ab c d e f g h i

194
Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings A B C D E F G H I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Page 1 of 194 Page 1 of 194 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 5 LNE Drawing No. Previo us No. Shelf No. Description Type o Print f Draw Date ing Box No. Notes 5645 6 12-0261 Proposed branch from Stoke Park, Pa. to Freemansburg, Pa. Tracing 12/30/1916 1 5647 4 12-0261 Proposed branch — mainline to Acme Slate Cos. Quarry Blueprint 5/15/1915 1 5670 28 12-0261 Proposed highway bridge between Martins Creek and Bangor Blueprint 4/21/1914 1 5691 19 12-0261 Untitled profile map Tracing no date 1 5797 5 12-0261 Proposed combination station at Fullerton, Pa. Blueprint 1/14/2011 1 6082 1 12-0261 Signal aspects and Book of Rules colors Blueprint 4/10/1918 1 MG311 6082 2 12-0261 Signal aspects and Book of Rules colors Blueprint 4/10/1918 1 ? 3 12-0261 Bridge No. 9323 — girders and bolts Blueprint 8/20/1915 1 13 sht 1A 7 12-0261 Masonry plan — bridge over highway — Tamaqua extension Blueprint 8/30/1911 1 13 sht 1A 8 12-0261 Masonry plan — bridge over highway at Sta 1726-14 Blueprint 8/30/1911 1 13 sht 3 9 12-0261 Erection diagram — bridge over highway at Sta 1726-14 Blueprint 10/17/1911 1 13 sht 4 10 12-0261 Floor plan — bridge over highway at Sta 1726-14 Blueprint 10/17/1911 1 13 sht 4 11 12-0261 Floor plan — bridge over highway at Sta 1726-14 Blueprint 10/17/1911 1 13 sht 5 12 12-0261 Girders — bridge over highway at Sta 1726 14 Blueprint 10/17/1911 1 13 sht 6 13 12-0261 Girders — bridge over highway at Sta 1726 14 Blueprint 10/31/1911 1 13 sht 7 14 12-0261 Laterals — bridge over highway at 1726 14 Blueprint 10/17/1911 1 13 sht 8 15 12-0261 Floor beams - bridge over highway at 1726 14 Blueprint 10/17/1911 1 14 sht 9 16 12-0261 Stringers and end struts — bridge over highway at Sta 1726-14 Blueprint 10/20/1911 1 15 sht 1 27 12-0261 Span No. 2 for Flat girder bridge over Lehigh River Blueprint 11/29/1911 1 15 sht 2 20 12-0261 Bridge over Lehigh River near Lehigh Gap Blueprint 11/29/1911 1 15 sht 3 21 12-0261 Untitled bridge plan Blueprint 12/8/1911 1 15 sht 4 22 12-0261 Girder — bridge crossing over Lehigh River near Lehigh Gap Blueprint 11/29/1911 1 15 sht 5 24 12-0261 Untitled bridge plan Blueprint 12/8/1911 1 15 sht 6 25 12-0261 Bridge over Lehigh River at Lehigh Gap Blueprint 11/29/1911 1 15 sht 7 26 12-0261 Bridge girders over Lehigh River Blueprint 12/8/1911 1 shts 8,10,12, 23 12-0261 Bridge girder — Tamaqua extension Blueprint (4) 12/8/1911 1 58 shts 1-3 17 12-0261 Girders and bracing — Jacoby Creek Bridge Blueprint (2) 06/17/1884 1 58 shts 1-3 18 12-0261 Proposed branch — State Park to Freemansburg Tracing (2) 1924 1 5458 64 12-0261 Penna Poughkeepsie & Boston — purchase of land at Deckertown, NJ 10/?/1890 2 5472 50 12-0261 Extension of L&NE from Pen Argyl to Benders Blueprint no date 2 5659 43 12-0261 Profile of proposed yard at Horn Spring — Tadmore? Tracing 3/28/1909 2 5690 29 12-0261 Unknown proposed plan for M&E equipment-map of Slatington Pencil Drw no date 2 5698 70 12-0261 Map of Benningers Crossing no date 2 5701 40 12-0261 Proposed extension of the Bangor branch to Jackson Blueprint 1/4/1912 2 5701 41 12-0261 Proposed extension of the Bangor branch to Jackson Blueprint 1/4/1912 2 5703 30 12-0261 Profile of Right of Way from Bangor Jct to Bangor Blueprint 9/29/1911 2 5741 49 12-0261 Map showing Catasauqua and vicinity Blueprint 1902 2 5744 62 12-0261 Profile of L&NE in the Bangor area Graph paper no date 2

Upload: others

Post on 11-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

123456789

1011121314151617181920

Page 1 of 194Page 1 of 194

212223242526272829

30313233343536373839

p

5

LNE Drawing No.

Previous No. Shelf No. Description

Type oPrint

f DrawDate

ing Box No. Notes

5645 6 12-0261 Proposed branch from Stoke Park, Pa. to Freemansburg, Pa. Tracing 12/30/1916 15647 4 12-0261 Proposed branch — mainline to Acme Slate Cos. Quarry Blueprint 5/15/1915 15670 28 12-0261 Proposed highway bridge between Martins Creek and Bangor Blueprint 4/21/1914 15691 19 12-0261 Untitled profile map Tracing no date 15797 5 12-0261 Proposed combination station at Fullerton, Pa. Blueprint 1/14/2011 16082 1 12-0261 Signal aspects and Book of Rules colors Blueprint 4/10/1918 1 MG3116082 2 12-0261 Signal aspects and Book of Rules colors Blueprint 4/10/1918 1

? 3 12-0261 Bridge No. 9323 — girders and bolts Blueprint 8/20/1915 113 sht 1A 7 12-0261 Masonry plan — bridge over highway — Tamaqua extension Blueprint 8/30/1911 113 sht 1A 8 12-0261 Masonry plan — bridge over highway at Sta 1726-14 Blueprint 8/30/1911 113 sht 3 9 12-0261 Erection diagram — bridge over highway at Sta 1726-14 Blueprint 10/17/1911 113 sht 4 10 12-0261 Floor plan — bridge over highway at Sta 1726-14 Blueprint 10/17/1911 113 sht 4 11 12-0261 Floor plan — bridge over highway at Sta 1726-14 Blueprint 10/17/1911 113 sht 5 12 12-0261 Girders — bridge over highway at Sta 1726 14 Blueprint 10/17/1911 113 sht 6 13 12-0261 Girders — bridge over highway at Sta 1726 14 Blueprint 10/31/1911 113 sht 7 14 12-0261 Laterals — bridge over highway at 1726 14 Blueprint 10/17/1911 113 sht 8 15 12-0261 Floor beams - bridge over highway at 1726 14 Blueprint 10/17/1911 114 sht 9 16 12-0261 Stringers and end struts — bridge over highway at Sta 1726-14 Blueprint 10/20/1911 115 sht 1 27 12-0261 Span No. 2 for Flat girder bridge over Lehigh River Blueprint 11/29/1911 115 sht 2 20 12-0261 Bridge over Lehigh River near Lehigh Gap Blueprint 11/29/1911 115 sht 3 21 12-0261 Untitled bridge plan Blueprint 12/8/1911 115 sht 4 22 12-0261 Girder — bridge crossing over Lehigh River near Lehigh Gap Blueprint 11/29/1911 115 sht 5 24 12-0261 Untitled bridge plan Blueprint 12/8/1911 115 sht 6 25 12-0261 Bridge over Lehigh River at Lehigh Gap Blueprint 11/29/1911 115 sht 7 26 12-0261 Bridge girders over Lehigh River Blueprint 12/8/1911 1

shts 8,10,12, 23 12-0261 Bridge girder — Tamaqua extension Blueprint (4) 12/8/1911 158 shts 1-3 17 12-0261 Girders and bracing — Jacoby Creek Bridge Blueprint (2) 06/17/1884 158 shts 1-3 18 12-0261 Proposed branch — State Park to Freemansburg Tracing (2) 1924 1

5458 64 12-0261Penna Poughkeepsie & Boston — purchase of land at Deckertown, NJ 10/?/1890 2

5472 50 12-0261 Extension of L&NE from Pen Argyl to Benders Blueprint no date 25659 43 12-0261 Profile of proposed yard at Horn Spring — Tadmore? Tracing 3/28/1909 25690 29 12-0261 Unknown proposed plan for M&E equipment-map of Slatington Pencil Drw no date 25698 70 12-0261 Map of Benningers Crossing no date 25701 40 12-0261 Proposed extension of the Bangor branch to Jackson Blueprint 1/4/1912 25701 41 12-0261 Proposed extension of the Bangor branch to Jackson Blueprint 1/4/1912 25703 30 12-0261 Profile of Right of Way from Bangor Jct to Bangor Blueprint 9/29/1911 25741 49 12-0261 Map showing Catasauqua and vicinity Blueprint 1902 25744 62 12-0261 Profile of L&NE in the Bangor area Graph paperno date 2

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I40414243444546474849505152535455565758596061

Page 2 of 194Page 2 of 194

61626364656667686970717273747576

777879

53 7 58 12 0261 Ne locomoti erecting and repair shop at Pen Arg l Bluepr 2/8/1916 2

5774 31 12-0261 Front Street near Stock House at Catasauqua Blueprint 1/28/1911 26060 61 12-0261 United States topographic map of L&NE — Bangor to Swatswood no date 26478 60 12-0261 L&E profile South Odgensburg to Hawley Blueprint 5/25/1917 2

1 sht 11 69 12-0261 Crossing over LV on Pencoyd bridge — standard guardrail bolts Blueprint 10/14/1911 21 sht 12 68 12-0261 Crossing over LV on Pencoyd bridge — floor bolts Blueprint 9/14/1911 21 sht 13 67 12-0261 Crossing over LV on Pencoyd bridge Blueprint 9/14/1911 21 sht 3 65 12-0261 Bridge Floor plan — Tamaqua extension — LV crossing Blueprint 7/14/1911 21 sht 3 66 12-0261 Bridge Floor plan — Tamaqua extension — LV crossing Blueprint 7/14/1911 2

13 sht 10 37 12-0261 Bridge over highway — Tamaqua extension Blueprint 10/30/1911 213 sht 11 39 12-0261 Bridge over highway — Tamaqua extension Blueprint 10/30/1911 213 sht 12 38 12-0261 Bridge over highway — Tamaqua extension Blueprint 10/20/1911 213 sht 13 36 12-0261 Bridge over highway — Tamaqua extension Blueprint 10/28/1911 213 sht 14 35 12-0261 Bridge over highway — Tamaqua extension Blueprint 10/28/1911 213 sht 15 34 12-0261 Bridge over highway — Tamaqua extension Blueprint 6/9/1911 23 sht 1 45 12-0261 Bridge crossing over highway — Tamaqua extension� Blueprint 9/27/1911 2

53 sht 1 55 12-0261 New locomotive and repair shop at Pen Argyl Blueprint 12/11/1914 253 sht 2 54 12-0261 New locomotive and erecting shop at Pen Argyl Blueprint 2/16/1916 253 sht 3 53 12-0261 New locomotive and erecting shop at Pen Argyl Blueprint 2/16/1916 253 sht 4 56 12-0261 New locomotive and repair shop at Pen Argyl Blueprint 2/3/1916 253 sht 5 57 12-0261 Pen Argyl Locomotive and repair shop — location of lights Blueprint 5/25/1915 253 sht 6 59 12-0261 New locomotive erecting and repair shop at Pen Argyl — Boiler Blueprint 2/14/1916 253 sht 7 sht 58 12 0261- New locomotive erecting and repair shop at Pen Argylw ve y Blueprint 2/8/1916int 25629A 63 12-0261 Extension from Tamaqua to Chestnut Ridge Blueprint 10/8/1913 25643A 52 12-0261 Map of property at Tamaqua of East Lehigh Colliery 3/1/1915 25649A 44 12-0261 Profile of unknown area — Tidewater Petroleum Co.? Graph paperno date 28012B 33 12-0261 Bridge over Tamaqua extension on highway Blueprint 6/8/1911 2no date 51 12-0261 Extension of L&NE from Pen Argyl to Benders Blueprint no date 2

no number 42 12-0261 Profile of proposed track — area unknown Tissue no date 2none 32 12-0261 Plan of Martins Gravel Bank (poor condition) Pen Draw 01/26/1889 2V3S7 46 12-0261 Station and track map of mainline — Wind Gap area Blueprint 6/30/1919 2

V3S8A 48 12-0261 Station and track map of mainline Blueprint 6/30/1919 2V3S8B 47 12-0261 Station and track map of mainline — Pen Argyl Blueprint 6/30/1919 21567 97 12-0262 Erie Railroad track scale with dead rail Blueprint 2/1/1906 35439 96 12-0262 Erie Railroad track scale with dead rail Blueprint 2/1/1906 35446 97 12-0262 Erie Railroad track scale with dead rail Blueprint 2/1/1906 35446 98 12-0262 Property to be acquired from Eric Tolland and Floyd Hallstead Paper 6/12/1911 35600 81 12-0262 Proposed Albion branch to the Acme Slate Company Tracing 6/6/1913 3

5614 84 12-0262Tamaqua extension — plan of masonry abutment for highwaybridge

Paper 6/21/1911 3

5616 77 12-0262 Plan for Lizard Creek Station bridge Tracing 7/23/1911 35619 73 12-0262 Plan of 16 X 24 water tank seat — 50,000 gallon capacity paper 4/8/1912 3

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I8081828384858687888990919293949596979899100101

Page 3 of 194Page 3 of 194

101102103104105106107108109110111112113114115116117118119120

86 12 0262 Cit map of Catasaq a sho ing s railroads 7/29/1914 3

5621 79 12-0262 Map of drainage basins at Snyders, Pa. Tracing 2/9/1911 35649 95 12-0262 Untitled profile map no date 35668 75 12-0262 Setting of 2 Babcock and Wilcox boilers in Batter Clas #3 Blueprint 06/10/1893 35742 88 12-0262 Untitled profile map showing Lobb Avenue—Pen Argyl underpass Paper no date 35743 87 12-0262 Untitled profile map poor conditiono date 35753 76 12-0262 DL&W Scranton locomotive flue rattler Blueprint 5/19/1913 35759 78 12-0262 Untitled profiles no date 35773 85 12-0262 Map of Crane Railroad showing connections at Catasauqua Paper 1907 35781 71 12-0262 Highway and railroad map of Pennsylvania paper 5/31/1911 3

127 shts 1-7 74 12-0262 Bridge over Lehigh River at Catasauqua Blueprint 2/2/1933 35628A 89 12-0262 Proposed inbound yard at Pen Argyl Blueprint 8/8/1913 35769A 78 12-0262 Untitled profiles no date 3

C3223/13 83 12-0262 Top chord 151 ft. span bridge between Portland and Columbia Blueprint 7/14/1908 3C3223/14 90 12-0262 Bridge spans over DL&W between Portland & Columbia Blueprint 7/22/1908 3C3223/16 82 12-0262 Bridge over Del River between Portland and Columbia Blueprint 7/14/1908 3C3223/17 91 12-0262 End stringers and top bracing — Bridge Portland & Columbia Blueprint 7/27/1908 3C3223/17 92 12-0262 Bottom laterals for bridge between Portland & Columbia Blueprint 7/22/1908 3C3223/18 99 12-0262 Diagonals for bridge between Portland & Columbia Blueprint 7/16/1908 3C3223/18 100 12-0262 Diagonals for bridge between Portland & Columbia Blueprint 7/16/1908 3

E401 72 12-0262 Tamaqua extension crossing Lehigh River Blueprint 7/31/1911 3none 80 12-0262 Untitled profil— Catasauqua Paper no date 3

86 12 0262- City map of Catasaqua showing various railroadsy u w variou 7/29/1914 393 12-0262 Post and hangers for bridge between Portland & Columbia Blueprint 7/14/1908 394 12-0262 Post and hangers for bridge between Portland & Columbia Blueprint 7/14/1908 3

3221/1 126 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 43221/1 128 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 43221/2 122 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 43221/6 131 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 43222/1 125 12-0262 Rivet and bolt detail from DL&W and NYS&W bridge Blueprint 7/14/1908 43222/1 130 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 43222/3 132 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 43222/4 133 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 43222/5 134 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 43222/6 129 12-0262 Bill of bolts and field rivets — bridge over DL&W and NYS&W Blueprint 7/14/1908 4

3223-F1 127 12-0262 Bill of pins for bridge over DL&W and NYS&W Blueprint 8/15/1908 43224/1 121 12-0262 Bridge over DL&W and NYS&W, rivet detail Blueprint 7/14/1908 43224/1 124 12-0262 West end girder bridge rivets and bolts — DL&W and NYS&W Blueprint 7/14/1908 43224/2 123 12-0262 Rivet and bolt detail from DL&W and NYS&W bridge Blueprint 7/14/1908 4

C3221/10 115 12-0262 Wooden floor plan bridge between Portland & Columbia Blueprint 7/16/1908 4C3221/10 119 12-0262 Wooden floor plan bridge between Portland & Columbia Blueprint 6/15/2009 4C3221/3 111 12-0262 Plate girder spans bridge between Portland & Columbia Blueprint 6/10/1908 4

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I121122123124125126127128129130131132133134135136137138139140141142

Page 4 of 194Page 4 of 194

142143144145146147148149150151152153154155156157158159160161

E4904/2 110 12 0262 Bridge er DL&W bet een Portland & Col mbia erall Bluepr 3/30/1908 4

C3221/4 112 12-0262 Plate girder spans bridge between Portland & Columbia Blueprint 6/24/1908 4C3221/5 113 12-0262 Plate girder spans bridge between Portland & Columbia Blueprint 6/3/1908 4C3221/6 114 12-0262 Plate girder spans bridge between Portland & Columbia Blueprint 6/22/1908 4C3221/7 118 12-0262 Plate girder spans bridge between Portland & Columbia Blueprint 6/25/1908 4C3221/8 117 12-0262 Plate girder spans bridge between Portland & Columbia Blueprint 7/3/1908 4C3221/9 116 12-0262 Plate girder spans bridge between Portland & Columbia Blueprint 7/1/1908 4

C3221-3221/2 138 12-0262 Erection diagram — bridge DL&W and NYS&W Blueprint 6/22/1908 4C3222/1 135 12-0262 Foundation plan and anchor bolts — bridge DL&W and NYS&W Blueprint 5/20/1908 4

C3222/1A 136 12-0262 Foundation plan and anchor bolts — bridge DL&W and NYS&W Blueprint 5/20/1908 4C3222/1A 137 12-0262 Foundation plan and anchor bolts — bridge DL&W and NYS&W Blueprint 5/20/1908 4C3222/3 139 12-0262 Columns — bridge DL&W and NYS&W Blueprint 6/16/1908 4C3222/A 120 12-0262 Detail of viadict over DL&W between Portland & Columbia Blueprint 5/29/1908 4C3223/19 102 12-0262 Stringers for 151 ft. spans bridge over DL&W and NYS&W Blueprint 7/29/1908 4C3223/20 101 12-0262 Stringer and top bracing bridge over DL&W and NYS&W Blueprint 7/30/1908 4C3223/22 103 12-0262 Wooden floor plan for bridge between Portland & Columbia Blueprint 8/31/1908 4C3224/3 105 12-0262 West enf pl girder span bridge between Portland & Columbia Blueprint 5/25/1908 4C3224/4 106 12-0262 Frames, shoes at west end bridge between Portland & Columbia Blueprint 5/27/1908 4C3224/5 104 12-0262 Wooden floor plan for bridge between Portland & Columbia Blueprint 7/18/1908 4E4904 107 12-0262 Bridge over DL&W between Portland & Columbia Blueprint 3/25/1908 4

E4904/2 108 12-0262 Bridge over DL&W between Portland & Columbia-overall view Blueprint 3/30/1908 4E4904/2 109 12-0262 Bridge over DL&W between Portland & Columbia-overall view Blueprint 3/30/1908 4E4904/2 110 12 0262- Bridge over DL&W between Portland & Columbia overall view ov w u -ov view Blueprint 3/30/1908int 42 sht 1 163 12-0275 Girders and bracing — bridge DL&W and NYS&W Blueprint 1/22/1912 52 sht 2 164 12-0275 Bridge for Tamaqua extension Blueprint 1/26/1912 52 sht 3 165 12-0275 Bridge for Tamaqua extension over highway Blueprint 1/26/1912 52 sht 4 166 12-0275 Bridge over highway at Tamaqua Blueprint 3/9/1912 52 sht 4 167 12-0275 Bridge over highway at Tamaqua Blueprint 3/9/1912 52 sht 5 168 12-0275 Bridge over highway at Tamaqua Blueprint 3/9/1912 52 sht 6 169 12-0275 Bridge over highway at Tamaqua Blueprint 3/9/1912 5

C3222/10 146 12-0275 NYS&W Blueprint 6/12/1908 5C3222/4 140 12-0275 Columns — bridge DL&W and NYS&W Blueprint 6/11/1908 5C3222/5 141 12-0275 Columns — bridge DL&W and NYS&W Blueprint 6/23/1908 5C3222/6 142 12-0275 Columns — bridge DL&W and NYS&W Blueprint 7/1/1908 5C3222/8 143 12-0275 Column bent at west end — bridge DL&W and NYS&W Blueprint 6/3/1908 5C3222/9 145 12-0275 NYS&W Blueprint 6/17/1908 5C3223/10 162 12-0275 Bottom chords — bridge DL&W and NYS&W Blueprint 7/14/1908 5C3223/11 160 12-0275 Top chords — bridge DL&W and NYS&W Blueprint 7/14/1908 5C3223/2 148 12-0275 Erection plan — bridge DL&W and NYS&W Blueprint 8/3/1908 5

C3223/2A 149 12-0275 Erection plan — bridge DL&W and NYS&W Blueprint 8/3/1908 5C3223/2B 150 12-0275 Erection plan — bridge DL&W and NYS&W Blueprint 8/3/1908 5C3223/3 151 12-0275 Shoes - 120 ft. spans — bridge DL&W and NYS&W Blueprint 6/26/1908 5

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I162163164165166167168169170171172173174175176177178179180181182183

Page 5 of 194Page 5 of 194

183184185186187188189190191192193194195196197198199200201202

5628 173 12 0275 Proposed eastbo at Pen Arg l Linen 8/8/1913 6

C3223/4 152 12-0275 Trusses for 120 ft. spans — bridge DL&W and NYS&W Blueprint 6/26/1908 5C3223/5 154 12-0275 Trusses for 120 ft. spans — bridge DL&W and NYS&W Blueprint 6/30/1908 5C3223/5 155 12-0275 NYS&W Blueprint 6/23/1908 5C3223/6 153 12-0275 Trusses for 120 ft. spans — bridge DL&W and NYS&W Blueprint 6/30/1908 5C3223/7 144 12-0275 Transverse bracing — bridge DL&W and NYS&W Blueprint 6/2/1908 5C3223/7 156 12-0275 NYS&W Blueprint 6/30/1908 5C3223/7 157 12-0275 NYS&W Blueprint 6/30/1908 5C3223/8 158 12-0275 Floor beams and sway bracing — bridge DL&W and NYS&W Blueprint 7/15/1908 5C3223/8 159 12-0275 Floor beams and sway bracing — bridge DL&W and NYS&W Blueprint 7/15/1908 5C3223/9 161 12-0275 End Posts — bridge DL&W and NYS&W Blueprint 7/14/1908 5C3223/A 147 12-0275 Plan showing masonry pilings — bridge DL&W and NYS&W Blueprint 7/25/1908 5

2290 212 12-0275 Wooden Doors for Locomorive Erecting Shop at Pen Argyl Blue Print 7/21/1914 62291 213 12-0275 Chimney for New Locomotive erecting Shop at Pen Argyl Blue Print 9/15/1914 62293 211 12-0275 New Locomotive Erecting and Repair Shop at Pen Argyl Blue Print 9/2/1914 63934 217 12-0275 Plan of Yard Water Piper New Pen Argyl Erecting Shop Blue Print 1/25/1915 64244 214 12-0275 Yard for New Locomotive and Repair Shop at Pen Argyl Blue Print 9/15/1914 64245 215 12-0275 Pit Transfer Table Pen Argyl Erecting Shop Blue Print 9/11/1914 64248 216 12-0275 Cross Section and Elevation New Erecting Shop at Pen Argyl Blue Print 12/11/1914 65454 175 12-0275 Proposed industrial tracks at Saylorsburg Linen 10/24/1911 65486 210 12-0275 Plan and elevation for Chapmans Coal dump 9 Linen 7/23/1910 65615 174 12-0275 Plan of masonry abutments for Tamaqua extension Tracing 6/28/1911 65628 173 12 0275- Proposed eastbound at Pen Argyl und y Linen 8/8/1913 65639 187 12-0275 Profile and grade between Pen Argyl and Danielsville Graph no date 65641 172 12-0275 Tracks and property st Slatington map in color Linen 12/10/1909 65653 208 12-0275 LVRR - new main locomotive shop at Sayre, Pa. Blueprint 6/28/1904 65655 186 12-0275 Public road crossings in Pennsylvania Whiteprint 7/11/1939 65754 209 12-0275 DL&W - Scranton motor house for flue rattler Blueprint 9/9/1911 65792 182 12-0275 Profile and grade between MP 27 and MP 33 Graph no date 65795 181 12-0275 Profile and grade between Danielsville & Lehigh Gap (large) Blueprint 1911 6

10 sht 1 177 12-0275 Bridge over highway at station 1403 Blueprint 8/4/1911 610 sht 2 176 12-0275 Floor plan highway crossing Blueprint 9/25/1911 610 sht 3 178 12-0275 Crossing over highway at station 1403 Blueprint 8/25/1911 610 sht 4 179 12-0275 Crossing over highway at station 1403 Blueprint 8/31/1911 610 sht 7 180 12-0275 Crossing over bridge, standard cast iron washers Blueprint 9/29/1911 62 sht 6 170 12-0275 Bridge over highway at Tamaqua Blueprint 3/9/1912 62 sht 6 171 12-0275 Bridge over highway at Tamaqua Blueprint 3/9/1912 6

34 sht 13 191 12-0275 Anchor and swedge bolts for Pen Argyl engine house Blueprint 5/10/1915 634 sht 14 192 12-0275 Bearing plates for Pen Argyl engine house Blueprint 5/11/1915 634 sht 15 193 12-0275 Hook bolts for Pen Argyl boiler house Blueprint 5/12/1915 634 sht 16 194 12-0275 Washers for Pen Argyl boiler house Blueprint 5/26/1915 634 sht 17 195 12-0275 Various hex nuts for Pen Argyl boiler house Blueprint 5/12/1915 6

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I203204205206207208209210211212213214215216217218219220221222223224

Page 6 of 194Page 6 of 194

224225226227228229230231232233234235236237238239240241

242

4242 224 12 0276 Oil Ho Pen Arg l Locomoti & Erecting Shop Bl P 9/15/1914 7

34 sht 22 196 12-0275 Foundation plan for Pen Argyl boiler house Blueprint 5/28/1915 634 sht 22 197 12-0275 Foundation plan for Pen Argyl boiler house Blueprint 5/26/1915 634 sht 23 198 12-0275 Truss marks for Pen Argyl boiler house Blueprint 5/10/1915 634 sht 26 199 12-0275 Holes for marking steel girders of Pen Argyl boiler house Blueprint 5/11/1915 634 sht 27 200 12-0275 Holes for marking steel girders of Pen Argyl boiler house Blueprint 5/11/1915 634 sht 28 201 12-0275 Posts and lintels for Pen Argyl boiler house Blueprint 5/12/1915 634 sht 29 202 12-0275 Lintels for Pen Argyl boiler house Blueprint 5/12/1915 634 sht 3 189 12-0275 Boiler house at Pen Argyl Blueprint 6/10/1915 634 sht 30 203 12-0275 Holes in steel girders for Pen Argyl engine house Blueprint 5/12/1915 634 sht 31 204 12-0275 Struts for Pen Argyl boiler house Blueprint 5/12/1915 634 sht 32 205 12-0275 Window posts for Pen Argyl boiler and engine house Blueprint 5/26/1915 634 sht 33 206 12-0275 Struts for Pen Argyl engine house Blueprint 5/12/1915 634 sht 34 207 12-0275 Struts for Pen Argyl engine house Blueprint 5/12/1915 634 sht 9 188 12-0275 Boiler house at Pen Argyl Blueprint 5/10/1915 64238A 219 12-0275 Storehouses and Offices for Pen Argyl Offices Blue Print 12/10/1914 65783A 184 12-0275 Bridge across Pullins Creek Blueprint 1915 6D3354 190 12-0275 Boiler house at Pen Argyl Blueprint 5/12/1915 6

183 12-0275 Profile company farm - Katellen? Graph 1905 6185 12-0275 Proposed spur to pumping station at Liberty Corner Linen 6/8/1911 6218 12-0275 Details of Pits & Pipe Tunnels; New Pen Argyl Erecting Shop Blue Print 9/9/1914 6

4239 220 12-0276 Foundations for Storehouse and Office Pen Argyl Shop Blue Print 9/8/1914 74242 224 12 0276- Oil House Pen Argyl Locomotive & Erecting Shop use y ve Blue Printue 9/15/1914rint 75276 265 12-0276 Profile Saylorsburg Jct to Saylorsburg Graph Paper?/?/1905 75494 264 12-0276 General Data for Bridge Over DL&W and NYS&W Tracing 3/7/1908 75610 259 12-0276 Map Showing Siding on Pochuck Branch Colored Line 4/6/1906 75631 261 12-0276 Master train dispatcher's sheet Tracing ?/?/? 75636 260 12-0276 Untitled Map Showing L&NE Paralleling Stream and LV Linen Map ?/?/? 75672 262 12-0276 Connection East of Katellen Linen 11/?/1910 75682 241 12-0276 Section profile unknown location 20" Vertical S?/?/? 75700 231 12-0276 Proposed Extension of L&NE to Bangor Slate Quarry Blue Print 1/4/1912 75739 257 12-0276 Profile of RR Connecting L&NE and L&L Paper Graph?/?/? 75794 256 12-0276 Profile of fill cross section Paper Graph?/?/? 7

20 sht 11 245 12-0276 Floor Plan for Bridge at Lehigh Gap-Tamaqua Extension Blue Print 12/26/1911 720 sht 7 246 12-0276 Floor Plan for Bridge Crossing Lehigh River Tamaqua Ext Blue Print 12/26/1911 720 sht 9 247 12-0276 Floor Plan for Bridge Crossing Lehigh at Lehigh Gap Blue Print 12/26/1911 732 sht 1 268 12-0276 Welfare Building at Pen Argyl Blue Print ?/?/? 732 sht 3 267 12-0276 Welfare Building at Pen Argyl Blue Print 6/9/1915 732 sht 4 266 12-0276 Welfare Building at Pen Argyl Blueprint - P 6/14/1915 745 sht 13 229 12-0276 Foundation Plan & Anchor Bolts for Bridge Portland & Columbia Blue Print 5/20/1906 7

45 sht 5 228 12-0276Girder Bridge Over Delawrae River between Portland and Columbia Blue Print 6/22/1908 7

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

243244245246247248249250251252253254255256257258259260261262263

Page 7 of 194Page 7 of 194

263264265266267268269270271272273274275276277278279280281282

st 251 12 7

45 sht 55 227 12-0276Proposed Bridge Over Delaware River between Portland and Columbia Blue Print 5/27/1908 7

45 sht 55 263 12-0276 Frames, Shoes, Etc.-Bridge Over DL&W and NYS&W Blue Print 3/27/1908 75 sht 1 232 12-0276 Bridge Plan for Bridge Over Creek-Tamaqua Extension Blue Print 8/4/1911 7

5 sht 1A 233 12-0276 Masonary Plan for Bridge Over Creek-Tamaqua Extension Blue Print 8/26/1911 75 sht 2 234 12-0276 Erection Diagram for Bridge Over Creek-Tamaqua Extension Blue Print 9/7/1911 75 sht 3 235 12-0276 Floor Plan for Bridge on Tamaqua Extension Blue Print 9/27/1911 75 sht 3 244 12-0276 Floor Plan for Bridge Over Creek-Tamaqua Extension Blue Print 10/11/1911 75 sht 4 243 12-0276 Girders & Bracing Bridge Over Creek-Tamaqua Extension Blue Print 9/7/1911 75 sht 6 236 12-0276 Bridge Over Creek for Tamaqua Extension Small Blue P 9/13/1911 75 sht 6 237 12-0276 Swedged Bolts for Bridge Tamaqua Extension Small Blue P 9/15/1911 75 sht 9 238 12-0276 Cut Washers for Bridge-Tamaqua Extension Small Blue P 10/11/1911 7

50 sht 6 223 12-0276 Boiler House & Coal Trestle Foundation Pen Argyl Blue Print 9/15/1914 75615B 258 12-0276 Plan of Masonary Highway Bridge Abutement Blue Print 6/28/1911 75646B 269 12-0276 Proposed Profile Broadhead to Freemansburg Blue Print 12/15/1924 78010A 255 12-0276 Crossing Over Highway-Tamaqua Extension Blue Print ?/?/? 79 sht 1 250 12-0276 Floor Plan Crossing Over Highway-Tamaqua Extension Blue Print 4/27/1911 79 sht 2 249 12-0276 Crossing Over Highway Tamaqua Extension Blue Print 8/25/1911 79 sht 4 254 12-0276 Standard Guard Rail bolt for Bridge Tamaqua Extension Blue Print 10/19/1911 79 sht 5 252 12-0276 Standard Cast Iron Washer Bridge Tamaqua Extension Blue Print 10/28/1911 79 sht 6 253 12-0276 Lag Screws and Cut Washers for Bridge Tamaqua Extension Blue Print 10/28/1911 79 st 39 3 251 12-02760276 Crossing Over Highway-Tamaqua ExtensionCrossing Over Highway Tamaqua Extension Blue PBlue Printrint 8/318/31/1911/1911 7

missing 221 12-0276 Detail of Column and Wall Foundations Pen Argyl Erecting Shop Blue Print 8/11/1914 7missing 222 12-0276 Boiler House Pen Argyl Erecting & Repair Shop Blue Print 9/15/1914 7missing 225 12-0276 Yard Plan of Sewers and Drain Pen Argyl Erecting Shop Blue Print 7/22/1914 7missing 226 12-0276 Draft of Building to be Constructed at Walnutport Linen Tracin ?/?/? 7missing 230 12-0276 Proposed Extension of L&NE to Jackson Slate Quarry Blue Print 1/4/1912 7missing 239 12-0276 Washers for Floor Bolts - Tamaqua Extension Blue Print 10/11/1911 7missing 240 12-0276 Guard Rail Bolts for Bridge Tamaqua Extension Blue Print 10/11/1911 7missing 248 12-0276 Floor Plan for Bridge Crossing Over Highway Tamaqua Extension Blue Print 9/27/1911 7

no number 242 12-0276 Graph Paper of Milton Street Fragile Pape?/?/? 75657 286 12-0276 Proposed Yard at Wind Gap Linen Tracin 3/?/1913 85681 271 12-0276 Unknown Profile on Heavy Graph Paper Small Pencil ?/?/? 85767 272 12-0276 Profile of Line from Katellen to Danielsville Blue Print ?/?/? 85780 285 12-0276 Property between Wind Gap and Pen Argyl Blue Print 1/16/1914 8

16 sht 1 291 12-0276 Proposed Bridge Over Lehigh River near Lehigh Gap Blue Print 11/31/1911 816 sht 2 292 12-0276 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 10/3/1911 816 sht 3 293 12-0276 Span No 1 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 10/6/1911 835 sht 28 288 12-0276 Lifting Beams Below Rail for Proposed Bridge Blue Print 2/8/1913 835 sht 30 289 12-0276 Detail of Wood Screws for Proposed Wood Beam Blue Print 2/8/1913 8

5600A 287 12-0276 Proposed Extension of Albion Branch to Quarries of Sacme Slate Blue Print 5/2/1913 8

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I283284285286287288289290291292293294295296

297298299300301302303

Page 8 of 194Page 8 of 194

303304305306307308309310311312313314315316317318319320321322

16 304 12 of Over River At 9

5646B 270 12-0276 Plan and Profile Broadhead to Freemansburg Blue Print 13/15/1922 867 sht 1 277 12-0276 Renewal of Bridge Acrpes Martins Creek Large Blue P 7/29/1921 867 sht 1 283 12-0276 Renewal of Bridge Between Martins Creek and Bangor Blue Print 7/39/1921 867 sht 2 278 12-0276 Renewal of Bridge #158 at Martins Creek Large Blue P 7/29/1921 867 sht 2 284 12-0276 Renewal of Bridge Between Martins Creek and Bangor Blue Print 7/29/1921 867 sht 3 280 12-0276 Renewal of Bridge #158 across Martins Creek at Bangor Blue Print 7/29/1921 867 sht 3 282 12-0276 Girders-Renewal of Bridge Martins Creek to Bangor Blue Print 7/29/1921 867 sht 4 279 12-0276 Renewal of Bridge #158 across Martins Creek at Bangor Blue Print 7/27/1921 867 sht 4 281 12-0276 Renewal of Bridge at Martins Creek to Bangor Blue Print 7/27/1921 867 sht 8 273 12-0276 Renewal of Bridge 158 at Bangor Small Blue P 8/5/1921 867 sht 8 276 12-0276 Summerfield Rivets & Bolts for Bangor Renewal Bridge Small Blue P 8/5/1921 867 sht 9 274 12-0276 Erection Bolts for Bridge Renewal at Bangor Small Blue P 8/5/1921 867 sht 9 275 12-0276 Erection Bolts and Rivets Renewal of Bridge at Bangor Small Blue P 8/3/1921 8

no number 290 12-0276 Very Long Blue Print of Profile of Entire L&NE Graph Paper?/?/? 8

5427 328 12-0277Terminal Grounds - PP&BR RR Slatington to Danielsville withproperty owners

Tracing Cloth 2/8/1909 9

5716 321 12-0277 Profile of Line to Sweepers Summit Pencil on Gr no date 95775 322 12-0277 Map of Crane Railroad through Catasauqua Borough Blue Print no date 95784 330 12-0277 Renewal of Bridge Over Papakating Creek Blue Print 10/27/1909 9

16 sht ? 303 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 12/4/1911 916 sht 10 305 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 12/4/1911 916 sht 11 sht 11 304 12-02770277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh GSpan No 3 Proposed Bridge Lehigh Lehigh Gapap Blue PBlue Printrint 11/711/7/1911/1911 916 sht 12 306 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 12/1/1911 916 sht 13 309 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/10/1911 916 sht 14 310 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/23/1911 916 sht 15 315 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/23/1911 916 sht 16 314 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/22/1911 916 sht 17 313 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/7/1911 916 sht 18 312 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/6/1911 916 sht 19 311 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 10/6/1911 916 sht 20 308 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 10/7/1911 916 sht 21 307 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/7/1911 916 sht 22 298 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 12/18/1911 916 sht 23 297 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 10/17/1911 916 sht 24 296 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/29/1911 916 sht 25 316 12-0277 Span No 3 - Rocker Nests for Bridge Over Lehigh River Blue Print-Sm11/22/1911 916 sht 26 317 12-0277 Span No 3 - Pilot & Driving Nuts Bridge Over Lehigh River Small Blue P 12/26/1911 916 sht 27 319 12-0277 Swedged Stone Bolts for Span No 3 Across Lehigh River Small Blue P 12/26/1911 916 sht 28 320 12-0277 Clamp Steel Anchor Clips for Span No 3- Bridge Across River Small Blue P 12/26/1911 916 sht 29 318 12-0277 Button Head Rivets for Span No 3 Across Lehigh River Small Blue P 12/26/1911 916 sht 4 294 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 10/10/1911 9

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I323324325326327328329330331332333334335336337338339340341342343344

Page 9 of 194Page 9 of 194

344345346347348349350351352353354

355356

357358359360361362

46 8 359 12 0277 Details for coal and sand station at Pen Arg l Bluepr 10

16 sht 5 295 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/3/1911 916 sht 6 299 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 1/10/1900 916 sht 7 300 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 1/3/1911 916 sht 8 301 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 10/30/1911 916 sht 9 302 12-0277 Span No 3 of Proposed Bridge Over Lehigh River At Lehigh Gap Blue Print 11/2/1911 95732B 329 12-0277 Bridge Over which Crane Iron Works had the Right of-Way Blue Print 7/24/1914 9

D48 sht 1 324 12-0277 ERIE/NYS&W Bridge Crossing at Sussex Blue Print 11/5/1909 9D48 sht 2 327 12-0277 Details of Floor Beams-Bridge over Hanford Branch Blue Print 11/5/1909 9D48 sht 3 326 12-0277 ERIE/ NYS&W Bridge on the Hanford Branch at Sussex Blue Print 11/5/1909 9

D48 sht E1 325 12-0277 ERIE/NYS&W Bridge on the Hanford Branch Blue Print 9/28/1909 9no number 323 12-0277 Renewal of Bridge Papakating Creek Blue Print 8/20/1915 9

5449 347 12-0277 Plan Showing Track & Property of L&NE at Pen Argyl Linen Tracin 10/30/1908 105481 350 12-0277 Plan of L&NE Engine House at Pen Argyl Linen Tracin ?/?/? 105752 365 12-0277 Caster rattler for L&NE locomotives Blueprint 1914 105776 348 12-0277 CRANE Railroad showing Connection at Catasaqua with L&NE Paper 12/?/1907 105776 349 12-0277 CRANE Railroad showing Connection at Catasaqua with L&NE Paper 12/?/1907 1010868 346 12-0277 Detail of Cross Frames & Laterals Bridge over Hanford Branch Blue Print 10/23/1909 10

46 sht 12 356 12-0277 Location of proposed coaling station Blueprint no date 1046 sht 13 355 12-0277 Details for coal and sand station at Pen Argyl Blueprint no date 1046 sht 5 357 12-0277 Coal and sand station-detail of sand drying room Blueprint no date 1046 sht 7 360 12-0277 Foundation plan for coal and sand station at Pen Argyl Blueprint no date 1046 sht 8 sht 359 12 0277- Details for coal and sand station at Pen Argyl y Blueprint no dateint no da 10te46 sht 9 358 12-0277 Elevation of steel tower for yard scraper Blueprint no date 1065 sht 1 354 12-0277 Girders for deck turntable Blueprint 4/15/1918 1065 sht 2 353 12-0277 Cross framework for deck turntable Blueprint 4/19/1918 1065 sht 3 352 12-0277 Floor plan for deck turntable Blueprint 4/22/1918 10

D48 sht 1 332 12-0277 Detail of Girders of Bridge Over Hanford Branch of ERIE Blue Print 9/28/1909 10D48 sht 1 336 12-0277 Detail of Girders for Bridge Over Hanford Branch of ERIE Blue Print 9/28/1909 10D48 sht 1 340 12-0277 Detail of Girders for Bridge Over Hanford Branch of ERIE Blue Print 9/28/1909 10D48 sht 1 344 12-0277 Detail of Girders for Bridge Over Hanford Branch of ERIE Blue Print 10/27/1909 10D48 sht 2 337 12-0277 Detail of Floor Beams for Bridge over Hanford Branch of ERIE Blue Print 10/27/1909 10D48 sht 2 341 12-0277 Detail of Floor Beams & Stringers Bridge over Hanford Branch Blue Print 10/27/1909 10

D48 sht 2 345 12-0277Detail of Floor Stringers and Brackets Bridge over ERIE HanfoBranch

rd Blue Print 10/27/1909 10

D48 sht 3 334 12-0277 Detail of Cross Frames Bridge Over Hanford Branch of ERIE Blue Print 10/27/1909 10

D48 sht 3 338 12-0277Detail of Cross Frames & Laterals for Bridge over Hanford Braof ERIE

nch Blue Print 10/27/1909 10

D48 sht 3 342 12-0277 Detail of Cross Frames Bridge Over Hanford Branch of ERIE Blue Print 10/23/1909 10D48 sht E1 331 12-0277 Marking Diagram of Bridge Over Hanford Branch of ERIE Blue Print 8/20/1915 10D48 sht E1 335 12-0277 Marking Diagram for Bridge over Hanford Branch of ERIE Blue Print 11/23/1909 10D48 sht E1 339 12-0277 Marking Diagram for Bridge Over Hanford Branch of ERIE Blue Print 10/23/1909 10D48 sht E1 343 12-0277 Marking Diagram for Bridge Over Hanford Branch of ERIE Blue Print 9/28/1909 10

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I363364365366367368369370371372373374375376377378379380381382383384

Page 10 of 194Page 10 of 194

384385386387388389390391392393394395396397398399400401402403

5792A 377 12 0290 LNE profile milepost 2 Bluepr 11

no number 351 12-0277 Casting for deck turntables Blueprint 2/16/1918 10no number 361 12-0277 Unmarked profile pertaining to Channel change Blueprint no date 10no number 362 12-0277 Unmarked profile pertaining to Channel change Blueprint no date 10no number 363 12-0277 Unmarked profile pertaining to Channel change Blueprint no date 10no number 364 12-0277 Unmarked profile pertaining to Channel change Blueprint no date 10

333 12-0277 Detail of Floor Beams & Stringers Bridge over Hanford Branch Blue Print 10/27/1909 105434 368 12-0290 Plan for bridge at Slatington over CNJ-Lehigh River Linen Tracin 3/6/1909 115441 398 12-0290 DL&W 30 foot caboose car Blueprint 03-27-1903 115473 373 12-0290 Map of yard at Dechertown-Pa., Poughkeepsie & Boston RR Linen Tracin 1890 115473 374 12-0290 Map of yard at Dechertown-Pa., Poughkeepsie & Boston RR Blueprint 1890 115620 375 12-0290 Cross section of locomotive wheel Linen Tracin no date 115658 369 12-0290 Profile of L&NE in the vicinity of Mauch Chunk Linen Tracin no date 115674 372 12-0290 Train dispatcher's sheet - train and crew consist Linen Tracin no date 115677 366 12-0290 Profile of L&NE between Sections 52 and 68 Graph Paperno date 115680 371 12-0290 Profile of Sections C to G Graph Paperno date 115707 399 12-0290 Profile of the Nazareth line 6707 Graph Paperno date 115732 376 12-0290 Map of Crane Iron Works and the CNJ Linen Tracin 7/29/1914 115763 367 12-0290 Profile of the Bangor & Portland Railroad Graph Paperno date 115798 393 12-0290 Projection of Sussex line in state of New Jersey 5898 Paper map no date 116201 370 12-0290 Route of Blue Ridge Traction Co. from Slat. To Danielsville Blueprint 1902 116404 392 12-0290 Plan for heavy engine turntables, No. 5 no date 11

5792A 377 12 0290- LNE profile milepost 2 to 26 to 26 Blueprint no dateint no da 11te5798A 394 12-0290 Projection of Sussex line in state of New Jersey 5898A Paper map no date 115798B 395 12-0290 Projection of Sussex line in state of New Jersey 5898B Paper map no date 115798C 396 12-0290 Projection of Sussex line in state of New Jersey 5898C Paper map no date 115798D 397 12-0290 Projection of Sussex line in state of New Jersey 5898C Paper map no date 11

no number 378 12-0290 Sketch showing barricades at Northampton crossing Blueprint 1/6/1937 11no number 379 12-0290 State of Pa. appropriation-highway in Northampton Blueprint 5/20/1936 11no number 380 12-0290 State of Pa. Property to be acquired at Slatford 5/20/1936 11no number 381 12-0290 State of Pa. Property to be acquired for highway Blueprint 5/20/1936 11no number 382 12-0290 Sketch showing barricade to be erected at DL&W crossing Blueprint 5/20/1936 11no number 383 12-0290 State of Pa. Property to be acquired in Northampton Twp. Blueprint 5/20/1936 11no number 384 12-0290 State of Pa. Property to be acquired in Upper Bethel Twp. Blueprint 5/20/1936 11no number 385 12-0290 State of Pa. Property to be acquired in Upper Bethel Twp. Blueprint 5/20/1936 11no number 386 12-0290 Grade crossing removal project in Upper Bethel Twp. Blueprint 9/9/1936 11no number 387 12-0290 Grade crossing removal project in Portland and Upper B. T. Blueprint 9/9/1936 11no number 388 12-0290 Grade crossing removal project in Portland Borough Blueprint 9/9/1936 11no number 389 12-0290 Grade crossing removal project in Portland Borough Blueprint 9/9/1936 11no number 390 12-0290 Track relocation in Portland Borough Blueprint 9/9/1936 11no number 391 12-0290 Track relocation in Upper Mt. Bethel Township Blueprint 9/9/1936 11

5466 402 12-0290 Names of adjacent property owners along Sussex branch Linen no date 12

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I404405406407408409410411412413414415416417418419420421422

423

Page 11 of 194Page 11 of 194

424

425426427428429430431432433434435436437438439440441442

5617 404 12-0290 Plan of concrete abutment bridge over the LVRR Linen 8/8/1911 125673 405 12-0290 Extension of Saylorsburg branch Linen Nov. 1910 125735 417 12-0290 Profile of connecting line between Weaversville and Sydney Blueprint no date 125793 541 12-0292 Elevation Plan of Bridge No 1/58 Blueprint 2/23/1925 125799 400 12-0290 Specifications for construction of Mill building Blueprint no date 12

37 sht 25 420 12-0290 Material required for new locomotive plant at Pen Argyl Blueprint 3/16/1915 1237 sht 26 419 12-0290 Columns required for Pen Argyl locomotive shops Blueprint 3/14/1915 1237 sht 28 418 12-0290 Plan for main locomotive shops at Pen Argyl Blueprint 3/16/1915 1237 sht 36 427 12-0290 Part trusses required for Pen Argyl locomotive shop Blueprint 3/19/1915 1237 sht 37 426 12-0290 Diagonal plates required for Pen Argyl locomotive shop Blueprint 3/19/1915 1237 sht 38 425 12-0290 Columns required for Penn Argyl locomotive shop Blueprint 3/23/1915 1237 sht 39 424 12-0290 Columns required for Penn Argyl locomotive shop Blueprint 3/22/1915 1237 sht 40 423 12-0290 Struts required for Penn Argyl locomotive shop Blueprint 3/23/1915 1237 sht 44 422 12-0290 Truss material required for Pen Argyl locomotive shop Blueprint 3/24/1914 1237 sht 46 421 12-0290 Main locomotive shop at Pen Argyl Blueprint 3/23/1915 12

5615A 406 12-0290 Tamaqua extension - masonry bridge abutments Blueprint 6/28/1911 125782A 403 12-0290 Plate girder span over Papaking Creek near Pellettown Blueprint 8/6/1915 12

no number 401 12-0290 Form AD 55 - report of waybills received Paper Sept. 1913 12no number 407 12-0290 Change in bridge abutments along mainline Blueprint no date 12

no number 408 12-0290Pa. Dept. of Highways - change in bridge abutments over SchRiver

ylkill Blueprint no date 12

no number 409 12-0290Pa. Dept. of Highways - change in bridge abutments over SchRiver

ylkill Blueprint no date 12

no number 410 12-0290Pa. Dept. of Highways - change in bridge abutments over SchRiver

ylkill Blueprint no date 12

no number 411 12-0290 Pa. Dept. of Highways - change in channel alignment Blueprint no date 12no number 412 12-0290 Pa. Dept. of Highways - change in channel alignment Blueprint no date 12no number 413 12-0290 Pa. Dept. of Highways - change in channel alignment Blueprint no date 12no number 414 12-0290 Pa. Dept. of Highways - change in channel alignment Blueprint no date 12no number 415 12-0290 Pa. Dept. of Highways - area of channel change Blueprint no date 12no number 416 12-0290 Pa. Dept. of Highways - area of channel change Blueprint no date 12no number 482 12-0290 Right-of-way to be acquired for extension of L&NE branch Typed paperno date 12no number 483 12-0290 Proposed revision of Bethlehem branch Linen 8/21/1916 1237 sht 122 454 12-0291 Bars, rod and nuts for Pen Argyl engine house Blueprint 3/26/1915 1337 sht 131 459 12-0291 Rafter asssembly for main locomotive shop at Pen Argyl Blueprint 3/12/1915 1337 sht 132 460 12-0291 Post erection for main locomotive shop at Pen Argyl Blueprint 3/19/1915 1337 sht 135 461 12-0291 Erection of struts for main locomotive shop at Pen Argyl Blueprint 4/14/1915 1337 sht 138 462 12-0291 Location of struts for Pen Argyl locomotive shop Blueprint 4/14/1915 1337 sht 139 463 12-0291 Location of struts for Pen Argyl locomotive shop Blueprint 4/14/1915 1337 sht 140 464 12-0291 Location of girts for Pen Argyl locomotive shop Blueprint 4/14/1915 1337 sht 141 465 12-0291 Detail of rafters for Pen Argyl engine house Blueprint 4/14/1915 1337 sht 159 458 12-0291 Crane clearance diagram for Pen Argyl engine house Blueprint 3/19/1915 13

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I443444445446447448449450451452453454455456457458459460461462463464

3

Page 12 of 194Page 12 of 194

464465466467468469470471472473474475476477478479480481482483

37 80&81 437 12 0291 Holes of s diameter for Pen Arg l engine ho Bluepr 3/16/1915 13

37 sht 160 457 12-0291 Crane clearance for main Pen Argyl engine house Blueprint 3/12/1915 1337 sht 161 456 12-0291 Crane clearance diagram - Pen Argyl engine house Blueprint 5/12/1915 1337 sht 31 430 12-0291 Left columns required for Pen Argyl locomotive shop Blueprint 3/19/1915 1337 sht 32 429 12-0291 Diagonals and plates required for Pen Argyl loco shop Blueprint 3/17/1915 1337 sht 34 428 12-0291 Girders and knee braces required for Penn Argyl loco shop Blueprint 3/19/1915 1337 sht 68 431 12-0291 Anchor bolts for piers for Pen Argyl engine house Blueprint no date 1337 sht 69 432 12-0291 Slabs for Pen Argyl engine house Blueprint no date 13

7 shts 100&99 445 12-0291 Posts and door posts for Pen Argyl engine house Blueprint 3/25/1915 137 shts 101&10 446 12-0291 Struts for Pen Argyl engine house Blueprint 3/24/1915 137 shts 105&10 448 12-0291 Struts and material for Crane shop at Pen Argyl Blueprint 3/25/1915 137 shts 107&10 447 12-0291 Struts and rivets for Pen Argyl engine house Blueprint 3/24/1915 137 shts 109&11 449 12-0291 Plates and posts for Pen Argyl engine house Blueprint 3/24/1915 137 shts 113&11 450 12-0291 Hinges and grating for Pen Argyl engine house Blueprint 3/25/1915 137 shts 115&11 451 12-0291 Rods and lug angles for Pen Argyl engine house Blueprint 3/29/1915 137 shts 118&11 452 12-0291 Beams, tees and hooks for Pen Argyl engine house Blueprint 3/25/1915 137 shts 120&12 453 12-0291 Splice bars and clamps for Pen Argyl engine house Blueprint 4/1/1915 137 shts 129&13 455 12-0291 Girts and rafters for Pen Argyl engine house Blueprint 3/10/1915 1337 shts 71&72 433 12-0291 Supports F-2 and F-3 for Pen Argyl engine house Blueprint 3/12/1912 1337 shts 73&74 434 12-0291 Bolts for Pen Argyl engine house Blueprint 3/13/1915 1337 shts 75&76 435 12-0291 Bolts for Pen Argyl engine house Blueprint 3/15/1915 1337 shts 77&78 436 12-0291 Bolts for Pen Argyl engine house Blueprint 3/16/1915 1337 shts shts 80&81 437 12 0291- Holes of various diameter for Pen Argyl engine house variou y use Blueprint 3/16/1915int 1337 shts 82&83 438 12-0291 Rivets and holes in steel for Pen Argyl engine house Blueprint 3/13/1915 1337 shts 85&86 439 12-0291 Holes of various diameter for Pen Argyl engine house Blueprint 3/18/1915 1337 shts 87&88 440 12-0291 Door posts and girders for Pen Argyl engine house Blueprint 3/19/1915 1337 shts 90&89 441 12-0291 Door posts and rods for Pen Argyl engine house Blueprint 3/19/1915 1337 shts 91&92 442 12-0291 Purlins for Pen Argyl engine house Blueprint 3/23/1915 1337 shts 93&94 443 12-0291 Girts and purlins for Pen Argyl engine house Blueprint 3/24/1915 1337 shts 95&97 444 12-0291 Posts for Pen Argyl engine house Blueprint 3/24/1915 13

5629 505 12-0291 Connection between L&NE and Chestnut Ridge Railroad Linen 10/9/1917 145635 493 12-0291 Plan Showing Land Required for Chestnut Ridge Bridge Linen 10/16/1917 145671 508 12-0291 Plan of Profile for Highway Bridge in Northampton County Blueprint 5/30/1919 145675 474 12-0291 Profile of Pen Argyl branch and Albion branch Graph Paperno date 145679 478 12-0291 Untitled profile of Lehigh and New England Railroad Graph Paperno date 145683 507 12-0291 Profile of Main Line of L&NE and Relocation Paper, poor ? 145748 491 12-0291 Plan for Coaling Converter for Locomotives Blueprint 3/26/1918 145758 492 12-0291 Profiles of the L&NE RR at Easton Linen 11/?/1904 145789 503 12-0291 Profile of Rivers Along Main Line of L&NE Paper ? 146453 475 12-0291 Proposed alignment of track at Auburn, Pa. Linen no date 149096 506 12-0291 Profile Along Center Line of Union Station at Bethlehem 3/12/1935 14

11 sht 1a 494 12-0291 Masonry Plan for Bridges Over Highway on Tamaqua Extension Blueprint 8/5/1917 14

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I484485486487488489490491492493494495496497498499500501502503504505

Page 13 of 194Page 13 of 194

505506507508509

510

511512513514

515516517518519520521522

485 12 0291 Profile and alignment of re of Bethlehem branch Linen 8/21/1916 14

11 sht 2 495 12-0291 Plan for Highway Crossing at Tamaqua Blueprint 9/29/1915 1411 sht 6 496 12-0291 Swedgwood Bolts for Bridge on Tamaqua Extension Blueprint 9/1/1915 14

37 sht 142 467 12-0291 Girts for Pen Argyl engine house Blueprint 4/13/1915 1437 sht 143 466 12-0291 Location of post for Pen Argyl engine house Blueprint 4/13/1915 1437 sht 144 473 12-0291 Detail of rafters for Pen Argyl engine house Blueprint 4/15/1915 1437 sht 150 471 12-0291 Anchor bolts for Pen Argyl engine house Blueprint 4/15/1915 1437 sht 150 472 12-0291 Girts for Pen Argyl engine house Blueprint 4/15/1915 1437 sht 151 470 12-0291 Anchor piles for engine pits for Pen Argyl engine house Blueprint 4/13/1915 1437 sht 152 469 12-0291 Standard cast rail clamps for Pen Argyl engine house Blueprint 4/17/1915 1437 sht 153 468 12-0291 Eccentric washer for Pen Argyl engine house Blueprint 4/17/1915 14

5738A 477 12-0291 Profile of line from York Bangor to Jackson Bangor Graph Paper 1/4/1912 1461 sht 25 512 12-0291 Anchor Bolts for Deckertown Crossing PP&B RR Blueprint 6/20/1889 1461 sht 26 511 12-0291 Sway Rod Pins for Deckertown Crossing - PP&B RR Blueprint 6/20/1889 1461 sht 27 510 12-0291 Plan for Deckertown Crossing - PP&B RR Blueprint 6/21/1889 1461 sht 28 509 12-0291 Plan for Deckertown Branch - PP&B RR Blueprint 6/14/1889 1461 sht 5 513 12-0291 Plan for Deck Lattice Girder for Deckertown Crossing Blueprint 8/7/1889 1461 sht 7 514 12-0291 Deck Lattice Girder for Deckertown Crossing Blueprint 6/10/1889 1461 sht 9 515 12-0291 Lateral Bracing for Deckertown Crossing Bridge Blueprint 6/11/1889 14

no number 476 12-0291 Proposed alignment of track at Auburn, Pa. Blueprint no date 14no number 481 12-0291 Proposed realignment of Bethlehem branch Linen 8/21/1916 14no number 484 12-0291 Profile and alignment of revision of Bethlehem branch Linen 8/21/1916 14no numberno number 485 12 0291- Profile and alignment of revision of Bethlehem branch vision Linen 8/21/1916 14no number 486 12-0291 Change in line of proposed Bethlehem branch Graph Paperno date 14no number 487 12-0291 Change in line of proposed revision of Bethlehem branch Graph Paperno date 14no number 488 12-0291 Change in line of proposed revision of Bethlehem branch Graph Paperno date 14no number 490 12-0291 Revision of line of Bethlehem branch Graph paperno date 14

no number 497 12-0291Commonwealth of Pennsylvania - Condemnation of Land - Northampton County 2/21/1940 14

no number 498 12-0291State of Pa - Condemnation of Land Owned by Elizabeth Sassercoal 2/21/1940 14

no number 499 12-0291 State of Pa - Condemnation of Land Owned by Philip Strunk Blueprint 2/21/1940 14no number 500 12-0291 State of Pa - Condemnation of Land Owned by Portland Borough Blueprint 2/21/1940 14no number 501 12-0291 State of Pa - Grading Analysis in Northampton County Blueprint 2/21/1940 14

no number 502 12-0291State of Pa - Property Required for Realignment inn Portland Borough 2/21/1940 14

no number 504 12-0291 Plan of Union Street Bridge at Bethlehem Blueprint 6/5/1935 14sht 1 480 12-0291 Relocation of Pa. Highway No. 226 at Tamaqua Linen 7/6/1936 14

sht E1 479 12-0291 Reconstruction of highway bridge No. 226 Linen 7/3/1936 145403 537 12-0292 Map of A Rale Property to be Acquired by PP&B RR Linen ?/?/1890 155440 540 12-0292 Detail of Rail Support for Track Maintenance Blueprint ? 155487 538 12-0292 Yard Development at Sussex Junction, N.J. Linen 8/20/1912 155772 539 12-0292 Plan Showing Right of Way of Crane Railroad Blueprint ? 15

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I523524

525526527528529530531532533534535536537538539540541542543

Page 14 of 194Page 14 of 194

543544545546547548549550551552553

554

555

556557558559560

no 524 12 Reinforced Pavement for 15

2B of 11 526 12-0292 Acquisition of Property from Dave Hoskins for Realignment Blueprint 2/1/1940 155608B 534 12-0292 Property between Wind Gap & Pen Argyl of L&NE Blueprint 1/17/1918 15

5608B 535 12-0292Acquisition of Property between Wind Gap & Pen Argyl-poor condition Blueprint 1/17/1918 15

5614B 536 12-0292 Plan of Masonry Abutments Over Bridge on Tamaqua Branch Blueprint 6/22/1915 1561 sht 11 516 12-0292 Girders & Bracing for Deckertown Crossing Bridge Blueprint 6/28/1889 1561 sht 15 520 12-0292 Columns for Deckertown Crossing Bridge Blueprint 6/19/1889 1561 sht 17 518 12-0292 Struts and Bent Plan for Columns of Deckertown Bridge Blueprint 8/27/1911 1561 sht 19 517 12-0292 Floor Plan for Deckertown Crossing Bridge Blueprint 6/22/1889 1561 sht13 519 12-0292 Girders and Bracing for DeckertownCrossing Bridge Blueprint 6/12/1889 1567 sht 2 549 12-0292 Renewal of Bridge No 1.58 Between Martins Creek & Bangor Blueprint 7/30/1925 1567 sht 3 548 12-0292 Renewal of Bridge Across Martins Creek at Bangor Blueprint 7/30/1925 1567 sht 4 547 12-0292 Renewal of Bridge No 1.58 Between Martins Creek and Bangor Blueprint 7/28/1925 1567 sht 5 546 12-0292 Renewal of Bridge Between Martins Creek and Bangor Blueprint 7/30/1925 1567 sht 6 545 12-0292 Renewal of Bridge Across Martins Creek and Bangor Blueprint 7/30/1925 1567 sht 7 544 12-0292 Erection Diagram for Bridge Across Bangor to Martins Creek Blueprint 7/28/1925 1567 sht 8 543 12-0292 Description of Renewal Parts for Bridge on Bangor Branch Blueprint 8/6/1925 1567 sht 9 542 12-0292 Detail of Marketing Bridge on Bangor Branch Blueprint 8/6/1925 15

no number 521 12-0292 Proposed Construction of Realigned RR through Portland Blueprint 9/19/1940 15no number 522 12-0292 Profile of Realigned Route through Portland Borough Blueprint 9/19/1940 15no number 523 12-0292 State of Pa. - Condemnation of Line in Northampton County Blueprint 2/13/1940 15no number number 524 12-02920292 Reinforced Concrete Pavement for L&NE Construction Concrete L&NE Construction Blueprint 2/1Blueprint 2/1/1940/1940 15no number 525 12-0292 Detail of Line Realignment in Borough of Portland Blueprint 2/1/1940 15no number 527 12-0292 Proposed Widening of Right of Way Blueprint 2/1/1940 15no number 528 12-0292 Proposed Acquisition from Clinton Carroll & Philip Sigenfous Blueprint 2/1/1940 15no number 529 12-0292 Proposed Acquisition of Lanf from Mrs A.O. Allen Blueprint 2/1/1940 15no number 530 12-0292 Proposed Realignment of L&NE Main Line in Portland Blueprint 2/1/1940 15no number 531 12-0292 Proposed Realignment of L&NE in Mt Bethel Township Blueprint 2/1/1940 15no number 532 12-0292 Acquisition of Property from Arthur Barton in Mt Bethel Township Blueprint 2/1/1940 15no number 533 12-0292 Acquisition of Property from Elizabeth Sasserpool Blueprint 2/1/1940 15

5652 560 12-0292 Plan Showing Station Grounds at Pen Argyl Linen 2/15/1920 165785 569 12-0292 Bridge Over Papakating Creek West of Pellettstown, N.J. Blueprint 6/21/1919 16

14 sht 1 561 12-0292Bridge Crossing Lehigh River near Lehigh Gap - Tamaqua Extension Blueprint 11/23/1915 16

