कामाचे नाव :- o&m for 5 years at moshi for p.c.m.c. bidder’s … · 2017....

12
Pimpri Chinchwad Municipal Corporation Pimpri-411018 Environment Engineering Department Common Set of Deviation Tender no.Env/10/2015-16 कामाचे नाव:- Designing, Providing, Erecting, commissioning, & Running the Leachate Treatment Plant with O&M for 5 years at Moshi for P.C.M.C. Sr. No. Volume/Section Clause No. Bidder’s Query Clarification M/s. Rochem Separation Systems 1 - The Proposed scheme can’t achieve 99.5% BOD reduction, i.e. From Inlet 35,000 mg/L to Outlet < 30 mg/L, Similarly 99.6% COD reduction i.e. From Inlet 70,000 mg/L to Outlet < 250 mg/L. Hence we proposed to add Reverse Osmosis System after Treated Water Tank to get the required outlet water quality. Please collect samples physically & analyze at your own cost. Also available lab results with PCMC is attached herewith. 2 - Tender also speaks about removal of Heavy metals too. The outlet parameters shows limits for various heavy metals, phenolic compounds, nitrogen fractions etc, however, inlet values of these parameters have not been specified. We request you to please specify the inlet paramenters. NIT Prevails 3 - Page No.4 species Contractor shall install online SCADA monitoring systems for parameters BOD, COD, SS, PH etc. Kindly elaborate us the SCADA system as per your requirement. PLC operated system to be provided. Which can be joined to existing SCADA system of PCMC 4 - In Anaerobic Treatment there will be Biogas generation, but disposal of the same your have not shown in proposed treatment scheme, kindly confirm whether you want flare it or utilize as a fuel If it is financial feasible it can be used for power generation without any extra cost to PCMC. 5 - Chemical treatment has been proposed before anaerobic reactor, we feel, this will affect the performance of anaerobic bacteria. As per the NIT designed flow diagram of the contractor should be get weighted by NEERI before execution. 6 - Makes of bought out items not mentioned in document. Can we use our preferred make? Standard Items approved and mentioned in MJP DSR and approved by ISI, should be used. 7 - Request for extension of due date, for 10 days, after Diwali. NIT Prevails Ms HNB Engineers Pvt.Ltd.Pune 1 A Please Provide RAW Influent/Leachate parameter for following to confirm outlet parameter for treated effluent. Arsenic, Mercury, Lead, Cadium, Total Chromium, Copper, Zinc, Nickel, Cynide, Chloride, Floride, Phenolic compounds, Ammonical nitrogen, Total Kjeldahl nitrogen. As per above point no.1 2 General We request electricity for O&M and trial run period for said plant will be provided at free of cost, Please Confirm. Electricity bill of O&M of the plant after trial run will be born by PCMC. 3 General We understand that 415V supply will be made available at our main panel, Please confirm. NIT Prevails

Upload: others

Post on 30-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

Pimpri Chinchwad Municipal Corporation Pimpri-411018

Environment Engineering Department Common Set of Deviation

Tender no.Env/10/2015-16 कामाचे नाव:- Designing, Providing, Erecting, commissioning, & Running the Leachate Treatment Plant with

O&M for 5 years at Moshi for P.C.M.C. Sr. No.

Volume/Section Clause No.

Bidder’s Query Clarification

M/s. Rochem Separation Systems 1 - The Proposed scheme can’t achieve 99.5% BOD

reduction, i.e. From Inlet 35,000 mg/L to Outlet < 30 mg/L, Similarly 99.6% COD reduction i.e. From Inlet 70,000 mg/L to Outlet < 250 mg/L. Hence we proposed to add Reverse Osmosis System after Treated Water Tank to get the required outlet water quality.

Please collect samples physically & analyze at your own cost. Also available lab results with PCMC is attached herewith.

2 - Tender also speaks about removal of Heavy metals too. The outlet parameters shows limits for various heavy metals, phenolic compounds, nitrogen fractions etc, however, inlet values of these parameters have not been specified. We request you to please specify the inlet paramenters.

