Route CR-25 Project Description NEW ALIGNMENT OF CR-25 (MCFARLAND ROAD) FROM CR-28 (OLD PASCAGOULA ROAD) TO CR-358 (THREE NOTCH ROAD) Type of Work GRADE, DRAIN, BASE AND PAVE Project Length in Miles 8.000 Urban Area MOBILE COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100059788 STPMB 4918 (250) PRELIMINARY ENGINEERING GRADE, DRAIN, BASE AND PAVE 2018 $2,000 $500 $2,500 100059789 STPMB 4918 (250) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2019 $4,800 $1,200 $6,000 TOTAL COST: $6,800 $1,700 $8,500 Route CR-32 Project Description THREE NOTCH ROAD (CR-32) ADDITIONAL LANES FROM SCHILLINGER ROAD TO MCDONALD ROAD. Type of Work ADDITIONAL ROADWAY LANES Project Length in Miles 2.000 Urban Area MOBILE COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100052461 STPMB 7502 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2019 $224 $56 $280 100052462 STPMB 7502 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2019 $732 $183 $915 TOTAL COST: $956 $239 $1,195 9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM STIP YEARS from 10/1/2014-9/30/2019 1 of 28 COUNTY HIGHWAY PROJECTS - MOBILE STIP PLAN: 2016 - Original

Upload: vokhanh

Post on 06-Sep-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Route CR-25 ProjectDescription

NEW ALIGNMENT OF CR-25 (MCFARLAND ROAD) FROM CR-28 (OLD PASCAGOULA ROAD) TO CR-358 (THREE NOTCH ROAD)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 8.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059788 STPMB 4918 (250) PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE AND PAVE

2018 $2,000 $500 $2,500

100059789 STPMB 4918 (250) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2019 $4,800 $1,200 $6,000

TOTAL COST: $6,800 $1,700 $8,500

Route CR-32 ProjectDescription

THREE NOTCH ROAD (CR-32) ADDITIONAL LANES FROM SCHILLINGER ROAD TO MCDONALD ROAD.

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052461 STPMB 7502 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2019 $224 $56 $280

100052462 STPMB 7502 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $732 $183 $915

TOTAL COST: $956 $239 $1,195

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

1 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route CR-372 ProjectDescription

CR-372 (SCHILLINGER RD) ADD LANES FROM SR-42 (US-98) TO SR-217 (LOTT RD)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 3.322 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046890 STPMBF-STPAAF 7503 (601)

UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2016 $244 $61 $305

100046891 STPMBF-STPAAF 7503 (601)

CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2016 $10,036 $2,509 $12,546

TOTAL COST: $10,280 $2,570 $12,851

Route CR-39 ProjectDescription

MCDONALD ROAD (CR-39) ADDITIONAL LANES FROM NORTH OF I-10 TO OLD PASCAGOULA ROAD.

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.500 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052448 STPMB 7612 (600) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2018 $936 $234 $1,170

100052449 STPMB 7612 (600) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2019 $560 $140 $700

100052450 STPMB 7612 (600) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $3,840 $960 $4,800

TOTAL COST: $5,336 $1,334 $6,670

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

2 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route CR-63 ProjectDescription

BRIDGE AND APPROACHES CR-63 (WILMER-GEORGETOWN ROAD) OVER BIG CREEK BIN # 4901

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061186 ACBRZ61186 ATRP (010)

CONSTRUCTION

BRIDGES AND APPROACHES

2016 $2,831 $713 $3,544

TOTAL COST: $2,831 $713 $3,544

Route CR-656 ProjectDescription

CR-656 (ZEIGLER BLVD) ADD LANES FROM ATHEY RD TO FORREST HILL DRIVE

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 6.820 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100043178 DBMB-STPMB 7550 (600)

UTILITIES

ADDITIONAL ROADWAY LANES

2019 $1,600 $400 $2,000

100037215 DBMB-STPMB 7550 (600)

CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $10,959 $2,740 $13,698

TOTAL COST: $12,559 $3,140 $15,698

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

3 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route CR-656 ProjectDescription