14 sht 2 562 12-0292Bridge Crossing Lehigh River near Lehigh Gap - Tamaqua Extension Blueprint 11/17/1915 16

14 sht 3 563 12-0292Bridge Crossing Lehigh River near Lehigh Gap - Tamaqua Extension 11/21/1915 16

14 sht 4 551 12-0292 Bridge Over Lehigh River on the Tamaqua Extension Blueprint 11/3/1915 1614 sht 5 552 12-0292 Span No 1 Bridge Over Lehigh River on Tamaqua Extension Blueprint 1/24/1915 164 sht 10 564 12-0292 Bridge Over Lizard Creek - Tamaqua Extension Blueprint 9/14/1915 164 sht 1a 554 12-0292 Bridge Over Lizard Creek on Tamaqua Extension Blueprint 8/26/1915 16

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I561

562

563564565566567568569570571572

573574575576577578

579 p

Page 15 of 194Page 15 of 194

579

580581582583584585586

587588589590591592593594

595596

no 578 12 16

4 sht 1b 553 12-0292 Bridge Over Lizard Creek on Tamaqua Extension-poor condition Blueprint 8/5/1915 16

4 sht 2 557 12-0292Bridge Over Lizard Creek Extension at Station 684+92-poor condition Blueprint 9/8/1915 16

4 sht 3 558 12-0292Bridge Over Lizard Creek on Tamaqua Extension Station 684poor condition

+92-Blueprint 10/14/1915 16

4 sht 4 559 12-0292 First Deck of Lizard Creek Extension Bridge Girder Span Blueprint 9/9/1915 164 sht 5 556 12-0292 Bridge Over Lizard Creek at Station 684+92-poor condition Blueprint 9/8/1921 164 sht 6 565 12-0292 Bridge Over Lizard Creek at Station 684 + 92 Blueprint 9/14/1915 164 sht 7 567 12-0292 Bridge Over Lizard Creek - Tamaqua Extension Blueprint 9/14/1915 164 sht 9 566 12-0292 Bridge Over Lizard Creek at Station 684 + 92 Blueprint 9/14/1915 1667 sht1 550 12-0292 Renewal of Bridge Between Martins Creek and Bangor Blueprint 7/30/1925 16

no number 555 12-0292 Bridge Over Lizard Creek at Station 684+42-poor condition Blueprint 8/15/1915 16no number 570 12-0292 List of Track Layout in Palmerton Borough Blueprint 7/11/1962 16no number 571 12-0292 List of Track Layout in Lehigh Township and Lower Tomanosing Blueprint 7/11/1962 16

no number 572 12-0292Reinforced Concrete Pavement in Northampton Township CaCounty

rbon Blueprint 7/11/1962 16

no number 573 12-0292 Reinforced Cement Concrete Pavement in Northampton Township Blueprint 7/11/1962 16no number 574 12-0292 Track Layout in Lehigh Township & Lower Towaxensing Township Whiteprint 6/27/1962 16no number 575 12-0292 Lehigh Gap Project of Cantilever Structure Whiteprint 6/17/1962 16no number 576 12-0292 Reinforced Cement Concrete Pavement - Lehigh Lower Township Whiteprint 6/17/1962 16no number 577 12-0292 Reinforced Cement Concrete Pavement - Lehigh Lower Township Whiteprint 6/17/1962 16

no number number 578 12-02920292 Record of Existing Road Types Northampton and Carbon Coug yp p nties White rint 6/17Whiteprint 6/17/1962/1962 16

sht 1/30 579 12-0292Right Wall "A" for Bridge at Lehigh Gap Northampton & CarboCounty

n Blueprint 2/19/1962 16

sht 10/30 588 12-0292 State of Pa- Bridge unit at Lehigh Gap - Cantilever structure Blueprint 2/19/1962 16sht 11/30 589 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16sht 12/30 590 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16sht 13/30 591 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16sht 14/30 592 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16sht 15/30 593 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16

sht 2/30 580 12-0292Right Wall "A" for Bridge at Lehigh Gap Northampton & CarboCounty

n Blueprint 2/19/1962 16

sht 3/30 581 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Right Wall Blueprint 2/19/1962 16sht 4/30 582 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Center Wall Blueprint 2/19/1962 16sht 5/30 583 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Center Wall Blueprint 2/19/1962 16sht 6/30 584 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16sht 7/30 585 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16sht 9/30 587 12-0292 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16sht8/30 586 12-0292 State of Pa - Bridge Unit at Lehigh Gap - Cantilever Structure Blueprint 2/19/1962 16

missing 617 12-0305State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure(No. 9/30)

missing 2/19/1962 17

S-2833 594 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 16/30) Blueprint 2/19/1962 17

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I597598599600601

602

603

604605606607608609610611612613614615

Page 16 of 194Page 16 of 194

616

617

618

619

620

621622623624

625

626627628629630

State of Pa - Bridge Unit at Lehigh Gap - Cantilever Structure

S-2833 595 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 17/30) Blueprint 2/19/1962 17S-2833 596 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - (No. 18/30) Blueprint 2/19/1962 17S-2833 597 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 19/30) Blueprint 2/19/1962 17S-2833 598 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 20/30) Blueprint 2/19/1962 17S-2833 599 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 21/30) Blueprint 2/19/1962 17

S-2833 600 12-0305Test Borings for Lehigh Gap Project - Northampton County (N22/30)

o. Blueprint ? 17

S-2833 601 12-0305Test Borings for Lehigh Gap Project - Northampton County (N23/30)

o. Blueprint ? 17

S-2833 602 12-0305Test Borings for Lehigh Gap Project - Northampton County (N24/30)

o. Blueprint ? 17

S-2833 603 12-0305 Test Borings for Lehigh Gap Project (No. 25/30) Blueprint ? 17S-2833 604 12-0305 Test Borings for Lehigh Gap Project (No. 26/30) Blueprint ? 17S-2833 605 12-0305 Test Borings for Lehigh Gap Project (No. 27/30) Blueprint ? 17S-2833 606 12-0305 Test Borings for Lehigh Gap Project (No. 28/30) Blueprint ? 17S-2833 607 12-0305 Test Borings for Lehigh Gap Project (No. 29/30) Blueprint ? 17S-2833 608 12-0305 Test Borings for Lehigh Gap Project (No. 30/30) Blueprint ? 17S-2833 609 12-0305 State of Pa. - Bridge at Lehigh Gap (No. 1/30) Blueprint 2/19/1962 17S-2833 610 12-0305 State of Pa. - Bridge Unit at Lehigh Gap (Right Wall) (No. 2/30) Blueprint 2/19/1962 17S-2833 611 12-0305 State of Pa. - Bridge Unit at Lehigh Gap (Right Wall) (No. 3/30) Blueprint 2/19/1962 17S-2833 612 12-0305 State of Pa. - Bridge Unit at Lehigh Gap (Center Wall) (No. 4/30) Blueprint 2/19/1962 17S-2833 613 12-0305 State of Pa. - Bridge Unit at Lehigh Gap (Center Wall) (No. 5/30) Blueprint 2/19/1962 17

S-2833 614 12-0305State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure . (No. 6/30)

Blueprint 2/19/1962 17

S-2833 615 12-0305State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure(No. 7/30)

Blueprint 2/19/1962 17

S-2833 616 12-0305State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure(No. 8/30)

Blueprint 2/19/1962 17

S-2833 618 12-0305State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure(No. 10/30)

Blueprint 2/19/1962 17

S-2833 619 12-0305State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure(No. 11/30)

Blueprint 2/19/1962 17

S-2833 620 12-0305State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure(No. 12/30)

Blueprint 2/19/1962 17

S-2833 621 12-0305 State of Pa. - Bridge Unit at Lehigh Gap (Center Wall) (No. 13/30) Blueprint 2/19/1962 17S-2833 622 12-0305 State of Pa. - Bridge Unit at Lehigh Gap (Center Wall) (No. 14/30) Blueprint 2/19/1962 17S-2833 623 12-0305 State of Pa. - Bridge Unit at Lehigh Gap (Center Wall) (No. 15/30) Blueprint 2/19/1962 17

S-2833 624 12-0305State of Pa.- Bridge Unit at Lehigh Gap - Cantilever Structure16/30)

(No. Blueprint 2/19/1962 17

S-2833 625 12-0305State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure(No. 17/30)

Blueprint 2/19/1962 17

5634 639 12-0305 Proposed Plan for Yards at Lizard Creek with LVRR Tracing 5/?/1908 185638 640 12-0305 Profile of RR from Summit to Bath Graph paper 8/7/1919 185678 645 12-0305 Profile of Line Proposed by Bangor & Portland Railroad Blueprint ? 185705 646 12-0305 Profile of L&NE RR (Untitled and Area Affected Unknown) Graph paper 8/?/1908 18

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I631632633634635636637638

639

640641642643644645646647648649650

Page 17 of 194Page 17 of 194

651652653654655656

657

658

659

660661662663664665666

5717 648 12-0305 Profile of Line from Bath through Chaprans to Summit Graph paper 4/9/1920 185721 647 12-0305 Profile of Line Sussex Junction to Pine Island Junction Graph paper ? 185783 641 12-0305 Bridge Across Paulins Kill (Girders & Bolts) Blueprint 12/27/1918 18

33 sht 1 652 12-0305 Plan for Second Oil House at Pen Argyl Shops Linen ? 1833 sht 3 651 12-0305 Plan for Oil House at Pen Argyl Shops Blueprint 4/22/1915 1838 sht 14 642 12-0305 Lupton Steel Sash for Building at Pen Argyl Blueprint 12/29/1918 1838 sht 14 643 12-0305 Lupton Steel Sash for Windows at Pen Argyl Shops Blueprint 12/29/1918 1838 sht 14 644 12-0305 Lupton Steel Sash for Windows at Pen Argyl Shops Blueprint ? 18

46 sht 5 650 12-0305 Location of Proposed Coaling Station & Storage Yard at Pen Argyl Blueprint ? 18

no number 649 12-0305Plan Showing Location of Collieries, Cement Plants & Slate Quarries Blueprint ? 18

S-2833 626 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 18/30) Blueprint 2/19/1962 18S-2833 627 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 19/30) Blueprint 2/19/1962 18S-2833 628 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 20/30) Blueprint 2/19/1962 18S-2833 629 12-0305 State of Pa. - Bridge Unit at Lehigh Gap - Cantilever (No. 21/30) Blueprint 2/19/1962 18S-2833 630 12-0305 Test Borings at Lehigh Gap (Sprague & Henwood) (No. 22/30) Blueprint ? 18S-2833 631 12-0305 Test Borings at Lehigh Gap (Sprauge & Henwood) No. 23/30 Blueprint ? 18S-2833 632 12-0305 Test Borings at Lehigh Gap (Sprauge & Henwood) No. 24/30 Blueprint ? 18S-2833 633 12-0305 Test Borings at Lehigh Gap (Sprauge & Henwood) No. 25/30 Blueprint ? 18S-2833 634 12-0305 Test Borings at Lehigh Gap (Sprauge & Henwood) No. 26/30 Blueprint ? 18S-2833 635 12-0305 Test Borings at Lehigh Gap (Sprauge & Henwood) No. 27/30 Blueprint ? 18S-2833 636 12-0305 Test Borings at Lehigh Gap (Sprauge & Henwood) No. 28/30 Blueprint ? 18S-2833 637 12-0305 Test Borings at Lehigh Gap (Sprauge & Henwood) No. 29/30 Blueprint ? 18S-2833 638 12-0305 Test Borings at Lehigh Gap (Sprauge & Henwood) No. 30/30 Blueprint 4/19/1918 18S-2834 653 12-0305 State of Pa. - Plan for Bridge at Lehigh Gap No. 1/7 Blueprint 7/28/1958 18S-2834 654 12-0305 State of Pa. - Plan for Bridge at Lehigh Gap No. 2/7 Blueprint 7/28/1958 18S-2834 655 12-0305 State of Pa. - Plan for Bridge at Lehigh Gap No. 3/7 Blueprint 7/28/1958 18

S-2832 690 12-0306State of Pa. - Barrier Wall Lehigh Gap - Northampton & CarboCounty No.1/8

n Blueprint 7/25/1958 19

S-2832 691 12-0306State of Pa. - Barrier Wall Lehigh Gap - Northampton & CarboCounty No. 2/8

n Blueprint 7/25/1958 19

S-2832 692 12-0306State of Pa. - Barrier Wall Lehigh Gap - Northampton & CarboCounty No. 3/8

n Blueprint 7/25/1958 19

S-2832 693 12-0306State of Pa. - Barrier Wall Lehigh Gap - Northampton & CarboCounty No. 4/8

n Blueprint 7/25/1958 19

S-2832 694 12-0306 Test Borings for Lehigh Gap Project - Carbon County Drawing Blueprint 7/28/1958 19S-2833 660 12-0306 State of Pa. - Bridge Unit at Lehigh Gap - Right Wall No. 1/30 Blueprint 2/18/1958 19S-2833 661 12-0306 State of Pa. - Bridge Unit at Lehigh Gap - Right Wall No. 2/30 Blueprint 7/28/1958 19S-2833 662 12-0306 State of Pa. - Bridge Unit at Lehigh Gap - Right Wall No. 3/30 Blueprint 2/18/1958 19S-2833 663 12-0306 State of Pa. - Bridge Unit at Lehigh Gap - Center Wall No. 4/30 Blueprint 7/28/1958 19S-2833 664 12-0306 State of Pa. - Bridge Unit at Lehigh Gap - Center Wall No. 5/30 Blueprint 7/28/1958 19

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

667

668

669

670

671

672673674675

676

677

678

679

680

Page 18 of 194Page 18 of 194

681

682

683

684

685686

687

688

689

690

691692693

St hi Ri & ll &

S-2833 665 12-0306State of Pa - Bridge Unit at Lehigh Gap - Cantilever Structure6/30

No. Blueprint 7/28/1958 19

S-2833 666 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure7/30

No. Blueprint 2/18/1958 19

S-2833 667 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure8/30

No. Blueprint 2/18/1958 19

S-2833 668 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure9/30

No. Blueprint 2/18/1958 19

S-2833 669 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure10/30

No. Blueprint 7/28/1958 19

S-2833 670 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Cantilever Structure11/30

No. Blueprint 7/28/1958 19

S-2833 671 12-0306 State of Pa. - Bridge Unit at Lehigh Gap - Center Wall B No. 12/30 Blueprint 7/28/1958 19S-2833 672 12-0306 State of Pa. - Bridge Unit at Lehigh Gap - Center Wall B No. 13/30 Blueprint 7/28/1958 19S-2833 673 12-0306 State of Pa. - Bridge Unit at Lehigh Gap - Center Wall B No. 14/30 Blueprint 7/28/1958 19

S-2833 674 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Right Wall & CantileStruc. (No. 15/30

ver Blueprint 7/28/1958 19

S-2833 675 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Right & Center WalNo. 16/30

ls Blueprint 7/28/1958 19

S-2833 676 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Right & Center WalNo. 17/30

ls Blueprint 7/28/1958 19

S-2833 677 12-0306State of Pa. - Bridge Unit at Lehigh Gap - Right & Center WalNo. 18/30

ls Blueprint 7/28/1958 19

S-2833 678 12-0306State of Pa. - Lehigh Gap - Right & Center Walls & Cantilever19/30

No. Blueprint 7/28/1958 19

S-2833 679 12-0306State of Pa Lehigh Gap Right & Center Walls & Cantileverate of Pa. - Le gh Gap - ght Center Wa s Cantilever20/30

No No. Blueprint 7/28/1958 19

S-2833 680 12-0306State of Pa. - Lehigh Gap - Right & Center Walls & Cantilever21/30

No. Blueprint 2/18/1958 19

S-2833 681 12-0306Test Borings for Lehigh Gap Project-Northampton County No.22/30

Blueprint 7/28/1958 19

S-2833 682 12-0306Test Borings for Lehigh Gap Project - Northampton County No23/30

. Blueprint 7/28/1958 19

S-2833 683 12-0306Test Borings for Lehigh Gap Project - Northampton County No24/30

. Blueprint 7/28/1958 19

S-2833 684 12-0306 Test Borings for Lehigh Gap Project - Carbon County No. 25/30 Blueprint 7/28/1958 19

S-2833 685 12-0306Test Borings for Northampton & Carbon County - Lehigh Gap26/30

No. Blueprint 7/28/1958 19

S-2833 686 12-0306Test Borings for Northampton & Carbon County - Lehigh Gap27/30

No. Blueprint 7/28/1958 19

S-2833 687 12-0306Test Borings for Northampton & Carbon County - Lehigh Gap28/30

No. Blueprint 7/28/1958 19

S-2833 688 12-0306Test Borings for Northampton & Carbon County - Lehigh Gap29/30

No. Blueprint 7/28/1958 19

S-2833 689 12-0306Test Borings for Northampton & Carbon County - Lehigh Gap30/30

No. Blueprint 7/28/1958 19

S-2834 656 12-0306 State of Pa. - Plan for Bridge at Lehigh Gap No. 4/7 Blueprint 2/18/1958 19S-2834 657 12-0306 Test Borings for Bridge at Lehigh Gap 9 Blueprint 7/28/1958 19

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I694695696697698699700701702703704705706707

708709710711712

713

Page 19 of 194Page 19 of 194

714715716

717718719720721

722723724725726

727728729730

S-2834 658 12-0306 Test Borings for Bridge at Lehigh Gap Blueprint 7/28/1958 19S-2834 659 12-0306 Test Borings for Bridge at Lehigh Gap Blueprint 7/28/1958 195458 731 12-0306 Map of Penna Poughkeepsie & Boston at Deckertown Blueprint ? 205689 730 12-0306 Profile of East & Westbound Nazareth Classification Yard Blueprint 12/18/1911 205738 729 12-0306 Profile of Proposed Branch Line at Pen Argyl Graph paper ? 205973 727 12-0306 Map of L&NE RR in Bethlehem area - Poor Condition Blueprint 3/8/1916 20

45 sht 107 701 12-0306 Bill of Pins for Bridge Over Delaware River Blueprint 07/29/1908 2045 sht 12 720 12-0306 Foundation Plan, Anchor Bolts, etc. Bridge Portland & Columbia Blueprint 5/20/1908 2045 sht 13 719 12-0306 Foundation Plan, Anchor Bolts, etc. Bridge Portland & Columbia Blueprint 7/1/1908 2045 sht 19 718 12-0306 Columns for Bridge Over DL&W Portland to Columbia Blueprint 8/3/1908 2045 sht 26 717 12-0306 Erection Plan for Bridge Over DL&W Portland & Columbia Blueprint 8/3/1908 2045 sht 27 716 12-0306 Erection Plan for Bridge between Portland & Columbia Blueprint 8/12/1908 2045 sht 28 715 12-0306 Shoes for 120' Span Wooden Bridge Columbia to Portland Blueprint 8/13/1908 2045 sht 29 714 12-0306 Trusses for 120' Span Wooden Bridge Columbia to Portland Blueprint 7/15/1908 20

45 sht 37 713 12-0306Floor Beams & Sway Bracing Wooden Bridge Columbia to Portland Blueprint 7/14/1908 20

45 sht 38 712 12-0306 End Posts Wooden Bridge Columbia to Portland Blueprint 7/14/1908 2045 sht 39 711 12-0306 Bottom Chords Wooden Bridge Columbia to Portland Blueprint 7/14/1908 2045 sht 4 725 12-0306 Plate Girder Span Bridge Columbia & Portland - Poor condition Blueprint 6/22/1908 2045 sht 40 710 12-0306 Top Chords Wooden Bridge Columbia to Portland Blueprint 7/14/1908 20

45 sht 41 709 12-0306Bottom Chord for 151 Ft Wooden Bridge Span Columbia to Portland Blueprint 7/14/1908 20

45 sht 42 708 12-0306 Top Chord for 151 Ft Wooden Bridge Columbia to Portland Blueprint 7/14/1908 2045 sht 43 707 12-0306 Top Chord for 151 Ft Wooden Bridge Columbia to Portland Blueprint 7/22/1908 2045 sht 44 706 12-0306 Shoes for Wooden Bridge Columbia to Portland Blueprint 7/27/1908 20

45 sht 45 705 12-0306 End Stringers & Top Bracing Wooden Bridge Portland & Columbia Blueprint 7/22/1908 2045 sht 46 704 12-0306 Bottom Laterals Wooden Bridge Portland to Columbia Blueprint 7/14/1908 2045 sht 48 703 12-0306 Posts & Hangers for Wooden Bridge Portland & Columbia Blueprint 9/6/1908 2045 sht 5 724 12-0306 Plate Girder Span Bridge Columbia & Portland Blueprint 6/25/1908 2045 sht 53 702 12-0306 Wooden Floor Plan Bridge between Portland & Columbia Blueprint 7/29/1908 20

45 sht 54 700 12-0306West End Girder Plan - Wooden Bridge - DL&W Portland & Columbia Blueprint 5/25/1908 20

45 sht 55 699 12-0306 Frames & Shoes Wooden Bridge - DL&W Portland & Columbia Blueprint 5/27/1908 2045 sht 56 698 12-0306 Wooden Floor Plan DL&W Bridge Portland & Columbia Blueprint 7/18/1908 2045 sht 6 723 12-0306 Skew Plate Girder Span Bridge Columbia & Portland Blueprint 7/7/1908 2045 sht 8 722 12-0306 Skew Plate Girder Bridge Columbia & Portland Blueprint 5/20/1908 20

45 sht 9 721 12-0306Wooden Platform Beams Bridge between Columbia & Portlan(Blue Print)

d Blueprint 5/20/1908 20

560? 732 12-0306 Plan Showing Property Between Wind Gap & Pen Argyl Blueprint 4/?/1890 206037A 726 12-0306 Map Showing Collieries, Cement Plants & Slate Quarries Blueprint 6/2/1908 20F139 728 12-0306 Map of L&NE RR in Nazareth Area - Poor Condition Blueprint ? 20

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

731

732733734735736

737

738

739

740741742743744745746747

Page 20 of 194Page 20 of 194

748

749

750751

752753754755756757758759760761762763764

& top . &

S-2832 695 12-0306Test Borings for Lehigh Gap Project - Northampton County Drawing Blueprint 7/28/1958 20

S-2832 696 12-0306Test Borings for Lehigh Gap Project - Northampton County Drawing Blueprint 7/28/1958 20

S-2832 697 12-0306 Test Borings for Lehigh Gap Project - Carbon County Blueprint 7/28/1958 205401 735 12-0306 Profile of Line Relocation between Saylorsburg & Benders Linen ? 215710 733 12-0306 Elevation Plan for Coal Dump at Bangor Graph paper 1/16/1914 215745 734 12-0306 Untitled Profile Graph of Elevation Graph paper 1/17/1905 21

45 sht 12 763 12-0306Foundation plan, anchor bolts, bridge Portland, Pa. & ColumbNJ.

ia, Blueprint 5/20/1908 21

45 sht 13 761 12-0306Foundation plan, anchor bolts, bridge Portland, Pa. & ColumbNJ.

ia, Blueprint 5/20/1908 21

45 sht 14a 759 12-0306Details of connection of bridge between Portland, Pa. & ColumNJ

bia, Blueprint 6/20/1908 21

45 sht 15 758 12-0306Erection diagram for bridge between Portland, Pa. and ColumNJ.

bia, Blueprint 6/22/1908 21

45 sht 19 757 12-0306 Columns for bridge between Portland Pa., & Columbia, NJ. Blueprint 7/4/1908 2145 sht 25 756 12-0306 Erection plan for bridge between Portland, Pa. and Columbia, NJ. Blueprint 8/3/1908 2145 sht 26 755 12-0306 Erection plan for bridge between Portland, Pa. and Columbia, NJ. Blueprint 8/3/1908 2145 sht 27 754 12-0306 Erection plan for bridge between Portland, Pa. & Columbia, NJ. Blueprint 8/3/1908 2145 sht 28 753 12-0306 Shoes for bridge between Portland, Pa. & Columbia, NJ. Blueprint 6/26/1908 2145 sht 29 752 12-0306 Trusses for bridge between Portland, Pa. and Columbia, NJ. Blueprint 6/26/1908 2145 sht 31 751 12-0306 Trusses for bridge between Portland, Pa. & Columbia, NJ. Blueprint 6/30/1908 21

45 sht 34 750 12-0306Stringers & top bracing bridge between Portland, Pa. & ColumStringers bracing bridge between Portland, Pa ColumbiaNJ.

bia, , Blueprint 6/30/1908 21

45 sht 35 749 12-0306Stringers & top bracing bridge between Portland, Pa. & ColumNJ.

bia, Blueprint 6/30/1908 21

45 sht 37 748 12-0306Floor beams & sway bracing for bridge between Portland & Columbia Blueprint 7/15/1908 21

45 sht 38 747 12-0306 End posts for bridge between Portland, Pa. and Columbia, NJ. Blueprint 7/14/1908 21

45 sht 39 746 12-0306Bottom chords for bridge between Portland, Pa. and ColumbiaNJ.

, Blueprint 7/14/1908 21

45 sht 40 745 12-0306 Top chords for bridge between Portland, Pa. and Columbia, NJ. Blueprint 7/14/1908 2145 sht 41 744 12-0306 Bottom Chord (151' Span) Bridge Portland to Columbia Blueprint 7/14/1908 2145 sht 42 743 12-0306 Top Chord (151' Span) Bridge Portland to Columbia Blueprint 7/14/1908 2145 sht 43 742 12-0306 Top Chord (151' Span) Bridge Portland to Columbia Blueprint 7/22/1908 2145 sht 44 741 12-0306 Shoes for Bridge Between Portland & Columbia Blueprint 1/27/1908 2145 sht 45 740 12-0306 End Stringers & Top Bracing Bridge Over DL&W and NYS&W Blueprint 7/22/1908 2145 sht 46 739 12-0306 Bottom Laterals for Bridge Portland to Columbia Blueprint 7/14/1908 2145 sht 48 738 12-0306 Posts & Hangers for Bridge Portland to Columbia Blueprint 7/18/1908 2145 sht 5 767 12-0306 Girder spans for bridge between Portland, Pa. & Columbia, NJ. Blueprint 6/22/1908 2145 sht 50 737 12-0306 Diagonals for Span Over DL&W and NYS&W Blueprint 7/29/1908 2145 sht 51 736 12-0306 Stringer for Bridge Over DL&W & NYS&W Blueprint ? 2145 sht 6 766 12-0306 Girder spans for bridge between Portland, Pa. & Columbia, NJ. Blueprint 6/25/1908 21

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

765766767

768

769

770

771772773

774

775

776777778

779

Page 21 of 194Page 21 of 194

780

781

782783784785786787788

789

790

791792793794795

45 sht 7 765 12-0306Plate girder spans for bridge between Portland, Pa. & ColumbNJ.

ia, Blueprint 7/1/1908 21

45 sht 8 764 12-0306 Girder spans for bridge between Portland, Pa. & Columbia, NJ Blueprint 7/22/1908 2145 sht 9 762 12-0306 Wooden floor plan bridge between Portland, Pa. & Columbia, NJ. Blueprint 7/15/1908 21

45 sht14 760 12-0306Foundation plan, anchor bolts, bridge Portland, Pa. & ColumbNJ.

ia, Blueprint 5/20/1908 21

1 sht 10/51 783 12-0130Req. List of Material-Road Relocation-Plainfield Twp-NorthamCounty

pton Blueprint 8/11/1958 22

1 sht 11/51 784 12-0130Req. List of Material-Road Relocation-Plainfield Twp-NorthamCounty

pton Blueprint 8/11/1958 22

1 sht 12/51 785 12-0130Req. List of Material-Road Relocation-Plainfield Twp-NorthamCounty

pton Blueprint 8/11/1958 22

1 sht 13/51 786 12-0130 Relocation of Line on Plainfield Twp - Northampton County Blueprint 8/11/1958 221 sht 14/51 787 12-0130 Field Relocation Map - Plainfield Township - Northampton County Blueprint 8/11/1958 22

1 sht 15/51 788 12-0130Required List for Road Relocation-Northampton County-PlainTownship

field Blueprint 8/11/1958 22

1 sht 16/51 789 12-0130Req. List of Material for Ramp "J" Plainfield Township-Northampton County Blueprint 8/11/1958 22

1 sht 17/51 790 12-0130Required List of Material for Road Relocation - Northampton County Blueprint 8/11/1958 22

1 sht 18/51 791 12-0130 County Blueprint 8/11/1958 221 sht 19/51 792 12-0130 County Blueprint 8/11/1958 22

1 sht 2/51 775 12-0130State of Pa -Property Condemnation-Northampton & Monroe County Blueprint 6/23/1958 22

1 sht 20/51 793 12-0130 Required List of Material for Line Relocation at Plainfield Township Blueprint 8/11/1958 22

1 sht 21/51 794 12-0130 Required List of Material for Line Relocation at Plainfield Township Blueprint 8/11/1958 22

1 sht 22/51 795 12-0130 Required List of Material for Line Relocation at Plainfield Township Blueprint 8/11/1958 221 sht 23/51 796 12-0130 Required List of Material for Line Relocation in Plainfield Township Blueprint 8/11/1958 221 sht 24/51 797 12-0130 Required List of Material for Line Relocation in Plainfield Township Blueprint 8/11/1958 221 sht 25/51 798 12-0130 Required List of Material for Line Relocation in Hamilton Township Blueprint 8/11/1958 221 sht 26/51 799 12-0130 Required List of Material for Line Relocation in Hamilton Township Blueprint 8/11/1958 221 sht 27/51 800 12-0130 Required List of Material for Hamilton & Plainfield Township Blueprint 8/11/1958 221 sht 28/51 801 12-0130 Required List of Material for Hamilton & Plainfield Township Blueprint 8/11/1958 22

1 sht 29/51 802 12-0130Required List of Materials for Ramp Reconstruction Hamilton Township Blueprint 8/11/1958 22

1 sht 3/51 776 12-0130General Notes Highway Relocation Northampton & Monroe County Blueprint 8/11/1958 22

1 sht 30/51 803 12-0130Required List of Material for Drive Approaches - Hamilton Township Blueprint 8/11/1958 22

1 sht 4/51 777 12-0130 Construction of Storm Sewers Northampton & Monroe Counties Blueprint 8/11/1958 221 sht 5/51 779 12-0130 Typical Ramp Construction Northampton & Monroe Counties Blueprint 8/11/1958 221 sht 6/51 780 12-0130 Computation of Construction & Overall Length of Grading Blueprint 8/11/1958 221 sht 7/51 778 12-0130 Method of Slope Benching Northampton & Monroe County Blueprint 8/11/1958 22

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I796

797798799800801802803

804805806807808809810811812813

814815

Page 22 of 194Page 22 of 194

815816

817

818819

820821822823824

825826827

828829

830

1 41/51 814 12 0130 Li Li tion Bl 8/11/1958 23

1 sht 8/51 781 12-0130 Required List for Roadway at Margaret Kostenbader Property Blueprint 8/11/1958 22

1 sht 9/51 782 12-0130Permanent Barricade with Supports - Plainfield Twp - Northampton County Blueprint 8/11/1958 22

45 sht 1 769 12-0130 Erection plan for bridge between Portland & Columbia Blueprint 6/28/1908 2245 sht 4 768 12-0130 Girder spans for bridge between Portland & Columbia Blueprint 6/2/1908 2245 sht 52 773 12-0130 Stringers & Top Bracing Bridge DL&W and NYS&W Blueprint 7/27/1908 2245 sht 54 772 12-0130 West End Plate Girder Span Bridge Portland to Columbia Blueprint 5/25/1908 2245 sht 55 771 12-0130 Frames, Shoes, Etc. Bridge Portland to Columbia Blueprint 5/27/1908 2245 sht 56 770 12-0130 Wooden floor plan bridge between Portland & Columbia Blueprint 7/8/1908 22

Section 1 intro 774 12-0130State of Pa.-Condemnation of R of W-Monroe & NorthamptonCounty

Blueprint 6/23/1958 22

1 sht 31/51 804 12-0130 Required List of Materials in Monroe & Hamilton Townships Blueprint 8/11/1958 231 sht 32/51 805 12-0130 Required List of Materials for Stream Diversion in Ross Township Blueprint 8/11/1958 231 sht 33/51 806 12-0130 Required List of Materials for Line Relocation - Hamilton Township Blueprint 8/11/1958 231 sht 34/51 807 12-0130 Required List of Material for Profile Change in Wind Gap Borough Blueprint 8/11/1958 231 sht 35/51 808 12-0130 Required List of Material for Profile Change in Ross Township Blueprint 8/11/1958 231 sht 36/51 809 12-0130 Required List of Material for Profile Change in Ross Township Blueprint 8/11/1958 231 sht 37/51 810 12-0130 Required Material for Curve Change in Ross Township Blueprint 8/11/1958 231 sht 38/51 811 12-0130 Required List for Excavation & Embankment - Ross Township Blueprint 8/11/1958 231 sht 39/51 812 12-0130 Required List for Material Involving Line Relocation in Ross Twp Blueprint 8/11/1958 23

1 sht 40/51 813 12-0130Req. List for Excavation & Embankment at Ross Township, Monroe County Blueprint 8/11/1958 23

1 sht 41/51 sht 814 12 0130- Required List for Materials Involving Line RelocationRequired st for Materials Involving ne Reloca Blueprint 8/11/1958ueprint 231 sht 42/51 815 12-0130 Required List for Profile Change in Ross Township Monroe County Blueprint 8/11/1958 23

1 sht 43/51 816 12-0130 Required List of Material for Local Profile Road Hamilton Township Blueprint 8/11/1958 23

1 sht 44/51 818 12-0130Required List of Material for Excavation & Embankment - HamTownship

ilton Blueprint 8/11/1958 23

1 sht 45/51 817 12-0130 Required List for Spiral Construction in Hamilton Township Blueprint 8/11/1958 23

1 sht 46/51 819 12-0130Required List of Material for Excavation & Embankment - HamTownship

ilton Blueprint 8/11/1958 23

1 sht 47/51 820 12-0130 List of Material for Acquired Right of Way in Hamilton Township Blueprint 8/11/1958 231 sht 48/51 821 12-0130 Ultimate Unfinished Bridge in Hamilton Township - Monroe County Blueprint 8/11/1958 231 sht 49/51 822 12-0130 Profile for Ramp in Hamilton Township Monroe County Blueprint 8/11/1958 231 sht 50/51 823 12-0130 Plant Materials Required for Plainfield & Ross Townships Blueprint 8/11/1958 23

1 sht 51/51 824 12-0130Roadside Development Project in Plainfield, Ross & HamiltonTownships

Blueprint 8/11/1958 23

S-2898 1/11 825 12-0130 State of Pa.-Steel Railroad Bridge in Northampton County Blueprint 5/11/1958 23S-2898 1/11 832 12-0130 General Layout for Bridge Unit in Northampton County Blueprint 5/14/1958 23

S-2898 10/11 830 12-0130State of Pa.-Bar List & Details for Steel Bridge in NorthamptonCounty

Blueprint 9/29/1958 23

S-2898 11/11 831 12-0130 Test Borings for Turnpike Engineers Wind Gap to Saylorsburg Blueprint 4/26/1957 23

S-2898 2/11 826 12-0130State of Pa.-Structual Steel Railroad Bridge in Northampton County Blueprint 9/29/1958 23

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I831832833

834835836837838839840

841842843844845846847848849850

0

6

Page 23 of 194Page 23 of 194

851852853854855856857858859860861862863864865

866867868869

S-2898 2/11 833 12-0130 State of Pa.-Framing Plan & Stress Sheet Bridge Unit Blueprint 5/14/1958 23S-2898 3/11 827 12-0130 State of Pa.-Girder Details for Steel Bridge in Northampton County Blueprint 9/29/1958 23S-2898 3/11 834 12-0130 State of Pa.-Girder Details for Bridge in Northampton County Blueprint 5/14/1958 23

S-2898 4/11 828 12-0130State of Pa.-Superstructure Details Steel Bridge in NorthamptCounty

on Blueprint 9/29/1958 23

S-2898 4/11 835 12-0130 Superstructure Details for Bridge in Northampton County Blueprint 5/14/1958 23S-2898 5/11 829 12-0130 State of Pa.-Bearing details in Northampton County Blueprint 9/29/1958 23S-2898 5/11 836 12-0130 Bearing Details for Bridge Unit in Northampton County Blueprint 5/14/1958 23S-2898 7/11 837 12-0130 West Abutment Details for Bridge in Northampton County Blueprint 5/14/1958 23S-2898 8/11 838 12-0130 East Abutment Details for Bridge in Northampton County Blueprint 5/14/1958 23S-2898 9/11 839 12-0130 Abutment & Wingwall Sections for Bridge in Northampton County Blueprint 5/14/1958 23

5429 865 12-0131Map Showing L&NE Property at Bethlehem-Hanover Twp, LeCounty

high Blueprint 6/?/1905 24

6 sht 2 62 sht 896 12-0131 138' Spans on Delaware River Bridge (poor condition) Blueprint 7/24/1889 2462 sht 100 869 12-0131 Material & Upsets for Delaware River Bridge Blueprint 6/12/1889 2462 sht 101 868 12-0131 Material Upsets for Delaware River Bridge Blueprint 6/12/1889 2462 sht 102 867 12-0131 Nuts & Bolts for Delaware River Viaduct (PP&B RR) Blueprint 8/22/1889 2462 sht 103 866 12-0131 Nuts & Bolts for Delaware River Viaduct Approach Blueprint 6/14/1889 24

2 sht 62 0r 71 903 12-0131 Details for Span Over Delaware River Bridge Blueprint 8/10/1889 2462 sht 63 901 12-0131 Details for 121' Span Over Delaware River Bridge (PP&B) Blueprint 5/23/1889 2462 sht 64 897 12-0131 Details on 121' Span for Delaware River Bridge (PP&B) Blueprint 8/27/1889 2462 sht 65 908 12-0131 Details of 121' Span Over Delaware River Bridge (PP&B) Blueprint 5/20/1889 2462 sht 66 909 12-0131 Detail of Bridge Span Over Delaware River Bridge (PP&B) Blueprint 7/1/1907 2462 sht 67 907 12-0131 Details of 121' Span Over Delaware River Bridge (PP&B) Blueprint 5/21/1889 2462 sht 68 904 12-0131 Details of 121' Span Over Delaware River Bridge (PP&B) Blueprint 5/23/1889 2462 sht 69 905 12-0131 Details of 121' Span Over Delaware River Bridge (PP&B) Blueprint 7/20/1954 2462 sht 70 906 12-0131 Details of 121' Span Over Delaware River Bridge (PP&B) Blueprint 5/23/1889 2462 sht 72 899 12-0131 Details of Nuts & Bolts Required for Delaware River Span (PP&B) Blueprint 5/23/1889 2462 sht 73 898 12-0131 Details for 121' Span for Delaware River Bridge (PP&B) Blueprint 5/21/1889 2462 sht 75 895 12-0131 Detail of Deck Span for PP&B RR Over Delaware River Blueprint 5/20/1889 2462 sht 76 882 12-0131 "C" Deck Spans for Delaware River Bridge Blueprint 5/20/1889 2462 sht 77 881 12-0131 Deck Spans for Delaware River Bridge Blueprint 5/26/1889 2462 sht 78 885 12-0131 Anchor Bolt Washers for Delaware River Bridge Blueprint 7/10/1887 2462 sht 79 887 12-0131 Deck Span 138' 0" for Bridge Over Delaware River Bridge Blueprint 6/1/1889 2462 sht 80 893 12-0131 Detail of 138' Span for PP&B RR Bridge Over Delaware River Blueprint 6/1/1889 2462 sht 81 894 12-0131 Detail of 138' Span for PP&B RR Bridge Over Delaware River Blueprint 6/1/1889 24

62 sht 81a 892 12-0131 Detail of 138' Span for PP&B RR Bridge Over Delaware River Blueprint 5/31/1889 24

62 sht 82 891 12-0131Detail of 138' Span for PP&B RR Bridge Over Delaware RiverBridge

Blueprint 5/31/1889 24

62 sht 83 890 12-0131 Detail of Material for 151' 4" Bridge Span Over Delaware River Blueprint 6/1/1889 2462 sht 84 889 12-0131 Bridge Span 151' 4" for PP&B RR Over Delaware River Bridge Blueprint 6/1/1889 2462 sht 85 888 12-0131 Bridge Span 151' 4" for PP&B RR Over Delaware River Bridge Blueprint 6/1/1889 24

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I870871872873874

875876877878879880881882883884885886887

888889

Page 24 of 194Page 24 of 194

890891892893894895896897898899

900901902903904905

906907

SS

62 sht 86 886 12-0131 Details for First Span of Delaware River Bridge Blueprint 7/20/1889 2462 sht 87 884 12-0131 Iron Bridge Spans for PP&B RR Bridge Over Delaware River Blueprint 6/1/1889 2462 sht 88 880 12-0131 Material & Eyes for Steel Bridge Over Delaware PP&B RR Blueprint 6/1/1889 2462 sht 89 883 12-0131 Span 151' 4" for PP&B RR Bridge Over Delaware River Blueprint 6/3/1889 2462 sht 90 871 12-0131 Material for Steel Bridge for PP&B RR Bridge Blueprint 6/1/1889 24

62 sht 91 876 12-0131Cast Bed Plates for Signal Track Bridge Over Delaware RiverBridge

Blueprint 5/23/1889 24

62 sht 92 877 12-0131 Marks for Bridge Parts on Bridge of PP&B RR Blueprint 5/23/1889 2462 sht 93 872 12-0131 Material & Upsets for Delaware River Bridge for PP&B RR Blueprint 5/23/1889 2462 sht 94 873 12-0131 Bolts & Nuts for Bridge Over Delaware River for PP&B RR Blueprint 5/24/1889 2462 sht 95 874 12-0131 Material Required for Delaware River Bridge of PP&B RR Blueprint 5/23/1889 2462 sht 96 875 12-0131 Bolts & Nuts for Bridge Over Delaware River for PP&B RR Blueprint 5/23/1889 2462 sht 97 879 12-0131 Material & Eyes for Steel Bridge Over Delaware PP&B RR Blueprint 5/23/1889 2462 sht 98 878 12-0131 Material Required for Bridge Over Delaware PP&B RR Blueprint 5/24/1889 2462 sht 99 870 12-0131 Material Required for Span Deck for PP&B RR Blueprint 5/27/1889 24

S-2898 3/11 857 12-0131 Girder Details for Bridge Unit in Northampton County Blueprint 5/14/1958 24S-2898 1/11 855 12-0131 General Layout for Structural Steel Bridge Northampton County Blueprint 5/14/1958 24S-2898 10/11 841 12-0131 Bar Lists & Details for Bridge in Northampton County Blueprint 5/14/1958 24S-2898 10/11 864 12-0131 Bar Lists & Details for Northampton County Bridge Blueprint 5/14/1958 24

S-2898 11/11 849 12-0131West Abutment Details for Structural Steel Bridge in NorthamCounty

pton Blueprint 10/23/1958 24

S-2898 11/11 854 12-0131 Test Borings for Turnpike Engineers Wind Gap to Saylorsburg Blueprint 4/26/1957 24

S-2898 2/11 856 12-0131F i Pl & St Sh t f B id U it i N th tFraming Plan & Stress Sheet for Bridge Unit in Northampton County Blueprint 5/14/1958 24

S-2898 4/11 858 12-0131 Superstructure Details for Bridge Unit Northampton County Blueprint 5/14/1958 24S-2898 5/11 859 12-0131 Bearing Details for Bridge Unit in Northampton County Blueprint 5/14/1958 24S-2898 6/11 840 12-0131 Superstructure Details for Bridge in Northampton County Blueprint 5/14/1958 24S-2898 6/11 860 12-0131 West Abutment for Steel Bridge in Northampton County Blueprint 5/14/1958 24S-2898 7/11 861 12-0131 East Abutment for Steel Bridge in Northampton County Blueprint 5/14/1958 24S-2898 8/11 863 12-0131 Substructure Details for Bridge Northampton County Blueprint 5/14/1958 24

S-2898A 1/11 843 12-0131 General Layout Bridge Unit in Northampton County Blueprint 10/23/1958 24-2898A 10/11 852 12-0131 Bar list and details for bridge Northampton County Blueprint 10/23/1958 24-2898A 11/11 853 12-0131 Test Borings for Turnpike Engineers Wind Gap to Saylorsburg Blueprint 4/26/1957 24

S-2898A 2/11 844 12-0131Framing Plan & Stress Sheet for Bridge Unit in Northampton County Blueprint 10/23/1958 24

S-2898A 3/11 845 12-0131 Girder Details for Bridge Unit in Northampton County Blueprint 10/23/1958 24S-2898A 4/11 846 12-0131 Superstructure Details for Bridge Unit Northampton County Blueprint 10/23/1958 24S-2898A 5/11 847 12-0131 Bearing Details for Bridge Unit in Northampton County Blueprint 10/23/1958 24S-2898A 6/11 848 12-0131 West Abutment for Structural Steel Bridge Northampton County Blueprint 10/23/1958 24S-2898A 8/11 850 12-0131 East Abutment for Structural Steel Bridge Northampton County Blueprint 10/23/1958 24

S-2898A 9/11 851 12-0131Substructure Details for Structural Steel Bridge Northampton County Blueprint 10/23/1958 24

62 sht 59 912 12-0131 Detail of 24' Spans for Bridge Over Delaware River Blueprint 6/15/1889 25

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I908

909910911

912913914

915916917918919920

921

922923

924925

6

Page 25 of 194Page 25 of 194

925

926927928929930931932933934935

936

937

938

939

940

62 49 922 12 0131 Floor Plan for Delaware River Deck Spans (PP&B) Bl 5/22/1889 25

62 sht 50 921 12-0131 Columns & Struts under 103' Span Over Delaware River (PP&B) Blueprint 5/22/1889 25

62 sht 32 939 12-013112 Span Deck Plate Girders for Bridge Over Delaware River (PP&B) Blueprint 4/27/1889 25

62 sht 33 938 12-0131 Deck Plate Girders for Delaware River Bridge at Portland (PP&B) Blueprint 4/27/1889 2562 sht 34 937 12-0131 Deck Plate Girders for Delaware River Bridge at Portland (PP&B) Blueprint 4/27/1889 25

62 sht 35 936 12-0131Complete Span for Single Track Deck Bridge Over Delaware (PP&B) Blueprint 5/8/1889 25

62 sht 36 935 12-0131 Single Track Span Bridge Over Delaware for PP&B RR Blueprint 5/8/1889 2562 sht 37 934 12-0131 Plate Girders for Delaware River Bridge at Portland on PP&B Blueprint 5/21/1889 25

2 sht 38 or 40 931 12-0131Plate Girder & Bracing of the Single Track Bridge Over the Delaware Blueprint 5/9/1889 25

62 sht 39 932 12-0131 Deck Plate Girder Bridge Over Delaware River Bridge Blueprint 5/2/1889 2562 sht 41 930 12-0131 Plate Girder & Bracing for Delaware River Bridge of PP&B Blueprint 5/18/1889 2562 sht 42 929 12-0131 Plate Girder & Brace of Single Track Deck Span - PP&B Blueprint 5/18/1889 2562 sht 43 928 12-0131 Deck Plate Girder Span for Bridge Over Delaware River (PP&B) Blueprint 5/11/1889 2562 sht 44 927 12-0131 Deck Plate Girder Span for Delaware River Bridge (PP&B) Blueprint 5/11/1889 25

62 sht 45 926 12-0131First Section Truss for Single Track Bridge Over Delaware RivPP&B

er Blueprint 5/16/1889 25

62 sht 46 925 12-0131Int Section of Top Chord and Plates for Delaware River BridgePP&B

Of Blueprint 5/17/1889 25

62 sht 47 924 12-0131 Truss for Single Track Deck Bridge Over Delaware River Blueprint 5/21/1889 25

62 sht 48 923 12-0131Struts and Lateral Plan for Single Track Bridge Over DelawareRiver

Blueprint 5/25/1889 25

62 sht 49 sht 922 12 0131- Floor Plan for Delaware River Deck Spans (PP&B) Blueprint 5/22/1889ueprint 25

62 sht 51 920 12-0131Cap Plates for Columns for Bridge Over the Delaware River (PP&B) Blueprint 5/2/1889 25

62 sht 52 919 12-0131 Caps for Columns on PP&B Bridge Over Delaware River Blueprint 5/30/1889 2562 sht 53 915 12-0131 Columns & Struts for Delaware River Bridge (PP&B) Blueprint 5/2/1889 2562 sht 54 918 12-0131 Columns & Struts for Bridge of the PP&B RR Blueprint 5/2/1889 2562 sht 55 917 12-0131 Columns & Struts for Bridge of the PP&B RR Blueprint 5/1/1889 2562 sht 56 916 12-0131 Columns & Struts for Bridge of the PP&B RR Blueprint 5/1/1889 2562 sht 57 914 12-0131 Approach to Delaware River Bridge (PP&B) Blueprint 6/11/1889 2562 sht 58 913 12-0131 Plan Showing Bridge Over Delaware at Columbia, NY Blueprint 4/1/1889 2562 sht 60 911 12-0131 East Abutment for Bridge Over Delaware River (PP&B) Blueprint 6/15/1889 2562 sht 61 910 12-0131 List of Elevation Blocks for West Run Off Blueprint 25

62 sht 5 966 12-0132Top Chord Section & Struts for Single Track Bridge Over Delaware River Blueprint 5/13/1889 26

62 sht 10 961 12-0132Post Stringer End Post Shoe for Sing Track Bridge Over DelaRiver

ware Blueprint 5/7/1889 26

62 sht 11 960A 12-0132Int Posts & Top Chord Section for Single Track Bridge Over Delaware River Blueprint 5/9/1889 26

62 sht 13 958 12-0132Center Section Top Chord for Tie & Struts Bridge Over DelawRiver

are Blueprint 5/10/1889 26

62 sht 14 957 12-0132Central Section of Top Chord, Tie & Struts Bridge Over DelawRiver

are Blueprint 5/10/1889 26

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I941942943

944945946947948949950951952

953954955956957

958

959 6

Page 26 of 194Page 26 of 194

959960961

962

963964965

966967968969

970971972973974975

sht 62 965 12 26

62 sht 15 956 12-0132 Shoes and Roller Nests for Single Deck Bridge Over Delaware Blueprint 5/17/1889 2662 sht 16 955 12-0132 Shoes and Roller Nests for Single Deck Bridge Over Delaware Blueprint 5/17/1889 2662 sht 18 953 12-0132 Vertical Posts & Stringers for Single Track Bridge (PP&B) Blueprint 5/29/1889 26

62 sht 19 952 12-0132Erection Diagram of Truss Span for Delaware River Bridge (PP&B) Blueprint 6/4/1889 26

62 sht 2 969 12-0132 Post Stringers End Post & Shoe for Single Track Deck Bridge Blueprint 5/7/1889 2662 sht 20 951 12-0132 Erection Diagram of Truss Spans Bridge Over Delaware River Blueprint 6/4/1889 2662 sht 21 950 12-0132 Wrought Bed Plates for Truss Spans Delaware River Bridge Blueprint 6/7/1889 2662 sht 22 949 12-0132 Wrought Iron Bed Plates for Truss Spans Delaware River Bridge Blueprint 6/7/1889 2662 sht 23 948 12-0132 Post Stringer End Post & Shoe for Delaware River Bridge (PP&B) Blueprint 5/22/1889 2662 sht 24 947 12-0132 Post Stringer End Posts & Shoe for Delaware River Bridge Blueprint 5/22/1889 2662 sht 25 946 12-0132 Int Posts & Top Chord Section for Bridge Over Delaware Blueprint 5/17/1889 2662 sht 26 945 12-0132 Int Posts & Top Chord Section for Bridge Over Delaware River Blueprint 5/17/1889 26

62 sht 27 944 12-0132Chord Section Post for Single Track Bridge Over Delaware (PP&B) Blueprint 5/20/1889 26

62 sht 28 943 12-0132 Top Chord Section for Single Track Deck Bridge Over Delaware Blueprint 5/24/1889 2662 sht 29 942 12-0132 Erection Diagram for Viaduct Approach to DL&W Bridge (PP&B) Blueprint 4/27/1889 2662 sht 30 941 12-0132 Erection Diagram for Viaduct Approach to DL&W Bridge (PP&B) Blueprint 4/27/1889 2662 sht 31 940 12-0132 11 Span Deck Plate Girders for Delaware River Bridge (PP&B) Blueprint 4/27/1889 26

62 sht 4 967 12-0132Int Posts & Top Chord Section for Single Track Delaware RiveBridge

r Blueprint 5/10/1889 26

2 sht 62 0r 762 0r 1 96571 12-01320132Top Chord Section & Struts for Sing Track Bridge Over DelawRiver

are Blueprint 5/13Blueprint 5/13/1889/1889 26

62 sht 7 964 12-0132 Post Stringer End Post & Shoe for Delaware River Bridge Blueprint 5/7/1889 2662 sht 8 963 12-0132 Masonry Plan for Delaware River Bridge (PP&B) Blueprint 5/14/1889 26

62 sht 9 960 12-0132Int Posts & Top Chord Section for Single Track Deck Bridge (PP&B) Blueprint 5/9/1889 26

62 sht12 959 12-0132Int Posts & Top Chord Section for Single Track Bridge Over Delaware River Blueprint 5/9/1889 26

62 sht17 954 12-0132 Vertical Posts & Stringers for Single Deck Bridge (PP&B) Blueprint 5/29/1889 26missing 962 12-0132 Masonry Plan for Delaware River Bridge (PP&B) Blueprint 5/14/1889 26

missing 968 12-0132Int Posts & Top Chord Section for Single Track Delaware RiveBridge

r Blueprint 5/10/1889 26

16 sht 8 1009 12-0132 Required Floor Beams for Bridge at Lehigh Gap - Sheet 307 Blueprint 11/12/1911 2716 sht 10 1007 12-0132 Required Floor Beams for Bridge at Lehigh Gap - Sheet 310 Blueprint 11/8/1911 2716 sht 11 1006 12-0132 Required Material for Bridge at Lehigh Gap Sheet 310 Blueprint 11/7/1911 27

16 sht 12 1004 12-0132Stringer Material Required for Span No 3 Bridge Crossing LehRiver

igh Blueprint 11/28/1911 27

16 sht 13 1005 12-0132 Stringers & Plates Required for Span No 3 Crossing Lehigh River Blueprint 11/29/1911 2716 sht 14 1003 12-0132 Material Required for Span No 3 Crossing Lehigh River Blueprint 11/29/1911 2716 sht 15 1002 12-0132 Span No 3 Crossing Lehigh River near Lehigh Gap Blueprint 11/28/1911 2716 sht 16 1001 12-0132 Span No 3 Crossing Lehigh River near Lehigh Gap Blueprint 11/28/1911 2716 sht 9 1008 12-0132 Required Floor Beams for Bridge at Lehigh Gap - Sheet 308 Blueprint 11/6/1911 27

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

976

977

978

979

980

981

982

983

984985986

987

988989

Page 27 of 194Page 27 of 194

990991992993994

995996997998999

10001001

1002

1003

10041005

Li Al Littl

62 sht 1 970 12-0132Post Stringer End Post & Shoe for Single Track Delaware RivBridge

er Blueprint 5/7/1889 27

missing 996 12-0132Required Amount of Stone Required for Relocation in Portland Borough 3/17/1937 27

no number 971 12-0132State of Pa - Drawing for Construction of SH 226 in Schuylkill County Blueprint no date 27

no number 972 12-0132Required List of Property for Line Relocation in West Penn Township Blueprint no date 27

no number 973 12-0132Required List of Property for Line Relocation in West Penn Township Blueprint no date 27

no number 974 12-0132Required List of Property for Line Relocation in West Penn Township Blueprint no date 27

no number 975 12-0132Required List of Property for Line Relocation in Tamaqua, W PTwp, Rahn Twp

enn Blueprint no date 27

no number 976 12-0132Crading Section for New Line in W. Penn Townp, Rahn & Tamaqua Blueprint no date 27

no number 977 12-0132Required List of Property to be Acquired for Line Relocation-WPenn Twp

Blueprint no date 27

no number 978 12-0132 Required List of Property to be Acquired in West Penn Twp Blueprint no date 27no number 979 12-0132 Required List of Property to be Acquired in West Penn Twp Blueprint no date 27

no number 980 12-0132Required List of Property to be Acquired in West Penn & RahTownships

n Blueprint no date 27

no number 981 12-0132Construction of Connection with Reading RR near Little SchuRiver

ylkill Blueprint no date 27

no number 982 12-0132 Adjacent of Property Adjacent to Tamaqua Yard at Rahn Twp Blueprint no date 27

no number 983 12-0132Required List of Property to Be Acquired Along Little SchuylkillRequired st of Property to Be Acquired ong e SchuylkillRiver

Blueprint no date 27

no number 984 12-0132 List of Property to Be Acquired Adjacent to Tamaqua Yard Blueprint no date 27no number 985 12-0132 List of Property to Be Acquired in Rahn Township Blueprint no date 27no number 986 12-0132 Property to Be Acquired for SH 166 in Northampton County Blueprint 6/22/1933 27no number 987 12-0132 Property to Be Acquired from Dave Hoskins in Bethel Township Blueprint 3/8/1937 27

no number 988 12-0132Construction Drawing for Extension of SH 166 in NorthamptonCounty

Blueprint 2/12/1936 27

no number 989 12-0132 Realignment of Line in Portland Borough & North Bethel Township Blueprint 3/8/1936 27no number 990 12-0132 Statement Showing Rock Fill in Portland Boro & Upper Bethel Twp Blueprint 9/9/1936 27no number 991 12-0132 Required List of Fill for Relocation in Portland Borough Blueprint 9/9/1936 27no number 992 12-0132 Required List of Material for Line Relocation in Portland Borough Blueprint 3/8/1937 27

no number 993 12-0132Required List of Fill for Relocation in Portland Boro & Mt BethTwp

el Blueprint 3/8/1937 27

no number 994 12-0132 Required List of Fill for Relocation in Upper Mt Bethel Township Blueprint 3/8/1937 27

no number 995 12-0132Required List of Material for Relocation in Upper Mt Bethel Township Blueprint 3/8/1937 27

no number 997 12-0132Required Amount of Material Required for Relocation in UppeBethel Twp

r Blueprint 3/7/1937 27

no number 998 12-0132Required List of Material for Relocation of Line in Upper Mt BeTwp

thel Blueprint 3/8/1937 27

no number 999 12-0132 Required List of Fill for Line Relocation in Upper Mt Bethel Twp Blueprint 3/8/1937 27

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I10061007

1008100910101011

10121013101410151016101710181019102010211022102310241025

Page 28 of 194Page 28 of 194

102610271028102910301031103210331034103510361037103810391040

1041104210431044

no number 1000 12-0132 Required Fill Required in Upper Mt Bethel Twp for Relocation Blueprint 3/8/1937 2716 sht 11 1122 12-0145 Plan for Oil House at Pen Argyl Sheet F-4 Blueprint 4/12/1915 28

16 sht 17 1010 12-0145End Bolt Struts and Bottom Laters for Lehigh Gap Bridge - Sh316

eet Blueprint 11/7/1911 28

16 sht 18 1116 12-0145 Plan for Oil House at Pen Argyl - Sheet F-1 Blueprint 4/6/1915 2816 sht 19 1027 12-0145 Top Chords for Bridge Over Lehigh Gap - Sheet 318 Blueprint 10/6/1911 2816 sht 2 1121 12-0145 Plan for Oil House at Pen Argyl Sheet F-3 Blueprint 4/12/1915 28

16 sht 20 1028 12-0145Top Chords for Bridge at Lehigh Gap over Lehigh River - She319

et Blueprint 10/7/1911 28

16 sht 21 1126 12-0145 Falsework Plan for LV Span Over Lehigh River Bridge Blueprint 6/2/1909 2816 sht 22 1125 12-0145 Falsework Plan for LV Span Over Lehigh River Bridge Blueprint 6/2/1909 2816 sht 23 1123 12-0145 Profile of Trolley Rail along L&NE Branch Blueprint no date 2816 sht 24 1124 12-0145 Map Showing the LV and Over Crossing of PP&B near Slatington Blueprint 6/?/1889 2816 sht 25 1117 12-0145 Plan for Oil House at Pen Argyl - Sheet C-2 Blueprint 4/7/1915 2816 sht 26 1118 12-0145 Plan for Oil House at Pen Argyl - Sheet C-4 Blueprint 4/26/1915 2816 sht 27 1119 12-0145 Plan for Oil House at Pen Argyl - Sheet F-1 Blueprint 4/8/1915 2816 sht 28 1120 12-0145 Plan for Oil House at Pen Argyl - Sheet F-2 Blueprint 4/17/1915 2816 sht 3 1115 12-0145 Plan for Oil House at Pen Argyl - Sheet F-6 Blueprint 4/14/1915 2816 sht 4 1114 12-0145 Plan for Oil House at Pen Argyl - Sheet F-5 Blueprint 4/14/1915 2816 sht 5 1113 12-0145 Profile of Saylorsburg Branch of L&NE Graph paper no date 2816 sht 6 1112 12-0145 Map & Profile of Connection with DL&W at Portland Tracing Jan 1890 2816 sht 7 1111 12-0145 Plan Showing Tracks and Property at Slatington Yard Blueprint 12/10/1909 2835 sht 28 1049 12-0145 Locomotive Jacks - Thickness of Concrete Work Blueprint 2/8/1913 2835 sht 30 1048 12-0145 Locomotive Jacks - Wood Blocks - Wood Screws Blueprint 2/8/1913 2835 sht 34 1047 12-0145 High Pressure Bridge for Square Shaft Bracket Blueprint 3/29/1915 2835 sht 35 1046 12-0145 High Pressure Truck Ends for Solid Boxes Blueprint 12/23/1911 2835 sht 37 1045 12-0145 Detalis from Whiting Foundry Equipment Co over L&NE Bridge Blueprint no date 28

no number 1029 12-0145 Description & Walkways for Delaware River Bridge at Portland Blueprint 6/10/1937 28no number 1030 12-0145 Column Bent Material for Bridge Over Lehigh River Blueprint 6/10/1937 28no number 1031 12-0145 List of Shipping Pieces Over Delaware River of Bridge Blueprint 6/10/1937 28no number 1032 12-0145 Required List of Parts for New Delaware River Bridge Blueprint 6/10/1937 28no number 1033 12-0145 List of Pieces from Forge Shop for Delaware River Bridge Blueprint 6/10/1937 28no number 1034 12-0145 Anchor Bolt Plan for New Bridge Over Delaware River Blueprint 6/10/1937 28no number 1035 12-0145 Erection Plan for New Bridge Over Delaware River Blueprint 6/10/1937 28no number 1036 12-0145 Bent Columns Required for Bridge Over Delaware River Blueprint 6/10/1937 28no number 1037 12-0145 List of Shipping Pieces for Span Over Delaware River Bridge Blueprint 6/10/1937 28no number 1038 12-0145 Fabricated Steel Construction for Bridge Over Delaware River Blueprint 6/10/1937 28

no number 1039 12-0145Required List of Beams and Angles for Bridge Over DelawareRiver

Blueprint 6/10/1937 28

no number 1040 12-0145 Erection Plan for Bridge Over Delaware River at Portland Blueprint 6/10/1937 28no number 1041 12-0145 Required List of Plates and Screns for Delaware River Bridge Blueprint 6/10/1937 28no number 1042 12-0145 Required List of Parts for Walkway on Bridge Over Delaware Blueprint 6/10/1937 28

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1045104610471048

10491050105110521053105410551056105710581059106010611062106310641065

Page 29 of 194Page 29 of 194

10651066106710681069107010711072107310741075

10761077107810791080108110821083

35 1056 12 One Motor Electric Table at 29

no number 1043 12-0145 Anchor Bolt Plan - Detail of Beams for Bridge Over Delaware Blueprint 6/10/1937 28no number 1044 12-0145 Required List of Posts and Rails for Bridge Over Delaware Blueprint 6/10/1937 28

5603 1068 12-0145 Map of Proposed Branch to the Acme Slate Quarry Tracing 6/2/1913 295676 1066A 12-0145 Various track profiles of different branches graph 29

6051 1063 12-0145Preliminary Survey for Connection with the NYO&W at CampbHall

ell tracing-heav ?/?/1905 29

6052 1067 12-0145 Large Pencil Profile Map of L&NE tracing-heav no date 296053 1066 12-0145 Map of Catasauqua Branch of L&NE tracing-heav no date 296076 1065 12-0145 Map of RDG Railroad Schuylkill & Susquehanna Railroad (6076) blueprint no date 29

20 sht 11 1069 12-0145 Floor Plan of the Tamaqua Extension of the L&NE Blueprint 12/26/1911 2935 sht 1 1058 12-0145 One Motor Electric Transfer Table at Pen Argyl Blueprint 11/18/1915 2935 sht 11 1054 12-0145 One Motor Electric Bridge and Motor Support Blueprint 9/17/1915 2935 sht 14 1053 12-0145 Pit Drawing for Locomotive Transfer Table Blueprint 3/20/1915 2935 sht 18 1052 12-0145 List of Various Secrew Locomotive Dimensions Blueprint 10/7/1914 2935 sht 2 1057 12-0145 One Motor Electric Transfer Table at Pen Argyl Blueprint no date 2935 sht 26 1050 12-0145 Locomotive Jacks and Lifting Beams Blueprint 2/6/1913 2935 sht 26 1051 12-0145 Locomotive Jacks and Lifting Beams - Whiting Foundry & Eqpt Co Blueprint ?/8/1913 2935 sht 3 1060 12-0145 One Motor Electric Transfer Table at Pen Argyl Blueprint 11/20/1915 2935 sht 4 1059 12-0145 One Motor Electric Transfer Table at Pen Argyl Blueprint 11/12/1915 2935 sht 5 1062 12-0145 One Motor Electric Transfer Table at Pen Argyl Blueprint 11/5/1915 2935 sht 6 1061 12-0145 One Motor Electric Transfer Table at Pen Argyl Blueprint 11/3/1915 2935 sht 7 sht 7 1056 12-01450145 One Motor Electric Transfer Table at Pen Argyl Transfer Pen Argyl Blueprint nBlueprint noo date 29date35 sht 8 1055 12-0145 One Motor Electric Transfer Table for Cab Table Blueprint 11/2/1915 29