NIT Prevails

3 - Page No.4 species Contractor shall install online SCADA monitoring systems for parameters BOD, COD, SS, PH etc. Kindly elaborate us the SCADA system as per your requirement.

PLC operated system to be provided. Which can be joined to existing SCADA system of PCMC

4 - In Anaerobic Treatment there will be Biogas generation, but disposal of the same your have not shown in proposed treatment scheme, kindly confirm whether you want flare it or utilize as a fuel

If it is financial feasible it can be used for power generation without any extra cost to PCMC.

5 - Chemical treatment has been proposed before anaerobic reactor, we feel, this will affect the performance of anaerobic bacteria.

As per the NIT designed flow diagram of the contractor should be get weighted by NEERI before execution.

6 - Makes of bought out items not mentioned in document. Can we use our preferred make?

Standard Items approved and mentioned in MJP DSR and approved by ISI, should be used.

7 - Request for extension of due date, for 10 days, after Diwali.

NIT Prevails

Ms HNB Engineers Pvt.Ltd.Pune 1 A Please Provide RAW Influent/Leachate parameter

for following to confirm outlet parameter for treated effluent. Arsenic, Mercury, Lead, Cadium, Total Chromium, Copper, Zinc, Nickel, Cynide, Chloride, Floride, Phenolic compounds, Ammonical nitrogen, Total Kjeldahl nitrogen.

As per above point no.1

2 General We request electricity for O&M and trial run period for said plant will be provided at free of cost, Please Confirm.

Electricity bill of O&M of the plant after trial run will be born by PCMC.

3 General We understand that 415V supply will be made available at our main panel, Please confirm.

NIT Prevails

Page 2: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

4 General We understand that provision of DG is not under the scope of contract, Please confirm.

Confirm

5 General We understand that provision of Compound wall, Internal Road & Internal Lighting is not under the scope of contract, Please Confirm.

Confirm

6 28 As the location of proposed plant in premises of Kachara depo. The smell & flies created from garbage much more and not related with proposed plant, so delete the clause, Please confirm.

NIT Prevails

7 General Please provide area of plot available. Please visit the site physically with PCMC officials and confirm the site.

8 General Please provide the Topography survey plan and soil investigation report available with department.

9 General We request you to provide grade of concrete to be used for PCC & RCC work also provide grade of steel for reinforcement.

As per IS standard and PWD manual.

10 General We request to extend the date of submission at least by 2-3 weeks after receipt of reply to pre-bid queries.

NIT Prevails

Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small capacity plant, you

can use PLC Confirmed, Plant should be PLC operated.

2 RCC Tanks Can we use equivalent material of construction for all tanks.

As per IS standard RCC tanks is preferred.

3 Electricity Scope O&M and water fresh

Who will bear this? How we can consider? As per Per point 2 of HNB Engineers Pvt. Ltd

4 O&M cost should be per month basis instead of Per Year basis.

Per Month Basis confirmed.

Ms Kalyani Engineers 1 Please give the documents of consent in details

(consent scope of work) sample required for designing. Due to diwali Please extend date of tender.

NIT Prevails

Sd/- Additional Commissioner

Pimpri Chinchwad Municipal Corporation Pimpri-411018

Page 3: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

1

PIMPRI CHINCHWAD MUNICIPAL CORPORATION Pimpri-411018

ENVIRONMENT ENGINEERING DEPARTMENT Tender No.Env/10/2014-15

E-Tender Notice

In view of various scientific theories of waste water treatment we are here by inviting e-Tenders on Turnkey (Lump sum) basis for work of contract for Designing, Providing, Erecting, Commissioning & Running the Leachate Treatment Plant with O & M for 5 years from various agencies who has state of art, technology & substantial experience in this field.

Sr No

Name of Work Tender Form fee

Tender Cost EMD Security Deposit

Time Limit

1 Designing, Providing, Erecting, Commissioning & Running the Leachate Treatment Plant with O & M for 5 years at Moshi for PCMC

Rs. 10,000/-

B-2 Type Tender (Seperat rate for capital cost and O&M cost)

Rs. 1,00,000/-

4% on accepted rate

As per time schedule

1. The Bid documents are available on website “www.pcmcindia.gov.in” to the bidders with registered key. To obtain the registration key the bidders are advised to contact Additional Commissioner (Environment) office & Executive Engineer (Environment) office, PCMC or his duly authorized representative. This official will guide interested bidders to document the authorization process to obtain the registration key. The bidders are instructed to obtain the Registration Key uptoDt. 02/10/2015.