CR-656 (ZEIGLER BLVD) ADD LANES FROM CR-372 (SCHILLINGER RD) TO CR-429 (CODY RD)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 3.600 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046893 STPMB 7550 (601) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2016 $668 $167 $835

100046894 STPMB 7550 (601) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2019 $304 $76 $380

100046895 STPMB 7550 (601) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $3,356 $839 $4,195

TOTAL COST: $4,328 $1,082 $5,410

Route CR-656 ProjectDescription

ADDITIONAL LANES ON CR-656 (ZEIGLER BLVD) FROM CR-70 (TANNER WILLIAMS RD) TO CR-31 (SCHILLINGER RD)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 4.200 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055881 STPMB 7550 (602) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2019 $1,504 $376 $1,880

100055882 STPMB 7550 (602) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2019 $896 $224 $1,120

100055883 STPMB 7550 (602) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $4,000 $1,000 $5,000

TOTAL COST: $6,400 $1,600 $8,000

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

4 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

DAUPHIN STREET ADDITIONAL LANES FROM SAGE AVENUE TO WEST OF I-65 AT SPRINGHILL MEMORIAL HOSPITAL.

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 3.300 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052458 STPMB 7533 () RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $216 $54 $270

100052459 STPMB 7533 () UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2021 $225 $56 $281

100052460 STPMB 7533 () CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2021 $2,920 $730 $3,650

TOTAL COST: $3,361 $840 $4,201

Route CR-NA ProjectDescription

MCGREGOR AVENUE WIDENING FROM AIRPORT BOULEVARD TO DAUPHIN STREET AND INSTALLATION OF A ROUNDABOUT AT DAUPHIN STREET

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.470 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052600 STPMBF 7508 (600) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2018 $2,200 $550 $2,750

100052601 STPMBF 7508 (600) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2019 $1,200 $300 $1,500

100052602 STPMBF 7508 (600) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $2,706 $676 $3,382

TOTAL COST: $6,106 $1,526 $7,632

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

5 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

GRADE, DRAIN, BASE AND PAVE LOTT ROAD FROM BEVERLY JEFFERIES HWY TO BROWN-BLANKENCHIP ROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 2.250 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061189 ACNU61189 ATRP (006) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2017 $1,498 $704 $2,202

TOTAL COST: $1,498 $704 $2,202

Route I -10 ProjectDescription

RESURFACE I-10 FROM WEST OF CR-39 (MCDONALD ROAD) TO CR-59 (CAROL PLANTATION ROAD)

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 8.920 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057810 IM-HSIP I010 (338) PRELIMINARY ENGINEERING

PAVEMENT MINOR REHABILITATION

2016 $155 $17 $172

100057811 IM-HSIP I010 (338) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2018 $9,256 $1,028 $10,284

TOTAL COST: $9,411 $1,046 $10,456

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

6 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route I -10 ProjectDescription

I-10 EAST TUNNEL INTERCHANGE BRIDGE BEARING REHABILITATION

Type of Work BRIDGE REHABILITATION

Project Length in Miles 0.828 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056331 IM I010 () PRELIMINARY ENGINEERING

BRIDGE REHABILITATION

2018 $301 $33 $334

TOTAL COST: $301 $33 $334

Route I -10 ProjectDescription

I-10 MOBILE RIVER BRIDGE AND I-10 BAYWAY WIDENING FROM EXIT 24 (BROAD STREET) TO MOBILE COUNTY LINE

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 13.227 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062408 ACNH I010 () PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $41,291 $10,323

$51,614

100062410 DPI I010 () RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $20,332 $5,083 $25,415

100062411 DPI I010 () UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $3,893 $973 $4,867

TOTAL COST: $65,516 $16,379

$81,895

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

7 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route I -165 ProjectDescription

RESURFACING I-165 SERVICE ROADS FROM .04 MILE SOUTH OF BAY BRIDGE ROAD TO .08 MILE NORTH OF WHISTLER STREET

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 3.400 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062514 IM I165 (303) PRELIMINARY ENGINEERING

PAVEMENT MINOR REHABILITATION

2017 $516 $57 $573

100058195 IM I165 (303) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2019 $5,478 $609 $6,086

TOTAL COST: $5,993 $666 $6,659

Route I -65 ProjectDescription

I-65 AT CR-41 (CELESTE RD) INTERCHANGE MODIFICATIONS.

