GexCon US
Using CFD to Analyze Gas Detector Placement in Process Facilities
Presented by:
Scott G. Davis, Olav R. Hansen, Filippo Gavelli and Are Bratteteig
GexCon
![Page 2: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/2.jpg)
GexCon US Outline
§ Background
§ CFD based dispersion study – Gas Detector System
§ Examples § Danger clouds § Optimize small leak rates
![Page 3: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/3.jpg)
GexCon US 3 3
Barriers
Consequence Development!
Consequence 1!
Consequence 2!Consequence 3!
Consequence 4!
Threat 1!
Threat 2!Threat 3!
Threat 4!
Chain of Causes!
Top Event!
Barriers
Probability Reducing Measures
Consequence Reducing Measures
Consequence Development!
Consequence 1!
Consequence 2!Consequence 3!
Consequence 4!
Threat 1!
Threat 2!Threat 3!
Threat 4!
Chain of Causes!
Top Event!
Threat 5
![Page 4: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/4.jpg)
GexCon US 4
Mitigation Measures Triggered
q Activation of q Emergency Shutdown (ESD) or Blowdown – isolating the inventory
and limiting the size of the release
q Ignition source control q Minimize the likelihood of ignition of flammable gases or liquids due to
loss of containment (large leak rates)
q Shutdown of ventilation in HVAC inlets
q Activation of fire water pumps and deluge
q Activation of PA/alarms to alert personnel
![Page 5: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/5.jpg)
GexCon US 5
Detector types
q Infrared point q Superior to catalytic detection
q Cannot detect hydrogen
q Infrared line q Better coverage than point detectors
q Prone to misalignment or beam blockage
q Acoustic
q Large coverage
q False alarms (pneumatic systems)
q Cannot detect low velocity leaks (pools)
Gas Detection System
![Page 6: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/6.jpg)
GexCon US 6
Design
q Number of detectors q Regulations vs. company practice
q Proportional to module volume
q Layout q Equally spaced vs. staggered (cloud size)
q Clustering around leak sources (not recommended)
q Distribution according to ventilation patterns
q Number of line vs. point detectors
Gas Detection System
![Page 7: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/7.jpg)
GexCon US 7
Example of clustering detectors around leak source
Gas Detection System
Gas detectors
Gas leak, not detected
![Page 8: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/8.jpg)
GexCon US 8
Design
q Set points and voting q 10%-25% low, 30%-60% high
q 1-2 LELm line
q 2ooN (2 out of N detectors)/3ooN
q Measures to be taken
Gas Detection System
![Page 9: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/9.jpg)
GexCon US 9
q Facility specific gas dispersion q Potential inventories
q Types of release q High/low momentum jets, flashing, liquid spills, lighter or heavier than
air gases
q Air movement and ventilation patterns (open, confined, dead zones)
q Topography
q Design Basis q Prescriptive and qualitative assessment – conservative
q Performance based - CFD
q Cases that are virtually impossible to anticipate
Complexities involved in GDS
ANSI/ISA-RP12.13.02 Recommended Practice for the Installation, Operation, and Maintenance of Combustible Detection Instruments
![Page 10: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/10.jpg)
GexCon US CFD - FLACS
§ Allows for 3D representation of geometry and detectors § Model the ventilation, dispersion and explosion potential
![Page 11: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/11.jpg)
GexCon US Detection Criteria
§ Leak rate and cloud size important § Cloud is what is detected and affects risk (ignition)
![Page 12: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/12.jpg)
GexCon US Detection Criteria § Recall need to detect the cloud not the leak § Site dependent
![Page 13: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/13.jpg)
GexCon US Detection Criteria
§ Correlation to compare inhomogeneous cloud to “dangerous” gas cloud (if ignited unacceptable consequences) § Mapping to determine when dispersed clouds are “dangerous”
![Page 14: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/14.jpg)
GexCon US Detection Criteria
§ Comparison of detectable cloud size vs. hazard potential
![Page 15: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/15.jpg)
GexCon US GDS Design Parameters