2. The bid document will be uploaded on the website on 21/10/2015, and will be taken off on 10/11/2015. The other details will be available on website during the period of Bid submission process.

3. Pre-bid meeting will be held on 30/10/2015. of 3:00 PM in the office of the Additional Commissioner, 4thfloor, Main Building, PCMC, Pimpri 18

4. Right to reject any or all the Bids is reserved by the Commissioner, PCMC. 5. Last date of submission of Bids is 10/11/2015 up to 15.00 Hrs. 6. Opening of Technical Bid on 10/11/2015 @ 16.00Hrs.(If Possible)

Sd/-

COMMISSIONER PimpriChinchwad Municipal Corporation

Pimpri-411018

Advertise No. 413 No.: Env/1/WS /396/2015 Date 15/10/2015

Page 4: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

2

QUALIFICATION CRITERIA /ELIGIBILITY CRITERIA

GENERAL QUALIFICATION / ELIGIBILITY CRITERIA

The bidder must have e registration with Environment department of PCMC The average annual financial turnover of the bidder during the last three financial years should not be

less than Rs. 100 lacs. The bidder should have their own manufacturing unit along with own designing, erection,

commissioning O and M team. The bidder shall submit the valid PAN No/IT Returns for last 3 financial years The Bidder shall submit the Sales Tax/VAT Registration The bid should be unconditional. The Bidder shall submit a Letter of Acceptance for all the Terms and

conditions of the Tender. Power of Attorney is necessary in relevant case/ situation/document

TECHNICAL QUALIFICATION

The bidder should have 5 years experience of Designing, Providing, Erecting, Commissioning & Running / Performing Waste water treatment package plant of capacity minimum 100 cum / day (0.10 MLD) with outlet parameters should be within permissible limits of MPCB / CPCB

The bidder should have installed the package plant for waste water (effulent) / lechate treatment with recycling system of similar capacity with any Government / Semi Government / Municipal Corporation / Private Organisation

Consortium OR Joint venture will not be allowed. The bidder should submit their client list.

PCMC will provide

A) Land as per requirement will be provided for proposed plant at Moshi kachara depo.

B) For Electricity & water supply connection, assistance will be provided by PCMC but all the expenses

for the connection charges & tariff for used quantity shall be borne by bidder.

Time Schedule –

1. For Construction &Machinary Installation – 9 Months

2. Plant Commissioning & Trial run period – 3 Month

3. Total completion period – 12 month

4. Operation & Maintenance period – 5 yearfrom the date of completion of trial run period

The soft copy of following document shall be uploaded through e-tendering system and hard copy of the

same shall be submitted to the office of Executive Engineer, Environment Engineering Department

before final submission date of the tender.

Technical Bid

1. Company Registration Document

2. Company Profile

3. IT Return for last 3 Years 2013,2014,2015

4. Experience in similar work as per following details (Project on waste water treatment package plant)

5. Experience certificate signed by concern authority / client shall be attached

Name of agency

No. of working plants with capacity &

locations

Type of technology Completion period of

completed plant.

