95 EXPRESS LANES
Project Update
Fairfax County Transportation CommitteeSeptember 16, 2014
![Page 2: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/2.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
Scope of Improvements
» Expand existing reversible HOV lanes from two to three lanes for 14 miles from just north of Edsall Road on I-395 to the Prince William Parkway
» Improve the existing two HOV lanes for six miles from Prince William Parkway to Route 234/Dumfries
» Build new nine mile reversible extension of existing HOV lanes from Dumfries to Garrisonville Rd in Stafford County
» Add new or improved access to and from HOV/HOT network at key interchanges
![Page 3: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/3.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
Construction Update
» Construction is nearly 90% complete
» On-schedule to open early 2015
» DBE/SWaM goals exceeded
» Goal $189.2 Million
» Committed Over $200 Million
» Paid to Date $174.5 Million
» Safety: Over Three Million safe-work hours
» All bridges completed
» All overhead signs installed
» All 943 tolling devices installed – testing is underway
» Sound wall construction advancing
![Page 4: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/4.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
I-95 Commuter Solutions
• Express Bus Service from Woodbridge to Tysons & DC» 195,000 total passenger trips
• Free, Saturday bus service along I-95» 21,000 total riders» Avg. daily riders: 570 (Apr-Jul)» Record ridership of 760 on Saturday,
August 2nd• VRE Step-up Fare
» 39K+ “new” riders to date• GWRegion Vanpools
» 40 new vanpools» 35,000 passenger trips
• Northern Va. commuter tools on Virginia 511 for I-95/395» Trip-planning tool; Park & Ride info &
real-time HOV travel times» 37,130 views/6,188 per month» Available on mobile app. and
www.511virginia.org/nova
![Page 5: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/5.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
What to Expect This Fall• Busy fall construction season
to remain on-schedule• Ongoing extended closures of
HOV lanes during weekends and overnight
• Testing of tolling equipment• Unveiling overhead signs• Final paving and lane
markings, guardrails and sound walls
• Final inspections• Final joint operations and
maintenance protocols• Coordination with nearby I-395
Auxiliary Lane Project• Customer readiness and
marketing campaign led by Transurban
![Page 6: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/6.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
How 95 Express Lanes Work
![Page 7: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/7.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
How the Lanes Work
» Express Lanes will be reversible with similar timing as today’s HOV system
» Dynamic system with variable tolls will manage traffic» Mandatory E-ZPass for all users» HOV-3, transit and motorcycles will ride toll-free with E-ZPass Flex» Rules of the road will be in effect 24 hours a day, seven days a week
![Page 8: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/8.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
How the Lanes Work
» Pricing signage in advance of all entrances
» Toll rates will adjust to keep lanes free flowing
» Toll equipment will identify vehicle’s total trip distance
» Sensors monitor traffic 24/7 and system adjusts toll prices as necessary
» All-electronic -- no toll booths
![Page 9: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/9.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
HOV-3 Travel
» HOV-3 qualifies for toll-free travel
» Carpools and vanpools will need the switchable E-ZPass Flex
» Now available through Virginia and Maryland’s E-ZPass
offices, retail locations in Northern Virginia and online
» E-ZPass Flex works on all other E-ZPass facilities
![Page 10: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/10.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
Segment Locations
![Page 11: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/11.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
Safety
» 24-hour safety monitoring from Express Lanes Operations Center
» Real-time traffic information and Express Assist
» Express Assist incident response will work with law enforcement, VDOT and emergency services
» Vehicle detection technology will assist with reversal of traffic flow
![Page 12: 95 Express Lanes Project Update](https://reader033.vdocuments.net/reader033/viewer/2022061203/547e6e5c5906b5a6718b466d/html5/thumbnails/12.jpg)
Click to edit Master title style
» Click to edit Master text styles– Second level
• Third level– Fourth level
• Fifth level
For More Information
For construction information,please visit:
www.vamegaprojects.com
For information on how to use the Express Lanes and E-Zpass, please visit:
95ExpressLanes.com