A Roadwork Scheduling Systemfor Ontario Highways
ITS Canada 15
General Meeting 2012
A Roadwork Scheduling Systemfor Ontario Highways
ITS Canada 15th Annual Conference and
General Meeting 2012
Presentation Outline
MTO Roadwork Scheduling and Coordination Unit (RWSCU)
� Responsibilities
� Process
� Workload
� Past Systems
Roadwork Scheduling System (RSS)
� Objectives
� Challenges
� Expected Benefits
� Architecture
� Agile Delivery Process
� Walkthrough
� Deployment Plan
Questions
MTO Roadwork Scheduling and Coordination Unit (RWSCU)
Roadwork Scheduling System (RSS)
MTO RWSCU:Responsibilities
� Responsible for managing work on Ontario roadways
� Roadwork may be for construction, engineering
investigation, maintenance, moving maintenance, special
events
� Priorities:� Priorities:
� Maintain knowledge of current and planned roadwork
� Maintain separation by time and space
� Prioritize emergency work
� Verify contract provisions are being met
� Monitor execution
� Disseminate information to the public
3
Responsible for managing work on Ontario roadways
Roadwork may be for construction, engineering
investigation, maintenance, moving maintenance, special
Maintain knowledge of current and planned roadwork
Maintain separation by time and space
Verify contract provisions are being met
Disseminate information to the public
MTO RWSCU:Process
4
MTO RWSCU:Workload
� In 2011
� ~100 contractors
� ~700 active roadwork contracts
� ~13,500 roadwork notifications
� Peaks during construction � Peaks during construction
season
5
~700 active roadwork contracts
~13,500 roadwork notifications
MTO RWSCU:Past Systems
� 2003 - In-House Oracle Forms Application
� 2008 - Next-Generation Compass Software
� Primary function of past systems was to maintain a
database of approved notifications for web publication
and performance monitoringand performance monitoring
� Placed a heavy burden on RWSCU staff to:
� ensure the correctness of the submitted notifications
� check for conformance with contract provisions
� identify and resolve conflicts with nearby closures
� perform data entry
6
House Oracle Forms Application
Generation Compass Software
Primary function of past systems was to maintain a
database of approved notifications for web publication
and performance monitoringand performance monitoring
Placed a heavy burden on RWSCU staff to:
ensure the correctness of the submitted notifications
check for conformance with contract provisions
identify and resolve conflicts with nearby closures
RSS:Objectives
� In 2011, MTO tendered a consultant assignment to
implement RSS
� Latest information technologies
� Operated by consultant as a service
� Runs in a “cloud” computing environment
� Accessible on the Internet
� Address process inefficiencies
� User-driven with online tracking
� Assignment was awarded to
� Completed as a joint effort between
7
In 2011, MTO tendered a consultant assignment to
Latest information technologies
Operated by consultant as a service
Runs in a “cloud” computing environment
Address process inefficiencies
driven with online tracking
Assignment was awarded to Delcan
Completed as a joint effort between Delcan and MTO
RSS:Challenges
� Short development timeframe
� Complex workflow and requirements
� Multiple stakeholders (MTO RWSCU, MTO Systems
Group, Contractors)
� Multiple cloud computing options� Multiple cloud computing options
� Securing the application on the internet
� Integration with existing MTO systems
8
Short development timeframe
Complex workflow and requirements
Multiple stakeholders (MTO RWSCU, MTO Systems
Multiple cloud computing optionsMultiple cloud computing options
Securing the application on the internet
Integration with existing MTO systems
RSS:Expected Benefits
Feature
Online entry, validation, and conflict
checking
User-driven approach
9
Online status tracking and automated e-
mails
Online storage and access to related
communications and materials
Benefit
Reduces rejection and resubmission
Reduces RWSCU data entry and results
in faster approval and earlier publication
of planned roadworkof planned roadwork
Enables contractors to stay informed
Simplifies administration
RSS:Architecture
� Secure publicly accessible website
� Runs in a “cloud” computing environment
� Offsite facility
� Virtual Server technology
� Very high CPU and network availability� Very high CPU and network availability
� Extensive security measures
� Administered by Delcan as a service
� MTO has full operational control of the system without
having to dedicate IT resources or equipment
� Web services integration with the existing NGCS ATMS
and TRIP
10
Secure publicly accessible website
Runs in a “cloud” computing environment
Very high CPU and network availabilityVery high CPU and network availability
as a service
MTO has full operational control of the system without
having to dedicate IT resources or equipment
Web services integration with the existing NGCS ATMS
RSS:Architecture
11
RSSArchitecture
� MTO Traveller’s Road Information Portal (TRIP)
12
Road Information Portal (TRIP)
RSS:Agile Delivery Process
� Prototype developed in close consultation with
stakeholders
� Software broken down into functional packages
� Packages incrementally delivered, reviewed,
adapted to ensure good fit stakeholder needsadapted to ensure good fit stakeholder needs
13
Prototype developed in close consultation with
Software broken down into functional packages
Packages incrementally delivered, reviewed, and
ensure good fit stakeholder needsensure good fit stakeholder needs
RSS:Walkthrough
Contractor self-registers
14
Contractor enters contract
information
RSS:Walkthrough
Contractor enters notification by completing the sentences
1.
15
Contractor enters notification by completing the sentences
1. Basic Information
2. Primary Closure
3. Additional
ImpactsImpacts
RSS:Walkthrough
Occurrences and staging
16
RSS:Walkthrough
Contractor performs conflict check
17
Contractor performs conflict check
RSS:Walkthrough
Contractor reviews
18
RSS:Walkthrough
Contractor submits
19
RSS:Walkthrough
Notification approval process
20
RSS:Walkthrough
� Email log
Online record of communications and related materials
� Attachments
21
Online record of communications and related materials
RSS:Deployment Plan
� Side-by-side with existing process until end of 2012
� Contractor training
� Help Desk and Issue tracking
� Outreach to other MTO regions
22
side with existing process until end of 2012
Help Desk and Issue tracking
Outreach to other MTO regions
Other Delcan Roadwork Information Systems
� QMost
� Web-enabled requirements management
highway construction and rehabilitation projects
� Construction requirements management, requirement
verification, performance monitoring and final acceptance
� iMove
23
� iMove
� Traveller information portal for disseminating information to the
public
� Provides multi-modal, multi-jurisdiction, real
traveller information via the World Wide Web
Roadwork Information Systems
requirements management application for
highway construction and rehabilitation projects
Construction requirements management, requirement
verification, performance monitoring and final acceptance
information portal for disseminating information to the
jurisdiction, real-time and static
traveller information via the World Wide Web
Questions?
Mark Conrad, Senior Systems Engineer
Delcan Corporation
Tel: 905-943-0524
E-mail: [email protected]
Hoi Wong, Senior Systems Engineer
Ontario Ministry of Transportation
Tel: 416-235-5614
E-mail: [email protected]
Mark Conrad, Senior Systems Engineer
Hoi Wong, Senior Systems Engineer
Ontario Ministry of Transportation