Period of Operation

&Maintainance of plant

For Whom Owner/ Local

Body

Page 5: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

3

DESIGN BASIS A ] RAW Effulent/Leachate PARAMETER Design Flow 100 cum / day pH 6.5-8.0 BOD (3 days @ 27o C) ≤ 25000-35000 mg/lit COD ≤ 50000-70000 mg/lit Suspended Solids ≤ 1000-2000 mg/lit Oil & Grease ≤ 30-80 mg/lit B ] TREATED WATER PARAMETER (As per MPCB / CPCB Norms) pH 5.5- 9.0 COD ≤ 250 mg/lit BOD(3 days @ 27 0C) ≤ 30 mg/lit DO ≤ 2 mg/lit Suspended Solids ≤ 100 mg/lit Dissolved solids ≤ 2100 mg/lit Oil & Grease ≤ 10 mg/lit Arsenic ≤ 0.2 mg/lit Mercury ≤ 0.01 mg/lit Lead ≤ 0.1 mg/lit Cadium ≤ 2 mg/lit Total Chromium ≤ 2 mg/lit Copper ≤ 3 mg/lit Zinc ≤ 5 mg/lit Nickel ≤ 3 mg/lit Cynide ≤ 0.2 mg/lit Chloride ≤ 1000 mg/lit Floride ≤ 2 mg/lit Phenolic Compounds (as C6H50H) ≤ 1 mg/lit Ammonical nitrogen ≤ 50 mg/lit Total Kjeldahl nitrogen ≤ 100 mg/lit

FOLLOWING ARE THE MINIMUM REQUIREMENT OF ELECTROMECHANICAL & CIVIL WORK 1. Collection of waste water from various locations with 2 Nos (1W+1SB) of lifiting pumps at each

location 2. Flow meter 3. Bar Screen (Manually operated) 4. O & M Grease Trap 5. Primary setteling tank 6. Lifting Pumps – 2 Nos (1 W+1SB) 7. Physiochemical treatment process to remove heavy metals 8. Anaerobic treatment for degradation of higher concentration of COD 9. Aerobic treatment 10. Air Blower with Electric motor & its accessories – 2 Nos (1W+1SB) 11. Settling tank media – 1 lot 12. Sludge pumps - 2 Nos (1W+1SB) 13. Sludge drying bed / Centrifuge 14. Filter Feed Pumps – 2 Nos (1W+1SB) 15. Pressure Sand Filter – 2 no 16. Activated Carbon Filter - 2 No 17. Disinfection System – 1 No 18. Interconnecting piping & valves – 1 lot 19. Instrumentation – 1 lot 20. Treated Water Transfer Pump – 2 Nos (1W+1SB) 21. All electrical work i.e. cabling, cable treys, MCC – 1 set 22. Suitable Construction of Bar Screen Chamber 23. Suitable Construction of Oil & Grease Trap Chamber 24. Suitable Construction of Sludge Holding Tank 25. Suitable Construction for Physiochemical treatment.

Page 6: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

4

26. Suitable construction for Anaerobic treatment 27. Suitable construction of aerobic tank 28. Suitable construction of settling tank 29. Suitable construction of intermediate storage tank 30. Chlorine contact tank chlorinator chlorine room 31. Suitable construction of treated water tank 32. Suitable construction of room for equipments 33. All foundation & RCC plinth for equipments 34. Anything required other than above for the completion of project will be in supplier’s scoper to

achieve the desired quality & quantity 35. Testing 36. Adequate Power Backup

NOTE: 1. The bidder has to provide the detail technical offer along with all technical specification like MOC,

Make etc. in their own data sheet format. 2. Only technically qualified bidders will be applicable for the commercial bid. 3. In case of successful bidder, EMD will be converted in to security deposit. 4. The performance guarantee shall be 5% of the quoted amount. Same will be refunded at the end of

one year of defect liability period. 5. In O & M period, the 4 % amt of the bill will be deducted as a security deposit from the RA bill. &

after 5year’s of completion it will be due for refund. 6. No escalation clause is applicable for this work. 7. Consortium OR Joint venture will not be allowed. 8. Bidder shall visit the site and collect the require information like topography, quantity of MSW &

generation of leachate per day, quality of leachate etc. at his own cost before bidding. 9. All necessary care & precaution has been taken for preaparing the scope of work. Further if any

additional requirement regarding the work shall be bidders responsibility.

Financial Bid The Financial bid should be in following formatand should be submitted online through e –tender system. No of Sites to be Quoted

Location of Site Capital Cost of the Project as per Schedule B inclusive of all Taxes & Duties

Operation &Maintainance Cost for Five Year inclusive of all Taxes & Duties

1 Moshi Kachara depot

Rs. ----------/- Rs. ----------/- Per Year

Note : 1. Rights to reject any or all application without assigning any reason are reserved with the

Commissioner, PCMC.

