INDEX1. INTRODUCTION
2. CORPORATE PROFILE AT YEAR-END 2008
3. WORK COMPLETED IN 2008
3.1. Industrial Projects3.2. Architectural Projects
4. PROJECTS IN PROGRESS AT 31.12.08
4.1. Industrial Facilities4.2. Architecture
4.2.1. New buildings4.2.2. Refurbishment of existing buildings
5. SPANISH COMPETITIONS
6. DESIGN & BUILD PROJECTS
7. INTERNATIONAL PROJECTS
8. OTHER INFORMATION OF INTEREST
� Turnover 2004-2008� Evolution of Master’s Staff (2004-2008)� Work completed: volume of investment by
sectors� Work in progress: volume of investment by
sectors
9. THE MASTER APPROACH: WHO WE ARE, WHAT WE DO, WHOM WE SERVE
10. SKILLS AND AGREEMENTS
� Company Capabilities� Company Experience� Agreement Master – CH2M Hill
� Worldwide associated offices location� Representative Clients, 1972 – 2008
INGENIERIA, ARQUITECTURA Y MANAGEMENT
![Page 3: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/3.jpg)
1. INTRODUCTION
INGENIERIA, ARQUITECTURA Y MANAGEMENT
![Page 4: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/4.jpg)
Sales volume in 2008 totaled 16.4 million Euros: 12.5 corresponded to Master S. A. de Ingeniería y Arquitectura and 3.9 to Master, S. L. Architecture et Ingenierie Maghreb, which represents a 30% decrease compared to 2007 turnover. The main reason for such decrease lies in a sales volume drop in Design & Build operations (€ 7.2 million in 2008 compared to € 14.9 million in 2007). It is well known that Design and Build contracts are an Opportunity Business for Master, which vary from year to year.
The € 9.25 million worth portfolio of architectural and engineering contracts remained stable and even experienced a slight 6.5% increase compared to the previous year. This figure, however, fell significantly short vi-à-vis the goals set at the beginning of the year, which could not be fulfilled basically due to the economic downturn we are going through. In this context, some of the projects were put on hold in the second half of 2008 and others already in progress witnessed a substantial investment decrease due to lack of financing. This situation led to reduced contract fees and expected billing.
The most important industrial projects completed in 2008 were the Synchrotron Light Laboratory for CELLS and Phase III of Damm’s Logistics Platform in the Logistics Activities Area located in the Port of Barcelona. The sum of industrial works carried out totaled € 73.3 million.
As regards architectural and other outstanding projects, works completed in 2008 represent a certified final value of approximately € 121.8 million. Among these projects, it is worth highlighting the Aragon Pavilion and the Congress Hall for Expoagua Zaragoza 2008, the new Telefonica Corporate University in Parc de Belloch, La Roca del Vallés and the new headquarters for the Institute of Predictive and Personalized Medicine against Cancer, from the Germans Trias i PujolHospital in Badalona.
Thus, projects with works completed in 2008 represented a total investment of € 195.1 million, 47.8% more than for works completed in 2007.
By the end of the year, the investment volume for projects and works in progress was around € 637 million for the 2009-2012 period. However, given current market uncertainty, it is difficult to guarantee that such amount will be actually invested. Nevertheless, at the time of drafting this report, no signed contract had been cancelled and we could only guess that the period provided for such investment will expand to 2014.
INGENIERIA, ARQUITECTURA Y MANAGEMENT
![Page 5: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/5.jpg)
Among the most representative works currently under execution we can mention the Bbraun new serum plant in Rubí, the extension of the Corporate Headquarters and the New Auditorium at the Caixa Penedès in Vilafranca del Penedès, and the new Convention Center and Far West Hotel that the Port Aventura company is building in its amusement park in Vilaseca-Salou, Tarragona. Works scheduled to be completed throughout 2009 include the Agro-Genomics Research Center, which is being built by the CSIC-IRTA consortium at the Autonomous University of Barcelona, and Diagonal 00 Tower, which will house future Telefónica headquarters in Barcelona.
Among projects in the design stage by the end of the year, it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the extension of LIDL headquarters in Montcada i Reixac, and the conversion project of the Support Buildings for the Expo Zaragoza which involves the refurbishment of some 165,000 square meters of roof area and next to € 240 million investment.
2008 has also been a key year for our subsidiary Master Société Limité d’ Ingénierie et Architecture Maghreb, which has completed the turnkey construction of Irizar Maroc new manufacturing plant of buses and coaches in Skhirat, Morocco. In the first stage, this work entailed the constructionof about 16,000 square meters of built area for a production capacity of 250 units per year, at a value exceeding 100 million dhrs.
Other international projects in which Master has been involved over the past year include participating in the tender for the beam lines extension of the ESRF (European Synchrotron Radiation Facility) in Grenoble, and the new CESLAB Synchrotron in Brno, Czech Republic, as well as conducting preliminary studies for the new research and development center of mutagenic drugs for Ipsen Dreux in France.
As in previous editions, I am pleased to present the works completed in 2008 and projects that were in the design stage or in execution by year end. I thank all our clients for their confidence in Master and our staff for making these projects come true.
Antonio MerinoChairman – CEOMaster, S. A. de Ingeniería y ArquitecturaMaster, S. L. Ingenierie et Architecture Maghreb
INGENIERIA, ARQUITECTURA Y MANAGEMENT
![Page 6: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/6.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
36 years in the architecture, engineering and project management business
COBEGAMartorelles-Montornés del Vallès (Barcelona), 2006
ALSTOMSanta Perpetua de Moguda-Mollet del Vallés (Barcelona), 1994
DANONEAldaia (Valencia), 2001
SAINT-GOBAIN MONTBLANCMontblanc (Tarragona), 1998
![Page 7: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/7.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
2. CORPORATE PROFILE AT YEAR-END 2008
![Page 8: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/8.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
1. Company Name
Master Sociedad Anónima de Ingeniería y Arquitectura
2. Date of Foundation
March 24, 1972
3. Head Office
Barcelona, 08020c. Josep Pla, 163Tel: 34 - 93 - 308 60 16Fax: 34 - 93 - 308 55 95
e-mail: [email protected]: www.masteringenieria.com
Regional Offices
Madrid, 28033c. Caleruega, 76Tel: 34 - 91 – 754 25 35Fax: 34 - 91 – 766 83 15
e-mail: [email protected]: www.masteringenieria.com
4. Legal Registration
Limited CompanyCompanies’ Registry of BarcelonaCorporate Tax Code: A - 62913264
5. General Management of the Company
Antonio Merino Pons, Chairman – CEO
Antonio Eixarch Cardona, Deputy General Manager and Production Manager
Elías Losada Seivane, Financial Director
6. Board of Directors
Antonio Merino PonsAntonio Eixarch CardonaElias Losada SeivaneAntonio Merino Gonzalo
7. Main Partners
Antonio Merino Pons, EngineerJuan Rosell Lastortras, Engineer
The company’s capital belongs to its founding partners. Master is an independent engineering company.
![Page 9: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/9.jpg)
8. Capital + Reserves
€ 3,181,000
9. Sales (2008)
€ 16,463,820 Architecture, Engineering and Management (56.2 %)Design & Build (43.8 %)
10. Current Staff (January, 2009)
Managing Directors 3Project Managers 10Construction Managers 3Architects 4Project Engineers 13Designers 7Construction Supervisors 17CAD Draughtsmen 17Administration and Sales 8Others 3
______Total 85
11. Production
Project Design 74.210 mh/yearWorks Supervision 30.770 mh/yearManagement 27.150 mh/year
________________Total 132.130 mh/year
INGENIERIA, ARQUITECTURA Y MANAGEMENT
12. Main Services
Master PlanningArchitecture ProjectsEngineering ProjectsProject ManagementConstruction ManagementDesign & Build
13. Main Fields of Activity
Industrial BuildingsCorporate Headquarters and Office BlocksData Processing CentersResearch BuildingsPharmaceutical Laboratories and Fine ChemicalsHospitalsTelecommunications InfrastructuresUrban Planning ProjectsHotels and Shopping CentersLogistics Infrastructures
14. Certificates
ISO 9001 : 2000 ISO 14001 : 2004OSHAS 18001 : 2007Certified by TÜV – RHEILAND
![Page 10: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/10.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
15. Branch in Morocco
MASTER S. L. INGENIERIE ET ARCHITECTURE MAGHREB
7 Rue Assad Ibnou ZararaEtage 5 Appt 10, Residence TarikMaarif, 20100 Casablanca (Maroc)Tel: 00 - 212 – 674 22 00 00Fax: 00 - 212 – 522 98 59 54e-mail: [email protected]
16. Important Clients and Projects
BBRAUN (Architecture, Engineering and Construction Management for a new manufacturing plant of parenteral medicines and irrigation solutions).
