!a$ marana · 2015-05-21 · !"a$ marana!"d$ oro valley sahuarita tohono o'odham...
TRANSCRIPT
Helmet Peak Rd
!"d$
!"a$
Tucson
Marana!"a$
!"d$
OroValley
Sahuarita
Tohono O'Odham Nation
Tucson Mountain Park
Saguaro National Park West
Coronado National Forest
CatalinaStatePark
SaguaroNational
ParkEast
Santa RitaExperimental
Range CoronadoNationalForest
Pima Mine Rd
Sahuarita Rd
Duval Mine Rd
Whitehouse Canyon Rd
Old Vail Connection Rd
Valencia Rd
Irvington Rd
Speedway BlGrant Rd
Golf Links Rd
Tanque Verde Rd
Sunrise DrCamino del Cerro
Ina Rd
Tangerine Rd
Sand
ario
Rd
Grea
sewo
od R
d
La C
anad
a Dr
Houg
hton
Rd
Wilm
ot R
d
Wen
twor
th R
d
Hermans Rd
Santa Rita Rd
Project Location
GreenValley
CWC Service Area
Recharge Sites Pipe Alignment
0 4 82Miles
November 20094250 - figure 1 location map.mxd
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com &Figure 1
Location Map CWC / CAPWater Delivery System
Sahuarita RdNo
gales
Hwy
Old N
ogale
s Hwy
La C
anad
a Dr
Pima Mine Rd
Helmet Peak Rd
!"d$
El Toro Rd
Nogales Highway
Cami
no de
Las Q
uintas
Ranc
ho Sa
huari
ta Bl
vd
North Parcel Recharge Site
#*
Well #11
Proposed36" Pipe
CWC Service Area
Proposed 20" Pipe FromRecharge Site to Well #11
Existing 36-inch line to Pima Mine Rd Recharge Facility
Connection to CAP atPima Mine Rd Recharge Facility Turnout
Proposed 20" Pipe
0 0.4 0.80.2Miles
February 20104250 - figure 2 proposed components.mxd
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com &
Figure 2Proposed Project
Components
")CAP Terminus
CAP Terminus Alternative
")
CWC / CAPWater Delivery System
Location of Booster Station to be Determined Along North-South Pipeline Reach
South Parcel (Preferred) Recharge Site
Sahuarita RdNo
gales
Hwy
Old N
ogale
s HwyLa C
anad
a Dr
Pima Mine Rd
Helmet Peak Rd
!"d$
El Toro Rd
Nogales Highway
Cami
no de
Las Q
uintas
Ra
ncho
Sah
uarit
a Blvd
_̂Jack Bore Railroad
_̂
Jack Bore Railroad
Jack Bore Santa Cruz River
_̂Staker Parson Property
Potential Staging and Storage Site
Potential Staging and Storage Site
0 0.4 0.80.2Miles
January 20104250 - figure 3 proposed jack and bore locs.mxd
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com &
Figure 3Proposed Jack & Bore Locations &Sites for Staging/Storing Materials
CWC / CAPWater Delivery System
_̂Jack Bore Interstate 19
_̂Jack Bore Railroad
_̂Jack Bore Santa Cruz River
T17S 14E 30T17S 14E 31
T17S
14E 3
0T1
7S 13
E 25
T17S
14E 3
1T1
7S 13
E 36
T17S 13E 36T17S 13E 25
Storage Area
Storage Area
North ParcelRecharge Site
South Parcel (Preferred)Recharge Site
Proposed 36" Pipe
Proposed 20" PipeTo Well #11
3.1 ac
3.1 ac
15.7 ac
17.9 ac
0 0.025 0.050.0125Miles
February 20104250 - figure 4 Proposed Recharge Facilities.mxd
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com &
Figure 4Proposed AlternativeRecharge Locations
CWC / CAPWater Delivery System
CWC / CAPWater Delivery System
June 20104250 - figure 5 fico-anc.mxd
Figure 5FICO-ANC Preliminary CAP
Water Delivery System
!"d$
")
&0 1 20.5
Miles
EXISTING 54" CAP
TIE INTO EXISTING CAP MAIN
CAP TURNOUTPROPOSED FICO CAPPIPELINE (36") PHASE 1PROPOSED FICO TURNOUTS
TO FICO GSF PHASE 1
PROPOSED FUTURE FICOPUMP STATION PHASE 2
PROPOSED FUTURE FICO CAPPIPELINE (36") PHASE 2
EXISTING PIMA MINE ROAD RECHARGE
FARMER'SWATER COMPANY
SAHUARITAWATER COMPANY
LAS QUINTASWATER COMPANY
COMMUNITYWATER COMPANY
GREEN VALLEYWATER COMPANY
CANOA RECHARGE BASIN
PROPOSED FUTURE FICOCAP PIPELINE PHASE 3
QUAIL CREEKWATER COMPANY
!(
PROPOSED FICO TURNOUTSTO FICO GSF PHASE 2
PIMA MINE ROAD
HELMET PEAK ROAD SAHUARITA ROAD
NOGA
LES
HIGH
WAY
DUVAL MINE ROAD
CONTINENTAL ROAD
")
PREFERRED CWC RECHARGE SITE
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com
Portions of this document include intellectual property of ESRI and its licensors and are used herein under license. Copyright © 2009 ESRI and its licensors. All rights reserved.
