Page 1: A Well Developed Roads Network - ChimpReports

years

A Well Developed Roads Network

UNRA at

Plot 5, Lourdel Road, Nakasero P.O. Box 28487 Kampala, Uganda

UGANDA NATIONAL ROADS AUTHORITY

Page 2: A Well Developed Roads Network - ChimpReports

Our roads are better today than six years ago when UNRA assumed the management and mainte-nance of the national road network and the Roads Authority is better placed to deliver on government manifestos promises.

The great strides UNRA has made over the last six years have realized commendable achievements in the roads sector; over 1500km of paved roads have been constructed, over 1500km are under construction or rehabilitation, bridges have been built and many others are under construction, whilst more than 21’000km of roads are being maintained and eight ferries professionally managed.

The Ugandan road-user public looks forward to a UNRA that will build upon these achievements and deliver on government’s plans, cognizant of the NRM manifesto’s fronting of roads infrastructure de-velopment as key to poverty eradication, hence keeping high the expectations of UNRA.

Because of the incessant state-of-roads-related challenges, the Roads Authority can only be ex-pected to be successful as it has some of the best individuals from the engineering fraternity and sup-port professions who are also conscious of the grav-

ity of the role of the road sector in national devel-opment.

It is gratifying that the challenges a nascent UNRA encountered five years ago with US$600m bud-get, but without designed roads and unprepared staffs are long past. Its absorption capacity is now well beyond what the funding can afford, not-withstanding a doubled roads network, much of it gravel that is susceptible to the vagaries of weath-er. UNRA’s institutional stature is remarkable given that it builds physical structures, the mementos of performance which for very long will remain.

The Ministry of Finance and Planning has allotted more money to UNRA because whatever money is voted to it is immediately absorbed. UNRA’s cur-rent requirements of more money for road main-tenance make urgent the need for the operation-alisation of the Uganda Road Fund Act to ensure adequate funding for roads maintenance, lest the achievements of the last five years are reversed; the Ministry has already taken the necessary steps towards the realization of this.

I commend UNRA’s outstanding output totality, and congratulate them on their sixth anniversary.

Hon Eng. Abraham ByandalaMINISTER OF WORKS AND TRANSPORT

Since its formation in July 2008, UNRA has taken a big step in the provision and main-tenance of National Roads in a more ef-ficient and effective manner.

As you travel upcountry, you can see ob-servable evidence that our roads are get-ting better and Uganda National Roads Authority is delivering on its mandate. UNRA is determined to contribute to na-tional development through better and safe roads.

Since UNRA started operations, over 1,500km of tarmac roads have been con-structed or reconstructed. There are over 1500km of major roads currently under construction. These include Kampala-Ma-saka (124km), Gulu-Atiak-Nimule (104km), Vurra-Oraba-Koboko-Oraba (92km), Mba-rara-Katuna (154km), Ishaka-Kagamba (35km), Hoima-Kaiso-Tonya (92km), Moro-to-Nakapiripirit (93km) and many others listed below.

A Well Developed Roads Network

H.E. the President commissioning Masaka-Mbarara road

Plot 5, Lourdel Road, Nakasero P.O. Box 28487 Kampala, Uganda

UGANDA NATIONAL ROADS AUTHORITY

Minister’s FOREWORD

Page 3: A Well Developed Roads Network - ChimpReports

Completed National Roads Since 2008Project Km Year completed

1 Jinja – Bugiri road 72 July 20092 Kampala Northern Bypass 21 Sept. 20093 Accident Black Spots on

Kampala – Jinja Road15 February 2009

4 Soroti – Dokolo – Lira 123 April 20105 Kawempe – Kafu road

(Phase 1)166 September 2009

6 Masaka – Kyotera/ Nyendo – Villa Maria

48 January 2010

7 Mbarara – Ishaka/ Ishanyu - Bwizibwera

83 Sept. 2010

8 Matugga – Semuto - Kap-eeka

41 February 2011

9 Nakasongola Loop 25 June 201110 Kampala - Mukono 23 June 201111 Lira – Kamdini - Karuma 88 August 201112 Kampala – Gayaza-Zirobwe 44 August 201113 Kampala – Masaka Phase 1 63 July 201214 Busega – Mityana 57 June 201215 Masaka – Mbarara 154 August 201216 Kabale – Kisoro – Buna-