CAIXA PENEDÈS (Architecture, Engineering, Project and Site Supervision, and Bidding & Contracting for the extension of Corporate Headquarters and Data Processing Center).
CELLS (Preliminary Design, Design Development, Detailed Design and Site Supervision of the Buildings and Urbanization of external spaces for the New Alba Synchrotron).
CNIO – NATIONAL ONCOLOGICAL RESEARCH CENTER (Project & Construction Management of a Building for Research and Development in the field of Biomedicine).
COBEGA (Construction Management for a new Coca Cola bottling plant).
DAMM (Master Site Plan, Construction Supervision and Construction Management for a new logistic center).
DANONE (Engineering, Tender Management, Construction Management for the Food Industry).
EXPOAGUA ZARAGOZA 2008 (Project Management and Site Supervision for new exhibit pavilions and convention centers).
GRUPO DEUTSCHE BANK Architecture + Engineering, Construction Management for Corporate Headquarters).
IRIZAR MAROC (Architecture and Engineering, Construction Supervision and Turn Key Construction for a new coach assembly plant).
RENAULT TRUCKS (Architecture + Engineering, Construction Supervision and Design & Build for the Automotive Industry).
TELEFÓNICA DE ESPAÑA (Architecture and Engineering for Data Processing Centers, Satellite Tracking Station and Corporate University).
SOCIEDAD GENERAL DE AGUAS DE BARCELONA (Project & Construction Management of the AgbarTower for the tenant).
![Page 11: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/11.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
Outcomes by design + Outcomes by management + Outcomes by design & build
CENTRO NACIONAL DE INVESTIGACIONES CARDIOVASCULARES Madrid, 2005
TORRE AGBARBarcelona, 2005
CENTRO NACIONAL DE INVESTIGACIONES ONCOLÓGICAS Madrid, 2002
INSTITUTO GUTTMANNBadalona (Barcelona), 2001
![Page 12: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/12.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
3. WORK COMPLETED IN 2008
![Page 13: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/13.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
3.1. INDUSTRIAL PROJECTS
![Page 14: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/14.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
SYNCHROTRON LIGHT SOURCE� Outcomes by design
€ 180,000,000 (Total Estimated Investment)€ 62,000,000 (Building and General Services)
Project Value
February 2005 – April 2006 (Project)May 2006 – December 2008 (Construction Work)
Planning
Plot: 61,185 m²Buildings: 27,760 m²
Surface Area
The solution consists of three wings, corresponding to the Technical Buildings, the Main Building and the Administrative Building, as well as the urbanization of the spaces external to the buildings.The Master Site Plan designed meets the requirements and objectives put forth through the appropriate solution of constructing buildings on the upper half of the plot, allowing permanent interconnection, ease of access to all points of the complex, the necessary flexibility and the possibility of future extension.
Project Description
Centro Direccional de Cerdanyola del Vallès, Barcelona.Location
Design and Construction Supervision of the new Synchrotron Light Source Laboratory which the Consortium CELLS (CONSORCIO PARA LA CONSTRUCCIÓN, EQUIPAMIENTO Y EXPLOTACIÓN DEL LABORATORIO DE LUZ SINCROTRON) will build in the Vallés area.
Aim Preparation of the winner Idea of the Competition and drawing up of the Preliminary Design, Design Development and Detailed Design, Construction Permits, Environmental Permits and Site Supervision of the Buildings and Urbanization of the spaces external to the buildings.
Extent of Master's Work
![Page 15: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/15.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
SYNCHROTRON LIGHT SOURCE� Outcomes by design
![Page 16: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/16.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
PRODUCTION FACILITY EXTENSIONFOR LONZA BIOLOGICS� Outcomes by design
Design development: Completed in February 2008
Detailed design: Completed in November 2008
Construction Work: Completed in March 2009
Planning
€ 334,505Project Value
Drafting of the Design Development and Detailed Design for the extension of the production facility and the warehouse, to be integrated into the production implementation project, developed by CH2M Hill. Drafting of the Safety and Security Study.
Extent of Master'sWork
Production Area: 410 m²
Storage Area: 100.90 m²
Surface Area
Design development and detailed design for the extension of the production facility and the warehouse.
Project Description
Torneiros Industrial Estate, La Relva Street, Porriño, province of Pontevedra.
Location
Project in collaboration with CH2M HILL to extend and adapt the facility in order to provide more flexibility to the plant and thus meet new drug manufacturing needs.
Aim
![Page 17: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/17.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
LOGISTICS CENTER IN ZAL II – CAL III � Outcomes by design
€ 11,000,000Project Value
Master site plan study for centralization of warehouses, Detailed Design and Administrative Projects, Construction supervision and preload of ground, industrial warehouses and external urbanization.
Extent of Master'sWork
Construction work on Phase III began in December 2007 and ended in December 2008.
Planning
Urban development: 10,000 m²Constructed: 18,000 m²
Surface Area
Industrial warehouse of 18,000 m² with 10,000 m² of urban area in phase III for operation of DAMM and ALFIL LOGISTICS connected to the railroad of the new ZAL II facilities.
Project Description
ZAL II Port of Barcelona.Location
Creation of a logistics platform near the port of Barcelona for the DAMM brewer company.
Aim
© Paisajes Españoles S.A.Photo: courtesy of GRUPO DAMM
![Page 18: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/18.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
3.2. ARCHITECTURAL PROJECTS
![Page 19: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/19.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
ARAGON PAVILION� Outcomes by management
Project Management and Site Supervision. Project Architects Authors: Daniel Alberto Olano and Mendo Architects.
Extent of Master'sWork
Construction works started in May 2006 and were completed in June 2008.
Planning
€ 20,840,000Project Value
Constructed: 8,737 m2Surface Area
Construction of the Pavilion used by the Aragon Community in the International Exhibition of Zaragoza2008. The building has two floors and a passable cover. The structure that supports the building is composed of three concrete clusters and 6 irregular steel structures. The different frameworks of the building are post-tensioned slabs. After the EXPO the building will become property of the Aragon Government.
Project Description
Avda. Pablo Ruiz Picasso, Zaragoza.Location
Aragon Pavilion of EXPO ZARAGOZA 2008.Aim
![Page 20: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/20.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
ARAGON PAVILION� Outcomes by management
![Page 21: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/21.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
ARAGON CONGRESS HALL� Outcomes by management
Project Management and Site Supervision. Project Architects Authors: Nieto and Enrique SobejanoFuensanta Architects.
Extent of Master'sWork
Construction works started in July 2006 and were completed in June 2008.
Planning
€ 78,048,000Project Value
Constructed: 22,285 m2Surface Area
Construction of the Congress Hall of the International Expo Zaragoza 2008. The building consists of two zones, one of them is a large open space for exhibitions and a second area is an auditorium that will hold shows with an especially high sound quality due to its acoustic setting. After the EXPO the palace will become property of the Aragon Government.
Project Description
Avda. Pablo Ruiz Picasso, Zaragoza.Location
Aragon Congress Hall of EXPO ZARAGOZA 2008.Aim
![Page 22: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/22.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
ARAGON CONGRESS HALL� Outcomes by management
![Page 23: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/23.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
“CITIES OF WATER” AND “OIKOS” THEMATIC SQUARES� Outcomes by design
"Cities on Water" Thematic Square: Writing of the Design Development and Detailed Design of Structures and Utilities to be integrated into the overall construction project developed by the expographyteam. Drafting of the Safety and Security Study and Environmental Study. Design Author Team: Studio Italo Rota, Milan. "Oikos" Thematic Square: Basic Writing of the Design Development and Detailed Design. Drafting of the Safety and Security Study and Environmental Study. Design Author Team: Roland Olbeter, Barcelona.
Extent of Master's Work
Design Development: Completed in November 2006 Detailed Design: Completed in May 2007 Construction Work: Completed in June 2008 The opening of the exhibition took place on June 13, 2008.