2. Approximate proportion for capital cost of civil and electro mechanical shall be 25% & 75%

Respectively.

After completion of project the operations & maintenance will be the responsibility of agency. The agencies are requested to furnish the detail rates (cost) in bifurcation for installation cost, including all civil, electrical and mechanical work and O & M. cost sepretely.The O & M period will be of 5 yrs from the date of completion of trial run period. Contractor shall install online SCADA monitoring systems for parameters BOD, COD, SS, PH, etc contractor shall ensure regular maintenance and operation of online systems with tamperproof mechanism having facility for online calibration. Contractor shall have the provision for connect and upload the online monitoring data at PCMC server.

Sr.No Particulars % Payment

A Civil Works 1. Approval of process Design 5 2. Approval of RCC Design and Drawing 2 3. Excavation 15 4. PCC 10 5. Concreting of Raft 25

Page 7: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

5

6. Concreting of Walls 34 7. Balance Civil Works / Finishing Work 4 8. Hydraulic Testing 5

Total 100 B Electrical and Mechanical Works (After Completion of related Civil Work)

1. Approval of process Design 5 2. Approval of Design & Drawing 2 3. On receipt of equipment / material on site 55 4. On erection / installation 25 5. Power connection with Required Power Back up system 4 6. Testing & successful commissioning 4 7. After completion of trial run period 5

SubTotal 100 C Operation & Maintenance Per Month

Payment Terms and condition –

I. Payment shall be release as per the progress of the work certified by Engineer Incharge.

II. There shall be a penalty of 01% per week for delay in complying the delivery schedule or

Erection schedule, causes not attributed due to PCMC and shall be limited to 10% Maximum.

III. Bidder should also follow all statutory Payments , Norms etc implemented by PCMC at site.

General Conditions:

1. All Specifications, Conditions & Special Conditions are part & parcel of this tender document and are binding on contractor& will remain unchanged until the completion of projects.

2. The agencies are supposed to submit their proposals through e tendering systems as mention in this advertisement.

3. The bidder should have to visit the sites before submission of the commercial bid. 4. Labour Colony is not permitted at the Site. 5. Leachate Inlet & Outlet parameters shall be tested at MoEF certified lab / MPCB lab as per

PCMC rerquierment & the same shall be at bidders cost. 6. Child labour is strictly prohibited. 7. Bidder shall provide all safety gears to their personnel during Erection and Commissioning of

the Plant .Vendor should also follow all Safety norms implemented by PCMC at site. 8. Inspection&Testing:

All equipment’s and their accessories shall be subjected to Inspection and inspection shall be carried out as per approved QAP. The vendor shall bear all expenses related to the tests to be carried out during fabrication of the equipment. This will necessarily include but shall not be restricted to all material tests, welding tests (radiography, DP etc.) electrical test, etc. Authorized representative of Client / Consultant shall at all times have an access to vendor’s / vendor’s sub-contractors workshop to witness fabrication / manufacturing stages of the equipment. All inspection facilities shall be made available to the inspection engineer by vendor or sub vendor. No equipment or its accessories / part shall be shipped without testing at shop up to full satisfaction of inspection authority. Vendor should maintain internal inspection records at all times, if any stages are found lacking by way of proper records, inspection authority reserves the right to ask vendor to modify / amend the fabrication stage. Any such inspection at vendor’s work or inspection waiver however shall not relieve vendor from his responsibility for supply of equipment / its accessories as per specifications and other obligations stipulated in contract.

Performance test of equipment shall be carried out at site as per relevant acceptance standard. 9. Care of Works/ Plants/ Equipment:

From the commencement to the completion of the Works / Plant / Equipment, the Contractor shall take full responsibility for the care thereof and of Temporary Works and Constructional Plant and in case any

Page 8: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

6

damage, loss or injury shall occur to the Works / Plant / Equipment or to any part thereof or to any Temporary Work or Constructional Plant from any cause whatsoever, shall at his own cost, repair and make good the same so that at completion the Work/ Plant/Equipment shall be in good order and condition and in conformity in every respect with the requirement of the Contract and the Engineer's instructions.