Special 11 1064 12-0145 Map Showing Maryd Colliery Lease - Harel Brook Coal Company 6/25/1923 29 oversized, out of box5633 1084 12-3383 Plan Showing Topography at Lehigh Gap of the L&NE Linen 11/14/1913 305647 1082 12-3383 Proposed Branch fro the Main Line to the Acme Slate Quarry Blueprint 5/15/1915 305655 1083 12-3383 Map Showing Public Road Crossings in State of Pennsylvania Linen 7/11/1939 305687 1113 12-3383 see above graph paper no date 305709 1102 12-3383 Profile of Pochuck Branch of L&NE RR (Heavy Paper Profile) Graph paper ? 305757 1112 12-3383 see above Linen Jan 1890 305967 1078 12-3383 Map Showing Property of the South Easton Water Company Blueprint 5/?/1913 305967 1079 12-3383 Map Showing Property of the South Easton Water Company Blueprint 5/?/1913 30

6037 1080 12-3383Map Showing Location of Colleries, Cement Plants and Slate Quarries Linen 4/18/1916 30

6078 1077 12-3383 Street Lights - Borough of East Stroudsburg Bl;ueprint 10/?/1916 301922 dup 1091 12-3383 Bridge Over Bushkill Creek at Atlantic Mills on Nazareth Branch Blueprint 10/10/1913 301922 dup 1096 12-3383 Bridge Over Bushkill Creek on Nazareth Branch Blueprint 10/10/1913 301935 dup 1095 12-3383 Castings for Bridge Over Bushkill Creek at Atlantic Mills Blueprint 3/14/1914 301936 dup 1092 12-3383 Material for Bridge Over Bushkill Creek at Atlantic Mills Blueprint 2/6/1914 301936 dup 1093 12-3383 Swedge Bolts and Hex Nuts for Bridge Over Bushkill Creek Blueprint 3/24/1914 301936 dup 1094 12-3383 Swedge Bolts and Washers for Bridge Over Bushkill Creek Blueprint 2/6/1914 30

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I10841085108610871088108910901091109210931094109510961097109810991100

1101110211031104

p

Page 30 of 194Page 30 of 194

110411051106110711081109111011111112111311141115111611171118

1119112011211122

4228A 1090 Girders Floor Beams for 3/10/1914 30

1937 dup 1086 12-3383 Bridge Over the Bushkill Creek on the Nazareth Branch Blueprint 3/24/1914 301938 dup 1097 12-3383 Material for Bridge Over Bushkill Creek on Nazareth Branch Blueprint 2/7/1914 302 sht 2 1075 12-3383 Cast Iron Material Required for Bridge Highway Blueprint 1/29/1912 302 sht 3 1076 12-3383 Swedged Bolts and Washers for Bridge on Tamaqua Extension Blueprint 2/23/1912 302 sht 4 1074 12-3383 Hook Bolts Required for Bridge Over Highway - Station 290-40 Blueprint 3/9/1912 302 sht 5 1073 12-3383 Washers Required for Bridge Over Highway - Station 290-40 Blueprint 3/9/1912 302 sht 6 1072 12-3383 Bridge Over the Tamaqua Extension - Station 290-40 Blueprint 3/9/1912 30

20 sht 7 1071 12-3383 Floor Plan of the Tamaqua Extension of the L&NE Blueprint 12/26/1911 3020 sht 9 1070 12-3383 Floor Plan of the Tamaqua Extension of the L&NE Blueprint 12/26/1911 30327 dup 1085 12-3383 Sketch of Shugar Connection on the Nazareth Branch Blueprint ? 3033 sht 13 1119 12-3383 see above Blueprint 4/8/1915 30

33 sht 17 du 1114 12-3383 see above Blueprint 4/14/2015 3033 sht 18 1115 12-3383 see above Blueprint 4/14/2015 3033 sht 6 1116 12-3383 see above Blueprint 4/6/1915 3033 sht 7 1117 12-3383 see above Blueprint 4/7/1915 3033 sht 9 1118 12-3383 see above Blueprint 4/26/1915 30

4227 dup 1087 12-3383 Bridge Over the Bushkill Creek on the Nazareth Branch Blueprint 1/25/1914 30

4227 dup 1099 12-3383Marking Diagram for Bridge Over Bushkill Creek on NazarethBranch

Blueprint 3/24/1914 30

4227 dup 1101 12-3383 Marking Diagram for Bridge at Atlantic Mills on Nazareth Branch Blueprint 1/25/1914 304228 dup 1098 12-3383 Laterals, Stringers & Floor Beams for Bridge Over Bushkill Creek Blueprint 2/4/1914 30

4228A 1090 12-338312-3383 Girders, Spans, Laterals, Stringers & Floor Beams for Bridge, Spans, Laterals, Stringers & Bridge Blueprint 3/10/1914Blueprint 304229 dup 1088 12-3383 Girders for Bridge Over the Bushkill Creek on Nazareth Branch Blueprint 2/4/1914 304229 dup 1089 12-3383 Girders for Bridge Over the Bushkill Creek on Nazareth Branch Blueprint 2/4/1914 304420 dup 1100 12-3383 Bridge Over Bushkill Creek at Atlantic Mills on Nazareth Branch Blueprint 1/23/1914 30

5461A 1111 12-3383 see above craft paper 12/10/2009 305785A 1110 12-3383 Bridge Over Papakating Creek at Pellettown, N.J. Blueprint 8/11/1915 30sht 2 1104 12-3383 Worksheet for Bridge Over Delaware River at Portland Blueprint 5/14/1937 30sht 3 1105 12-3383 Material Over 1/4" Thick to be Used on Bridge at Portland Blueprint 5/14/1937 30sht 5 1103 12-3383 Walkway for Bridge Over Delaware River at Portland Blueprint 5/14/1937 30sht 6 1109 12-3383 Temporary Rods fo Bridge at Portland Over Delaware River Blueprint 5/14/1937 30

sht E1 1107 12-3383 Anchor Bolt Plan Detail of Bearings for Bridge at Portland Blueprint ? 30sht1 1106 12-3383 Copper Bearing Steel to be Used on Bridge at Portland Blueprint ? 30

unknown 1081 12-3383 Comparative Profiles and Alignment at Auburn, Schuylkill County Graph ? 30unknown 1108 12-3383 Erection Plan for Bridge Over Delaware at Portland Blueprint 5/14/1937 30

5422 1124 12-3383 see above Blueprint 6/?/1889 31

5451 1149 12-3383Proposed Location for Freight House & Transfer Platform at PArgyl

en Linen 11/10/1909 31

5622 1142 12-3383 Map showing land lines from Danielsville to Lehigh Gap Linen 7/12/1913 315644 1144 12-3383 Profile of Line to Bangor Royal Slate Quarry Tracing ? 315696 1123 12-3383 see above Blueprint no date 31

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1123112411251126112711281129113011311132113311341135113611371138113911401141114211431144

Page 31 of 194Page 31 of 194

1144114511461147

1148

114911501151

1152115311541155

11561157

115811591160

1136 d Sh id t 31

5722 1128 12-3383 Profile of Main Line of L&NE at Penna Ave near Bangor graph ? 315730 1145 12-3383 Profile of Spur Line to Bangor Graph paper ? 315736 1141 12-3383 Property to be Acquired West of Hazard Blueprint 9/6/1898 315750 1129 12-3383 Proposed LV Engine House at Coxton Blueprint 8/9/1909 315750 1130 12-3383 Location Foundation for LV Round House at Coxton Blueprint 8/9/1909 315751 1143 12-3383 Kingsland shops flue rattler foundation Tracing 8/31/1910 316028 1147 12-3383 Topography of L&NE Yards & Shops - Very Poor Condition heavy paper ? 316091 1148 12-3383 Miscellaneous Topography Map of Portions of L&NE heavy paper ? 3133 sht 1120 12-3383 see above Blueprint 4/17/1915 31

33 sht 15 1121 12-3383 see above Blueprint 4/12/1915 3133 sht 16 1122 12-3383 see above Blueprint 4/12/1915 3143 sht 20 1125 12-3383 see above Blueprint 6/2/1909 3143 sht 20 1126 12-3383 see above Blueprint 6/2/2009 3143 sht 20 1127 12-3383 Falsework Plan for LV Span Over Lehigh River Bridge Blueprint 6/2/1909 3145 sht 42 1140 12-3383 Top Chord for Bridge over Delaware at Portland Blueprint 7/10/1906 3145 sht 12 1137 12-3383 Foundation Plan and Anchor Bolts for Bridge over Delaware Blueprint 5/20/1908 3145 sht 13 1138 12-3383 Foundation Plan and Anchor Bolts for Bridge over Delaware Blueprint 5/20/1908 3145 sht 40 1139 12-3383 Top Chords for Bridge over Delaware at Portland Blueprint 7/11/1908 3145 sht 48 1133 12-3383 Posts & Hangers for Bridge over Delaware River at Portland Blueprint 7/14/1908 3145 sht 5 1134 12-3383 Details of Bridge over Delaware River at Portland Blueprint ? 3145 sht 54 1135 12-3383 West End Girder Span for Bridge Over Delaware River at Portland Blueprint 5/25/1906 3145 ht 5545 sht 55 1136 12 338312-3383 Frames and Shoes for Portland Bridge to ColumbiaFrames an oes for Portland Br ge to Columbia Bl i t 5/27/1906Blueprin 5/27 31/190645 sht 6 1146 12-3383 Skew Place Girder Spans for Bridge over Delaware at Portland Blueprint 6/26/1908 315750B 1132 12-3383 Construction Details - Proposed Round House at Coxton Blueprint 8/9/1909 31missing 1131 12-3383 Proposed Round House at Coxton, Pa. Blueprint 8/9/1909 31

5643 1151 12-3396Map of L&NE Property in Vicinity of East Lehigh Colliery, Tamaqua linen 3/1/1915 32

5759 1150 12-3396Proposed Branch of the CRANE Railroad through the BorougCatasaqua

h of vellum 11/?/1909 32

6306 1161 12-3396 Valuation Diagram from Slate Junction to Slatington Linen ? 32112 sht 11 1172 12-3396 Pedestals for Highway Bridge Crossing on Tamaqua Extension Blueprint 10/9/1911 32

12 sht 1 1173 12-3396Massonry Plan for Highway Bridge Crossing on Tamaqua Extension Blueprint 5/2/1911 32

12 sht 10 1175 12-3396 Struts and Brackets for Highway Bridge on Tamaqua Extension Blueprint 10/6/1911 3212 sht 12 1167 12-3396 Swedgwood & Field Bolts for Lehigh River Crossing - Sheet C-Z Blueprint 10/6/1911 3212 sht 13 1170 12-3396 Rail Bolts, Hock Bolts and Lag Screws for Bridge over Highway Blueprint 10/11/1911 32

12 sht 14 1171 12-3396Cast Iron Washers for Floor Bolts on Highway Crossing - She4

et C-Blueprint 10/13/1911 32

12 sht 15 1169 12-3396 Lag Screws Required for Bridge over Highway Crossing - Sheet 5 Blueprint 10/13/1911 32

12 sht 1a 1174 12-3396Massonry Plan for Highway Crossing on Tamaqua Extension Sheet E-1

- Blueprint 8/25/1911 32

12 sht 3 1180 12-3396 Erection Diagram for Highway Crossing on Tamaqua Extension Blueprint 10/6/1911 3212 sht 4 1179 12-3396 Floor Plan for Highway Bridge on Tamaqua Extension - Sheet E-3 Blueprint 10/11/1911 32

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1161116211631164

116511661167

11681169

11701171117211731174117511761177117811791180

Page 32 of 194Page 32 of 194

1180118111821183118411851186118711881189

11901191

119211931194119511961197

60 10 1189 12 3396 lt & Gi id PP&B RR Bl 8/19/1889 32

12 sht 4 1181 12-3396 Floor Plan for Highway Bridge on Tamaqua Extension - Sheet E-3 Blueprint 10/13/1911 3212 sht 6 1178 12-3396 Details for Spans for Highway Bridge on Tamaqua Extension Blueprint 10/9/1911 3212 sht 7 1182 12-3396 Floor Beams for Highway Bridge Crossing on Tamaqua Extension Blueprint 10/6/1911 3212 sht 8 1177 12-3396 Stringers for Highway Crossingf Bridge on Tamaqua Extension Blueprint 10/6/1911 32

12 sht 9 1176 12-3396Laterals for Highway Crossing Bridge on Tamaqua ExtensionSheet 4

- Blueprint 10/5/1911 32

43 sht 1 1165 12-3396 Erection Diagram for Bridge Over Lehigh River at Slatington Blueprint 6/4/1909 3243 sht 10 1159 12-3396 Girders for Bridge over Lehigh River at Slatington Blueprint 5/22/1909 32

43 sht 11 1155 12-3396Floor Beams and Stringers for Bridge over Lehigh River at Slatington Blueprint 5/25/1909 32

43 sht 13 1156 12-3396 Floor Beams & bottom Laterals for Bridge at Slatington Blueprint 6/8/1909 32

43 sht 14 1154 12-3396Stringers and End Frames for Bridge over Lehigh River at Slatington Blueprint 6/14/1909 32

43 sht 16 1157 12-3396 Plan for Bridge over Lehigh River at Slatington Blueprint 6/?/1909 3243 sht 18 1158 12-3396 Bridge over Lehigh River at Slatington Blueprint 5/5/1909 3243 sht 20 1162 12-3396 Flasework Plan for LVRR Bridge over Lehigh River Blueprint 6/2/1909 3243 sht 5 1164 12-3396 Girders & Frames for Bridge over Lehigh River at Slatington Blueprint 6/?/1909 3243 sht 7 1166 12-3396 Column Bents & Lateral Bracing for Bridge over Lehigh River Blueprint 6/3/1909 3243 sht 8 1160 12-3396 West Shoes & Rollers for Bridge over the Lehigh River Blueprint 5/?/1909 3243 sht 8 1163 12-3396 Girders & Bracing for Bridge over Lehigh River at Slatington Blueprint 5/25/1909 325608A 1152 12-3396 Contours and sections Linen 5/?/1915 325614A 1153 12-3396 Plan for Masonry Abutment Bridge at Tamaqua Blueprint 6/21/1911 32

60 sht 10 sht 1189 12 3396- Bolts & Nuts for Girder Bridge for PP&B RRBo s Nuts for rder Br ge for Blueprint 8/19/1889ueprint 3260 sht 3 1184 12-3396 Girders, Lateral Bracings & Cross Frames of PP&B Blueprint 8/15/1989 3260 sht 5 1185 12-3396 Single Deck Platform Bridge of PP&B RR Blueprint 8/12/1889 3260 sht 7 1186 12-3396 Single Track Deck Girder Bridge for PP&B RR Blueprint 8/?/1889 3260 sht 8 1188 12-3396 Bolts & Nuts for Girder Bridge for PP&B RR Blueprint 8/13/1889 3260 sht 9 1187 12-3396 Bolts & Nuts for Girder Span for PP&B RR Bridge Blueprint 8/17/1889 32

5433 1202 12-3396 Map of the PP&B RR from the Delaware River to the NYS&W Blueprint 10/29/1889 335608 1198 12-3396 Paln Showing Property Between Wind Gap & Pen Argyl Tracing 5/20/1914 335624 1190 12-3396 Draft of 252 Building Lots at Danielsville of L&HR Blueprint ? 335625 1191 12-3396 Plan Showing Tamaqua Extension and Chestnut Ridge RR Blueprint 10/8/1913 33

5640 1200 12-3396Map Showing Tracts of Land to be Acquired between Wind GPen Argyl

ap & Linen 12/23/1914 33

5686 1204 12-3396 Profile of Albion Branch of the L&NE paper ? 33

5699 1205 12-3396Comparative Profile of L&NE & DL&W from Benders Jct to Pen Argyl ? 33

5711 1203 12-3396 Profile of East Bangor Consolidated Switch paper ? 335756 1199 12-3396 Map Showing Crane Railroad through the Borough of Catasaqua ? 335765 1201 12-3396 Profile of Wind Gap Classification Yard (Poor Condition) Tracing ? 335796 1220 12-3396 Proposed Joint Station with LV at Cementon - Interior View Blueprint 12/1/1910 335796 1221 12-3396 Proposed Joint Station with LV at Cementon - Horizontal Plan Blueprint 12/1/1910 33

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I119811991200120112021203120412051206120712081209

121012111212

12131214121512161217

0

Page 33 of 194Page 33 of 194

1218121912201221122212231224

1225122612271228122912301231

123212331234

5796 1222 12-3396 Foundation Plan for Union Station with LV at Cementon Blueprint 12/1/1910 336079 1192 12-3396 Showing the Lehigh & New England RR & Connections Van Dyke 5/1/1918 336079 1193 12-3396 Showing the Lehigh & New England Railroad & Connections Tracing 3/1/1918 336079 1195 12-3396 The Lehigh & New England Railroad & Connections - 2 copies Van Dyke 3/1/1918 336079 1196 12-3396 White Lineof the Lehigh & New England Railroad & Connections Tracing 3/1/1918 336079 1197 12-3396 Tracing of the Lehigh & New England Railroad & Connections Heavy Pape 3/1/1918 3310820 1214 12-3396 Washers & Floor Bolts for Bridge over L&NE RR Blueprint 12/26/1911 33

20 sht 11 1217 12-3396 Bridge across Lehigh River at Lehigh Gap Blueprint 12/26/1911 3320 sht 13 1206 12-3396 Guard Rail Splices at Various Mile Posts Along the L&NE Blueprint 12/26/1911 3320 sht 13 1207 12-3396 Guard Rail Splices at Various Mile Posts Along the L&NE Blueprint 12/26/1911 33

sht 13 2 copi 1218 12-3396 Bridge for Tamaqua Extension at Lehigh Gap Blueprint 12/26/1911 3320 sht 14 1210 12-3396 Standard Floor Bolts for Bridge over Lehigh River Blueprint 5/27/1912 33

20 sht 15 1212 12-3396Standard Cast Iron Washers for Floor Bolts on Lehigh River Bridge Blueprint 5/27/1912 33

20 sht 16 1213 12-3396 Standard Guard Rail Bolts for Lehigh River Bridge Blueprint 12/26/1911 3320 sht 18 1211 12-3396 Cut Washers for Bridge over Lehigh River Blueprint 12/26/1911 33

20 sht 19 1208 12-3396Floor Plan of Bridge Crossing Lehigh River Along Tamaqua Division Blueprint 12/26/1911 33

20 sht 7 1209 12-3396 Spikes for Bridge over Lehigh River at Lehigh Gap Blueprint 6/25/1911 3320 sht 9 1215 12-3396 Floor Plan for Bridge over Lehigh River at Lehigh Gap Blueprint 12/26/1911 33missing 1216 12-3396 Bridge across Lehigh River at Lehigh Gap Blueprint 6/4/1912 33

no number 1194 12-3396 The Lehigh & New England Railroad & Connections Van Dyke 3/1/1918 33no number 1219 12-3396 Change of Grade at Danielsville Paper ? 33

5410 1236 12-3397 Map Showing Lots Belonging to the L&NE at Pen Argyl Linen ? 345420 1237 12-3397 Profile of Line State Line to Pine Island Tracing 8/14/1894 345609 1238 12-3397 Profile of PP&B Lehigh River Crossing Tracing 5/24/1889 345613 1240 12-3397 Profile of Pochuck Branch to Proposed Quarry Blueprint ? 345618 1239 12-3397 Tamaqua Extension for Bridge at Lehigh Gap Blueprint 10/21/1911 345694 1234 12-3397 Profile Alignment for Eastbound Through Track Graph paper ? 34

5695 1235 12-3397PP&H Connection with the NYS&W at Augusta, N.J. (Poor Condition) heavy paper 5/?/1889 34

5737 1232 12-3397 Plan of Proposed Branch from Albion to Acme Slate Quarry Blueprint 6/6/1913 34 also #56006095 1223 12-3397 Undescribed Profile of a Portion of the L&NE heavy paper 1/0/1900 3410600 1244 12-3397 Map of Old Bangor Slate Co Quarry and Property - 2 copies Blueprint ?/?/1899 3410670 1247 12-3397 Repairs to Bridge over the Delaware River at Portland, Pa. Blueprint 8/22/1923 3410686 1249 12-3397 Improvement of Main Line East of Stier, Pa. Linen 4/11/1924 3410688 1243 12-3397 Profile of L&NE through Wind Gap Borough Blueprint ? 34

10691 1248 12-3397Details of Substructure for Bridge Replacement over PapakatCreek

ing Linen 5/2/1924 34

10697 1245 12-3397 Details of Stalls of Pen Argyl Enginehouse Tracing ? 345 sht 8(10689 1242 12-3397 Plan of L&NE Through Wind Gap Borough Blueprint(line ? 34

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

123512361237123812391240124112421243124412451246124712481249

1250

12511252

1253

Page 34 of 194Page 34 of 194

1253125412551256

12571258125912601261126212631264

1265126612671268126912701271

10662 1259 12 y 35

38 sht 14 1229 12-3397Steel Sash for L&NE Engine House at Pen Argyl - Sheet 1 of Sheets

2 Blueprint 12/28/1914 34

8 sht 16(10833 1230 12-3397 Lupton Products for the Pen Argyl Engine House - Sheet No 7 Blueprint(line 8/19/1914 3438 sht 17 1231 12-3397 Repairs for the Locomotive Repair Shop at Pen Argyl - Sheet No 8 Blueprint 6/20/1914 3438 sht 18 1224 12-3397 Pond Tuop for Pen Argyl Locomotive Reapir Shop Blueprint 9/20/1913 3438 sht 19 1225 12-3397 Steel Sash for Pen Argyl Locomotive Repair Shop Blueprint 9/25/1913 3438 sht 20 1226 12-3397 Steel Sash for Pen Argyl Locomotive Repair Shop - Sheet 3 Blueprint 9/26/1913 3438 sht 21 1227 12-3397 Steel Sash for Pen Argyl Locomotive Repair Shop - Sheet 4 Blueprint 10/11/1913 3438 sht 22 1228 12-3397 Pond Truss for L&NE Engine House at Pen Argyl - Sheet No 5 10/3/1913 34

5756A 1241 12-3397 Right of Way of Crane Railroad Through Borough of Catasaqua Blueprint ? 345971 1263 12-3397 Map of the Lehigh & New England Railroad Blueprint 1/?/1908 355988 1266 12-3397 Lehigh Navigation Electric Company - Transmission Lines Blueprint ? 356031 1271 12-3397 Details of 30' Straight Switch for Interlocking Purposes Blueprint 12/6/1944 356423 1267 12-3397 Plan Showing Grade Crossing on Glenwood Branch Linen 2/20/1926 3510648 1251 12-3397 Details of I Beam Span for Bridge near Stier Tracing 11/13/1922 3510649 1253 12-3397 Details of I Beam Span of Bridge over Stream Near Stier Tracing 11/13/1922 35

10650 1254 12-3397Proposed location Mack Industrial siding off of Allentown branBeth., PA

ch Blueprint 11/23/1922 35

10660 1261 12-3397Relocation of Main Line for Reduction of Grade Near Quarry Junction Linen 8/11/1923 35

10661 1260 12-3397 Proposed Station for Saylorsburg, Pa. Tracing 8/9/1923 35

10662 1259 12-33973397Relocation of Main Line for Reduction of Grade in NorthamptoCounty

n LinenLinen 8/298/29/1923/1923 35

10663 1258 12-3397 Proposed Relocation of Main Line for Reduction of Grade Tracing 8/29/1923 3510664 1257 12-3397 Proposed Plan for Reduction of Grade in Upper Bethel Township Tracing 8/29/1923 3510665 1256 12-3397 Proposed Sideing to Tamaqua Development Company Tracing 8/24/1923 35

10669 1255 12-3397Proposal Addition Main Track in Bethel Township NorthamptoTownship

n Linen 12/21/1923 35

10670 1262 12-3397 Repairs to Bridge Over Delaware River at Portland Tracing 8/22/1923 3510680 1252 12-3397 Improvement of Main Line over Jacoby Creek Near Stier Linen 2/8/1924 3510683 1250 12-3397 Improvement of Main Line over Jacoby Creek East of Stier Tracing 3/5/1924 3510800 1286 12-3397 Details for 16' 6" Switch Blueprint 12/16/1930 3510801 1287 12-3397 Addition of Stalls at Pen Argyl Engine House Linen ?/?/1930 3510803 1288 12-3397 Plate Girder Span on the Maryd Branch - Sheet No. 1 Blueprint 3/25/1931 3510804 1289 12-3397 Plate Girder Span on the Maryd Branch - Sheet No. 2 Blueprint 3/26/1931 35

10873 1283 12-3397Details of New Structural Steel Glass Windows for LocomotiveShop

Linen 11/9/1946 35

10879 1282 12-3397 Consolidated Loading Diagrams of L&NE Locomotives Linen graphp 4/17/1947 3510880 1281 12-3397 Proposed Maintenance of Way Garage at Pen Argyl Tracing 5/19/1947 3510881 1280 12-3397 Proposed Steel Walk at Rittersville Coal Trestle Tracing 7/14/1947 3510884 1279 12-3397 Proposed Car Repair Facilities at Pen Argyl Tracing 9/11/1947 3510887 1285 12-3397 Proposed Steel Inspection Platform at Pen Argyl Erecting Shop Tracing 3/18/1943 3510888 1284 12-3397 Proposed Conduit Between Erecting and Woodworking Shops Tracing 4/1/1948 35

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I127212731274127512761277

12781279

128012811282128312841285128612871288128912901291

Page 35 of 194Page 35 of 194

129212931294

1295

12961297129812991300

1301130213031304

1305

13061307

10909 2381 12-3236 Reconstruction of bridge no. 63.79 in connection with SH 46 Linen ? 35140 sht 2 1274 12-3397 Wedge Type Adjustable Brace and Plates for Interlocking Switch Blueprint 11/23/1944 35140 sht 3 1275 12-3397 Details for 30' Switch Sections Blueprint 10/20/1944 3559 sht 1 1277 12-3397 Plan for 50' Deck Plate Bridge at Jacoby Creek Blueprint 6/6/1889 3559 sht 2 1278 12-3397 Detail of 50' Deck Plate Bridge Over Jacoby Creek Blueprint 6/8/1889 35

5959 (5996) 1265 12-3397 Preliminary Survey for Acquisition of Country Farm paper ?/?/1908 35

6402A 1269 12-3397Cross Section and Elevation Plan of Coxton Engine House - LRR

V Blueprint 8/25/1913 35

6402B 1270 12-3397 General Plan for Foundation of LV RR Coxton Engine House Blueprint 7/19/1913 35

6402C 1268 12-3397LV RR Proposed Round House Extension at Coxton - Construction Details Blueprint 7/9/1913 35

10290 2451 12-3237 Various types of roadside signals used on the L&NE Blueprint-bac ? 3610802 1293 12-3398 Plan Showing Addition to Pen Argyl Round House Stalls Linen 2/5/1931 3610809 1290 12-3398 Safety Runway at Pen Argyl Boiler House Blueprint 11/21/1931 3610810 1291 12-3398 Safety Runway at Pen Argyl Boiler House Blueprint 11/21/1931 3610811 1292 12-3398 Electroforged Grating for Pen Argyl Enginehouse Blueprint 11/30/1931 3610812 1301 12-3398 Multi Top Drop Table for Use at Enginehouse Blueprint 7/1/1926 3610813 1302 12-3398 Section of Pit for Drop Table Curved Track Blueprint 5/9/1930 3610814 1306 12-3398 Desk Map Showing Connecting Railroads with the L&NE paper ? 3610819 1313 12-3398 Untitled Blue Print Presumably Pertaining to Pen Argyl Shop Blueprint ? 3610823 1299 12-3398 Profile of Road Paving in Wind Gap Borough Tracing 9/12/1932 3610823 1300 12-3398 Profile of Road Paving Over Broadway Crossing near Wind Gap Blueprint 8/2/1932 36

10827 1315 12-3398P d C i th C ti t T k f th D iProposed Crossing on the Connection to Tracks of the Davis Thomas Co. Blueprint 3/31/1922 36

10828 1316 12-3398 Chart Showing New York City Temperatures from 1871 to 1931 Blueprint 2/4/1933 3610830 1317 12-3398 Plan Showing Highway in Vicinity of Lehigh Gap Tracing 10/16/1933 36

10831 1318 12-3398Plan-Removal of Old Bridge in Bushkill Township NorthamptoCounty

n Blueprint ? 36

10832 1298 12-3398Plan for Building Bridge Abutment on Catasaqua Branch at Catasaqua Linen 9/26/1934 36

10885 1294 12-3398 Proposed Diesel Inspection Facilities at Pen Argyl Enginehouse Linen 3/29/1949 3610885 1297 12-3398 Proposed Diesel Inspection Facilities at Pen Argyl Tracing 2/16/1948 3610888 1296 12-3398 Proposed Diesel Facility at Pen Argyl Tracing 2/28/1948 3610896 1295 12-3398 Temporary Girder Supports for Rebuilding Bridge at Catasaqua Tracing 7/11/1949 36

10816A 1312 12-3398Proposed Change of Grade near Bangor Borough, Northampton County 8/30/1954 36

10816B 1311 12-3398 Profile of Grade Crossing Elimination near Bangor Borough Blueprint 8/30/1954 3610816C 1310 12-3398 Paving with Various Utilities in Area of Bangor Borough Blueprint 8/30/1954 3610816D 1309 12-3398 Index Map Showing Station Record in Bangor Area Blueprint 8/30/1954 36

10816E 1307 12-3398Drawing for Construction and Condemnation of Right of Way Northampton County

in Blueprint 8/23/1954 36

10833-1 1303 12-3398Elimination of Grade Crossing by New Undergrade Highway Crossing Linen 1/24/1935 36

10833-2 1304 12-3398 Elimination of Grade Crossing in Borough of Wind Gap Linen 1/23/1935 36

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I130813091310131113121313131413151316131713181319

13201321

132213231324132513261327

Page 36 of 194Page 36 of 194

132813291330

13311332133313341335133613371338

13391340134113421343

1344

10833-3 1331 12-3398 Plan of Spans for Grade Crossing Elimination at Wind Gap Linen 2/12/1935 3610833-5 1329 12-3398 East Abutment for Highway Bridge in Wind Gap Borough Tracing 2/16/1935 3610833-6 1328 12-3398 Plan for Retaining Wall in Wind Gap Borough Tracing 2/22/1935 3610833-7 1327 12-3398 Elimination of Highway Crossing in Borough of Wind Gap Tracing 2/9/1935 3610836-1 1326 12-3398 Timber Floor Plan for Span No. 1 Bewteen Portland and Columbia Tracing 6/12/1935 3610836-2 1325 12-3398 Timber Floor Plan for Span No. 2 Bewteen Portland and Columbia 6/20/1935 36

10836-2A 1324 12-3398 Timber Floor Plan for Span No. 2 Bewteen Portland and Columbia Linen 6/15/1937 3610836-3 1323 12-3398 Timber Floor Plan for Span No. 3 Bewteen Portland and Columbia Linen 6/25/1935 3610836-4 1322 12-3398 Timber Floor Plan for Span No. 4 Bewteen Portland and Columbia 7/3/1935 3610836-5 1321 12-3398 Timber Floor Plan for Span No. 5 Bewteen Portland and Columbia 7/24/1935 3610836-6 1320 12-3398 Timber Floor Plan for Bridge Between Portland and Columbia Tracing 7/26/1935 3610836-7 1319 12-3398 Bridge Over the DL&W and NYS&W - Portland to Columbia Tracing 9/9/1935 36

10868-3 1339 12-3398Detail of Floor Beams, Stringers and Brackets for Bridge Over NYS&W 11/3/1909 36

10868-4 1338 12-3398 Details of Cross Frames and Laterals Over NYS&W and DL&W Blueprint 11/5/1904 36

no number 1305 12-3398Desk Map of the L&NE Showing Interchange Points with OtheRailroads

r paper ? 36

no number 1332 12-3398 Desk Map of Lehigh & New England Railroad (12 copies) 9/?/1944 36no. 27 1334 12-3398 Standard 90 Lb Rail & Joint (Paper) Blueprint 1/?/1904 36no. 34 1336 12-3398 Standard Insulated Rail Joints (6 Hole) (Small Paper) Blueprint 4/?/1904 36no. 35 1337 12-3398 Standard Insulated Rail Joints (4 and 6 Hole) (Small Paper) Blueprint 4/?/1904 36no. 42 1335 12-3398 Standard Low Switch Targen & Stand (Small Paper) 2/?/1911 36

1340 Details of Bridge Girders on Hanford Branch near Sussex, N.J. Blueprint 11/5/1909 371341 Marking Diagram for Bridge on Hanford Bridge near Sussex Blueprint 9/28/1909 371342 Required List of Material for Bridge in Northampton County Blueprint 5/23/1946 37

1343Drawings for Construction of New Right of Way in Northampton County 5/23/1946 37

1344 Corrugated Wire Glass Window for Pen Argyl Engine House Blueprint 12/24/1946 371345 Original Solid Corrugated Wire Glass for Pen Argyl Engine House 12/24/1946 371346 Plan Showing Location of Electronic Testing Channels Blueprint 8/28/1946 371347 Proposed Overhead Runway for Car Repair Shop at Pen Argyl 11/12/1943 371348 Floor Plan for Bridge Over Pauls Kill at Hainesburg Junction 7/13/1944 371349 Electronic Testing Channels for Main Line Bridges Tracing 8/28/1946 371350 Plan Showing Repairs to Bridge Over NYS&W at Sussex Junction 2/6/1946 37

1351Plan Showing Proposed Repairs to NYS&W Bridge East of Sussex Jct 10/20/1945 37

1352 Floor Plan for Bridge Over Pottsville Branch of the LVRR 9/18/1944 371353 Street and Track Layout at Portland, Pa. ? 371354 Track Layout in the Industrial Section of Portland, Pa. ? 371355 Industrial Track Layout at East End of Portland, Pa. ? 37

1356Plan for Reconstruction of Bridge Over State Highway in Lehigh Township 5/4/1937 37

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

134513461347

13481349

1350135113521353

1354

1355

13561357

1358

13591360

Page 37 of 194Page 37 of 194

13611362

136313641365136613671368136913701371

1372137313741375137613771378

1357Plan for Reconstruction of Bridge Over Highway in Northampton County 5/4/1937 37

1358 West Abutment for Reconstructed Bridge in Lehigh Township 5/4/1937 371359 Map of Roseto Borough Showing Street Layout 3/2/1939 37

1360Weekly Comparison of Nazareth Water Tank (Tracing & Van Dyke) ? 37

1361 Proposed Guard rail for Highway Bridge West of Berlinville Blueprint 12/13/1939 37

1362Sketch Showing Proposed Boiler Room Layout for Pen Argyl Car Shop 6/?/1941 37

1363 Bridge Over Highway Route No 471 in Lehigh Township 8/5/1937 371364 Plans for Bridge Over Highway Route No 471 in Lehigh Township 8/5/1937 371365 Floor Beams for Bridge Over SH 471 in Lehigh Township 8/7/1937 37

1366Shear & Moment Diagrams & Funicular Polygon for Various Locomotives 7/24/1946 37

1367Shear & Moment Diagrams & Funicular Polygon - Class F-1 Locomotive 7/19/1946 37

1368Shear & Moment Diagrams & Funicular Polygon - Class E-50 & E-60 Locos 7/24/1946 37

1369 Moment Diagram for Coopers E-72 Loading 8/10/1943 37

1370Shear and Moment Diagrams & Funicular Polygon for Class E-14 Locomotives 7/18/1946 37

10338 1380 12-3411Proposed Rearrangement of Tracks at Portland Sand & GraveCompany

l Linen 3/18/1937 38

10339 1382 12-3411 Plan Showing Public Road to be Eliminated at Chapman Quarries Linen 5/20/1937 3810341 1381 12-3411 Plan of Grade Crossing to be Eliminated at the Chapman Quarries Blueprint 6/16/1937 3810341 1383 12-3411 Plan Showing Location of Private Road Crossing to be Eliminated Linen 8/12/1937 38

10343 1385 12-3411Wiring Diagram for Power Switchboard at Pen Argyl Engine House Linen 12/3/1938 38

10344 1384 12-3411 Circuit Diagram for Automatic Signals at Lehigh Gap Linen 2/18/1938 3810345 1386 12-3411 Plan for Repairing First Bridge Span at Lehigh Gap Linen 5/25/1939 3810346 1387 12-3411 Plan for Stiffners for Bridge North of Bangor Linen 6/5/1939 3810349 1388 12-3411 Floor Plan for Bridge Over Monocacty Creek at Bath, Pa. Linen 11/27/1939 3810350 1389 12-3411 Plan Showing Proposed Plan for Additional Tracks at Pen Argyl Blueprint 2/15/1940 3810350 1390 12-3411 Plan Showing Additional Tracks and Yard Relocation at Pen Argyl Linen 4/2/1940 3810352 1391 12-3411 Plan Showing Proposed Relocation of Race St at Bath, Pa. Linen 7/3/1940 3810357 1393 12-3411 Floor Plan for Bridge Over Paulins Kill at Augusta, N.J. Linen 7/16/1941 38

10397 2591 12-3238Wiring diagram for highway crossing protection in Vernon Township Linen 5/29/1953 38

10601 1394 12-3411 Profile of Lehigh River Crossing of the PP&B Blueprint 8/6/1889 3810606 1403 12-3411 Plan of a Portion of the Third Ward of Catasaqua, Pa. Blueprint ? 3810608 1395 12-3411 Foundation for Coaling Station at Sussex, N.J. Linen 3/12/1918 3810609 1396 12-3411 Engine House Foundation for Coaling Station at Sussex, N.J. Linen 3/23/1914 3810610 1397 12-3411 Elevation & Sections for Coaling Station at Sussex Junction Linen 3/16/1918 3810611 1398 12-3411 Elevation Plan for Coaling Station at Sussex Junction, N.J. Linen 3/23/1918 38

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I13791380138113821383138413851386138713881389139013911392139313941395

1396139713981399 g

Page 38 of 194Page 38 of 194

13991400

1401140214031404

1405

1406

14071408

1409

14101411

1412

1413

10919 1420 Details Bolts for New Blueprint 5/12/1953 39

10612 1399 12-3411 Plans for Coaling Station at Sussex, N.J. Linen 3/19/1918 3810613 1400 12-3411 Monitor Details for Coaling Station at Sussex Jct., N.J. Linen 3/2/1918 3810614 1400 12-3411 Monitor Details for Coaling Station at Sussex Jct., N.J. Linen 3/2/1918 3810615 1402 12-3411 Engine House Details for Coaling Station at Sussex, N.J. Linen 3/26/1918 3810626 1413 12-3411 Elevation and Location Plan for Unnamed Building Tracing ? 3810630 1406 12-3411 Topographical Map of a Portion of the Allentown Branch Blueprint 10/19/1917 3810632 1412 12-3411 Longitudional Plan for Section of Unnamed Building Linen ? 3810634 1415 12-3411 Proposed Elevation Plan for M&W Shop at Pen Argyl Tracing ? 3810635 1404 12-3411 Rolling Door for the Pen Argyl Enginehouse Blueprint 4/28/1916 3810636 1405 12-3411 LV RR Ten Ton Iron Test Car Blueprint ?/?/1895 3810637 1410 12-3411 Details for Placing Additional Girders on Bridge East of Bath, Pa. Linen 5/8/1922 3810637 1411 12-3411 Details for Placing Additional Girders on Bridge East of Bath, Pa. Blueprint 5/8/1922 3810638 1408 12-3411 Details to Replace Bridge on Bethlehem Branch East of Bath, Pa. Linen 5/24/1922 3810638 1409 12-3411 Details to Replace Bridge Over Stream East of Bath, Pa. Blueprint 5/24/1922 3810647 1407 12-3411 Details of I Beam Span for Renewal of Bridge East of Stier, Pa. Linen 11/13/1922 3810900 1416 12-3411 Proposed Sidewalk for Bridge at Sussex Jct., N.J. Tracing 11/2/1950 3810919 1418 12-3411 Details for Footwalk & Railing for Bridge in New Jersey Blueprint 9/3/1950 38

10930 1419 12-3411Plan for Truck Hoist and Washing Platform at M&W Shop at PArgyl

en Linen 1/25/1956 38

10352A 1392 12-3411 Plan Showing Proposed Relocation of Race St at Bath, Pa. Linen 8/16/1940 38no number 1417 12-3411 Stringers for Sidewalk Bridge at Sussex Jct., N.J. Linen ? 38

10919 1420 12-341112-3411 Details Showing Rates and Anchor Bolts for New Jersey Brid Showing Rates and Anchor Jersey Bridgeses Blueprint 5/12/1953 3910919 1425 12-3411 Girder Details for New Jersey State Highway Bridge Blueprint 9/8/1953 39

10919 1426 12-3411Girder Details for New Jersey State Highway Bridge Reconstructed by L&NE Blueprint 9/3/1953 39

10919 1427 12-3411 Girder Details for New Jersey State Highway Bridge Blueprint 9/3/1953 3910919 1428 12-3411 Details for Footwalk on Bridge Over New Jersey State Highway Blueprint 9/3/1953 3910919 1429 12-3411 Details for Cross Plates of Floor Frame on State Highway Bridge Blueprint 9/8/1953 39

10924 1424 12-3411Plan Showing Grade Crossing in Stillwater Township, SussexCounty, N.J.

Linen 3/19/1954 39

10925 1422 12-3411Piping Diagram for Compressor & Cooling Tower at Pen ArgyEnginehouse

l Blueprint 8/24/1954 39

10925 1423 12-3411Piping Diagram for Compressor & Cooling Tower at Pen ArgyEnginehouse

l Tracing 8/24/1954 39

10926 1421 12-3411 Plan for Bridge at Stockertown Over Martins Creek Tracing 9/22/1954 39

10931 1431 12-3411Plans and Sections for Truck Hoist and Oil Air Controls at PenArgyl

Linen 1/31/1956 39

10938 1432 12-3411Plan of Floor on Bridge 15/90 Over Lizard Creek in Schuylkill County Linen 10/5/1956 39

10940 1430 12-3411 Plan to Provide Additional Office Space at Nazareth Station Linen 3/12/1957 39

104 sht 13 1435 12-3411List of Drawing Numbers for Twin Span Turntable by BethleheSteel

m Blueprint ? 39

104 sht 14 1437 12-3411Girders for Twin Span Turntable at Pen Argyl Built by BethlehSteel

em Blueprint 5/?/1927 39

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I14141415141614171418

1419

1420

14211422

14231424

14251426

142714281429

1430

Page 39 of 194Page 39 of 194

1430

143114321433

143414351436143714381439144014411442144314441445144614471448

1433 12 cardboard 39

104 sht 19 1438 12-3411 U Bolts for Center Span of Pen Argyl Turntable Blueprint 3/2/1927 39104 sht 20 1439 12-3411 Brake Lever Details and Latch Plate for Twin Span Turntable Blueprint 9/21/1926 39104 sht 21 1440 12-3411 Brake Lever Bearing for Twin Screw Turntable at Pen Argyl Blueprint 10/21/1926 39104 sht 22 1441 12-3411 Bridge & Fabrication Plan for Twin Span Turntable for Brake Lever Blueprint 10/21/1926 39104 sht 23 1442 12-3411 Truck Erection Bolt for Twin Span Turntable at Pen Argyl Blueprint 8/2/1926 39

104 sht 24 1443 12-3411Pinon Clutch and Shaft for Twin Turntable at Pen Argyl Enginehouse Blueprint 4/2/1926 39

104 sht 25 1443 12-3411Pinon Clutch and Shaft for Twin Turntable at Pen Argyl Enginehouse Blueprint 4/2/1926 39

104 sht 26 1444 12-3411Machinery Bearings for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 3/31/1926 39

104 sht 27 1445 12-3411 Spur Gear for Twin Span Turn Table at Pen Argyl Enginehouse Blueprint 10/4/1927 39

104 sht 28 1449 12-3411 Rope Guide and Brake Rope for Twin Span Turntable at Pen Argyl Blueprint 6/24/1927 39104 sht 30 1446 12-3411 Dust Cover Twin Span Turntable at Pen Argyl Enginehouse Blueprint 10/16/1925 39

104 sht 31 1447 12-3411Brake Wheel & Shoes for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 6/15/1927 39

104 sht 32 1448 12-3411 Wheel Bearing Bolts for Twin Span Turntable at Pen Argyl Blueprint 6/28/1927 39

F6827 1436 12-3411Bethlehem Steel Company's Matchmarking diagram Pen Argyturntable

l Blueprint 10/5/1927 39

no number 2661 12-3251 Details of culvert under station 550+42 Blueprint ? 39no number 2671 12-3251 Location of L&NE through property of Blue Ridge Real Estate Co. Blueprint ? 39

posterposter 1433 12-34113411Instructions for Operating and Lubricating Bethlehem Twin SpTurntable

an cardboard 1/?1/?/1927/1927 39

104 sht 1 1473 12-3412House Supports for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 8/9/1927 40

104 sht 15 1468 12-3412 Erection Diagram for Twin Span Turntable at Pen Argyl Blueprint 6/11/1926 40104 sht 2 1474 12-3412 Cross Frames for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 6/21/1926 40

104 sht 29 1450 12-3412Pulley Support & Brake Rope for Twin Span Turntable at PenArgyl

Blueprint 6/24/1927 40

104 sht 3 1475 12-3412 Wire Support for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 5/23/1927 40104 sht 33 1451 12-3412 Shafting for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 10/14/1925 40104 sht 34 1452 12-3412 Motor Pinon and Spur Gear for Twin Span Turntable Blueprint 10/13/1925 40104 sht 35 1453 12-3412 Axles for MCB Bearing on Twin Span Turntable at Pen Argyl Blueprint 6/28/1927 40104 sht 36 1454 12-3412 Wedges and Brasses for MCB Bearings for Twin Span Turntable Blueprint 6/27/1927 40104 sht 37 1456 12-3412 MCB Journal Box for Twin Span Turntable at Pen Argyl Blueprint 9/17/1915 40104 sht 38 1457 12-3412 Truck Casting with Platform for Twin Span Turntable at Pen Argyl Blueprint 10/6/1915 40104 sht 39 1458 12-3412 Bearing Saddle & Wrench for Twin Span Turntable at Pen Argyl Blueprint 8/25/1925 40104 sht 4 1476 12-3412 Wire Tower for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 6/8/1926 40

104 sht 40 1459 12-3412 33" Car Wheel for Twin Screw Turntable at Pen Argyl Blueprint 8/24/1925 40104 sht 41 1460 12-3412 Equalizing Casting for Twin Span Turntable at Pen Argyl Blueprint 8/18/1925 40104 sht 42 1461 12-3412 Truck Casting for Twin Span Turntable at Pen Argyl Blueprint 8/17/1925 40104 sht 43 1466 12-3412 Saddle for Twin Span Turntable at Engine House at Pen Argyl Blueprint 8/27/1925 40104 sht 44 1467 12-3412 Center Pin and Anchor Bolt for Twin Span Turntable at Pen Argyl Blueprint 8/28/1925 40

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I14491450145114521453145414551456145714581459146014611462146314641465146614671468

1469

Page 40 of 194Page 40 of 194

146914701471

14721473

1474147514761477

14781479

14801481148214831484

1485

61 1492 12 4885

104 sht 45 1465 12-3412 Pivoy Casting for Twin Span Turntable at Pen Argyl Blueprint 6/8/1927 40104 sht 46 1463 12-3412 Base Casting for Twin Screw Turntable at Pen Argyl Blueprint 6/7/1927 40104 sht 47 1463 12-3412 Base Casting for Twin Screw Turntable at Pen Argyl Blueprint 6/7/1927 40104 sht 48 1463 12-3412 Base Casting for Twin Screw Turntable at Pen Argyl Blueprint 6/7/1927 40104 sht 49 1455 12-3412 Operating Machinery for Twin Span Turntable at Pen Argyl Blueprint 12/1/1926 40104 sht 5 1477 12-3412 Laterals for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 6/8/1926 40

104 sht 50 1470 12-3412 Rail Clip for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 9/17/1926 40104 sht 51 1471 12-3412 Ties for Twin Span Turntable at Pen Argyl Enginehouse Blueprint ?/?/1926 40104 sht 52 1472 12-3412 Pit Rail for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 5/25/1926 40104 sht 6 1478 12-3412 Laterals for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 6/4/1926 40104 sht 7 1469 12-3412 Bolts for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 10/30/1925 40missing 1462 12-3412 Bronze Disc for Twin Span Turntable at Pen Argyl Blueprint 8/28/1925 40missing 1464 12-3412 Erection Diagram of Center for Twin Span Turntable at Pen Argyl Blueprint 6/17/1926 40

104 sht 10 1482 12-3412 Name Plate for Twin Span Enginehouse at Pen Argyl Blueprint 5/16/1926 41104 sht 11 1483 12-3412 Cross Frames for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 5/29/1926 41104 sht 12 1484 12-3412 Cross Girder for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 5/29/1926 41104 sht 8 1480 12-3412 Railing for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 10/7/1927 41104 sht 9 1481 12-3412 Hand Railing for Twin Span Turntable at Pen Argyl Enginehouse Blueprint 5/27/1926 4116 sht 14 1503 12-3412 Columns for Deckertown Bridge - PP&B RR Blueprint 6/10/1889 4146 sht 1 1513 12-3412 Plan for Proposed Sand House at Pen Argyl Blueprint ? 41

61 sht 1 sht 1 1492 12-34123412Masonry Plan for Deckertown Bridge for PP&B RR - Contract 4885 & 4886 & 4886 BlueprintBlueprint ? 41? 41

61 sht 10 1500 12-3412 Girder and Bracing for Deckertown Bridge - Sheet No 1 Blueprint 6/8/1889 4161 sht 11 1501 12-3412 Girder and Bracing for Deckertown Bridge - PP&B - Sheet No 1 Blueprint 6/8/1889 41

61 sht 12 & 13 1502 12-3412Girders and Bracing for Deckertown Bridge - PP&B RR - Shee2

t No Blueprint 6/12/1889 41

61 sht 15 1505 12-3412 Columns for Deckertown Bridge of the PP&B RR - Sheet No 3 Blueprint 6/10/1889 41

61 sht 16 1507 12-3412Struts and Bent Plan for Columns on Deckertown Bridge of PPRR

&B Blueprint 6/20/1889 41

61 sht 17 1509 12-3412 Floor Plan for Deckertown Bridge (Incomplete and Torn Blue Print) Blueprint ? 4161 sht 18 1508 12-3412 Struts and Bent for Columns on Deckertown Crossing Blueprint 6/20/1889 4161 sht 19 1510 12-3412 Floor Plan for Deckertown Bridge for PP&B RR - Sheet No 6 Blueprint 6/22/1889 41

61 sht 2 1491 12-3412Masonry Plan for Deckertown Bridge for PP&B RR - Contract 4885 & 4886 Blueprint ? 41

61 sht 20 1511 12-3412 Drawing No 2937 Showing Cast Washers for Deckertown Bridge Blueprint ? 41

61 sht 21 1512 12-3412Floor Plan for Deckertown and Jacoby Creek Bridges on PP&RR

B Blueprint 6/18/1889 41

61 sht 22 1506 12-3412 Abutment for Deckertown Bridge on the PP&B RR - Sheet No 32 Blueprint 7/8/1889 4161 sht 23 1490 12-3412 Floor for Bridge at Deckertown Bridge of the PP&B RR Blueprint ?/?/1889 4161 sht 24 1489 12-3412 Three Pony Pieces for Triangular Tower for Deckertown Bridge Blueprint 7/20/1889 4161 sht 26 1488 12-3412 Bolts and Nuts Required for Deckertown Bridge of the PP&B RR Blueprint 6/20/1889 41

61 sht 27 1487 12-3412List of Materials Required for Bridge Assembly at DeckertownBridge

Blueprint 6/21/1889 41

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I148614871488

1489

1490

1491

1492

1493

14941495

14961497

14981499

15001501

Page 41 of 194Page 41 of 194

15011502150315041505

150615071508

1509

1510

151115121513

1514151515161517

10366 1529 12 3413 Floor Plan for Bridge West of Kapp Linen 3/22/1945 42

61 sht 28 1486 12-3412 Bolts and Nuts for Deckertown Bridge of PP&B RR Blueprint 6/14/1889 4161 sht 3 1493 12-3412 Sheet No 1 Masonry Plan for Deckertown Bridge of PP&B RR Blueprint ? 4161 sht 4 1494 12-3412 Deck Lattice Girder for Deckertown Bridge on the PP&B RR Blueprint 6/7/1889 41

61 sht 6 1496 12-3412Deck Lattice Girder for Deckertown Bridge on the PP&B - SheNo 3

et Blueprint 6/10/1889 41

61 sht 6 1497 12-3412Deck Lattice Girder for Deckertown Bridge on the PP&B - SheNo 3

et Blueprint 6/10/1889 41

61 sht 8 1498 12-3412Lateral Bracing - End and Internal Brace Frames at DeckertowBridge

n Blueprint 6/11/1889 41

61sht 9 1499 12-3412Lateral Bracing - End and Internal Brace Frames for DeckertoSheet No 4

wn - Blueprint 6/11/1889 41

torn sheet 1495 12-3412Deck Lattice Girder for Deckertown Bridge on the PP&B - SheNo 2

et Blueprint 6/7/1889 41

1479 12-3412Machinery Covers for Twin Span Turntable at Pen Argyl Enginehouse 10/29/1926 41

1485 12-3412 Bolts for Deckertown Bridge of PP&B RR Blueprint 6/20/1889 41

1504 12-3412Girders and Bracing for Deckertown Bridge - PP&B RR - Shee2

t No Blueprint 6/12/1889 41

9741 1514 12-3413 Sand House for Proposed Coal and Sand Station at Pen Argyl Blueprint ? 42

10363 1541 12-3413Map of Catasaqua & Fogelsville RR in the Vicinity of Reuben Steckel Estate Blueprint 2/17/1930 42

10364 1527 12-3413 Plan and Deck for Turntable at Pen Argyl Linen 4/17/1942 42

10365 1528 12-3413Plan Showing Topography in Vicinity of Grade Crossing at Pellettown Linen 12/7/1943 42

10366 1529 12 3413- Floor Plan for Bridge West of Kapp Linen 3/22/1945 4210368 1530 12-3413 Bridge Floor Plan for Bridge Over Lizard Creek Blueprint 10/21/1946 4210368 1531 12-3413 Details of Bridge Floor Plan for Bridge Over Lizard Creek Tracing 10/21/1946 4210369 1533 12-3413 Proposed Water Barrel Platforms Along Main Line Linen 3/27/1950 4210376 1533 12-3413 Proposed water barrel platforms Tracing 42

10379 1534 12-3413Plan Showing Right of Way with Private Crossing in PlainfieldTownship

Blueprint 1/28/1952 42

no L&N nunbe 1567 12-3413 US Topographic Map of Harrisburg Quadrangle card stock 9/?/1910 42no L&N nunbe 1568 12-3413 US Topographic Map of Lebanon Quadrangle card stock 2/?/1911 42

10363A 1540 12-3413Map of Catasaqua & Fogelsville RR at the Ferdinand EberharEstate

d Blueprint 2/17/1937 42

10363B 1539 12-3413Map of Catasaqua & Fogelsville RR at the Ferdinand EberharEstate

d Blueprint 2/17/1937 42

10363C 1538 12-3413Map of Catasaqua & Fogelsville RR at the Ferdinand EberharEstate

d Blueprint 9/9/1941 42

10363D 1537 12-3413 Map of Catasaqua & Fogelsville RR at the Matthias Holp Estate Blueprint 8/?/1915 4210363E 1537 12-3413 Map of Catasaqua & Fogelsville RR at the Matthias Holp Estate Blueprint 8/?/1915 42

10363F 1535 12-3413Tracing Showing L&NE Crossing with the C&F RR in White HTownship

all Tracing 2/15/1941 42

18 sht 2 2871 12-3264 Rivets and holes to be used on span #6 Lehigh Valley crossing Blueprint 8/24/1911 4246 sht 10 1523 12-3413 Elevation and Sections for Pen Argyl Coal & Sand Stations - 9535 Blueprint ? 4246 sht 11 1524 12-3413 Rear Elevation for Pen Argyl Coal and Sand Station - 9539 Blueprint ? 42

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1518151915201521

15221523

152415251526

1527

152815291530153115321533153415351536

nnnnn

Page 42 of 194Page 42 of 194

15361537153815391540154115421543154415451546154715481549155015511552155315541555

no L&N 1546 12 ?nnnnnnnnnnnnnnnnnn

46 sht 12 1525 12-3413 Detail of Coal and Sand Station and Sand Drying Room Blueprint ? 4246 sht 2 1515 12-3413 Coal and Sand Station for the L&NE at Pen Argyl Blueprint ? 4246 sht 3 1516 12-3413 Proposed Coaling Station for the L&NE at Pen Argyl Blueprint ? 4246 sht 4 1517 12-3413 Proposed Coaling Station for the L&NE at Pen Argyl - 9373 Blueprint ? 42

46 sht 5 1518 12-3413Map Showing Proposed Location of Coaling Station and StoraYard

ge Blueprint ? 42

46 sht 6 1519 12-3413 Coaling and Sand Station Foundation for Pen Argyl Facility Blueprint ? 42

46 sht 7 1520 12-3413Coaling and Sand Station Foundation - End Elevation Plan - PArgyl

en Blueprint ? 42

46 sht 8 1521 12-3413 Coal and Sand Station - Details for Foundation - 9531 Blueprint ? 4246 sht 9 1522 12-3413 Elevation of Steel for Yard Scraper Blueprint ? 42

missing 1532 12-3413Plan and Profile Showing Proposed Signal Protection at Wilcox, N.Y. 11/16/1946 42

missing 1536 12-3413Plan of Catasaqua & Fogelsville RR in Vicinity of Portland Cement Co 8/?/1915 42

missing 1556 12-3413 US Topographic Map of Bloomsburg Quadrangle 2/?/1898 42missing 1557 12-3413 US Topographic Map of Wallpack Quadrangle ? 42missing 1560 12-3413 US Topographic Map of Scranton Quadrangle 8/?/1893 42

o L&N numbe 1542 12-3413 US Topographic Map of Catawissa Quadrangle card stock 5/?/1894 42o L&N numbe 1543 12-3413 US Topographic Map of Harrisburg Quadrangle card stock 9/?/1909 42o L&N numbe 1544 12-3413 US Topographic Map of Hamburg Quadrangle card stock 6/?/1911 42o L&N numbe 1545 12-3413 US Topographic Map of Staten Island Quadrangle card stock 9/?/1913 42o L&N numb e 1546numbe 12-34133413 US Topographic Map of Allentown Quadranglep g p p Q g card scard tockstock ? 4242o L&N numbe 1547 12-3413 US Topographic Map of Lake Hopatcong Quadrangle card stock 9/?/1912 42o L&N numbe 1548 12-3413 US Topographic Map of Wind Gap Quadrangle card stock ? 42o L&N numbe 1549 12-3413 US Topographic Map of Easton Quadrangle card stock ?/?/1919 42o L&N numbe 1550 12-3413 US Topographic Map of Hummelstown Quadrangle card stock 1/?/1912 42o L&N numbe 1551 12-3413 US Topographic Map of Harrisburg Quadrangle card stock 9/?/1910 42o L&N numbe 1552 12-3413 US Topographic Map of Port Jervis Quadrangle card stock 5/?/1911 42o L&N numbe 1553 12-3413 US Topographic Map of Franklin Quadrangle card stock ?/?/1894 42o L&N numbe 1554 12-3413 US Topographic Map of Hummelstown Quadrangle card stock 1/?/1912 42o L&N numbe 1555 12-3413 US Topographic Map of Hackettstown Quadrangle card stock 1/?/1910 42o L&N numbe 1558 12-3413 US Topographic Map of Wallpack Quadrangle card stock 2/?/1898 42o L&N numbe 1559 12-3413 US Topographic Map of Delaware Water Gap Quadrangle card stock ? 42o L&N numbe 1561 12-3413 US Topographic Map of Easton Quadrangle card stock 6/?/1913 42o L&N numbe 1562 12-3413 US Topographic Map of Wind Gap Quadrangle card stock ?/?/1906 42o L&N numbe 1563 12-3413 US Topographic Map of Delaware Water Gap Quadrangle card stock ?/?/1951 42o L&N numbe 1564 12-3413 US Topographic Map of Allentown Quadrangle card stock ?/?/1928 42o L&N numbe 1565 12-3413 US Topographic Map of Wind Gap Quadrangle card stock ? 42o L&N numbe 1566 12-3413 US Topographic Map of Millerstown Quadrangle card stock 6/?/1907 42o L&N numbe 1569 12-3413 US Topographic Map of Hummelstown Quadrangle card stock 1/?/1912 42

torn sheet 1526 12-3413 Monitor Details for Coal and Sand Station at Pen Argyl Blueprint ? 42

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1556155715581559156015611562156315641565156615671568156915701571157215731574157515761577

nnnnnnnnnnnnnnnnnnnnno

Page 43 of 194Page 43 of 194

1577157815791580

158115821583158415851586158715881589

159015911592159315941595

n L&N 1591 12 3413 US Topographic Map of Milford adrangle (Pa ) car ock 9/?/1926 43nnn

nnnnnnnnn

nnnnnn

5869 2941 12-3152 Plan for under grade crossing at Lehigh Gap, Northampton County Linen 1/21/1915 43o L&N numbe 1570 12-3413 US Topographic Map of Lebanon Quadrangle card stock 9/?/1904 43o L&N numbe 1571 12-3413 US Topographic Map of Mahoney Quadrangle card stock 9/?/1901 43o L&N numbe 1572 12-3413 US Topographic Map of Coatesville Quadrangle card stock 12/?/1910 43o L&N numbe 1573 12-3413 US Topographic Map of New Bloomfield Quadrangle card stock 2/?/1907 43o L&N numbe 1574 12-3413 US Topographic Map of White Lake Quadrangle (N.Y. - Pa.) card stock ?/?/1922 43o L&N numbe 1575 12-3413 US Topographic Map of New Cumberland Quadrangle card stock 10/?/1906 43o L&N numbe 1576 12-3413 US Topographic Map of Wernersville Quadrangle card stock 11/?/1907 43o L&N numbe 1577 12-3413 US Topographic Map of Millersburg Quadrangle card stock 9/?/1893 43o L&N numbe 1578 12-3413 US Topographic Map of Mount Holly Quadrangle card stock 1/?/1910 43o L&N numbe 1579 12-3413 US Topographic Map of Lake Hopatcong Quadrangle card stock 9/?/1912 43o L&N numbe 1580 12-3413 US Topographic Map of Allentown West Quadrangle card stock ?/?/1936 43o L&N numbe 1582 12-3413 US Topographic Map of Greenwood Lake Quadrangle (2 copies) card stock 6/?/1913 43o L&N numbe 1583 12-3413 US Topographic Map of Princeton Quadrangle card stock 10/?/1908 43o L&N numbe 1584 12-3413 US Topographic Map of High Bridge Quadrangle card stock 1/?/1910 43o L&N numbe 1585 12-3413 US Topographic Map of Franklin Furnace Quadrangle (N.J.) card stock 7/?/1916 43o L&N numbe 1586 12-3413 US Topographic Map of Damascus Quadrangle (Pa. - N.J.) card stock ?/?/1923 43o L&N numbe 1587 12-3413 US Topographic Map of Bordertown Quadrangle card stock 9/?/1912 43o L&N numbe 1588 12-3413 US Topographic Map of Ellendale Quadrangle (N.Y.) card stock 10/?/1912 43o L&N numbe 1589 12-3413 US Topographic Map of Newburgh Quadrangle (N.Y.) card stock 4/?/1913 43o L&N numbe 1590 12-3413 US Topographic Map of Poughkeepsie Quadrangle (N.Y.) card stock 6/?/1913 43

L&No numnumbe 1591be 12 3413- US Topographic Map of Milford Quadrangle (Pa ) Qu . cardd sstock 9/?/1926t 43o L&N numbe 1592 12-3413 US Topographic Map of Wallpack Quadrangle (Pa.) card stock 1/?/1910 43o L&N numbe 1593 12-3413 US Topographic Map of Pine Grove Quadrangle (PA) card stock 6/?/1908 43o L&N numbe 1594 12-3413 US Topographic Map of Pottsville Quadrangle (Pa.) card stock 8/?/1909 43

o L&N numbe 1595 12-3413US Topographic Map of Delaware Water Gap Quadrangle (PaN.J.)

. - card stock 11/?/1893 43

o L&N numbe 1596 12-3413 US Topographic Map of Goshen Quadrangle (N.Y. - N.J.) card stock 5/?/1910 43o L&N numbe 1597 12-3413 US Topographic Map of Port Jervis Quadrangle (N.Y.) card stock 5/?/1911 43o L&N numbe 1598 12-3413 US Topographic Map of Hamburg Quadrangle (Pa.) card stock ?/?/1920 43o L&N numbe 1599 12-3413 US Topographic Map of Hazleton Quadrangle (Pa.) card stock 7/?/1915 43o L&N numbe 1600 12-3413 US Topographic Map of Mahonoy City Quadrangle (Pa.) card stock 1/?/1910 43o L&N numbe 1601 12-3413 US Topographic Map of Catawissa Quadrangle (Pa.) card stock 6/?/1908 43o L&N numbe 1602 12-3413 US Topographic Map of Flatbrookville Quadrangle (N.J.) card stock ?/?/1943 43o L&N numbe 1603 12-3413 US Topographic Map of Easton Quadrangle (Pa.) card stock 6/?/1913 43

o L&N numbe 1604 12-3413US Topographic Map of Delaware Water Gap Quadrangle (PaN.J.)