Planning
€ 3,000,000 (each Thematic Square)Project Value
1,200 m² (each Thematic Square)Surface Area
Projects for the construction of an ephemeral thematic square.
Project Description
Ebro riverbanks of ExpoZaragoza 2008.Location
Construction of a group of ephemeral spaces in front of river flood zone.
Aim
![Page 24: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/24.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
HEADQUARTERS BUILDING RENOVATION� Outcomes by design
Design Development and Detailed Design of Architecture and Utilities, Administrative Projects, Site Supervision.
Extent of Master'sWork
The construction works were completed in October 2008.
Planning
€ 3,385,000Project Value
3,150 m²Surface Area
Reuse of an existing building adapting the construction to new requirements and regulations with available areas for technical services, work, management and administration, general services and technical scientific service.
Project Description
Germans Trias y Pujol Hospital, BadalonaLocation
Refurbishment and renovation of the building that houses the Headquarters of the Institute of Predictive and Personalized Medicine of Cancer, where doctoral courses related to cancer research will be taught.
Aim
![Page 25: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/25.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
COMMERCIAL STORES� Outcomes by design
Sant Adrià del Besos: Preliminary Design, Licensing Projects, Detailed Design, Bidding & Contracting, Construction Supervision and Legalizations. Vilaseca and Sabadell: Licensing Projects, Detailed Design for Civil Works and Utilities, Bidding & Contracting and Construction Supervision.
Extent of Master'sWork
Design Phase: 2006 - 2008 The construction works have been completed during 2008
Planning
St. Adrià del Besòs: 1,500 m² of building 3,830 m² of urbanization
Vilaseca: 1,480 m² of building 4,530 m² of urbanization
Sabadell: 2,634 m² of building 3,800 m² of plot
Surface Area
Construction of commercial stores (supermarkets) with sales room, warehouse, technical lofts and development with parking area.
Project Description
Sant Adrià del Besòs (Barcelona), Vilaseca(Tarragona) and Sabadell (Barcelona).
Location
New construction of commercial stores and adaptation of an existing building for the German supermarket company LIDL.
Aim
![Page 26: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/26.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
TELEFONICA PARC BELLOCH� Outcomes by design
Design Development and Detailed Design of Utilities, and Construction Supervision.Architects: Enric Batlle and Joan Roig.
Extent of Master's Work
The construction works were completed in February 2009.
Planning
€ 10,200,000Value of the Project
Building: 18,560 m²Urbanization: 44,050 m²
Surface Area
Reffiting of existing buildings in the complex BellochPark, owned by Santa & Cole, adapting the external urbanization and planning the implementation of a new building to be used as a residence in the complex.
Project Description
Parc de Belloch in La Roca del Vallès, Barcelona.Location
Restoration of existing buildings and implementation of new residence to house the new Corporate University of Telefónica.
Aim
![Page 27: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/27.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
TELEFONICA PARC BELLOCH� Outcomes by design
![Page 28: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/28.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
4. PROJECTS IN PROGRESS AT 31.12.08
![Page 29: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/29.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
4.1. INDUSTRIAL FACILITIES
![Page 30: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/30.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
RUBÍ MANUFACTURING PLANT � Outcomes by design and management
Master Site Plan, Preliminary Design, Administrative Projects, Master Plan of preliminary proceedings as Construction Managers, Basic Engineering and Detail Engineering for Architecture, Civil Works and Utilities, Site Supervision and Construction Management.
Extent of Master's Work
The construction work began in July 2007 and its completion is scheduled for October 2010.
Planning
€ 17,000,000,- (estimated)Project Value
17,197 m²Surface Area
The new building, with a total built surface area of 17,197 m², will have a basement floor (with areas for utilities, staff changing rooms, manufacturing workshops and maintenance), ground floor for 2 production lines and first floor for preparation area and utilities technical areas.
Project Description
Rubí, Barcelona.Location
Construction of new building to house the new manufacturing plant of parenteral medications and solutions for irrigation.
Aim
![Page 31: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/31.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW CELL THERAPY LABORATORY � Outcomes by design
Design Development for Activity and Construction Permits.
Extent of Master's Work
2008Planning
€ 5,365,000Project Value
4,209 m²Surface Area
Corporate building in a plot of 3,437m² with basement floor for parking and utilities, ground floor of 1,603 m² for laboratories, 1st Floor of 711 m²devoted to laboratories, administration and management areas and technical plant of 134 m².
Project Description
Tres Cantos (Madrid)Location
Cell Therapy Laboratory for development and production of medicines.
Aim
![Page 32: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/32.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
LOGISTICS CENTER IN ZAL II – PHASE IV and V� Outcomes by design
© Paisajes Españoles S.A.Foto: cortesía de GRUPO DAMM
Master site plan study for centralization of warehouses and rail penetration in Phase V.
Extent of Master's Work
The Preliminary Design will be completed in June 2009 and the Detailed Design and Administrative Projects are planned between June 2009 and June 2010 to start construction work in 2010.
Planning
€ 25,000,000 (estimated)Project Value
Phase IV Plot: 61,000 m²Phase V Plot: 67,000 m²
Surface Area
Warehouses in Phase IV and V with 128,000 square meters of plot surface area for exploitation of DAMM and ALFIL LOGISTICS with connection to the railroad of the new ZAL II.
Project Description
ZAL II Port of Barcelona.Location
Creation of a logistics platform near the port of Barcelona for the brewer company DAMM.
Aim
![Page 33: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/33.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW R&D LABORATORY� Outcomes by design
Preliminary Design, Design Development, Detailed Design, Site Supervision, and Turnkey Construction.
Extent of Master's Work
2007 - 2010 Planning
€ 13,000,000 Project Value
9,100 m²Surface Area
The functional program of the New Center is developed in a building comprising a semi-basement floor, ground floor and two floors. Two clusters of services and circulation areas, arranged in the central area of the building, meet the demands regarding use for both Ipsen staff and external users. To meet the specific requirements of laboratories, a series of courtyards passages for utilities have been arranged in the central area, next to the nuclei and along the corridors, to optimize building operation.
Project Description
Mediterranean Technology Park in Castelldefels(Barcelona).
Location
New Research and Development Center project for IPSEN PHARMA.
Aim
![Page 34: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/34.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
CORPORATE AND R&D BUILDING FOR DR. ESTEVE LABORATORIES� Outcomes by design
Design Development and Detailed Design of Utilities, Environmental License File. Certificate of Urban Development Compatibility. Site Supervision for Utilities. Architect: RCR Architects.
Extent of Master's Work
The projects should be developed during 2009. The start of construction work is scheduled for late 2009 -early 2010.
Planning
€ 50,000,000Project Value
50,000 m²Surface Area
The project involves the construction of a new building for research and development, in addition to remodeling Can Marcet Farmhouse and urbanization of the building perimeter. The R & D building will house offices, laboratories, animal house, and general services and will have a parking area. It consists of five levels that are integrated into the ground (below ground level and above ground level areas).
Project Description
Sant Cugat del Vallès, Barcelona.Location
New corporate and research building for Dr. EsteveLaboratories that promotes Layetana.
Aim
![Page 35: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/35.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW MULTISERVICE WAREHOUSES� Outcomes by design
Design Development for construction permit, Detailed Design of Civil Works and Utilities, Purchasing Management and Construction Supervision.
Extent of Master'sWork
The project was initiated in November 2007 and is scheduled for completion in March 2009. Construction work has yet to start.
Planning
€ 5,500,000Project Value
Warehouses: 6,676 m²Office (inside buildings): 3,000 m²Urbanization: 16,500 m²
Surface Area
Construction of an industrial building consisting of several adjoining buildings. There will be 8 warehouses of 585 m² of floor with associated parking area of approximately 280 m² per warehouse and 2 more warehouses of 926 m² and 1,070 m²respectively with their parking areas of 280 m² and 478 m².
Project Description
Zona Franca Industrial State in Barcelona.Location
Urbanization of the area where the old Mercat Central de la Flor (Flower Market) was built, within the Food Division of MERCABARNA, and construction, in one of the new free spaces, of a new industrial building comprising different adjacent warehouses to be called Multiservei III.