gana/Kyanika101 Sept. 2013

17 Nyakahita-Kazo 68 February 201418 Kazo – Kamwenge 75 March 201419 Fort Portal – Bundibugyo-

Lamia 103 March 2014

20 Malaba/ Busia – Bugiri 82 April 201421 Mbarara – Kikagati –

Murongo Bridge75 May 2014

Total 1,527

Ongoing major projects

Hoima-Kaiso/Tonya road under construction. The road will be completed in September 2014

There are over 1,500km of major roads currently under construc-tion. These roads include;

Road Project KM Status 1 Kampala (Busega)-Masaka

(Phase ll) Funded by GOU51 90% of works completed. The

project will be completed by September 2014

2 Tororo- Mbale- Soroti (Funded by GOU)

152 80% of the works done. The section from Tororo-Mbale will be handed over by September 2014. Mbale-Soroti section will be handed over by December 2014.

3 Jinja-Kamuli (Funded by GOU):

60 80% of the works done and the project will be handed over in September 2014.

4 Kawempe-Luwero-Kafu (Over-lay) (Funded by GOU)

166 90% of the works done and the road will be completed by Sep-tember 2014.

5 Hoima-Kaiso-Tonya road 92 80% of the works done and the project will be completed by Dec 2014 (Funded by GOU)

6 Gulu-Atiak road (Funded by WB/GOU)

74 70% of the works done and the project will be completed in June 2015

7 Vurra – Arua – Koboko – Ora-ba (Funded by WB/GOU)

92 70% of the works done and the project will be completed by June. 2015

8 Mbarara (Buteraniro) -Ntunga-mo(Funded by EU/GOU):

59 75% of the works done and the project will be completed by Dec. 2014.

9 Ntungamo-Katuna Road (Funded by EU/GOU):

74 60% of the works done and the project will be completed by Dec. 2014.

10 Mukono – Jinja (Funded by GOU)

52 70% of the works done and the road will be completed in Dec. 2014.

11 Ishaka – Kagamba(Funded by GOU)

35 40% of the works done and the project will be completed by June 2015.

12 Nakapiriprit – Moroto road (Funded by GOU)

93 30% of the works done and the project will be completed by January 2016.

13 Kampala-Entebbe Express Highway with a spur to Mu-nyonyo (Funded by China EXIM bank/ GOU)

51 30% of the works done and the project will be completed by Dec. 2017.

14 Kamwenge-Fort Portal(Funded by WB/GOU)

65 20% of the works done. The proj-ect will be completed by Janu-ary 2016.

15 Kafu-Kiryandongo(Funded by GOU)

43 20% of the works done. The proj-ect will be completed by June 2015.

16 Luuku-Kalangala (Staged up-grading under PPP)(Funded by JICA/GOU)

66 30% of works completed

17 Atiak –-Nimule 37 15% of the works done. 18 Mbarara-Bypass

(Funded by EIB/GOU)40 5% of the works done

19 Mpigi-Kanoni (Funded by GOU)

64 The works on this road com-menced in February 2014

20 Mukono-Kyetume-Katosi/Kiso-ga-Nyenga (Funded by GOU)

74 Contractor mobilizing.

21 Kiryandongo-Kamdini-Gulu (Funded by GOU)

123 Contractor mobilizing.

Total 1,563

Plot 5, Lourdel Road, Nakasero P.O. Box 28487 Kampala, Uganda

UGANDA NATIONAL ROADS AUTHORITY

Page 4: A Well Developed Roads Network - ChimpReports

Upcoming works

Hon Abraham Byandala groundbreaking the works for Kiryandongo-Gulu roadA total of over 1,800km of roads are due to commence. The following roads will commence in 2014/15:

