9,825,461,087,64 10,91 6,00 0,00 8,00 inauguration siemens anderlecht – 10 may 2006 inauguration...

20
Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Post on 18-Dec-2015

229 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

6,00

0,00

8,00Inauguration Siemens Anderlecht – 10 May 2006

Inauguration Siemens in Anderlecht10 May 2006

Press presentation

Page 2: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 2

Our Location Concept

Locations: head office in Brussels area and at least one main office in Flanders and Walloonia

Mobility: buildings must be easily accessible and must allow a flexible working concept

Technology: buildings must be technically adapted in terms of ICT, security, building management, environment,

Image: buildings must be representative of the dynamic and modern image of Siemens

Costs: • Reduction of surface of offices in Belgium-Luxembourg

(from 160 000 to 80 000 - currently 105 600)• Operational costs must be in line with objectives

Page 3: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 3

New head office in Anderlecht

• New Business park in the Brussels Capital Region

• Close to the Ring

• Easily accessible, also via public transport (Metro)

• Cost in line with objectives

• “Erasmus Office Park” is renamed “Siemens Business Park”

Page 4: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 4

Siemens NV/SAMarie Curiesquare 30 - Square Marie Curie 301070 Brussel – Bruxelles

Siemens Business Services NV/SAMarie Curiesquare 30 - Square Marie Curie 301070 Brussel – Bruxelles

Siemens Business Park

Page 5: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 5

Siemens Business Park

Location • Two buildings bought by Siemens

– Occupied by:• Group management and staff (CEO, CFO, corporate communication, finance, CIO, Corporate

Consulting, RI, later HR ADMIN)• Siemens Business Services (IT services)• Medical Solutions

• Fujitsu Siemens Computers moved into a 3rd building (120 employees)

• Other companies: Vedior, Delhaize Group, Cytec, Hay Group, Atoll

Comparison

Old Headquarter SBP Anderlecht

M² 24.000 11.500

Employees 800 620

Workplaces 800 500

Operational Cost -39%

Page 6: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 6

Approach

Physical environment Technology

Culture / processes

Page 7: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 7

Mobility

Mobility manager : “Mobile working makes our life easier !”

Outside

Public transport

Siemens and mobility

Inside

On the way

Page 8: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 8

Dynamic Office in Anderlecht

Flexible working• No fixed place

• Choice in function of activity

A variety of available workplaces • Lounges: cosy and quiet to work or interact

• Benches: work in teams

• Cocoons: concentration, confidential calls, small meetings

• Meeting rooms: for meetings

Paperless and mobile working• Notebooks, GSM, IP phone

• Wireless LAN

• Follow-me printing

Page 9: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 9

Culture & processes: highlights

Desk sharing• Activity defines choice of workplace

Clean desk – clean floor• No clutter, cleaning up before leaving

Cupboards / archiving• Limited storage spaces -> use efficiently

• Central archive in Huizingen

Forum• Multi-purpose rooms (restaurant, visitors restaurant,

club…)

• Bar, Business Lounge, visitors

Security concept• Once checked / free access

Printing habits

It is about much more than just

moving from A to B

Page 10: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 10

Physical

Full dynamic office: needs of the activity determine the choice for the workplace to use

Welcome zone

Page 11: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 11

Lounge

Page 12: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 12

Lounge

Page 13: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 13

Bench

Page 14: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 14

Cocoons – Meeting Rooms

Page 15: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 15

Technology: Telecom

Network• One network for voice and data

• Voice over IP

• LAN 100 Mbit capacity

Wireless LAN• 55 Mbit capacity

• 4 access points per floor

Voice over IP• Follow-me phone

• Remote connection to Huizingen data and command center

Page 16: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 16

Technology: IT

All standardised notebook PC’s• Fujitsu Siemens Computers Lifebook series

• Profile-based logon

• Network driven updates and monitoring

• Certificates for secured access

Fax via email• Expressions

Office devices• 21 Océ OP1030

Multifunctional devices : print, copy, scan, fax

Page 17: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 17

Technology: follow-me printing

Print to 1 default printer, job is coming out where and when you want

To print, employees wave their Corporate ID card in front of a MFD (multi-functional device) and their jobs automatically get printed on demand

Flexibility + confidentiality

Page 18: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 18

Technology: Integrated Security

Access Control: SIPORT (SBT): allow access management for building (doors, barriers, tourniquets); profile-based; during working hours;

Outside working hours: CCTV: 7 state-of-the-art camera's outside the buildings with full digital management;

Anti-intrusion : Concept, sensors (movement, heat, shock, etc.) in the building;

Remote connection with Siemens security network

Page 19: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 24

Technology: Industry

Extension of the electrical distribution of both buildings

Electrical switchboards

Frequency converters

Page 20: 9,825,461,087,64 10,91 6,00 0,00 8,00 Inauguration Siemens Anderlecht – 10 May 2006 Inauguration Siemens in Anderlecht 10 May 2006 Press presentation

Siemens in Anderlecht –January 2006 26

Technology

Building Access (Mifare)

Parking Access

Telephone Access (VOIP)

IT Access (WiFi)Passwords Safekeeping

Sign Documents (e.g. PDF file)

Wireless Access (Wifi)

Follow-Me-PrintingWith Multi Functional Devices

Fax via Mail Unified Messaging

Identity & Access Management