10. Insurance against accident etc. to workmen: The Contractor shall insure against such liability with an insurer approved by the Employer (which approval shall not be unreasonably withheld) with his own cost and shall continue such insurance during the whole of the time that any persons are employed by him on the Works and shall when required produce to the Engineer or the Engineer's representative such policy of insurance and the receipt for payment of the current premium. Provided always that in respects of any persons employed by any sub-contractor the Contractor's obligation to insure as aforesaid under this sub-clause shall be satisfied if the sub-contractors shall have insured against the liability in respect of such persons in such manner that the Employer is indemnified under the policy but the Contractor shall require such sub-contractor to produce to the Engineer or the Employer's Representative when required such policy of Insurance and the receipt for payment of the current premium.

11. Compliance with Statutory Regulations : The Contractor shall conform in all respects with the provisions of any such Statute Ordinance or Law as aforesaid and the Regulations or Bye-laws of any local or other duly constituted authority which may be applicable to the Works or to any Temporary Works and with such rules and regulations of public bodies and companies as aforesaid and shall keep the Employer indemnified against all penalties and liability of every kind for breach of any such Statute Ordinance or Law Regulation or Bye-Law. Provided always that the Employer will repay or allow to the Contractor all such sums as the Engineer shall certify to have been properly payable and paid by the Contractor in respect of such fees.

12. Testing by Contractor: The contractor shall at his own cost test all materials and components sufficient to demonstrate their compliance with the specifications. The Contractor shall provide copies of all test results to the Engineer for his approval.

Sd/-

ADDITIONAL COMMISSIONER PCMC, PIMPRI, PUNE– 18

Page 9: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

7

क पाबाबत या िवशेष िनिवदा अटी व शत .

१. कामाचे व प पहाता मनपाचे पयावरण िवभाग या िवभागात न दणी असणारे ठेकेदार िनिवदा भ शकतात.

२. कोणतीही िनिवदा अंशत: अथवा पुणत: ि वकारणे अथवा नाकारणे अथवा र करणे याचा पूण अिधकार महानगरपािलकेने राखुन ठेवला आह,े यासाठी कोणतेही कारण दले जाणार नाही.

३. काम अ याव यक सेवेम ये मोडत अस यामुळे लॅ ट चालन, देखभाल व दु तीचे काम िनिवदाधारकाला कोण याही प रि थतीत मनपास कमान ३० दवस आगोदर पूवसूचना द यािशवाय बंद करता येणार नाही अथवा एकतफ कं ाट सोडून देता येणार नाही. तसे

के यास िनिवदाधारकाची अनामत र म व देय असलेली िबले ज क न याचे नाव का या यादीत समािव कर यात येईल. तसेच आव यकतेनुसार चालन, देखभाल व दु तीचे कामाचा कालावधी वाढवून द यास िनिवदाकारांनी मंजूर िनिवदा दराने वाढीव कालावधीसाठी काम चालू ठेवणे बंधनकारक राहील.

४. िनवड केले या सं थेस महानगरपािलकेबरोबर ठरवून दले या कामाचा करारनामा वखचाने वरीत क न ावा लागेल व यानंतरच कायादेश दे यात येईल.

५. िनवड केले या सं थेस क पाचे काम MPCB मधील तरतुदीनुसार चालिवणेबंधनकारक आह.े ६. िनिवदाकार काम करीत असताना मनु य अथवा कोणतीही शारीरीक, मानिसक अथवा िजिवत

हानी झा यास याची सव वी जबाबदारी िनिवदाकारावर राहील. महापािलका यास जबाबदार राहणार नाही. अथवा कोण याही कारचा मोबदला या संदभात महापािलकेकडून दला जाणार नाही. कालांतराने महानगरपािलके या सेवेत घेणेबाबत िनणयदेखील घेतला

जाणार नाही. ७. िनिवदाकाराने कामावर नेमले या कामगारांचा िवमा शासक य िनयमानुसार उतरिवणे तसेच