Road Name Km Status

1 Kanoni-Ssembabule-Villa Maria (Funded by GOU)

120 Contract Awarded. Works will commence in September 2014

2 Musiita-Lumino-Busia/Majanji (Funded by GOU)

104 Contract Awarded. Works will commence in September 2014

3 Pakwach-Nebbi(Funded by GOU)

30 Contract Awarded. Works will commence in September 2014

4 Acholi Bur – Musingo (Funded by GOU)

86 Contract awarded. Works will commence in September 2014

5 Olwiyo - Gulu (Funded by GOU)

70 Contract awarded. Works will commence in September 2014

6 Gulu – Acholi Bur (Funded by GOU)

86 Contract awarded. Works will commence in September 2014

7 Expansion of Kampala North-ern Bypass(Funded by EU/EIB/GOU)

17 Contract awarded. Works will commence in September 2014

8 Ntungamo-Kakitumba/Mirama Hills (Funded by DFID/TMEA/ GOU)

37 Contract awarded. Works will commence in September 2014

9 Kigumba-Masindi-Hoima-Bulima-Kabwoya (Funded by AfDB/GOU)

135 Bids evaluation completed. Report submitted to AfDB for “No Objection” to award con-tract.

10 Masaka-Bukakata (Funded by BADEA/OPEC)

41 Bid evaluation completed. Report submitted to BADEA for “No Objection” to award contract.

11 Design and Build of Mubende-Kakumiro-Kibaale-Kagadi (Funded by GOU)

107 Bid evaluation ongoing.

12 Kyenjojo-Kabwoya (Funded by WB/GOU)

105 Bid evaluation ongoing.

13 Mukono-Kayunga-Njeru (Funded by GOU)

94 Procurement ongoing

14 Rukungiri-Kihihi-Ishasha-Kam-buga/Kihihi-Kanungu-Kambu-ga (Funded by AfDB/GOU)

112 Procurement ongoing

15 Tirinyi-Pallisa-Kumi/Kamonkoli (Funded by BADEA/ OPEC/GOU)

111 Procurement ongoing

16 Kyenjojo-Fort Portal (Funded by GOU)

50 Bid evaluation ongoing

17 Ishaka-Rugazi-Katunguru (Funded by GOU)

55 Bid evaluation ongoing

18 Sironko-Namusi-Muyembe (Funded by GOU)

32 Bid evaluation ongoing.

19 Nansana-Busunju (Funded by GOU)

47 Bid evaluation ongoing.

20 Mbale-Nkokonjeru (Funded by GOU)

20 Bid evaluation ongoing.

21 Kapchorwa-Suam (Funded by AfDB/GOU)

73 At project preparation.

22 Hoima-Wanseko 111 At project preparation.

23 Kayunga - Galiraya 88 At project preparation

25 Zirobwe-Wobulenzi 25 At project preparation

26 Muyembe - Nakapiripirit Funded by Islamic Develop-ment Bank

94 At project preparation

27 Mbale-Bubulo-Lwakhakha (Funded by AfDB/GOU)

41 At project preparation

Total 1,872

Roads being designed for upgrade to tarmacDesigns for these roads are either ongoing or have been completed. Gov-ernment is seeking funds for construction of these roads.