. - card stock ?/?/1922 43

o L&N numbe 1605 12-3413 US Topographic Map of Schunemunk Quadrangle (N.Y.) card stock 3/?/1912 43o L&N numbe 1606 12-3413 US Topographic Map of Reading Quadrangle (Pa.) card stock 5/?/1915 43o L&N numbe 1607 12-3413 US Topographic Map of Quakertown Quadrangle (Pa.) card stock 9/?/1894 43o L&N numbe 1608 12-3413 US Topographic Map of Slatington Quadrangle (Pa.) card stock 7/?/1902 43o L&N numbe 1609 12-3413 US Topographic Map of Easton Quadrangle (Pa.) card stock 6/?/1918 43

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1596159715981599160016011602160316041605160616071608160916101611

16121613161416151616

nnnnnnnnnnnnnnnn

nnnnno

Page 44 of 194Page 44 of 194

1616161716181619162016211622

1623

1624

162516261627

16281629

163016311632

no L&N numbe 1633 US Monticello . card stock 5/?/1911 43nnnn

o L&N numbe 1610 12-3413 US Topographic Map of Germantown Quadrangle (Pa.) card stock 11/?/1908 43o L&N numbe 1611 12-3413 US Topographic Map of Pine Grove, Pa. Quadrangle card stock 2/?/1892 43o L&N numbe 1612 12-3413 US Topographic Map of Lykens, Pa. Quadrangle card stock 11/?/1893 43o L&N numbe 1613 12-3413 US Topographic Map of Mount Holly, N.J. Quadrangle card stock 2/?/1898 43o L&N numbe 1614 12-3413 US Topographic Map of New Brunswick, N.J. Quadrangle card stock 11/?/1909 43o L&N numbe 1615 12-3413 US Topographic Map of West Point, N.Y. Quadrangle card stock ?/?/1912 43o L&N numbe 1616 12-3413 US Topographic Map of Burlington, Pa. - N.J. Quadrangle card stock 12/?/1910 43o L&N numbe 1617 12-3413 US Topographic Map of Dundaff, Pa. Quadrangle card stock 7/?/1892 43o L&N numbe 1618 12-3413 US Topographic Map of Wallpack, NJ - Pa. Quadrangle card stock 1/?/1910 43o L&N numbe 1619 12-3413 US Topographic Map of Lambertville, NJ - Pa. Quadrangle card stock 1/?/1912 43o L&N numbe 1620 12-3413 US Topographic Map of Morristown, N.J. Quadrangle card stock 6/?/1912 43o L&N numbe 1621 12-3413 US Topographic Map of Nesquehoning, Pa. Quadrangle card stock ?/?/1942 43o L&N numbe 1623 12-3413 US Topographic Map of Doylestown, Pa. Quadrangle (2 copies) card stock 12/?/1908 43o L&N numbe 1624 12-3413 US Topographic Map of Millersburg, Pa. Quadrangle card stock 11/?/1907 43o L&N numbe 1625 12-3413 US Topographic Map of Hummelstown, Pa. Quadrangle card stock 3/?/1907 43o L&N numbe 1627 12-3413 US Topographic Map of Shamokin, Pa. Quadrangle (2 copies) card stock 2/?/1900 43

o L&N numbe 1629 12-3413US Topographic Map of Port Jervis, Pa. - N.Y. Quadrangle (2copies)

card stock 5/?/1911 43

o L&N numbe 1630 12-3413 US Topographic Map of Tarrytown, N.Y. Quadrangle card stock 2/?/1914 43o L&N numbe 1631 12-3413 US Topographic Map of Godhen, N.Y. - N.J. Quadrangle card stock 6/?/1913 43o L&N numbe 1632 12-3413 US Topographic Map of Greenwod Lake, N.J. - N.Y. Quadrangle card stock 6/?/1913 43

L&N numbe 1633 12-341312-3413 US Topographic Map of Monticello, N.Y. Quadrangle Topographic Map of , N.Y Quadrangle card stock 5/?/1911 43o L&N numbe 1634 12-3413 US Topographic Map of Somerville, N.J. Quadrangle card stock 1/?/1910 43o L&N numbe 1635 12-3413 US Topographic Map of Harlem, N.J. - N.Y. Quadrangle card stock 6/?/1913 43o L&N numbe 1636 12-3413 US Topographic Map of Paterson, N.J. - N.Y. Quadrangle card stock 8/?/1911 43o L&N numbe 1637 12-3413 US Topographic Map of Plainfield, N.J. - N.Y. Quadrangle card stock 5/?/1915 43

0319 E1 1657 12-3426 Details for Anchor Bolt Plan for Bridge at Portland, Pa. Linen 5/28/1937 440319 E2 1658 12-3426 Erection Plan for Bridge Over Delaware River at Portland, Pa. Linen 6/5/1937 44

0319 sht 1 1652 12-3426List of Beams and Angles for Bridge Over Delaware River at Portland, Pa. Linen 5/7/1937 44

0319 sht 2 1651 12-3426Work Sheet No 3 for Bridge No 63-79 Over Delaware River atPortland, Pa.

Linen 1/5/1937 44

0319 sht 3 1653 12-3426Required List of Shipping Pieces for Bridge Over Delaware atPortland, Pa.

Linen 6/5/1937 44

0319 sht 4 1654 12-3426 Copper Bearing Steel Required for Bridge at Portland, Pa. Linen 5/5/1937 440319 sht 5 1656 12-3426 Required List of Material for Walkway Over Bridge at Portland, Pa. Linen 6/5/1937 44

0319 sht 6 1655 12-3426Temporary Rods to be Used on Bridge Over Delaware River aPortland, Pa.

t Linen 6/5/1937 44

15 sht 1 1643 12-3426 Lehigh River Crossing of Tamaqua Extension - Sheet E-201 Blueprint 11/27/1911 44

15 sht 13 1639 12-3426Span No 2 - Tamaqua Extension - Smedged Stone Bolts - SpNo 2

an Blueprint 12/18/1911 44

15 sht 2 1650 12-3426 Detail for Span No 2 Bridge Over Lehigh River at Lehigh Gap Blueprint 12/18/1911 4415 sht 3 1649 12-3426 Detail Print for Bridge Over Lehigh River at Lehigh Gap Blueprint 12/5/1911 44

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1633163416351636163716381639164016411642164316441645164616471648164916501651165216531654

Page 45 of 194Page 45 of 194

165416551656165716581659

1660

16611662166316641665166616671668166916701671

37 117 1744 12 3426 Pen Arg l locomoti shop information on rods Bl 3/23/1915 44

15 sht 4 1646 12-3426 Span No 2 - Deck Plate Girder Beam for Bridge at Lehigh Gap Blueprint 12/18/1911 4415 sht 5 1648 12-3426 Detail of Span No 4 for Bridge Over Lehigh River at Lehigh Gap Blueprint 12/19/1911 4415 sht 6 1645 12-3426 Span for No 2 Crossing Lehigh River at Lehigh Gap Blueprint 12/18/1911 4415 sht 7 1644 12-3426 Detail of Girder Spans for Bridge Over Tamaqua River Blueprint 12/18/1911 44

37 sht 100 1726 12-3426 Pen Argyl locomotive shop - information on doors Blueprint 3/24/1915 4437 sht 101 1727 12-3426 Pen Argyl locomotive shop - information on struts Blueprint 2/24/1915 4437 sht 102 1728 12-3426 Pen Argyl locomotive shop - information on struts Blueprint 2/24/1915 4437 sht 103 1729 12-3426 Pen Argyl locomotive shop - information on struts Blueprint 3/24/1915 4437 sht 104 1730 12-3426 Pen Argyl locomotive shop - information on struts Blueprint 3/25/1915 4437 sht 105 1731 12-3426 Pen Argyl locomotive shop - information on struts Blueprint 4/13/1915 4437 sht 106 1732 12-3426 Pen Argyl locomotive shop - materials for crane stops Blueprint 3/24/1915 4437 sht 107 1733 12-3426 Pen Argyl locomotive shop - materials for crane stops Blueprint 3/24/1915 4437 sht 108 1734 12-3426 Pen Argyl locomotive shop - information on posts Blueprint 3/25/1915 4437 sht 109 1735 12-3426 Pen Argyl locomotive shop - information on posts Blueprint 3/25/1915 4437 sht 110 1736 12-3426 Pen Argyl locomotive shop - information on trusses Blueprint 3/25/1915 4437 sht 111 1737 12-3426 Pen Argyl locomotive shop - cast iron cover plate for man hole Blueprint 3/24/1915 4437 sht 112 1738 12-3426 Pen Argyl locomotive shop - cast iron cover plate for man hole Blueprint 3/24/1915 4437 sht 113 1739 12-3426 Pen Argyl locomotive shop - grating for transfer table Blueprint 3/25/1915 4437 sht 114 1741 12-3426 Pen Argyl locomotive shop - hinges and straps details Blueprint 3/25/1915 4437 sht 115 1742 12-3426 Pen Argyl locomotive shop - information on lug angles Blueprint 3/23/1915 4437 sht 116 1743 12-3426 Pen Argyl locomotive shop - information on rods Blueprint 3/24/1915 4437 sht 117 sht 1744 12 3426- Pen Argyl locomotive shop information on rods y ve - Blueprint 3/23/1915ueprint 4437 sht 118 1745 12-3426 Pen Argyl locomotive shop - information on hook bolts Blueprint 3/25/1915 4437 sht 119 1746 12-3426 Pen Argyl locomotive shop - materials for tunnel Blueprint 3/25/1915 4437 sht 120 1747 12-3426 Pen Argyl locomotive shop - information on rail clamps Blueprint 4/1/1915 4437 sht 121 1748 12-3426 Pen Argyl locomotive shop - information on splice bars Blueprint 3/25/1915 4437 sht 122 1749 12-3426 Pen Argyl locomotive shop- information on anchors and bars Blueprint 3/26/1915 44

37 sht 160 1686 12-3426Pen Argyl locomotive shop - crane clearance diagram for coveyard

red Blueprint 3/12/1915 44

37 sht 161 1687 12-3426Pen Argyl locomotive shop - crane clearance diagram for marchine shop Blueprint 3/12/1915 44

37 sht 162 1688 12-3426 Pen Argyl locmotive shop - Blacksmith's shop partition Blueprint 3/17/1915 4437 sht 163 1689 12-3426 Pen Argyl locomotive shop - erection diagram for erection shop Blueprint 3/16/1915 4437 sht 164 1690 12-3426 Pen Argyl locomotive shop - diagram of bays Blueprint 3/19/1915 4437 sht 165 1691 12-3426 Pen Argyl locomotive shop - erection diagram for machine shop Blueprint 3/27/1915 4437 sht 166 1685 12-3426 Pen Argyl locomotive shop - information on machine shop Blueprint 5/10/2015 4437 sht 167 1684 12-3426 Pen Argyl locomotive shop - information on trusses Blueprint 4/2/1915 4437 sht 168 1683 12-3426 Pen Argyl locomotive shop - information on rivets Blueprint 4/2/1915 4437 sht 169 1682 12-3426 Pen Argyl locomotive shop - information on trusses Blueprint 4/2/2015 4437 sht 170 1681 12-3426 Pen Argyl locomotive shop - information on windows Blueprint 4/2/2015 4437 sht 171 1680 12-3426 Trusses and Eve Struts Required for Pen Argyl Enginehouse Blueprint 5/18/1915 44

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

16721673167416751676

167716781679168016811682168316841685168616871688168916901691

Page 46 of 194Page 46 of 194

16921693169416951696169716981699170017011702170317041705170617071708170917101711

37 sht 172 1679 12-3426Bracing, Posts and Sway Bracing Required for Pen Argyl Enginehouse Blueprint 5/8/1915 44

37 sht 173 1678 12-3426 List of Wall Anchors Required for Pen Argyl Enginehouse Blueprint 5/3/1915 4437 sht 174 1675 12-3426 List of Material Required for Main Locomotive Shop at Pen Argyl Blueprint 4/2/1915 4437 sht 175 1677 12-3426 Wall Anchors and Purlins Required for Pen Argyl Enginehouse Blueprint 5/8/1915 4437 sht 176 1676 12-3426 Rivets for Shaft Supports at Pen Argyl Enginehouse Blueprint 6/15/1915 44

37 sht 177 1674 12-3426Additional List of Material Required for Main Locomotive ShopPen Argyl

at Blueprint 5/3/1915 44

37 sht 178 1673 12-3426 List of Material Required for Main Locomotive Shop at Pen Argyl Blueprint 6/15/1915 4437 sht 180 1670 12-3426 Plan for Main Locomotive Shop at Pen Aggyl Blueprint 3/8/1929 4437 sht 65 1671 12-3426 Sketch Showing the Fan House at the Pen Argyl Shops Blueprint 3/25/1915 4437 sht 66 1693 12-3426 Roof drainage for main locomotive shop - Pen Argyl Blueprint 2/27/1915 4437 sht 67 1692 12-3426 Pen Argyl locomotive shop - information on roof drainage Blueprint 3/23/1915 4437 sht 68 1697 12-3426 Pen Argyl locomotive shop - anchor bolts for Piers A, B & C Blueprint 3/1/2015 4437 sht 69 1698 12-3426 Pen Argyl locomotive shop - information on slabs Blueprint 3/1/1915 4437 sht 70 1699 12-3426 Pen Argyl locomotive shop - information on slabs Blueprint 3/1/1915 4437 sht 71 1700 12-3426 Pen Argyl locomotive shop - information on supports Blueprint 3/12/1915 4437 sht 72 1701 12-3426 Pen Argyl locomotive shop - information on supports Blueprint 3/12/1915 4437 sht 73 1702 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/13/1915 4437 sht 74 1703 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/15/1915 4437 sht 75 1704 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/15/2015 4437 sht 76 1705 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/15/2015 4437 sht 77 1706 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/16/1915 4437 sht 78 1707 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/15/2015 4437 sht 79 1709 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/16/1915 4437 sht 80 1708 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/16/1915 4437 sht 81 1710 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/16/1915 4437 sht 82 1711 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/16/1915 4437 sht 84 1713 12-3426 Pen Argyl locomotive shop - information on crane girders Blueprint 3/27/1915 4437 sht 85 1714 12-3426 Pen Argyl locomotive shop - information on girts Blueprint 3/18/1915 4437 sht 86 1715 12-3426 Pen Argyl locomotive shop - information on girts Blueprint 3/19/1915 4437 sht 87 1716 12-3426 Pen Argyl locomotive shop - information on girts Blueprint 3/18/1915 4437 sht 88 1696 12-3426 Pen Argyl locomotive shops - information on doors Blueprint 3/19/1915 4437 sht 88 1712 12-3426 Pen Argyl locomotive shop - information on crane girders Blueprint 3/18/1915 4437 sht 89 1695 12-3426 Pen Argyl locomotive shop - information on door posts Blueprint 3/19/1915 4437 sht 90 1694 12-3426 Pen Argyl locomotive shop - drawing of rods Blueprint 3/20/1915 4437 sht 91 1717 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/23/1915 4437 sht 92 1718 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/23/1915 4437 sht 93 1718 12-3426 Pen Argyl locomotive shop - information on beams Blueprint 3/23/1915 4437 sht 94 1720 12-3426 Pen Argyl locomotive shop - information on girts Blueprint 3/24/1915 4437 sht 95 1721 12-3426 Pen Argyl locomotive shop - information on posts Blueprint 3/24/1915 4437 sht 96 1722 12-3426 Pen Argyl locomotive shop - information on posts Blueprint 3/24/1915 44

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I17121713171417151716

1717

1718171917201721172217231724

1725

17261727

17281729

n

Page 47 of 194Page 47 of 194

17301731173217331734

173517361737173817391740174117421743174417451746

1747

37 sht 97 1723 12-3426 Pen Argyl locomotive shop - information on windows Blueprint 3/24/1915 4437 sht 98 1724 12-3426 Pen Argyl locomotive shop - information on posts Blueprint 3/24/1915 4437 sht 99 1725 12-3426 Pen Argyl locomotive shop - information on posts Blueprint 3/24/1915 44

76 sht 155 none 12-3426 Cambria Steel CO-Steel Car Department-diagram of spring "G" Blueprint ev 6/30/1910 44C203&C202 1641 12-3426 Tamaqua Extension - Span No 2 - Cast Steel Pedestal Blueprint 12/13/1911 44

C38 1741 12-3426Pen Argyl locomotive shop - hinge and eye details for doors inerecting shop

paper 1/26/1915 44

D319 1660 12-3426Forge Shop Material Required for Bridge Over Delaware at Portland, Pa. tracing 6/16/1937 44

D319 1661 12-3426 Galvanized Screens Required for Bridge at Portland, Pa. tracing 5/27/1937 44D319 1662 12-3426 Lag Screws Required for Bridge at Portland, Pa. tracing 6/11/1937 44D319 1664 12-3426 Galvanized U Bolts for Bridge at Portland, Pa. tracing 5/28/1937 44D319 1665 12-3426 Castings Required for Bridge at Portland, Pa. tracing 4/23/1937 44

missing 1638 12-3426 Bridge Over Lehigh River Near Lehigh Gap - Button Head Rivets 10/18/1911 44o L&N numbe 1668 12-3426 Plan for L&NE Track - Yard & Buildings at Pen Argyl, Pa. Blueprint 6/24/1891 44

no number 1663 12-3412Copper Bearing Steel Required for Bridge at Portland, Pa. Materials list tablet paper 4/28/1937 44

no number 1666 12-3426Plan for Yard and Enginehouse & Supporting Facilities at WinGap

d Blueprint 1/21/1914 44

no number 1669 12-3426 Profile of Track & Bridge at Pellettown, N.J. graph cardst 9/18/1942 44

37 sht 10 1801 12-3426Cross Section of the Roof Design to be Used at the Pen ArgyEnginehouse

l Blueprint 3/15/1915 45

37 sht 115 1800 12-3426 Detail of Steel Girders to be Used in the Pen Argyl Enginehouse Blueprint 3/12/1915 4537 sht 12 1799 12-3426 Detail of Steel Work for the Pen Argyl Enginehouse Blueprint 3/21/1915 45

37 sht 124 1751 12-3426 Detail of Struts for Main Locomotive Shop at Pen Argyl Blueprint 5/13/1915 4537 sht 125 1752 12-3426 Detail of Struts for Main Locomotive Shop at Pen Argyl Blueprint 5/3/1915 4537 sht 126 1753 12-3426 Detail of Columns for Main Locomotive Shop at Pen Argyl Blueprint 5/3/1915 4537 sht 127 1754 12-3426 Gauges to be Used on the New Pen Argyl Enginehouse Blueprint 5/3/1915 45

37 sht 128 1755 12-3426 Swedge and Hex Nuts to be Used at Pen Argyl Locomotive House Blueprint 5/3/1915 4537 sht 129 1756 12-3426 Girts to be Used in the New Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 13 1798 12-3426 Detail of Steel Work for the Pen Argyl Enginehouse Blueprint 5/13/1915 45

37 sht 130 1757 12-3426 Girts and Rafters to be Used on the Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 131 1758 12-3426 Detail of Rafters to be Used on the Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 132 1750 12-3426 Pen Argyl locomotive shop-detail on posts Blueprint 3/17/1915 4537 sht 133 1760 12-3426 List of Various Type Struts to be Used on Pen Argyl Enginehouse Blueprint 5/12/1915 4537 sht 134 1761 12-3426 Detail of Struts Required for Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 135 1762 12-3426 Detail of Struts Required for Pen Argyl Enginehouse Blueprint 4/17/1918 4537 sht 136 1763 12-3426 Columns and Posts to be Used in Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 137 1764 12-3426 Columns and Posts to be Used in New Pen Argyl Enginehouse Blueprint 5/13/1915 4537 sht 138 1765 12-3426 List of Purlins to be Used in New Pen Argyl Enginehouse Blueprint 4/17/1915 45

37 sht 139 1766 12-3426Types of Purlins Required in Construction of Pen Argyl Enginehouse Blueprint 4/17/1915 45

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I17481749175017511752175317541755175617571758

1759

17601761

1762

1763176417651766

Page 48 of 194Page 48 of 194

1766176717681769

1770177117721773

177417751776

177717781779

1780178117821783

37 1786 12 45

n

37 sht 14 1797 12-3426 Detail of Steel Work for Pen Argyl Enginehouse Blueprint 3/15/1915 457 sht 140 & 14 1768 12-3426 List of F-26 Rafters to be Used on Pen Argyl Enginehouse Blueprint 4/17/1915 45

37 sht 142 1776 12-3426 Posts to be Used at the New Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 143 1777 12-3426 Girts to be Used at the New Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 144 1770 12-3426 Types of Rafters to be Used at Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 145 1769 12-3426 Lintels Required for New Enginehouse at Pen Argyl Blueprint 4/17/1915 4537 sht 146 1771 12-3426 List of Lintels to be Used on Pen Argyl Enginehouse Blueprint 4/12/1915 4537 sht 147 1772 12-3426 Detail of Lintels Required for Pen Argyl Enginehouse Blueprint 5/18/1915 4537 sht 148 1773 12-3426 Detail of L-3 Lintels to be Used on Pen Argyl Enginehouse Blueprint 4/17/1915 4537 sht 149 1774 12-3426 Detail of Various Lintels to be Used at Pen Argyl Enginehouse Blueprint 5/13/1915 4537 sht 15 1796 12-3426 Plan for Use of Purlins and Louvres in the Pen Argyl Enginehouse Blueprint 5/3/1915 45

37 sht 150 1775 12-3426List of Anchor Bolts for Wood Sills to be Used at Pen Argyl Enginehouse Blueprint 4/1/1915 45

37 sht 151 1778 12-3426Location of Bearing Points in Construction of Pen Argyl Enginehouse Blueprint 4/30/1915 45

37 sht 152 1779 12-3426 Rail Clamps to be Used on New Pen Argyl Enginehouse Blueprint 4/17/1915 45

37 sht 153 1780 12-3426Eccentric Washers Used in Construction on Pen Argyl Enginehouse Blueprint 4/17/1915 45

37 sht 154 1782 12-3426List of Various Types of Field Rivets to be Used on Pen Argyl Enginehouse Blueprint 5/13/1915 45

37 sht 155 1784 12-3426 Purlins and Struts to be Used on the Pen Argyl Enginehouse Blueprint 5/19/1913 4537 sht 156 1785 12-3426 Struts to be Used in Roof of the Pen Argyl Enginehouse Blueprint 5/19/1915 4537 sht 157 sht 157 1786 12-34263426 Brack and Knees for Ose on Pen Argyl Enginehousegy g Blueprint 5/19Blueprint 5/19/1915/1915 4537 sht 158 1781 12-3426 List of Field Rivets to be Used on the Pen Argyl Enginehouse Blueprint 6/1/1915 4537 sht 159 1783 12-3426 Crown Clearance Diagram for the Pen Argyl Erecting Shop Blueprint 3/18/1915 4537 sht 16 1795 12-3426 Plan for the Use of Purlins in the Pen Argyl Enginehouse Blueprint 3/27/1915 45

37 sht 17 1794 12-3426Construction of Louvres in the Fan House at Pen Argyl Enginehouse Blueprint 4/17/1915 45

37 sht 18 1793 12-3426 Purlin Plan for the Pen Argyl Enginehouse Assembly Blueprint 3/23/1915 4537 sht 19 1792 12-3426 Construction of the Louvres in the Pen Argyl Enginehouse Blueprint 5/13/1915 4537 sht 20 1791 12-3426 List of Bar Anchors for Use on the Pen Argyl Enginehouse Blueprint 5/3/1915 45

37 sht 22 1789 12-3426Bar Anchors and Lupton Steel Sash to be Used in Pen Argyl Enginehouse Blueprint 3/27/1915 45

37 sht 23 1788 12-3426 Lupton Steel Sash to be Used in the New Pen Argyl Enginehouse Blueprint 3/23/1915 4537 sht 8 1803 12-3426 Anchor Bolts Required for Roof of Pen Argyl Enginehouse Blueprint 3/3/1915 45

37 sht 9 1802 12-3426Cross Section of the Roof Design to be Used at the Pen ArgyEnginehouse

l Blueprint 3/15/1915 45

37 sht21 1790 12-3426 Lupton Steel Sash for Use in Pen Argyl Enginehouse Blueprint 3/27/1915 45no number 3081 12-3151 Drainage statistics on main line to Pine Island Junction Linen ? 45

umber missin 1787 12-3426Foundations for the New Pen Argyl Main Locomotive Shop pocondition

or Blueprint 3/18/1915 45

37 sht 12 1814 12-3427 Diagonals to be Used in the New Pen Argyl Enginehouse Blueprint 3/23/1915 4637 sht 2 1809 12-3427 Plan of the Foundation for the Pen Argyl Enginehouse Blueprint 3/13/1915 4637 sht 29 1827 12-3427 Columns to be Used on the New Pen Argyl Enginehouse Blueprint 3/23/1915 46

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1784178517861787

17881789

17901791179217931794

1795179617971798179918001801

1802

Page 49 of 194Page 49 of 194

1802

1803

180418051806

1807180818091810

1811

1812181318141815181618171818

5 12

3

37 sht 3 1808 12-3427 Foundation for the Fan House at the Pen Argyl Enginehouse Blueprint 3/12/1915 4637 sht 30 1826 12-3427 Columns to be Used on the New Pen Argyl Enginehouse Blueprint 3/19/1915 4637 sht 31 1825 12-3427 Columns Required for the New Pen Argyl Enginehouse Blueprint 3/19/1915 4637 sht 32 1824 12-3427 Diagonals and Plates for New Pen Argyl Enginehouse Blueprint 3/17/1915 46

37 sht 34 1822 12-3427Girders, Knee Braces and Beams & Diagonals for Pen Argyl Enginehouse Blueprint 3/19/1915 46

37 sht 35 1821 12-3427 Girders, Knee Braces and Beams at Pen Argyl Enginehouse Blueprint 3/19/1915 46

37 sht 36 1820 12-3427Trusses and Uprights to be Used on the New Pen Argyl Enginehouse Blueprint 3/14/1915 46

37 sht 37 1819 12-3427 Diagonals and Plates Required for the Pen Argyl Enginehouse Blueprint 3/19/1915 4637 sht 38 1818 12-3427 Columns Required for Use on the Pen Argyl Enginehouse Blueprint 3/22/1915 4637 sht 38 1823 12-3427 Diagonals and Plates for Pen Argyl Enginehouse Blueprint 3/17/1915 4637 sht 39 1817 12-3427 Columns Required for Use on the Pen Argyl Enginehouse Blueprint 3/22/1915 46

37 sht 4 1807 12-3427List and Number of Anchor Bolts Required for Pen Argyl Enginehouse Blueprint 3/3/1915 46

37 sht 40 1816 12-3427 Struts Required for Use on the New Pen Argyl Enginehouse Blueprint 3/23/1915 4637 sht 41 1815 12-3427 Struts Required for the New Pen Argyl Enginehouse Blueprint 3/23/1915 4637 sht 43 1813 12-3427 Diagonals & Knee Braces Required for Pen Argyl Enginehouse Blueprint 3/27/1915 4637 sht 44 1812 12-3427 Trusses required for the New Pen Argyl Enginehouse Blueprint 3/24/1915 4637 sht 45 1811 12-3427 Posts, Diagonals & Plates for the Pen Argyl Enginehouse Blueprint 3/22/1915 4637 sht 46 1810 12-3427 Diagonals, Struts and Plates for Pen Argyl Enginehouse Blueprint 3/23/1915 46

37 sht 537 sht 18061806 12-34273427Anchor Bolts, Slabs and Washers to be Used in the Pen ArgyEnginehouseEnginehouse

l Blueprint 3/5/Blueprint 3/5/19151915 4646

37 sht 6 1805 12-3427Anchor Bolts to be Used on the Roof of the Pen Argyl Enginehouse Blueprint 3/18/1915 46

37 sht 7 1804 12-3427Anchor Bolts, Slabs and Washers to be Used in the Pen ArgyEnginehouse

l Blueprint 3/3/1915 46

37 sht ? 1833 12-3427 GI Cover Plates for Pen Argyl Railroad Shops - poor condition Blueprint 7/14/1915 4737 sht 24 1832 12-3427 Bar Anchors to be Used in the Pen Argyl Enginehouse Blueprint 3/18/1915 47

37 sht 25 1831 12-3427Half Trusses to be Used in Construction of the New Pen ArgyEnginehouse

l Blueprint 3/16/1915 47

37 sht 26 1830 12-3427 Columns to be Used in the New Pen Argyl Enginehouse Blueprint 3/14/1915 4737 sht 27 1829 12-3427 Columns and Shop Work Sheets for New Pen Argyl Enginehouse Blueprint 3/19/1915 4737 sht 28 1828 12-3427 Struts, Diagonals and Plates for the New Pen Argyl Enginehouse Blueprint 3/16/1915 47

37 sht 49 1849 12-3427 Rail Supports, Angles and Rail Support for Pen Argyl Enginehouse Blueprint 4/16/1915 47

37 sht 50 1848 12-3427 Rail Supports, Angles and Rail Support for Pen Argyl Enginehouse Blueprint 4/16/1915 477 sht 50A & 5 1846 12-3427 Plan of Crane Girder Lacing at Pen Argyl Enginehouse Blueprint 1/28/1915 47

37 sht 52 1845 12-3427 Plan of Crane Girder Lacing at Pen Argyl Enginehouse Blueprint 1/18/1915 4737 sht 53 1844 12-3427 Cross Section of Plane Girder Lacing at Pen Argyl Enginehouse Blueprint 1/28/1915 4737 sht 54 1843 12-3427 Plan of Crane Girder Lacing at Pen Argyl Enginehouse Blueprint 1/28/1915 4737 sht 55 1842 12-3427 Plan of Crane Girder Lacing at Pen Argyl Enginehouse Blueprint 1/28/1915 4737 sht 56 1841 12-3427 Plan of Crane Girder Lacing at Pen Argyl Enginehouse Blueprint ? 47

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I18191820182118221823

1824182518261827182818291830183118321833183418351836183718381839

Page 50 of 194Page 50 of 194

18391840184118421843184418451846184718481849185018511852

18531854185518561857

6 sht 108 & 1947 Ton L&NE 5/4/1907 48

37 sht 57 1840 12-3427 Plan of Crane Girder Loading at Pen Argyl Enginehouse Blueprint ? 4737 sht 58 1839 12-3427 Section of Third End Wall at Pen Argyl Enginehouse Blueprint ? 4737 sht 59 1838 12-3427 Blue Print of Section of Third End Wall at Pen Argyl Enginehouse Blueprint ? 4737 sht 60 1837 12-3427 Horizontal Section at End of Pen Argyl Enginehouse Blueprint ? 4737 sht 61 1836 12-3427 Detail Blue Print of Pen Argyl Enginehouse Blueprint ? 47

37 sht 62 1835 12-3427Horizontal Sections of Ends of Buildings at Pen Argyl Enginehouse Blueprint 2/5/1915 47

37 sht 63 1834 12-3427 Drop Frames for the Pen Argyl Enginehouse Blueprint ? 475346 3291 12-3136 PA Tracing 10/28/1918 485922 1852 12-3428 Map Showing Location of Side Tracks Along the Albion Branch Craft paper ? 486039 1853 12-3428 Map of the Race Street Area in the Pen Argyl Area Linen ? 48

37 sht 47 1851 12-3428 Half Trusses for Use at the Pen Argyl Enginehouse Blueprint 3/26/1915 4837 sht 48 1850 12-3428 Various Struts for Use on the Pen Argyl Enginehouse Blueprint 3/30/1915 48

76 sht 100 1935 12-3428 Hopper Door for 50 Ton L&NE Hopper Car Blueprint 2/27/1911 4876 sht 101 1938 12-3428 Threaded Bolt with Cotter Pin for 50 Ton Hopper Car Blueprint 1/4/1910 4876 sht 102 1939 12-3428 Bottom Hopper Angle for 50 Ton Hopper Car Blueprint 9/16/1909 4876 sht 103 1940 12-3428 Suspension Spring Slide for 50 Ton Hopper Car on L&NE RR Blueprint ? 4876 sht 104 1941 12-3428 Air Cylinder Fulcrum for 50 Ton Hopper Car on L&NE RR Blueprint 3/19/1910 4876 sht 105 1942 12-3428 End Grab Iron for 50 Ton Hopper Cars on L&NE RR Blueprint 1/24/1911 4876 sht 106 1943 12-3428 Button Head Bolt for 50 Ton Hopper Car on L&NE Blueprint 9/6/1909 4876 sht 107 1944 12-3428 Box for Hand Brake Chain on 50 Ton L&NE Hopper Car Blueprint ? 48

6 sht 108 & 1 1 194711 12-342812-3428 Pipe Clamp for 50 Ton Hopper Car on L&NE CarsPipe Clamp for 50 Hopper Car on Cars Blueprint 5/4/1907Blueprint 4876 sht 109 1948 12-3428 Operating Shaft Center Arm for 50 Ton Hopper Car Blueprint 7/19/1909 4876 sht 110 1945 12-3428 Grab Bar Lever Connection for 50 Ton Hopper Car Blueprint ? 4876 sht 112 1949 12-3428 1" Diameter Pin for 50 Ton Hopper Car on L&NE RR Blueprint ? 4876 sht 113 1950 12-3428 MCB Standard Axle for 50 Ton Hopper Cars on L&NE RR Blueprint 12/9/1907 4876 sht 114 1951 12-3428 Rear Barlow Draft Gear Stop for 50 Ton Hopper Cars on L&NE Blueprint ? 4876 sht 115 1952 12-3428 Pawl for 50 Ton Hopper Car on L&NE RR Blueprint ? 4876 sht 116 1953 12-3428 Barlow Draft Gear Side Link for 50 Ton Hopper Car on L&NE RR Blueprint 5/12/1909 4876 sht 117 1954 12-3428 Brake Levers for 50 Ton Hopper Cars on the L&NE RR Blueprint 8/6/1909 4876 sht 118 1955 12-3428 Column Bolt Lock for 50 Ton Hopper Cars on L&NE RR Blueprint ? 4876 sht 119 1956 12-3428 Journal Box Bolt Lock for 50 Ton Hopper Car on L&NE RR Blueprint ? 4876 sht 120 1957 12-3428 Brake Levers for 50 Ton Hopper Cars on the L&NE RR Blueprint 2/26/1904 4876 sht 121 1958 12-3428 Spring Plank Filler Bolt Lock for 50 Ton Hopper Cars on L&NE Blueprint ? 4876 sht 122 1959 12-3428 Brake Beam Hangers for 50 Ton Hopper Cars on L&NE RR Blueprint ? 48

76 sht 123 1960 12-3428Card Board for Examination and Inspection for 50 Ton L&NE Hopper Car Blueprint ? 48

76 sht 124 1961 12-3428 Suspension Spring Clamp for 50 Ton Hopper Cars on L&NE RR Blueprint ? 4876 sht 125 1962 12-3428 Connecting Rods for 50 Ton Hopper Cars on the L&NE Blueprint 8/5/1909 4876 sht 126 1963 12-3428 Chain and Cylinders to be Used on 50 Ton L&NE Hopper Cars Blueprint ? 4876 sht 127 1964 12-3428 Operating Dog Cams to be Applied to 50 Ton L&NE Hopper Cars Blueprint 3/24/1910 48

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I1858185918601861186218631864186518661867186818691870187118721873187418751876187718781879

Page 51 of 194Page 51 of 194

18791880188118821883188418851886188718881889189018911892189318941895189618971898

76 154 1893 12 3428 Ladder Treads for Use on 50 Ton Hopper Cars Bl 8/22/1912 48

76 sht 128 1965 12-3428 Operating Lever Connection on 50 Ton L&NE Hopper Car Blueprint 1/11/1909 4876 sht 129 1966 12-3428 Barlow Draft Key for 50 Ton Hopper Car on L&NE Blueprint ? 4876 sht 130 1967 12-3428 Brake Rod Guide for 50 Ton L&NE Hopper Cars Blueprint 5/6/1909 4876 sht 132 1869 12-3428 Horn Type Brace for Use on 50 Ton Hopper Cars Blueprint ? 4876 sht 133 1870 12-3428 Spring Plank Fillers for Use on 50 Ton Hopper Cars Blueprint ? 48

76 sht 133A 1871 12-3428 Connecting Rods for Use on 50 Ton Hopper Cars Blueprint 10/7/1921 4876 sht 135 1873 12-3428 Operating Dog Cams for Use on 50 Ton Hopper Car Blueprint ? 4876 sht 136 1874 12-3428 Rear Farlow Draft Gear Stop on 50 Ton Hopper Car Blueprint 9/27/1912 4876 sht 137 1875 12-3428 Ratchet Wheel for Use on 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 138 1876 12-3428 Spring Plank Filler for Use on 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 141 1879 12-3428 End Sill Grab Iron for 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 143 1881 12-3428 Winding Shaft Dog Bolt for 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 144 1882 12-3428 Hopper Door Hinge for 50n Ton Hopper Car Blueprint 8/22/1912 4876 sht 145 1884 12-3428 Truck & Body Lever Connection for 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 146 1885 12-3428 Lead Lever Fulcrum for 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 147 1886 12-3428 Connecting Rod for 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 148 1887 12-3428 Live Truck Lever Guide for 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 149 1888 12-3428 Brake Levers for 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 150 1889 12-3428 End Sill Grab Iron for 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 151 1890 12-3428 Grab Iron for Top of Ladders on 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 153 1892 12-3428 Brake Pin for Use on 50 Ton Hopper Car Blueprint 8/22/1912 4876 sht 154 sht 1893 12 3428- Ladder Treads for Use on 50 Ton Hopper Cars Blueprint 8/22/1912ueprint 4876 sht 17 1968 12-3428 Brake Rod Guide for 50 Ton L&NE Hopper Cars Blueprint 5/6/1909 4876 sht 18 1969 12-3428 General Arrangement of Transverse Bracing at Cross Ridge Blueprint 5/7/1911 4876 sht 19 1970 12-3428 Gould Freight Coupler - 5 X 7 Shank Blueprint 3/7/1911 4876 sht 20 1971 12-3428 Gould Journal Box for Steel Car Blueprint 3/4/1911 4876 sht 21 1972 12-3428 5_ X 10 Steel Journal Box - Kensington Blueprint 3/21/1911 4876 sht 22 1973 12-3428 Push Pole Pocket for Steel Cars Blueprint 7/19/1909 4876 sht 23 1974 12-3428 Body Side Bearings for Steel Cars for L&NE RR Blueprint 7/19/1909 4876 sht 24 1975 12-3428 Outside Winding Shaft Bracket for Steel Cars on L&NE Blueprint 7/20/1907 4876 sht 25 1976 12-3428 Inside Bearing for Winding Shaft for Steel Cars on L&NE Blueprint 1/20/1909 4876 sht 26 1977 12-3428 Material Soft Steel Bartley Nut Lock for L&NE Steel Cars Blueprint 5/11/1910 4876 sht 27 1978 12-3428 Floor Sheet Spice Plate and Filler for L&NE Steel Cars Blueprint 3/7/1911 4876 sht 28 1979 12-3428 Coupler Striking Plate for Use on L&NE Steel Cars Blueprint 7/19/1909 4876 sht 29 1980 12-3428 Body center Plate for L&NE Steel Cars Blueprint 7/19/1909 4876 sht 30 1981 12-3428 Combining Column Casting and Brake Beam Hanger Support Blueprint 10/12/1909 4876 sht 31 1982 12-3428 Uncoupling Rod Bracket for L&NE Steel Cars Blueprint 7/19/1909 4876 sht 32 1983 12-3428 MCB Standard 5 X 7 Coupler Shank for Steel L&NE Cars Blueprint 3/1/1911 4876 sht 33 1984 12-3428 Floor Sheet for L&NE Steel Cars Blueprint 3/7/1911 4876 sht 34 1985 12-3428 Flat Rivet Keys for Use on L&NE Steel Cars Blueprint 10/29/1909 4876 sht 35 1986 12-3428 Bolts in PRR Standard Freight Truck Blueprint 2/28/1911 48

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I189919001901190219031904190519061907190819091910191119121913191419151916

191719181919

Page 52 of 194Page 52 of 194

191919201921

19221923192419251926192719281929193019311932193319341935193619371938

76 1903 12 on 50 48

76 sht 36 1987 12-3428 Bolts in PRR Standard Freight Truck Using No 7 Axles Blueprint 7/31/1912 4876 sht 37 1988 12-3428 Hand Brake Wheel on Standard Freight Car Blueprint 3/2/1911 4876 sht 38 1989 12-3428 Combined Column Casting & Brake Beam Casting Blueprint 12/24/1910 4876 sht 42 1854 12-3428 General Arrangement of Arch Bar Truck for 50 Ton Cars Blueprint 11/12/1912 4876 sht 43 1855 12-3428 General Print of Truck Design for Hopper Car Blueprint 11/13/1912 4876 sht 44 1860 12-3428 Plan for Reservoir Car for 50 Ton Hopper Car Blueprint 7/29/1907 4876 sht 45 1861 12-3428 Plan for Coupler Carrier for 50 Ton Hopper Car Blueprint 7/31/1909 4876 sht 46 1862 12-3428 Plan for Brake Mast Yoke for 50 Ton Hopper Car Blueprint ? 4876 sht 47 1863 12-3428 Plan for Brake Step Bracket for 50 Ton Hopper Car Blueprint 2/8/1911 4876 sht 51 1865 12-3428 Plan for U Bolt Pipe Clamp for 50 Ton Hopper Car Blueprint 2/27/1911 48

76 sht 52 & 53 1859 12-3428 Plan for Horizontal Grab Irons for 50 Ton Hopper Cars Blueprint 8/1/1907 4876 sht 56 1894 12-3428 Hinge Butt for Use on 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 57 1895 12-3428 Push Rod for Use on 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 58 1896 12-3428 Lever Guide for Use on 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 59 1897 12-3428 Side Grab Irons for 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 60 1898 12-3428 Air Reservoir Release Rod to be Used on 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 61 1899 12-3428 Brake Mast for Use on 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 62 1900 12-3428 Winding Shaft for Use on 50 Ton Hopper Cars Blueprint 8/22/1912 48

76 sht 63 1901 12-3428Drop Door Channel Connecting Cap for Use on 50 Ton HoppeCars

r Blueprint 8/22/1912 48

76 sht 64 & 65 1902 12-3428 1_" Hook Bolt Pipe Clamp for Use on 50 Ton Hopper Cars Blueprint 8/22/1912 4876 sht 66 sht 66 1903 12-34283428 Bending Shaft Ratchet for Use on 50 Ton Hopper CarsBending Shaft Ratchet for Use Ton Hopper Cars Blueprint 8/22Blueprint 8/22/1912/1912 4876 sht 67 1904 12-3428 Brake Connection Spreader for Use on 50 Ton Hopper Cars Blueprint ? 4876 sht 68 1905 12-3428 Hand Brake Ratchet and Pawl for Use on 50 Ton Hopper Cars Blueprint 2/5/1911 48

76 sht 69 1906 12-3428Diagonal Brace Gusset Side to End Sill for Use on 50 Ton HoCars

pper Blueprint 3/1/1911 48

76 sht 70 1907 12-3428 Suspension Spring for Use on 50 Ton Hopper Cars Blueprint 2/9/1911 4876 sht 71 1908 12-3428 End Sill Grab Iron for Use on 50 Ton Hopper Car Blueprint 2/6/1911 4876 sht 73 1910 12-3428 Ladder Treads to be Used on 50 Ton Hopper Cars Blueprint 2/6/1911 4876 sht 74 1911 12-3428 Air Cylinder Support for Use on 50 Ton Hopper Cars for L&NE Blueprint 3/8/1910 4876 sht 75 1912 12-3428 Arch Bars and Journal Tie Bars for Use on 50 Ton Hopper Cars Blueprint 2/23/1911 4876 sht 76 1913 12-3428 Body Corner Caps for Use on 50 Ton Hopper Cars Blueprint 8/1/1909 4876 sht 77 1914 12-3428 Bolster and Side Connection Angle foe 50 Ton Hopper Cars Blueprint 7/29/1909 4876 sht 78 1915 12-3428 Floor Supports on Center Sill for 50 Ton Hopper Cars Blueprint 8/1/1909 4876 sht 79 1916 12-3428 Side Sill Step Required for Use on 50 Ton Hopper Cars Blueprint ? 4876 sht 81 1918 12-3428 Cross Head Brace for Use on 50 Ton Hopper Cars Blueprint 7/29/1907 4876 sht 82 1919 12-3428 Center Sill Diaphragm Separators for 50 Ton Hopper Cars Blueprint 7/24/1909 4876 sht 83 1920 12-3428 Step Inside of 50 Ft Hopper Car Blueprint 3/1/1909 4876 sht 84 1921 12-3428 Floating Lever Fulcrum for 50 Ton Hopper Cars Blueprint 4/23/1916 4876 sht 85 1922 12-3428 King Pin, Key and Ring for 50 Ton Hopper Car Blueprint 7/30/1909 4876 sht 86 1923 12-3428 Body Bolster Bottom Plate for 50 Ton Hopper Car Blueprint 3/2/1910 4876 sht 87 1924 12-3428 Bolster Webb Stiffener for 50 Ton Hopper Car 7/30/1907 48

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I193919401941194219431944194519461947194819491950

1951

195219531954195519561957

1958

Page 53 of 194Page 53 of 194

1958195919601961196219631964196519661967

196819691970197119721973197419751976

76 16 1994 12 3429 Hopper Cars Bluepr t 3/8/1911 49

76 sht 89 1936 12-3428 Details for Winding Shaft for 50 Ton Hopper Cars Blueprint ? 4876 sht 90 1937 12-3428 Brake Pin for 50 Ton Hopper Cars Blueprint ? 4876 sht 91 1926 12-3428 Longitudional Ridge Support for 50 Ton Hopper Cars Blueprint 7/12/1909 4876 sht 92 1927 12-3428 Bolster Side and Subsill Gusset for 50 Ton Hopper Cars Blueprint 7/29/1909 4876 sht 93 1928 12-3428 Uncoupling Lever for 50 Ton Hopper Car Blueprint 3/2/1911 4876 sht 94 1929 12-3428 Outside Hopper Sheet for 50 Ton L&NE Hopper Car Blueprint 3/1/1911 4876 sht 95 1930 12-3428 Ratchet Wheel Plate Bushing for 50 Ton Hopper Car Blueprint 2/4/1911 4876 sht 96 1931 12-3428 Ratchet Wheel for 50 Ton Hopper Car for L&NE RR Blueprint 2/4/1911 4876 sht 98 1933 12-3428 Brake Step for 50 Ton Hopper Car on L&NE Blueprint 3/2/1911 4876 sht 99 1934 12-3428 Pawl for Ratchet Wheel on 50 Ton L&NE Hopper Car Blueprint 10/27/1910 48

767 sht 97 1932 12-3428 Longitudional Ridge Sheet for 50 Ton L&NE Cars Blueprint 2/27/1911 481901 12-3428 Grab Iron at Top of Ladder for Use on 50 Ton Hopper Cars 8/22/1912 48

5393 sht 5 3361 12-3136Right of way and track map through Washington Twp. And UpBethel Twp.

per Blueprint ? 49

76 sht 1 2001 12-3429Details of Westinghouse Air Brakes to be Applied to L&NE HoCars

pper Blueprint 3/21/1910 49

76 sht 10 1998 12-3429 Center Sill Construction for L&NE Hopper Cars Blueprint 3/9/1911 4976 sht 11 1999 12-3429 Side Construction of L&NE Hopper Car Blueprint 3/7/1911 4976 sht 12 1997 12-3429 Farlow Twin Spring Draft Gear Steel Couplers Blueprint 3/21/1911 4976 sht 13 1996 12-3429 Center Construction for 50 Ton Steel Hopper Cars Blueprint 12/12/1912 49

76 sht 14 & 15 1995 12-3429 Gould Crown Cast Steel Truck Bolster for 50 Ton L&NE Cars Blueprint 3/9/1911 49

76 sht 16 sht 1994 12 3429-Position Layout of Brake Beam, Hangers and Levers for 50 ToHopper Cars

n Blueprint 3/8/1911in 49

76 sht 2 2002 12-3429 General Arrangement of Clark Side Dump Car Blueprint 4/20/1927 4976 sht 3 2003 12-3429 Air Brakes to be Used on 50 Ton Side Dump Car Blueprint 4/10/1917 4976 sht 39 1990 12-3429 Chain-General with Special Straight End Link or Links Blueprint 8/10/1911 4976 sht 4 2004 12-3429 General Arrangement of Air Dump Piping Blueprint 4/6/1911 4976 sht 40 1991 12-3429 Ratchet Wheel and Pawl Plate Steel Freight Cars Blueprint ? 4976 sht 41 1992 12-3429 MCB Class D Helical Springs for Steel Cars Blueprint 11/6/1908 4976 sht 5 2006 12-3429 Draft Gear, Bolster and End Construction of 50 Ton Hopper car Blueprint 11/12/1912 4976 sht 6 2005 12-3429 General Arrangement of 50 Ton Hopper Car Blueprint 3/10/1911 4976 sht 7 2007 12-3429 General Arrangement of Air Brake for 50 Ton L&NE Hopper Car Blueprint 3/9/1911 49

76 sht 8 2008 12-3429General Arrangement of Draft Gear, Bolster and End Construof Hopper

ction Blueprint 3/10/1911 49

76 sht 9 2000 12-3429 General Arrangement of Door Mechanism for 50 Ton L&NE Cars Blueprint 3/8/1911 49? Sht 18 2026 12-3441 Bridge Over Lehigh River at Slatington, PA for the L&NE RR Blueprint 4/7/1909 5043 sht 1 2029 12-3441 Erection Diagram for Bridge Over Lehigh River at Slatington, Pa. Blueprint 6/4/1909 5043 sht 10 2050 12-3441 Girders for the Slatington, Pa. Bridge of the L&NE RR Blueprint 5/22/1909 5043 sht 11 2051 12-3441 Floor Beams, Stringers, Etc for the Bridge Over the Lehigh River Blueprint 5/28/1889 5043 sht 12 2052 12-3441 Girders Required for the Lehigh River Bridge Near Slatington, Pa. Blueprint 5/27/1909 5043 sht 13 2053 12-3441 Floor Beams and Bottom Laterals for Bridge Over Lehigh River Blueprint 6/5/1909 5043 sht 14 2054 12-3441 Stringers, End Frames, Etc for Bridge Over the Lehigh River Blueprint 6/14/1909 50

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

197719781979198019811982

19831984198519861987

1988

1989

1990

1991

19921993

t

Page 54 of 194Page 54 of 194

19931994

1995

1996

199719981999

200020012002200320042005

2006200720082009

43 2018 12 Details of Over River Sheet of 8 50

43 sht 15 2027 12-3441Stringers, End Frames for Bridge Over Lehigh River at SlatingPa.

ton, Blueprint 8/6/1909 50

43 sht 16 2028 12-3441 Cast Steel Shoes for Bridge Over Lehigh River at Slatington, Pa. Blueprint 6/?/1909 5043 sht 17 2025 12-3441 Bridge Over Lehigh River at Slatington, PA for the L&NE RR Blueprint 5/5/1909 5043 sht 19 2024 12-3441 Falsework Plan for CNJ Span of Lehigh River Bridge Blueprint 6/2/1909 5043 sht 2 2030 12-3441 Girders for Bridge Over Lehigh River at Slatington, Pa. Blueprint 5/25/1909 5043 sht 20 2023 12-3441 Falsework Plan for LVRR Span of Lehigh River Bridge Blueprint 6/2/1909 50

43 sht 21 2009 12-3441Bill of Guard Timbers for Bridge Over Lehigh River at SlatingPa.

on, Blueprint 1/15/1909 50

43 sht 22 2012 12-3441 Girder Bridge Over Lehigh River at Slatington, Pa. Blueprint 8/11/1909 5043 sht 23 2013 12-3441 Girder Bridge Over Lehigh River at Slatington, Pa. Blueprint 8/11/1909 5043 sht 25 2016 12-3441 Details of Girder Span Bridge Over Lehigh River - Sheet 5 of 8 Blueprint 8/11/1909 5043 sht 26 2017 12-3441 Details of Girder Span Bridge Over Lehigh River - Sheet 6 of 8 Blueprint 8/11/1909 50

43 sht 27 2020 12-3441Girder Span Bridge Over Lehigh River at Slatington, Pa. - Sheof 8

et 7 Blueprint 8/11/1909 50

43 sht 28 2021 12-3441Girder Span Bridge Over Lehigh River at Slatington, Pa. - Sheof 8

et 8 Blueprint 8/11/1909 50

43 sht 29 2022 12-3441Deck Plates for Girder Span Bridge Over Lehigh River at Slatington, Pa. n-1 of 1 Blueprint 8/11/1909 50

43 sht 3 2044 12-3441Bracing and Girders to be Used on the Slatington, PA Bridge the Lehigh River

Over Blueprint 5/25/1909 50

43 sht 30 2019 12-3441Girder Span Bridge Over Lehigh River at Slatington, Pa. - Sheof 8

et 1 Blueprint 8/11/1909 50

43 sht 31 sht 31 2018 12-34413441 Details of Girder Span Bridge Over Lehigh River - Sheet 2 of Girder Span Bridge Lehigh 2 8 Blueprint 8/11Blueprint 8/11/1909/1909 5043 sht 32 2015 12-3441 Details of Girder Span Bridge Over Lehigh River at Slatington, Pa. Blueprint 8/11/1909 50

43 sht 34 2010 12-3441Deck and Girder Span for Bridge Over Lehigh River at SlatingPa.

ton, Blueprint 8/11/1909 50

43 sht 4 2045 12-3441Girders, Bracing and Masonry Plates Required for the SlatingPa. Bridge

ton, Blueprint 5/25/1909 50

43 sht 5 2046 12-3441Girders and Frames to be Used on the Bridge Over the LehigRiver

h Blueprint 6/9/1909 50

43 sht 6 2043 12-3441 Girders and Frame of the L&NE Bridge Over the Lehigh River Blueprint 5/26/1909 5043 sht 7 2047 12-3441 Girders, Bents and Lateral Bracing for the Lehigh River Bridge Blueprint 6/4/1909 50

43 sht 8 2048 12-3441Cast Steel Shoes, Rollers, Ect for the L&NE Bridge at SlatingtPa.

on, Blueprint 6/16/1909 50

43 sht 9 2049 12-3441 Erection Diagram for Bridge Over Lehigh River at Slatington, Pa. Blueprint 6/4/1909 5054 sht 1 2061 12-3441 Masonry Plan for Single Span Bridge at Pauline Crossing Blueprint 5/23/1909 5054 sht 13 2065 12-3441 Portal Struts for Through Bridge of PP&B RR near Baleville, N.J. Blueprint 6/2/1889 5054 sht 14 2060 12-3441 Top Chord Sections for PP&B RR Bridge at Baleville, N.J. Blueprint 8/6/1889 5054 sht 15 2031 12-3441 Stress Sheet for Baleville Bridge for the PP&B RR Blueprint 5/23/1889 50

54 sht 16 2033 12-3441Detail of Spans for Bridge at Paulins Crossing near Baleville, on PP&B

N.J. Blueprint 8/6/1889 50

54 sht 17 2034 12-3441 Iron Spans for Bridge at Paulins Crossing on PP&B RR Blueprint 6/25/1889 5054 sht 18 2035 12-3441 Detail of Bolts for Span on PP&B RR Blueprint 1/21/1889 5054 sht 19 2036 12-3441 Steel Bolts for Span at Paulins Crossing on PP&B RR Blueprint 10/3/1889 50

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

20102011

201220132014201520162017

2018

2019

2020

2021

2022

20232024

2025

Page 55 of 194Page 55 of 194

20252026202720282029203020312032

203320342035203620372038203920402041

20422043

57 sht 1 2055 12 3441 PP&B RR Blueprint 5/18/1889 50

54 sht 2 2062 12-3441Massonry Plan for Two Single Track Span Bridge near BaleviN.J.

lle, Blueprint 8/6/1909 50

54 sht 20 2037 12-3441 Detail of Steel Spans and Nuts for Paulins Crossing on PP&B RR Blueprint 1/24/1889 50

54 sht 21 2038 12-3441Steel Cotter Pins and Bolts Required for Paulins Crossing on PP&B RR Blueprint 6/24/1889 50

54 sht 22 2040 12-3441 Iron Rods Required for the PP&B RR Bridge at Paulins Crossing Blueprint 6/26/1889 5054 sht 24 2041 12-3441 List of Iron Rods to be Used on the Paulins Crossing Bridge Blueprint 8/6/1889 5054 sht 24 2042 12-3441 Iron Washers Required for Use of the Paulins Crossing Bridge Blueprint 6/25/1889 5054 sht 25 2039 12-3441 Steel Rods Required for the Paulins Crossing of the PP&B RR Blueprint 1/24/1889 5054 sht 26 2032 12-3441 Detail of Span at Paulins Crossing of the PP&B RR Blueprint 12/26/1907 50

54 sht 3 2063 12-3441Massonry Plan for Two Single Span Bridges near Baleville, NSheet #1

.J. - Blueprint 8/5/1889 50

54 sht 4 2064 12-3441End Posts and Top Chords for Single Track Bridge near BalevN.J. - Sheet #2

ille, Blueprint 6/5/1889 50

54 sht 5 2066 12-3441End Posts and Top Chords and Shoes for PP&B RR Bridge nBaleville, N.J.

ear Blueprint 6/5/1889 50

54 sht 6 2067 12-3441End Post Top Chords and Shoe Struts for PP&B RR Bridge nBaleville, N.J.

ear Blueprint 6/8/1889 50

54 sht 7 2068 12-3441End Post Top Chords and Shoe Struts for PP&B RR Bridge nBaleville, N.J.

ear Blueprint 6/8/1889 50

54 sht 8 2069 12-3441 Floor Beams for Single Track PP&B RR Bridge near Baleville, N.J. Blueprint 6/11/1889 5057 sht ? 2056 12-3441 Girders and Bracing Required for the PP&B RR Bridge Blueprint 5/13/1889 50

57 sht 1 2055 12 3441-Girders and Bracing Required for the Baleville, N.J. Bridge of PP&B RR

the Blueprint 5/18/1889 50

57 sht 3 2057 12-3441 Girders and Bracing Required for the PP&B RR Bridge Blueprint 5/15/1889 5057 sht 4 2059 12-3441 Various Wedges Required for the PP&B RR Bridge Blueprint 5/21/1889 5057 sht 5 2058 12-3441 Steel Wedges to be Used on the PP&B RR Bridge Blueprint 5/20/1889 5033 sht 1 2089 12-3441 Erection Details for the Pen Argyl Oil House Blueprint 4/19/1915 5133 sht 10 2080 12-3441 Field Paint to be Used on the New Pen Argyl Oil House Blueprint 5/12/1915 5133 sht 11 2081 12-3441 Material Required for Base of New Pen Argyl Enginehouse Blueprint 5/12/1915 5133 sht 12 2082 12-3441 Description of Beams to be Used on New Pen Argyl Enginehouse Blueprint 5/12/1915 51

33 sht 13 2083 12-3441Diagram Showing Holes to be Drilled in Steel for Pen Argyl Enginehouse Blueprint 4/27/1915 51

33 sht 14 2084 12-3441 Door Posts to be Used on Pen Argyl Oil House Blueprint 4/27/1915 5133 sht 15 2085 12-3441 Lintels to be Used in New Pen Argyl Oil House Blueprint 4/27/1915 5133 sht 16 2086 12-3441 Hinges and Door Post to be Used on Pen Argyl Oil House Blueprint 4/27/1915 5133 sht 17 2087 12-3441 Required Material for Pen Argyl Oil House Blueprint 4/27/1915 5133 sht 18 2088 12-3441 Rails, Posts and Crosses Required for Pen Argyl Oil House Blueprint 4/27/1915 5133 sht 2 2091 12-3441 Elevation Diagram for New Pen Argyl Oil House Blueprint 3/23/1915 5133 sht 3 2090 12-3441 Details for Gate Construction pf Pen Argyl Oil House Blueprint 4/26/1915 5133 sht 4 2075 12-3441 Elevation Diagram for Pen Argyl Oil House Blueprint 4/1/1915 51

33 sht 6 2076 12-3441Material Required for Construction of Pen Argyl Oil House - SC-1

heet Blueprint 4/27/1915 51

33 sht 7 2077 12-3441 Bent Rods Required for Construction of Pen Argyl Enginehouse Blueprint 4/27/1915 51

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

204420452046

2047

204820492050

205120522053

2054

20552056

2057

20582059

Page 56 of 194Page 56 of 194

2060

2061

20622063

20642065206620672068

206920702071

20722073

2074

33 sht 8 2078 12-3441Field Rivets and Screws Required for Construction of Pen ArgEnginehouse

yl Blueprint 5/12/1915 51

33 sht 9 2079 12-3441 Batten Heads and Pins Required for the Pen Argyl Oil House Blueprint 4/27/1915 5147 sht 1 2093 12-3441 Elevation Plan for Electric Transfer Table Blueprint 1/?/1904 51

47 sht 10 2102 12-3441Drum Brake for Electric Transfer Table for the FW&DC Ry at Childress, TX Blueprint 4/23/1907 51

47 sht 11 2103 12-3441Axle Bearings for Electric Transfer Table for NYC RR at DepeN.Y.

w, Blueprint 10/20/1908 51

47 sht 12 2104 12-3441 Standard Switch Boxes for Electric Transfer Table Blueprint 8/21/1909 5147 sht 13 2105 12-3441 Brake for Electric Transfer Table for MEC RR at Waterville, ME Blueprint 8/26/1909 51

47 sht 14 2106 12-3441Double Bearings for Electric Transfer Table for PRR at JerseyCity, N.J.