Aim
![Page 36: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/36.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
INDUSTRIAL FACILITY FOR AUTOMOTIVE TESTING� Outcomes by design
Preliminary Design and Design Development of Civil Works, Architecture and Utilities.
Extent of Master's Work
Design Development: 2 months Construction works: 9 months (estimate)
Planning
€ 1,600,000 (estimated value)Project Value
Constructed: 1,614 m2 Surface Area
Unique Building in a plot of 1,000 m2, comprising 797 m2 of basement for parking, toilets and changing rooms, power and diagnosis bank and utilities; Ground Floor of 384 m2 for acceptance, diagnosis and clean room; First floor of 384 m2 for offices and laboratory.
Project Description
Leganés Technological Park, Leganés (Madrid).Location
Implantation of an industrial plant for laboratory testing for the automotive industry.
Aim
![Page 37: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/37.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
4.2. ARCHITECTURE
![Page 38: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/38.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
4.2.1. New Buildings
EMBA
ARRAHONA OPTIMUS
![Page 39: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/39.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW CORPORATE HEADQUARTERS OF LEITAT TECHNOLOGY CENTER� Outcomes by design
6,800 m²Surface Area
€ 6,200,000 (Value of the utilities)Project Value
Design for Environmental permit, Detailed Design and Construction Supervision of Utilities. Architects: team led by Roser Amadó and LluisDomènech of B01 Arquitectes, SCP.
Extent of Master'sWork
Design started in September 2007 and was completed in January 2008. Construction works are scheduled to be completed in December 2009 - January 2010.
Planning
The project includes the design of the building and external urbanization. The building proposed by B01 Architects is a rectangular space, divided into four blocks, coated with a reflective skin that will mirror the trees of the forest in which it is located, with large glass openings that will allow seeing the inside and visually integrating it in the landscape. The south facade is designed to locate the office area while the north will host laboratories and workshops. The public areas (showroom, museum, auditorium, classrooms, dining room, etc.) will be located in the central areas of the complex. The parking area will be located in the building deck. The energy production becomes a symbolic element of the building, when placed in a large South-oriented pergola, which supports the solar collectors and photovoltaic cells.
Project Description
Terrassa, Barcelona.Location
Design of the new corporate headquarters of LEITAT Technology Center (Laboratory of Textile Testing and Research), with the aim of providing the Center with facilities in accordance with the requirements of a reference center of the twenty-first century.
Aim
![Page 40: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/40.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
CORPORATE HEADQUARTERS EXTENSION� Outcomes by design
€ 44,220,000Project Value
Plot: 33,120 m²
Constructed: Underground parking: 28,200 m²
Office area: 11,850 m²
Auditorium: 4,050 m²
Urbanization: 19,800 m²
Surface Area
The extension is based on two basements, ground floor, first floor, second floor and third floor. The building floor is organized from a circulation axis, which puts together the common services and activities, based on the penetration of light and views to a large courtyard. Next to this axis, office floors are arranged, surrounding two courtyards to have constant even natural lighting in all work and circulation areas. The basement floor is entirely devoted to a parking area. The project also envisages construction of an auditorium for 800 people, linked to the extension of the existing building by the parking floor.
Project Description
Vilafranca del Penedès (Barcelona).Location
Extension of Corporate Headquarters and the Data Processing Center and construction of a new parking area and auditorium.
Aim
Preliminary Design, Design Development, Detailed Design of Architecture, Civil and Structural Works, Detail Engineering of Utilities, Design and Site Supervision, Permits Management and Bidding & Contracting.
Extent of Master'sWork
Design begun in November 2007 and construction work is scheduled to be completed in July 2011.
Planning
![Page 41: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/41.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
PLANT MOLECULAR GENETICS LABORATORY� Outcomes by design
Preparation of the winner Idea of the Competition and drawing up of the Design Development, Detailed Design and Site Supervision of Architecture, Civil Works and Utilities.
Extent of Master's Work
Design was completed in September 2006. Construction work started in June 2007 and was completed in July 2009.
Planning
€ 12,000,000,-Project Value
6,979 m²Surface Area
The project includes the design of the building and the surrounding area urbanization. The building proposed by Master would work independently at present but with a possibility for future extension by means of the annexation of a new body, for which a global solution has been set out at a conceptual level with a distribution and image that support the development of the total volume by phases.
Project Description
Universidad Autónoma de Bellaterra, Barcelona.Location
Design of the new building for the Plant Molecular Genetics Laboratory of CSIC – IRTA.
Aim
![Page 42: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/42.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
DIAGONAL 00 TOWER� Outcomes by design
EMBA Estudi Massip-Bosch Arquitectes
Environmental License, Design Development and Detailed Design of Utilities, and Construction Supervision. Architect: Enric Masip (EMBA).
Extent of Master's Work
Construction work started in August 2007 and is scheduled to be completed by the end of 2009.
Planning
€ 57,000,000Project Value
32,000 m²Surface Area
Outstanding high-rise building that will house the corporate headquarters of TELEFÓNICA. The project is developed in 2 basement floors, ground floor and 24 floors for offices, with a height of 105 meters above street level. Besides the space for offices, the building includes an auditorium, cafe and public exhibition areas.
Project Description
Plaza Ernest Lluch, Barcelona.Location
Design of Corporate Headquarters facilities for TELEFÓNICA.
Aim
![Page 43: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/43.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
GERIATRIC RESIDENCE� Outcomes by design
Design Development, Detailed Design, and Construction Supervision.
Architects: Juan de Ávalos (IDEISA) and Jose Antonio Marín Sánchez (EMDUCSA).
Extent of Master'sWork
Design: March 2005 - July 2005.
Construction work started in October 2006 and is scheduled for completion in May 2009.
Planning
€ 10,286,000Project Value
Plot: 3,972.50 m²Constructed: 16,816.79 m²
Surface Area
The residential building consists of a semi-basement floor (day care center and service area with kitchen and laundry), ground floor (main lobby, an area of geriatric care and rehabilitation, administration area, library, dining rooms, cafeteria and multi-purpose area), four floors for rooms and deck floor with a garden. The parking area consists of 3 underground floors with a total capacity of 399 parking spaces: 17 doubles and 89 store rooms.
Project Description
Salvador Allende Avenue, Cornellà de Llobregat (Barcelona).Location
Construction of a geriatric residence and day-care center above an underground parking in the lot where there is now a school.
Aim
![Page 44: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/44.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
RESIDENTIAL COMPLEX AND SPORTS CENTER� Outcomes by design
Residential Complex and Sports Center: € 8,980,615
Parking area: € 3,582,000
Project Value
Design Development and Detailed Design, Site Supervision. Architect: José Antonio Marín Sánchez (EMDUCSA).
Extent of Master'sWork
Design: March 2005 - July 2005.
Construction work began in November 2006 and is scheduled for completion in December 2009.
Planning
Plot: 2,400 m²Constructed: Sports use above ground level: 2,367.45 m²
Civic and social use: 378.80 m²Residential use: 3,562.50 m²Parking area: 8,400.00 m²
Surface Area
The sports center and homes combine public uses in the lower floors (basement, semi-basement, ground floor and first floor) and private residential use on the upper floors. The Pavilion consists of a main sports track with dressing rooms and attached rooms, partitioned secondary track and meeting rooms and premises for local sports bodies of the neighborhood. The parking area consists of 3 underground floors under Línea Eléctrica Avenue with a capacity of 285 parking spaces and the same number of storage areas.
Project Description
San Ildefons Avenue – Línea Eléctrica Avenue, Cornellà de Llobregat (Barcelona).
Location
Demolition of existing sports pavilion of Sant Ildefons and construction of a new sports center with a residential complex of 42 multi-family dwelling on the top. Construction of a parking area of 3 underground floors under Línea Eléctrica Avenue.
Aim
![Page 45: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/45.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
IBIS BIOMEDICAL RESEARCH CENTER � Outcomes by design
Interior Architecture Preliminary Design, Design Development, Detail Engineering and Detail Design of Utilities. Architect: Alberto Balbontín.
Extent of Master's Work
Design: 2006 – 2008 Construction work: Start in 2008 and completion scheduled for July 2009
Planning
€ 8,500,000Project Value
8,195 m²Surface Area
The building, which has volume dimensions of 43.25 by 53.70 m, is divided into four areas of laboratories and a service center. An events room, a general multi-purpose laboratory and auditorium, a lecture hall, an office, a changing room, a computer room and the administrative and management area are all located on the ground floor. Also located on the ground floor, though completely separate from the area open to the public, is the Animal House with a separate entrance on the south side of the building. The lower level houses a parking area, part of the Animal House and storage area. Laboratories for research teams are located on the first and second floors.
