1

Is membrane filtration worth it?

A case study of 3 municipal MBR’s in Michigan and their operational

experiences.

Joe Hebert - Ottawa County Public Utilities

Page 2: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

2

Who are these MBR’s?

• North Kent Sewer Authority, Parcc Side Clean Water Plant – 4 years

• Crockery Twp Clean Water Plant – 6 years

• Traverse City Regional WWTP – 8 years

• All of them are using the GE (Zenon) ZeeWeed 500 series membranes.

What is ZeeWeed?

• PVDF hollow fiber membrane (outside-in pathway)

• 0.04 micron nominal pore size

• 1.9mm O.D. – 0.8mm I.D.

• TMP range = -8 to 8 psi

Page 3: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

3

• Start-up was October 30, 2008

• Membranes installed for 6 MGD (40 - 500D cassettes w/ 60 modules per cassette)

• Average flow of 3.5 MGD (58% of design)

• Permit Limits (mo. average) – 0.5 mg/l NH3

– 4 mg/l CBOD

– 20 mg/l TSS

– 1 mg/l Phosphorus

– 200 cts fecal Coliform

Background

Page 4: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

4

• Biological phosphorus removal

• Sodium aluminate @ 0.5:1

• MLSS 4,500 mg/l • Flux rate y 7 gf2d (designed 9.7 gf2d)

• Maintenance cleaning weekly (alternating hypochlorite and citric acid)

• Recovery cleaning twice yearly (hypochlorite and citric acid)

• Membrane performance same as new

Operations

• Electric - $1,200 day (70% secondary)

• Sodium aluminate - $60,000 yr (25,000 gal/yr)

• Sodium hypochlorite - $4,200 yr (2,700 gal/yr)

• Citric acid - $18,000 yr – (2,000 gal/yr)

• Budgeting $1.8M/10 yrs for membrane replacement

Operational Costs

Page 5: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

5

• $1.23 / 1,000 gal for O&M

• $1.42 / 1,000 gal for O&M + CR

• $3.80 / 1,000 gal for O&M + CR + bond construction

• Meeting all permit limits!

• Is it worth it?...

Bottom Line

Crockery Township Clean Water Plant

Page 6: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

6

Crockery Township Clean Water Plant Background

• Start-up was January 1, 2006

• Membranes installed for 75,000 GPD (2 – 500B cassettes w/ 8 modules per cassette) (32 module equivalent)

• Average flow of 12,000 GPD (16% of design)

• Permit Limits (mo. average) – 0.5 mg/l NH3

– 4 mg/l CBOD

– 20 mg/l TSS

– 0.15 mg/l Phosphorus

– 200 cts fecal Coliform

Crockery Township Clean Water Plant Operations

• Phosphorus removal with alum

• Aluminum Sulfate @ AL:P 3.5:1 (5:1)

• MLSS 8,000 - 12,000 mg/l • Flux rate y 10 gf2d (designed 10 gf2d)

• Maintenance cleaning as needed (alternating hypochlorite and citric acid)

• Recovery cleaning once yearly (hypochlorite and citric acid)

• Good membrane performance with some losses in permeability

Page 7: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

7

Crockery Township Clean Water Plant

Operational Solutions

• Batch discharges – Reduced electrical usage (42% reduction)

– Fewer labs (75% reduction)

– Labor is reduced (50% less)

• Long SRT to promote endogenous bio activity – Reduced sludge production (yield = 0.24 - 0.34)

• Aeration blower timers – On/off air cycles eliminated foaming issues

– Recover alkalinity (10% reduction of NaOH)

– Reduced electrical usage (27% reduction)

Crockery Township Clean Water Plant

Operational Costs

• Electric - $13,100 yr (276 KWH/day)

• Aluminum Sulfate - $1,100 yr (997 gallons)

• Sodium hypochlorite & Citric acid - $150 yr

• Sodium hydroxide - $1,100 yr (191 gallons)

• Budgeting $100K/10 yrs for membrane replacement

Page 8: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

8

Crockery Township Clean Water Plant

Bottom Line

• $22.21 / 1,000 gal for O&M

• $24.77 / 1,000 gal for O&M + CR

• Meeting permit limits! (had some difficulties meeting phosphorus limit consistently)

• Is it worth it?...

Traverse City Regional Wastewater Treatment Plant

Page 9: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

9

Traverse City Regional Wastewater Treatment Plant Background

• Retrofit start-up was July 2004

• Membranes installed for 8.5 MGD (104 – 500C cassettes w/ 32 modules per cassette)

• Average flow of 4.3 MGD (51% of design)

• Community based effluent limits – 1 mg/l NH3

– 4 mg/l BOD

– 4 mg/l TSS

– 0.5 mg/l Phosphorus

Traverse City Regional Wastewater Treatment Plant Operations

• Biological phosphorus removal

• Ferric chloride

• MLSS <10,000 mg/l (14 day SRT)

• Flux rate ave 9.2 gf2d (9.7 gf2d design)

• Maintenance cleaning weekly (alternating hypochlorite and citric acid)

• Recovery cleaning once yearly (hypochlorite and citric acid)

• Membrane performance is same as new

Page 10: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

10

Traverse City Regional Wastewater Treatment Plant

Operational Solutions

• Reduced electrical costs by ⅓ – 10/30 air scour

– Vacuum pump run time reduction

– RAS pump timer

• Isolated causes and solutions to biological membrane fouling

• Found solutions to prevent foaming

Traverse City Regional Wastewater Treatment Plant

Operational

Costs

• Electric - $ 0.22 / 1,000 gal

• Ferric chloride - 55,000 gal/yr of 40%

• Sodium hypochlorite & Citric acid - $23,200 yr

Page 11: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

11

Traverse City Regional Wastewater Treatment Plant

Bottom Line

• $1.34 / 1,000 gal for O&M

• Meeting community effluent limits!

• Is it worth it?...

Is membrane treatment worth it?

Larry Campbell, Superintendent, PARCC Side CWP “Yes, the performance and effluent quality is worth it if

the permit requirements demand this level of treatment. Operators also are enthusiastically behind the use of membranes.”

Page 12: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

12

Is membrane treatment worth it?

Joe Hebert, Chief Operator, Crockery CWP “Yes, the effluent quality is excellent and I like the

operations, but the costs may not work well for small treatment plants without having the economy of scale.”

Is membrane treatment worth it?

Scott Blair, Superintendent, TC Regional WWTP “Yes, for us and our community, meeting high effluent

quality standards was very important. Plus, we were severely limited on space for expansion, so there were few better options facing us when we upgraded the plant.”

Page 13: A case study of 3 municipal MBR’s in Michigan and their ... 2 - Joe Hebert.pdf · 7/11/2012 1 Is membrane filtration worth it? A case study of 3 municipal MBR’s in Michigan and

7/11/2012

13

Joe Hebert, Chief Operator – Crockery Township Clean Water Plant

Ottawa County Road Commission, Department of Public Utilities

Email: [email protected]

Office: 616-850-7219 Cell: 616-638-0382