Blueprint 1/26/1910 51

47 sht 15 2107 12-3441 Concrete Piers for Electric Transfer Table at Pen Argyl, Pa. Blueprint 10/16/1912 5147 sht 16 2108 12-3441 Shafting for Electric Transfer Table for PRR at Indianapolis, IN Blueprint 6/2/1913 51

47 sht 17 2109 12-3441Center Sheaves for Electric Transfer Table for PRR at Indianapolis, IN Blueprint 6/4/1913 51

47 sht 18 2110 12-3441Trolley Details for Electric Transfer Table for PRR at IndianapIN

olis, Blueprint 7/1/1913 51

47 sht 2 2095 12-3441 Detail for Standard Coupling Transfer Table at Pen Argyl Blueprint 9/16/1902 51

47 sht 23 2119 12-3441General Plan for Electric Transfer Table for L&NE at Pen ArgyPa.

l, Blueprint 10/16/1912 51

47 sht 24 2118 12-3441Clutch and Shifter Levers for Electric Transfer Table for PRR Indianapolis, IN

at Blueprint 5/19/1913 51

47 sht 25 2117 12-3441 Cab for Electric Transfer Table for PRR at Indianapolis, IN Blueprint 5/26/1913 51

47 sht 26 2116 12-3441M hi Pl tf f El t i T f T bl f PRR tMachinery Platform for Electric Transfer Table for PRR at Indianapolis, IN Blueprint 5/13/1913 51

47 sht 28 2114 12-3441Floor Beams & Erecting Poles for Electric Transfer Table for Pat Indianapolis, IN

RR Blueprint ? 51

47 sht 29 2113 12-3441Floor Beams and Channels for Electric Transfer Table for PRRIndianapolis, IN

at Blueprint 5/31/1913 51

47 sht 3 2094 12-3441 Standard Window Drum for NYC RR at Depew, MT Blueprint 3/24/1904 51

47 sht 30 2112 12-3441Cab Arrangement for Electric Transfer Table for PRR at Indianapolis, IN Blueprint 7/30/1913 51

47 sht 4 2096 12-3441 Axle Bearings for NYC RR at West Albany, N.Y. Blueprint 4/1/1905 5147 sht 5 2097 12-3441 Split Coupling for NYC RR at West Albany, N.Y. Blueprint 5/?/1905 5147 sht 6 2098 12-3441 Main Drive Gears for Use by the NYC RR at Depew, N.Y. Blueprint 7/24/1906 5147 sht 7 2099 12-3441 Electric Transfer Table Shafting for CI&S RR at Hammond, IN Blueprint 10/22/1906 51

47 sht 8 2100 12-3441Clutch Gears for Electric Transfer Table for B&LE RR at Greenville, Pa. Blueprint 3/2/1907 51

47 sht 9 2101 12-3441 Drum Guards for the FW&DC Ry at Childress, TX Blueprint 3/19/1907 5154 sht 10 2071 12-3441 Stringers and Top Chords for PP&B RR Bridge near Baleville, N.J. Blueprint 6/14/1889 51

54 sht 11 2072 12-3441Stringers and Top Chord Section for Bridge near Baleville, N.J(#6)

. Blueprint 6/14/1889 51

54 sht 12 2074 12-3441 Shipping Marks for Oil House at Pen Argyl - Sheet K-1 Blueprint 5/15/1915 51

54 sht 9 2070 12-3441 Floor Beams for Single Track PP&B RR Bridge near Baleville, N.J. Blueprint 6/11/1889 51

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I2075

2076

207720782079208020812082

2083208420852086

20872088208920902091

20922093

3

Page 57 of 194Page 57 of 194

209320942095

2096

2097209820992100

21012102

21032104

2105210621072108

no numbers 2092 12-3441 Plan for Electric Transfer Table of the Utah Light & Railway Co Blueprint 9/20/? 51

no numbers 2111 12-3441Overhead Trolley Poles for Electric Transfer Table for NYNH&Hartford, CT

H at Blueprint 12/24/1911 51

no numbers 2115 12-3441Stringers and Laterals for Electric Transfer Table for PRR at Indianapolis, IN Blueprint ? 51

#2 2158 12-3442 L&NE Underpass in Schuylkill County under SH 226 Blueprint 10/29/1952 52#2 2159 12-3442 L&NE Underpass in Schuylkill County under SH 226 Blueprint 11/12/1952 52#3 2157 12-3442 L&NE Underpass in Schuylkill County under SH 226 Blueprint 10/29/1952 52

38 sht ? 2134 12-3442 Details of Locomotive Repair Shop at Pen Argyl Blueprint 10/11/1913 5238 sht ? 2135 12-3442 Pond Truss for Use on Pen Argyl Locomotive Repair Shop Blueprint 10/3/1913 52

38 sht ? 2141 12-3442Steelwork between Upper and Lower Tier of Sash at Pen ArgEnginehouse

yl Blueprint 12/28/1914 52

38 sht ? 2156 12-3442 Lupton Steel Sash for Main Locomotive Shops at Pen Argyl Blueprint 3/29/1915 5238 sht 1 2150 12-3442 Steel Sash for Main Locomotive Shops at Pen Argyl on L&NE Blueprint 3/9/1915 5238 sht 10 2136 12-3442 Elevation View of Locomotive repair Shop at Pen Argyl Blueprint 9/25/1913 52

38 sht 10 2147 12-3442Fire Proof Windows for Storage House and Office Building at Argyl

Pen Blueprint 4/8/1915 52

8 sht 10A & 1 2140 12-3442 Pond Continuous Sash for the new L&NE Pen Argyl Enginehouse Blueprint 12/28/1914 5238 sht 11 2145 12-3442 Steel Sash for Boiler House of the L&NE at Pen Argyl Blueprint 4/29/1915 5238 sht 13 2142 12-3442 Steel Louvers for the new Pen Argyl Enginehouse of L&NE Blueprint 9/9/1915 5238 sht 16 2139 12-3442 Sash List for the L&NE Pen Argyl Enginehouse Blueprint 8/19/1914 52

38 sht 17 2138 12-3442Anchors and Door Panels for the new L&NE Pen Argyl Enginehouse Blueprint 8/20/1914 52

38 sht 18 2137 12-3442 Pond Truss for the L&NE Pen Argyl Enginehouse Blueprint 9/20/1913 5238 sht 20 2133 12-3442 Elevation Plan of Pen Argyl Locomotive Repair Shop Blueprint 9/26/1913 5238 sht 3 2155 12-3442 Steel Sash and Doors for Main Locomotive Shop at Pen Argyl Blueprint 3/12/1915 52

38 sht 4 2154 12-3442Steel Sash and Doors to be Used on the Main Pen Argyl Locomotive Shop Blueprint 3/19/1915 52

38 sht 5 2153 12-3442Pond Sash for saw Tooth Construction on Main Locomotive Enginehouse Blueprint 3/15/1915 52

38 sht 6 2152 12-3442 Pond Sash for Saw Tooth Construction Main L&NE Enginehouse Blueprint 3/29/1915 5238 sht 9 2148 12-3442 Steel Sash and Doors for Oil House at Pen Argyl on L&NE Blueprint 3/31/1915 5247 sht 21 2121 12-3442 Standard Motor Panels for AC Motors Blueprint 9/23/1912 52

47 sht 22 2120 12-3442General Plan for Electric Transfer Table for L&NE at Pen ArgyPa.

l, Blueprint 10/16/1912 52

47 sht 31 2124 12-3442 Floor Details for Transfer Table North of Guernsey Blueprint 9/14/1906 52

47 sht 32 2125 12-3442Cab Pedestal for Electric Transfer Table, NP RR, South TacoWA

ma, Blueprint 3/15/1907 52

47 sht 37 2130 12-3442 Wiring Diagram for Electric Transfer Table, NYC RR Blueprint 6/26/1908 52

47 sht 40 2122 12-3442Motor Resistance for Electric Transfer Table - C&NW RR, BooIA

ne, Blueprint 8/10/1911 52

79 sht 10 2162 12-3442 CNJ Hand Rail Column to be Used on Marine Equipment Blueprint 5/23/1908 5279 sht 11 2161 12-3442 CNJ Sheave to be Used on Marine Pile Driver Blueprint 6/10/1904 5279 sht 12 2164 12-3442 CNJ Draw Bar Carry Iron for Use on Freight Cars Blueprint 3/3/1910 52

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I210921102111

21122113

211421152116

2117

2118211921202121

21222123

21242125

Page 58 of 194Page 58 of 194

212621272128212921302131213221332134213521362137

2138

2139

214021412142

. 5

79 sht 13 2167 12-3442 CNJ Brake Wheel for Freight Cars Blueprint 11/5/1904 5279 sht 14 2168 12-3442 CNJ Spring Class 94 for Freight Cars Blueprint 11/23/1905 5279 sht 3 2169 12-3442 CNJ Brake Forging Details for Scale Test Car Blueprint 5/27/1911 52

79 sht 7 2165 12-3442CNJ Engine Truck Brake Head for Use on CNJ Steam Locomotives Blueprint 12/6/1904 52

79 sht 9 2160 12-3442 CNJ Pedestal for Scale Test Car Blueprint 3/25/1911 52

missing 2127Cab Handle for Electric Transfer Table, NP RR South TacomaWA

, Blueprint 4/26/1907 52

torn off 2143 12-3442 Steel Sash for Welfare Building at Pen Argyl on L&NE Blueprint 6/24/1915 52torn off 2144 12-3442 Steel Sash for Welfare Building at Pen Argyl on L&NE Blueprint 6/22/1915 52

torn off 2149 12-3442Hollow Copper Windows for Storehouse and Office at Pen Argyl on L&NE 3/18/1915 52

torn off 2151 12-3442Steel Sash for Main Storehouse and General Office on L&NEPen Argyl

at Blueprint 3/18/1915 52

17 sht 1 2196 12-3442 Roller pedestals for spans 4 and 5 for Lehigh River crossing Blueprint 7/13/1911 5317 sht 2 2194 12-3442 Details of spans 3 and 5 involving the Tamaqua extension Blueprint 7/11/1911 5317 sht 3 2197 12-3442 Skew deck pin spans for Lehigh River bridge crossing Blueprint 7/7/1911 53

17 sht 4 2195 12-3442Details of spans 4 and 5 of bridge at Lehigh Gap crossing LehRiver

igh Blueprint 7/31/1911 53

17 sht 41 2198 12-3442 Skew deck pin spans at Lehigh Gap near Lehigh River Blueprint 7/8/1911 53

17 sht 5 2199 12-3442Stud bolts to be used on spans 4 and 5 on Lehigh River Bridgsheet 401

e Blueprint 8/16/1911 53

17 sht 6 2192 12-3442 Spans no. 4 and 9 of Tamaqua extension over Lehigh River Blueprint 7/13/1911 53

17 sht 7 2190 12-3442Spans no. 4 and 5 for bridge on Tamaqua extension near LehSpans no 4 and for bridge on Tamaqua extension near LehighGap

igh Blueprint 7/11/1911 53

17 sht 8 2191 12-3442 Span no. 4 for bridge on Tamaqua extension near Lehigh Gap Blueprint 8/5/1911 5317 sht 9 2193 12-3442 Details of Tamaqua extension over Lehigh River near Lehigh Gap Blueprint 7/15/1911 5379 sht 1 2170 12-3442 General Arrangement for Scale Test Car on CNJ Blueprint 5/27/1911 5379 sht 2 2174 12-3442 CNJ body for scale test car Blueprint ? 5379 sht 4 2173 12-3442 CNJ forging details for scale test car Blueprint 5/21/1911 5379 sht 5 2171 12-3442 CNJ draft gear arrangement for scale test car Blueprint 5/20/1911 5379 sht 6 2172 12-3442 CNJ floor casting for scale test car Blueprint 4/28/1911 5387 sht 10 2183 12-3442 NYS&W false work plan for bridge no. 78.77 Blueprint 8/22/1923 5387 sht 11 2181 12-3442 NYS&W valuation section over Paulins Kill at Blairstown, NJ Blueprint 9/5/1923 5387 sht 12 2180 12-3442 NYS&W valuation section near Paulins and Blairstown, NJ Blueprint 8/15/1923 5387 sht 13 2179 12-3442 NYS&W valuation section for renewal of bridge no. 77.22 Blueprint 8/15/1923 53

87 sht 14 2177 12-3442NYS&W valuation section for area West of Swartswood, NJ - masonry Blueprint 8/16/1923 53

87 sht 15 2178 12-3442NYS&W valuation section for the sections in Swartswood, NJ areas Blueprint 2/13/1917 53

87 sht 2 2189 12-3442NYS&W masonry plan for bridge at Paulins Kill near BlairstowNJ

n, Blueprint 8/27/1923 53

87 sht 3 2188 12-3442 NYS&W bill of material required for bridge no. 81-88 at Paulins Kill Blueprint 3/13/1917 5387 sht 4 2187 12-3442 NYS&W false work plan for valuation bridge no. 3 - NJ Blueprint 8/27/1923 53

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I21432144

214521462147

2148

87 sht 5 2186 12-3442 Bill of material for bridge over Paulins Kill at Blairstown, NJ Blueprint 8/13/1923 5387 sht 7 2182 12-3442 NYS&W valuation section over Paulins Kill at Blairstown, NJ Blueprint 8/2/1923 53

87 sht 8 2185 12-3442NYS&W valuation section for bridge over Paulins Kill near Blairstown, NJ Blueprint 3/13/1917 53

87 sht 9 2184 12-3442 NYS&W for bridge over Paulins Kill near Blairstown, NJ Blueprint 9/28/1923 53no numbers 2176 12-3442 NYS&W valuation section 30J and bridge no. 80.67 and 81.88 Blueprint 8/16/1923 53

17 sht 10 2225 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 409

- Blueprint 7/14/1911 54

Page 59 of 194Page 59 of 194

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

2149

2150

2151

2152

17 sht 11 2226 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 410

- Blueprint 7/13/1911 54

17 sht 12 2227 12-3443Skew deck pin spans for span no. 4 crossing Lehigh River - sNo 411

heet Blueprint 7/24/1911 54

17 sht 13 2228 12-3443Skew deck pin spans for span no. 4 crossing Lehigh River - sno. 412

heet Blueprint 7/29/1911 54

17 sht 14 2229 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 413

- Blueprint 7/25/1911 54

Page 60 of 194Page 60 of 194

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

2153

2154

2155

2156

2157

2158

2159

2160

2161

2162

21632164

21652166

Page 61 of 194Page 61 of 194

2166

21672168216921702171217221732174

21752176217721782179

2180

2181

2182

17 sht 34 & 2209 12 Skew deck pin spans for bridge no 4 crossing Lehigh River 7/28/1911 54

17 sht 19 2221 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 418

- Blueprint 7/22/1911 54

17 sht 20 2223 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 419

- Blueprint 7/22/1911 54

17 sht 21 2224 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 420

- Blueprint 8/12/1911 54

17 sht 22 2222 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 421

- Blueprint 7/18/1911 54

17 sht 23 2211 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 431

- Blueprint 8/5/1911 54

17 sht 24 2219 12-3443Skew deck pin spans for span no. 5 crossing Lehigh River - s425

heet Blueprint 7/31/1911 54

17 sht 25 2218 12-3443Skew deck pin spans for span no. 5 crossing Lehigh River - s424

heet Blueprint 8/8/1911 54

17 sht 26 2217 12-3443Skew deck pin spans for span no. 5 crossing Lehigh River - s425

heet Blueprint 8/5/1911 54

17 sht 28 2215 12-3443Skew deck pin spans for span no. 4 crossing Lehigh River - sNo 427

heet Blueprint 7/29/1911 54

17 sht 29 2214 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 428

- Blueprint 7/20/1911 54

17 sht 30 2213 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 429

- Blueprint 7/24/1911 54

17 sht 31 & 32 2212 12-3443 Skew deck spans for span no. 5 crossing Lehigh River - sheet 430 Blueprint 8/5/1911 54

17 sht 33 2210 12-3443Skew deck pin spans for bridges 4 and 5 crossing Lehigh Rivesheet 432

r - Blueprint 8/4/1911 54

17 sht 34 & 3 5 220935 12-3443-3443 Skew deck pin spans for bridge no 4 crossing Lehigh River . Blueprint 7/28/1911Blueprint 54

17 sht 36 2204 12-3443Skew deck pin spans for bridge over Lehigh River at Lehigh Gsheet 435

ap - Blueprint 7/21/1911 54

17 sht 37 2205 12-3443 Skew deck pin spans for bridges 4 and 5 - sheet no. 436 Blueprint 7/21/1911 5417 sht 38 2206 12-3443 Skew deck pin spans for bridges 4 and 5 - sheet 437 Blueprint 7/25/1911 5417 sht 39 2207 12-3443 Skew deck pin spans for bridges 4 and 5 - sheet 438 Blueprint 7/25/1911 5417 sht 40 2203 12-3443 Skew deck pin spans for bridges 4 and 5 at Lehigh Gap Blueprint 7/26/1911 5417 sht 42 2201 12-3443 Deck pin spans for spans 4 and 5 over Lehigh River Blueprint 7/15/1911 5417 sht 43 2200 12-3443 Deck pin spans for bridges 4 and 5 over Lehigh River Blueprint 7/7/1911 5417 sht 44 2202 12-3443 Deck pin spans for bridges 4 and 5 over Lehigh River Blueprint 7/15/1911 54

17 sht27 2216 12-3443Skew deck pin spans for span no. 4 crossing Lehigh River - sno. 426

heet Blueprint 7/23/1911 54

6026 2269 12-3443 Elevated view of locomotive repair shop at Pen Argyl - sheet no. 1 Linen ?/1913 556489 2243 12-3443 Sketch showing proposed station at Saylorsburg Craft paper ? 5510847 2237 12-3443 Plan of abutments for bridge-Portland Sand, Northampton, PA Blueprint 4/2/1937 55

103 sht 1 2255 12-3443 Erection diagram for PP&L double steel tower Blueprint 12/26/1922 55

103 sht 10 2267 12-3443Design assembly for 66KV double circuit steel transmission toPP&L

wer -Blueprint 7/16/1926 55

103 sht 11 2268 12-3443Design assembly for 66KV double circuit steel transmission toPP&L

wer -Blueprint 5/9/1924 55

103 sht 12 2265 12-3443Reference drawings for 66KV for double circuit transmission t- PP&L

ower Blueprint 12/28/1926 55

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I21832184

2185

2186

2187

2188

2189

21902191

219221932194

2195

21962197

Page 62 of 194Page 62 of 194

2198

2199

22002201

220222032204220522062207

22082209

2210

2211

2212

to used

103 sht 13 2254 12-3443 Double circuit steel transformer tower built by PP&L Blueprint 12/28/1922 55103 sht 2 2256 12-3443 66KV double steel transmission tower to be built by PP&L Blueprint 11/22/1922 55

103 sht 2 & 3 2258 12-3443Elevation drawing for 66KV double circuit transmission tower PP&L

- Blueprint 11/22/1922 55

103 sht 4 2259 12-3443Plan of anchorage detail for 66KV double circuit transmission tower - PP&L Blueprint 11/22/1922 55

103 sht 5 2260 12-3443Lower elevation plan for 66KV double circuit transmission towPP&L

er - Blueprint 11/22/1922 55

103 sht 6 2261 12-3443Anchorage detail for 66KV double circuit transmission tower - PP&L Blueprint 3/11/1924 55

103 sht 7 2264 12-3443Anchor bolt connections for 66KV double circuit transmission tower - PP&L Blueprint (2 c12/28/1926 55

103 sht 8 2262 12-3443Sizes and stresses for 66KV double circuit transmission towerPP&L

- Blueprint 11/22/1922 55

103 sht 9 2266 12-3443 Design assembly for 66KV transmission tower - PP&L Blueprint 11/22/1922 55

11 sh5t 2 2251 12-3443Guard rails and floor plans for bridge over Tamaqua extensionsheet E-2

Blueprint 10/30/1911 55

11 sht 1 2249 12-3443 Bridge over highway on Tamaqua extension sheet E-1 Blueprint 10/25/1911 5511 sht 1a 2250 12-3443 Bridge over highway on Tamaqua extension sheet E-1 Blueprint 8/26/1911 55

11 sht 3 2252 12-3443Girders, struts and masonry to be used on bridge over Tamaqext. sheet 1

ua Blueprint 10/25/1911 55

11 sht 4 2253 12-3443Girders, struts and masonry to be used on bridge over Tamaqext. sheet 1

ua Blueprint 8/28/1911 55

11 sht 5 2245 12-3443 Detail of crossing over highway on Tamaqua extension Blueprint 10/18/1911 55

11 sht 7 2246 12-3443Lag screws to be used on grade crossing on Tamaqua extensLag screws be on grade crossing on Tamaqua extensionsheet C-3

ion Blueprint 10/18/1911 55

11 sht 8 2247 12-3443Cast iron washers to be used on grade crossing on Tamaquasheet C-4

ext. Blueprint 10/28/1911 55

11 sht 9 2248 12-3443Lag screws and cut washers to be used on grade crossing shC-5

eet Blueprint 10/18/1911 55

113 sht 1 2239 12-3443 Reinforcing plan for bridge over Delaware River at Portland Blueprint 6/26/1929 55

113 sht 2 2240 12-3443Jacking rig for piers "0 & 6" for bridge over Delaware River at Portland Blueprint 6/15/1929 55

113 sht 3 2236 12-3443 Top grillages and anchor bolts for bridge at Portland, PA Blueprint 6/11/1929 55113 sht 3 2241 12-3443 Jacking rig for piers for L&NE bridge at Portland, PA Blueprint 5/27/1929 55113 sht 4 2242 12-3443 Details of bottom grillages for L&NE bridge at Portland Blueprint 5/8/1929 55113 sht 5 2234 12-3443 Jacking rig for Delaware River bridge at Portland, PA Blueprint 8/20/1929 55113 sht 6 2235 12-3443 Top grillages and anchor bolts for bridge at Portland, PA Blueprint 5/31/1929 55

113 sht 7 2238 12-3443Steel details for jacking rig for bridge over Delaware River at Portland Blueprint 5/4/1929 55

113 sht 9 2237 12-3443 Steel details for bridge over Delaware River at Portland, PA Blueprint 6/14/1929 55

17 sht 15 2230 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 414

- Blueprint 7/26/1911 55

17 sht 16 2231 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 451

- Blueprint 7/26/1911 55

17 sht 17 2232 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 416

- Blueprint 7/25/1911 55

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

221322142215221622172218

2219

2220

2221

22222223222422252226

2227

2228

2229

Page 63 of 194Page 63 of 194

22292230

2231

2232

22332234

2235

223622372238223922402241

224222432244

17 sht 18 2233 12-3443Skew deck pin spans for spans 4 and 5 crossing Lehigh Riversheet 417

- Blueprint 7/25/1911 55

6489A 2244 12-3443 Side, rear and front elevation for proposed station at Saylorsburg Craft paper ? 555981 2289 12-3223 Topographic map between Tamaqua and Pottsville - L&NE RR Blueprint ? 56

10836 8/15 2298 12-3223 Plan for main line bridge between Portland and Columbia Blueprint 9/18/1935 5610836 3/5 2299 12-3223 Plan for main line bridge between Portland and Columbia Linen 9/24/1935 5610836 2/3 2300 12-3223 Main line bridge over L&NE between Portland and Columbia Linen 2/6/1936 56

10836 14/15 2311 12-3223Details of bridge over the Delaware River between Portland aColumbia

nd Linen 4/6/1936 56

10840 1/2 2304 12-3223Relocation of main line between Rahn Township and Tamaqugeneral plan

a - Linen 1/16/1936 56

10841 2305 12-3223Relocation of SH 226 between Rahn Township and TamaquaL&NE

on Linen 1/16/1936 56

10844 2303 12-3223Plan showing location of grade crossing to be abandoned at Bangor Jct Blueprint 7/28/1936 56

10845 2302 12-3223 Pedestrian underpass between Portland and Slatford for L&NE mylar 9/9/1936 5610846 2293 12-3223 Coal trestle to be erected at Bangor for L&NE Blueprint ? 5610847 2301 12-3223 Plan of abutments for bridge in upper Bethel Township for L&NE Linen 4/6/1937 56

10848 4/5 2294 12-3223 Plan for reconstruction of bridge over state highway SH 471 Linen 5/4/1937 56

10849 2295 12-3223General details for plan of reconstruction of bridge in NorthamCounty

pton Linen 5/4/1937 56

45 sht 13 2285 12-3223Foundation plan, anchor bolts for bridge between Portland anColumbia

d Blueprint ? 56

45 sht 40 2287 12-3223Top Chords for bridge between Columbia and Portland on Delaware River Blueprint ? 56

45 sht 48 2284 12-3223 Posts and hangers for bridge between Portland and Columbia Blueprint ? 56

45 sht 5 2282 12-3223Details of bridge over DL&W and NYS&W between Portland aColumbia

nd Blueprint ? 56

45 sht 55 2286 12-3223Frames, shapes and West girder spans for bridge over DelawRiver

are Blueprint ? 56

6026A 2270 12-3223South side elevation view of new locomotive repair shop - sheno. 2

et Linen ?/1913 56

6026B 2275 12-3223 Plan for locomotive repair shop at Pen Argyl sheet no. 3 Linen ? 56

6026C 2276 12-3223Plan for locomotive repair shop for Pen Argyl repair shop - shno. 4

eet Linen ? 56

6026D 2277 12-3223Plan for locomotive repair shop for Pen Argyl repair shop - shno. 5

eet Linen ? 56

6026E 2278 12-3223 Detail of wall flashing for locomotive repair shop - sheet no. 5A Linen ? 566026F 2279 12-3223 Girders for erecting shop of Pen Argyl enginehouse - sheet no. 6 Linen ? 566026G 2280 12-3223 Columns for erecting shop at Pen Argyl enginehouse - sheet no. 7 Linen ? 566026H 2281 12-3223 Wall support for Pen Argyl enginehouse - sheet no. 8 Linen ? 566026I 2272 12-3223 Plan for locomotive repair shop at Pen Argyl - sheet no. 9 Linen ? 56

6026J 2271 12-3223Erection diagram for locomotive repair shop at Pen Argyl - sheno. 10

et Linen ? 56

6026K 2274 12-3223 Foundation plan for Pen Argyl locomotive repair shop Linen ? 566026L 2273 12-3223 Plan for the power house at the Pen Argyl shops Linen ? 56

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I2245

2246

224722482249225022512252

2253225422552256

2257

22582259226022612262

Page 64 of 194Page 64 of 194

2263226422652266226722682269227022712272227322742275227622772278227922802281

LNE X 2296 12-3223 Reconstruction of underpass at Lehigh Gap for L&NE Linen 12/3/1935 56

no number 2291 12-3223Bureau of Information of Eastern Region pertaining to L&NE MW

of Original type ? 56

no number 2- 2 co 12-3223Bureau of Information of Eastern Region pertaining to L&NE MW-reversed

of Brownprint ? 56

4300 2328 12-3223 Plan for #2 bridge over Lehigh River near Lehigh Gap Linen 1/21/1911 574301 2331 12-3223 Plan for pier no. 3 for bridge over Lehigh River near Lehigh Gap Linen 2/21/1911 574302 2332 12-3223 Plan for pier no. 4 for bridge over Lehigh River near Lehigh Gap Linen 2/21/1911 574331 2330 12-3223 Plan for pier no. 5 for bridge over Lehigh River near Lehigh Gap Linen 8/4/1911 574334 2325 12-3223 Plan for West abutment and retaining wall near Lehigh Gap Linen 8/23/1911 57

4344 2329 12-3223Plan for East abutment and retaining wall for bridge over LehiRiver

gh Linen 10/20/1911 57

5616 2340 12-3223 DL&W general arrangement for scale car Blueprint 8/26/1909 576062 2323 12-3223 Topographical map showing drainage on Saylorsburg branch Linen 5/31/1917 576083 2324 12-3223 Plan for reinforced concrete trestle across black bridge Linen 8/26/1918 57

6310 2337 12-3223Volume Diagram of Bushkill to Martins Creek & Northampton Bath

to Linen 11/1/1924 57

6312 2341 12-3223Volume diagram for East Bangor branch from Quarry Jct. To Upper Bangor Linen 8/26/1909 57

10836 11/15 2314 12-3223 Timber floor plan for bridge over Delaware River at Portland Linen 10/31/1935 5710836 4/5 2313 12-3223 Timber floor plan for bridge over Delaware at Portland Linen 3/16/1936 5710836 13/15 2312 12-3223 Timber floor plan for bridge between Portland and Columbia Linen 3/18/1936 57

10837 2309 12-3223 Plan for grade crossing elimination at Bruglers, NJ Linen 8/12/1935 57

10837 2310 12-3223Pl f b id D l b t P tl d dPlan for new bridge over Delaware between Portland and Columbia, NJ Linen 4/8/1956 57

10839 2308 12-3223 Topography in vicinity of grade crossing at Berlinville Linen 1/7/1936 5710840 -2 2307 12-3223 Encased I-beam for bridge at Rahn Township near Tamaqua, PA Blueprint 1/16/1936 5710840-1 2306 12-3223 Encased I-beam railroad underpass at Tamaqua, PA Blueprint 1/16/1936 57

4352 & 4330 2327 12-3223 Plan for piers 1 & 6 on the Tamaqua extension Linen 8/3/1911 5755 sht 1 2315 12-3223 Masonry descriptions for plate girders on Poughkeepsie bridge Blueprint 12/24/1886 57

55 sht 2 & 6 2318 12-3223 Sheet #5 for station #5 for new Poughkeepsie bridge for PP&B RR Blueprint ? 5755 sht 3 2320 12-3223 Sheet #2 for 21' girder span on PP&B bridge Blueprint 12/26/1907 5755 sht 4 2321 12-3223 Sheet #3 for 26' girder span for PP&B Poughkeepsie bridge Blueprint 12/26/1907 5755 sht 5 2319 12-3223 Sheet #4 for girders for new PP&B Poughkeepsie bridge Blueprint 12/26/1907 5759 sht 1 2322 12-3223 Sheet #1 for 50' deck girder over Jacoby Creek at Portland Blueprint 06/06/1889 5780 sht 16 2344 12-3223 DL&W thimble and guard rail bracket for scale test car Blueprint 8/27/1909 5780 sht 18 2349 12-3223 DL&W equalizer spring cap for freight cars Blueprint 2/1/1903 5780 sht 2 2343 12-3223 DL&W lettering for scale test car Blueprint 10/29/1909 5780 sht 24 2348 12-3223 DL&W draft spring for freight cars Blueprint 9/27/1911 5780 sht 25 2342 12-3223 DL&W ratchet wheel Blueprint 8/6/1909 5780 sht 26 2347 12-3223 DL&W brake wheel for freight cars Blueprint 1/31/1903 5780 sht 3 2339 12-3223 DL&W foundation brake for scale car Blueprint 8/27/1909 5780 sht 4 2338 12-3223 DL&W cast steel pedestal for passenger car trucks Blueprint 1/11/1910 57

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I228222832284228522862287228822892290229122922293

2294229522962297

2298

2299

2300

Page 65 of 194Page 65 of 194

2300230123022303230423052306

2307230823092310231123122313231423152316231723182319

8710 12 Coulston 58

80 sht 5 2345 12-3223 DL&W wrought iron details for scale test car Blueprint 8/26/1909 5780 sht 6 2346 12-3223 DL&W wrought iron details for scale test car Blueprint 8/26/1909 57

no number 2333 12-3223 Map of Allentown, PA and vicinity Craft paper 03/?/1920 57no number 2334 12-3223 Map of Allentown, PA and suburbs Craft paper 12/?/1910 57no number 2335 12-3223 Map of Allentown, PA and suburbs Craft paper 19/?/1919 57no number 2336 12-3223 City map of Allentown, PA - Lehigh County Craft paper 11/1/1924 57

1853 2396 12-3236 Map showing piece of land acquired from Mary E. Perkins Blueprint 5/?/1900 585278 2365 12-3236 Profile of connection to Pine Island branch to jct. of NYS&W Graph craft ? 586040 2368 12-3236 County Blueprint 12/?/1917 586341 2366 12-3236 Wiring diagram for automatic signals Portland to Columbia Linen 2/18/1932 586448 2364 12-3236 Profile of P&R Railroad from Schoemtown to Tamaqua Linen ? 586460 2390 12-3236 Plan for proposed new line to Acme Slate Quarry Blueprint 4/3/1919 58

6460 2392 12-3236Proposed branch of L&NE from main line to Acme Slate Co. Quarry Blueprint 4/3/1919 58

6460 2393 12-3236 Plan of located line and proposed branch to Acme Slate Quarry 4/3/1919 586460 2394 12-3236 Plan of located line of proposed branch to Acme Slate Quarry Blueprint 4/3/1919 586492 2388 12-3236 CNJ details of bridge no. 64 crossing Bridgeton Raceway Blueprint ? 58

8709 2398 12-3236Map showing 1.9 acres of land to be conveyed to Richard-Coulston Co. Blueprint 5/6/1926 58

8709 2399 12-3236Map showing 1.9 acres of land to be conveyed to Richard-Coulston Co. Blueprint 5/6/1926 58

8710 12-32363236Map showing 1.9 acres of land to be conveyed to Richard-Coulston Co. Co. Blueprint 5/7/Blueprint 5/7/19261926 58

10909 2374 12-3236 Reconstruction of L&NE bridge no. 63.79 in New Jersey Linen 8/?/1953 5810909 2375 12-3236 Reconstruction of L&NE bridge pier no. 63.79 Linen ? 5810909 2382 12-3236 Framing plan and details for reconstruction of bridge no. 63.79 Linen 3/?/1953 5810909 2383 12-3236 L&NE RR bridge no. 63.79 in connection with SH 46 2/?/1953 5810909 2384 12-3236 General plan and elevation of bridge 63.79 over SH 46 Linen 2/?/1953 58

10843, 1/5 2377 12-3236 Grade crossing elimination between Portland and Slateford Linen 11/24/1936 58

10843, 2/5 2376 12-3236Reconstruction of bridge over Delaware River from Portland toSlatford

Linen 6/18/1936 58

10843, 3/5 2379 12-3236 Details of grade crossing elimination in Northampton County Linen 6/19/1936 5810843, 4/5 2378 12-3236 Bridge no. 63.79 in connection with grade crossing elimination Linen 10/31/1936 5810843, 5/5 2380 12-3236 Details of grade crossing elimination in Northampton County Linen 10/31/1936 58139 sht 1 2370 12-3236 Heat treated bolts for frogs and switches on L&NE RR Blueprint 12/4/1944 58139 sht 2 2372 12-3236 Details for 16' SW switch plate on L&NE Blueprint 12/4/1944 58139 sht 3 2373 12-3236 Wedge type adjustable brace and plates Blueprint 11/27/1944 58139 sht 4 2371 12-3236 Basket adjustment for no. 1 road on L&NE rolling stock Blueprint 5/1/1944 58139 sht 5 2369 12-3236 Switch stand connecting rod for use with basket Blueprint 11/23/1944 5880 sht 11 2362 12-3236 DL&W wrought iron details for scale car Blueprint 8/27/1909 5880 sht 12 2359 12-3236 DL&W cast iron details for scale car Blueprint 8/25/1909 5880 sht 14 2360 12-3236 DL&W details of wheel box for scale car Blueprint 8/20/1909 5880 sht 15 2358 12-3236 DL&W journal box for passenger cars Blueprint 1/11/1910 58

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I2320232123222323232423252326232723282329233023312332

23332334233523362337

23382339

Page 66 of 194Page 66 of 194

2340

234123422343234423452346

2347234823492350235123522353

235423552356

80 sht 17 2355 12-3236 DL&W buffer casting for freight car Blueprint 8/25/1909 5880 sht 19 2350 12-3236 DL&W board for bad order and repair cards Blueprint 3/5/1906 5880 sht 20 2351 12-3236 DL&W "I" section brake beam for freight cars Blueprint 1/24/1903 5880 sht 22 2354 12-3236 DL&W brake pawl for freight cars Blueprint 8/5/1909 5880 sht 23 2353 12-3236 DL&W equalizer spring for freight cars Blueprint 6/6/1912 58

80 sht 7, 9 2357 12-3236 DL&W wrought iron details for scale car Blueprint 8/26/1909 5880 sht13 2361 12-3236 DL&W details of weight box for scale car Blueprint 8/25/1909 58

no number 2367 12-3236 Euclid Road - Beaver County Coal Corporation profile Blueprint 1/17/1959 58sheet 1 2385 12-3236 Monocacy Creek urban renewal project no R-25 Craft paper 12/1/1959 58sheet 2 2386 12-3236 Relocated main line in the Monocacy Creek area Craft paper 11/12/1959 585955 2419 12-3236 Map of preliminary survey from Bangor to Handelong Craft paper 4/?/1905 596034 2414 12-3236 Shaffer Blueprint ? 596324 2421 12-3236 Plan showing grade crossing in the town of Warwick, NY Linen 2/20/1925 59

6325 2420 12-3236Plan showing topography and grade crossing in vicinity of Lewisburg, NJ Linen 5/26/1927 59

6347 2418 12-3236 Borough of Bath - plan of water supply involving the L&NE Linen 10/18/1935 597816 2428 12-3236 Plan showing retirement of track at Drewa, NY Linen 2/26/1934 5910384 2438 12-3236 Floor on bridge 7/77 on Martins Creek branch at Stockertown, PA Linen 9/23/1952 5910385 2436 12-3236 L&NE chart showing miles of track tampered Linen ?/?/1958 59

10387 2437 12-3236Proposed plan for telephone line between LVRR tower and Rstation

DG Linen 2/6/1953 59

10388 2439 12-3236 Plan of floor on bridge 95/39 over stream east of Roys, NJ Linen 1/12/1953 5910390 2440 12-3236 Plan of floor on bridge over highway at Danielsville, PA Linen 2/7/1953 59

10391 2443 12-3236Plan for steel grating on foot walk on Bethlehem branch East Bath

of Linen 3/10/1953 59

10394 2445 12-3236 Floor plan of bridge over Walkill River East of Sussex Jct., NJ Linen 8/5/1953 5910395 2444 12-3236 Bridge floor plan over Pochuck Creek at Wilcox, NY Linen 10/21/1953 591 sht 1 2409 12-3236 Masonry plan for crossing over LV on Tamaqua extension Blueprint 8/14/1911 59

1 sht 10 2403 12-3236 Drawing room plan showing crossing over Tamaqua extension Blueprint 9/9/1911 591 sht 11 2402 12-3236 Drawing showing crossing over LV at station 647-71.1 Blueprint 10/18/1911 59

1 sht 12 2404 12-3236Description of standard iron washers to be used on crossing oLV

ver Blueprint 10/10/1911 59

1 sht 13 2405 12-3236 Description of cut washers to be used on crossing over LV Blueprint 10/13/1911 591 sht 14 2406 12-3236 Steel wire nails to be used on crossing over LV at sta. 647+61.1 Blueprint 10/13/1911 591 sht 2 2411 12-3236 Erection diagram for bridge over LV on Tamaqua extension Blueprint 9/4/1911 591 sht 3 2413 12-3236 Floor plan for bridge over LV at station 647+711 9/14/1911 591 sht 4 2412 12-3236 Girders for bridge over LV on the Tamaqua extension Blueprint 9/9/1911 591 sht 5 2410 12-3236 Rivet plan for bridge over LV on Tamaqua extension Blueprint 9/2/1911 59

1 sht 6 2408 12-3236Floor beams and bracing for crossing over LV on Tamaqua extension Blueprint 9/2/1911 59

1 sht 7 2407 12-3236 Stringers for crossing over LV sta. 647+711 over LV Blueprint 9/9/1911 591 sht 8 2400 12-3236 Laterals crossing over LV extension to Tamaqua - Sheet 1 Blueprint 9/11/1911 59

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

23572358

235923602361

2362236323642365236623672368

23692370

237123722373

2374

Page 67 of 194Page 67 of 194

23742375237623772378

23792380238123822383

23842385

2386

23872388

2389

93099 1B 2429 12 3236 protection 6/29/1952 59

10700A 2446 12-3236Commonwealth of PA - standard reinforced concrete culvert sno. 10

pan Blueprint 7/1/1909 59

10700B 2447 12-3236 Commonwealth of PA - standard abutments - 2' to 16' Blueprint 6/22/1919 59

10700C 2448 12-3236Commonwealth of PA - standard cross sections of various highways Blueprint 4/16/1920 59

10700D 2449 12-3236 Commonwealth of PA - State Highway Department standard inlets Blueprint 4/16/1920 5938 sht 18 2425 12-3236 Pond truss for Pen Argyl locomotive repair shop Blueprint 9/20/1913 59

38 sht 19 2426 12-3236Lipton steel sash and pond continuous sash for Pen Argyl enginehouse 9/15/1913 59

38 sht 21 2423 12-3236 Lipton steel sash and doors for Pen Argyl enginehouse Blueprint 10/11/1913 5938 sht 22 2424 12-3236 Detail of pond truss for Pen Argyl locomotive repair shop Blueprint ? 5938sht 20 2422 12-3236 Lipton steel windows for use at Pen Argyl enginehouse Blueprint 4/26/1913 5956 sht 1 2415 12-3236 Plate girder span over Paulins Kill on the PP&B RR Blueprint 5/15/1889 59

56 sht 2, 3283 2417 12-3236 Bridge seats for deck plates over girder spans Blueprint 2/20/1908 5956 sht 3 2416 12-3236 Anchor bolts for PP&B span over Paulins Kill Blueprint 5/16/1889 59

93099, pg 1 2431 12-3236Detail wiring for flashing lights - type XC - highway crossing protection Blueprint 6/24/1952 59

93099, pg 1A 2433 12-3236 Detail wiring of flashing lights XC - standard AAR flashing light 6/24/1952 59

93099, pg 2A 2435 12-3236Detail arrangement of standard AAR flashing light crossing protection Blueprint 6/24/1952 59

93099, pg 2B 2430 12-3236 Arrangement plan for written circuits - standard flashing light Blueprint 6/24/1952 5993099, pg 2C 2432 12-3236 Arrangement plan written circuit - standard AAR flashing light Blueprint 6/24/1952 59

93099, pgpg1B 2429 12 3236-Detail wiring of flashing lights - type XC - highway crossing protection 6/29/1952 59

10200 2452 12-3237 Proposed line to the old Bangor Slate Co. Mill at Bangor Blueprint 9/30/1899 6010201 2453 12-3237 Proposed narrow gauge RR to old Bangor Slate Co. Mill Blueprint 10/18/1899 6010202 2454 12-3237 Detail of L&NE route through the Borough of Catasauqua Blueprint ? 6010203 2458 12-3237 Map of proposed railroad between Catasauqua and Weaverville Blueprint 12/?/1904 60

10205 2456 12-3237Plan showing the extension of line "I" Crane RR through Catasauqua, PA Blueprint 7/?/1909 60

10211 2459 12-3237 Blue print of erecting shops to be built at Pen Argyl Blueprint 9/23/1914 6010212 2455 12-3237 Details of abutment for replacement of bridge East of Plains, NJ Blueprint 3/31/1922 6010278 2462 12-3237 Map showing grade crossing at Orange Park, NY Blueprint 10/30/1928 6010286 2460 12-3237 Plan showing topography in vicinity of grade crossing in Bath, PA Linen 8/13/1929 60

10287 2461 12-3237Plan showing industrial development at Rittersville in AllentowPA

n, Linen 4/28/1953 60

10288 2474 12-3237 Plan showing proposed changes to lye vat at Pen Argyl shop Linen 2/25/1930 60

10289 2471 12-3237Proposed plan showing change of Albion branch at Pen Argyl(blue print)

Blueprint 3/28/1930 60

10289 2472 12-3237Proposed plan showing change of Albion branch at Pen Argyl(blue print)

Blueprint 6/2/1932 60

10289 2473 12-3237 Plan showing location of Albion branch at Pen Argyl (blue print) Blueprint 3/28/1930 60

10290 2457 12-3237Roadside signal rules no. 281, 283, 284, 285, 286, 287, 288, 290, 291, 292

289, several copie ? 60

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

23902391239223932394

2395239623972398239924002401240224032404

24052406240724082409

Page 68 of 194Page 68 of 194

2409241024112412241324142415241624172418

24192420242124222423

2424242524262427

10702D 2481 12 3237 Welfare building to be constructed at Pen Argyl enginehouse ? 60

10293 2470 12-3237Proposed plan showing change of Albion branch at Pen Argyl(tracing)

Linen 10/6/1932 60

10294 2467 12-3237 Wiring diagram for flashing signals and bells at grade crossings Linen 7/19/1934 6010294 2468 12-3237 Wiring diagram for flashing lights and bells at Portland, PA Linen 11/28/1930 6010295 2466 12-3237 Plan showing proposed additional racks at Pen Argyl yard Linen 5/22/1930 6010296 2464 12-3237 Chart showing trackage rights of NYS&W over the L&NE Linen ? 60

10296 2465 12-3237Chart showing weight of rail and changes therein 1911 to 192inclusive

9 Linen 10/31/1931 60

10296 2466A 12-3237 Chart showing weight of rail on the L&NE RR Blueprint 12/26/1930 6010297 2463 12-3237 Proposed plan for low coal trestle at Pen Argyl coal yard Linen 11/25/1930 6010755 2475 12-3237 Plan for foundation of turntable at Pen Argyl enginehouse Linen 6/28/1927 6010765 2476 12-3237 Plan for the new freight station of the L&NE at Pen Argyl Blueprint 10/6/1927 6010766 2489 12-3237 Plan showing topography in vicinity of Stillwater station Linen 12/14/1927 6010772 2477 12-3237 Truck plan in vicinity of bridge 98.38 at Sussex Junction, NJ Blueprint 2/3/1930 6010798 2487 12-3237 Plan showing additions to Pen Argyl enginehouse stalls Linen ? 6010798 2488 12-3237 Plan showing additions to Pen Argyl enginehouse stalls Linen 2/26/1931 6010799 2486 12-3237 Plan showing additions to Pen Argyl enginehouse stalls Linen ? 60

10700E 2450 12-3237Commonwealth of PA - State Highway Department standard hwalls

ead Blueprint 4/16/1920 60

10702A 2484 12-3237 Exterior view of welfare building at Pen Argyl enginehouse Tracing ? 6010702B 2483 12-3237 Floor plan for Pen Argyl freight station Tracing ? 6010702C 2482 12-3237 Elevation view of welfare building to be built at Pen Argyl Tracing ? 6010702D 2481 12 3237- Welfare building to be constructed at Pen Argyl enginehouse TracingTracing ? 60

no number 2478 12-3237 Steel manufacturers heat number for rail castings (Van Dyke) Blueprint ? 60no number 2480 12-3237 Plan showing details of crew board to be installed at Pen Argyl Blueprint ? 60no number 2485 12-3237 Rail record of heats poured for L&NE rails (tracing) Tracing ? 60

10701 2521 12-3237 Automobile map showing 50 mile radius of Bethlehem, PA Blueprint ?/?/1919 6110713 2509 12-3237 Plan showing concrete foundation of water tank near Portland Blueprint 10/15/1924 6110713 2511 12-3237 Plan showing concrete foundations and arrangement of piping Linen 10/15/1924 6110719 2513 12-3237 Details for reconstructing two spans of bridge no. 93.57 Linen 1/29/1925 6110731 2514 12-3237 Plan showing concrete paving at Pen Argyl shops Linen 7/6/1925 6110737 2515 12-3237 Beam spans over Popokating Creek East of Pelletown, NJ Linen 2/9/1925 61

10737 2525 12-3237 Detail of girders for bridge over Ppakating Creek at Pellestown, NJ Blueprint 2/9/1925 6110738 2516 12-3237 Beam span for bridge 93.71 over cattle pass East of Pelletown, NJ Linen 2/7/1925 6110738 2524 12-3237 Beam span for bridge 43.71 East of Pellestown, NJ Blueprint 8/7/1925 6110743 2517 12-3237 Plan showing proposed track to quarry of Bangor Veim Slate Co. Linen 5/20/1926 6110744 2518 12-3237 Proposed coal trestle at Nazareth - structural plan Linen 3/9/1926 61

10747 2519 12-3237Plan showing topography in land leased to Bath Portland CemCo.

ent Blueprint 6/22/1926 61

10747 2520 12-3237 Plan showing topography in vicinity of East Allen Township Blueprint 6/22/1926 6110748 2523 12-3237 Details of coal trestle for L&NE at Nazareth, PA Linen 5/12/1924 6110752 2522 12-3237 Map of the L&NE RR and connections Linen ? 61

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I242824292430

2431

2432

2433

24342435

24362437

2438243924402441244224432444

1

Page 69 of 194Page 69 of 194

24452446

244724482449

2450

2451

24522453245424552456

24572458

2459

at

10774 2490 12-3237 Map made for Kate Fuller by Henry Pelton, surveyor Linen 10/23/1912 6110778 2501 12-3237 Plan showing proposed wheel drop pit at Pen Argyl round house Linen 11/26/1928 6110788 2502 12-3237 Proposed substructure for undercrossing on SH 226 Linen 4/15/1930 61

10792 2503 12-3237Details of substructure for undercrossing of SH 226 SchuylkillCounty

Blueprint 7/7/1930 61

10793 2504 12-3237Details of substructure for undercrossing of SH 226 in West PTownship

enn Linen 7/7/1930 61

10794 2498 12-3237Details of substructure for bridge crossing SH 226 in SchuylkiTownship

ll Linen 7/7/1930 61

10794 2505 12-3237Details of substructure for undercrossing of SH 226 Schuylkill County 7/7/1930 61

10795 2500 12-3237 Plan showing proposed wheel drop pit for Whitong drop pit table Linen 9/26/1930 61

10797 2499 12-3237 Plan showing proposed addition at round house stalls at Pen Argyl Linen 1/21/1931 6110700F 2510 12-3237 Pennsylvania Highway Department - miscellaneous ratings Blueprint 4/16/1920 61

10793A 2506 12-3237Details of substructure for undercrossing of SH 226 SchuylkillCounty

Linen 9/3/1930 61

0793B, 10713 2508 12-3237 Plan showing concrete foundation of water tank near Portland Linen 10/15/1924 61Dwg. A1 2495 12-3237 Stringers and stress sheet for bridge over Delaware at Portland Blueprint 3/1/1923 61Dwg. A3 2497 12-3237 End view of stress sheet for bridge over Delaware at Portland Blueprint 3/1/1923 61Dwg. A4 2496 12-3237 Span length and stress sheet for bridge over Delaware at Portland Blueprint 3/1/1923 61Dwg. B2 2492 12-3237 Bottom plan and stress sheet for bridge over Delaware at Portland Blueprint 3/1/1923 61

Dwg. D127 2512 12-3237 Foundation for water tank near Portland, PA Blueprint 10/9/1926 61

Dwg.A2 2494 12-3237Loading diagram and stress sheet for bridge over Delaware atLoading diagram and stress sheet for bridge over DelawarePortland

Blueprint 3/1/1923 61

Dwg.B1 2493 12-3237 Bottom plan and stress sheet for bridge over Delaware at Portland Blueprint 3/1/1923 61

6457 2530 12-3238L&NE located lines from Auburn to West Penn Schuylkill Cou(drawing)

nty Linen 7/17/1918 62

6457 2531 12-3238 Located lines of L&NE from Auburn to West Penn (blue print) Blueprint 7/17/1918 6210212 2579 12-3238 Details of abutment for bridge over Castle Pass East of Plains, NJ Linen 3/31/1922 62

10214 2577 12-3238Details of substructure for bridge renewal of bridge East of BaPA

th, Linen 7/3/1922 62

10214 2578 12-3238Details of substructure for bridge renewal of structure East of Bath, PA Blueprint 7/3/1922 62

10215 2576 12-3238Plan showing topography in vicinity of grade crossing at AuguNJ

sta, Linen 8/4/1922 62

10216 2541 12-3238 Floor plan for girder plate bridge East of Sussex Junction, NJ Linen 8/11/1922 6210221 2542 12-3238 Masonry plan for proposed trestle at Bangor Junction, PA Linen ? 6210222 2543 12-3238 Plan for extension of concrete culvert near Slate Junction, PA Linen 5/11/1923 6210226 2544 12-3238 Plan showing proposed lumber storage shed at Pen Argyl, PA Linen 9/8/1923 62

10233 2545 12-3238Details of concrete pipe for replacement of bridge West of WilNY

cox, Linen 2/26/1924 62

10238 2546 12-3238 Plan of L&NE from Edward Super to Enoch Remer Linen ? 62

10244 2547 12-3238Details of bridge reconstruction over Monocaby Creek East ofChapman

Linen 1/29/1925 62

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I2460

2461

2462

2463

2464

2465

246624672468246924702471247224732474247524762477

Page 70 of 194Page 70 of 194

247724782479

248024812482248324842485248624872488248924902491

24922493

2494

10315 2565 12 3238 Flashi gna d hi th PA Li 6/17/1933 62

10245 2550 12-3238 Foundation plan for 20 ton pillar crane at Allentown, PA Linen 3/10/1925 62

10246 2549 12-3238Details for substructure over Monocaby Creek at Chapman Quarries Linen 10/20/1925 62

10246 2551 12-3238Details of substructure of bridge over Bethlehem bridge near Chapman Quarries Blueprint 3/27/1925 62

10255 2548 12-3238Map showing one of properties of WG&D RR through Stroudsburg, PA Linen 5/31/1888 62

10260 2589 12-3238Floor plan for replacement of bridge over Monocaby Creek at Bath, PA Linen 2/25/1926 62

10270 2589 12-3238Floor plan for replacement of bridge over Monocaby Creek at Bath, PA Linen 2/25/1926 62

10274 2587 12-3238Plan showing grade crossing of Lehigh Valley Transit at Catasauqua Linen 3/2/1928 62

10278 2584 12-3238 Map showing grade crossing at Orange Farm, NY (tracing) Linen 10/30/1928 6210278 2585 12-3238 Map showing grade crossing at Orange Farm, NY (blue print) Blueprint 10/30/1928 6210278 2586 12-3238 Map showing grade crossing at Orange Farm, NY (blue print) Blueprint 10/30/1928 6210279 2583 12-3238 Plan of highway crossing gate Linen 1/4/1929 6210283 2582 12-3238 Details of crossing sign post and form Linen 5/23/1929 6210284 2581 12-3238 Plan showing layout of coal silo plant and paving at Allentown, PA Linen 6/10/1929 6210285 2580 12-3238 Details of Smith concrete tie and forms Linen 6/28/1929 6210300 2532 12-3238 Plan showing details for proposed monorail hoist at Pen Argyl Linen 3/20/1931 6210303 2538 12-3238 Plan showing wheel drop pit at Pen Argyl round house Linen 12/21/1931 6210311 2540 12-3238 Wiring diagram for automatic tunnel signals Linen 4/24/1939 6210315 2565 12 3238- Flashing signals at Main and Race highway crossing at Bathng si ls at Main an Race ghway crossing at Ba , PA nenLinen 6/17/1933 6210315 2572 12-3238 Wiring diagram for flashing signals at Bath, PA Linen 4/22/1936 6210319 2575 12-3238 Proposed plan for rebuilding of bridge at Wind Gap, PA Linen 5/18/1933 62

10320 2574 12-3238 Plan showing relocation of public road and bridge at Pen Argyl, PA Linen 6/9/1933 6210321 2573 12-3238 Details of bent for cinder conveyor at Pen Argyl, PA Linen 7/10/1933 6210323 2533 12-3238 Design for solid manganese steel frog by Bethlehem Steel Co. Blueprint 8/20/1931 6210324 2535 12-3238 Design of frog and switches by Bethlehem Steel Co. for the L&NE Blueprint 11/15/1953 6210325 2534 12-3238 Design of frog and switches by Bethlehem Steel Co. for the L&NE Blueprint 12/4/1948 6210325 2537 12-3238 Detail of rail-bound manganese steel frog for L&NE Blueprint 2/20/1920 6210326 2569 12-3238 Wiring diagram of flashing signals at Broadway station (tracing) Linen 6/31/1946 6210326 2570 12-3238 Wiring diagram of flashing signals at Broadway station (blue print) Blueprint 6/9/1938 6210326 2571 12-3238 Wiring diagram of flashing signals at Broadway station (blue print) Blueprint 8/9/1938 6210332 2568 12-3238 Map showing public roads between Danielsville and Lehigh Gap Linen 2/24/1936 6210336 2563 12-3238 Plan showing replacing of bridge abutment North Bangor Linen 4/7/1938 6210396 2558 12-3238 Plan for highway crossing protection West of Augusta, NJ, pg 2 Linen 5/29/1953 62

10397 2559 12-3238Details of flashing light protection in Vernon Township, SusseCounty, pg 3

x Linen 5/29/1953 62

10398 2552 12-3238 Tie plan for reconstruction of L&NE near Columbia, NJ Linen 9/22/1953 62

10399 2553 12-3238Plan showing proposed rearrangement of L&NE at Semmel, Carbon County Blueprint 12/30/1954 62

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

24952496

2497249824992500250125022503250425052506

2507

25082509

251025112512

Page 71 of 194Page 71 of 194

25132514

2515

2516

25172518

25192520

252125222523252425252526

2527

10399 2555 12-3238Plan showing proposed rearrangement of tracks for PA Turnpat Semmel

ike Tracing 2/20/1955 62

10405 2536 12-3238 Highway grade crossing at Snyders, West Penn Township Blueprint 1/23/1957 62

10405 2539 12-3238Plan for highway crossing protection at Snyders, West Penn Township Linen 1/23/1957 62

10405 2556 12-3238 Highway crossing protection at Snyders, West Penn Township Blueprint 1/23/1957 6210405 2557 12-3238 Highway crossing protection at Snyders, West Penn Township Linen 1/23/1957 6210405 2566 12-3238 Highway crossing protection at Snyders, West Penn Township Linen 11/3/1958 6210505 2562 12-3238 Tracing showing highway protection devices near Snyders, PA Linen 1/23/1957 6210703 2527 12-3238 Plan showing replacement of bridge East of Plains, NJ Blueprint 2/8/1924 6210704 2528 12-3238 Plan showing replacement of bridge over stream at Armstrong, NJ Blueprint 2/11/1924 6210735 2526 12-3238 Framing and siding for new building at Pen Argyl Blueprint 8/24/1925 6211522 2529 12-3238 Map showing trackage rights of Crane Iron Co. at Catasauqua, PA Blueprint ? 62

10336A 2561 12-3238 Plan for replacing abutments East of Bangor Tracing 4/17/1937 62

10404, pg 4 2560 12-3238Detail of highway crossing protection in Vernon Township, SuCounty

ssex Linen 1/25/1956 62

no number 2554 12-3238Map of L&NE and property of Joseph Blozusia through BowmEstate

an Tracing 5/18/1955 62

5572 2638 12-3238 Plan showing proposed with the New Jersey Zinc Co. Linen ? 63

6101 2637 12-3238Map of the L&NE RR main line, sidings & track - Borough of Catasauqua, PA Linen ? 63

6339 2616 12-3238 Tracks and right of way of the L&NE RR at Pen Argyl Blueprint 8/18/1897 637372 2618 12-3238 Automatic interlocking at Dexter Hill near Nazareth, PA Linen ? 637372 2619 12-3238 Detail of DL&W and L&NE crossing at the Dexter Cement Plant Linen ? 637483 2609 12-3238 Tracing of road crossing record of L&NE (field sheet) Linen ? 63

7483 2617 12-3238Road crossing traffic records to be used by the L&NE RR (vandykes 2)

Blueprint ? 63

10256 2590 12-3238Details of substructure for bridge over Monocaby Creek East Bath, PA

of Linen 2/4/1926 63

10396 2592 12-3238Wiring diagram for highway crossing protection at Hampton Township Linen 5/29/1953 63

10403 2595 12-3238 Detail of wiring for flashing lights at crossing at Frankfort Township Linen 1/23/1956 63

10403 2596 12-3238Arrangement of wiring circuits for flashing lights at Frankfort Township Linen 1/23/1956 63

10404 2594 12-3238 Detail of wiring for flashing lights at crossing at Vernon Township Linen 1/23/1956 63

10405 2593 12-3238Wiring diagram for highway crossing protection at Snyders, WPenn Township

est Blueprint 1/23/1957 63

10902 2641 12-3238 Proposed sewer disposal unit for Pen Argyl storehouse Linen 3/6/1951 6310908 2640 12-3238 Tie details for repair on bridge 31.96 at Lehigh Gap Linen ? 6310910 2621 12-3238 Plan showing Meadow Road crossing at Florida, NY Linen ? 6310911 2635 12-3238 Required list of material between 437+08 to station 437+24 Blueprint ? 6310916 2624 12-3238 Material list and wiring diagram for signal at Hampton Township Blueprint ? 63

10917 2623 12-3238Material list and wiring diagram for grade crossing at Vernon Township Blueprint ? 63

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

252825292530253125322533

2534

2535253625372538253925402541254225432544254525462547

Page 72 of 194Page 72 of 194

25472548

254925502551

25522553255425552556255725582559

25602561

25622563

2604 12 3238 Details and topography of the L&NE between MP 14 and MP 18 Li ? 63

12393 2620 12-3238Plan showing land and track to be used by the L&NE in Bethlehem, PA Linen ? 63

45815 2610 12-3238 Details of front end parts of L&NE locomotives Linen ? 6310905 sht 1 2642 12-3238 Proposed route of the L&NE through to Bangor Mills Linen ? 6310905 sht 4 2643 12-3238 Trackage map of the L&NE in the vicinity of MP 52 Linen ? 6310911 1 of 6 2626 12-3238 Record of stations of existing road types Blueprint ? 6310911 2 of 6 2628 12-3238 Overall lengths of underpasses in Schuylkill and West Penn Twps. Blueprint ? 63

10911 3 of 6 2627 12-3238Detail of underpass highway bridges in Schuylkill and West PTwps.

enn Blueprint ? 63

10911 4 of 6 2633 12-3238Required list for bridge reconstruction in Schuylkill and West PTwps.

enn Blueprint ? 63

10911 5 of 6 2634 12-3238 Required list of bridge material between sta 425+50 to sta 426+70 Blueprint ? 6310919 sht 2 2622 12-3238 Framing plan for reconstruction of L&NE bridge no. 63.79 Blueprint ? 6310919 sht 1 2625 12-3238 Anchor bolt plan for reconstruction of bridge 63.79 in New Jersey Blueprint ? 63no num ber 2631 12-3238 Reconstruction of L&NE bridge no. 63.79 in connection with SH 46 Blueprint ? 63no number 2597 12-3238 Map of Catasauqua Branch (Crane RR) of the L&NE RR Linen ? 63no number 2598 12-3238 Map of the Tamaqua extension of the L&NE RR Linen ? 63no number 2599 12-3238 Profile of the L&NE RR between MP 30 and MP 34 Linen ? 63no number 2600 12-3238 Detail of Chestnut Ridge extension of the Palmerton branch Linen ? 63no number 2601 12-3238 Details of the L&NE RR between MP 26 and MP 30 Linen ? 63no number 2602 12-3238 Details of the L&NE RR between MP 22 and MP 26 Linen ? 63no number 2603 12-3238 Details of the L&NE RR between MP 18 and MP 22 Linen ? 63no numberno number 2604 12 3238- Details and topography of the L&NE between MP 14 and MP 18 nenLinen ? 63no number 2605 12-3238 Details and topography of the L&NE between MP 10 and MP 14 Linen ? 63

no number 2606 12-3238Details and topography of the Catasauqua branch between Mand MP 5

P 1 Linen ? 63

no number 2607 12-3238 Details and topography of the L&NE RR between MP 6 and MP 10 Linen ? 63no number 2608 12-3238 Assignment plate placed on L&NE locomotives - mortgages Linen ? 63

no number 2611 12-3238Details of L&NE and highways in the vicinity of the WashingtoSlate Quarry

n Blueprint ? 63

no number 2612 12-3238 Proposed electric signal to be used on the Bethlehem branch Blueprint ? 63no number 2613 12-3238 Track sheet of the Bethlehem branch of the L&NE RR Linen ? 63no number 2614 12-3238 Grease and oiling instructions for use on L&NE locomotives Linen ? 63no number 2615 12-3238 Plan showing location of public crossings on Bangor branch Tracing 6/16/1955 63no number 2630 12-3238 Plans for reconstruction of L&NE bridge 63.79 in Warren County Blueprint ? 63no number 2632 12-3238 Reconstruction of L&NE bridge no. 63.79 in connection with SH 46 Blueprint ? 63no number 2636 12-3238 Reconstruction of L&NE bridge 63.79 in connection with H 46 Blueprint ? 63

6319 2677 12-3251Plan showing alignment and revision of grade of L&NE at Portland, PA Linen 1/30/1925 64

8006 2656 12-3251 L&NE bridge over Tamaqua extension at station 1066+33.5 Blueprint 7/14/1911 64

10840 2663 12-3251Encased I-beam railroad underpass relocation of SH 226 RahTownship

n Blueprint 1/16/1936 64

104 sht 1 2679 12-3251 House supports for twin span turntable at Bethlehem, PA Blueprint 8/9/1927 64

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I25642565256625672568256925702571257225732574

257525762577

2578

2579

2580

2581

0

Page 73 of 194Page 73 of 194

2582

2583258425852586

258725882589

2590

25912592259325942595259625972598

104 sht 10 2688 12-3251 Name plate for twin span turntable at Bethlehem, PA Blueprint 5/16/1926 64104 sht 11 2689 12-3251 Cross frames for twin span turntable at Bethlehem, PA Blueprint 5/29/1926 64104 sht 12 2678 12-3251 Detail of twin span turntable and cross girder Blueprint 5/27/1926 64104 sht 2 2681 12-3251 Cross frames for twin span turntable at Bethlehem, PA Blueprint 6/21/1926 64104 sht 3 2680 12-3251 Wire support for twin span turntable at Bethlehem, PA Blueprint 5/23/1927 64104 sht 4 2682 12-3251 Wire tower for twin span turntable at Bethlehem, PA Blueprint 6/8/1926 64104 sht 5 2683 12-3251 Laterals for twin span turntable at Bethlehem, PA Blueprint 6/8/1926 64104 sht 6 2684 12-3251 Laterals for twin span turntable at Bethlehem, PA Blueprint 6/4/1926 64104 sht 7 2685 12-3251 Machinery covers for twin span turntable at Bethlehem, PA Blueprint 10/29/1926 64104 sht 8 2686 12-3251 Turntable railing for twin span turntable at Bethlehem, PA Blueprint ? 64104 sht 9 2687 12-3251 PA Blueprint 5/27/1926 64

10840 2 of 2 2662 12-3251Details of encased I-beam for underpass of SH 226 in Rahn Township Blueprint 1/16/1936 64

905 sht 2, 80 2655 12-3251 L&NE bridge over Tamaqua extension at station 1066+33.5 Linen ? 645 sht 4 2657 12-3251 Girders and bracings over creek at station 1066+33.4 Blueprint 9/7/1911 64

5 sht 5 2659 12-3251Cast iron material required for bridge 1066+33.5 - Tamaqua extension Blueprint 9/8/1911 64

5 sht 6 2660 12-3251Swedged bolts and hex nuts for bridge 1066+33.5 - Tamaqua extension 9/18/1911 64

5 sht 8 2652 12-3251List of washers used with floor bolts - Bridge over creek at sta1066 + 33.5

tion Blueprint ? 64

no number 2664 12-3251Plan of L&NE in Tamaqua Borough and location with respect pipe line

to Blueprint ? 64

no number 2665 12-3251 Location of the L&NE with respect to the Little Schuylkill River Blueprint ? 64

no number 2666 12-3251Location of the L&NE with respect to the Tamaqua yard of RDCo.