§ Unrealistic and not impossible to detect all leaks § Small leaks can lead to very small clouds < 1m3
§ Dangerous leaks – typically a relaxed requirement § Cloud size is generally quite large
§ ALARP – optimize for small, higher frequency leaks § For example – 0.1 kg/s
§ False Alarms – raise detection level/voting? § Redundancy § Caution against optimizing detectors around chosen
scenarios
![Page 16: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/16.jpg)
GexCon US GDS Design Parameters
§ Time to detection § Important parameter to evaluate effectiveness § Relative to the leak rate § Many reasonably designed systems will detect clouds that can
lead to escalation or unacceptable consequences
§ Minimizing time to detection can play crucial role in initiating mitigation measures (ignition source, ESD or deluge)
![Page 17: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/17.jpg)
GexCon US Explosion Risk during leak
17
![Page 18: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/18.jpg)
GexCon US Confirmed Gas Detection
■ Some explosion risk prior to gas detection
18
![Page 19: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/19.jpg)
GexCon US Deluge activated
■ Additional risk accumulation until deluge activated (full coverage)
19
![Page 20: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/20.jpg)
GexCon US CFD based dispersion study
§ Geometry model § Important to predict flow phenomena in complex geometry
![Page 21: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/21.jpg)
GexCon US CFD based dispersion study
§ GDS will be compared to dispersion results § Vary wind direction and speed, leak characteristics § Typically 100-600 scenarios are performed per area § Gas density is very important – need to simulate both lighter and
heavier than air gases § Record data at over 1000 sensor locations (line as well)
![Page 22: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/22.jpg)
GexCon US CFD based dispersion study
§ Detection of “Dangerous” clouds § Larger leak rates – relaxed requirement § Clouds quite large § Limited options with respect to mitigation measures
§ Optimization of GDS against small leaks § Increased benefit of initiating mitigation measures § High probability events (0.1-0.3 kg/s leak rates) § Typically never reach “dangerous” sizes
![Page 23: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/23.jpg)
GexCon US CFD based dispersion study
![Page 24: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/24.jpg)
GexCon US CFD based dispersion study
![Page 25: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/25.jpg)
GexCon US “Dangerous” Clouds
Leak
Leak
Pmax = 1.0 barg Pmax = 1.3 barg* Pmax = 0.6 barg *Design Accidental Load = 1.2 barg Stoichiometric Cloud
![Page 26: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/26.jpg)
GexCon US Layout Comparison
§ Ensure all “dangerous” clouds are detected
![Page 27: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/27.jpg)
GexCon US False Alarms
§ Numerous shutdowns costing $4-8 million § Performance going from 1x60%LEL to 2x20%LEL
![Page 28: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/28.jpg)
GexCon US Minimum Number of Detectors
§ Maximize probability of detection – medium/large leaks
![Page 29: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/29.jpg)
GexCon US Optimize Small Leaks – 0.1 kg/s
§ Optimize probability of detection for layouts
![Page 30: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/30.jpg)
GexCon US Optimize Small Leaks – 0.1 kg/s
§ Compare detected vs. max potential cloud size
![Page 31: 9S Davis Et Al Presentation](https://reader036.vdocuments.net/reader036/viewer/2022082205/55cf8585550346484b8ef0a4/html5/thumbnails/31.jpg)
GexCon US Summary
§ CFD allows one to quantity the detection of GDS to potential hazard § Time to detection and probability of detection are typically reported § Relative to leak rate
§ Couple the results to measures that can be initiated by detection § Improving a GDS by a few seconds may not be important for ESD (~ 30 seconds) § But could be very important for shutting down ignition sources
§ Limited scenarios are performed – do not get trapped into optimizing sensors around chosen leaks sources
§ Requires the input of multiple disciplines
§ CFD is not stand alone but provides firm and repeatable base upon which complex reasoning for GDS is based