Project Description
Virgen del Rocío de Sevilla University Hospital grounds. Location
Upcoming project for the Andalusian Center of Biomedical Research.
Aim
![Page 46: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/46.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
MONTCADA I REIXAC OFFICE BLOCK EXTENSION � Outcomes by design
Administrative Projects, Detailed Design, Bidding & Contracting and Construction Supervision.
Extent of Master's Work
Design: to be undertaken during the 1st half of 2009. Construction work: the duration of the construction work is planned to cover the 2nd half of 2009 and all 2010.
Planning
8,000 m²Surface Area
The project consists of constructing a new building connected to the existing building. The new building will house offices, multi-purpose rooms, cafeteria and parking areas on 6 floors: Basement, Ground Floor and 4 standard floors.
Project Description
Montcada i Reixac, Barcelona.Location
Extension of LIDL General Offices to house the corporate headquarters.
Aim
![Page 47: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/47.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
REUS COMMERCIAL STORES AND ST. FRUITÓS WAREHOUSE� Outcomes by design
Reus: Preliminary Design, Licensing Projects, Detailed Design, Bidding & Contracting, Construction Supervision and Legalization of Utilities. St. Fruitós: Licensing Projects, Detailed Design, Bidding & Contracting, Construction Supervision and Legalization of Utilities.
Extent of Master's Work
Design: 2006 - 2008 Construction work is scheduled to begin in October 2009
Planning
Reus: 1,500 m² of buildingSt. Fruitós: 32,225 m² of building
65,817 m² of urbanization
Surface Area
Construction of commercial stores (supermarkets) with sales floors, warehouse, technical lofts and urbanization with parking area.
Project Description
Reus (Tarragona) and Sant Fruitós de Bages (Barcelona)Location
New commercial stores and adaptation of an existing building for the German supermarket company LIDL.
Aim
![Page 48: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/48.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
GOLD RIVER HOTEL (FAR WEST AREA)� Outcomes by design
Administrative Projects, Design Development, Detailed Design and Site Supervision.
Extent of Master's Work
The complex will be available to the public in June 2009Planning
€ 38,000,000Project Value
Constructed: 32,450 m²Urbanization: 80,940 m²
Surface Area
Construction of an urban environment and architectural thematic area, which represents a mining town of old Far West, with 500 rooms and 260 parking spaces, five of them for coaches.
Project Description
Port Aventura Thematic Park Thematic Park in Vila-Seca/Salou (Tarragona).
Location
Construction of a hotel complex of 4 * and 5 *.Aim
![Page 49: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/49.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
CONVENTION CENTER� Outcomes by design
Design Development, Detailed Design and Site Supervision.
Extent of Master'sWork
Design: October 2006 - June 2007 Construction work: June 2007 - May 2009
Planning
€ 20,500,000Project Value
Plot: 42,050 m²Constructed: 13,290 m²
Surface Area
The building consists of two main functions and spaces that are the Exhibit Hall and multi-purpose rooms. The building geometry is formed by two large rectangular blocks oriented to two different views and at different levels. Their articulation serves to house complementary functions as the Harvard room or adjoining exhibition rooms. The glass box that marks the access to the multi-purpose rooms, formally emphasizes the change of direction between the two large volumes. The rest of the spaces (meeting rooms, administrative area, technical rooms) are aligned in the North and East facades in bodies of lower height than the two main volumes.
Project Description
Vila-seca (Tarragona).Location
Design and construction of a new building for a convention center, considered from a corporate approach.
Aim
![Page 50: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/50.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
OFFICE BLOCKS IN CAN SANT JOAN� Outcomes by design ARRAHONA OPTIMUS
Administrative Projects for Environmental Permit, Detailed Design of Utilities, and Construction Supervision of Utilities. Architect: Juan Trias de Bes.
Extent of Master's Work
The design was completed in 2006 and construction work began in late 2006, completion is scheduled for mid 2009.
Planning
€ 6,000,000Project Value
Above ground level (Offices): 16,000 m²Below ground level (Parking area): 12,200 m²
Surface Area
The project consists of defining the electromechanical utilities, fire protection system, sanitation and lifts for all buildings, parking area and landscaping of the plot.
Project Description
Can Sant Joan Industrial Estate in Sant Cugat del Vallès, Barcelona.
Location
Complex of buildings for offices and parking area.Aim
![Page 51: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/51.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
C + I BUILDINGS IN DIAGONAL BESÓS CAMPUS� Outcomes by design
Environmental Permit, Design Development and Detailed Design of Utilities and Structures, Construction Supervision. Architects: Batlle i Roig Arquitectes.
Extent of Master's Work
Detailed Design is scheduled to be completed in September 2009.
Planning
€ 25,000,000Project Value
23,000 m²Surface Area
The project includes construction of two exempted buildings, with their elevation connected below ground level. The use of Building C is for chemical and material research laboratories. Building I is devoted to teaching and electronic research. The project is developed in two basement floors and seven floors in height.
Project Description
Diagonal Besós Campus, Barcelona.Location
Design of utilities and structure of the future C + I buildings of the Polytechnic University of Catalonia.
Aim
![Page 52: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/52.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
4.2.2. Refurbishment of existing buildings
![Page 53: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/53.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
RESTRUCTURING OF THE PAVILIONS BUILDING POST-EXPO� Outcomes by design
Preliminary Design, Design Development and Detailed Design of Structure (two intermediate frameworks in each building) and utilities of Ronda, Actur and Ebros buildings, parking area and urbanization. Architects: Estudio Lamela Arquitectos - Master SA de Ingenieria y Arquitectura grouping of companies.
Extent of Master's Work
Design: May 2007 - June 2009 Construction work: 2009 – 2011
Planning
€ 241,500,000,-Value of the Project
Buildings: 179,267 m2 Parking area: 83,660 m²
Surface Area
Adaptation of the buildings of the Expo 2008: Ronda, Actur and Ebros, parking area and urbanization, to become a business park, with shopping and entertainment areas. 173,000 m² of offices, 6,270 m² of premises and 2,700 parking spaces for private and rotational use, as well as adaptation of the access and urbanization.
Description of the Project
Meandro de Ranillas, Zaragoza.Location
Restructuring of the pavilions building, called "Support Building", of the Expo Zaragoza 2008 International Exhibition to be sold as office blocks, commercial and restaurant industry premises.
Aim
![Page 54: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/54.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
RESTRUCTURING OF THE PAVILIONS BUILDING POST-EXPO � Outcomes by design
![Page 55: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/55.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
5. SPANISH COMPETITIONS
![Page 56: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/56.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW HEADQUARTERS OF MÓSTOLES INDUSTRIAL� Outcomes by design
Preliminary Design.Extent of Master's Work
Design Phase: 7 months Contracting and Construction Work Phase: 18 months
Planning
€ 10,200,000 Project Value
Above ground level: 6,300 m²Below ground level: 5,500 m²
Surface Area
Outstanding building with ground floor + 4 standard floors and 2 basements, with general services and showroom in ground floor (Showroom, Caffeteria, Reception, etc.) and offices in upper floors.
Project Description
New industrial park in Móstoles, Madrid.Location
Tender for the new R & D headquarters, showroom and offices of MÓSTOLES INDUSTRIAL SA
Aim
![Page 57: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/57.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW MAIMÓNIDES INSTITUTE� Outcomes by design
Architectural proposal at preliminary design level, Architecture, Civil Works and Utilities.
Extent of Master's Work
Construction work is scheduled to last 16 months. Planning
€ 12,000,000Project Value
7,500 m²Surface Area
Building for R&D Laboratory and General Services. It consists of a basement, an animal house, ground floor for general services and 3 floors for research laboratories and offices. All this around a central atrium south -oriented courtyard.
Project Description
Reina Sofia University Hospital grounds, Córdoba.Location
Preliminary design for tender of the new “Maimónides” Biomedical Research Institute.