G Blueprint ? 64

no number 2668 12-3251 Grade of railroad embankment in Rahn Township Blueprint 1/7/1937 64no number 2669 12-3251 Profile of the L&NE through Rahn Township in Schuylkill County Blueprint ? 64no number 2670 12-3251 Route of the L&NE RR through property of Mrs. George Hughes Blueprint ? 64

no number 2672 12-3251Profile of the L&NE through property of the Blue Ridge Real ECo.

state Blueprint ? 64

no number 2673 12-3251 Profile and location of the L&NE through West Penn Township Blueprint ? 64no number 2674 12-3251 Map and profile of the L&NE through West Penn Township Blueprint ? 64

no number 2675 12-3251Profile and location of the L&NE with respect to Little SchuylkRiver

ill Blueprint ? 64

no number 2676 12-3251Profile and location of the L&NE through property of Mrs. ElsieAllison

Blueprint ? 64

82 sht 10 2693 12-3251 Cast steel pedestal for L&NE bridge at Bethlehem, PA Blueprint 6/27/1922 6583 sht 1 2697 12-3251 Floor system 4-47-6 single track thru P1 girder spans Blueprint 5/2/1922 6583 sht 1 2698 12-3251 Floor system 4-47-6 single track thru plate girder span Blueprint 5/2/1922 6583 sht 10 2691 12-3251 Cast steel pedestal for L&NE bridge at Bethlehem, PA Blueprint 6/27/1922 6583 sht 10 2692 12-3251 Cast steel pedestal for L&NE bridge at Bethlehem, PA Blueprint 6/27/1922 6583 sht 3 2695 12-3251 Girders for single track through girder spans 5/1/1922 6583 sht 6 2690 12-3251 Erection plan and floor plan for L&NE bridge Blueprint 5/2/1922 65

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I25992600

26012602

2603

26042605

26062607

2608

2609

2610

2611

2612

2613

Page 74 of 194Page 74 of 194

6 3

2614

2615

2616

2617261826192620262126222623

2624

2625

2626

2627

03 t / 65

83 sht 6 2694 12-3251 Erection plan and floor plan for single track through bridge spans Blueprint 5/2/1922 65no number 2699 12-3251 Structure E-2 Pennsylvania Turnpike over L&NE RR Blueprint 10/27/1954 65

no number 2710 12-3251Drawings for construction of L&NE over SH 226 in Schuylkill County Blueprint 11/21/1935 65

no number 2711 12-3251 Map of L&NE through Tamaqua Borough in Schuylkill County Blueprint 12/30/1935 65

no number 2712 12-3251Required list of material for L&NE West Penn Township in Schuylkill County Blueprint 12/30/1935 65

no number 2713 12-3251Required list of material for rerouting L&NE in West Penn Township Blueprint 12/30/1935 65

no number 2714 12-3251 Required list of material for rerouting L&NE in Schuylkill County Blueprint 12/20/1935 65

no number 2715 12-3251Index and map of rerouting of L&NE in West Penn and Rahn Township Blueprint 12/20/1935 65

no number 2717 12-3251 L&NE subgrade in Tamaqua Borough and Rahn Township Blueprint 12/20/1935 65

no number 2718 12-3251Required list of material for upgrading L&NE in West Penn Township Blueprint 12/20/1935 65

no number 2719 12-3251Required list of material for upgrading L&NE along Little SchuRiver

ylkill Blueprint 12/20/1935 65

Turnpike Com2700 12-3251Preliminary study of proposed L&NE Railroad runaround - PeTurnpike

nna Blueprint 11/16/1954 65

Turnpike Com2701 12-3251Structure e-2 Penna Turnpike sec 36-E preliminary study proposed runaround Blueprint 11/17/1954 65

Turnpike Com2702 12-3251Through plate girder carrying L&NE over turnpike - general pland elevation

an Blueprint 2/7/1955 65

Turnpike Cou p e Com2703 12-32513 5Through plate girder bridge carrying L&NE over Turnpike - substructures Bluepueprint 2/7/1955 65/ 955

Turnpike Com2704 12-3251Through plate girder bridge carrying L&NE over Turnpike - girdetails

der Blueprint 2/7/1955 65

Turnpike Com2705 12-3251Through plate girder bridge carrying L&NE over Turnpike - substructures Blueprint 2/7/1955 65

Turnpike Com2706 12-3251Through plate girder bridge carrying L&NE over Turnpike - reinforcing schedule Blueprint 2/7/1955 65

Turnpike Com2707 12-3251Through plate girder bridge carrying L&NE over Turnpike - superstructure Blueprint 2/7/1955 65

Turnpike Com2709 12-3251 Through plate girder bridge - girders and floor framing Blueprint 2/7/1955 6552 sht 1 2726 12-3252 New locomotive and erecting repair shop at Pen Argyl Blueprint 7/30/1914 6652 sht 17 2730 12-3252 General location plan of buildings at new Pen Argyl erecting shop Blueprint 9/15/1914 6652 sht 18 2729 12-3252 Pit for transfer table at new Pen Argyl erecting shop Blueprint 9/11/1914 6652 sht 19 2728 12-3252 Foundation for turntable at Pen Argyl erecting at repair shop Blueprint 8/14/1914 6652 sht 22 2727 12-3252 New locomotive erecting shop at Pen Argyl - foundation scale Blueprint 9/2/1914 66

no number 2720 12-3252Required list of material for rerouting L&NE through West PenTownship

n Blueprint 12/20/1935 66

no number 2721 12-3252Required list of material for rerouting L&NE through Rahn Township Blueprint 12/20/1935 66

no number 2722 12-3252Required list of material for upgrading L&NE in West Penn Township Blueprint 12/20/1935 66

no number 2723 12-3252Required list of material for upgrading L&NE in West Penn Township Blueprint 12/20/1935 66

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I26282629

2630263126322633

26342635

2636

263726382639

264026412642264326442645

Page 75 of 194Page 75 of 194

2646264726482649

26502651

265226532654

26552656

26572658

2659

2660

Fl d LVRR

no number 2724 12-3252 Required list of material for upgrading L&NE in Tamaqua Borough Blueprint 12/20/1935 66no number 2725 12-3252 Required list of material for rerouting L&NE in Rahn Township Blueprint 12/20/1935 66

8004 2760 12-3252Detail of single track girder span over LVRR on Tamaqua extension Blueprint 6/30/1911 67

11510 2766 12-3252 Plan showing present location of tracks at Glenwood Jct., NY Tracing 6/14/1927 6711510 2767 12-3252 Plan showing proposed extension to Empire Quarries Blueprint 6/14/1927 6711510 2768 12-3252 Proposed extension of track at Glenwood Jct., NY Blueprint 6/10/1926 67

11510 2769 12-3252Proposed extension of track to Empire Quarries at Glenwood NY

Jct., Blueprint 12/24/1926 67

1 sht 1 2756 12-3252 Masonry plan for crossing over LVRR on Tamaqua extension Blueprint 8/14/1911 67

1 sht 10 2763 12-3252Swedged bolts and hex nuts for span over LVRR on Tamaquaextension

Blueprint 9/2/1911 67

1 sht 11 2764 12-3252Standard ground bolts, lag screws and boat spikes on LVRR opass

ver Blueprint 10/11/1911 67

1 sht 12 2765 12-3252 Standard cast iron washers to be used on LVRR over pass Blueprint 10/13/1911 671 sht 13 2762 12-3252 Cut washers required for span over LVRR on Tamaqua extension Blueprint 10/11/1911 67

1 sht 14 2761 12-3252Steel wire nails to be used on LVRR crossing on Tamaqua extension Blueprint 10/11/1911 67

1 sht 1a 2751 12-3252 Masonry plan for crossing over LVRR on Tamaqua extension Blueprint 7/29/1911 671 sht 2 2749 12-3252 Crossing over Lehigh Valley Railroad on Tamaqua division Blueprint 9/9/1911 671 sht 3 2750 12-3252 Floor plan for crossing over LVRR at Sta 647+71.1 Blueprint 9/27/1911 671 sht 4 2755 12-3252 Girders crossing over LVRR on the Tamaqua extension Blueprint 9/1/1911 671 sht 5 2754 12-3252 Floor beams and bracing for crossing over LVRR Blueprint 9/9/1911 67

1 sht 6 2757 12-3252Floor beams and bracing for crossing over LVRR Tamaquaoor beams an bracing for crossing over - Tamaqua extension Blueprint 9/9/1911 67

1 sht 7 2753 12-3252 Stringers crossing over Lehigh Valley Railroad at Sta 647+61 Blueprint 9/2/1911 671 sht 8 2752 12-3252 Laterals for bridge crossing LVRR on the Tamaqua extension Blueprint 9/1/1911 671 sht 9 2758 12-3252 List of material required for LVRR crossing on Tamaqua division Blueprint 9/5/1911 67

52 sht 10 2739 12-3252Foundation and offices for new locomotive erecting house at PArgyl

en Blueprint 9/8/1914 67

52 sht 11 2738 12-3252 General plan, elevation and sections for oil house at Pen Argyl Blueprint 9/15/1914 67

52 sht 12 2737 12-3252Boiler house foundation and coal trestle at new Pen Argyl enginehouse Blueprint 9/15/1914 67

52 sht 13 2736 12-3252 Chimney for new locomotive enginehouse at Pen Argyl Blueprint 9/15/1914 6752 sht 14 2735 12-3252 Oil house and general plan for new Pen Argyl enginehouse Blueprint 9/15/1914 67

52 sht 15 2732 12-3252Location plan of water pipes for new Pen Argyl erecting and reshops

pair Blueprint 7/31/1914 67

52 sht 16 2731 12-3252 Location and sewer plan for new Pen Argyl enginehouse Blueprint 7/22/1914 67

52 sht 2 2744 12-3252East and South elevation for locomotive and repair shop at PeArgyl

n Blueprint 7/30/1914 67

52 sht 20 2734 12-3252 Rail fastening for turntable walls at new Pen Argyl enginehouse Blueprint 8/14/1914 67

52 sht 21 2733 12-3252Concrete manhole and appurtances at new Pen Argyl enginehouse Blueprint 9/2/1914 67

52 sht 3 2745 12-3252East and South elevation for locomotive and repair shop at PeArgyl

n Blueprint 7/30/1914 67

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I2661

2662

26632664266526662667266826692670

2671

2672

267326742675267626772678

Page 76 of 194Page 76 of 194

2679268026812682

26832684268526862687268826892690

269126922693269426952696

52 sht 4 2747 12-3252 Details of large wooden doors at new Pen Argyl erecting shops Blueprint 7/31/1914 67

52 sht 4a 2748 12-3252Details of large wooden doors at main locomotive shop at PenArgyl

Blueprint 8/25/1914 67

52 sht 5 2742 12-3252Details of column and wall foundation for new locomotive erecshop

ting Blueprint 8/11/1914 67

52 sht 6 2741 12-3252 Main locomotive shop to be erected at Pen Argyl Blueprint 8/25/1914 6752 sht 7 2746 12-3252 Heating system for the new locomotive erecting shop at Pen Argyl Blueprint 9/3/1914 6752 sht 8 2743 12-3252 Details of pits and pipe tunnels for new locomotive erecting shop Blueprint 9/9/1914 6752 sht 9 2740 12-3252 Plan for storehouse and office at new Pen Argyl enginehouse Blueprint 8/29/1914 678004A 2759 12-3252 Detail of 68' crossing span over the LVRR on Tamaqua extension Blueprint ? 676010 2774 12-3253 Plan of the Crane Railroad at Catasauqua, PA Linen ? 686106 2771 12-3253 Map of the L&NE RR in Nazareth Borough and vicinity Blueprint ? 68

6144 2773 12-3253Diagram of the town of Columbia in the state of New Jersey - surveyed Linen 11/?/1813 68

6168 2772 12-3253Map of the L&HR RR in the village of Maybrook and town of Montgomery Blueprint 5/9/1932 68

6191 2775 12-3253Plan showing properties between lands of Bowan Estate and Bachart

Irvin Linen 4/19/1912 68

9339 2777 12-3253 Detail for welfare building for the welfare building at Pen Argyl Linen 4/23/1915 68 None 2798 12-3253 Station map - tracks operated by the Chicago & Erie RR Blueprint 6/10/1918 68

3351 sht 1 2779 12-3253 Welfare building for the L&NE RR at Pen Argyl Linen 6/14/1915 683351 sht 2 2778 12-3253 Detail of girders for the L&NE welfare building at Pen Argyl Linen 6/14/1915 68

3351 sht E1 2776 12-3253 Welfare building for the L&NE at Pen Argyl Craft paper ? 6836 sht 42 2808 12-3253 Material required for store house and office building Blueprint 4/13/1925 6836 sht 43 2809 12-3253 Detail of posts required for new Pen Argyl enginehouse Blueprint 9/13/1915 6836 sht 44 2809a 12-3253 Detail of frames required for new Pen Argyl enginehouse Blueprint 4/13/1915 68

6493A 2770 12-3253 Map of the Allentown branch of the L&NE and adjacent territory Blueprint 4/25/1922 68

None 2780 12-3253Exhibits filed with the ICC in connection with railroad consolidcover

ation-Linen ? 68

None 2781 12-3253 Exhibits filed with the ICC in connection with railroad consolidation Van Dyke ? 68None 2782 12-3253 Map of L&NE RR and connecting rail lines 1/?/1923 68None 2783 12-3253 L&NE tonnage and car interchange with other railroads Tracing 12/31/1922 68None 2784 12-3253 L&NE tonnage and car interchange with other railroads Van Dyke 12/31/1922 68None 2785 12-3253 Equipment owned or leased by the L&NE RR Van Dyke 12/31/1922 68None 2786 12-3253 L&NE RR equipment owned or leased - exhibit no. 4 Vellum 12/31/1922 68None 2787 12-3253 Total cars interchanged with the L&NE - exhibit #6 Vellum 4/20/1923 68

None 2788 12-3253L&NE list of exhibits submitted to the ICC relative to railroad consolidation Vellum 12/31/1922 68

None 2789 12-3253 Map of the L&NE RR and connecting lines 1/?/1923 68None 2790 12-3253 Capital obligations of the L&NE RR submitted to ICC - exhibit #3 Vellum 12/31/1922 68None 2791 12-3253 Miles of road operated by the L&NE in PA, NY and NJ - exhibit #2 Vellum 12/31/1922 68None 2792 12-3253 L&NE RR results of operation - ICC exhibit #6 Van Dyke 12/31/1922 68None 2793 12-3253 L&NE freight and passenger revenue submitted to ICC - exhibit #7 Vellum 12/31/1922 68

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

2697

2698269927002701270227032704270527062707270827092710

271127122713271427152716

Page 77 of 194Page 77 of 194

271627172718271927202721

27222723

27242725

272627272728

27292730

2731

2841 t 69

None 2795 12-3253L&NE tonnage and car interchange chart submitted to ICC - exhibit #5 Va n Dyke 6/1/1923 68

None 2796 12-3253L&NE results of operation for ten years ended December 31, - exhibit #9

1922 Va n Dyke 12/31/1922 68

None 2797 12-3253 L&NE passing over tonnage for years 1915 to 1922 - exhibit no. 8 Vellum 12/31/1922 68None 2799 12-3253 L&NE capital obligations as of December 31, 1922 - exhibit #3 Van Dyke 12/31/1922 68None 2800 12-3253 Capital obligations as of December 31, 1922 - exhibit #3 Van Dyke 12/31/1922 68None 2801 12-3253 Map of the Lehigh & New England Railroad Blue line 6/1/1923 68None 2802 12-3253 Map of the Lehigh & New England Railroad Blue line 6/1/1923 68None 2803 12-3253 L&NE capital obligations as of December 31, 1922 Van Dyke 12/31/1922 68None 2804 12-3253 Capital obligations as of December 31, 1922 Van Dyke 12/31/1922 68None 2805 12-3253 Capital obligations as of December 31, 1922 - exhibit #3 Van Dyke 12/31/1922 68None 2806 12-3253 Capital obligations as of December 31, 1922 - exhibit #3 Van Dyke 12/31/1922 68None 2807 12-3253 Capital obligations as of December 31, 1922 - exhibit #3 Tracing 12/31/1922 686158 2816 12-3253 Steam railroad map of Pennsylvania Blue print ?/?/1923 696184 2812 12-3253 Detail of crossing with DL&W at Augusta, NJ Blueprint 5/3/1943 69

6184 2813 12-3253Detail of material required for DL&W crossing at Augusta, NJ duplicate

- Blueprint 8/13/1943 69

6184 2814 12-3253 Track and frogs required for DL&W crossing at Augusta, NJ Blueprint 8/31/1943 6918 sht 10 2836 12-3253 Details of span #6 on Tamaqua extension crossing Lehigh River Blueprint 9/7/1911 6918 sht 11 2839 12-3253 Details of riveted span for Tamaqua extension span #6 Blueprint 9/8/1911 6918 sht 12 2840 12-3253 Rivets required for span #6 for Tamaqua extension Blueprint 9/18/1911 6918 ht 1318 sht 13 2841 12 325312-3253 Ri t d h l i d f #6 L hi h Ri iRivets and holes required for span #6 Lehigh River crossing Bl i t 9/20/1911Blueprin 9/20 69/191118 sht 14 2843 12-3253 Rivets and holes required for structural steel on span #6 Blueprint 9/2/1911 6918 sht 16 2845 12-3253 Rivets and holes required on span #6 for Lehigh River bridge Blueprint 9/13/1911 6918 sht 17 2846 12-3253 Diagonals required for span #6 for Lehigh River crossing Blueprint 9/14/1911 6918 sht 18 2848 12-3253 Revised floor beams required for span #6 Lehigh River crossing Blueprint 9/15/1911 6918 sht 19 2847 12-3253 Floor beams required for span #6 for Lehigh River crossing Blueprint 7/16/1911 69

18 sht 20 2849 12-3253Revised floor beams required for span #6 for Lehigh River crossing Blueprint 9/21/1911 69

18 sht 8 & 9 2838 12-3253 Details of span #6 on Tamaqua extension crossing Lehigh River Blueprint 9/11/1911 69

18sht 15 2844 12-3253Rivets and holes required in structural steel for Lehigh River bridge Blueprint 9/12/1911 69

18sht 7 2842 12-3253 Required top required for bridge #6 crossing Lehigh River Blueprint 9/6/1911 69

36 sht 45 2810 12-3253Detail of frames and posts required for new Pen Argyl enginehouse Blueprint 4/15/1915 69

36 sht 46 2811 12-3253 Detail of frames and position of holes in steel for enginehouse Blueprint 4/15/1916 695892E 2953 12-3152 Stripes for L&NE engine 853 - also 1/4 top bolts Blueprint ? 69

60 sht 1 2821 12-3253 Girders, lateral bracing and cross frames for the PP&B RR bridges Blue print 08/15/1889 6960 sht 10 2828 12-3253 Detail of bolts to be used on the PP&B RR bridge Blueprint 08/19/1889 69

60 sht 4 2825 12-3253 Girders and bracing for single track deck plate girder for PP&B RR Blueprint 08/12/1889 69

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I27322733273427352736

27372738273927402741

2742274327442745274627472748274927502751

Page 78 of 194Page 78 of 194

2752275327542755

275627572758275927602761

2762276327642765

276627672768

60 sht 5 2824 12-3253 Girders and bracing for single track deck bridges on PP&B RR 08/12/1889 6960 sht 6 2826 12-3253 Girder, lateral bracing and struts for bridges on PP&B RR Blueprint 08/?/1889 6960 sht 7 2822 12-3253 Single track plate girders for bridges on PP&B RR Blue print 6/?/1889 6960 sht 8 2827 12-3253 Detail of bolts required for the PP&B bridges Blueprint 08/13/1889 6960 sht 9 2829 12-3253 Detail of bolts and nuts required on the PP&B RR bridge Blueprint 08/17/1889 69

60 sht3 2823 12-3253 Girders, lateral bracing and cross frames for the PP&B RR bridges Blueprint 08/15/1889 696011A 2830 12-3253 Townhouse to be located at Pen Argyl, PA Linen 2/12/1913 696011B 2835 12-3253 Detail of beams and girders for new Pen Argyl enginehouse Linen 2/21/1913 696011C 2834 12-3253 Longitudinal section through stalls of new Pen Argyl enginehouse Linen 12/4/1912 696011D 2833 12-3253 Details of wall for new Pen Argyl enginehouse Blueprint 12/5/1912 69

6011E 2832 12-3253Details of columns and brackets for the new Pen Argyl enginehouse Linen 2/26/1913 69

6011F 2831 12-3253 Steel frame encased in concrete for the Pen Argyl enginehouse Linen 3/8/1913 6963 sht 1 2818 12-3253 Contract no. 5003 - sheet no. 1 - H beam girder span - PP&B RR Blue print ? 6963 sht 2 2819 12-3253 Contract no. 5003 - sheet #1 - H beam girder span - PP&B RR Blue print ? 69

5897 2878 12-3264 Plan of properties of the Blue Ridge Real Estate Companies Linen 10/21/1922 706076 2877 12-3264 Map of Schuylkill & Susquehanna branch of the P&R RR Linen ? 70

None 2874 12-3264 Girders for the new Pen Argyl turntable Blueprint 5/13/1912 7018 sht 21 2850 12-3264 Rivets and stiffs to be used on span #6 for Lehigh River crossing Blueprint 9/22/1911 7018 sht 22 2863 12-3264 Stringers, rivets and holes required for span #6 Lehigh crossing Blueprint 09/25/1911 7018 sht 23 2860 12-3264 Rivets, holes and stiffs required for span #6 Lehigh River crossing Blueprint 09/26/1911 70

18 sht 24 2862 12-3264T l t l l t d b k t i d f #6 L hi hTop laterals, plates and brackets required for span #6 Lehigh crossing Blueprint 10/13/1911 70

18 sht 25 2861 12-3264 Rivets and holes required for span #6 Lehigh River crossing Blueprint 10/12/1911 7018 sht 26 2869 12-3264 Rivets and holes required for span #6 Lehigh crossing Blueprint 10/5/1911 7018 sht 27 2870 12-3264 Sway braces, bolts, struts and brackets required for span #6 Blueprint 10/12/1911 70

18 sht 28 2868 12-3264Roller shoes and masonry plates required for span #6 Lehigh crossing Blueprint 9/30/1911 70

18 sht 29 2864 12-3264 Stringers (519) required for span #6 Lehigh River crossing Blueprint 09/23/1911 7018 sht 3 2853 12-3264 Top chords required on span # 6 for Lehigh River crossing Blueprint 9/5/1911 7018 sht 30 2865 12-3264 Stringers, cross frames, laterals, plates and fillers for span #6 Blueprint 9/28/1911 7018 sht 31 2867 12-3264 Stringers, rivets and holes required for span #6 Lehigh crossing Blueprint 9/23/1911 7018 sht 32 2859 12-3264 Stud bolts required for span #6 Lehigh River crossing Blueprint 09/30/1911 70

18 sht 33 2856 12-3264Rockers, teeth and flats required for span #6 Lehigh River crossing Blueprint 9/30/1911 70

18 sht 34 2855 12-3264 Cast steel anchor clips required for span #6 Lehigh River crossing Blueprint 9/10/1911 7018 sht 35 2857 12-3264 Pins and nuts required for span #6 Lehigh River crossing Blueprint 9/30/1911 7018 sht 36 2858 12-3264 Swedged stone belts required for span #6 Lehigh River crossing Blueprint 9/30/1911 70

18 sht 4 2854 12-3264Top chords, rivets and holes required for span #6 Lehigh Rivecrossing

r Blueprint 9/1/1911 70

18 sht 5 2852 12-3264 Rivets and holes required on span #6 for Lehigh River crossing Blueprint 9/6/1911 7018 sht 6 2851 12-3264 Top chords required on span no. 6 for Lehigh River crossing Blueprint 9/6/1911 70

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

27692770277127722773

2774

27752776277727782779278027812782278327842785278627872788

Page 79 of 194Page 79 of 194

278827892790

2791279227932794

2795

27962797279827992800

2801280228032804

2890 12 3264 Railroad map of the United States issue of 1935 South West 10/?/1935 71

4 sht 8 3054 12-3151Bridge over Lizard Creek between stations 684+92 - Tamaquextension

a Blueprint 9/13/1911 70

missing 2875 12-3264 Profile of L&NE RR between MP 1190 to MP 1158 ? 70None 2872 12-3264 Pit and floor plan for new Pen Argyl turntable Blueprint 5/7/1912 70None 2873 12-3264 Center girders and cross frames for new Pen Argyl turntable Blueprint 5/13/1912 70None 2876 12-3264 Expense account of Florence Jacobs as a viewer for the L&NE tracing 1/6/1915 70

1245 2895 12-3264General arrangement of ash converter bearings for Pen Argylenginehouse

Blueprint 3/14/1954 71

5849 2909 12-3264Plan showing location of L&NE tracks through property of A.RBrugler

. Linen 4/22/1911 71

6175 2883 12-3264 Railroad map of the United States - issue of 1940 - North West Heavy Pape 10/?/1940 716175 2893 12-3264 Railroad map of the United States - issue of 1935 - North West Heavy Pape 10/?/1935 71

6175 2894 12-3264 Railroad map of the United States - issue of 1935 - South West Heavy Pape 10/?/1935 71 None 2899 12-3264 Proposed plan showing construction of Black Diamond Camp Blueprint 1/6/1954 71

Corps of Eng 2881 12-3264 Railroad map of the United States - issue of 1935 - South East Heavy Pape 10/?/1935 71Corps of Eng 2882 12-3264 Railroad map of the United States - issue of 1940 - South West Heavy Pape 10/?/1940 71Corps of Eng 2884 12-3264 Railroad map of the United States - issue of 1940 - South East Heavy Pape 10/?/1940 71Corps of Eng 2885 12-3264 Railroad map of the United States - issue of 1940 - North East Heavy Pape 10/?/1940 71Corps of Eng 2886 12-3264 Railroad map of the United States - issue of 1935 - North West Heavy Pape 10/?/1935 71Corps of Eng 2887 12-3264 Railroad map of the United States - issue of 1935 - North East Heavy Pape 10/?/1935 71Corps of Eng 2888 12-3264 Railroad map of the United States - issue of 1935 - South West Heavy Pape 10/?/1935 71Corps of Eng 2889 12-3264 Railroad map of the United States - issue of 1935 - North West Heavy Pape 10/?/1935 71Corps ofCorps of EEng 2890ng 12 3264- Railroad map of the United States - issue of 1935 - South West - - HeavyH Pape 10/?/1935eavy Pape 71Corps of Eng 2891 12-3264 Railroad map of Maine - issue of 1935 Heavy Pape 10/?/1935 71Corps of Eng 2892 12-3264 Railroad map of the United States - issue of 1935 - South East Heavy Pape 10/?/1935 71

missing 2879 12-3264 Map showing topography between Portland, PA and Columbia, NJ 6/?/1927 71missing 2880 12-3264 Adjacent properties along Little Schuylkill River ? 71None 2896 12-3264 Map showing profile connection with P&R Alliance branch Blueprint ? 71None 2898 12-3264 Profile map showing in detail the Tamaqua extension Blueprint ? 71

None 2900 12-3264Plan showing proposed dormitory construction of Black DiamoCamp

nd Tissue 1/6/1954 71

None 2901 12-3264 Proposed location plan for cooling tower at Pen Argyl enginehouse Tissue 1/14/1954 71None 2903 12-3264 Front and side elevation plan for Pen Argyl recreation building Vellum ? 71None 2904 12-3264 Proposed shelter for transportation employees at Pen Argyl Vellum 7/9/1932 71None 2905 12-3264 Proposed plan for tool shelter at Pen Argyl enginehouse Vellum ? 71None 2906 12-3264 Proposed ash storage bin for Pen Argyl enginehouse Vellum 7/28/1952 71

None 2907 12-3264Plan for proposed locker room at Tadmor yard office in NazarTwp.

eth Tissue 2/11/1954 71

None 2908 12-3264 Foundation plan for ash storage bin at Pen Argyl boiler house Linen 7/31/1952 71USGS map 2902 12-3264 Bushkill topographic map showing the L&NE RR Heavy Pape ?/?/1924 71

6156 2918 12-3152 Map of the Danielsville Land Company Mylar ? 72

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

28052806280728082809

2810

2811281228132814281528162817281828192820

2821

2822 0

Page 80 of 194Page 80 of 194

2823

2824

2825

2826

2827

2828

2829

2830

2831

2832283328342835

Ri & RR 3645

2

19303 2920 12-3152Elevation diagram of Coxe stoker to be installed at Pen Argyl enginehouse Blueprint 5/24/1951 72

no number 2914 12-3152 Sketch of L&NE tracks through Martins Creek Mylar ? 723 sht 1 2929 12-3152 Floor plan of crossing over highway at station 1179+00 Blueprint 10/14/1911 723 sht 2 2930 12-3152 Crossing over highway at station 1179+00 Blueprint 9/21/1911 723 sht 3 2921 12-3152 Crossing over highway at station 1179+00 Blueprint 9/21/1911 72

3 sht 4 2923 12-3152Bolts required for station 1179+00 at highway crossing - Tamaextension

qua Blueprint 10/11/1911 72

3 sht 5 2924 12-3152Washers required at station 1179+00 at highway crossing - Tamaqua extension Blueprint 9/27/1911 72

3 sht 6 2922 12-3152 Crossing over highway at station 1179+00 - Tamaqua extension Blueprint 10/11/1911 72C4794 2925 12-3152 List of specialties required for gondola cars of L&NE Blueprint ? 72

CS5617 2919 12-3152 Jets to be used at the Pen Argyl enginehouse Blueprint 7/20/1956 72no number 2910 12-3152 Plan showing the S&L branch of the P&R to Pottsville mylar ? 72no number 2912 12-3152 Route of the L&NE through the village of Martins Creek Mylar ? 72no number 2913 12-3152 Proposed profile of L&NE on loading track graph paper ? 72no number 2915 12-3152 Map of L&NE along state highway in Martins Creek Blueprint 1/17/1952 72no number 2916 12-3152 Map of the L&NE Martins Creek branch Blueprint 3/3/1952 72no number 2917 12-3152 Map of the L&NE Martins Creek branch and spur line to Bangor Blueprint 1/17/1952 72

Val. 24 sht 1 2935 12-3152Right of way of Goshen & Deckertown RR - Station 3116+20 4170+00

to Blueprint 6/30/1918 72

Val. 24 sht 1 2937 12-3152Right of way of Goshen & Deckertown RR - Station 3592+40 3645+20

to Blueprint 6/30/1918 72

Val. 24 sht 11 2932 12-3152Right of way of Goshen & Deckertown RR Station 3645+20ght of way of Goshen Deckertown - Station +203698+00

to to Blueprint 6/30/1918 72

Val. 24 sht 1 2936 12-3152Right of way of Goshen & Deckertown RR - Station 3698+00 3735+21

to Blueprint 6/30/1918 72

Val. 24 sht 2 2934 12-3152Right of way of Goshen & Deckertown RR - Station 3170+00 3222+50

to Blueprint 6/30/1918 72

Val. 24 sht 3 2933 12-3152Right of way of Goshen & Deckertown RR - Station 3222+80 3275+60

to Blueprint 6/30/1918 72

Val. 24 sht 4 2931 12-3152Right of way of Goshen & Deckertown RR - Station 3275+60 3328+40

to Blueprint 6/30/1918 72

Val. 24 sht 5 2928 12-3152Right of way & track map of Goshen & Deckertown RR - statio3328+40 to 3381+20

n Blueprint 6/30/1885 72

Val. 24 sht 6 2927 12-3152Right of way of Goshen & Deckertown Railway - Pine Island branch Blueprint 6/30/1885 72

Val. 24 sht 7 2926 12-3152Right of way of Goshen & Deckertown Railway operated by ERR

rie Blueprint 6/30/1885 72

Val. 24 sht 8 2939 12-3152Right of way of Goshen & Deckertown RR - Station 3486+80 3539+60

to Blueprint 6/30/1918 72

Val. 24 sht 9 2938 12-3152Right of way of Goshen & Deckertown RR - Station 3539+60 3592+40

to Blueprint 6/30/1918 72

5844 2944 12-3152 Plan for engine coal chutes at Bangor, PA Linen 12/?/1893 7311516 2983 12-3152 Profile map of Tamaqua extension showing elevations Blue print ? 7311533 2987 12-3152 Pine Island Crushing Plant - location plan and contours Blueprint 3/30/1927 73

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I283628372838

2839

2840

2841

2842

2843

2844

2845

2846

2847

28482849

2850

Page 81 of 194Page 81 of 194

28502851

2852285328542855

2856

28572858

2859

28602861

286228632864

5

11546 2981 12-3152 Skew through plate girder span for bridge in West Penn Township Linen 10/13/1930 7311546 2982 12-3152 Skew through plate girder span for bridge in West Penn Township Blue print 10/13/1930 7311547 2986 12-3152 Plan showing proposed track changes at Catasauqua, PA Linen 12/17/1930 73

11547 2989 12-3152Plan showing proposed track changes at Catasauqua, PA - scheme C Blueprint 12/17/1930 73

11547 2990 12-3152Plan showing proposed track changes at Catasauqua, PA - scheme A Blueprint 12/17/1930 73

11547 2991 12-3152Plan showing proposed track changes at Catasauqua, PA scheme B Blueprint 12/17/1930 73

11558 2985 12-3152Right of way and track map of LVRR from station 1054+18 to 1107+76 Blueprint 6/30/1917 73

11560 2945 12-3152Route map showing passage of L&NE through various propersheet 1 of 6

ties - Linen ? 73

11560 2946 12-3152Route map showing passage of L&NE through various propersheet 2 of 6

ties - Linen ? 73

11560 2947 12-3152Route map showing passage of L&NE through various propersheet 3 of 6

ties - Linen ? 73

11560 2948 12-3152Route map showing passage of L&NE through various propersheet 4 of 6

ties - Linen ? 73

11560 2949 12-3152Route map showing passage of L&NE through various propersheet 5 of 6

ties - Linen ? 73

11560 2950 12-3152Route map showing passage of L&NE through various propersheet 6 of 6

ties - Linen ? 73

11576 2988 12-3152 Detail of grade crossing over Roseto Street in Borough of Roseto Linen 3/16/1929 73

11577 2940 12-3152Plan showing topography in vicinity of grade crossing in WarwNY

ick, Linen 11/16/1938 73

11578 2984 12-3152 Tie plan for twin span turntable at Pen Argyl Linen 12/13/1940 73

11505-A 2994 12-3152Foundation plan for new freight and passenger station at LansPA

ford, Linen 4/16/1925 73

100 sht 1 2968 12-3152 Anchor bridge plan for Crane Railroad bridge Blueprint 8/26/1910 73100 sht 3 2967 12-3152 Span details for bridge #1 - materials, rivets and holes required Blueprint 8/26/1910 73100 sht 4 2966 12-3152 Details for bridge span #2 - materials, rivets and holes required Blueprint 2/26/1910 73

11505-A 2995 12-3152Foundation tracing for freight and passenger station at LansfoPA

rd, Blueprint 4/16/1925 73

11505-B 2993 12-3152First floor plan for new freight and passenger station at LansfoPA

rd, Linen 4/17/1925 73

11505-C 2999 12-3152 Roof plan for new freight and passenger station at Lansford, PA Linen 4/16/1925 73

11505-D 2998 12-3152South elevation plan for new freight and passenger station at Lansford, PA Linen 4/21/1925 73

11505-E 2992 12-3152North elevation for new freight and passenger station at LansfPA

ord, Linen 4/23/1925 73

505-G, 1150 2997 12-3152 Sectional plan for freight and passenger station at Lansford, PA Linen 4/28/1925 73

11530, 6484 2943 12-3152Plan showing the Davis and Thomas Foundry & Machine WorCatasauqua

ks at Blueprint 02/?/1892 73

2 sht 1 2951 12-3152 Girders and braces for highway bridge over Tamaqua extension Blueprint 2/22/1912 732 sht 2 2952 12-3152 Details for bridge at station 290+40 on Tamaqua extension Blueprint 1/23/1912 73

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

2865

2866

2867

286828692870287128722873

28742875

28762877

2878287928802881

A

Page 82 of 194Page 82 of 194

28812882

2883288428852886288728882889289028912892

2893

289428952896

2897

of 2978 12 73A

2 sht 3 2958 12-3152Swedged bolts, bolts and washers required for bridge at statio290+40

n Blueprint 1/4/1912 73

2 sht 4 2959 12-3152Hook bolts, guard bolts, log bolts and steel wire nails at statio290+40

n Blueprint 3/9/1912 73

2 sht 5 2960 12-3152Cast iron washers to be used for bridge over highway at statio290+40

n Blueprint 3/9/1912 73

2 sht 6 2963 12-3152Cut washers for bridge over highway on Tamaqua extension astation 290+40

t Blueprint 3/9/1912 73

5892 sht 3 2955 12-3152 Locomotive cab scheme Blueprint 735892 sht 4 2955 12-3152 Steel plates for small end windows for L&NE locomotive #853 Blueprint ? 735892A-E 2957 12-3152 Spring hangers and wheel arrangement for L&NE engine #853 Blueprint ? 736 sht 1 2971 12-3152 Floor plan for bridge over creek at station 1202+18-2 copies Blueprint 9/30/1911 736 sht 2 2972 12-3152 Girders and bracing for bridge over creek at station 1202+18 Blueprint 9/22/1911 73

6 sht 3 2973 12-3152Drawing of bridge over creek at station 1202+18 - Tamaqua extension Blueprint 9/22/1911 73

6 sht 4 2974 12-3152 Swedge bolts required for bridge at 1202+18 - Tamaqua extension Blueprint 9/22/1911 73

6 sht 5 2975 12-3152Standard guard rail, standard hook bolts and lag screws for brat sta. 1202+18

idge Blueprint 10/23/1911 73

6 sht 6 2976 12-3152 Standard cast iron washers bolts for bridge at station 1202+18 Blueprint 10/21/1911 73

6 sht 7 2977 12-3152Cut washers and lag screws for crossing over creek at station1202+18

Blueprint 10/21/1911 73

6 sht 8 2980 12-3152 1202+18 Blueprint 10/23/1911 73dup. of 8003 2961 12-3152 Map showing details of highway bridge at station 290+40 Blueprint 1/3/1912 73dup. of 8007dup. 8007 2978 12-31523152 Details of girder span bridge over creek at station 1202+18g p g Blueprint 6/8/Blueprint 6/8/19111911 73

dup. of 8007 2979 12-3152 Steel plate girder plan for bridge over creek at station 1202+18 Blueprint 6/8/1911 73

dup.of 8003 2962 12-3152Details for bridge over highway on Tamaqua extension at stat290+40

ion Blueprint 1/3/1912 73

no number 2956 12-3152 Flues and flue head sheet for L&NE locomotive #853 Blueprint ? 73no number 2964 12-3152 Map of the L&NE in the Borough of Pen Argyl Linen ? 73no number 2965 12-3152 Plan for stencils for lettering on engine cabs Linen ? 73no number 2969 12-3152 Plan showing private crossing and adjacent areas in Pen Argyl Blueprint 1/16/1952 73

1219 3001 12-3151 Details of 4" coal conveyor for stoker Linen 6/6/1951 741 of 6 3004 12-3151 PUC order regarding relocation of line South of Tamaqua - page 1 tablet paper 12/20/1935 74

10 of 16 3029 12-3151 Reconstruction of line along Susquehanna Pipe Line Co. Blueprint 6/30/1936 7410840 1 0f 2 3018 12-3151 General plan of relocation of SH 226 in Schuylkill County Blueprint 1/16/1936 7410840 2 0f 2 3017 12-3151 Relocation of SH 226 in Rahn Township, Schuylkill County Blueprint 1/10/1936 74

11 of 16 3026 12-3151Required list of material for relocation through Blue Ridge ReaEstate

l Blueprint 6/30/1936 74

11505-F 3000 12-3151East and West elevation new freight and passenger station atLansford, PA

Linen 4/19/1925 74

13/16 3023 12-3151 Required list of material for relocation along Little Schuylkill River Blueprint 1/30/1936 7414/16 3022 12-3151 Required list of material for line relocation in P&R Coal & Iron Co. Blueprint 1/30/1936 74

15/16 3021 12-3151Required list of material for line relocation in Rahn Twp. and Tamaqua Borough Blueprint 6/30/1936 74

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

28982899

290029012902290329042905

2906290729082909

29102911

2912291329142915

Page 83 of 194Page 83 of 194

2916

29172918291929202921292229232924292529262927

292829292930293129322933

on emnat 443 10

16 of 16 3019 12-3151 Required list of material through Tamaqua Borough Line relocation Blueprint 1/19/1936 7416 of 16 3024 12-3151 Required list of material for relocation along Little Schuylkill River Blueprint 6/30/1938 74

2 of 16 3012 12-3151Condemnation of right of way in Schuylkill County - 585+51.7598+61

3 to Blueprint 6/30/1938 74

2 of 6 3005 12-3151 PUC order regarding relocation of line South of Tamaqua - page 2 tablet paper 12/20/1935 743 of 6 3006 12-3151 PUC order regarding relocation of line South of Tamaqua - page 3 tablet paper 12/30/1935 74

4 of 16 3014 12-3151 Detail of retaining wall, cribbing and inlet for line relocation Blueprint 6/30/1936 744 of 6 3007 12-3151 PUC order regarding relocation of line South of Tamaqua - page 4 tablet paper 6/6/1950 74

4 sht 13 3059 12-3151 Floor boly washers required on Lizard Creek bridge Blueprint 10/13/1911 74

5 of 16 3015 12-3151Map of L&NE through property of Georges Hughes & Mrs. AmHill

elia Blueprint 6/30/1936 74

5 of 6 3008 12-3151 PUC order regarding relocation of line South of Tamaqua - page 5 tablet paper 6/6/1950 746 of 16 3025 12-3151 Required list of material for relocation in West Penn Township Blueprint 6/30/1936 746 of 6 3009 12-3151 PUC order regarding relocation of line South of Tamaqua - page 6 tablet paper 6/6/1950 74

7 of 16 3027 12-3151Required list of material for relocation through property of TedNorridas

Blueprint 6/30/1936 74

8 of 16 3031 12-3151 Required list of material between station 476+40 to 482+60 Blueprint 6/30/1936 74

9 of 16 3030 12-3151Required list of material required for relocation thru Mrs. ElsieAllison

Blueprint 6/30/1936 74

L-356 3020 12-3151 Detail of route 226-5 in Schuylkill County - station 550+42 Blueprint 6/30/1936 74no number 3002 12-3151 Details of coal conveyor for L&NE stoker fired locomotive Cardboard ? 74no number 3003 12-3151 1956 Public Utilities Company railroad map of Pennsylvania Craft paper ?/?/1956 74

no number 3011 12-3151Condemnation of right of way in Schuylkill County 443+10 toC d ion of right of way in Schuylkill County - + to598+61

Blueprint 6/30/1936 74

no number 3013 12-3151Grading materials required for line relocation in West Penn Township Blueprint 6/30/1936 74

no number 3032 12-3151 State of PA - standard cross sections for rail and bridges Blueprint 6/30/1936 74no number 3033 12-3151 State of PA - miscellaneous standards for special concrete gutter Blueprint 6/5/1929 74no number 3034 12-3151 State of PA - specifications for standard end walls and end walls Blueprint 6/5/1929 74no number 3035 12-3151 State of PA - standard details for reinforced concrete pavement Blueprint 6/30/1936 74no number 3037 12-3151 State of PA - guard fence standards - types 1A and 1B Blueprint 9/26/1935 74

R-109 3028 12-3151 Reconstruction of F bridge on SH 226 over Schuylkill River Blueprint 6/30/1936 74S-181 3038 12-3151 State of PA - standard abutments - spans 20 to 45 feet Blueprint 6/30/1935 74S-185 3016 12-3151 Details of standard five foot culvert Blueprint 6/30/1926 745826 3068 12-3151 Proposed branch line to the Jackson Bangor Slate Quarry Linen 12/18/1911 755846 3067 12-3151 Proposed change in line of the PP&B at Portland and Columbia Linen 1/?/1889 75

6309 3072 12-3151Volume diagram of the Saylorsburg branch - Saylorsburg to Saylorsburg Jct Linen ? 75

6345 3070 12-3151 Profile of line from Bethlehem to Benders Jct., PA Linen ? 756345 3071 12-3151 Profile of line from Bethlehem to Benders Jct., PA Blue print ? 7511506 3046 12-3151 Map of Carbon County Blueprint ? 7511523 3069 12-3151 Plan for proposed realignment of tracks at Hainesburg junction Blueprint 2/11/1927 7511567 3044 12-3151 Standard switch for standard 130 lb rail with adjustable braces Linen 12/4/1933 75

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I29342935293629372938293929402941294229432944

2945294629472948294929502951295229532954

Page 84 of 194Page 84 of 194

295429552956

295729582959

2960

296129622963

2964

2965

2966

2967

2968

set sht 10 3056 12 bolts and hex nuts be on Creek 75

s

11579 3042 12-3151 Details of 1'6" switch for RE rail with adjustable braces Linen 3/1/1940 75A-1072 3074 12-3151 Wiring diagram for stoker drive at Pen Argyl enginehouse Blueprint 6/1/1941 75A1216 3073 12-3151 Foundations for stoker and ash system at Pen Argyl enginehouse Blueprint 6/1/1941 75

dup. 8005 3051 12-3151 Stress sheet for bridge over Lizard Creek on Tamaqua division Blueprint 6/8/1911 75dup. 8005B 3050 12-3151 Bridge over Lizard Creek on Tamaqua division Blueprint 6/8/1911 75

GF-2 3041 12-3151 State of PA - guard fence standard - type 1-C Blueprint 6/30/1936 75no number 3045 12-3151 Proposed streets south of West Union Blvd. In Bethlehem, PA Blueprint 4/5/1914 75no number 3047 12-3151 Tracks showing entrance to Lehigh Portland Cement Co. Linen ? 75no number 3048 12-3151 Track map of Bath showing crossings at Main and Race streets Linen ? 75no number 3049 12-3151 Map of Lehigh County Blueprint ? 75no number 3076 12-3151 Steel required for bridge over Lehigh River at Catasauqua Linen 1/18/1933 75

no number 3077 12-3151Anchor and swedge bolts required for bridge over Lehigh RiveCatasauqua

r at tablet paper 1/17/1933 75

no number 3078 12-3151 Washers, bolts and nuts required for bridge over Lehigh River tablet paper 1/28/1933 75no number 3082 12-3151 Drainage statistics - Palmerton, Gap Junction and Palmerton East Linen ? 75no number 3098 12-3151 Form for listing of bridges - location, purpose and character Linen ? 75

S-192 3040 12-3151 State of PA - standard reinforced concrete bridge - span 14' Blueprint 4/12/1926 75set 127 sht 1 3075 12-3151 Girders for bridge over Lehigh River at Catasauqua, PA Linen 1/19/1935 75set 127 sht 2 3080 12-3151 Floor beams, stringers and brackets for bridge over Lehigh River 1/19/1933 75set 127 sht 3 3079 12-3151 Diagonals base rates for bridge no. 6.21 over Lehigh River Linen 1/19/1933 75set 4 sht 1 3060 12-3151 Masonry plan for bridge over Lizard Creek - Tamaqua extension Blueprint 8/4/1911 75

set 4 sht 10 4 3056 12-31513151 Swedge bolts and hex nuts to be used on Lizard Creek bridgeSwedge to used Lizard bridge Blueprint 9/13Blueprint 9/13/1911/1911 75set 4 sht 12 3058 12-3151 Standard GI washers to be used on Lizard Creek bridge Blueprint 10/11/1911 75set 4 sht 1a 3065 12-3151 1st deck plate girder span for bridge over Lizard Creek - sheet 1 Blueprint 9/6/1911 75

set 4 sht 1b 3066 12-31511st deck plate girder span for bridge over Lizard Creek - Tamaextension

qua Blueprint 8/26/1911 75

set 4 sht 2 3064 12-3151 1st deck plate girder span for bridge over Lizard Creek Blueprint 9/6/1911 75set 4 sht 3 3063 12-3151 Floor plan for bridge over Lizard Creek - Tamaqua extension Blueprint 9/22/1911 75

set 4 sht 4 3062 12-3151Deck plate girder span for bridge over Lizard Creek - Tamaquextension

a Blueprint 9/6/1911 75

set 4 sht 5 3061 12-3151Deck span girders for bridge over Lizard Creek - Tamaqua extension Blueprint 9/6/1911 75

set 4 sht 6 3052 12-3151 Bridge over Lizard Creek at station 684+42 Blueprint 9/18/1911 75set 4 sht 7 3053 12-3151 Bridge over Lizard Creek at station 684+92 Blueprint 9/13/1911 75

sheet #10 3095 12-3151Drainage statistics - main line - Tamaqua extension - Danielsvsheet no. 10

ille - Linen ? 75

heet #11, #13 3090 12-3151Drainage statistics - main line Danielsville to Hainesburg Jct. - sheet no. 13 ? 75

sheet #12 3097 12-3151Drainage statistics - main line - Danielsville - Hainesburg Jct. sheet 12

- Linen ? 75

sheet #14 3089 12-3151Drainage statistics - main line Danielsville to Hainesburg Jct. -sheet no. 14

Linen ? 75

sheet #15 3088 12-3151Drainage statistics - main line Danielsville to Hainesburg Jct. -sheet no. 15

Linen ? 75

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

296929702971

2972

297329742975

2976

2977297829792980298129822983298429852986

s

Page 85 of 194Page 85 of 194

2987298829892990299129922993299429952996

29972998

2999

30003001

3002

aVV

V #

V #

V #

sheet #16 3087 12-3151Drainage statistics - main line Danielsville to Hainesburg Jct. -sheet no. 16

Linen ? 75

sheet #17 3086 12-3151 Drainage statistics - main line Danielsville to Hainesburg Jct. Linen ? 75sheet #18 3085 12-3151 Drainage statistics - main line to Pine Island - sheet no. 18 Linen ? 75

heet #19, #20 3084 12-3151Drainage statistics - main line to Hainesburg Jct. to Pine IslanNY

d, Linen ? 75

sheet #2 3099 12-3151Drainage statistics - Nesquehoning branch - Hauto - Nesquehoning - sheet no. 2 Linen ? 75

sheet #6 3092 12-3151 Drainage statistics - main line - Tamaqua extension - Danielsville Linen ? 75sheet #7 3091 12-3151 Drainage statistics - main line - Tamaqua extension - Danielsville Linen ? 75

sheet #8 3093 12-3151Drainage statistics - main line - Tamaqua extension - Danielsvsheet no. 8

ille - Linen ? 75

sheet #9 3094 12-3151Drainage statistics - main line - Tamaqua extension - Danielsvsheet no. 9

ille - Linen ? 75

V.3g/2 3043 12-3151 Right of way map of Bangor branch of the L&NE RR Blueprint 6/30/1919 75A4-1139 3136 12-3138 Martins Creek general layout with Alpha Portland Cement Co. Blueprint 11/26/1924 76A4-1647 3131 12-3138 Parcels comprising Alpha Portland Cement Company Blueprint 3/2/1936 76A4-1654 3135 12-3138 Right of way of the L&NE through Alpha Portland Cement Co. Blueprint 4/6/1936 76

a-445 3137 12-3138 Alpha Portland Cement property at Easton, PA 11/3/1919 76no number 3132 12-3138 Deed from DL&W RR to Alpha Portland Cement Co. Stock 12/18/1939 76no number 3134 12-3138 Proposed coal drying installation at #4 plant Blueprint 2/13/1948 76

Sheet 1 3122 12-3138 Bridges on the main line from Hauto to Tamaqua Linen ?/?/1918 76Sheet 2 3123 12-3138 Bridges on the main line from Tamaqua to Danielsville Linen ? 76sheet 3 3124 12-3138 Bridges on the main line from Tamaqua to Danielsville Linen ? 76sheet 4 3125 12-3138 Bridges on the main line from Tamaqua to Danielsville - sheet #4 Linen ? 76sheet 5 3126 12-3138 Bridges on the main line from Tamaqua to Danielsville - sheet #5 Linen ? 76sheet 6 3127 12-3138 Bridges on the main line from Tamaqua to Danielsville - sheet #6 Linen ? 76sheet 7 3128 12-3138 Bridges on the main line from Tamaqua to Danielsville - sheet #7 Linen ? 76sheet 8 3129 12-3138 Bridges on the main line from Danielsville to Pine Island - sheet #8 Linen ? 76sheet 9 3130 12-3138 Bridges on the main line from Danielsville to Pine Island - sheet #9 Linen ? 76

l . 24 NY No. 3139a 12-3138 Right of way and track map of the Goshen & Deckertown Railroad Blueprint 6/20/1919 76al. 24 NY No. 3138 12-3138 Right of way of the Goshen & Deckertown Railroad Blueprint 6/30/1918 76al. 24 NY No. 3139 12-3138 Pine Island branch of the Goshen & Deckertown Railroad Blueprint 6/30/1918 76

Val.21 #188 3133 12-3138Right of way of the DL&W RR from Bangor, Portland and MarCreek

tins Blueprint ? 76

alue sect. 1 3119 12-3138 Drainage statistics - main line - Panther Creek Valley - Tamaqua Linen ? 76

alue sect. 1a # 3101 12-3138Drainage statistics - Nesquehoning branch - Hauto - Nesquehoning - sheet no. 1 Linen ? 76

Value sect. 2 3100 12-3138Drainage statistics - Lizard Creek Junction branch - Semel - LCreek Jct.

izard Linen ? 76

alue sect. 2 3111 12-3138 Drainage statistics - Bangor Junction - Bangor (2 copies?) Linen ? 76

alue sect. 2 3104 12-3138Drainage statistics - main line - Tamaqua - Danielsville - shee4

t no. Linen ? 76

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

3003

3004

300530063007

3008

3009

3010

30113012

3013

3014

30153016

3017

V #

a

a

Page 86 of 194Page 86 of 194

3017

3018301930203021

302230233024

302530263027302830293030

3031

3032

a

alue sect. 2 3103 12-3138Drainage statistics - main line - Tamaqua - Danielsville - shee5

t no. Linen ? 76

Value sect. 3 3109 12-3138Drainage statistics - Bushkill Quarry branch - Bushkill Jct. - Bushkill Quarry Linen ? 76

lue sect. 3 &3 3108 12-3138Drainage statistics - Nazareth branch - Pen Argyl to NorthampJct.

ton Linen ? 76

alue sect. 3b # 3117 12-3138 Drainage statistics - Bethlehem branch - Benders Jct. - Bethlehem Linen ? 76alue sect. 3b # 3118 12-3138 Drainage statistics - Bethlehem branch - Benders Jct. - Bethlehem Linen ? 76

lue sect. 3b 1 3102 12-3138Drainage statistics - Bethlehem branch - Benders Jct. - Bethle- sheet no. 1 of 4

hem Linen ? 76

alue sect. 3c # 3113 12-3138Drainage statistics - Catasauqua branch - Crane Junction - Catasauqua Linen ? 76

alue sect. 3c # 3114 12-3138Drainage statistics - Catasauqua branch - Crane Junction - Catasauqua Linen ? 76

Value sect. 3d 3116 12-3138Drainage statistics - Saylorsburg branch - Saylorsburg Jct. - Daylors Lake Linen ? 76

alue sect. 3e # 3112 12-3138 Drainage statistics - Nazareth branch - Bath Jct. - Martins Creek Linen ? 76

alue sect. 3e # 3105 12-3138Drainage statistics - Nazareth branch - Bath Jct. - Martins Cresheet no. 2

ek - Linen ? 76

alue sect. 3e # 3106 12-3138Drainage statistics - Nazareth branch - Bath Jct. - Martins Cresheet no. 3

ek - Linen ? 76

Value sect. 3g 3121 12-3138East Bangor branch - Quarry Junction - Upper Bangor - drainastatistics

ge Linen ? 76

alue sect. 3h # 3115 12-3138 Drainage statistics - Allentown branch - Allen Jct. - Allentown Linen ? 76

lue sect.3b #2 3107 12-3138Drainage statistics - Bethlehem branch - Benders Jct. - Bethle

2 f- sheet 2 of 4hem

Linen ? 76

5509 3167 12-3138Plan showing Lake branch encroachments and clearances of buildings Linen 11/13/1914 77

5515 3148 12-3138 Map showing the PP&B RR through Slatington, PA Blueprint 4/19/1890 775525 3168 12-3138 Map showing land required for right of way thru the Craig Estate Linen 1/30/1911 775531 3146 12-3138 Plan showing plan of L&NE through property of James Delp Linen 7/1/1911 77

5539 3145 12-3138Plan of expansion of Panther Creek Railroad - Greenwood to Tamaqua Linen 6/11/1912 77

5544 3149 12-3138 Plan showing property to be secured from Elmer Schneck Linen 5/24/1913 775550 3165 12-3138 Plan of room framing for one stall enginehouse at Pen Argyl Tissue 1/21/1913 77

5557 3147 12-3138Arrangement of cement tile plates for roof of Pen Argyl enginehouse Blueprint 1/31/1918 77

5570 3161 12-3138 LVRR plan showing proposed new freight yard at Lizard Creek Jct. Tracing 8/3/1914 775570 3162 12-3138 LVRR plan showing proposed new freight yard at Lizard Creek Jct. Blue print 8/13/1914 776210 3143 12-3138 Steel, bolts and rivets required for L&NE bridge Blueprint ? 776211 3151 12-3138 Specifications of Fairbanks railroad track scale Blueprint ? 776232 3169 12-3138 NYO&W between Smartswood Jct., NJ and Hainesburg Jct., NJ Blueprint 1/?/1910 77

6238 3166 12-3138Map of L&NE properties and adjoining properties at CatasauqPA

ua, Linen 8/16/1917 77

6260 3164 12-3138Plan showing relocation of township road between Pen Argyl Wind Gap

and Linen 10/13/1920 77

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I303330343035

3036

30373038

30393040

3041

30423043

3044

3045

3046

30473048

V

V

V

V

V

V

V

Page 87 of 194Page 87 of 194

3048

304930503051305230533054305530563057305830593060

3061

3062306330643065

5002 3207 12 3137 Profile of L&NE from Pen Argyl to mile post no 89 Craft ? 78

6264 3141 12-3138 Map of lands and tracks of the L&NE at Catasauqua Linen 6/16/1921 776268 3142 12-3138 Plan showing grade crossing at Orange Farm, NY Linen 9/10/1921 776282 3163 12-3138 Plan showing passage of L&NE RR through Hugh L. Davie Estate Linen ? 77

6299 3160 12-3138Floor plan for replacement of bridge at Berks Street, CatasauqPA

ua, Linen 5/8/1925 77

al. 24 NY No. 3159 12-3138Pine Island branch of Goshen & Deckertown RR - station 353to 3592+40

9+60 Blueprint 6/30/1918 77

5584A 3144 12-3138 General location and plan of shops in Borough of Wind Gap Blueprint 12/3/1915 77

6211A 3150 12-3138Details of railroad track scale to be purchased from St. JohnsbVT

ury, Blueprint ? 77

E2 3152 12-3138 Tie plan for twin span turntable at Pen Argyl Blueprint 9/9/1955 77

al. 24 NY No. 3157 12-3138Pine Island branch of Goshen & Deckertown RR - station 340to 3486+80

0+00 Blueprint 6/30/1918 77

al. 24 NY No.1 3153 12-3138Pine Island branch of the Goshen & Deckertown RR operatedErie

by Blueprint 6/30/1918 77

al. 24 NY No. 3140 12-3138 Pine Island branch of the Goshen & Deckertown Railroad Blueprint 6/30/1918 77

al. 24 NY No. 3156 12-3138Pine Island branch of Goshen & Deckertown RR - station 332to 3381+20

8+40 Blueprint 6/30/1918 77

al. 24 NY No. 3155 12-3138Pine Island branch of Goshen & Deckertown RR - station 338to 3434+00

1+20 Blueprint 6/30/1918 77

al. 24 NY No. 3158 12-3138Pine Island branch of Goshen & Deckertown RR - station 348to 3539+60

6+80 Blueprint 6/30/1918 77

al. 24NY No.1 3154 12-3138Pine Island branch of the Goshen & Deckertown RR operatedErie

by Blueprint 6/30/1918 77

5002 3207 12 3137- Profile of L&NE from Pen Argyl to mile post no 89 . Craft ? 78

5012 3209 12-3137Grade profiles of the L&NE RR from Campbell Hall to MartinsCreek

Craft ? 78

5038 3206 12-3137 Proposed change of line near Danielsville, Northampton County Linen 8/14/1011 785329 3208 12-3137 Profile of L&NE fro Danielsville to Lehigh Gap Craft ? 785385 3171 12-3137 Railroad locations from Blackwood to Lyons, PA on the PRR Linen 7/2/1924 785500 3204 12-3137 Map showing proposed elimination of grade crossings at Bath, PA Linen ? 785517 3196 12-3137 General drawing of station signal quadrant Blueprint ? 785524 3182 12-3137 NYNH&H map of station grounds at Campbell Hall, NY Blueprint 5/?/1905 785526 3179 12-3137 Plan showing connections with the Pottsville branch of the LVRR Linen 2/13/1911 785533 3181 12-3137 Map and profile of grade crossings at stations 556+15 and 568+56 Linen 7/22/1911 785537 3185 12-3137 Plat and profile of public crossing at Danielsville, PA Linen 5/31/1912 785542 3174 12-3137 Plan showing tracts 165 and 168 of Tamaqua extension Linen 3/11/1913 785560 3184 12-3137 Plan showing land to be acquired from property of H. Fehr Blueprint 5/23/1913 78

5571 3192 12-3137Plan showing proposed connections of Palmerton branch andZinc Co.

NJ Linen 11/17/1914 78

5577 3178 12-3137Plan showing proposed connection of Palmerton branch with Zinc Co.

NJ Linen 3/17/1915 78

5582 3193 12-3137 Profile of proposed siding West of Danielsville Linen 6/3/1915 785584 3173 12-3137 Location of new yards and shops at Wind Gap Linen 12/3/1915 785595 3183 12-3137 Pencil map of L&NE from Cockersville to Homers Quarry Craft paper ? 78

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

306630673068306930703071

30723073307430753076307730783079

3080

30813082

3083

Page 88 of 194Page 88 of 194

3084

30853086

3087308830893090

309130923093

3094

3095309630973098

Pl ow NJ

6202 3188 12-3137Route of the Blue Ridge Traction Co. from Danielsville to Slatington Blueprint 5/?/1902 78

6205 3198 12-3137 Profile of Blue Ridge Traction Co. from Danielsville to Slatington Blueprint ?/?/1902 786206 3202 12-3137 Profile of Blue Ridge Traction Co. from Slatington to Danielsville Blueprint ?/?/1902 786215 3186 12-3137 Plan for new track scale at Pen Argyl Blueprint ? 786224 3172 12-3137 Drawings for L&NE extension - Danielsville to Tamaqua Linen ? 786230 3180 12-3137 Details of track scales at Pen Argyl Blueprint ? 78

6234 3199 12-3137Middletown & Unionville extension from Johnson, NY to WilcoNY

x, Blueprint 9/21/1916 78

6243 3205 12-3137 Lehigh Navigation Electric Co. - Bangor distribution line Blueprint 5/15/1914 786247 3194 12-3137 Plan showing proposed departure tracks at Wind Gap Linen 3/26/1918 786248 3200 12-3137 Map showing tracks from Smartswood Jct. To Durrey Craft paper 9/30/1918 786249 3190 12-3137 Land to be acquired from Blue Ridge Real Estate at Ashfield, PA Linen 12/19/1918 786258 3177 12-3137 Plan showing proposed state highway crossing at Tuscoraro, PA Graph 7/26/1920 786260 3203 12-3137 Plan showing relocation of road from Pen Argyl to Wind Gap Blueprint 10/13/1920 786283 3195 12-3137 Profile of the L&NE from Port Clinton to New Ringold Blueprint 11/?/1908 78

6291 3175 12-3137Plan showing widening and improvement of line between QuaPortland

rry & Linen 7/2/1923 78

6297 3189 12-3137Plan showing quantities of excavation for each mile of road onmain line

Linen 2/12/1925 78

6298 3201 12-3137 Diagram showing excavation required for branch lines Linen 2/12/1925 78

11526 3187 12-3137LVRR Seneca division - bridge 358 over public highway at Manchester, NY Blueprint 12/16/1915 78

5580A 3170 12-3137Plan showing proposed connection Palmerton branch with NJan sh ing proposed connection - Palmerton branch with Zinc Co.

Blueprint 4/22/1915 78

5584A 3197 12-3137General plan of new shops and yards in Wind Gap and PlainTownship

field Blueprint 12/3/1915 78

6210A 3176 12-3137 Details of railroad track scale to be erected at Pen Argyl Blueprint ? 78

5230 3225 12-3137Map of adjacent properties between Race and Bridge StreetsCatasauqua

in Craft 12/18/1918 79

5386 3210 12-3137 Top of rail elevations from Sussex Junction to Pine Island Graph 7/15/1924 795504 3248 12-3137 Map showing track operations in Schuylkill County (2 copies) Linen ? 795522 3213 12-3137 Profile of N&S&W and W&B railroads in Pocono mountain area Craft ? 79

5534 3216 12-3137 Plat showing proposed change of highway in West Penn Township Linen 2/12/1912 795538 3211 12-3137 Plat and profile of public road crossing near Danielsville, PA Linen 6/4/1912 795543 3212 12-3137 Plan showing land required for extension in Lehigh Township Linen 4/19/1913 79

5551 3219 12-3137Plan showing proposed extension of L&NE in Borough of Catasauqua Linen 1/13/1911 79

5575 3242 12-3137Plan showing proposed additions to engine and yard facilitiesMation (Erie)

at Blueprint 5/?/1912 79

5599 3215 12-3137 Profile of grades on the DL&W for system Blueprint ? 796213 3217 12-3137 Plan for proposed railroad track scales at Pen Argyl Blueprint ? 796221 3243 12-3137 Line map showing total length of land of Albert Bowman Estate Linen ? 79

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

30993100

3101

3102

3103

3104

3105

3106

3107

3108

310931103111

3112

Page 89 of 194Page 89 of 194

3113

3114

3115

3116311731183119312031213122312331243125

3126

31273128

L&NE d Rid Stree hi

6238 3226 12-3137L&NE property between Race and Bridge Streets in Catasauq(2 copies)

ua Van Dyke 8/16/1917 79

6267 3246 12-3137 Plan showing grade crossing at Orange Farm, NY Tracing 9/17/1921 79

6284 3235 12-3137Plan showing location of state road between Wind Gap and PArgyl

en Blueprint 5/11/1922 79

6284 3236 12-3137Plan showing location of state road between Wind Gap and PArgyl

en Blueprint 4/21/1922 79

6284 3237 12-3137Plan showing location of state road between Wind Gap and PArgyl

en Linen 12/10/1928 79

6284 3238 12-3137Plan showing location of state road between Wind Gap and PArgyl

en Blueprint 5/11/1922 79

6284 3239 12-3137Plan showing location of state road between Wind Gap and PArgyl

en Blueprint 5/5/1922 79

6284 3240 12-3137Plan showing location of state road between Wind Gap and PArgyl

en Blueprint 5/11/1922 79

6284 3241 12-3137Plan showing location of state road between Wind Gap and PArgyl

en Blueprint 12/10/1928 79

6286 3247 12-3137L&NE dispatchers record of movement of trains East and Westbound trains Linen ? 79

6290 3218 12-3137Plan showing revision of grade from Quarry Junction to PortlaPA

nd, Linen 6/27/1923 79

6359 3244 12-3137 Plan for L&NE highway crossing at Lewisburg, NJ Tracing 11/5/1951 796359 3245 12-3137 Plan for L&NE highway crossing at Lewisburg, NJ Blue print 4/5/1950 79

5534A 3214 12-3137 Plat showing proposed change of highway in West Penn Township Linen 9/26/1921 79

6238A 3220 12-3137Map of L&NE between Race and Ridge Streets in LehightonMap of between Race an ge ts in Le ghton Borough 10/18/1917 79

6238A 3221 12-3137Profile of the L&NE through property of Lehigh Coal & NavigaCo.

tion Van Dyke 8/16/1913 79

6238B 3222 12-3137L&NE and adjoining properties between Race and Bridge StreCatasauqua

ets, Blueprint 8/16/1917 79

6238C 3224 12-3137Map of L&NE between Race and Bridge Streets in Borough oCatasauqua

f Blueprint 7/14/1920 79

6238D 3223 12-3137 Map of property between Race and Dodge Streets in Catasauqua Blueprint 8/16/1916 796285A 3229 12-3137 West elevation for new L&NE freight station at Allentown, PA Blueprint ?/?/1922 796285B 3228 12-3137 Second floor rear elevation for new freight station at Allentown, PA Blueprint ?/?/1922 796285C 3230 12-3137 Foundation plan for new L&NE freight station at Allentown, PA Blueprint ?/?/1922 796285C 3231 12-3137 Foundation plan for new L&NE freight station at Allentown, PA Blueprint ?/3/1922 796285D 3232 12-3137 PA Blueprint ?/?/1922 796285E 3234 12-3137 East elevation for new freight station for L&NE at Allentown, PA Blueprint ?/?/1922 796285F 3227 12-3137 Plan for freight station at Hanover Ave., Allentown, PA (first floor) Blueprint ?/?/1914 796285F 3233 12-3137 First floor plan for new freight station at Allentown Blueprint ?/?/1922 79

no number 3249 12-3137Map showing proposed connection of the L&NE with the NewJersey Zinc Co.

