    18.30$

    13.30

    SUBTOTAL

    Equipment (locomotives, cab cars and trailers)

    Orange Siding Rehabilitation 11.20$

    144.00$

    94.90$

    Le end:

    2009 2010 2011

    .

    Re uiredforservice startu

    Notes

    FullertonTurnbackFacilit

    Schedule

    Final Design

    Construction

    Anaheim Layover Facility

    Oran e Sidin Rehabilitation

    New Control Points & Signals

    Laguna Niguel Turnback Facility

    Required for service start up

    2

    Rail Equipment Delivery

  • 7/28/2019 8281 PowerPoint

    4/9

    Grade Crossin Safet Enhancements Cost

    (millions)Number of Crossing sProject

    14

    1

    10

    1

    5 9.19$

    .

    15.59$

    2.86$

    15.92$

    3.71$

    City of Tustin

    City of Santa Ana

    City of Irvine

    Cit of San J uan Ca istrano

    City of Anaheim

    1

    2

    0

    TOTAL 50

    3.36$

    2.04$

    0.30$

    4.36$86.41$

    City of San Clemente

    City of Fullerton

    Right-of-way & Utilities

    City of Dana Point

    Construction will take place on two crossings

    concurrently throughout the project.

    Notes

    City of Orange

    Schedule

    City of Anaheim

    2010 20112009

    Legend:

    Final Design

    Construction

    City of Tustin

    Cit ofDana Point

    City of San J uan Capistrano

    City of Santa Ana

    City of Irvine

    3

    Date: J une 2010 Construction deferred to later date.

    City of San Clemente

    City of Fullerton

  • 7/28/2019 8281 PowerPoint

    5/9

    Station Im rovementsCost

    (millions)Project

    Fullerton Parking Structure (810)

    Orange Parking Structure (800)

    Tustin Parking Structure (825)

    Laguna Niguel/Mission Viejo (LN/MV) Station Amenities and Parking Lots (500)

    41.97$

    23.05$

    17.50$

    8.50$

    Santa Ana VSS

    Tustin VSS

    Tustin Pedestrian Walkway

    0.75$

    0.75$

    0.24$

    93.51$

    .

    TOTAL

    Legend: City lead design/build contract - IFB issued in May 2010

    PA/ED

    Notes2010

    Tustin Pedestrian Walkway Completion date May 2010

    2011Schedule 2009

    Fullerton Parking Stucture

    2012 2013

    Final Design City lead RFP for design issued J une 2010Construction IFB issued J une 2010 - NTP expected in Sept.

    MOU approved by Board in September 2009

    City lead design/build contract RFP expected J une 2010

    Desi n/build contract RFP issued Ma 2010

    Tustin Parking StructureOrange Parking Structure

    Fullerton VSS

    LN/MV Station/Parking Improvements

    Santa Ana VSS

    4

    Design/build contract RFP expected J une 2010Tustin VSS

  • 7/28/2019 8281 PowerPoint

    6/9

    LOSSAN Grade Se aration Pro ectsCost

    (millions)Project

    17th Street - Santa Ana (Proposed)

    Orangethorpe Avenue - Anaheim (Proposed)Ball Road - Anaheim (Proposed)

    Grand Avenue - Santa Ana (Proposed)

    Main Street - Orange (Proposed)

    71.00$

    72.00$

    69.00$

    94.00$

    89.00$

    State College Boulevard - Anaheim

    Sand Canyon Avenue - Irvine

    Santa Ana Boulevard - Santa Ana

    TOTAL 595.00$

    70.00$

    56.00$

    74.00$

    Legend: 17th Street - Santa Ana

    Project Concept Orangethorpe Ave - Anaheim

    ProectA roval BallRoad- Anahei

    2020Schedule 20192014 20152009 20182010 2011 2012 2013 2016 2017

    Final Design Grand Avenue - Santa Ana

    Construction Main Street - Orange

    State College Boulevard

    Sand Canyon Ave

    5

    * Schedules assumes future funding availability.

    Note: State College project approval has been completed by the City of Anaheim

  • 7/28/2019 8281 PowerPoint

    7/9

    Anaheim Regional Transportation

    Cost

    Renewed Measure M - Project T Bond Proceeds

    Measure M Transit Revenue

    2008 State Transportation Improvement Program

    44.63$

    29.22$

    (millions)

    99.20$

    Federal

    TOTAL 178.87$

    5.82$

    Environmental Clearance Initiated with the City as

    Lead Agency

    2009 201320122010 2011

    Environmental Clearance

    Architectural & En ineerin Desi nArchitectural & En ineerin Underwa

    Current Status Schedule

    Right-of-Way

    Next Major Milestone: Notice of Intent/Notice of

    ARTIC and California High-Speed Train Project

    Teams Coordinating Design Efforts to Ensure

    Seamless Integration of Both Projects

    6

    Preparation

    Env Clear Final Design Construction

  • 7/28/2019 8281 PowerPoint

    8/9

    Go Local Fixed-Guidewa Pro ramProject

    Step Tw o

    Aw ard

    Step Two Activities Underway: Conceptual Engineering, Alternatives Analysis, State/Federal Environmental Clearance

    Project Sch edule

    Anaheim Rapid Connection:

    ARTIC-Platinum Triangle-Anaheim Resort 5.90$Connector

    Santa Ana/Garden Grove Fixed-Guidewa :

    SARTC to Harbor Boulevard/Garden Grove 5.90$

    (Final design/construction schedule shown for initial operating segment:SARTC to Bristol

    TOTAL 11.80$

    * Phases not currently funded.

    Step Two Activities FinalDesign/ROW* Construction*

    An ah eim Fixed -Gu id eway Santa Ana Fixed-Guidew ay

    7

  • 7/28/2019 8281 PowerPoint

    9/9

    Facilities En ineerinSchedule

    Project 2009Cost

    (millions)

    2010 2011

    , , -

    Ana, GG, Irv SC Bases - Steam Clean Area Vehicle Lifts

    Ana, GG, Irv CC, Irvine SC Bases - Security Upgrades

    PEROW - Drainage Improvements

    Ana, GG, Irv SC Bases - Elevator Upgrades 0.40$

    0.70$

    1.50$

    0.40$

    .

    Ana Base - Pavement Reconstruction

    Irv SC Base - Workers Fall Protection

    Irv SC Base - Bus Wash Building Modifications

    Ana, GG, Irv SC, SA Bases - EVR Phase II Upgrades

    TOTAL

    0.05$

    0.25$

    4.20$

    0.13$

    .

    OCTA Facility Legend:

    Ana Anaheim Bus Base

    GG Garden Grove Bus Base

    Final DesignPreliminary DesignRFP Construction

    Irv CC Irvine Construction Circle Bus BaseIrv SC Irvine Sand Canyon Bus Base

    SA Santa Ana Bus Base

    GWTC Golden West Transportation Center

    PEROW Pacific Electric Right-of-Way

    8