8/3/2019 9_PCUSN PMA
1/18
PCUSN Preventive Maintenance
2005
-
8/3/2019 9_PCUSN PMA
2/18
2
-
8/3/2019 9_PCUSN PMA
3/18
3
-
8/3/2019 9_PCUSN PMA
4/18
4
PCUSN Preventive Maintenance
PCUSN preventive maintenance procedures:Preventive maintenance
The implementation of the preventive maintenance procedures is the responsibility ofeach customer.
-
8/3/2019 9_PCUSN PMA
5/18
5
Nortel Recommended Methods of Scheduling ofPreventive Maintenance for PCUSNIncluded in NTP 411-9001-091
-
8/3/2019 9_PCUSN PMA
6/18
6
SPM Operation Status check
> STEP 1: Log into the PCUSN
> STEP 2: Use the command: d lp/* pcusp pm/*
> STEP 3: Display all the spm, which are linked to an active Agprs,make sure they are enabled.
Use the command: d pcusa/* conn/* pcmlk/*
> STEP 4: Procedure completed
-
8/3/2019 9_PCUSN PMA
7/187
Standby Card Status
> STEP 1: Log into the PCUSN
> STEP 2: For each lp (Lp/0, Lp/1, Lp/5 (and Lp/8 for PCUSN24 aswell), check that you have either mainCardStatus andSpareCardStatus and either active or available.
Use the command: d lp/*
Example:
mainCardStatus and spareCardStatus either active or available.
> STEP 3 : Procedure Completed
-
8/3/2019 9_PCUSN PMA
8/188
CP Synch-Status
> STEP 1: Log into the PCUSN
> STEP 2: For each PCUSN, check that the SyncStatus is synchronized (with the CPspare card) and
syncProgress is equal to 100%.
Use the command: d fs
> STEP 3: Use the command: d ns/*
This command will display the network synchronization
Expected result:NS
adminState = unlocked
operationalState = enabled
usageState = busy
clockSyncState = synchronized
activeReference = Lp/5 DS3/0 DS1/1 (AGPRS link used to get the synchronization)
standbyReference = Lp/5 DS3/0 DS1/5 (AGPRS link used to get the synchronization)
Ok
> STEP 4: Procedure Completed
-
8/3/2019 9_PCUSN PMA
9/189
OAM Synchronization
Check PCUSN Time
> STEP 1: Log into PCUSN
> STEP 2: For each PCUSN, check that the time of the PCUSN issynchronized with the time of the
PCUOAM workstation. This is just OAM time synchronization and not atall of the system clock synchronization.
Use the command: d time
> STEP 3: Procedure Completed
-
8/3/2019 9_PCUSN PMA
10/18
10
PCUSN CP Card Cleaning
> STEP 1: Check to see if the disk usage is over 70%. If so, it is necessary to clean up thePCUSN CP card and delete all the useless view & software files: check the file systemdisk usage.
Use the command: d fs
> STEP 2: If the usage is more than 70%, delete some view and software files. List thesoftware that can be deleted.
Use the command: tidyq sw> STEP 3: Choose and clean the old module.
Use the command: remove sw av/software_module (ex:wirelessPcu_CA0335AE)
> STEP 4: Choose and clean the old views. To list the views,
Use the command: d pr view/*
> STEP 5: To delete the views.
Use the command: tidyremove(view_name) pr
> STEP 6 : Procedure Completed
-
8/3/2019 9_PCUSN PMA
11/18
11
NMSUSER Rights checking
> STEP 1: Check the rights of the nmsuser.
Use the command: dp ac userid/NMSUSER
Correct results:AllowedAccess = local telnet fmip ftp
AllowedOutAccess = telnet
> STEP 2 : Procedure Completed
-
8/3/2019 9_PCUSN PMA
12/18
12
Passport Bus Status and testBUS Status
> STEP 1: Check that the two PCUSN passport buses are active and enabled. If not,please contact Nortel Networks Technical Support.
Use the command: on each card, d sh ca/* bus/* and check the shelf bus with command:d sh bus/*
Bus Test
Note, there is a loss of redundancy on the back plane during this check. Please perform
the test during maintenance window.> STEP 1: Before doing a bus test, you need to lock the bus you are going to check. The
default time of this test is 2 min. You will need to set it to 5 min.
Use the command: set sh bus/x test duration 5 and lock sh bus/x
> STEP 2: Start the test
Use command: start sh bus/x test
> STEP 3: Wait until the console displays:
Shelf Bus/x Test
Test stopped
Note: On the console you get some alarms about the bus. This is normal.
-
8/3/2019 9_PCUSN PMA
13/18
13
Passport Bus Status and test (continued)
> STEP 4: Check the bus test results.
Use command: d sh bus/x test
Results:
In the SelfTestResults, you should get a + for each card.
In the ClockSourceTestResults, you should get a + for each card.
In the BroadCastTestResults, you should get a + between each card.
In the PingTestResults, you should not have any failure.
If any one of these conditions isnt satisfied, please contact TAS.
> STEP 5: Unlock the bus that was tested.
Use command: Unlock sh bus/x
Repeat the same operation for bus y.
> STEP 6: Procedure completed.
-
8/3/2019 9_PCUSN PMA
14/18
14
> Important note:
The suggested CP/E3C/PCUSP Card switchover should be performedduring maintenance window as the CP switchover will impact service.
-
8/3/2019 9_PCUSN PMA
15/18
-
8/3/2019 9_PCUSN PMA
16/18
16
Redundant CP/E3C (DS3)/PCUSP CardSwitchover (Continued)
> STEP 6: Do a CP switchover.
Use the command: switchover lp/0
> STEP 7: After switchover, check the status of the new active CP card and wait 10 min.
Use the command: d lp/0
> STEP 8: Check of PCUSP redundancy
Display the status of PCUSP card , and check the current active PCUSP card.
Use the command: d lp/1
> STEP 9: Reset the current passive PCUSP card (e.g. if the activeCard = Shelf Card/13the passive is shelf Card/1).
Use the command: reset sh ca/1
> STEP 10: Check that the alarm is cleared
> STEP 11: After the reset , check the status of the PCUSP card and wait 10 min.
Use the command: d lp/1
-
8/3/2019 9_PCUSN PMA
17/18
17
Redundant CP/E3C (DS3)/PCUSP CardSwitchover (Continued)
> STEP 12: Switchover the PCUSP board (WARNING: SERVICE IMPACTING OPERATION).
Use the command: switchover lp/1
Repeat the steps for the other lp (usually lp/13) of the PCUSN 24.
> STEP 13: Check of E3C redundancy :
Display the status of E3C card , and check the current active E3C card.
Use the command: d lp/5
> STEP 14: Reset the current passive E3C card (e.g. if the activeCard = Shelf Card/10 the passivecard is Shelf card/5).
Use the command: reset sh ca/5
> STEP 15: Check the status of the E3C card and wait 10 min.
Use the command: d lp/5
> STEP 16: Switchover the E3C board (WARNING: SERVICE IMPACTING OPERATION). Use thecommand: switchover lp/5
> STEP 17: After switchover, check the status of the new active E3C card.
Use the command: d lp/5
> STEP 18: Procedure completed
-
8/3/2019 9_PCUSN PMA
18/18
18
References
> Nortel OMC-R NTP Cross Reference
411-9001-091 PCUSN Reference Manual
241-5701-050 Passport 7400,15000,20000 Commands
241-5701-520 Passport 7400,15000,20000 Troubleshooting guide
241-7401-215 Passport 7400 Hardware Maintenance Guide