Blueprint 4/27/1915 79

5302 3275 12-3136General location plan of new shops and yards in Borough of WGap

ind Craft 4/11/1916 80

5308 3288 12-3136 Profile showing changes in North line of L&NE from Greenville Craft 12/?/1889 80

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

3129313031313132

3133

313431353136

3137

3138

3139

3140

3141

3142

3143

Page 90 of 194Page 90 of 194

3 3

31443145

3146

31473148314931503151

31523153315431553156315731583159

55 9 80

5344 3287 12-3136Map showing right of way to be acquired to serve Old Bangor Slate Co. Linen 7/22/1918 80

5348 3286 12-3136 Plan showing proposed rearrangement of tracks at Rahn Colliery Linen 11/15/1918 805372 3289 12-3136 Map showing adjustment of division lines with Bangor Slate Co. Blueprint 3/15/1906 805508 3284 12-3136 Map showing plan and profile change at Ashfield, PA Linen 10/10/1913 80

5511 3273 12-3136Plat showing land to be acquired from Robert Andreas in EasPenn Twp

t Blueprint 10/11/1911 80

5514 3270 12-3136Map showing proposed change in main line between Phillips aSummit

nd Linen 9/6/1905 80

5523 3259 12-3136 Profile of East Bangor branch of the L&NE RR Linen ? 805527 3260 12-3136 Map of drainage basis at Snyders, PA Linen 2/9/1911 80

5528 3266 12-3136Plan for proposed extension between Tamaqua and ChestnutRidge

Blue print 3/13/1911 80

5528 3267 12-3136Plan for proposed extension between Tamaqua and ChestnutRidge

Blue print 3/13/1911 80

5528 3269 12-3136Plan for proposed extension between Tamaqua and ChestnutRidge

Blue print 4/13/1911 80

5529 3274 12-3136Plat showing land to be acquired from Polly Zettlemoyer in EaPenn Twp

st Linen 6/16/1911 80

5535 3271 12-3136 Plat showing proposed change in highway at West Penn Township Linen 11/26/1911 80

5566 3254 12-3136Route of the Blue Ridge Transportation Co. from Slatington toDanielsville

Linen 5/?/1902 80

55733 32503 50 12-31363 36Crane railroad showing proposed track connection with the LVat Catasauquaq

RR Linene 5/235/ 3//1914 80

5580 3261 12-3136Proposed connection with the Palmerton branch and New Jersey Zinc Co. 4/22/1915 80

5586 3278 12-3136 Yard adjacent to locomotive and repair shops at Pen Argyl Linen 2/3/1916 80

6203 3279 12-3136Route of the Blue Ridge Transportation Co. from Slatington toDanielsville

Blueprint 5/?/1902 80

6208 3279 12-3136Route of the Blue Ridge Transportation Co. from Slatington toDanielsville

Blueprint 5/?/1902 80

6214 3252 12-3136 Timber required for railroad track scale (sheet 1 of 2 sheets) Blueprint ? 806239 3276 12-3136 Map and profile of Campbell Hall Connecting RR in NY and NJ Linen 07/29/1889 806254 3255 12-3136 Plan showing proposed siding at Palmerton, Carbon County Linen 3/29/1920 806274 3277 12-3136 Property of the Wind Gap and Delaware Railroad at Bangor (Map) Blueprint 05/31/1883 80

62046207 3251 12-3136Profile of the Blue Ridge Traction Company from Slatington toDanielsville

Blueprint ?/?/1902 80

5504 -1 3272 12-3136 Map showing various tracts of land acquired for the L&NE Blueprint ? 805584A 3285 12-3136 "G" Blueprint ? 806210B 3262 12-3136 Plan for railroad track scale at Pen Argyl, PA Blueprint ? 806213B 3253 12-3136 Timber required for railroad track scale (sheet 2 of 2 sheets) Blueprint ? 806229A 3256 12-3136 Proposed plan for railroad track scale (sheet 1 of 3 sheets) Blueprint ? 806229B 3257 12-3136 Proposed plan for railroad track scale (sheet 2 of 3 sheets) Blueprint ? 806229C 3258 12-3136 Proposed plan for railroad track scale (sheet 3 of 3 sheets) Blueprint ? 80

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

3160316131623163316431653166316731683169

31703171

3172

31733174

3175

31763177

Page 91 of 194Page 91 of 194

3177

317831793180

318131823183

318431853186

3187318831893190319131923193

5203 3329 12 3136 Map showing proposed branch of the L&NE to Howersville PA Bl 08/?/1903 81

no number 3265 12-3136Plan for proposed extension between Tamaqua and ChestnutRidge

Tracing 3/13/1911 80

no number 3268 12-3136 Form showing inventory of track, switches, frogs, etc. Linen ? 80no number 3282 12-3136 Stencil for Lehigh & New England Anthracite Building Linen ? 80

1153 3352 12-3136 Index 5591- Profile of L&NE in the American Bangor area Blueprint ? 815033 3312 12-3136 Proposed connection of L&NE with the LV RR Linen 2/8/1911 815061 3298 12-3136 Plan showing proposed interchange track with LV at Lizard Creek Blueprint 8/17/1914 815105 3349 12-3136 Profile between station 5280+07.1 to station 5574+31 Linen 3/31/1926 815106 3340 12-3136 Profile of Campbell Hall Connecting Railroad showing base of rail Linen 3/31/1926 815107 3343 12-3136 Plan showing encroachments on right of way at Wind Gap Linen 5/26/1926 815116 3355 12-3136 Schuylkill division alignment - Philadelphia to Pottsville Craft 6/21/1918 81

5121 3342 12-3136Plan showing four tracts of land conveyed to the L&NE from LBarber

evi Linen 8/1/1928 81

5141 3348 12-3136 Plan showing locomotive and car repair shops at Pen Argyl Linen 4/8/1935 81

5144 3363 12-3136Plan showing location of building in vicinity of tunnel at Catasauqua Linen 9/26/1936 81

5149 3341 12-3136Profile showing former & present base of rail - Owens to Libercrossing

ty Linen 12/28/1939 81

5160 3364 12-3136 Profile base of rail from mp 101 to mp 106 Linen 2/16/1949 81

5200 3296 12-3136Preliminary survey - L&NE at Wind Gap and L&LR at SaylorsbPA

urg, Craft 04/?/1905 81

5202 3335 12-3136Map showing proposed change in line of L&NE near DanielsvPA

ille, Craft 08/?/1903 81

5203 3329 12 3136- Map showing proposed branch of the L&NE to Howersville PA , Blueprint 08/?/1903ueprint 81

5204 3331 12-3136Index 5204 - private properties through which the L&NE passeColumbia County

s in Craft ? 81

5221 3333 12-3136 Map showing proposed yard development at Sussex Jct., NY Linen 9/23/1914 815224 3313 12-3136 Estimate of excavation required for various portions of the L&NE Craft ? 81

5225 3324 12-3136Index 5225 - profile and elevation diagram at various points athe L&NE

long Craft ? 81

5229 3379 12-3136 Profile of line from Maiden Creek to Lenhartsville, PA Craft 11/?/1889 815231 3314 12-3136 Estimate of excavation required for various portions of the L&NE Craft ? 81

5233 3316 12-3136Index 5233 - presumed profile of the L&NE in various areas-unbuilt Bernville Craft ? 81

5234 3339 12-3136 Index 5234 - profile of the L&NE South to Le Roy, PA Craft ? 815238 3338 12-3136 Index 5213 - Preliminary line to Harrisburg from Hamburg Linen ? 81

5242 3334 12-3136Profile of L&NE between Delaware River and Walnut Port on Lehigh River

the Craft ? 81

5243 3303 12-3136 Index 5243 - a line from station 710 to station 1220 Craft ? 815248 3311 12-3136 Profile of projected location in New Jersey Columbia to Balealine Craft ? 815253 3370 12-3136 Index 5253 - profile of L&NE between Pen Argyl and Slatington Craft ? 815254 3309 12-3136 Profile of P&PRR from Slatington to Bankelsville Linen ? 815256 3322 12-3136 Index 5256 - profile of the L&NE in various places along the line Craft ? 815257 3299 12-3136 Excavation required between Wind Gap and Bangor Junction Craft ? 81

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3194319531963197319831993200

3201320232033204320532063207

320832093210

3211

3212 0

Page 92 of 194Page 92 of 194

321232133214

32153216321732183219

3220322132223223

3224

3225322632273228

12 ?

5258 3373 12-3136 Profile of PP&B RR from Hainesburg and Danielsville, PA Craft ? 815261 3323 12-3136 Index 5761 - profile of the L&NE in various places along the line Craft ? 815270 3321 12-3136 Owners through which the L&NE passes in various counties Tissue,graph ? 815273 3330 12-3136 Various private properties through which the L&NE RR passes Linen ? 815274 3336 12-3136 Index 5274 - profile and elevation of L&NE near Danielsville, PA Linen ? 815277 3295 12-3136 Profile and elevation of L&NE in the vicinity of Deckertown Craft ? 815281 3327 12-3136 L&NE adjacent to property of Alvin Kistler and William Shaffer Linen ? 81

5287 3332 12-3136Private properties through which the L&NE passes between mand mp 28

p 20 Tissue ? 81

5287 3372 12-3136 Excavation required between Swartswood Junction and mp 19 Craft ? 815289 3310 12-3136 Profile of L&NE between mp 11 and mp 20 Tissue ? 815301 3376 12-3136 Profile of line from Lenhartsville, PA to Leesport, PA Craft 11/?/1889 815303 3375 12-3136 Index 5303 - excavation plan between mp 1 and mp 65 Craft ? 815305 3297 12-3136 L&NE excavation required between mp 99 and mp 87 Craft ? 815309 3302 12-3136 Excavation diagram for various sections of L&NE RR Craft 10/19/1889 81

5310 3305 12-3136Little Swatara Valley - profile of line from Shartleaville to Jonestown Craft ? 81

5316 3301 12-3136 excavation Tissue ? 815318 3328 12-3136 Index 5318 - excavation diagram for various portions of L&NE Tissue ? 81

5321 3308 12-3136Index 5231 - presumably refers to an excavation along the L&(2 copies)

NE Graph ? 81

53255325 3323320 12-31363136Connection of L&NE with Peoples Coal and Supply Companycopies)copies)

(2 TissueTissue ? 8181

5328 3304 12-3136 Index 4328 - title unknown - presumably pertains to an excavation Tissue ? 815330 3300 12-3136 Profile of L&NE between Ashfield and Andreas Craft ? 81

5333 3371 12-3136Index 5233 - profile of L&NE between station 1868+71.1 and 1442+62.4 Craft ? 81

5338 3377 12-3136 Plan showing proposed extension of siding at Andreas, PA Linen 1/29/1918 815340 3374 12-3136 Index 5340 - plan of buildings at Pen Argyl, PA Craft ? 815346 3292 12-3136 PA Blue print 10/28/1918 815346 3293 12-3136 PA Blue print 7/15/1957 81

5347 3294 12-3136 Topographical map of L&NE Eastward from MP 51 near Wind Gap Linen 11/4/1918 815356 3306 12-3136 Index 5356 - excavation required from various portions of L&NE Craft ? 815370 3378 12-3136 Land of Achenbach & Heany occupied by the WG&D RR Craft 09/10/1888 815373 3290 12-3136 Map showing lines of WG&D RR and PS&NE RR Craft 2/15/1886 81

5377 3307 12-3136Profile of projected line Bath Portland Mill to main line East of Arandts Craft ? 81

5530 3346 12-3136Plat showing land required for line extension at West Penn Township Linen 6/30/1911 81

5552 3347 12-3136 Map showing proposed yard at Pen Argyl - scales as shown Linen 2/18/1923 815567 3344 12-3136 Index 5557 - encroachments by L&NE on various property owners Craft ? 819000 3350 12-3136 Chart of NYS&W from Hainesburg to Stewartstown, NJ Linen 12/31/1925 81

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

3229

323032313232

3233323432353236323732383239324032413242324332443245324632473248

Page 93 of 194Page 93 of 194

3248324932503251

325232533254325532563257

3258

32593260

3261

326232633264

5004 3450 12 3076 Pl L&NE Linen 9/30/1914 82

5393 sht 1 3358 12-3136Right of way and track map between L&NE and Lehigh TelepCo.

hone Blueprint 3/11/1935 81

5393 sht 2 3359 12-3136Right of way and track map through property of Mt. Bethel MilCo.

ling Blueprint 3/11/1935 81

5393 sht 3 3360 12-3136 Right of way and track map between Quarry Junction and Stier Blueprint ? 815393 sht 4 3362 12-3136 Right of way and track map through Bangor, PA Blueprint ? 81

5442A 3345 12-3136Map showing proposed change in location of L&NE near WesBangor

t Blueprint 8/26/1902 81

no number 3315 12-3136 L&NE trackage at Martins Creek, PA & Benders Junction Linen ? 81no number 3317 12-3136 Map of various buildings along the L&NE Tracing ? 81no number 3318 12-3136 Map of various buildings along the L&NE Tracing ? 81no number 3319 12-3136 Map of various buildings along the L&NE Tracing ? 81no number 3351 12-3136 Profile of the L&NE between Allentown and Bethlehem, PA Linen ? 81no number 3353 12-3136 Profile of the L&NE between East Allen and lower Mt. Bethel Linen ? 81no number 3365 12-3136 Rail specifications from station 5533+50 to station 5362 yellow paper ? 81no number 3366 12-3136 Rail specifications from station 5533+50 to station 5362 yellow paper ? 81no number 3367 12-3136 Rail specifications from station 5542 to station 394.69 yellow paper ? 81no number 3368 12-3136 Rail specifications from 5502 to station 5571 yellow paper ? 81no number 3369 12-3136 Profile of L&NE between mp 100 and mp 101 Linen ? 81

5000 3476 12-3076 Profile of line and list of property holders in vicinity of Pen Argyl Craft ? 825001 3437 12-3076 Profile of Decheadent to Pine Island for L&NE Craft ? 825003 3458 12-3076 Profile of Slatington division of the PP&B RR Craft 09/16/1889 825004 3450 12 3076- Plan of L&NE sign for freight stationan of sign for freight station Linen 9/30/1914 825005 3464 12-3076 Profile of PP&B RR Pine Island to Emmons Station Craft ? 825006 3473 12-3076 Profile of the L&NE in the vicinity of Penn Allen Summit Craft ? 825007 3465 12-3076 Map showing L&NE RR passing through various property owners Linen ? 82

5010 3472 12-3076Profile of preliminary line from Harrisburg to Swartswood, NJ PP&B RR

- Craft 01/?/1890 82

5013 3445 12-3076 Profile of the L&NE from Summit to Bath, PA Linen ? 825014 3459 12-3076 L&NE plan for siding at Campbell Hall, NY Blueprint 1/22/1911 825016 3466 12-3076 Map showing proposed branch of the L&NE to Howersville, PA Linen 08/?/1904 825023 3452 12-3076 Plan showing proposed L&NE siding at Florida, NY Linen 4/7/1914 825024 3444 12-3076 Map showing L&NE track in the vicinity of Bushkill Junction Linen ? 82

5034 3440 12-3076 Map of P&R Schuylkill & Susquehanna branch Rockville to Auburn Blueprint ?/?/1914 82

5036 3457 12-3076Plat showing land required for right of way through J.H. Breineproperty

r Linen 8/10/1911 82

5039 3470 12-3076 Plan of proposed change of line near Danielsville, PA Linen 8/12/1911 82

5040 3436 12-3076Plan for connection of North and South gradings Katellen, Northampton County Linen 8/25/1911 82

5043 3449 12-3076Map of proposed change in L&NE from Danielsville to HowertJunction

on Linen 11/15/1911 82

5047 3434 12-3076 Chart of traffic moving for August - showing average daily motion Linen 10/7/1912 825053 3463 12-3076 US Pipe line proposed crossing of tracks of L&NE Craft 2/26/1914 82

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3265

326632673268326932703271

3272

32733274

3275

327632773278

327932803281

Page 94 of 194Page 94 of 194

3282

3283

328432853286

328732883289329032913292329332943295329632973298

Plan showing proposed commercial siding extension at Pine

5055 3455 12-3076 Map of the Mary D Colliery branch showing the L&NE RR Linen 8/4/1914 82

5056 3461 12-3076Plan and profile of proposed passing siding East of ArmstrongSussex County

, Linen 7/28/1914 82

5058 3432 12-3076 Plan showing the right of way of the Chestnut Ridge Railway Linen 9/1/1914 825067 3448 12-3076 Profile of the L&NE from Pen Argyl to Benders, PA Craft ? 825082 3467 12-3076 Details of flue and rattler drum for Pen Argyl repair shop Linen 11/29/1915 825083 3447 12-3076 Plan of the L&NE from Pen Argyl to Crown Slate Company Linen 12/6/1915 825085 3462 12-3076 Profile of main line and Westbound yard at Pen Argyl Linen 3/4/1915 82

5086 3460 12-3076L&NE diagram showing telegraph and telephone lines and locof selectors

ation Linen 3/25/1918 82

5088 3478 12-3076Map showing public road crossings on the L&NE in the statesPA and NJ

of Linen 5/21/1916 82

5088 3479 12-3076 Map showing public road crossings in states of NJ and NY Blueprint 3/21/1916 82

5095 3443 12-3076Map showing L&NE through property of B.L. Clements and FrSnyder

ank Linen 8/22/1916 82

5097 3441 12-3076Map showing trackage of the L&NE through Lehigh Coal & Navigation Co. Blueprint ? 82

5137 3409 12-3076 Profile of located highway near mp 57 at Handelong, PA Graph 10/17/1932 825154 3416 12-3076 Plan showing track West of Wilcox where accident occurred Linen 10/4/1944 82

5157 3401 12-3076Plan and profile showing track from mp 7.50 to 7.08 Rahn Township Linen 8/20/1947 82

5205 3425 12-3076 Map of proposed branch of the L&NE at Howers Slate Quarries Linen 8/?/1903 825207 3410 12-3076 Map showing proposed siding near Augusta, NJ Linen 9/30/1908 82

5209 3402 12-3076Plan showing proposed commercial siding extension at Pine Island Jct. Linen 05/?/1910 82

5211 3383 12-3076Proposed connections between PP&B RR and LV at SlatingtoPA

n, Linen ? 82

5212 3393 12-3076Map showing eight tracks of Eastbound classification yard at PArgyl

en Linen ? 82

5213 o numb 12-3076 Preliminary line to Harrisburg via Hamburg Linen no date 825214 3420 12-3076 Plan showing rebuilding of trestle bridge at Black Creek Linen 12/31/1908 82

5220 3421 12-3076Plan showing property belonging to NYS&W and occupied byL&NE

the Linen 1/4/1910 82

5235 3469 12-3076 Profile of the L&NE RR through various property holders Craft ? 825236 3475 12-3076 Profile of proposed connection with the CRR of NJ near Pen Argyl Craft ? 825240 3477 12-3076 Projection profile of the L&NE between Lehigh Gap and West end Craft ? 825244 3424 12-3076 Grade profile of the L&NE from Slatington to Pine Island Jct., NY Blueprint 10/?/1900 825245 3413 12-3076 Profile map of the L&NE from mp 60 to mp 62 Craft ? 825246 3474 12-3076 Profile and list of property owners in vicinity of Penn Allen Summit Craft ? 825247 3414 12-3076 Grand profile of the L&NE from Slatington to Pine Island Jct., NY Blueprint 10/?/1900 825249 3430 12-3076 Profile of L&NE from Slatington to Lehigh Gap station Craft ? 825252 3428 12-3076 Preliminary projection map from Columbia to Swartswood Craft ? 825255 3417 12-3076 Profile of PP&B RR between Benders and Danielsville Craft ? 825259 3471 12-3076 Dry masonry culverts and iron bridges between section 39 and 42 Craft ? 82

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I329933003301330233033304330533063307330833093310

331133123313331433153316331733183319

Page 95 of 194Page 95 of 194

3319

3320

3321

3322

33233324

33253326

3327332833293330

33313332

3333

5339 3442 12 Plan at Slate Junction, Linen 82

5260 3385 12-3076 Profile of the PP&B RR between Pen Argyl, PA and Benders, PA Craft 03/?/1890 825262 3415 12-3076 Proposed spur of the PP&B RR from Wilcox to Granite Quarries Craft ? 825264 3468 12-3076 Profile of the L&NE in the vicinity of Pen Argyl, PA Craft ? 825265 3417 12-3076 Profile of PP&B RR between Benders and Danielsville Craft ? 825272 3387 12-3076 Preliminary profile of PP&B RR from Walnutport to Danielsville Linen ? 825275 3418 12-3076 Projection profile of the L&NE at Bangor Junction Craft ? 825276 3429 12-3076 Estimate to install siding to Lees Gravel Bank Craft 2/?/1889 825288 3408 12-3076 Profile of L&NE from mp 28 to mp 32 Graph ? 825297 3412 12-3076 Map showing proposed yard extension at Sussex Jct., NJ Linen 2/15/1917 825299 3453 12-3076 Map of the L&NE from Danielsville to Slatefield Craft ? 825304 3389 12-3076 Party line from station 3540 to station 4680 Craft ? 825307 3456 12-3076 3831 Craft 12/?/1889 82

5311 3422 12-3076Profile of the L&NE and property to be acquired in vicinity of Summit Craft ? 82

5312 3426 12-3076 Map of PP&B RR North of the Hamburg and Jonestown Line Craft 11/?/1889 825313 3406 12-3076 Profile of line from Slatington to Derry, PA (101 miles) Craft 11/?/1889 825314 3433 12-3076 Draubenspeck Cut from station 1230-73 to 1237+27 Graph ? 825331 3419 12-3076 Profile of L&NE RR between mp 20 and mp 28 Craft ? 825332 3382 12-3076 Progress profile of fifth residency of L&NE RR Craft ? 825335 3397 12-3076 Profile of the L&NE to Maryd, PA copied from original Tissue 12/31/1917 825337 3427 12-3076 Plan showing proposed extension of siding at Knapp, PA Linen 1/28/1918 825339 3442 12-30763076 Plan showing proposed siding at Slate Junction, PA showing proposed siding PA Linen 2/112/11/1918/1918 82

5342 3454 12-3076Alliance Coal Co. - Plan showing proposed lease from Shanferoone Coal Co. Blueprint 12/31/1917 82

5343 3390 12-3076Map showing right of way to be acquired from Bangor ExcelsiQuarry

or Linen 6/25/1918 82

5345 3400 12-3076Map showing location of road crossings through property of CCroof

& Linen 6/3/1918 82

5349 3439 12-3076Plan showing portion of Rahn Colliery branch near Seek, Schuylkill County Linen 12/14/1918 82

5350 3395 12-3076 Map showing lines of Lehigh Navigation and Electric Co. Blueprint 07/31/1893 82

5357 3403 12-3076Plan showing crossing of Maryd branch at Tuscoraro, PA Schuylkill County Linen 5/25/1920 82

5358 3438 12-3076 Map of the right of way of the Lehigh & Susquehanna RR Linen 6/8/1920 82

5360 3396 12-3076Plan showing location of proposed state highway crossing at Tuscoraro, PA Linen 7/26/1920 82

5366 3388 12-3076 Map showing lands to be conveyed to the Crane Iron Works Linen 4/19/1921 825366 3411 12-3076 Map showing lands to be conveyed to Crane Iron Works Blueprint 4/19/1921 825376 3380 12-3076 Profile of line from St. Clair to New Philadelphia Craft ? 82

5378 3394 12-3076Plan showing engine terminal and changes of main line at Tamaqua, PA Linen 7/26/1920 82

5381 3405 12-3076 Chart showing the L&NE from Lizard Creek Jct. To Blackwood, PA Linen 3/7/1924 82

5387 3392 12-3076Map showing location of reservoir, pipe line and water columnMt. Bethel

at Linen 7/28/1924 82

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3334

3335

3336

3337

333833393340

3341334233433344

3345

33463347334833493350

Page 96 of 194Page 96 of 194

3350

33513352

33533354335533563357335833593360

33613362

33633364

33653366

5051 3483 12 Linen ?

5536 3404 12-3076 Plan showing location of state highway in West Penn Township Linen 4/23/1912 82

5569 3391 12-3076Map showing proposed interchange with the L&NE and LV at Lizard Creek Jct. Linen 7/9/1914 82

5366-X 3398 12-3076Map showing lands to be conveyed to the Crane Iron Works aCatasauqua, PA

t Blueprint 4/19/1921 82

5366-X 3399 12-3076Map showing lands to be conveyed to the Crane Iron Works aCatasauqua, PA

t Blueprint 4/19/1921 82

5529A 3407 12-3076Plat showing land required for right of way through ShellhammEstate

er Blueprint 6/26/1911 82

no number 3451 12-3076 Map of the L&NE and properties through which RR passes Linen ? 825011 3489 12-3076 Profile of lower line from Pen Argyl to Benders Jct. Craft ? 83

5018 3495 12-3076Profile of the L&NE and NYS&W between Tamaqua and JersCity, NJ (2 copies)

ey Linen ? 83

5019 3510 12-3076 Map of proposed public road between Pen Argyl and Wind Gap Craft ? 835021 3506 12-3076 Map showing L&NE along Columbus Street and Decatur Street Linen ? 835022 3499 12-3076 Map of the PP&B RR yard at Slatington, PA Blueprint 08/12/1890 83

5032 3491 12-3076Plat showing land required for right of way through Neff and Fritzinger Linen 3/2/1911 83

5035 3484 12-3076Map showing land required for right of way through property oJ.A. Semmel

f Linen 4/24/1911 83

5037 3487 12-3076 Plat showing location of temporary trestle Linen 7/18/1911 835042 3488 12-3076 Plat showing proposed changes of public road at Danielsville, PA Linen 10/26/1911 835046 3505 12-3076 Map showing the location of a stream at station 133+40 Linen 10/4/1912 835051 3483 12-30763076 Map of L&NE track alignment and adjacent property ownersp g j p p y Linen ? 8383

5054 3482 12-3076Map showing location of open wires of Bell Telephone Del Brito Fox Gap

dge Linen 4/18/1914 83

5063 3509 12-3076 Diagram showing tracks in Hainesburg yard Linen 11/23/1914 83

5064 3500 12-3076Plan showing proposed interchange with Chestnut Ridge Railat E. Palmerton

road Linen 12/8/1914 83

5069 3485 12-3076 Plan showing proposed yard development at Sussex Junction, NJ Linen 4/26/1915 835074 3504 12-3076 Plan showing location of poles and wires at Slatington yard Linen 5/27/1915 835084 3503 12-3076 Plan for new locomotive repair shops at Pen Argyl Tissue 8/16/1914 835088 3480 12-3076 Map showing public road crossings in states of NJ and NY Blue print 3/21/1916 835088 3481 12-3076 Map showing public road crossings in the states of NJ and NY Blue line 3/21/1916 835089 3511 12-3076 Jct. Linen 4/1/1916 835094 3501 12-3076 L&NE map showing tracks at Campbell Hall, NY Linen 7/21/1916 83

5210 3502 12-3076Map showing proposed change from mile post 16 to Summit Station Linen ? 83

5263 3497 12-3076 Profile of the main line of the B&P RR Craft ? 83

5268 3490 12-3076Profile of the L&NE and connection with NYS&W at HainesbuJunction

rg Linen ? 83

5271 3507 12-3076 Map showing excavation required in vicinity of Benders, PA Craft ? 83

5295 3496 12-3076Extension from Johnson to Wilcox of Middletown & Unionville Railroad Craft ? 83

5298 3508 12-3076 Plan showing additional tracks at Campbell Hall, NY Linen 5/13/1917 83

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I336733683369

33703371

3372

33733374337533763377337833793380338133823383338433853386

Page 97 of 194Page 97 of 194

33863387338833893390

33913392339333943395

3396

3397339833993400340134023403

11570 3514 12 3076 Pl ow d k PA Linen 10/18/1934 83

5375 3492 12-3076 Plan showing tracks in Pen Argyl yard Linen 2/2/1922 835375 3493 12-3076 Plan showing tracks in Pen Argyl yard Blue print 2/22/1922 835840 3522 12-3076 Proposed shop layout at Pen Argyl - proposition no. 2 Linen 3/23/1900 83

5845 3539 12-3076Contour map of Augusta and vicinity showing crossing of PP&RR at Sussex

B Linen 8/21/1889 83

5866 3535 12-3076 Heating plans, oil house, store house and offices at Pen Argyl Linen 5/28/1915 83

6182 3527 12-3076L&NE, Pen Argyl special type hatchway roof, hopper bottom scars

teel Blue print 11/23/1939 83

11501 3512 12-3076Relocation of main line for reduction of grade between mp 59 mp 62

and Linen 8/15/1923 83

11511 3528 12-3076 Plan for bridge on Albion Quarry branch at Pen Argyl Linen 1/26/1927 8311513 3525 12-3076 Profile of P&R RY between Port Clinton and Landingville, PA Blue Print ? 8311519 3526 12-3076 Elevation profile of the main line of the L&NE RR Craft ? 8311523 3538 12-3076 Plan of proposed rearrangement of tracks at Hainesburg Junction Linen 2/11/1927 8311524 3530 12-3076 LV RR bridge over highway 17 miles East of Clifton Springs, NY Blueprint 9/6/1915 8311527 3513 12-3076 LVRR bridge over Fish Creek East of Victor, NY Blueprint 11/20/1915 8311528 3529 12-3076 LV RR bridge over creek 0.1 West of Phelpts, NY Blueprint 1/25/1916 8311543 3533 12-3076 Details of 16' 6" switch for 100 lb ARA type B rail Linen 1/30/1930 8311545 3523 12-3076 Plan for bridge at SH 226 in West Penn Township Tracing 10/11/1930 8311545 3524 12-3076 Plan for bridge at SH 226 in West Penn Township Blue Print 10/11/1930 8311549 3536 12-3076 Details of 16' 6" switch as used on the L&NE RR Blueprint 12/16/1930 8311557 3531 12-3076 Road map of the state of New Jersey Craft ? 8311570 3514 12 3076- Plan showing freight house and team track at Bangor PAan sh ing freight house an team trac at Bangor, Linen 10/18/1934 8311591 3517 12-3076 Map showing tracks and right of way at Pen Argyl, PA Linen 08/18/1897 835221A 3498 12-3076 L&NE plan showing proposed yard extension at Sussex Jct., NJ Craft 9/23/1914 83

no number 3516 12-3076 Map showing transfer of property from Andrew Bitz to John Bitz Tissue 12/30/1939 83no number 3518 12-3076 Map showing transfer of property from George Ihre to George Bits Tissue 4/3/1968 83

no number 3519 12-3076Map showing transfer of property from John Repsher and GeoIhre

rge Tissue ? 83

no number 3520 12-3076 Map showing transfer of property from Robert L. Shoock Linen ? 83no number 3521 12-3076 Map showing transfer of property from George Bitz Linen ? 83no number 3534 12-3076 Details of 16' 6" reinforced split switch Blue Print 3/29/1928 83no number 3537 12-3076 Profile of top of rail for Penn Dixie #6 Graph 11/18/1952 83

no number 3541 12-3076Relocation of L&NE to accommodate new highway at Pen Argcopies)

yl (2 paper ? 83

no number 3542 12-3076Sketch showing parking area in Bethlehem at Cherokee & Brighton Streets Linen 6/10/1938 83

no number 3543 12-3076 Sketch of L&NE RR at West Goepp St. in Bethlehem, PA Linen 4/19/1937 83no number 3544 12-3076 Profile of L&NE at Columbus St., Roseto, PA Craft ? 83no number 3545 12-3076 Crossing of the L&NE and Chestnut Ridge Railway Linen ? 83no number 3546 12-3076 Profile of the L&NE between Lehigh Avenue and Vineard Street Linen ? 83no number 3547 12-3076 Profile of the L&NE between Goshen and Kippe Street Linen ? 83no number 3548 12-3076 Profile of the L&NE in the vicinity of Penna Avenue Tissue 11/21/1940 83

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I34043405

3406

340734083409341034113412341334143415341634173418

34193420342134223423

Page 98 of 194Page 98 of 194

3423342434253426

34273428342934303431

3432343334343435343634373438

34393440

3550 12 3077 Cross section showing cripple track at Tadmor yard Ti 12/31/1937 84

no number 3549 12-3076 Plan showing proposed location of siding in Allentown Linen 3/4/1938 83147 3561 12-3077 Drawings of Penna highways in Schuylkill County (16 pages) Blueprint 11/?/1953 84

3913 3571 12-3077Plan showing property to be secured from Ellen Myers, NazarPA

eth, Blueprint 8/1/1912 84

5129 3554 12-3077Sketch for reinforcing West abutments of bridge at Martins Cr(2 copies)

eek Linen 7/19/1939 84

5140 o num b 12-3077 Plan showing facilities of AT&T, West Penn Twp. Linen 12/31/1934 845513 o numb 12-3077 Map of the L&NE to the American Bangor Quarry Blueprint no date 845591 3552 12-3077 Proposed future grade line at section station 400+0 (2 copies) Tissue, Craft ? 845802 3556 12-3077 Map of right of way of Lehigh and Lackawanna Railroad Linen 05/?/1904 845804 3557 12-3077 Map of Lehigh & Lackawanna Railroad in Moore Township Linen 05/?/1904 845805 3559 12-3077 Map of the L&NE between Wind Gap and Pen Argyl, PA Linen 9/4/1913 845863 3560 12-3077 Map showing a part of Northampton County, PA Linen 7/15/1915 845891 3568 12-3077 Plan showing location through land of Thomas W. App Linen 5/20/1913 845933 3572 12-3077 Map showing Pen Argyl tracks along the Albion branch Blueprint ? 846121 3566 12-3077 Switch angle head cut A and flange cut B (2 copies) Blue Print ? 846186 3573 12-3077 Proposed Diesel servicing facilities at the Pen Argyl terminal Tissue 12/4/1947 84

11589 o numb 12-3077Proposed siding for Andreas Quarry, West Penn Township, Schuylkill C., PA Linen 84

5854A 3567 12-3077 Map showing the L&NE RR and slate quarries Craft 01/?/1909 845863-C 3555 12-3077 Topographic map showing part of Northampton County Blueprint 7/14/1915 84A4-1647 3574 12-3077 Chart showing location of Atlas Portland Cement Co. Blueprint 8/12/1959 84

no numberno number 3550 12 3077- Cross section showing cripple track at Tadmor yard Tissue 12/31/1937ssue 84no number 3551 12-3077 Plan showing location of proposed sidings at Martins Creek Tissue 2/2/1937 84no number 3563 12-3077 Street map of the L&NE showing sidings in Bath, PA Tissue 1/15/1960 84no number 3564 12-3077 Street map of Wind Gap showing L&NE sidings tissue 1/18/1960 84

no number 3576 12-3077Bangor and Belvidere quadrangle topographic maps showing L&NE Craft ?/?/1943 84

no number 3577 12-3077 Bangor quadrangle topographic map showing the L&NE RR Craft ?/?/1943 84no number 3578 12-3077 Easton quadrangle topographic map showing the L&NE RR Craft ?/?/1946 84no number 3579 12-3077 Profile of Pulaski Highway Linen 7/10/1948 84

Pa-R58 3569 12-3077 Progressive development layout of plant reconstruction Blueprint 12/5/1954 84

Pa-R58 3570 12-3077Progressive layout of plant reconstruction through property ofBok

J.E. Blueprint 12/5/1954 84

5830 3607 12-3077 Proposed changes in the right of way of the L&NE Blueprint 12/?/1910 855855 3613 12-3077 Plan showing proposed extension to Bangor Excelsion Quarry Linen 3/6/1916 855899 3612 12-3077 Plan showing proposed connection at Lizard Creek with the LV RR Linen 7/3/1914 856172 3593 12-3077 Plan showing grade crossing in vicinity of Pine Island, NY Linen 7/1/1935 856172 3594 12-3077 Plan showing grade crossing in vicinity of Pine Island, NY Blue print 7/1/1935 856172 3595 12-3077 Plan showing topography in vicinity of Pine Island grade crossing Blue print 7/1/1935 85

6173 3610 12-3077Map of the L&NE showing location of collieries, quarries & cemplants

ent Blueprint 1/1/1936 85

6311 3598 12-3077 Volume diagram on the Bangor branch of the L&NE Linen ? 85

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I344134423443

3444

3445

344634473448344934503451

34523453345434553456345734583459

Page 99 of 194Page 99 of 194

34593460346134623463

3464

3465

3466

3467

3468346934703471

3472

3473

no 3590 12 Tissue 85

6357 3597 12-3077 Detail of property lines along Front Street in Catasauqua, PA Blueprint 1/7/1946 8511539 3611 12-3077 16' 6" reinforced split switch for L&NE RR Blueprint 5/1/1928 8511548 3599 12-3077 LV RR proposed new tunnel through Musconetcong Mountain Blueprint 6/14/1927 85

11572 3581 12-3077Plan showing topography in vicinity of grade crossing at OranFarm, NY

ge Linen 7/17/1956 85

11572 3583 12-3077Plan showing topography in vicinity of grade crossing at OranFarm, NY

ge Linen 11/26/1941 85

11572 3584 12-3077Plan showing topography in vicinity of grade crossing at OranFarm, NY

ge Vandyke 11/26/1941 85

11572 3585 12-3077 Plan showing topography in vicinity of Orange Farm, NY Blueprint 10/11/1935 8511572 3586 12-3077 Plan showing topography in vicinity of Orange Farm, NY Blue line prin11/26/1941 8511572 3587 12-3077 Plan showing topography in vicinity of Orange Farm, NY Blue line prin 7/17/1956 85

84 sht 11 3615 12-3077 Sheet #1 floor plan for steel bridge for the L&NE Linen 3/10/1922 8584 sht 3 3619 12-3077 Girders for single track bridge no. 100.024 Linen 5/5/1922 85

84 sht 4 3618 12-3077Bottom laterals for L&NE bridge to be built by the Bethlehem SCo.

teel Linen 5/9/1922 85

84 sht 7 3614 12-3077 Sheet #3 floor plan for steel bridge for the L&NE Linen 5/31/1922 8584 sht 8 3616 12-3077 Erection diagram for single track bridge for the L&NE RR Linen 5/12/1922 85

no number 3580 12-3077 Plan of the Goshen & Deckertown RR in vicinity of Pine Island Tissue 6/30/1918 85no number 3582 12-3077 Profile of Pulaski Highway Blue line prin ? 85no number 3588 12-3077 DL&W and L&HR tracks in vicinity of Andover, NJ Tissue 6/13/1957 85no number 3589 12-3077 Plan showing the L&HR and NYS&W at Sparta Junction Tissue ? 85no number number 3590 12-30773077 Plan showing the NYC, Erie and L&HR RR at Campbell Hall, g , & p , NY Tissue 6/136/13/1957/1957 85no number 3591 12-3077 Plan showing the Erie and L&HR RR at Greycourt, NY Tissue 6/13/1957 85no number 3592 12-3077 Plan showing the L&NE through Blue Ridge Real Estate Co. Blueprint ? 85no number 3596 12-3077 Valuation map of the L&NE in vicinity of Chester Township Blueprint ? 85V-22-NY/1 3600 12-3077 Right of way and track of the Montgomery & Erie Railway Blueprint 6/30/1918 85

V-22-NY/2 3602 12-3077Right of way of the Montgomery & Erie Railroad - Montgomerbranch (2 copies, one in bad condition)

y Blueprint 5/16/1922 85

V-22-NY/3 3604 12-3077Right of way of the Montgomery & Erie RR station 3224+10 to3276+90

Blueprint 6/30/1918 85

v-22-NY/4 3603 12-3077Right of way of the Montgomery & Erie Railroad - Montgomerbranch

y Blueprint 6/30/1918 85

V-22-NY/5 3605 12-3077Right of way of the Montgomery & Erie RR station 3329+70 to3382+50

Blueprint 6/30/1918 85

V-22-NY/6 3606 12-3077Right of way of the Montgomery & Erie RR station 3382+50 t3423+20

o Blueprint 6/30/1918 85

5853 3642 12-3078 Details of PRR standard turntable with piper center wheels Blueprint ? 865927 3643 12-3078 Proposed changes in the L&NE right of way near Benders Linen 12/?/1910 86

114 sht 1 3651 12-3078 Profile of the L&NE between station 990+00 to 1000+100 Blueprint 8/9/1929 86

114 sht 17 3657 12-3078Commonwealth of Pennsylvania - standard method of placingbar Mat Reinf

D Blueprint 4/28/1928 86

114 sht 18 3655 12-3078Commonwealth of Pennsylvania for placing of type A reinforcement Blueprint 3/26/1928 86

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

34743475

3476

347734783479348034813482

3483348434853486

3487

3488348934903491

Page 100 of 194Page 100 of 194

3491349234933494

3495349634973498

349935003501

35023503

3504350535063507

C201 3625 12 3078 Material required for cast steel pedestal for new L&NE bridge Bl 11/29/1911 86

114 sht 19 3654 12-3078Commonwealth of Pennsylvania - standard concrete bridge - span

40' Blueprint 2/16/1926 86

114 sht 2 3652 12-3078 Profile of the L&NE between station 970+00 to station 979+98 Blueprint 8/19/1929 86

114 sht 20 3653 12-3078Commonwealth of Pennsylvania - standard abutments for spa20 to 45 feet

ns Blueprint ? 86

114 sht 22 3649 12-3078Commonwealth of PA - standard superstructure for 30' 40' & 5roadways

0' Blueprint 3/24/1939 86

114 sht 24 3647 12-3078 4 10/11/1929 86114 sht 25 3646 12-3078 Required list of materials for bridge over Lizard Creek - sheet #25 Blueprint 10/12/1929 86114 sht 26 3644 12-3078 Drawings for construction SH 226 in Schuylkill County Blueprint 11/28/1930 86114 sht 3 3658 12-3078 Required list of material of digging cut and exposing of fill Blueprint 8/9/1929 86114 sht 6 3660a 12-3078 919+50 Blueprint 8/9/2029 86

114 sht 7 3660 12-3078Required list of material for cut between stations 910+00 to st920+00

a Blueprint 9/9/1929 86

114sht 21 3650 12-3078 Commonwealth of PA - standard piers for spans 12' to 45' Blueprint 10/24/1925 86114sht 23 3648 12-3078 4 Blueprint ? 8684 sht 13 3620 12-3078 Pedestals and floor beam for single track L&NE bridge Trace 5/15/1922 86

C1 3626 12-3078Steel guard rail bolts and standard hook bolts for new L&NE bridge Trace 4/9/1912 86

C1 3640 12-3078 Standard guard rail bolts and standard hook bolts for L&NE bridge Blueprint 1/3/1912 86C2 3628 12-3078 Standard washers for new L&NE bridge Trace 3/4/1912 86C2 3638 12-3078 Standard steel washers and floor bolts required for L&NE bridge Blueprint 12/26/1911 86

C201 3625 12 3078- Material required for cast steel pedestal for new L&NE bridge Blueprint 11/29/1911ueprint 86C202 3624 12-3078 Cast steel pedestal required for L&NE bridge Blueprint 11/29/1911 86C202 3630 12-3078 Material required for cast steel pedestal for new L&NE bridge Blueprint 12/14/1911 86C203 3623 12-3078 Details for Bars of L&NE bridge and pedestals Blueprint 11/29/1911 86

C203 3629 12-3078Cast steel material required for L&NE bridge on Tamaqua extension Blueprint 12/14/1911 86

C204 3622 12-3078 Swedge and stone bolts, and washers required for L&NE bridge Blueprint 11/29/1911 86C3 3627 12-3078 Cut washers to be used on new L&NE bridge Trace 3/9/1912 86C3 3639 12-3078 Cut washers and lag screws required for L&NE bridge Blueprint 1/3/1912 86

D1 3635 12-3078 L&NE Tamaqua extension crossing Lehigh River near Lehigh Gap Linen 5/8/1911 86E1 3637 12-3078 Masonry plan for L&NE bridge over Lehigh River near Lehigh Gap Linen 5/18/1911 86E1a 3636 12-3078 Detail for bed plates for bridge over the Lehigh River Linen 6/30/1911 86

E2 3634 12-3078Floor plan for L&NE bridge crossing Lehigh River on Tamaquextension

a Linen 12/26/1911 86

E3 3632 12-3078 Floor plan for L&NE bridge on the Tamaqua extension Linen 12/26/1911 86

E4 3633 12-3078Floor plan for L&NE bridge on the Tamaqua extension near LGap

ehigh Linen 12/26/1911 86

E5 3621 12-3078 Floor plan for bridge crossing Lehigh River near Lehigh Gap Linen 12/26/1911 86no number 3631 12-3078 General office questionnaire used in intrasystem correspondence reg. Paper ? 86no number 3645 12-3078 Construction under clearances on the main line of the L&NE 5/1/1950 86

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I35083509

351035113512

351335143515

3516351735183519

352035213522352335243525

3526

Page 101 of 194Page 101 of 194

35263527

3528352935303531

353235333534

3535

35363537

3538353935403541

no number 3656 12-3078 Required list of material for revised width of right of way Blueprint 8/9/1929 869324 3679 12-3078 Details of boiler house to be built at Pen Argyl house Linen 4/15/1915 87

114 sht 8 3665 12-3078Required list of material required for fill stations 830+00 and 840+00 Blueprint 10/11/1929 87

114 sht 10 3669 12-3078 Required list of material for fill between stations 800+00 to 812+00 Blueprint ? 87114 sht 14 3667 12-3078 Commonwealth of Pennsylvania - details of standard inlets Blueprint 6/5/1929 87

114 sht 15 3666 12-3078Commonwealth of Pennsylvania - standard end walls and retawalls

iningBlueprint 6/5/1929 87

114 sht 16 3663 12-3078 Standard cross sections for various type track roads Blueprint 6/5/1929 87114 sht 4 3662 12-3078 Required list of material for fill between station 940+00 to 950+00 Blueprint 8/9/1929 87

114 sht13 3668 12-3078Commonwealth of Pennsylvania - details of reinforced concrepavements

te Blueprint 8/30/1929 87

E2 3680 12-3078 Details for boiler house for the L&NE at Pen Argyl Blueprint 5/12/1915 87no number 3661 12-3078 Required list of material for fill between station 920+00 to 930+00 Blueprint 8/9/1929 87no number 3664 12-3078 820+00 Blueprint 10/12/1929 87

no number 3670 12-3078Commonwealth of Pennsylvania - details of miscellaneous standards Blueprint 2/20/1930 87

no number 3671 12-3078 Required list of material for fill between stations 790+00 to 800+00 Blueprint ? 87no number 3672 12-3078 Track layout of the L&NE in Pen Argyl, PA Linen 3/21/1945 87no number 3674 12-3078 Required list of material needed to upgrade main right of way Blueprint 1/30/1957 87no number 3675 12-3078 Required list of material needed L&NE in Caron County Blueprint 1/30/1957 87no number 3676 12-3078 Typical section at RR pier of cantilever structure Blueprint 1/30/1957 87

no number 3677 12-3078Required list of material for relocation in Lehigh Twp. and Tomamensing Twp. Blueprint 1/30/1957 87

no number 3678 12-3078 Required list of material for relocation in East Towamwnsing Twp. Blueprint 1/30/1957 87

no number 3697 12-3078Electric washers and holes required for new Pan Argyl boiler house Trace ? 87

no number 3706 12-3078 Partial list of stringers required for Pen Argyl engine house Trace 4/16/1925 87no number 3707 12-3078 Partial list of stringers and diagonals for Pen Argyl boiler house Trace 4/16/1925 87

sheet 1 3681 12-3078 Required list of roof trusses for L&NE Pen Argyl boiler house Linen 5/10/1915 87

sheet 2 3682 12-3078Columns and roof trusses required for L&NE Pen Argyl boiler house Linen 5/10/1915 87

sheet C1 3704 12-3078 Anchor bolts and swedge bolts for new Pen Argyl boiler house Trace 5/10/1915 87sheet C2 3699 12-3078 Bearing plates required for use on the new Pen Argyl boiler house Trace 5/11/1915 87

sheet C3 3698 12-3078List of hook bolts required for use on the new Pen Argyl boilerhouse

Trace 5/12/1915 87

sheet C5 3693 12-3078List of rods and swedge bolts required for the Pen Argyl boilerhouse

Trace 5/12/1915 87

sheet C6 3694 12-3078 Graphite to be used in construction of Pen Argyl boiler house Trace 5/14/1915 87

sheet C7 3692 12-3078List of button heal field rivets to be used on Pen Argyl engine house Trace 5/14/1915 87

sheet C8 3684 12-3078 Lintel L-6 for new L&NE boiler house at Pen Argyl Trace 6/9/1915 87sheet C9 3685 12-3078 Swedge and hex nuts required for L&NE Pen Argyl boiler house Trace 7/26/1915 87sheet E1 3683 12-3078 Foundation plan for new L&NE boiler house at Pen Argyl Trace 6/9/1915 87

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3542

354335443545354635473548354935503551355235533554355535563557

3558

3559

3560

Page 102 of 194Page 102 of 194

35603561

3562356335643565

3566

3567356835693570

35713572357335743575

3576

5886 3745 12 3/12/1913 88

sheet EF1 3702 12-3078 Truss members with peak plates on boiler house at Pen Argyl Trace 5/10/1915 87

sheet EF2 3703 12-3078Trusses, columns and beams to be used on boiler house at PArgyl

en Trace 5/14/1915 87

sheet F1 3688 12-3078 Miscellaneous steel structures required for Pen Argyl boiler house Trace 5/11/1915 87sheet F2 3689 12-3078 Post foundation for boiler house foundation at Pen Argyl Trace 5/11/1915 87sheet F2 3690 12-3078 Detail of steel columns for Pen Argyl engine house Trace 5/12/1915 87sheet F3 3686 12-3078 Posts and lintels required for L&NE Pen Argyl boiler house Trace 5/11/1915 87sheet F3 3700 12-3078 Rivets required for new Pen Argyl engine house Trace 5/14/1915 87sheet F4 3687 12-3078 Lintels to be used in construction of Pen Argyl boiler house Trace 5/12/1915 87sheet F5 3705 12-3078 Partial list of steel columns for new Pen Argyl boiler house Trace 5/12/1915 87sheet F7 3691 12-3078 Detail of steel columns for Pen Argyl engine house Trace 5/12/1915 87sheet F8 3696 12-3078 Struts and wall angles required on the new Pen Argyl boiler house Trace 5/12/1915 87sheet F9 3695 12-3078 Struts and holes required on the new Pen Argyl engine house Trace 5/12/1915 87sheet K1 3701 12-3078 Half truss and bottom chord for Pen Argyl boiler house Trace ? 87sheet M4 3709 12-3078 List of timber bolts, cut washes and square nuts for boiler house Linen 6/16/1925 87sheet M5 3708 12-3078 List of hook bolts, cut washers and square nuts for boiler house Linen 6/16/1925 87

Val 21/187 3673 12-3078 Right of way of the DL&W between Portland and Martins Creek Blueprint ? 87

5816 3721 12-3091Plan showing proposed branch line to Hackson-Bangor Slate Quarries Linen 10/25/1909 88

5829 3743 12-3091Map showing slate properties and quarries of the Pen Argyl Company Blueprint ?/?/1901 88

5886 3745 12-30913091Map showing proposed extension of the L&NE from Snyder toCatasauquaq

BlueprintBlueprint 3/12/1913 88

8009 3724 12-3091 Plate girders for bridge over Lizard Creek on Tamaqua extension Blueprint 7/26/1911 88

8 sht 1 3727 12-3091Deck plates for bridge over Lizard Creek on the Tamaqua extension Blueprint 9/13/1911 88

8 sht 2 3728 12-3091 Floor plan for bridge over Lizard Creek at station 1251 Blueprint 10/21/1911 888 sht 4 3719 12-3091 Detail of lag screws required for bridge over Lizard Creek Blueprint 10/4/1911 888 sht 5 3720 12-3091 Swedged bolts required for bridge over Lizard Creek Blueprint 9/18/1911 88

8 sht 6 3723 12-3091Standard guard and hook bolts required for Catasauqua boilehouse

r Blueprint 10/4/1911 88

8 sht 7 3722 12-3091Standard cast iron washers for floor bolts for Catasauqua boilhouse

er Blueprint 10/4/1911 88

8 sht 8 3718 12-3091 Material cast iron required for bridge over Lizard Creek Blueprint 9/18/1911 888 sht 9 3717 12-3091 Steel wire nails required for bridge over Lizard Creek Blueprint 10/4/1911 888009A 3725 12-3091 Plate girders and stress sheet for bridge over Lizard Creek Blueprint 6/8/1911 88

98 sht 2 3711 12-3091Floor beams, stringers and diagonal bracing for Pen Argyl bohouse

iler Linen 4/17/1925 88

98 sht 3 3712 12-3091 Plate girder span for Pen Argyl boiler house Linen 4/17/1925 8898 sht 4 3715 12-3091 Detail of plate girder spans for boiler house at Catasauqua, PA Linen 4/17/1925 8898 sht 5 3716 12-3091 Detail of plate girder spans for boiler house at Catasauqua, PA Lilnen 4/17/1925 8898 sht 6 3714 12-3091 Laterals and struts & plate girder spans for Pen Argyl boiler house Linen 4/17/1925 88

98 sht 7 3713 12-3091Columns, cross bracing and girders to be used on Pen Argyl bhouse

oiler Linen 4/17/1925 88

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I35773578

357935803581

3582

358335843585358635873588

3589359035913592359335943595

Page 103 of 194Page 103 of 194

3595359635973598359936003601360236033604360536063607360836093610

3611

36123613

333 3739 12 10/7/1917 88

e p

98 sht 8 3710 12-3091 Elevation view of roof trusses for boiler house at Pen Argyl Linen 1/29/1925 88no number 3729 12-3091 Commonwealth of Pennsylvania - miscellaneous standards Blueprint 6/5/1929 88

no number 3730 12-3091Commonwealth of Pennsylvania - standard end walls and retawalls

iningBlueprint 6/5/1929 88

no number 3731 12-3091 Commonwealth of Pennsylvania - standard cross sections Blueprint 6/5/1929 88no number 3732 12-3091 Commonwealth of Pennsylvania - standard inlets Blueprint 6/5/1929 88

no number 3733 12-3091Commonwealth of Pennsylvania - standard details for reinforcconcrete

ed Blueprint 3/10/1928 88

no number 3735 12-3091Commonwealth of Pennsylvania - drawings for construction inNorthampton

Blueprint 6/3/1931 88

no number 3736 12-3091 Profile of the L&NE in Bangor and Roseto Borough Blueprint 7/16/1930 88no number 3737 12-3091 Standard method of placing type "D" bar mat reinforcement Blueprint 4/28/1928 88no number 3738 12-3091 Standard method of placing type "A" fabric reinforcement Blueprint 3/26/1928 88no number 3740 12-3091 Profile of L&NE in Roseto Borough Blueprint ? 88no number 3741 12-3091 Map showing right of way of the L&NE through Roseto Borough Blueprint ? 88

no number 3742 12-3091Map showing equipment required for rerouting of L&NE througRoseto

h Blueprint ? 88

no number 3746 12-3091 Right of way and track map of the L&NE in Bath yard Blueprint 12/31/1963 88no number 3747 12-3091 PA Blueprint 5/16/1926 88no number 3748 12-3091 Map of the Allentown branch of the L&NE RR Blueprint 6/30/1919 88no number 3750 12-3091 Right of way of L&NE through Lower Nazareth Township Blueprint ? 88no number 3751 12-3091 Right of way of the L&NE - Bethlehem branch Blueprint 12/1/1940 88

S-333S 3739 12-30913091 Commonwealth of Pennsylvania - standard reinforced boxesy BlueprintBlueprint 10/7/1917 88sheet 1 3726 12-3091 Bridge over Lizard Creek at station 251 on Tamaqua extension Blueprint 10/22/1911 88

sheet 2/6 3734 12-3091 Commonwealth of Pennsylvania - details of grading sections Blueprint 6/3/1931 885896 blank 12-3091 Map of L&NE railroad between Pen Argyl and Wind Gap, PA Linen 9/4/1913 896401 blank 12-3091 Philadelphia and Reading Hopper car Blueprint 4/14/1909 896460 blank 12-3091 cover sheet Linen 897786 blank 12-3091 Proposed extension of track in Pen Argyl yard Linen 10/21/1925 89 done March 4th, 200610904 blank 12-3091 Proposed reconstructionof underpass #9.18, West Penn Township Linen 10/30/1951 891 sht 9 blank 12-3091 Tamaqua extension-crossing over LVRR Sta. 647+71.1 Blueprint 9/11/1911 895 sht 1 3755 12-3091 Masonry plan for bridge over creek at station 1066+33.5 Blueprint 8/4/1911 89

5 sht 1a 3753 12-3091 Masonry plan for bridge over creek at station 1066+35.5 Blueprint 8/4/1911 895 sht 2 3756 12-3091 Erection diagram for bridge over creek at station 1066+35.5 Blueprint 9/7/1911 895 sht 3 3754 12-3091 Floor plan for bridge over creek at station 1066+33.5 Blueprint 9/27/1911 895 sht 7 3752 12-3091 Standard GI bolts for floor bolts for bridge 1066+35 Blueprint 9/27/1911 89

no number 3757 12-3091 Relocation of the L&NE between station 360+62.85 and 3821+893 Blueprint 12/6/1935 89no number blank 12-3091 Track layout of the Alpha Portland Cement Company Linen no date 89

et 2/16-2 co 3758 12-3091PA Dept. of Highways - drawing for construction of right of waSH 226

y on Blueprint 11/4/1935 89

sheet 3/16 3760 12-3091Sketch showing ditch dimensions and tabulations for L&NE relocation Blueprint ? 89

2400 12-3049 Profile at Sequines Sand Pit, Pa paper ? 90

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3614361536163617361836193620362136223623362436253626362736283629363036313632363336343635

Page 104 of 194Page 104 of 194

36353636363736383639364036413642364336443645364636473648364936503651365236533654

2459 12 3049 profile of Albion branch and B&P rail linen 90

2404 12-3049 Lettering diagram for crane blue 12/07/07 902417 12-3049 unknown boring diagram blue 902418 12-3049 Map of siding changes at Hainesport Jct., NJ vel 902419 12-3049 Bangor Central map paper 902421 12-3049 Profile of mainline change at W. Bangor, Pa blue 2/04/03 902422 12-3049 DL&W spur to Albion Slate Co. blue 4/20/12 902427 12-3049 Bridge #33.19 west of Quarry Jct., Pa linen 4/01/13 902430 12-3049 Sketch of change on N. Main St. Bangor, Pa blue 8/00/06 902431 12-3049 "I" beams blue 902432 12-3049 Wing walls for bridge @ Bangor, Pa over Martins Creek linen ? 902436 12-3049 Map of Albion branch blue 12/10/01 902439 12-3049 Profile of Bushkill branch paper ? 902440 12-3049 Profile of American Bangor switch paper ? 902441 12-3049 plan of enginehouse and machine shop @ Pen Argyl, Pa linen ? 902446 12-3049 profile of DL&W and LNE Albion sidings vel ? 902448 12-3049 PP&B map of yard at Portland, Pa linen 10/23/1890 902449 12-3049 profile of coal dump at Bangor, Pa vel ? 902451 12-3049 plan for Bangor Union switch frog 10-?-1903 902453 12-3049 PP&B profile of proposed spur to Northampton Slate Co. paper 2/00/1890 902454 12-3049 PP&B spur to Northampton quarry paper 5/00/1890 902456 12-3049 Proposed siding location and date unknown ? 902459 12 3049- profile of Albion branch and B&P railway way linen 6/30/02 906/30/022461 12-3049 Bangor slate blue 902462 12-3049 Lehigh & Lackawanna branch south of Summit Station, Pa linen 9/07/05 902463 12-3049 three-span bridge #7 over Paulins Kill linen 2/02/09 902465 12-3049 Alsen raceway blue 902467 12-3049 MW standard bridge warning telltale linen 11/17/10 902468 12-3049 profile at Portland, Pa vel 902473 12-3049 profile vel 902476 12-3049 smokestack blue 902477 12-3049 profile near bridge 34.06 vel 4/01/13 902478 12-3049 Map of spur to Bangor Union Quarry linen 9/01/03 902483 12-3049 profile near bridge 33.19 vel 3/31/13 902485 12-3049 highway change on Pochuck RR blue 902487 12-3049 Deckertown crossing: NYS&W over PP&B linen 8/17/1889 902488 12-3049 Profile of Albion branch paper ? 902491 12-3049 Chestnut alley paper ? 902492 12-3049 Track profile vicinity Lizard Creek blue 902493 12-3049 profile of Albion branch overhead crossing B&P blue ? 902500 12-3049 Structure inventory - Pennsylvania linen ? 902501 12-3049 Structure inventory - Pennsylvania linen ? 90

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3655365636573658365936603661366236633664366536663667366836693670367136723673367436753676

Page 105 of 194Page 105 of 194

36763677367836793680368136823683368436853686368736883689369036913692369336943695

2533 12 3049 Reb ilding coal trestle at Bale NJ linen 90

2502 12-3049 Structure inventory - Pennsylvania linen ? 902503 12-3049 Structure inventory - New Jersey linen ? 902504 12-3049 Structure inventory - New York linen ? 902505 12-3049 Schedule of owned rolling stock linen ? 902506 12-3049 profile at Kittitiny paper ? 902507 12-3049 Map - Katellen to Paulins Kill linen ? 902508 12-3049 Sidings at Bangor Fidelity Slate Co. blue 11/00/03 902511 12-3049 profile of siding and road Mt Bethel twp. blue 8/22/17 902512 12-3049 Map at Heller Av, Pen Argyl, Pa linen 5/11/20 902514 12-3049 Sketch of pipeline along Nazareth branch paper 1917 902519 12-3049 Map of highway crossing paper 1917 902520 12-3049 Map of Palmerton east blue ? 902521 12-3049 LVRR - CRR of NJ - Phila. linen ? 902522 12-3049 Map of Royal switch at Wind Gap, Pa linen ? 902523 12-3049 Map of mainline change at Bangor Fidelity quarry linen 902526 12-3049 framework for Bangor Royal tunnel linen 7/28/09 902527 12-3049 Concrete span over Pennsylvania Av., Portland, Pa linen 5/29/02 902528 12-3049 Small building plan - concrete linen ? 902529 12-3049 Filing case linen 10/15/02 902530 12-3049 Plan for Coal trestle at Pen Argyl, Pa linen 11/05/09 902531 12-3049 Bridge piers at Portland, Pa linen 902533 12 3049- Rebuilding coal trestle at Baleville NJu ville, linen 5/03/11 905/03/112534 12-3049 Plan for base of Johnsonville water tank linen 7/01/08 902538 12-3049 Plan of crossing at Augusta, NJ linen 9/24/08 902541 12-3049 Slatington map linen 902542 12-3049 proposed siding at Benders Jct., Pa linen 11/23/09 902543 12-3049 proposed siding at Mt. Bethel, Pa linen 1/03/10 902544 12-3049 proposed track change at Swartswood Jct., NJ linen 6/03/10 902547 12-3049 New location of siding at Pen Argyl frt. Station linen 3/06/06 902548 12-3049 Map of property at Saylorsburg (Pa.) station linen 6/06/07 902549 12-3049 Proposed location of ash pit at Pen Argyl, Pa linen 5/22/08 902550 12-3049 proposed sand pit siding near Portland, Pa linen 6/05/08 902567 12-3049 Track map at Bangor station linen ? 902568 12-3049 Proposed Incline, East Bangor Br, E Bangor Quarry linen 5/08/07 902569 12-3049 Proposed retaining wall crossing DL&W and Albian Br, Pen Argyl linen 9/10/10 902571 12-3049 proposed siding for Genuine Washington Slate, Berlinsville, Pa linen 10/03/10 902572 12-3049 proposed siding for stone crusher at Mt. Bethel, Pa. linen 1/31/11 902573 12-3049 Relocation of powerhouse siding at Pen Argyl, Pa. linen 3/15/11 902574 12-3049 profile of powerhouse siding at Pen Argyl, Pa. vel 3/14/11 902576 12-3049 plan for siding for Pen Argyl Silk Co. linen 7/17/11 902579 12-3049 plan for industrial track at Saylorsburg, Pa. linen 1/15/11 90

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3696369736983699370037013702370337043705370637073708370937103711371237133714371537163717

Page 106 of 194Page 106 of 194

37173718371937203721372237233724372537263727372837293730373137323733373437353736

2626 St l Pa 90

S

2581 12-3049 plan for siding at Decker & Simmons at Sussex, NJ linen 2/16/12 902582 12-3049 plan for location of catch basins at Pen Argyl, Pa linen 2/21/12 902586 12-3049 MW standard signal blades (semaphores) blue 10/21/11 902588 12-3049 profile from Albion branch to quarries and Acme Slate Co. vel 5/02/13 902591 12-3049 plan for proposed siding at Longacre, Pa. linen 8/29/13 902597 12-3049 field profile of Chestnut Ridge branch vel 5/05/14 902598 12-3049 MW standard 100lb tie plate linen 5/20/14 902599 12-3049 Diagram of signals at Lehigh Gap, Pa linen 6/19/14 902600 12-3049 plan for 80 ft. turntable at Pen Argyl, Pa. linen 3/29/12 902602 12-3049 foundation plan fo Pen Argyl turntable linen 5/11/12 902603 12-3049 Monroe and Carbon Co. map paper ? 902606 12-3049 MW standard crossing sign for NJ linen 6/06/12 902608 12-3049 crosing gate arm detail linen 9/03/12 902611 12-3049 plan of location of derailment of coach #6, Wind Gap, Pa vel 1/20/13 902612 12-3049 MW standard crossing sign for PA and NY linen 6/06/12 902613 12-3049 map of Sussex Jct. Showing topography linen 8/04/13 902617 12-3049 MW standard fence linen 5/30/12 902621 12-3049 plan of re-arrangement of tracks for #14 switch at Benders Jct. linen 10/01/13 902622 12-3049 map of Main st. Pen Argyl showing topography linen 10/21/13 902623 12-3049 plan showing location of crossing gates at Wind Gap, Pa. linen 10/25/13 902625 12-3049 plan showing drainage ditch at N. Bangor station linen ? 902626 12 304912-3049 plan drainage of Main St Pen Argyl Paplan drainage of Main ., Pen Argy , lilinen 1/28/14 901/28/142627 12-3049 plan proposed alignment change E. Bangor br. @ Star Slate linen 2/13/14 902630 12-3049 MW standard snow fence linen 1/04/12 902631 12-3049 MW standard for private crossing linen 2/01/12 902632 12-3049 MW standard for flanger sign linen 12/06/11 902633 12-3049 MW standard for clearance post linen 3/02/12 902634 12-3049 MW standard for whistle sign linen 1/27/12 902635 12-3049 MW standard for mile post linen 1/27/12 902636 12-3049 MW standard for rail rack linen 8/05/12 902637 12-3049 MW standard for highway approach fence linen 7/24/12 902638 12-3049 MW standard for watchmans shanty linen 7/12/12 902639 12-3049 MW standard for telephone booth linen 7/19/12 902640 12-3049 MW standard for station sign linen 7/29/12 902641 12-3049 MW standard for trespass sign linen 8/26/12 902642 12-3049 MW standard for bridge numbers linen 8/07/12 902644 12-3049 MW standard for signal blades linen 10/23/12 902645 12-3049 MW standard for bridge warning linen 10/10/12 90

tencil No.V-15 12-3039 Classification of Program Ballast as Maintenance and Investment Linen no date 902701 12-3049 Map of Blue Ridge traction crossing LNE at Berlinsville, Pa Linen 3-10-11 912714 12-3049 Plan and Profile change B.R.T crossing at Berlinsville, Pa Linen 4-12-11 91

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I37373738373937403741374237433744374537463747

37483749

3750

3751

3752

37533754

Page 107 of 194Page 107 of 194

375537563757375837593760376137623763

376437653766

3767

3768376937703771

2725 12-3049 Map and profile of Highway crossing at Andreas, Pa Linen 8-23-11 912726 12-3049 Map of West Penn Twp showing roads and RR Linen 9-1-11 912728 12-3049 Map showing county roads in a portion of West penn Twp. Linen 9-8-11 912729 12-3049 Cost estimate chart for Changes at Wind Gap to Benders Jct. Linen 12-0-10 912730 12-3049 Power line map at App's siding Linen 0 912742 12-3049 Profile of overhead road bridge near Danielsville, Pa Linen 7-0-12 912752 12-3049 Rail cross sections for 80# and 90# rail Linen 7-17-13 912759 12-3049 Steel plan bridge over highway - Catasauqua branch Linen 7-3-13 912765 12-3049 Plan of proposed resevoir site, West Penn twp. Linen 6-5-12 912766 12-3049 Plan and Profile change B.R.T crossing at Berlinsville, Pa Blue 4-12-11 912768 12-3049 Profile from 210 to 280 Velum 91

2769 12-3049Approx Estimates of costs single track branches of the L&NE Snyder to Catasauqua Blue 0 91

2770 12-3049 Old line - new line, Crane RR Linen 0 91

2777 12-3049Plan showing location of proposed bridge for shipments from Leicesters Rubber Co. at E. Catasauqua, Pa Linen 7-17-14 91

2778 12-3049Map of proposed siding for the Craig estate on the Chestnut RRR.

idge Blue 3-6-14 91

2779 12-3049Map of proposed siding for the Craig estate on the Chestnut RRR. And connection with L&NE

idge Blue 3-6-14 91

2780 12-3049Map of proposed siding for the Craig estate on the Chestnut RRR. And connection with L&NE

idge Linen 3-6-14 91

2783 12-3049 Plan of sidings MaryD colliery Linen 5-25-15 912785 12-3049 Plan and profile for siding at Parson Bro's Slate Co. Linen 6-28-15 912787 12-3049 Topo map for road from Wing Gap to Pen Argyl crossing Linen 7-29-15 912789 12-3049 Plan of Augusta, NJ station and detail of station platform Linen 8-12-15 912796 12-3049 Plan and profile showing drainage ditch near Slate Jct. Linen 10-1-15 912797 12-3049 Plan of Banner Slate Co. Dump siding Linen 10-9-15 912798 12-3049 Tonnage rating chart for locomotives at 10mph Linen 10-16-15 912799 12-3049 Plan showing five bridges east of Bath Pa with profile Linen 11-19-15 912800 12-3049 MW standard #188: Standard crossing warning sign Linen 11-29-15 912801 12-3049 Bridge 6.59 across Monocacy creek, Bath, Pa Linen 12-6-15 91

2802 12-3049Plan of proposed extension of siding for Miller and Dilliard, MtBethel, Pa

Linen 12-7-15 91

2808 12-3049 Plan showing siding along mainline at Bangor Jct. Linen 2-7-16 912809 12-3049 Plan for transfer table foundation at Pen Argyl Linen 2-9-16 91

2810 12-3049Plan showing additional siding at "Millers Connection" with DLMt Bethel twp.