Aim
![Page 58: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/58.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW MAIMÓNIDES INSTITUTE� Outcomes by design
![Page 59: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/59.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
6. DESIGN & BUILD PROJECTS
![Page 60: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/60.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
ADAPTING OF INDUSTRIAL BUILDING � Outcomes by design & build
Administrative Projects for obtaining permits, Detailed Design, Construction Supervision and turn-key construction.
Extent of Master's Work
Design completed in late 2006. Construction work completed in May 2008.
Planning
€ 2,500,000Project Value
Building: 6,600 m²Plot: 10,000 m²
Surface Area
The project consists of the total adequacy of existing industrial building to house a production area and warehouse (5,386 m²), and offices / dressing rooms (1,218 m²). The remodeling involves all the inside and the outside of the building, as well as the entire urbanization area of the plot, with the creation of loading bays (4,000 m²).
Project Description
Zona Franca Industrial Estate, Sector “C”, Barcelona.Location
Adapting an existing warehouse for developing logistics and graphic arts activities related to food industry.
Aim
![Page 61: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/61.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
7. INTERNATIONAL PROJECTS
![Page 62: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/62.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
CESLAB SYNCHROTRON RADIATION FACILITY� Outcomes by design
Preliminary Design and Basic Engineering of Civil and Structural Works. Collaborating partners for the Architectural Design: K4, A.S. ARCHITECTS & ENGINEERS.
Extent of Master'sWork
2008 - 2015Planning
€ 265,000,000 (estimated value)Project Value
Buildings: 30,000 m²Surface Area
The CESLAB will be a modern third-generation electron synchrotron facility with energy of 3 GeV serving the Central Europe since year 2015. It will be constructed in conjunction with other European and world synchrotrons; the accelerator complex itself in conjunction with the team of the Spanish synchrotron ALBA. The beamlines that are being prepared will focus on structural biology, imaging techniques, biomedicine, structural chemistry, material sciences, nano-technologies, and environmental research.
Project Description
Brno, Czech Republic.Location
Competition for the architectural, engineering, construction and related technical consultancy services for the New CESLAB Synchrotron Radiation Facility.
Aim
![Page 63: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/63.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
CESLAB SYNCHROTRON RADIATION FACILITY� Outcomes by design
![Page 64: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/64.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
EXPERIMENTAL HALL EXTENSION� Outcomes by design
Development of the architectural and engineering proposal. Master became finalist among 16 participants.
Extent of Master's Work
Design: 2009Construction work: 2010 – 2012
Planning
€ 60,000,000Project Value
Experimental Hall: 17,000 m²Laboratory and office areas: 14,200 m²
Surface Area
Extension of the Experimental Hall and new spaces for offices and laboratories.
Project Description
Grenoble, France.Location
EX2 International competition for the extension of the Experimental Hall of the EUROPEAN SYNCHROTRON RADIATION FACILITY.
Aim
![Page 65: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/65.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
EXPERIMENTAL HALL EXTENSION� Outcomes by design
![Page 66: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/66.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW PHARMACEUTICAL PLANT� Outcomes by design and management
Conceptual Design for Architecture, Civil Works and Utilities, Cost Estimation, Design Development for Construction permit, Project Management.
Extent of Master's Work
2008 – 2010Planning
€ 17,000,000Project Value
5,400 m²Surface Area
The project includes a new building of 3,500 m² for R&D and offices, another new building of 400 m² for the development of mutagenics (OSD – Oral Solid Dosage) and remodeling of a building of 1,500 m² to house laboratories, offices and warehouse areas.
Project Description
Dreux, France.Location
Conceptual Design for a new R & D building and pharmaceutical production facility within the existing plant of IPSEN company in France.
Aim
![Page 67: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/67.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW COACH ASSEMBLY PLANT� Outcomes by design & build
Preliminary Design, Design Development, Detail Design, Administrative Projects and Permits Management, Legalisations, Procedures and Arrangements, Construction Supervision and Turnkey Construction.
Extent of Master's Work
Design: July 2006 - October 2006 Construction work: February 2007 - June 2008
Planning
€ 9,100,000Project Value
Industrial area (ground floor and mezzanine): 14,215 m²Offices (ground floor and first floor): 1,755 m²Urbanization: 28,800 m²Plot: 65,310 m²
Surface Area
The project involves the construction of a production hall organized in ground floor and social mezzanine, a dispatching area and a warehouse for raw materials. It is completed by a two-floor office block. The total constructed surface area is 15,970 m².
Project Description
Shkirat - Rabat (Morocco).Location
Construction of a new coach assembly plant to manufacture 250 units a year in a first phase.
Aim
![Page 68: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/68.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
NEW COACH ASSEMBLY PLANT� Outcomes by design & build
![Page 69: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/69.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
8. OTHER INFORMATION OF INTEREST
![Page 70: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/70.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
10.100.000 €
13.650.000 €
17.380.000 €
23.600.000 €
16.463.820 €
0 €
5.000.000 €
10.000.000 €
15.000.000 €
20.000.000 €
25.000.000 €
2004 2005 2006 2007 2008
Turnover 2004-2008
![Page 71: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/71.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
108 98102 111
85
0
20
40
60
80
100
120
2004 2005 2006 2007 2008
Evolution of Master's Staff (2004-2008)
![Page 72: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/72.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
WORK COMPLETED: VOLUME OF INVESTMENT BY SECTORS
LOGISTICS €11,000,000
CONVENTION CENTERS€ 78,048,000
RESEARCH AND DEVELOPMENT € 62,000,000
OTHER OUTSTANDING PROJECTS
€ 26,840,000
FOOD & BEVERAGE € 3,316,500
CHEMICAL AND PHARMA INDUSTRY
€ 334,505
UNIVERSITIES €10,200,000
CORPORATE HEADQUARTERS AND
OFFICE BLOCKS € 3,385,000
![Page 73: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/73.jpg)
WORK IN PROGRES: VOLUME OF INVESTMENT BY SECTORS
CONVENTION CENTERS€ 20,500,000
OTHER OUTSTANDING PROJECTS
€ 241,500,000
CHEMICAL AND PHARMA INDUSTRY
€ 17,000,000
RESEARCH & DEVELOPMENT € 105,865,000
FOOD & BEVERAGE € 30,000,000
AUTOMOTIVE € 10,700,000
CORPORATE HEADQUARTERS AND
OFFICE BLOCKS € 113,420,000
LOGISTICS € 27,500,000
RESTAURANTS € 60,000,000 RETIREMENT HOMES
€ 10,286,000
UNIVERSITIES € 25,000,000
INGENIERIA, ARQUITECTURA Y MANAGEMENT
![Page 74: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/74.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
9. THE MASTER APPROACH
![Page 75: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/75.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
THE MASTER APPROACH
WHO WE ARE WHAT WE DO WHOM WE SERVE
� Planners
� Architecture & Engineering Designers
�Managers
�Master planning
� Architectural & Engineering design
� Project & Construction Management
� Design & Build contracts
� Industry
� Health
� Corporations
� R&D
� Institutions
� Pharma Labs.
� Retail & Hotels
![Page 76: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/76.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
THE MASTER CORE BUSINESS
Retail & Hotels
Pharma Labs.InstitutionsR&DCorporationsHealthIndustry
Cristalería Española
Danone
Cobega CNIO
CNIC
Instituto Guttmann
Basf
Novartis
Agbar
CNM
CSIC
CELLS
Deutsche Bank
RACC
Caixa Terrassa
Boehringer
Novartis
Synthon
El Triangle
Kempinski
PrestigeCongress
![Page 77: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/77.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
Who we are / What we do / Whom we serveA & E DESIGNERS + CONSTRUCTION MANAGERS
1993
INSTITUTIONS �
![Page 78: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/78.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
the master approach: outcomes by design + management
1993
![Page 79: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/79.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
Who we are / What we do / Whom we serveA & E DESIGNERS + CONSTRUCTION MANAGERS
PHARMA LABS �
1998
![Page 80: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/80.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
the master approach: outcomes by design + management
1998
![Page 81: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/81.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
Who we are / What we do / Whom we serveENGINEERING DESIGNERS + CONSTRUCTION SUPERVISORS
1999
RETAIL �
![Page 82: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/82.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
the master approach: outcomes by design + construction supervision
1999
![Page 83: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/83.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
Who we are / What we do / Whom we servePROJECT & CONSTRUCTION MANAGERS (for the Tenant)
CORPORATIONS �
2005
![Page 84: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/84.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
the master approach: outcomes by management
2005
![Page 85: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/85.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
Who we are / What we do / Whom we serveA & E DESIGNERS + CONSTRUCTION SUPERVISORS
R & D �
2008
![Page 86: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/86.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
the master approach: outcomes by design + construction supervision
2008
![Page 87: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/87.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
Who we are / What we do / Whom we serveA & E DESIGNERS + CONSTRUCTION MANAGERS
INDUSTRY �
2008Photo: courtesy of GRUPO DAMM © Paisajes Españoles S.A.