कामगार काय ामधील सव तरतुद ची अंमलबजावणी करणे बंधनकारक राहील. ८. काम अ याव यक सेवेम ये अस याने वषातील ३६५ दवस सदर काम चालू राहील यामुळे

लॅ टसाठी रोज लागणारे कामगार िनिवदाकाराने वत: पुरवावे लागतील व कामगारांना सा ािहक सु ी दे याची संपूण जबाबदारी िनिवदाकाराची राहील. आय या वेळेस गैरहजर रािहले या कमचा याऐवजी पयायी व था क न दैनं दन कामात अडथळा िनमाण होणार नाही याची द ता िनिवदाकाराने यावयाची आह.े

९. िनिवदाकाराने नेमले या कामगारांचा पगार, रजा, व इतर सवलती बाबतची सव जबाबदारी िनिवदाकाराची राहील याबाबत महापािलकेची कोणतीही जबाबदारी राहणार नाही. तसेच या संबंधी िनिवदाकार सं थेबरोबर कामगारांम ये काही वाद / तंटा िनमाण झा यास महापािलका कोणताही ह त ेप करणार नाही. मानवािधकार आयोगाशी संबंधीत सव मािहती पुरिवणे व चौकशीस सामोरे जाणे हे िनिवदाकारास बंधनकारक राहील.

१०. मंजुर झाले या िनिवदाकाराने याने नेमले या कामगारांना गणवेष, बुट, हॅ ड लोज, मा क व ओळखप देणे आव यक आह.े तसेच कामगारांचे रिज टर अ यावत क न याम ये कामगाराचे नांव, ज मतारीख, व पूण प ा असणे आव यक आह.े

११. कॉ ॅ ट लेबर अ ट १९७० व कॉ ॅ टर लेबर िनयम १९७१ अ वये मंजूर िनिवदाकारास कामगार आयु कायालयाचे आव यक ते परवाने वखचाने घे याची जबाबदारी मंजूर िनिवदाकारावर राहील.

Page 10: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

8

१२. कामगार काय ानुसार व महारा शासनाची शासक य िनयमांची पूतता कर याची सव वी जबाबदारी िनिवदाकारावर राहील.

१३. कमान वेतन कायदा १९४८ या िनयमानुसार िनिवदाकाराला यांनी नेमले या कामगारांना / कमचा यांना वेतन दे याची सव जबाबदारी िनिवदाकारावर राहील.

१४. कामगार काय ानुसार व महारा शासना या िनयमानुसार िनिवदाकारास कोण याही प रि थतीत बाल कामगार कामावर ठेवता येणार नाही.

१५. िनिवदाकाराला चिलत शासक य िनयमानुसार वेळोवेळी यावे लागणारे न दणी माणप / परवाने या या संबंधीत कायालयाकडून वखचाने व वत:चे जबाबदारीने यावे लागतील.

१६. िनिवदाकाराने क प चालन, देखभाल व दु तीसाठी आव यक असणा-या पेअर पाटस व सािह य पुरवठादारांची प यांसह यादी देणे बंधनकारक आह.े

१७. िनिवदाकाराने क प चालन, देखभाल व दु तीबाबतची मागदशक पुि तका (Manual) देणे बंधनकारक आह.े

१८. िनिवदेमधील अटी व शत बाबत काही वाद िनमाण झा यास याबाबत िनणय मा.महापािलका आयु , पपरी चचवड महानगरपािलका यांचेवर तो सोपिव यात येईल व मा.महापािलका आयु , पपरी चचवड महानगरपािलका हे दो ही प ाक रता लवाद असतील व यांनी दलेले िनणय अंतीम व दो ही प ांवर बंधनकारक राहील.

१९. िनिवदाकाराने करावया या कामा या वेळा व पा या कामा या सोईनुसार ठरावया या असून याचा तपशील महानगरपािलकेकडे लेखी व पात सादर करावयाचा आहे.

२०. िनिवदाकाराने ित दन केले या कामाचा अहवाल दरमहा ५ तारखे पूव कायकारी अिभयंता, पयावरण यांचेकडे कायालयात सादर करणे बंधनकारक राहील.

