a better way to define software requirements & test cases

16
A better way to define software requirements & test cases powersto ry For PowerPoint Toronto ALM User Group

Upload: hachi

Post on 24-Feb-2016

29 views

Category:

Documents


0 download

DESCRIPTION

p ower story For PowerPoint. A better way to define software requirements & test cases . Toronto ALM User Group. First some questions…. Roles BAs ? UI/UX? Developer? Scrum Master? Product Manager?. Requirements Management Use TFS ? Use another tool? - PowerPoint PPT Presentation

TRANSCRIPT

PowerPoint Presentation

A better way to define software requirements & test cases

powerstory For PowerPointToronto ALM User GroupPowerStory is based on our deep passion to provide better ways of defining software requirements and creating test cases.Visual Studio 11 2012 Microsoft Corporation. All rights reserved. Microsoft, Windows, and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries.The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.3/7/20131First some questionsRolesBAs ?UI/UX?Developer?Scrum Master?Product Manager?Requirements ManagementUse TFS ?Use another tool?

Test Case ManagementUse TFSUse another tool?

main flow1. -----------2. ---------3. ---------------alternate flows3.1 ------------------- 3.1.1 ---------- 3.1.2 -------------

3.2 --------------- 3.2.1 ----------- Use CasesUI WireframesABDEFTest CasesTest Case 11. -----------2. ---------3. ---------------Test Case 21. -----------2. ---------3.1 ------------------- 3.1.1 ---------- 3.1.2 -------------Test Case 31. -----------2. ---------3.2 --------------- 3.2.1 -----------CABCDEFABABUI StoryboardsTraditional requirements & Test specifications

Use CasesUI WireframesUI StoryboardsUser StoriesinconsistenciesTest Casesin other wordsoften duplicate requirements,such as user steps and system response flowconfusionalso suffer from translation errors from one deliverable to the next. wasted budgetreworkUse CasesUI WireframesUI StoryboardsUser StoriesTest CasesWhat if we took these specifications..combine some of them into single integrated deliverable, that removes the duplication and translation errorsUse Case Storyboardand automatically generated your Test CasesTest Case Generation..with TFS Integrationpowerstory For PowerPoint..that is what powerstory doespowerstory For PowerPointSo what is a Use Case StoryboardUI Mockup / WireframeUse CaseEditormain flowAlternate flowsAssociate each use case step with a UI Mockup / wireframeUI Controls LibraryDrag and Drop to create your UI Mockupbased on PowerPoint

Communicate better through requirements simulation

Steps Navigator / EditorPowerStory also makes it easier to present or communicate your UI Storyboard to stakeholders, developers and testers, by

Providing a Storyboard navigator making it easy to navigate through the main and alternate flows as well as jump to any step.PowerStory can optionally add the step to the title of the slide as well as insert clickable links based on the structure of the main flow and alternate flows defined or using navigation links & titles

Optionally have navigation links automatically inserted on the slidesOptionally have slide titles synced with step textPowerStory also makes it easier to present or communicate your UI Storyboard to stakeholders, developers and testers, by

Providing a Storyboard navigator making it easy to navigate through the main and alternate flows as well as jump to any step.PowerStory can optionally add the step to the title of the slide as well as insert clickable links based on the structure of the main flow and alternate flows defined Generate Test Cases into MS Team Foundation Server

Lastly PowerStory will significantly reduce you project budget by automatically generating a test case for each valid path through the combination of main flow and alternate flows.

These test cases are inserted directly into Team Foundation Server with automatic traceability to their corresponding requirements work-item.

In addition you can export these test cases to a word document if you dont use Team Foundation Server to manage your test cases.

Automatic Traceability within Team Foundation Server

Lastly PowerStory will significantly reduce you project budget by automatically generating a test case for each valid path through the combination of main flow and alternate flows.

These test cases are inserted directly into Team Foundation Server with automatic traceability to their corresponding requirements work-item.

In addition you can export these test cases to a word document if you dont use Team Foundation Server to manage your test cases.

Generate Test Cases into MS Excel import to HP QC

Lastly PowerStory will significantly reduce you project budget by automatically generating a test case for each valid path through the combination of main flow and alternate flows.

These test cases are inserted directly into Team Foundation Server with automatic traceability to their corresponding requirements work-item.

In addition you can export these test cases to a word document if you dont use Team Foundation Server to manage your test cases.

Generate Test Cases into MS Word

Lastly PowerStory will significantly reduce you project budget by automatically generating a test case for each valid path through the combination of main flow and alternate flows.

These test cases are inserted directly into Team Foundation Server with automatic traceability to their corresponding requirements work-item.

In addition you can export these test cases to a word document if you dont use Team Foundation Server to manage your test cases.

powerstory For PowerPointSaves you significant project time and budget, byA better way to define software requirements & test cases!communicating requirements more clearlygenerating test cases automaticallyremoving requirements duplication and translation errorsPowerStory was designed to address real-world efficiency and accuracy issues with traditional approaches to requirements definition and test case creation. It was designed to work with PowerPoint because lets face it, PowerPoint is a tool that almost everyone has on their desktop and knows how to use, making it easy to collaborate with. In addition PowerStorys integration with TFS not only gives you the ease of continuing to use MS Office tools for requirements definition, but also provides comprehensive requirements management capabilities within an integrated ALM suite of products. This combination truly gives you the tools you need to save project time and budget, for very little cost. Visual Studio 2012 2012 Microsoft Corporation. All rights reserved. Microsoft, Windows, and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries.The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.3/7/201315demosUse Case StoryboardsSteps EditorUI Control LibraryAdd your own UI ControlsShare UI ControlsSimulationView OptionsPowerPoint templates for reuseTest Case Gen For Word and Excel

TFS IntegrationStart with TFS workitemAttach PPT file to a workitem Link to shared file eg. skydriveTest Case Generation into TFS