Type of Work INTERCHANGE

Project Length in Miles 0.500 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039475 ACNH39475F I065 (388) CONSTRUCTION

INTERCHANGE

2016 $5,669 $1,664 $7,333

TOTAL COST: $5,669 $1,664 $7,333

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

8 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route I -65 ProjectDescription

I-65 AT CR-41 (CELESTE RD) INTERCHANGE MODIFICATIONS.

Type of Work INTERCHANGE

Project Length in Miles 0.500 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039476 ACNH39475F I065 (388) UTILITIES

INTERCHANGE

2016 $207 $52 $259

TOTAL COST: $207 $52 $259

Route I -65 ProjectDescription

RESURFACING I-65 FROM MAIN STREET TO NORTH OF SR-158

Type of Work RESURFACING

Project Length in Miles 9.148 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062513 IM I065 (466) PRELIMINARY ENGINEERING

RESURFACING

2016 $533 $60 $592

100058747 IM I065 (466) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2017 $7,520 $836 $8,355

TOTAL COST: $8,052 $895 $8,948

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

9 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route SR-13 ProjectDescription

CULVERT REPLACMENT, BIN 5715, SR-13 (US-43) OVER STEELE CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061587 BR 0013 (601) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2016 $303 $76 $379

100061588 BR 0013 (601) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,167 $542 $2,709

TOTAL COST: $2,470 $618 $3,088

Route SR-16 ProjectDescription

REPLACE BRIDGE, BIN 008714, SR-16 (US-90) WESTBOUND OVER TENSAW-SPANISH RIVER. (SUFF=49.7, STATUS=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.306 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056130 BRF 0016 (522) UTILITIES

BRIDGE REPLACEMENT

2019 $451 $113 $564

100049566 BRF 0016 (522) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $19,677 $4,919 $24,596

TOTAL COST: $20,127 $5,032 $25,159

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

10 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route SR-17 ProjectDescription

BRIDGE REPL SR-17(US-45) (STR#17-49-35.7) OVER BENNETTS CK BIN 003218

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.020 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063583 BR 0017 (574) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2018 $62 $15 $77

TOTAL COST: $62 $15 $77

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

11 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Original

Route CR-31 ProjectDescription

ADDITIONAL LANES ON SCHILLINGER ROAD SOUTH (CR-31) FROM THREE NOTCH ROAD (CR-32) TO APPROXIMATELY 0.2 MILES SOUTH OF HALLS MILL CREEK.

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.742 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064999 ST-049-888-013 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2016 $0 $10,000

$10,000

TOTAL COST: $0 $10,000

$10,000

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

12 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 1

Route I -10 ProjectDescription

I-10 MOBILE RIVER BRIDGE CORRIDOR PRESERVATION

Type of Work BRIDGE

Project Length in Miles 2.460 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065672 HPPF AL06 (903) RIGHT OF WAY

BRIDGE 2016 $1,538 $385 $1,923

TOTAL COST: $1,538 $385 $1,923

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

13 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 5

Route I -10 ProjectDescription

I-10 EASTBOUND WATER STREET ON-RAMP CLOSURE AND IMPROVEMENTS TO CANAL STREET, CLAIBORNE STREET, AND TEXAS STREET INTERCHANGE

Type of Work INTERCHANGE

Project Length in Miles 1.500 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064990 HPPF AL06 (902) CONSTRUCTION

INTERCHANGE

2016 $1,326 $336 $1,662

TOTAL COST: $1,326 $336 $1,662

Route I -165 ProjectDescription

INSTALLATION OF PRECAST CONCRETE PAVEMENT SYSTEM ON I-165 SB SERVICE ROAD LEFT TURN LANES JUST WEST OF BAY BRIDGE ROAD SR-16 (US-90)

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.121 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065216 TIDP-IM I165 (302) CONSTRUCTION