Road Km1 Namagumba- Budadiri- Nalugugu 302 Kamuli- Bukungu 643 Luwero-Kiwoko-Butalangu; 324 Atiak-Kitgum 1085 Pajule-Pader 186 Kotido-Kaabong 647 Angatun-Lokapel 478 Kashozi-Buremba-Kariro; 539 Kashwa-Kashongi-Ruhumba; 3310 Kisubi-Nakawuka-Natete 2711 Nakawuka-Kasanje-Mpigi 2012 Nakawuka-Mawugulu-Nanziga-Maya 1513 Kasanje-Buwaya 914 Seeta-Namugongo-Kyaliwajala-Kira-Kasangati-Matu-

ga-Wakiso-Temangalo-Buloba-Nsangi84

15 Nambole(Jokas)-Namilyango-Mukono-and Najjana-kumbi-Busabala

39

16 Kabwohe-Bwizibwera/Nsika-Ibanda-Kabujogera-Masyoro-Rwenjaza/Kyambura

85

17 Atiak-Kitgum 1018 Pajule-Pader 1819 Kotido-Kaabong 6420 Angatun-Lokapel 4721 Jinja-Mbulamuti-Kamuli 8022 Kasohzi-Buremba-Kaliro 5323 Kashwa-kashongi-Ruhumba 3324 Kisubi-Nakawuka-Natete 2725 Nakawuka-Kasanje-Mpigi 20

26 Nakawuka-Mawugulu-Nanziga-Maya 15

Plot 5, Lourdel Road, Nakasero P.O. Box 28487 Kampala, Uganda

UGANDA NATIONAL ROADS AUTHORITY

Page 5: A Well Developed Roads Network - ChimpReports

Bridges

Awoja bridge on Mb ale-Soroti road was completed in December 2013

# Bridge name Status1 Awoja bridge (Mbale-Soroti

road)Works Completed

2 Mubuku bridge on Kasese-Rwe-mi road

Works Completed

3 Kilembe bridge on Kasese-Kilem-be road

Works completed

4 Nalubale Bridge at Jinja Reha-bilitation

Works Completed

5 Daca,Ure,Eventre and Uzurugo on Wandi

Works completed

6 2nd Nile Bridge at Jinja The Contractor is mobilizing. Com-mencement order was issued on 14th April 2014.

7 Ayugi and Ire Bridges on Atiak-Moyo-Afoji road

75% Completed

8 Apak Bridge 15% completed9 Birara Bridge Detailed design completed and civil

works commenced. Works imple-mented under Design and build contract.

10 Mitaano and Ntungwe bridges in Kanunugu

Contract signed on 31st March 2013. Civil works commenced May 2014. Delays caused by court injunctions and administrative reviews.

11 Pakwala,Nyacyara, Goli and Nyagak-3 bridges in Nebbi

30% works completed.

12 Kabaale(linking Kyankwanzi to Ngoma in Nakaseke)

Contract awarded

13 Kasozi(Lugogo) bridge (linking Ngoma-Buruli)

Contract awarded

14 Nalakasi-Ariamoi-Kotido-Kaa-bong-Kapedo road

Under Bid evaluation.

15 Nyamugasani(Kasese)-kinyama-seke-kisinga-kibirizi road

Under Bid evaluation.

16 Kyanzuki-Kasese-Kilembe road Contract signed. Works commenced in June 2014.

17 Kaabong(Kaabong)-Ariamoi-Kotido-Kabong-Kapedo road

Under Bid evaluation.

18 Lopei bridge on Ariamoi-Kotido-Kaabong-kadepo road

Under Bid evaluation.

Plot 5, Lourdel Road, Nakasero P.O. Box 28487 Kampala, Uganda

UGANDA NATIONAL ROADS AUTHORITY

27 Kasanje-Buwaya 928 Bududa circular road 2829 Muhanga-Kisiizi-Rwashamarie.

19 Maliba bridge on Nkenda-Bugoye-Nyakalingijo road, Kasese

Under Procurement

20 Ruboni bridge on access to MT.Mageritta tourist site, Kasese

Under Procurement.

21 Cido bridge on Nebbi-Goli, Nebbi district

Contract awarded.

22 Leresi (Butaleja) bridge on Butaleja Leresi-Budaka road

Contract awarded.

