A Design-Build Success Story

Dick SpragueHDR, Inc.

Landfill Gas Migration Control

Purpose & Background

• Design-Build Project Delivery– Emerging delivery system in public sector– Single source of responsibility

• Faster, less contentious delivery• Not necessarily cheaper

• Landfill– Historic landfill cell began in early 1950s– New, lined landfill cell began in late 1990s– Landfill gas migration discovered in 2001

Landfill Site

Landfill Gas Migration

• Anaerobic decomposition– Predominantly methane and carbon dioxide

• March 2001 monitoring– High concentrations of Lfg at property boundary– >1,000 feet beyond property boundary

• May 2001– Issued engineering RFP– Informed state agency & neighbors

Extent of Contamination

4950

4940

4920

4900

4790

4770

4750

silty sand

fat clay

silty sand

silty clay

lean clay

poorly sorted sand

Design-Build Project

• Too little time for traditional design-bid-build• 2-part contract

– Several form contracts– AGC, AIA, EJCDC– DBIA is fairest to all parties– 2-Part form contract includes:

• Terms & Conditions• Scope• Price & Schedule

Design-Build Project (cont.)

• Part I - Concept Design & Proposal– 30% Design– Proposal for Part II

• Firm, fixed price based on bids• Drilling subcontractor• Equipment supplier• Balance of construction contractor

– Documents Belong to Owner• Negotiate with Part I contractor• Bid the work• Cancel the project

Design-Build Project (cont.)

• Part II– Final Design– Construction, Start-up & Warantee– Firm schedule based on WES commitments

• Contract (part II) signed on September 27• Completion planned for December 14

– “Best Value” Selection

Design-Build Project (cont.)

Design-Build Project (cont.)

• Performance– Drilling subcontractor failed to perform

• Primarily his lower tier subs• Third lower tier sub required to complete project

– Flare station operational December 14, accepted December 18

– 60 percent of wells operational on December 18; met commitment to state agency

– Final completion January 18

Design-Build Project (cont.)

Gas Monitoring Wells

Monwell I

-10.0

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

1/1

4/2

00

2

2/1

4/2

00

2

3/1

4/2

00

2

4/1

4/2

00

2

5/1

4/2

00

2

6/1

4/2

00

2

7/1

4/2

00

2

8/1

4/2

00

2

9/1

4/2

00

2

10

/14

/20

02

11

/14

/20

02

12

/14

/20

02

1/1

4/2

00

3

2/1

4/2

00

3

3/1

4/2

00

3

4/1

4/2

00

3

5/1

4/2

00

3

6/1

4/2

00

3

7/1

4/2

00

3

8/1

4/2

00

3

Date

lev

el CH4

O2

Static Pressure

Design-Build Project (cont.)

Design-Build Project (cont.)

Gas Monitoring Wells

Monwell I

-10.0

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

1/1

4/2

00

2

2/1

4/2

00

2

3/1

4/2

00

2

4/1

4/2

00

2

5/1

4/2

00

2

6/1

4/2

00

2

7/1

4/2

00

2

8/1

4/2

00

2

9/1

4/2

00

2

10

/14

/20

02

11

/14

/20

02

12

/14

/20

02

1/1

4/2

00

3

2/1

4/2

00

3

3/1

4/2

00

3

4/1

4/2

00

3

5/1

4/2

00

3

6/1

4/2

00

3

7/1

4/2

00

3

8/1

4/2

00

3

Date

lev

el CH4

O2

Static Pressure

Design-Build Project (cont.)

Design-Build Project (cont.)

Event Planned Actual

Engineering Contract

June 18 July 20

Construction Contract

October 1 September 27

Begin Construction

October 15 October 2

System Startup December 18

System Complete December 15 January 18

Design-Build Project (cont.)

Lump Sum Price

Change Orders

Net Price

Design-Build Project (cont.)

Lump Sum Price

Change Orders

Net Price

$929,367