a ssessment of current channel capacity and the benefits from deepening options
DESCRIPTION
Beneficial use of dredgings from a future Haven Navigation C hannel deepening project February 2014. Harwich Haven Authority and the Port of Felixstowe are working together on the early stages of a Haven Navigation Channel deepening project. During 2011 and 2012 we undertook;. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/1.jpg)
Harwich Haven Authority
Beneficial use of dredgings from a future Haven Navigation Channel deepening project
February 2014
![Page 2: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/2.jpg)
Harwich Haven Authority and the Port of Felixstowe are working together on the early stages of a Haven Navigation Channel deepening project. During 2011 and 2012 we undertook;
2
• Assessment of current channel capacity and the benefits from deepening options
• Early cost estimates
• Studies of the initial physical impacts• Studies of the initial environmental impacts
![Page 3: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/3.jpg)
During 2013, we undertook;
3
• An application to the TEN-T Agency for support for further studies, assisted by ECC, which was successful (50% funded)
• A site investigation, excavating trial pits throughout the channel and harbour
• Soils testing on the samples recovered
• Preparation of contracts for further studies
![Page 4: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/4.jpg)
The next stage will be to make a pre-application submission to the Marine Management Organisation (MMO) The pre-application phase includes;
4
• A Scoping report for Regulator and Stakeholder consultation and feedback
• Assessment of potential for beneficial use of dredgings
• Detailed environmental assessment• WFD, Waste Directive, Habitats Regulations,
noise, traffic assessments…
![Page 5: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/5.jpg)
5
Harbour and channel is currently dredged to -14.5m CD and covers about 17.7M m 3
![Page 6: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/6.jpg)
6
Location of trial pit sampling points
![Page 7: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/7.jpg)
7
Backhoe Dredger:
Mjølner R
![Page 8: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/8.jpg)
8
![Page 9: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/9.jpg)
9
![Page 10: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/10.jpg)
10
![Page 11: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/11.jpg)
11
![Page 12: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/12.jpg)
An initial (and approximate) assessment of the materials above the dredge level has been made, dividing the soils into ‘hard clays’, ‘soft clays’ and ‘sand / gravel’ mixtures…
12
Dredge depth Hard clays Soft
claysSand and
gravelTotal dredge
volume
15.5m
CD 11.7 M m3 0.8 M m3 2.9 M m3 15.4 M m3
16.0m
CD 17.7 M m3 1.7 M m3 4.8 M m3 24.2 M m3
![Page 13: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/13.jpg)
An initial (and approximate) assessment of the materials above the dredge level has been made, dividing the soils into ‘hard clays’, ‘soft clays’ and ‘sand / gravel’ mixtures…
13
Dredge depth Hard clays Soft
claysSand and
gravel‘Available’ sand and
gravelTotal dredge
volume
( 50%) 15.5m
CD 11.7 M m3 0.8 M m3 2.9 M m3 1.5 M m3 15.4 M m3
16.0m
CD 17.7 M m3 1.7 M m3 4.8 M m3 2.4 M m3 24.2 M m3
![Page 14: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/14.jpg)
As part of the MMO pre-application process, HHA is required to consider beneficial uses;
14
• Seek information from stakeholders regarding existing projects that could benefit from dredged material
• Consider if / how these projects could use the dredged material
• Provide further information as available regarding amounts and type of material
![Page 15: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/15.jpg)
The pre-application process is about to be launched and the Scoping Report submitted to the MMO
15
• The studies and the various environmental assessments are planned to be completed by March 2015
• Proposals and information regarding existing projects should be sent to HHA by the end of June 2014
• Beneficial disposal options are likely to be considered in the third quarter of 2014
![Page 16: A ssessment of current channel capacity and the benefits from deepening options](https://reader035.vdocuments.net/reader035/viewer/2022070422/568164d0550346895dd6fe29/html5/thumbnails/16.jpg)
16
John Brien (Harbour Engineer)Harwich Haven AuthorityHarbour HouseThe QuayHarwich EssexCO12 3HH
01255 [email protected]