23 Nyalita-Kapchorwa-Suam road Contract awarded

FERRIES

UNRA is operating and Maintaining 10 ferries/ crossings as summarized below: • Laropi Ferry: across the Albert Nile between Laropi (Moyo District)

and Umi (Adjumani District). • Masindi Port Ferry: across the Victoria Nile between Masindi Port

(Masindi District) and Kungu (Apac District). • Wanseko Ferry: across the Lake Albert between Wanseko (Buliisa

District) and Panyimur (Nebbi District). • Nakiwogo Ferry: across the Lake Victoria between Nakiwogo (En-

tebbe Municipality) and Kyanvubu (Wakiso District). • Kiyindi Ferry: across the Lake Victoria between Kiyindi (Mukono Dis-

trict) and Buvuma (Mukono District);

New Ferries acquired since 2008a) A ferry across the Nile River from Mbulamuti in Kamuli District to

Nabuganyi in Kanyunga District. Started operations in May 2013.b) A ferry across the Albert Nile between Obongi (Moyo district) and

Majii (Adjumani District). Started Operations in 2012c) A new ferry across Lake Kyoga at Nakasongola (Zengebe) to Na-

masale started operations in 2012. d) MV Kalangala ferry across Lake Victoria from Bukakata to Kalanga-

la. This ferry is operated in partnership with Kalangala Infrastructure Services (KIS) Project under a Public Private Partnership.

e) New Laropi Ferry. This is new ferry that started operations in 2013

New Ferries under Procurement1. Second ferry for Namasale2. Sigulu Islands ferry3. Ferry replacing the old Panyemuru ferry4. Lake Basina Ferry 5. Bunkungu – Kagwara ferry – The design for this ferry was handed-

over to UNRA

Page 6: A Well Developed Roads Network - ChimpReports

The Express Highways below are planned for capacity improvement

Progress on Capacity improvement projectsRoad Project Progress

1 Kampala-Entebbe Express Highway with a spur to Munyonyo(Funded by China EXIM bank/ GOU)

30% of the works done and the project will be completed by Dec. 2017.

2 Expansion of Kampala Northern Bypass(Funded by EU/EIB/GOU)

Contract awarded. Works will commence in September 2014

3 Kampala Flyover Project Detailed Engineering design is ongoing. The project is supported by the Japa-nese Government through JICA

4 Kibuye - Busega - Mpigi Expressway (30km) Detailed Engineering design is ongoing. The first phase will be constructed under the Kampala-Entebbe Express Highway project

5 Kampala – Jinja Expressway (80 km) Detailed Engineering design is ongoing. Construction will be financed under PPP.6 Kampala Southern Bypass (18 km) Detailed design ongoing7 Kampala – Bombo Expressway (35km) Procuring design services

Artistic impression of Kampala-Entebbe Expressway Works on Kampala-Entebbe Expressway are ongoing and the project will be completed by Dec 2017

Kampala Flyover Project. Detailed engineering design is on-going. The project is supported by the Japanese Government through JICA.

Expansion of Kampala-North-ern Bypass. Contract awarded. Works will commence in Sep-tember 2014

Kampala-Jinja Expressway: De-tailed engineering design is ongo-ing. The process for land acquisi-tion has started. Construction will be financed by PPP

Detailed Engineering design is ongoing. The first phase will be constructed under the Kampala Entebbe express Highway Proj-ect

UNRA CUSTOMER CARE CENTREIn our effort to help serve our customers better and obtain feedback from all our stakeholders, we have installed a

Customer care hotline and email to be able to listen to you better.Talk to us!

031-2233111 or 041-4318111 Email [email protected] http://www.unra.go.ug

Actual works

Plot 5, Lourdel Road, Nakasero P.O. Box 28487 Kampala, Uganda

UGANDA NATIONAL ROADS AUTHORITY

CLOCK TOWER KAMPALA-MPIGI