२१. मा य िनिवदाकाराकडून संपूण कालावधीसाठी मनपा काम क न घेऊ शकेल तसेच पुढे मुदत वाढवून देणे अगर क हाही िवनापरवाना काम बंद करणे याबाबतचे सव अिधकार मा.महापािलका आयु , पपरी चचवड महानगरपािलका यांनी राखीव ठेवले आहेत.

२२. िनिवदाकाराने वरील अट चा व िवशेष अट चा भंग के यास यास माद हणून त ार चे िनरसन होईपयत ित दन . १०००/- माणे दंड आकार यात येईल तसेच सदर दंडाची र म ा परी थीतीनूसार वाढिवणेचे अिधकार कायकारी अिभयंता (पयावरण) यांना राहतील व यानुसार होणारी दंडाची र म देय असले या िबलामधून वसुल कर याचे अिधकार मनपास राहतील.

२३. िनिवदाकाराने सव यं णा स मपणे व प रणामकारक र या चालिवणेसाठी लट चालिवणे, देखभाल व दु ती इ यादी कचराहताळणी, वग करण इ यादी बाबतचे सव तरांवरील

िश ण य क पाचे काम सु हो यापूव च देणे आव यक राहील. िश णासाठीचा खच िनिवदाकाराने वत: करावयाचा आह.े

२४. िनिवदाधारकाने शासक य / िनमशासक य सं थेम ये का या यादीम ये [Black List] न टाकले बाबतचे माणप र. . १००/- चे टॅ प पेपरवर सादर करावे.

२५. सदरचे क पास MPCB कडील Consent तसेच इतर आव यक परवान या घे याची जबाबदारी ठेकेदाराची राहील.

२६. क प मते या मते या ८०% (कमीत कमी) कवा १२०% (जा तीत जा त) ऐवढा मतेने चालिवणेची जबाबदारी सव वी ठेकेदाराची राहील.

२७. क प थािपत मतेने चालिवणेची जबाबदारी सव वी ठेकेदाराची राहील.

Page 11: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

9

२८. क पावर वास व मा या होणार नाही याची द ता ठेकेदाराने यावयाची आह.े याक रता आव यक असणारी दुग धीनाशक औषध फवारणी ठेकेदाराने वखचाने करावयाची आहे.

२९. जनरेटर चालिव यासाठी रा पाळीत कुशल कमचारी नेमणे व जनरेटरसाठी लागणारे इंधन पुरिवणे, तसेच जनरेट या आवाजामुळे वनी दुषण होणार नाही याबाबत यो य ती काळजी घेणे ठेकेदारावर बंधनकारक आहे.

३०. लॅ ट व आजुबाजू या प रसराची व छता राखणे ठेकेदारावर बंधनकारक आह.े ३१. देखभाल दु तीचे कालावधीम ये आव यक असणा या व खा याने सुचिवले या लॅबटे ट

ठेकेदाराने वखचाने करावया या असून याचा मािसक अहवाल खा यास सादर करणे ठेकेदारावर बंधनकारक राहील.

३२. सुर ा अनामत कवा सुर ा अनामत हणून ि वकारले या बँक गॅरंटीचा कालावधी हा िनिवदा वैधता कालावधी अिधक कामाची मुदत अिधक हमी काळ या माणे राहील.

३३. क पाचे देखभाल दु तीसाठी आव यक असणा या पेअसपाट व इतर आव यक मिशनरी तसेच इतर सािह य याची आगाऊ तजवीज ठेकेदाराने करणे आव यक आह.े

३४. क पाचे देखभाल दु तीचा कालावधी पूण झा यानंतर क प सव मिशनरी सहीत सुि थतीम ये(Working condition)ह तांतरण करणे िनिवदाधारकास बंधनकारक राहील.

सही/-

अित र आयु पपरी चचवड महानगरपािलका

पपरी ४११ ०१८

Page 12: कामाचे नाव :- O&M for 5 years at Moshi for P.C.M.C. Bidder’s … · 2017. 8. 14. · Ms Water Treatment Equipments 1 Scada Monitoring Not required for such a small

F:\data0\LTP\Tender_document_for_LTP (1).docx

10