![Page 88: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/88.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
the master approach: outcomes by design + management
2008
![Page 89: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/89.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
Who we are / What we do / Whom we serveA & E DESIGNERS + CONSTRUCTION SUPERVISORS
2008
HEALTH �
![Page 90: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/90.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
the master approach: outcomes by design + construction supervision
2008
![Page 91: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/91.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
10. SKILLS AND AGREEMENTS
![Page 92: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/92.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
COMPANY CAPABILITIES
� Architecture� Urban Planning� Civil and Structural Engineering� Electrical Engineering� Mechanical Engineering� Fluid Engineering� Process Design� Air Conditioning Techniques (HVAC)� Fire Prevention Protection� Security & Safety� Warehouse Logistics Engineering & Consultancy� Master Site Plan Studies� Plant Layout Studies (Industrial Facilities)� Office Planning Studies� Legalisation of Industrial Installations� Project Management� Construction Management� Programme Management� cGMP Validation Reports� Due Diligence Reports
![Page 93: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/93.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
COMPANY EXPERIENCE
� INDUSTRIAL BUILDINGS
� Food and Beverage� Automotive Industry� Publishing and Graphics Industry� Electronics� Distribution and Logistics� Computer Equipment and Telecommunications� Railway Industry� Glass Industry� Machinery and Capital Goods Manufacturing� Paper and Packaging
� OFFICE BLOCKS AND GENERAL COMPANY SERVICES
� Corporate Headquarters� Banks and Saving Banks� Insurance Companies� Data Processing Centers� Call Centers� Internet Data Centers
![Page 94: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/94.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
COMPANY EXPERIENCE (Cont.)
� PHARMACEUTICAL INDUSTRY FACTORIES AND FINE CHEMICAL FACILITIES
� R+D BUILDINGS AND LABORATORIES
� Biotechnology and Biomedicine� Medicine and Life Sciences� Microelectronics� Nanotechnology� Material Research
� HOSPITAL COMPLEXES
� SHOPPING CENTERS
� HOTELS, LEISURE PARKS AND SPORTS COMPLEXES
� TELECOMMUNICATIONS
� PUBLIC BUILDINGS
� AIRPORT INSTALLATIONS
![Page 95: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/95.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
ISO 9001:2000 QUALITY CERTIFICATE
![Page 96: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/96.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
AGREEMENT MASTER - CH2MHILL (Lockwood Greene)WORLDWIDE ASSOCIATED OFFICE LOCATION
![Page 97: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/97.jpg)
INGENIERIA, ARQUITECTURA Y MANAGEMENT
REPRESENTATIVE CLIENTS, 1972-2008ABBOTT LABORATORIES � ABELLO LINDE, S.A.� AEROPUERTOS ESPAÑOLES Y NAVEGACION AEREA (AENA) � AFFINITY (GALLINA BLANCA PURINA) � AGENCIA ESPAÑOLA DE MEDICAMENTOS Y PRODUCTOS SANITARIOS � AGROLIMEN � AGUAS DE BARCELONA � AJUNTAMENT DE CORNELLÀ � AKZO COATINGS, S.A. � ALCALÁ FARMA � ALCAMPO, S.A. � ALMIRALL PRODESFARMA �ALTHAIA � ALUPERFIL, S.A. � ALZAMORA � AMENA � ANTIBIOTICOS � ARBORA & AUSONIA � AREA METROPOLITANA DE BARCELONA MANCOMUNITAT DE MUNICIPIS/ EIX PROMOCIO INDUSTRIAL � AREAS � ARMSTRONG WORLD INDUSTRIES, S.A. � ARTES GRAFICAS TOLEDO (MONDADORI) � ARTICULOS DEPORTIVOS DECATHLON, S.A. � AUTOSERVICIOS CAPRABO, S.A �AUNA � AVITUM CENTROS DE DIÁLISIS, S.A. � B01 ARQUITECTES � B.BRAUN MEDICAL S.A. � BANCO DE ESPAÑA, S.A. � BANCO VITALICIO DE ESPAÑA, S.A. � BASF ESPAÑOLA, S.A. �BEIERSDORF, S.A. (BDF) � BENETTON, S.A. � BENTELER � BLUESPACE � BOEHRINGER INGELHEIM ESPAÑA, S.A. � BORSA DE BARCELONA � BOUYGUES INMOBILIARIA, S.A. � BRITISH PETROLEUM ESPAÑA � CAIXA D’ESTALVIS DE GIRONA � CAIXA D'ESTALVIS DE LES BALEARS (SA NOSTRA) � CAIXA D'ESTALVIS DE MANRESA � CAIXA D'ESTALVIS DE TARRAGONA � CAIXA D'ESTALVIS DE TERRASA � CAIXA D'ESTALVIS DE SABADELL � CAIXA D'ESTALVIS I PENSIONS DE BARCELONA (LA CAIXA) � CAIXA DE CATALUNYA � CAIXA DEL PENEDES � CAMBRA DE COMERÇ DE BARCELONA �CATALANA DE POLIMEROS (LA SEDA DE BARCELONA) � CELLERIX � CENTRAL LECHERA ASTURIANA, S.A. � CENTRE DE MEDICINA REGENERATIVA � CENTRE INTEGRAL DE MERCADERIES I ACTIVITATS LOGISTIQUES, S.A. (CIMALSA) � CENTRO DE BIOLOGIA MOLECULAR SEVERO OCHOA � CENTRO LOGISTICO MARTORELL, S.A. � CENTRO NACIONAL DE INVESTIGACIONES ONCOLOGICAS �CENTRO NACIONAL DE MICROELECTRONICA � CENTROS LOGISTICOS AEROPORTUARIOS � CEPSA RED, S.A. � CHOCOVIC � CILAG AG � CINDASA � COBEGA � COLEGIO OFICIAL DE INGENIEROS INDUSTRIALES DE CATALUÑA � COMERCIAL DE LAMINADOS, S.A. � COMPAÑIA ESPAÑOLA DE PETROLEOS, S.A. - CEPSA - � COMPAÑIA LOGISTICA DE HIDROCARBUROS, S.A. - CLH -� CLUB EGARA � COMUNIDAD DE MADRID - CONSEJERIA DE ECONOMIA - � CONFEDERACION DE CAJAS DE AHORRO (CECA) � CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS �CONSORCIO PARA LA CONSTRUCCIÓN, EQUIPAMIENTO Y EXPLOTACIÓN DEL LABORATORIO DE LUZ SINCROTRÓN (CELLS) � COOB'92 (COMITE ORG. OLIMPICO BARNA 92, S.A.) � COPCA �CORBERO, S.A. � CORPORACIÓN INMOBILIARIA COMAREX � CRESCSPAN, S.A. � CHRISTIAN SALVESEN � CRUZ VERDE � DAMART, S.A. � DAMM, S.A. � DANONE, S.A. � D.B. INMUEBLES Y PATRIMONIO, S.A. (GRUPO DEUTSCHE BANK) � DEPARTAMENT DE JUSTÍCIA DE LA GENERALITAT DE CATALUNYA � DEPARTAMENT D‘ENSENYAMENT DE LA GENERALITAT DE CATALUNYA �DEPARTAMENT D'INDUSTRIA I ENERGIA DE LA GENERALITAT DE CATALUNYA � DERIVADOS ELECTROQUIMICOS DE LEVANTE, S.A. (DELSA) � DERIVADOS FORESTALES � DEUTSCHE BANK � DIA �DIGITAL EQUIPMENT CORPORATION ESPAÑA, S.A. � DIODE ESPAÑA, S.A. � DOPACO, S.A. � DOUWE EGBERTS ESPAÑA � DU PONT IBERICA, S.A. � EDUCA SALLENT, S.A. � EHLIS, S.A. � EL CONSORCI DE LA ZONA FRANCA � ELECTREN � EMBA � EMDUCSA � EMPRESA NACIONAL HIDROELECTRICA DE RIBAGORZANA, S.A. � ENASTAR, S.A. � EXPOAGUA ZARAGOZA 2008 � FERRER INTERNACIONAL � FIRA DE BARCELONA � FITNESSALUD � FORMOL Y DERIVADOS � FUERZAS ELECTRICAS DE CATALUÑA, S.A. � FUNDACIÓN CELLEX � FUNDACIÓN CENTRO NACIONAL DE INVESTIGACIONES CARDIOVASCULARES CARLOS III (CNIC) � GARCIA DE POU, S.A. � GAS NATURAL � GEC ALSTHOM � GENERAL DE CONFITERIA � GESTIÓ D’INFRAESTRUCTURES, S.A. (GISA) �GIST BROCADES �GOBIERNO DE CANTABRIA � GRAFOS, S.A. � GRIFERIA TRES � GRUPO LAR � GRUPO LECHE PASCUAL � GRUPO PIERRE PREMIER ESPAÑA, S.A. � GRUPO SANDO � GUASCOR FOTON � GUCCI � GUTERMANN, S.A. � HABITAT GRUPO INMOBILIARIO � HALESA M.B.T, S.A. � HEINEKEN � HENKEL IBERICA, S.A. � HENRY COLOMER � HEWLETT PACKARD ESPAÑOLA, S.A. �HILATURAS GOSYPIUM, S.A. � HOECHST IBERICA, S.A. � HOMAG ESPAÑA, S.A. � HOSPITAL DE BELLVITGE � HOSPITAL NUESTRA SEÑORA DE GRACIA � HOSPITAL DR. JOSEP TRUETA � HOSPITAL GENERAL DE BASURTO � HOSPITAL GERMANS TRIAS I PUJOL � HOSPITAL PRINCEPS D'ESPANYA � HOTEL PRINCESA SOFIA (INTERCONTINENTAL HOTELS) � HOTELERA PADRON, S.A. (GRUPO SAUER) � HOTELES CENTER � IBEROSTAR � I.B.M. � ICL ESPAÑA � I.C.N. HUBBER � IMA-TELSTAR � I.M.P.S.O.L. (INSTITUT MUNICIPAL PER LA PROMOCIO DE SOL) � INDUSTRIAL BOLSERA �INDUSTRIAS MARCA � INDUSTRIAS MURTRA, S.A. � INDUSTRIAS PALEX (GRUPO BRAUN) � INDUSTRIAS QUIMICAS ESTEVE, S.A. � INDUSTRIAS REUNIDAS DE AUTOMOCION, S.A. (IRAUSA) �INGABARSA � INMOBILIARIA COLONIAL, S.A. � INSTITUT CATALA DEL SOL � INSTITUT CATALA DE LA SALUT � INSTITUT DE RECERCA I TECNOLOGIA AGROALIMENTARIES (IRTA) � INSTITUT DE RECERCA ONCOLÒGICA (IRO) � INSTITUT GUTTMANN � INSTITUT UNIVERSITARI DEXEUS � INSTITUTO DE INVESTIGACIÓN APLICADA DEL AUTOMÓVIL (IDIADA) � INSTITUTO DE MEDICINA PREDICTIVA Y PERSONALIZADA DEL CÁNCER (IMPPC) � INSTITUTO DE SALUD CARLOS III � INTERNATIONAL COMPUTERS, S.A. � IPSEN � IRIZAR � ISABEL CABANILLAS, S.A. � JOHNSON & JOHNSON, S.A. � KABI / PFRIMMER � LA SEDA DE BARCELONA, S.A. � LABORATORIOS DEL DR. ESTEVE � LABORATORIOS LABAZ � LABORATORIOS LACER � LABORATORIOS BEECHAM, S.A. �LABORATORIOS FHER � LABORATORIOS VITA, S.A. � LAINCO � LAYETANA � LEAR CORPORATION � LIDL SUPERMERCADOS, S.A. � LOS PAMPANOS DE SANTA PONSA, S.A. (GRUPO SAUER) �LOTERÍAS Y APUESTAS DEL ESTADO � MAKRO � MANULI ESPAÑA, S.A. � MASA DECOR, S.A. � MEDITEL � MERITOR � MICROSPACE � MILUPA, S.A. � MINISTERIO DE EDUCACION Y CIENCIA (UNIVERSIDAD AUTONOMA DE MADRID) � MINISTERIO DE FOMENTO � MIQUEL, COSTAS & MIQUEL � MYRURGIA � MONTESA HONDA S.A. � NESTLE ESPAÑA, S.A. � NOKIA TELECOMMUNICATIONS SPAIN, S.A. � NOVARTIS (CIBA-GEIGY/SANDOZ) � NTE, S.A. � NUTREXPA, S.A. � ONEBA � ORANGE � ORGANON ESPAÑOLA, S.A. � PANRICO, S.A. � PANSFOOD, S.A. (AGROLIMEN) � PARC LOGÍSTIC DE LA ZONA FRANCA � PARC TECNOLÒGIC WORLD TRADE CENTER DE CORNELLÀ � PHILIPS LIGHTING IBERICA � PIMAD, S.A. (BIMBO) � PLASTICOS TA-TAY �POLIALCO � PORT AVENTURA � PROVASA � PPG IBERICA, S.A. � PRESTIGE GROUP � PROCTER & GAMBLE ESPAÑA, S.A. � PRODUCTOS CAPILARES, S.A. � PRODUCTOS ROCHE, S.A. � PULCRA, S.A. � QUILOSA � QUIMICA SINTETICA � QUINTELA � RAESA � RANK XEROX � RAYEN CURA � RCR ARQUITECTES � REAL AUTOMOVIL CLUB DE CATALUNYA (RACC) � RENAULT V.I. ESPAÑA, S.A. � RENFE � REPSOL PETROLEO, S.A. � RESISTENCIAS TOPE � RETEVISION AUNA � REVLON (HENRY COLOMER) � ROCKWELL ABS ESPAÑA, S.A. � SAARGUMMI � SACRESA � SANTA & COLE �SERVEI CATALÀ DE LA SALUT � SIMON HOLDING � SMITHKLINE BEECHAM � SOCIEDAD ESPAÑOLA DE AUTOMOVILES TURISMO, S.A. (SEAT) � SOCIEDAD GENERAL DE PUBLICACIONES �SYNTHON HISPANIA, S.L. � TALLERES CUENCA MALMIERCA � TECNOVA DE CATALUNYA, S.L. � TELEFONICA DE ESPAÑA, S.A. � THYSSEN HANIEL LOGISTIC, S.A. � TORRE DE COMUNICACIONES DE COLLCEROLA � TRANSFORMACIONES METALURGICAS, S.A. � TRANSPORTS METROPOLITANS DE BARCELONA � 3 M PORTUGAL � TR CORPORACIÓN INMOBILIARIA � TRIANGULO PLAZA DE CATALUÑA, S.L. (U.A.P.) � UNION QUIMICA FARMACEUTICA � UNIVERSIDAD AUTONOMA DE MADRID � UNIVERSITAT AUTÒNOMA DE BARCELONA � UNIVERSITAT POLITÈCNICA DE CATALUNYA� UTIEL, S.A. � VALEO TERMICO, S.A. � VIDRIERIAS DE MONTBLANC, S.A. � VOLPAK � WINTERTHUR � WURTH
![Page 98: A N N U A L R E P O R Tenginyeries.cat/dirdocs/file_Master_Annual Report... · it is worth mentioning the new School of Industrial Engineering on the Besós campus of the UPC, the](https://reader036.vdocuments.net/reader036/viewer/2022071211/6023752c17483040057e93e7/html5/thumbnails/98.jpg)
JOSEP PLA, 163, 3º 4ªT 933 086 016 • F 933 085 59508020 BARCELONA
CALERUEGA, 76, 1º 2ªT 917 542 535 • F 917 668 31528033 MADRID
7 R U E A S S A D I B N OU Z AR AR A E T A G E 5 • A P P T 1 0 R E S I D E N C E T A R I K • M A A R I F C A S A B L A N C A • M A R O C T 0674 22 00 00 • F 0522 98 59 54 [email protected] w w w . m a s t e r i n g e n i e r i a . c o m