This figure was developed from a mapprovided by FICO dated October 15, 2008(FICO 2008a).
CWC / CAPWater Delivery System
Figure 6Regional Subsidence
Sahuarita Rd
!"d$
Pima Mine Rd
Duval Mine Rd
February 20104250 - figure 6 regional subsidence.mxd
&0 1 20.5
Miles
Preferred Recharge Site02/23/2007 to 03/14/2008Subsidence
0 to -0.2 in-0.2 to -0.4 in-0.4 to -0.8 in-0.8 to -1.4 in
Preferred Recharge Site
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com
Portions of this document include intellectual property of ESRI and its licensors and are used herein under license. Copyright © 2009 ESRI and its licensors. All rights reserved.
CWC / CAPWater Delivery System
Figure 7Regional Ground Water Level Increase,
Preferred Alternative (Case 2) vs. NoAction (Case 1), No Rosemont Pumping
Noga
les H
wy
Helmet Peak Rd
!"d$
PreferredRecharge Site
100
1
10
20
30
90807060
5040
3020
10
1
March 20104250 - figure 7 reg gw_pref alt_no_act.mxd
&0 0.9 1.80.45
Miles
Contour of Projected Groundwater Level Change,in Feet, Due to CWC RechargeModel No-Flow Grid Cell (Layer 3)Existing Recharge Project Boundary
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com
Portions of this document include intellectual property of ESRI and its licensors and are used herein under license. Copyright © 2009 ESRI and its licensors. All rights reserved.
1
CWC / CAPWater Delivery System
Figure 8Recharge Water Migration,
Preferred Alternative
!(!(
!(!(
!(
!(
!(!(
!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(
!(
!(
!(!(!(!(
!( !( !( !(
!(!(
!(
!( !(
!(
!(
!( !(!(
Noga
les H
wyOl
d Nog
ales H
wy
Pima Mine Rd
Helmet Peak Rd
!"d$
Rancho
Sahu
arita B
lvd
PreferredRecharge Site
1
1
February 20104250 - figure 8 recharge water migration_pref alt.mxd
&0 0.9 1.80.45
Miles
!(Well Location Within Projected Extent ofRecharged Water MigrationContour of Projected Groundwater Level Changeof 1 Foot, Due to CWC RechargeProjected Extent of Recharged Water Migration(determined using the particle path modeling)Model No-Flow Grid Cell (Layer 3)Existing Recharge Project Boundary
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com
Portions of this document include intellectual property of ESRI and its licensors and are used herein under license. Copyright © 2009 ESRI and its licensors. All rights reserved.
1
CWC / CAPWater Delivery System
Figure 9Regional Ground Water Level Increase,
Preferred Alternative (Case 5) vs. NoAction (Case 4), with Rosemont Pumping
!(
!(
!(!(
Noga
les H
wyOl
d Nog
ales H
wy
Pima Mine Rd
Helmet Peak Rd
!"d$
PreferredRecharge Site
100
1
10
20
30
9080
70605040
3020
10
1
March20104250 - figure 9 reg gw_pref alt_rosemont_no_project.mxd
&0 0.9 1.80.45
Miles
!( Simulated Location for Rosemont Supply WellContour of Projected Groundwater Level Change,in Feet, Due to CWC RechargeModel No-Flow Grid Cell (Layer 3)Existing Recharge Project BoundaryRosemont Property
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com
Portions of this document include intellectual property of ESRI and its licensors and are used herein under license. Copyright © 2009 ESRI and its licensors. All rights reserved.
1
CWC / CAPWater Delivery System
Figure 10Recharge Water Migration,Preferred Alternative with
Rosemont Pumping
!(!(
!(!(
!(
!(
!(!(
!(!(
!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(
!(
!(!(
!(!(!(!(
!( !( !( !(
!(!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(!(
Noga
les H
wyOl
d Nog
ales H
wy
Pima Mine Rd
Helmet Peak Rd
!"d$
El Toro Rd
Rancho
Sahu
arita B
lvd
PreferredRecharge Site
1
1
March 20104250 - figure 10 recharge water migration_pref alt_rosemont.mxd
&0 0.9 1.80.45
Miles
!( Simulated Location for Rosemont Supply Well
!(Well Location Within Projected Extent ofRecharged Water MigrationContour of Projected Groundwater Level Changeof 1 Foot, Due to CWC RechargeProjected Extent of Recharged Water Migration(determined using the particle path modeling)Model No-Flow Grid Cell (Layer 3)Existing Recharge Project BoundaryRosemont Property
ERO Resources Corp.1842 Clarkson StDenver, CO 80218www.eroresources.com
Portions of this document include intellectual property of ESRI and its licensors and are used herein under license. Copyright © 2009 ESRI and its licensors. All rights reserved.
1