a joint technical services department: a panel discussion · electronic—1 fte constor prep—0.5...

29
A Joint Technical Services Department ALAO 33 rd Annual Conference Greater Columbus Convention Center October 25-26, 2007 Panel Participants: Amy Badertscher, Kenyon College Andrea Peakovic, Kenyon College Sheryl Pustay, Denison University

Upload: others

Post on 22-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

A Joint Technical Services Department

ALAO 33rd Annual ConferenceGreater Columbus Convention

CenterOctober 25-26, 2007

Panel Participants:Amy Badertscher, Kenyon CollegeAndrea Peakovic, Kenyon College

Sheryl Pustay, Denison University

Page 2: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Highlights…• A combined Denison &

Kenyon technical service team

• Combined work processes when possible

– Materials processed at one location

• Work processes defined by material types

Page 3: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Why Combine?• Do MORE not LESS

• Streamline work processes

• Complete projects

• Incorporate electronic resources

• More options for staff to define their roles

Page 4: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Goals of Restructuring

• Improve access to information resources

• Create value-added services for our patrons

• Bottomline: Redesign with the user in mind

Page 5: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Our Context…• Five Colleges of Ohio

members

• Share an online catalog & joint storage facility

• OhioLINK members

• Similar in size, acquisitions and technical service staffing

Page 6: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

How We Started…• Pre-planning Committee

• Planning Task Force

• Hired Consultants

– R2 Consulting

– Maureen Sullivan

• Background Reading

Page 7: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Core Recommendations• A joint approval plan

• Expedited delivery

• Replace paper with electronic flows wherever possible

• Use vendor-provided services

• Concentrate our intellectual resources in areas that we cannot automate

Page 8: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Implementation: What Now?• Began with paper

monographs workflow

– YBP (Denison)

– Non-YBP vendors (Kenyon)

• Developed staffing model

• Staff workflow assignments based on staff interests

• Expedited delivery service

Page 9: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

SelectionYankee/Non-Yankee books & CD’s

A-V Media

Ordering/Receiving/FastCatYBP books, Approvals—1.5 FTE

Non-YBP books, Approvals—1 FTECD’s—0.5 FTE

A-V Media—0.5 FTEGov Docs—0.5 FTE

Gov Doc Maps—0.5 FTESerials—2 FTE

Total: 6.5 FTE

Approval Plan

CatalogingBooks & CD’s—1 FTE

A-V Media—1 FTEElectronic—1 FTE

CONStor Prep—0.5 FTEGifts & Other Projects—1 FTE

Total: 4.5 FTE

Electronic, gifts, deselection, remote storage materials

User AccessCatalog Enrichments & Enhancements—1 FTE

Coordination of Training—0.5 FTETotal: 1.5 FTE

20%

DRAFT Staffing Model

*Please note—the FTE’s represented above are preliminary projected estimates!

Rev. 8/4/05

Total: 12.5 FTE

Page 10: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

YBP Work Processes: To Do List• Electronic invoicing

• Shelf-ready materials

• PromptCat profiles

• Design property stamps

• Transition orders to GOBI

• Shipping addresses

• Quality control

Page 11: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Non-YBP To Do List• Develop online order form

• Create and modify vendor accounts

• Train staff in invoicing and Millennium

• Non-mainstream materials

• Standing orders

• Identify local cataloging practices

Page 12: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Lessons Learned…• Details, details, details!

• The devil is in the details!

• Trial and Error

• Time-consuming process

• Expect work imbalances

Page 13: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Operational Perspective:

From the Viewpoint of a Technical Services Staff

Member

Page 14: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Factors Important in Implementing the Program

• Include staff members in decisions

• Flexibility – different methods

• View the plan as “the process”, not “the person”

Page 15: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Include Staff Members • Staff was included in initial

planning

• Teams or groups were formed by material type

• Input leads to personal freedom and then to success

Page 16: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Flexibility

• Different methods for different material types

• Benefits will become evident

Page 17: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

View Plan as “the process”, not “the person”• When problems occur, look at

the problem not at which college or person was involved.

• Be understanding

• Mistakes and miscommunications happen at all levels.

• How problems are handled leads to success.

Page 18: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

The Combined Goal Is…• To assist the faculty,

students and staff on both campuses

• We are not here to heighten ourselves individually

• We are here to help the students reach greater heights for themselves

Page 19: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Just between “friends”

Page 20: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

What is it all about• The collaboration project

focuses on acquisitions, serials and cataloging functions

• My role is a project manager and leader and spend time at each school

• Success of the project requires input and support from all

Page 21: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Is this all there is…

Purchase Material

Receive Material

Physical Processing

Receive Order

Catalog Material

Send to Collection

Page 22: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Where do we go from here?• What are the next steps we

should take to continue to make progress?

• The never ending “are we there yet” question?

• How do we address the issues of constant change?

Page 23: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Current Goals• Evaluate all job

descriptions• Create documentation for

all functions• Increase training and

professional development opportunities

• Continue to review and change

Page 24: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

And Beyond….• Shared government documents

collection• Shared classification method

for all Audio Visual material • A shared collection

development plan including one approval plan

• One bindery source• Reduced number of “paper”

periodicals and a “shared”collection

Page 25: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Some things that might be holding us back?• Separate locations• Experience• Forces outside of technical

services • Our own fears• Procedural differences• Lack of documentation • Too many choices

Page 26: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Yes, we are progressing

• Quantitative measures are difficult

• Qualitative measures include time for:– Eliminate backlogs– Focus on special projects– Original cataloging– Enhancing catalog records– Shifting staff functions to

rebalance work levels

Page 27: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Things to think about

• More shelf ready material from a variety of vendors

• Better methods of sharing information and communicating changes

• Eliminating overlap in our roles• Increased time for special

projects, database clean up, training, and other “back burner” things.

Page 28: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

Final Thoughts• We are rethinking roles and

redefining positions as people retire.

• Traditional roles are changing and will require more flexible in the future.

• The knowledge base of workers entering the academic library market is different today than it was 20 years ago.

• We need to continue adjust and expand these positions.

Page 29: A Joint Technical Services Department: A Panel Discussion · Electronic—1 FTE CONStor Prep—0.5 FTE Gifts & Other Projects—1 FTE Total: 4.5 FTE Electronic, gifts, deselection,

For More Information…

www.denison.edu/collaborations/ohio5/libres/lwrtf/lwrtf.html