PAVEMENT REHABILITATION

2017 $1,152 $95 $1,247

TOTAL COST: $1,152 $95 $1,247

Route I -65 ProjectDescription

I-65 NORTHBOUND/SOUTHBOUND BRIDGES (BIN #13807) OVER COTTAGE HILL ROAD MP 2.496 TO MP 2.728 PARTIAL BRIDGE DECK REPAIR/REPLACEMENT

Type of Work BRIDGE REHABILITATION

Project Length in Miles 0.232 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065774 IM I065 (470) CONSTRUCTION

BRIDGE REHABILITATION

2016 $3,707 $412 $4,119

TOTAL COST: $3,707 $412 $4,119

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

14 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 8

Route SR-158X ProjectDescription

SR-158 EXTENSION FROM EAST OF LOTT ROAD (SR-217) TO SCHILLINGER ROAD. GRADE, DRAIN, BASE, PAVE, AND BRIDGE (EB SEABURY CREEK, EB ROGERS ROAD, AND SCHILLINGER ROAD INTERSECTION)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 1.219 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060152 NHF 0158 (502) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2018 $17,695 $4,424 $22,119

TOTAL COST: $17,695 $4,424 $22,119

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

15 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 8

Route CR-656 ProjectDescription

CLEARING AND GRUBBING ON CR-656 (ZEIGLER BOULEVARD) FROM ATHEY ROAD TO FORREST HILL DRIVE

Type of Work CLEARING AND GRUBBING

Project Length in Miles 3.410 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065368 STPMB 7550 (603) CONSTRUCTION

CLEARING AND GRUBBING

2017 $102 $25 $127

TOTAL COST: $102 $25 $127

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

16 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 9

Route I -10 ProjectDescription

DESIGN OF VARIOUS INTELLIGENT TRANSPORTATION SYSTEM DEVICES AND FIBER BACKBONE ALONG I-10, I-65, I-165, SR-16 (US-90), SR-42 (US-98), SR-59 WITHIN THE MOBILE AND BALDWIN URBAN AREA

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057418 IM MR17 (900) PRELIMINARY ENGINEERING

UNCLASSIFIED 2017 $0 $0 $0

100057419 IM MR17 () CONSTRUCTION

UNCLASSIFIED 2019 $8,263 $918 $9,181

TOTAL COST: $8,263 $918 $9,181

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

17 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 13

Route SR-16 ProjectDescription

REPLACE BRIDGE, BIN 008714, SR-16 (US-90) WESTBOUND OVER TENSAW-SPANISH RIVER.

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.650 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064691 BRF 0016 (522) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2017 $566 $141 $707

TOTAL COST: $566 $141 $707

Route SR-42R ProjectDescription

CONSTRUCT BRIDGE ON (CR-63) WILMER-GEORGETOWN ROAD OVER SR-42 (US-98) WITH JUGHANDLE INTERCHANGE ONTO SR-42 (US-98)

Type of Work BRIDGE

Project Length in Miles 0.010 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060480 NHF 0042 (535) CONSTRUCTION

BRIDGE 2019 $6,910 $1,727 $8,637

TOTAL COST: $6,910 $1,727 $8,637

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

18 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 14

Route NA- ProjectDescription

ONE MOBILE - COMPLETE STREET INITIATIVE TIGER GRANT

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066565 TIGER-FAUP 4917 (250) CONSTRUCTION

UNCLASSIFIED 2018 $5,525 $1,303 $6,828

TOTAL COST: $5,525 $1,303 $6,828

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

19 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 19

Route SR-42R ProjectDescription

CONSTRUCT BRIDGE ON (CR-63) WILMER-GEORGETOWN ROAD OVER SR-42 (US-98) WITH JUGHANDLE INTERCHANGE ONTO SR-42 (US-98)

Type of Work BRIDGE

Project Length in Miles 0.010 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066917 BP-049-042-015 () RIGHT OF WAY

BRIDGE 2019 $0 $240 $240

TOTAL COST: $0 $240 $240

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

20 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 21

Route SR-42R ProjectDescription

CONSTRUCT BRIDGE ON GLENWOOD ROAD OVER SR-42 (US-98)

Type of Work BRIDGE

Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066916 BP-NHF 0042 (517) RIGHT OF WAY

BRIDGE 2018 $201 $66 $267

TOTAL COST: $201 $66 $267

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

21 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 22

Route SR-158X ProjectDescription

SR-158 EXTENSION FROM EAST OF LOTT ROAD (SR-217) TO SCHILLINGER ROAD GRADE, DRAIN, BASE, PAVE AND BRIDGE

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 1.220 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067136 NHF 0158 (502) UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2018 $238 $59 $297

TOTAL COST: $238 $59 $297

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

22 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 26

Route I -10 ProjectDescription

I-10 MOBILE RIVER BRIDGE LOAD TEST PROGRAM

Type of Work UNCLASSIFIED

Project Length in Miles 2.460 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067528 IM I010 (341) CONSTRUCTION

UNCLASSIFIED 2018 $3,997 $444 $4,441

TOTAL COST: $3,997 $444 $4,441

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

23 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 27

Route SR-158X ProjectDescription

SR-158 EXTENSION FROM 0.5 MILE EAST OF GLENWOOD ROAD TO WEST OF LOTT ROAD (SR-217). GRADE DRAIN, BASE, PAVE, AND BRIDGE (EB COLLINS CREEK, EB MCCRARY ROAD, AND EB COLLINS CREEK TRIBUTARY) (UTILITY WORK)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.709 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060153 NH 0158 (508) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2018 $158 $40 $198

TOTAL COST: $158 $40 $198

Route SR-42 ProjectDescription

EXTEND EASTBOUND BRIDGE ON SR-42 (US-98) OVER BIG CREEK EAST 1440'

Type of Work BRIDGE

Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054972 NHF 0042 (511) CONSTRUCTION

BRIDGE 2019 $8,130 $2,032 $10,162

TOTAL COST: $8,130 $2,032 $10,162

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

24 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 30

Route SR-42R ProjectDescription

CONSTRUCT BRIDGE ON GLENWOOD ROAD OVER SR-42 (US-98)

Type of Work BRIDGE

Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052812 NHF 0042 (517) CONSTRUCTION

BRIDGE 2019 $4,385 $1,096 $5,481

TOTAL COST: $4,385 $1,096 $5,481

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

25 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 30

Route SR-158X ProjectDescription

SR-158 EXTENSION FROM 0.5 MILE EAST OF GLENWOOD ROAD TO WEST OF LOTT ROAD (SR-217). GRADE DRAIN, BASE, PAVE, AND BRIDGE (EB COLLINS CREEK, EB MCCRARY ROAD, AND EB COLLINS CREEK TRIBUTARY)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.709 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067717 NH 0158 (508) UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2018 $168 $42 $210

TOTAL COST: $168 $42 $210

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

26 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 31

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - DAUPHIN STREET FROM SAGE AVENUE TO SPRINGHILL HOSPITAL

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066704 STPMB 4918 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2018 $50 $13 $63

100066705 STPMB 4918 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2018 $450 $113 $563

TOTAL COST: $500 $125 $625

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - AIRPORT BLVD FROM UNIVERSITY BLVD TO HILLCREST ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066706 STPMB 4918 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2019 $51 $13 $63

100066707 STPMB 4918 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $455 $114 $568

TOTAL COST: $505 $126 $631

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

27 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 36

Route SR-158X ProjectDescription

SR-158 EXTENSION LOTT ROAD OVERPASS AND JUG HANDLE. GRADE, DRAIN, BASE, PAVE AND BRIDGE (EB SEABURY CREEK TRIBUTARY AND PARTIAL LOTT ROAD)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 5.540 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068084 NHF 0158 (505) UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $291 $73 $364

100060154 NHF 0158 (505) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $25,920 $6,480 $32,400

TOTAL COST: $26,211 $6,553 $32,764

Route SR-16 ProjectDescription

INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - SR-16 (US-90) FROM BROAD STREET TO BANKHEAD TUNNEL

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 2.920 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066702 STPMB 0016 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2018 $119 $119 $238

100066703 STPMB 0016 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2018 $381 $509 $891

TOTAL COST: $500 $628 $1,128

9/5/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

28 of 28

COUNTY HIGHWAY PROJECTS - MOBILE

STIP PLAN: 2016 - Amendment # 36