&W, Linen 2-15-16 91

2811 12-3049Diagram showing position of drivers of 6-wheel switching engon 38 degree curve

ine Linen 2-16-16 91

2813 12-3049 Details plan and sections for bridge 6.54 across Moncacy creek Linen 1-28-16 912819 12-3049 Map of tracks vicinity of Broadway, Wind Gap, Pa Linen 4-10-16 912821 12-3049 Rearrangement of rooms, third floor Anthracite Building Linen 5-26-16 91

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3772

37733774

3775377637773778377937803781378237833784378537863787

3788378937903791

Page 108 of 194Page 108 of 194

37913792379337943795379637973798

3799

38003801380238033804

3805380638073808

2868 12 3049 B&P map at Washington Slate co Linen 0 91

2823 12-3049 Foundation for flag pole at new repair shop at Pen Argyl, Pa Linen 6-22-16 91

2824 12-3049Plan for overhead cable protection at Hazen Sand Co.,Mt. BePa

thel, Linen 7-15-16 91

2826 12-3049 MW standard #189: Standard trespass sign Linen 7-28-16 91

2827 12-3049MW standard #156.5: Standard crossing sign, New Jersey, additional sign Linen 8-2-16 91

2835 12-3049 MW standard #190: Standard crossing approach sign Linen 12-4-16 912836 12-3049 MW standard #191: Standard crossing flagman's sign Linen 12-6-16 912837 12-3049 Map from Columbia to Swartswood showing proposed line Linen 0 912838 12-3049 Map from Pine Island to Campbell Hall showing proposed line Linen 0 912840 12-3049 Plan of proposed motor car house, Pen Argyl, Pa Linen 1-25-17 912841 12-3049 Schuylkill Valley RR profile: Pottsville Jct. To Tamaqua, Pa Linen 1-29-17 912845 12-3049 Plan for linemans motor Car houses - frame Linen 3-9-17 912846 12-3049 Plan for linemans motor Car houses - hollow tile Linen 3-8-17 912847 12-3049 Plan showing foundation for train order board, Danielsville, Pa Linen 912848 12-3049 Plan of proposed building for hostlers and coal pocket laborers Linen 4-20-17 912850 12-3049 Trackchart and profile Pen Argyl to Hainesburg Jct., NJ Blue 5-7-17 912851 12-3049 Bandage types Linen 91

2855 12-3049Plan of ownership and proposed relocation of P&R tracks at Catasauqua, Pa Linen 7-12-17 91

2858 12-3049 Plan of curb and platform at Augusta station Linen 9-21-17 912866 12-3049 Lehigh River bridge at Lehigh Gap Blue 4-4-11 912868 12 3049- B&P map at Washington Slate co . Linen 0 912870 12-3049 WG&D RR land and Lake branch Blue 2-11-1892 912871 12-3049 Proposed empty car tracks at Alliance breakers Blue 3-22-18 912879 12-3049 Proposed extention to siding at Lehigh Valley Ice. Co Linen 3-26-19 912881 12-3049 Plan showing interchange facilities at Campbell Hall, NY Linen 4-14-19 912889 12-3049 Diagram of Operating statistics - accounting Linen 2-24-20 912891 12-3049 Topo map of MaryD branch near Tuscarora, Pa Linen 4-22-20 912892 12-3049 Profile of MaryD branch near Tuscarora, Pa Blue 4-24-20 91

2893 12-3049Proposed rearrangement of tracks at Parsons Slate Co, Pen Argyl, Pa Linen 4-24-20 91

2894 12-3049Plan of proposed tracks for Republic Fireproofing Co.,CatasauPa

qua, Linen 6-10-20 91

2897 12-3049 Plan showing location of proposed station at Slatington, Pa Linen 7-17-20 912938 12-3049 Standard plan for hook and guard Linen 2-11-22 912944 12-3049 pipeline Linen 912953 12-3049 Proposed change of track alignment on Albion branch Linen 10-18-22 91

2960 12-3049Catasauqua and Fogelsville RR proposed track changes at Catasauqua Linen 1-5-23 91

2961 12-3049 Standard tie plate drawing for 80# rail Linen 1-15-23 912962 12-3049 Standard tie plate drawing for 90# rail Linen 1-15-23 912963 12-3049 Standard tie plate drawing for 76#LV and 80# rail Linen 1-16-23 91

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

38093810

3811

38123813381438153816

38173818

3819

382038213822

38233824

3825

Page 109 of 194Page 109 of 194

3825

382638273828382938303831

3832

3833383438353836

3837

3838

38393840

12 PA 91

296412-3049

Standard tie plate drawing for 80#ASCE and 90# ASCE and 1rail

00# Linen 1-17-23 912967 12-3049 Plan of private road bridge near Quarry Jct., PA Linen 9-5-23 912968

12-3049General plan for timber trestle over East Bangor branch, EastBangor, Pa

Linen 9-14-23 912969

12-3049General plan for steel trestle over East Bangor branch, East Bangor, Pa

Linen 9-14-23 912970 12-3049 Plan showing extension of track B mp65 near Columbia, NJ Linen 9-29-23 912972 12-3049 Pittsburgh to New Haven map of comparison routes Linen 3-4-24 912976 12-3049 Floor plan of bridge #90.17 east of Plains, NJ Linen 10-26-53 912977 12-3049 Location of proposed siding near Mt Bethel, Pa Linen 7-28-24 912978

12-3049Diagram showing total miles of track constructed each year, 1to 1919

849 Linen 8-2-24 912979 12-3049 Moments for LNE Consolidations class E-S-14 Linen 912980

12-3049plan of proposed extension to siding for Hazen sand Co., PortPa.

land, Linen 10-10-24 912981

12-3049Plan of track changes for Portland Sand & Gravel, near PortlaPa

nd, Linen 11-24-24 912985 12-3049 Floor plan for bridge #4.3 east of Chapman Quarries, Pa Linen 4-2-25 912991 12-3049 Plan of proposed passing siding at Wantage, NJ Linen 5-11-25 912993

12-3049Plan showing proposed extension of tack 2D on Sussex br., Sussex, NJ

Linen 6-25-25 912994 12-3049 Traffic density diagram for 1924 Linen 8-3-25 912996

12-3049-3049Plan showing proposed 6" water supply line to tank at Pen ArPA

gyl, Linen 8-11-25 912999

12-3049Plan showing proposed entrance protection at storehouse andshops at Pen Argyl

Linen 10-1-25 912641A 12-3049 MW standard for trespass sign blue 2/04/15 912645A 12-3049 MW standard for bridge warning blue 9/01/14 912727A 12-3049 Track Profile station 513.5 Linen 0 912938A 12-3049 Standard plan for hook and guard Blue 8-24-33 913000 12-3050 Profile of siding to slate mill at Bangor Star Quary paper no date 923001

12-3050

Map showing part of Main Street. Pen Argyl, Pa and the trackthe Albion Branch of the Lehigh and New England Railroad anthe Pen Argyl Branch of the Bangor and Portland Railway.

s of d

Linen no date92

300212-3050

Location of Pennsylvania Poughkeepsie and Boston Railroad below Slatington PA

Linen 7/?/1889 923003 12-3050 Profile of pipe line at Johnsonville paper no date 923006 12-3050 Profile of old grading from Slate Valley to Lockport velum no date 923008 12-3050 Profile of line to Thompson property velum no date 923009

12-3050New York Susquehanna & Western (NYSW) RR storage trackHainsburg Junction New Jersey

Blueprint 4/16/1906 923011

12-3050Map of location of Albion Branch of the Lehigh and New EnglaRailroad. Pen Argyl, PA

nd linen 6/28/1902 923012

12-3050Map showing location for proposed change in Main Line of theLehigh and New England Railroad at and near West Bangor,

PA

Blueprint 1/1/1903 923013 12-3050 Grade profiles of the P P & B RR velum ?/?/1890 92

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3841

38423843

3844

3845

3846

384738483849

3850

3851

Page 110 of 194Page 110 of 194

3851

3852

385338543855

3856

3857

385838593860386138623863

3864

3865

Railraod with the Central Railroad of New Jersey near Walnutport

3014 12-3050 Profile of roposed track to the Blue Mountain Slate Quarry paper 1/13/1903 923015

12-3050Lehigh and New England RR profile of preliminary survey WinGap to Saylorsburg Junction to connect with L & L R R

d Velum ?/?/1905 923018 12-3050 Map of line at Cross Street near Walling Avenue linen no date 923020

12-3050

Delaware Lackawanna and Western R R Bangor and PortlandDivision - Pen Argyl Branch. Plan of proposed connection to Stephens Jackson and Company to accompanying agreemenwith the Lehigh and New England Railroad and Stephens, Jacand Company covering tracks to Stephens Jackson and Comand Albion Slate Company. Pen Argyl, PA

ts kson

pany

Blueprint 1/17/1913

92

3021

12-3050

Map showing location along Main Street of the Pen Argyl Branand side tracks of the Bangor and Portland Railway and the ABranch and side tracks of the Lehigh and New England R R inArgyl, PA

ch lbion Pen

linen no date

92

3022

12-3050

Map showing a part of Main Street, Pen Argyl, PA. and the traof the Albion Branch od the Lehigh and New England R R andArgyl Branch of the Bangor and Portland Railway

cks Pen

linen no date92

302512-3050

Map of proposed change in Main Line of Lehigh and New EngRailroad at Bangor Fidelity Quarry. West Bangor, PA.

land linen no date 923028 12-3050 Profile of line towards Amity Blueprint no date 923029 12-3050 Profile of proposed change Point Phillips to Summit Velum no date 923031

12-3050

Map of center line of proposed connection between DelawareLackawanna and Western Railroad and Lehigh and New EngRailroad

land

linen 9/28/189992

303512-305012-3050

Proposed connection of Pennsylvania Poughkeepsie and BosRailraod with the Central Railroad of New Jersey near Walnutport

ton Blueprint 4/?/1890 923036

12-3050Lehigh and New England RR plan showing re-arrangement oftracks in Chapman's Quarry Yard, Chapman's Quarry, PA

linen 9/15/1913 923037

12-3050New York Susquehanna & Western (NYSW) RR extension of storage track Hainsburg Junction New Jersey

linen 9/28/1906 923038 12-3050 Profile of Pennsylvania Poughkeepsie and Boston Railroad Velum 8/11/1890 923046 12-3050 Reinforced concrete culvert pipe (poor condition) Blueprint 7/11/1913 923048

12-3050

Lehigh and New England Railroad motive power department diagram showing manner of marking 100,000 pound capacitygondola cars

steel Blueprint 3/16/1911

92

304912-3050

Delaware Lackawanna and Western Railroad standard signalblades

Blueprint 1/11/1909 923050

12-3050Lehigh and New England Railroad profile of proposed line Catasaqua PA to Snyders PA

Velum 6/?/1909 923053 12-3050 Profile of spur to Glenwood Blueprint 10/14/1908 923054 12-3050 Proposed change at Chapmans Velum no date 923055 12-3050 Proposed change at Chapmans Velum no date 923056 12-3050 Map of preliminary line spur to Glenwood Blueprint no date 923058 12-3050 Scheme "A" Profile of proposed change of line Velum no date 923059

12-3050Map of Meimbach Branch of the Lehigh and New England Railroad from Slate Valley Station to Meimbach's Slate Quarry

linen 8/?/1903 923061

12-3050Sketch showing two Consolodated Engines 80.5 tons each, followed by a train load of 3000 pounds per line foot

Blueprint 7/8/1904 92

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

3866

3867

3868

3869

3870

3871

387238733874

3875

3876

Page 111 of 194Page 111 of 194

3876

3877

38783879

3880

3881

3882

38833884

3885

3886

3887

3888

306312-3050

Plan showing location of the Car Barn and Power House in reference to the track of the Blue Ridge Traction Company

Blueprint no date 923064

12-3050

Map of northern Northampton County showing Wind Gap andDelaware Railroad, Pennsylvania Slatington and New EnglanRailroad, Bangor and Portalnd Railroad and the Delaware Lackawanna and Western Railroad

d

linen no date

92

3065

12-3050

Map showing location of the Pen Argyl Branch of the Bangor aPortland Railway and the Albion Branch of the Lehigh and NeEngland Railroad in Pen Argyl, PA.

nd w

linen no date92

306712-3050

Map of the Meimbach Branch of the Lehigh and New EnglandRailroad from Berlinsville Station to Meimbach's Slate Quarry

linen 8/?/1903 923071

12-3050Lehigh and New England Railroad plan showing fence and gafor farm and private crossings

te linen no date 923075

12-3050

Lehigh and New England Railroad new locomotive erecting anrepair shop, Pen Argyl, PA. Main Locomotive shop. Cross PipDuct.

d e

linen 2/19/191692

3077

12-3050

Map showing a part of Main Street, Pen Argyl, PA. and the traof the Albion Branch od the Lehigh and New England R R andArgyl Branch of the Bangor and Portland Railway

cks Pen

linen no date92

3080 12-3050 Profile of West Bangor Branch from "E" to "F" Velum no date 923088 12-3050 Lehigh Valley Railroad standard 10 foot switch Blueprint 1/?/1900 923089

12-3050

Lehigh and New England Railroad profile showing proposed change of grade through lands of Andrew R. Brugler near Hainsburg, New Jersey

Velum 8/19/191492

3091

12 305012-3050

Map showing location of proposed connecting line between Leand New England and Lehigh and Lackawanna Railroads neag gKatellen, PA

high r

linen 5/30/190592

309212-3050

Lehigh Valley Railroad plan showing proposed new ash pit Lehighton

Blueprint 12/5/1907 923093

12-3050Lehigh and New England Railroad plan showing proposed schfor drainage at Main and Goble streets, Portland, PA

eme linen no date 923094 12-3050 Plan showing timbering at Bangor Royal, Bangor, PA linen no date 923095

12-3050Lehigh and New England Railroad plan showing proposed rebuilding of Slate Belt Electric Street Railway coal trestle, Pen

linen 11/4/1909 923096

12-3050Lehigh and New England Railroad plan for repairing and reinforcing Bridge #7 over Paulins Kill, Augusta New Jersey

linen 8/13/1910 923098

12-3050Lehigh and New England Railroad plan and elevation of propocoal trestle at West Bangor Quarry

sed linen 4/28/1911 923101

12-3050Lehgih and New England Railroad plan showing proposed ya1.26 miles west of Pen Argyl, PA

rd linen 6/4/1912 923105 12-3050 Lehigh and New England Railroad plan of private car Blueprint 1/9/1909 923106

12-3050Lehgih and New England Railroad plan showing location of spabout a mile west of Benders Junction

ring linen 1/4/1933 923107

12-3050Lehigh and New England Railroad plan showing proposed sigprotection for railroad grade crossing at Augusta, New Jersey

nal linen 8/30/1910 923108

12-3050

Lehigh and New England Railroad plan showing proposed sigand derail protection for railroad grade crossing at Sugusta, NJersey

nal ew

linen 8/29/191092

311212-3050

Lehigh and New England Railroad plan showing proposed extension of siding for Blue Mountain Slate Company near Wind

linen 8/21/1909 92

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

3889

389038913892

3893

3894

3895

3896

3897

3898

3899

3900

3901

Page 112 of 194Page 112 of 194

39023903390439053906

390739083909

39103911391239133914

3915391639173918

311312-3050

Lehgih and New England Railroad plan showing tracks PortlaIce Company and vicinity near Portland, PA

nd linen 8/3/1909 923114

12-3050Lehgih and New England Railroad plan showing proposed pasiding at Danielsville, PA

ssing linen 4/21/1910 923116 12-3050 plan showing profile of line near Horn's Springs velum no date 923117 12-3050 plan showing profile of line near Black Creek paper no date 923118

12-3050Lehigh and New England Railroad plan showing proposed sidat Campbell Hall NY

ing linen 1/31/1910 923119

12-3050

Lehigh and New England Railroad plan showing proposed chof main line and siding and provide coal trestle at Star QuarryEast Bangor, PA

ange ,

linen 7/8/191092

312012-3050

Lehgih and New England Railroad plan showing proposed schemes for siding facilities at Star Quarry, East Bangor, PA

linen 5/7/1910 923121

12-3050Map showing the location of tracks, buildings and properties aSussex Station

t the linen 9/6/1904 923122

12-3050Map of railroad spur of M. G. Bailey and N. H. Hart from Limestone Quarries to Pochuck Railroad, Warwick, Orange

linen 8/29/1908 923124

12-3050Report to Interstate Commerce Commission Block Signals Leand New England Railroad Portland PA to Columbia NJ

high linen 1/1/1911 923125

12-3050Profile of north grading from dip west of Katellan to summit at Horn's Springs

velum no date 923127

12-3050

Lehigh and New England Railroad, Lehigh and Lackawanna Branch map showing proposed change of allignment of Main south of Summit Station

Line linen 5/1906

92

312912-3050

Lehigh and New England Railroad company skethc showing proposed additional track at Swartswood Junction NJ

linen 10/28/1910 923134

12-3050Lehigh and New England Railroad plan of crossing frog - crosof main line and Nazareth Branch

sing linen 9/17/19013 923135 12-3050 Lehigh and New England Railroad floor plan of shop Pen Argyl, linen 12/29/1913 923136 12-3050 Plan and profile of proposed coal trestle at Portland, Pa linen 11-20-1911 923139 12-3050 Plan of proposed pipeline along R of W at Johnsonville, Pa. linen 8-02-1909 923148 12-3050 Locomotive shop lye vat detail of pipe fittings linen 1-24-1916 923152

12-3050Stephens-Jackson Co. proposed boilerhouse and coal trestle Pen Argyl, Pa.

at linen 3-4-1913 923153 12-3050 Plan of siding extension west of DL&W crossing at Augusta, NJ linen 3-14-1913 923154 12-3050 Profile of "J-M" siding, Campbell Hall, NY paper 5-23-1913 923161

12-3050Plan of 4-span I girder bridge (#22) over Papakating Ck., Pellettown, NJ

Linen 3-20-1909 923162 12-3050 NJ Division trestle bridge rebuild standard plan (bridge #19) Linen 12-30-1908 923163 12-3050 Bridge #27 rebuild with 2 60' steel girders over Papakating Ck. Linen 12-30-1908 923164 12-3050 Bridge #42 trestle rebuild Linen 12-30-1908 923166 12-3050 Plan of proposed 6 pocket addition to coal trestle at Bangor, Pa. Linen 1-27-1914 923167

12-3050Plan of Crane RR sidings & connection with L&NE at CatasauPa.

qua, Linen 1-31-1914 923169 12-3050 plan of Erie RR Pine Island branch at Florida, NY Linen 12-27-1913 923171 12-3050 Map of drainage along Saylorsburg branch Linen 2-21-1914 923172 12-3050 Tonnage rating for locomotives #2 to #153 Linen ? 92

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3919392039213922392339243925392639273928392939303931393239333934393539363937393839393940

Page 113 of 194Page 113 of 194

394039413942394339443945

3946394739483949395039513952395339543955395639573958

3219 12 3050 M W standard #140 80lb tie plates Blueprint 23 92

3174 12-3050 Plan of proposed extension of track to Bangor Excelsior Quarry Linen 4-10-1914 923176 12-3050 Plan of proposed sidings along mainline at Benders Jct., Pa. Linen 5-4-1914 923180 12-3050 Plan of contours near Pen Argyl for shop layout Linen 6-11-1914 923181 12-3050 Plan and profile of proposed siding extension west of Arnots, Pa. Linen 6-13-1914 923182 12-3050 Plan and profile of pipeline to water crane at Horn Springs, Pa. Linen 6-18-1914 923190 12-3050 Plan of proposed interchange at Lizard Ck. Jct. - scheme "D" Linen 10-21-1914 923200 12-3050 Hudson River topo map paper ? 923201 12-3050 M of W standard #101 - Ridgid frog #6 Linen 3-12-1909 923202 12-3050 Profiles of lines near DL&W connections at Slateford and Portland paper ? 923203 12-3050 M of W standard #103 - Ridgid frog #8 Linen 3-15-1909 923205 12-3050 M of W standard #105 - Ridgid frog #10 Linen 3-15-1909 923206 12-3050 sketch ? 923207 12-3050 M of W standard #107 - Ridgid frog #12 Linen 3-24-1909 923208 12-3050 Chart of Tamaqua extension costs Linen 9-30-1911 923209 12-3050 M of W standard #109 - spring frog #6 Linen 8-23-1910 923210 12-3050 Tamaqua extension profile between sta 260 and sta 360 paper 4-24-1911 923211 12-3050 M of W standard #111 - spring frog #8 Linen 8-23-1910 923213 12-3050 M of W standard #113 - splice for 100lb. Rail Linen 5-27-1913 923214 12-3050 M of W standard #113 - splice for 90lb. Rail Linen 5-27-1913 923217 12-3050 Rod for locomotive Blueprint 7-19-1901 923218 12-3050 "Look out for Locomotive" sign Blueprint 9-19-1910 923219 12 3050- M of W standard #140 - 80lb tie plates of - Blueprint 2-23-19112- - 9219113220 12-3050 M of W standard #120 - 15' switch linen 3-21-1909 923222 12-3050 Meter's track scale Blueprint ? 923223 12-3050 track sketch at Wind Gap station linen 5-12-1916 923225 12-3050 M of W standard #125 - 15' guard rail linen 9-08-1909 923230 12-3050 M of W standard #130 - 80lb rail 4-hole splice linen 2-15-1911 923233

12-3050proposed profile of state highway crossing of MaryD br. at Tuscarora, Pa.

linen 5-25-1920 923238 12-3050 Standard plan for tumbler lock for switches linen 8-7-1920 923240 12-3050 Plan for additional w/b departure track in Pen Argyl yard linen 11-1-1921 923242 12-3050 PP&B RR profile Blueprint 0-0-1890 923243 12-3050 profile west side Old Bangor quarry Blueprint ? 923244 12-3050 unknown Blueprint ? 923245 12-3050 Old Bangor Slate Quarry elevation Blueprint 11-4-01 923254 12-3050 Map of lines of W.G.& D RR and P.S.& N.E.RR Blueprint 2-15-1886 923256 12-3050 Map of proposed branch from Snyder to Catasauqua, Pa. Blueprint 10-6-1910 923258 12-3050 Map of property at Lehigh Gap and Palmerton, Pa Blueprint 2-26-1913 923259 12-3050 Map of Lehigh canal at North Catasauqua, Pa. Blueprint 5-16-1911 923260 12-3050 M of W standard #160 - concrete bumping post linen 11-4-1909 923261 12-3050 M of W standard #161 - wooden cattle linen 3-2-1911 92

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I39593960396139623963396439653966396739683969397039713972

3973397439753976397739783979

Page 114 of 194Page 114 of 194

39793980398139823983398439853986398739883989399039913992399339943995399639973998

93

3262 12-3050 Map of Old Bangor Slate Co. Blueprint ? 923263 12-3050 profiles of MaryD branch paper ? 923265 12-3050 Plan of proposed siding at Slate Jct., Pa. linen 1-4-1923 923266 12-3050 Plan of proposed siding at Slate Jct., Pa. linen 1-10-1923 923267 12-3050 Circuit diagram for automatic signals at Catasauqua, Pa. linen 5-27-1917 923269 12-3050 Proposed additional yard tracks at Pen Argyl, Pa. linen 10-21-1921 923270 12-3050 M of W standard #170 - #8 turnout linen 3-7-1911 923271 12-3050 Plan of proposed siding location and extension of Bangor br. linen 2-28-1923 923274 12-3050 Plan showing grade crossings to be abandoned on Saylorsburg br. linen 9-5-1923 923275 12-3050 Plan and tracks of the Rittersville term., Allentown, Pa. linen 4-17-1953 923283 12-3050 Bridge seats Blueprint 4-5-1889 923284 12-3050 Plan of tracks at Swartswood Jct., NJ linen 1-17-1917 923286 12-3050 M of W standard #186 - #10 turnout linen 11-25-1913 923287 12-3050 M of W standard #187 - #6 turnout linen 11-25-1913 92

3118A12-3050

Lehigh and New England Railroad plan showing proposed sidat Campbell Hall NY

ing Blueprint 1/31/1910 923212-A 12-3050 M of W standard #112 - 24" 4-bolt splice Linen 5-27-1913 923212-B 12-3050 M of W standard #112 - 24" 4-bolt splice Linen 5-27-1913 923406 12-3050 Plan of Stock bin Linen 933411 12-3050 Northampton bridge piers Linen 933415 12-3050 60' turntable stress sheet Blueprint 933416 12-3050 Map of track to Sequines sand pitp q p Linen 933420 12-3050 Map and profile Bangor Fidelity quarry, W. Bangor, Pa Linen 933422 12-3050 Albion trestle Blueprint 933423 12-3050 Wood trestle Linen 933426 12-3050 East abutment of Hainesburg bridge Linen 2-0-02 933427 12-3050 West abutment of Hainesburg bridge Linen 2-0-02 933429 12-3050 Profile of siding thru Stevens Jackson & Co. Linen 933430 12-3050 Profile of proposed change in mainline at Bangor Fidelity quarry Linen 933431 12-3050 Map and profile of proposed siding to Provident quarry Linen 933432 12-3050 Map of Penna. Av. Delivery yard, Bangor, Pa. Linen 933433 12-3050 Profile change of allignment south of Summit Station, Pa Vellum 5-0-06 933434 12-3050 Profile change of allignment south of Summit Station, Pa Vellum 5-0-06 933438 12-3050 Map & profile of Albion loading branch Linen 933439 12-3050 Plan / profile proposed crossing in Pen Argyl yard Linen 933440 12-3050 Coal trestle Blueprint 933443 12-3050 Bangor coal trestle Blueprint 933444 12-3050 Map of Orange County, NY paper 933445 12-3050 Detail drawings - coal trestle Linen 933446 12-3050 Coal trestle - Pen Argyl Linen 933447 12-3050 Cross sections paper 93

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I3999400040014002400340044005400640074008400940104011401240134014401540164017401840194020

Page 115 of 194Page 115 of 194

40204021402240234024402540264027402840294030403140324033

40344035403640374038

3484 12 3050 USGS West Point NY quadrangle paper 1912 93

3448 12-3050 Cross sections paper 933449 12-3050 Cross sections paper 933450 12-3050 Cross sections paper 933452 12-3050 Masonry bridge Linen 933453 12-3050 Retaining wall Blueprint 933454 12-3050 10" Mansfield water column plan Blueprint 4-20-05 933456 12-3050 Map of Penn Bangor slate quarry Linen 933459 12-3050 Cross sections paper 933463 12-3050 Cross sections paper 933464 12-3050 Cross sections paper 933465 12-3050 Cross sections paper 933466 12-3050 Cross sections paper 933467 12-3050 Cross sections paper 933469 12-3050 Cross sections paper 933470 12-3050 Cross sections paper 933471 12-3050 Cross sections paper 933472 12-3050 Cross sections paper 933473 12-3050 Cross sections paper 933474 12-3050 Cross sections paper 933475 12-3050 Cross sections paper 933483 12-3050 USGS Schunemunk, NY quadrangle paper 1912 933484 12 3050- USGS West Point NY quadrangle , paper 1912 933485 12-3050 USGS Newburg, NY quadrangle paper 1913 933486 12-3050 USGS Ramapo, NY quadrangle paper 1912 933487 12-3050 USGS Greenwood Lake, NJ quadrangle paper 1913 933488 12-3050 USGS Hackettstown, NJ quadrangle paper 1910 933489 12-3050 USGS Delaware Water Gap, PA quadrangle paper 1915 933490 12-3050 USGS Franklin Furnace, NJ quadrangle - with highlights paper 1911 933491 12-3050 USGS Hazleton quad highlighted Paper 1915 933492 12-3050 USGS Slatington quad highlighted Paper 1902 933493 12-3050 USGS Easton quad highlighted Paper 1891 933495 12-3050 Plan masonry for coal dump Blueprint 933497 12-3050 Float and stop for water tanks Linen 02/25/1909 933498 12-3050 Plans for Union Station at Augusta, New Jersey Linen 07/18/1990 933500 12-3050 West Bangor quarry proposed coal dump: sheets 3500A to 3500F Linen 2-01-12 933507 12-3050 Sketch of PP&BRR showing construction done by each contra

& railroadctor Linen 4-29-1890 93

3520 12-3050 Guard rail clamp yoke Blue 4-14-11 933522 12-3050 Reconstruction of filing case (engineering dept) Linen 11-21-11 933523 12-3050 Profile of Albion Br. (LNE and DL&W) Velum 00-00 933525 12-3050 Profile of Albion Br. (foundation pier elevations) Linen 00-00 93

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I40394040404140424043404440454046

40474048404940504051405240534054

40554056405740584059

Page 116 of 194Page 116 of 194

40594060406140624063406440654066406740684069407040714072

40734074407540764077

3558 93

3528 12-3050 Standard plan for stations - Class "D" Linen 00-00 933530 12-3050 Details of bridge floor bolts Linen 3-29-09 933532 12-3050 Proposed spur to Hanmann Structural Slate Co., Handelong, Pa. Velum 3-30-12 933538 12-3050 Map folder for following schematic track diagrams: Linen 00-00 933539 12-3050 Cross-section for extension of Handelong siding paper 4-11-13 933540 12-3050 Bridge drawing Linen 00-00 933541 12-3050 Proposed spur to Albion Slate Co., Pen Argyl, Pa. Linen 5-02-12 933542 12-3050 Proposed spur to Albion Slate Co., Pen Argyl, Pa. Velum 5-02-12 933543 12-3050 Plan of tracks at Stephens-Jackson Co., Pen Argyl, Pa (joint u

with DL&W)se Linen 6-13-12 93

3544 12-3050 Proposed plan for renewal of Jacoby's Creek bridge, Portland, Pa. Linen 2-21-12 933545 12-3050 Proposed plan for renewal of Jacoby's Creek bridge, Portland, Pa. Linen 5-09-12 933547 12-3050 Proposed spur to Albion Slate Co., Pen Argyl, Pa. Velum 6-30-12 933548 12-3050 Cattle pass at Baleville, NJ Linen 7-17-08 933549 12-3050 Proposed concrete arch at Swartswood Jct., NJ Linen 11-29-08 933550 12-3050 Diagram of Truss removed at Hainesburg Jct., NJ Linen 8-00-08 933552 12-3050 Under grade crossing: Lobb Av. Pen Argyl, Pa Linen 12-03-08 933553 12-3050 Proposed overhead crossing at Bangor Fidelity Slate, West

Bangor, PaLinen 11-04-09 93

3554 12-3050 Plan of 10 ton derrick car Linen 2-16-09 933555 12-3050 Plan of proposed concrete arch at Baleville, NJ Linen 4-02-08 933557 12-3050 Plan of bridge over Jacoby's Creek near Portland, PA Linen 00-00 933558 12 305012-3050 D k b id 37/100 P li Kill B l ill NJDeck bridge 37/100 over Paulins Kill near Baleville, NJ BlBlue 2 12 06 932-12-063559 12-3050 Through bridge 26/100 over Paulins Kill near Baleville, NJ Blue 2-12-08 933560 12-3050 Pen Argyl gas Co., masonry details for coal dump Linen 3-01-11 933562 12-3050 E. Bangor branch: Bridge over main track at Consolidated #3 Linen 6-24-11 933563 12-3050 Plan of freight shelter Linen 11-23-12 933564 12-3050 Proposed culvert at Bangor Linen 10-04-11 933565 12-3050 Proposed culvert at Bangor Linen 10-04-11 933567 12-3050 Bridge 53.123 E of Slate Valley Linen 11-08-11 933568 12-3050 Bangor station -concrete lintels Linen 8-18-09 933569 12-3050 Pen Argyl storehouse Linen 8-07-08 933570 12-3050 Floor plans for Pen Argyl storehouse Linen 08/07/1908 933571 12-3050 Sections and elevations for Pen Argyl storehouse Linen 08/07/1908 933572 12-3050 General data for roof trusses for Pen Argyl storehouse Linen 08/19/1908 933573 12-3050 Plan for iron rack at Pen Argyl blacksmith shop Linen 04/16/1910 933574 12-3050 Plan of 1st floor office at 624 Main St., Bethlehem, position of

furnitureLinen no date 93

3575 12-3050 Plan of 2nd floor at 624 Main St., Bethlehem, position of furniture Linen 03/25/1942 933576 12-3050 Plan of 1st floor offices at 624 Main St., Bethlehem, Pa. Linen no date 933577 12-3050 Plan of 2nd floor offices at 624 Main St., Bethlehem, Pa. Linen no date 933578 12-3050 Plan of 1st floor offices at 624 Main St., Bethlehem, Pa. Linen no date 93

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I4078407940804081408240834084408540864087408840894090409140924093409440954096409740984099

Page 117 of 194Page 117 of 194

40994100410141024103410441054106410741084109411041114112411341144115411641174118

3468E 12 3050 Cross sections paper 93

3579 12-3050 Plan of 2nd floor offices at 624 Main St., Bethlehem, Pa. Linen no date 933581 12-3050 Drawing table for engineer's office Linen 05/25/1908 933582 12-3050 Proposed concrete reservoir at Horn Springs Linen 04/25/1910 933585 12-3050 First floor of Pen Argyl offices with proposed rearrangements Linen 05/03/1911 933586 12-3050 Second floor of Pen Argyl offices Linen 05/05/1911 933587 12-3050 Proposed Frt./Pass. Station at Summit, Pa Linen 10-13-11 933588 12-3050 Proposed Frt./Pass. Station at Summit, Pa Linen 10-16-11 933591 12-3050 Profile of Pennsylvania Av., Portland, Pa Velum 9-18-08 933592 12-3050 Proposed siding to Albion Slate Co., Pen Argyl, Pa. Linen 1-25-10 933595 12-3050 Proposed spur to Star Quarry to Columbia bangor - sheet #1 Blue 2-07-02 933596 12-3050 Proposed spur to Star Quarry to Columbia bangor - sheet #2 Blue 2-07-02 93

3442A 12-3050 Cross section paper 933442B 12-3050 Cross section paper 933445A 12-3050 Detail drawings - coal trestle Linen 933451A 12-3050 Cross sections paper 933451B 12-3050 Cross sections paper 933451C 12-3050 Cross sections paper 933468A 12-3050 Cross sections paper 933468B 12-3050 Cross sections paper 933468C 12-3050 Cross sections paper 933468D 12-3050 Cross sections paper 933468E 12 3050- Cross sections paper 933468F 12-3050 Cross sections paper 933468G 12-3050 Cross sections paper 933487A 12-3050 USGS Greenwood Lake, NJ quadrangle - with highlights paper 1913 933487B 12-3050 USGS Greenwood Lake, NJ quadrangle paper 1913 933488A 12-3050 USGS Hackettstown, NJ quadrangle - with highlights paper 1910 933488B 12-3050 USGS Hackettstown, NJ quadrangle paper 1910 933489A 12-3050 USGS Delaware Water Gap, PA quadrangle - with highlights paper 1915 933489B 12-3050 USGS Delaware Water Gap, PA quadrangle paper 1915 933490A 12-3050 USGS Franklin Furnace, NJ quadrangle paper 1911 933491A 12-3050 USGS Hazleton quad highlighted Paper 933491B 12-3050 USGS Hazleton quad highlighted Paper 933492A 12-3050 USGS Slatington quad highlighted Paper 1912 933493A 12-3050 USGS Easton quad highlighted Paper 1913 933538A 12-3050 Schematic track diagram - Lehigh & Lackawanna Br Linen 00-00 933538B 12-3050 Schematic track diagram - Saylorsburg Br./Northampton Br Linen 00-00 933538C 12-3050 Schematic track diagram - Nazareth Br. Linen 00-00 933538D 12-3050 Schematic track diagram - East Bangor Br. / Albion Br Linen 00-00 933538E 12-3050 Schematic track diagram - Glenwood br. / Pochunck RR./ mainline Linen 00-00 933574A 12-3050 same as above Linen no date 93

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I41194120412141224123

4124

41254126412741284129

4130

4131413241334134413541364137

Page 118 of 194Page 118 of 194

4138413941404141

41424143

414441454146414741484149415041514152415341544155

3575A 12-3050 same as above Linen 03/25/1942 933800 12-3022 Location of PP&B below Slatington, Pa. (map) Paper 8-10-1889 953801 12-3022 Map and profile of yard at Slatington, Pa. - PP&B RR linen 12-10-1890 953802 12-3022 Map and profile of yard at Pen Argyl, Pa. - PP&B RR linen 1-7-1890 953811 12-3022 Proposed route of Pochuck RR Paper 4-28-1897 953813 12-3022 Chart of Broken rails removed from various steam railroads in

state of New York, 1905 - 1907 by rail weight blue 4-24-1907 95

3814 12-3022 Chart of Broken rails removed from various steam railroads instate of New York, 1905 - 1907 by year rail was rolled

blue 4-24-1907 953815 12-3022 LVRR drawing for coal and ash handling plant blue 9-00-1905 953816 12-3022 Osgood railroad track scale blue 1-24-1906 953823 12-3022 Map and preliminary spur to Glenwood linen 1-14-1908 953827 12-3022 Bushkill Ck. bridge plan at Atlantic Mills, Pa on Nazareth br. linen 3-4-1912 953828 12-3022 Plan and section details for Bushkill Ck. Bridge at Atlantic Mill

Nazareth br.s, Pa linen 7-5-1913 95

3829 12-3022 General data for renewal of bridge over Paulins Kill w. of Hainesburg Jct.

linen 3-3-1908 953833 12-3022 Profile of Albion branch linen ? 953834 12-3022 Profile of branch to American Bangor Slate Co. linen 9-6-1904 953836 12-3022 Detail plan of plate girder bridge at Baleville, NJ vellum 2-8-1908 953840 12-3022 Plan of coal dump at Bangor, Pa linen 7-17-1905 953842 12-3022 Map and profile of PP&B spur to Northampton Slate Quarry linen 2-00-1890 953843 12-3022 Map and profile of crossing of B&B RR and LVT at W. Bangor, Pa. linen ? 953846 12-3022 Proposed change of alignment at West Bangor, Pa blue 9-00-1899 953849 12-3022 two 100' girder spans over Black Ck. On spur to Amity. linen 9-25-1908 953850 12-3022 Plan of track scale blue ? 953851 12-3022 Foundation plan for track scale blue ? 953852 12-3022 Profile of MaryD branch crossing with state highway at Tusca

Parora, linen 5-25-1920 95

3855 12-3022 Bridge warning standard drawing two tracks (ERIE RR drawing) blue 953856 12-3022 Bridge warning standard drawing three or more tracks (ERIE

drawing)RR blue ? 95

3858 12-3022 Track scale plan blue 953859 12-3022 Color map of L&NE RR and connections linen 4-00-1913 953862 12-3022 Iron work detail for derrick car linen ? 953863 12-3022 Plan of bridge over Papakating Ck., Sussex, NJ linen 7-2-1908 953865 12-3022 Plan of timber trestle east of Swartswood Jct. linen 3-25-1908 953868 12-3022 Details of bridge over main track at E. Bangor, Pa linen 6-22-1911 953869 12-3022 Floor plan for proposed frt. House at Bangor, Pa. linen 6-28-1909 953870 12-3022 Elevations and section for proposed frt. House at Bangor, Pa. linen 6-28-1909 953872 12-3022 Plan and elevation of Pen Argyl enginehouse roof linen 7-29-1908 953873 12-3022 Proposed frt. House at Bangor, Pa - details linen 6-28-1909 953874 12-3022 Concrete coal dump at Bangor, Pa plan and profile linen ? 95

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I41564157415841594160

4161

4162

4163

416441654166

41674168416941704171417241734174

Page 119 of 194Page 119 of 194

417441754176417741784179

418041814182

4183418441854186418741884189419041914192

3902 12 3022 Map of the Albion branch Linen no date 96

3876 12-3022 Proposed water station at Black Cr. West of Pine Island Jct. NY linen 5-10-1911 953882 12-3022 Map of Pen Argyl yard linen 1-18-1909 953883 12-3022 Plan showing tracks and streets in Pen Argyl, Pa linen 6-4-1909 953884 12-3022 Map and profile proposed line to Bangor Peerless Slate Quarry linen 6-28-1909 953885 12-3022 Plan of proposed siding to Prudential Slate Quarry, Harpers , PA. linen 7-17-1909 953886 12-3022 Plan of proposed additional siding and WYE track at Benders

Pa Jct., linen 9-21-1909 95

3887 12-3022 Plan of proposed siding to Susquehanna Fire Clay Co. at Saylorsburg, Pa.

linen 1-24-1910 953888 12-3022 Plan of proposed siding extention to Stephen Jackson at Pen

Argyl, Pa.linen 6-18-1910 95

3892 12-3022 Plan of grade crossing at Orange Farm, NY where John Pawlwas injured

ok linen 1-3-1910 953893 12-3022 Plan of proposed siding to Prudential Slate Quarry, Harpers , PA. linen 9-8-1913 953896 12-3022 Map showing switch to Standard Oil Co. pumping station linen 3-26-07 953897 12-3022 Map of proposed extension of American Bangor Br to Old

Delabole Quarrylinen 10-11-1907 95

3898 12-3022 Plan and profile of proposed engine storage track, Pen Argyl, Pa linen 3-16-1914 953871A 12-3022 Standard 30' caboose - end plan blue 5-8-1912 953871B 12-3022 Standard 30' caboose - floor plan blue 5-8-1912 953871C 12-3022 Standard 30' caboose - lettering plan blue 5-8-1912 953871D 12-3022 Standard 30' caboose - side plan and section blue 5-8-1912 953901 12-3022 Map of Easton, Pa. Blueprint, 2 cno date 963902 12 3022- Map of the Albion branch Linen no date 963903 12-3022 Map - Albion branch through property of Albion Slate Co. Linen no date 963904 12-3022 Map - Albion branch through property of Albion Slate Co. Linen 1/21/1903 963905 12-3022 Lehigh Clay working Co.'s plant at Saylorsburg, Pa. Linen 7/24/1911 963912 12-3022 Property map of Monroe County, Pa. Paper, 2 cop2/10/1880 963914 12-3022 Plan showing tracks aty Quarry Jct., Pa. Linen 10/9/1912 963915 12-3022 Plan showing present and proposed water supply at Horn Spr

Pa.ings, Linen 9/22/1913 96

3918 12-3022 Plan for water column Blueprint 6/?/1912 963920 12-3022 Plan showing location of siding and coal trestle at Lehigh Gap, Pa. Linen 12/15/1913 963927 12-3022 Detail plan and location of proposed office & car inspector bui

at Campbell Hall, N.Y.lding Linen 6/3/1914 96

3928 12-3022 Plan showing location of stream at Millers, Pa. Linen 7/21/1914 963929 12-3022 Detail plan of card file cabinet Linen 8/11/1914 963931 12-3022 Proposed cattle pass near Columbia, N.J. Linen 8/21/1914 963932 12-3022 Plan of proposed freight shelter at Augusta, N.J. Linen 8/22/1914 963934 12-3022 Location plan of water pipes for new loco shop at Pen Argyl, Pa. Linen 7/31/1914 963935 12-3022 Plan of proposed freight shelter at Augusta, N.J. Linen 9/11/1914 963936 12-3022 Plan and profile of public road at Johnsonville, Pa. Linen 9/22/1914 963937 12-3022 Proposed coal trestle and shelter at Saylorsburg, Pa. Linen 11/2/1914 963938 12-3022 Topo map at Sour's Mill Dam, Pa. (Bushkill Township) Linen 12/1/1914 96

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I41934194

41954196419741984199420042014202420342044205

42064207420842094210421142124213

Page 120 of 194Page 120 of 194

42134214421542164217421842194220422142224223422442254226422742284229423042314232

3972 i t 4/28/1916 96

3941 12-3022 Standard 15ft. Switch Linen & Blue 1/30/1915 963945 12-3022 Plan of Welfare building at Pen Argyl, Pa. Linen 4/14/1915 963949 12-3022 Plan of coaling and ashes plant with profile of tracks at Pen A

Pa.rgyl, Linen 8/7/1915 96

3951 12-3022 Details of transfer platform at Pen Argyll, Pa. Linen 10/11/1915 963952 12-3022 Design of building for transfer platform at Pen Argyl, Pa. Linen 10/19/1915 963953 12-3022 Design of building for transfer platform at Pen Argyl, Pa. Linen 10/19/1915 963954 12-3022 Design of transfer platform at new loco shop at Pen Argyl, Pa. Linen & Blue 11/15/1915 963955 12-3022 Drainage of new loco shop at Pen Argyl, Pa. Linen & Blue 11/8/1915 963956 12-3022 Plan of wooden stringer bridge at Chapmans Quarries, Pa. Linen 11/17/1915 963957 12-3022 Ash conveyor plant details at new loco shop at Pen Argyl, Pa. Linen 2/3/1916 963958 12-3022 Plan in sections of frictionless rail at Chapmans Quarry, Pa. Linen 2/24/1916 963961 12-3022 Lye pit pipe and pipe hangar details at loco shop at Pen Argyl, Pa. Linen 1/17/1916 963962 12-3022 Boiler house walls and foundations at loco shop at Pen Argyl, Pa. Linen 1/28/1916 963963 12-3022 plan showing train order and interlocking signals at Benders J

Pa.ct., Linen & Blue 3/22/1916 96

3966 12-3022 Piping layout in boiler house at Pen Argyl, Pa. Blueprint 3/14/1916 963967 12-3022 Plan for a type cabinet drawer Blueprint 4/28/1916 963968 12-3022 Plan for a type cabinet drawer Blueprint 4/28/1916 963969 12-3022 Plan for a type cabinet drawer Blueprint 4/28/1916 963970 12-3022 Plan for a type cabinet drawer Blueprint 4/28/1916 963971 12-3022 Plan for a type cabinet drawer Blueprint 4/28/1916 963972 12 302212-3022 Pl f t bi t dPlan for a type cabinet drawer BlBluepri tn 4/28/1916 963973 12-3022 Plan for a type cabinet drawer Blueprint 4/28/1916 963974 12-3022 Plan for a type cabinet drawer Blueprint 4/28/1916 963975 12-3022 Plan for a type cabinet drawer Blueprint 963976 12-3022 Plan showing proposed signal tower at Benders Jct., Pa. Linen 5/3/1916 963979 12-3022 Plan of standard bridge warning Linen & Blue 5/10/1916 963980 12-3022 Plan of standard bridge warning Linen 8/21/1914 963981 12-3022 Plan of yardmaster's office at Pen argyl, Pa. Linen 8/12/1916 963982 12-3022 30 ton transfer jack Blueprint 6/?/1902 963983 12-3022 30 ton transfer jack Blueprint 6/?/1902 963999 12-3022 Revised piping layout in boiler house at Pen Argyl, Pa. Blueprint no date 96

4001 12-3023 Profile of mainline Bangor Jct. to bangor vellum 9-29-1911 974003 12-3023 BRT Co. map and profile at Howers Crossing, Danielsville, Pa blueprint 7-00-1903 974004 12-3023 Preliminary survey Bangor to Handelong vellum 1905 974007 12-3023 sketch for overpass blueprint ? 974013 12-3023 Plan and elev for Erie RR 29' Boxcar caboose blueprint 6-19-09 974015 12-3023 80' deck turntable for LV RR blueprint 7-02-1907 974016 12-3023 Pa blueprint ? 974017 12-3023 Stiff leg Derrick plan and details blueprint 9-26-1911 974020 12-3023 Substructure renewal for bridge #12.93 on Bethlehem branch linen 7-03-13 97

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I4233423442354236

4237

4238

423942404241424242434244424542464247424842494250

4251

Page 121 of 194Page 121 of 194

42514252425342544255425642574258425942604261426242634264426542664267426842694270

4060 12 gy linen ?

4022 12-3023 Proposed bridge (deck) over Paulins Kill east of Baleville, NJ blueprint 2-24-1908 974023 12-3023 Proposed bridge( thru plate) over Paulins Kill east of Baleville, NJ blueprint 2-22-1908 974024 12-3023 Renewal of bridge over Paulins Kill east of Baleville, NJ blueprint 2-11-1908 974025 12-3023 Renewal of bridge over Paulins Kill east of Baleville, NJ blueprint 2-13-1908 97

4026 12-3023Plan showing general data for bridge over Paulins Kill east of Baleville, NJ linen 1-30-1908 97

4027 12-3023PP&B Map of yard at Slatington showing proposed additional tracks blueprint 9-26-1890 97

4028 12-3023Details of substructure for bridge over Bushkill Cr. At Atlantic Pa

Mills, linen 12-23-1913 97

4030 12-3023 Nazareth coal dump paper ? 974034 12-3023 Foundation plan of Miller and Lizard Ck water tanks blueprint 6-24-1912 974036 12-3023 Topography in vicinity of S. Flory Mfg. Co., Bangor, Pa linen 1-10-1913 974038 12-3023 Details of standard Piper turntable center; used at Susex Jct. blueprint 2-00-1895 974043 12-3023 Walchaerts valce gear drawing blueprint ? 974049 12-3023 I beam girder for bridge #22 at Pellettown, NJ blueprint 4-26-1909 974055 12-3023 Mansonry plans forLehigh River bridge at Slatington, PA linen 9-30-1889 974056 12-3023 Mansonry plans forLehigh River bridge at Slatington, PA linen 9-30-1889 974057 12-3023 profile of thru truss bridge east of Baleville,NJ vellum 2-08-1908 974058 12-3023 Plan details of thru truss bridge east of Baleville,NJ vellum 2-08-1908 974059 12-3023 Plan details of thru truss bridge east of Baleville,NJ vellum 2-08-1908 97

4060 12-30233023Map showing LNE Albion br and B&P RR Pen Argyl br at PenArgyl, Pa.,

linen ? 97

4068 12-3023 Map of grade and under crossing of NYS&W at Deckertown, NJ paper 12-00-1888 974069 12-3023 Track Howe scale plan blueprint 5-25-1912 974070 12-3023 Howe track scale details blueprint 5-25-1912 974071 12-3023 Howe track scale foundation blueprint 5-21-1912 974077 12-3023 Wall vault opening paper ? 974078 12-3023 Crane RR Davies and Thomas branch, Catasauqua blueprint 10-00-1909 974079 12-3023 Map of extension of Albion branch to Courney Quarries blueprint 6-00-1903 974081 12-3023 Roberson conveyor for coaling locomotives blueprint 10-00-1913 974083 12-3023 locomotive hoist (gantry crane) blueprint ? 974084 12-3023 Standard industrial trestle plan -MW standard #158 linen 1-08-1913 974086 12-3023 Map of American Bangor branch linen 8-12-1905 974088 12-3023 Plan of proposed undercrossing of Heller Av. In Pen Argyl, PA linen 5-23-1911 974089 12-3023 Flory's dam map blueprint ? 974090 12-3023 Wrought iron track clip linen 8-00-1903 974092 12-3023 Plan of coal trestle at American Bangor slate quarry linen 8-00-1903 974094 12-3023 plan of 60' turntable at Swartswood Jct., NJ blueprint 974095 12-3023 standard 65' turntable plan blueprint 974096 12-3023 center bearing plan for standard turntable blueprint 974097 12-3023 Aluminum figures for locomotive number plate blueprint 1-08-1912 97

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I4271

42724273427442754276427742784279

42804281428242834284428542864287428842894290

Page 122 of 194Page 122 of 194

42914292429342944295429642974298

4299

4300

4301

4302

43034304

43054306

4098 12-3023 Map of Northhampton Co.Cement district linen ? 97

4100 12-3023Bangor Royal tunnel plan of extension plan for replacing woodbents

linen 4-15-1909 98

4101 12-3023 Plans and details for pile driver on derrick linen 2-18-1909 984103 12-3023 Plan of 60' deck plate girder turntable Linen 2-14-1910 984105 12-3023 Proposed plan and elevation for tower at Augusta, NJ Linen 2-05-1909 984106 12-3023 plan and elevation of telegraph office at Sussex Jct., NJ Linen 11-13-1908 984108 12-3023 Plan and details of printing frame Linen 4--03-1909 984109 12-3023 Proposed 50M gal water tank at Sussex, NJ Linen 9-14-1910 984110 12-3023 Proposed extension to passenger station at Augusta, NJ Linen 12-14-1910 98

4115 12-3023Map of interchange yard between LNE and NYS&W at HainsbNJ

urg, Linen 7-1-1907 98

4116 12-3023 Map and profile of siding to Old Delabole Quarry near Bangor, Pa Linen 10-28-1907 984117 12-3023 Plan and details for bridge at Quarry Jct., Pa Blueprint 10-06-1913 984118 12-3023 Plan and details for bridge at Quarry Jct., Pa Blueprint 10-06-1913 984119 12-3023 DL&W plan for relocation of West Bangor branch at Pen Argyl, Pa Linen 1-17-1911 984125 12-3023 Map showing topography and drainage at Pen Argyl Linen 10-9-1912 984128 12-3023 Map L&NE and connections - (note many multible copies) Blueprint 4-30-1918 984133 12-3023 Plan and details for station at Slatington, Pa Linen 3-17-1914 984134 12-3023 Plan and details for station at Slatington, Pa Linen 3-17-1914 984135 12-3023 Details of plate girder turntable at Slatington, Pa Linen 4-13-1914 984137 12-3023 Proposed passing siding at Arndts, Pa paper 00-00-1914 984138 12-3023 Proposed station at Danielsville, Pa Linen 8-29-1914 984144 12-3023 Ramaco iron works reinforced switch drawing Blueprint ? 984145 12-3023 CRR of NJ (CNJ) standard 15' switch plan and details Blueprint 1-09-1911 984148 12-3023 Road map of a portion of Northampton and Lehigh Co. Linen 7-01-1915 984149 12-3023 Plan of bridge at N. Bangor, Pa 984157 12-3023 Plan of Panther Creek railroad paper 8-19-1913 984158 12-3023 Plan of Panther Creek railroad paper 8-19-1913 984190 12-3023 Plan and sections of Martins Ck. On Bangor Br.near MP1 Linen 7-29-1915 98

4192 12-3023Plan, elevations & details of trestle bridge #96.12 across Papakating Ck west of Lewisburg, NJ Linen 8-12-1915 98

4193 12-3023Plan, elevations & details of trestle bridge #93.44 across Papakating Ck west of Pellettown, NJ Linen 8-16-1915 98

4194 12-3023Plan, elevations & details of trestle bridge #93.23 across Papakating Ck west of Pellettown, NJ Linen 8-17-1915 98

4195 12-3023Plan, elevations & details of trestle bridge #92.14 across Papakating Ck west of Armstrong, NJ Linen 8-18-1915 98

4196 12-3023Plan, elevations & details of trestle bridge #89.66 across PaulKill east of Augusta, NJ

ins Linen 8-21-1915 98

4198 12-3023 borough Linen 9-24-1915 98

4199 12-3023Plan and profile of proposed siding to Sequine & Co. sand pitPortland, Pa

s, Linen 9-24-1915 98

4200 12-3024 Details of wood forms for Arch culvert - CM&StP drawing blue 8/13/1912 99

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I43074308430943104311431243134314431543164317431843194320432143224323

4324

4325

4326

Page 123 of 194Page 123 of 194

43264327432843294330433143324333433443354336433743384339434043414342434343444345

4229 12 3024 Pa linen 2/4/1914 99

4201 12-3024 concrete highway undercrossing - elevation and plan blue 12/27/1912 994202 12-3024 concrete highway undercrossing - footing plan blue 12/27/1912 994203 12-3024 concrete highway undercrossing - elevation and details of barrel blue 1/25/1913 994204 12-3024 concrete highway undercrossing - footing plan blue 1/25/1913 994205 12-3024 Manning viaduct over CNW & CGW masonry location plan blue 3/20/1913 994206 12-3024 Manning viaduct over CNW & CGW details of east abutment blue 4/19/1913 994207 12-3024 Manning viaduct over CNW & CGW details of east abutment blue 4/19/1913 994208 12-3024 Standard concrete arch culvert for fill up to 100' blue 3/8/1910 994209 12-3024 Standard concrete arch culvert for fill up to 100' blue 3/8/1910 994210 12-3024 Standard concrete arch culvert for fill up to 40' blue 994211 12-3024 Standard concrete arch culvert for fill up to 40' blue 994212 12-3024 Standard concrete arch culvert for fill up to 40' blue 994213 12-3024 Standard concrete arch culvert for fill up to 40' blue 994214 12-3024 Standard concrete arch culvert for fill up to 40' blue 7/1/1910 994215 12-3024 Standard concrete arch culvert for fill up to 40' blue 12/15/1910 994216 12-3024 Standard concrete arch culvert for fill up to 40' blue 7/15/1910 994217 12-3024 Standard concrete arch culvert for fill up to 40' blue 8/13/1910 99

4227 12-3024Marking diagram for bridge #19.86 on Nazareth branch at AtlaMills, Pa

ntic linen 1/26/1914 99

4228 12-3024Laterals, stringers, and brackets for bridge #19.86 on Nazaretbranch at Atlantic Mills, Pa

h linen 2/4/1914 99

4229 12 3024-70' Girders for bridge #19.86 on Nazareth branch at Atlantic MPa

ills, linen 2/4/1914 99

4230 12-3024 LVRR standard bridge warning telltales blue 4/18/1910 994247 12-3024 Foundation for scale for eastbound yard at Pen Argyl, Pa linen 10/23/1914 994249 12-3024 foundation for locomotive jack pit at new shop, Pen Argyl, Pa linen 5/12/1915 994250 12-3024 locomotive jack pit sections linen 5/13/1915 994251 12-3024 Foundation for scale for westbound yard at Pen Argyl, Pa linen 6/7/1915 994252 12-3024 New locomotive shop general floor plan linen 6/12/1915 994253 12-3024 New locomotive shop fan house arrangement of electrical equip. linen 7/14/1915 994254 12-3024 Foundation of scale for westbound yard linen 7/19/1915 994255 12-3024 New locomotive shop foundation plan of flue rattler linen 7/30/1915 994256 12-3024 New locomotive shop foundation sections for flue rattler linen 7/30/1915 994257 12-3024 New locomotive shop motor house for flue rattler linen 8/2/1915 994258 12-3024 Foundation plan for 50,000 gal water tank at Pen Argyl, Pa. linen 12/14/1915 994259 12-3024 New locomotive shop details of Lye vat linen 1/11/1916 994260 12-3024 New locomotive shop ash conveyor plant plan and details linen 1/20/1916 994261 12-3024 New locomotive shop paint shop general data plan linen 2/14/1916 994262 12-3024 New locomotive shop general floor plan for machinery location linen 2/16/1918 994263 12-3024 New locomotive shop switchboard room and transformer yard linen 3/14/2016 994264 12-3024 Brickwork details for boiler - Babcock and Wilcox paper 8/2/1915 994265 12-3024 Map of LNE and NYS&W route of anthracite coal to tidewater blue 11/13/1916 99

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I4346

4347

4348434943504351

43524353

4354

4355

4356

4357

43584359

43604361

Page 124 of 194Page 124 of 194

43614362436343644365436643674368436943704371437243734374437543764377437843794380

4292 12 3024 General plan roundhouse at Pen Argyl Pa 99

4266 12-3024 Profiles of LNE and NYS&W from coal fields to tidewater linen 7/14/1916 99

4267 12-3024Map showing steam and electric lines providing passenger seto Bangor, Pa

rvice linen 8/9/1916 99

4267 12-3024Map showing steam and electric lines providing passenger seto Bangor, Pa (colored)

rvice blue 8/9/1916 99

4268 12-3024 No tresspassing sign - full size linen 8/1/1916 994273 12-3024 Jct. linen 3/22/1916 994274 12-3024 Plan and profiles of streets in Catasauqua, Pa linen 1/8/1917 99

4276 12-3024Plan of proposed under grade crossing at Broadway, Wind GaPa.

p, linen 9/30/1915 99

4278 12-3024 Plan and details of substructure for bridge #89.66 at Augusta, NJ linen 10/1/1915 99

4281 12-3024Plan of proposed under grade crossing at Broadway, Wind GaPa. scheme"C"

p, linen 10/21/1915 99

4282 12-3024Plan, elevations & details of trestle bridge #91.72 across Papakating Ck east of Plains, NJ linen 10/23/1915 99

4283 12-3024Plan, elevations & details of trestle bridge #100.24 across Wariver east of Sussex Jct., NJ

lkill linen 10/30/1915 99

4284 12-3024Plan, elevations & details of trestle bridge #108.76 across Blacreek west of Pine Island Jct., NY

ck linen 10/26/1915 99

4285 12-3024Plan of proposed under grade crossing at Broadway, Wind GaPa. scheme"D"

p, linen 11/29/1915 99

4287 12-3024 Proposed station for Danielsville, Pa - plan and elevation linen 4/12/1916 99

4287 12-3024Proposed station for Saylorsburg, Pa - plan and elevation (nomarked up Danielsville station drawing)

te: blue 7/13/1923 99

4292 12 3024- General plan roundhouse at Pen Argyl Pa , linen 5/1/1916linen 995/1/19164293 12-3024 Section plan thru roundhouse at Pen Argyl, Pa linen 4/26/1916 994294 12-3024 Track pit details for roundhouse at Pen Argyl, Pa. linen 5/1/1916 994295 12-3024 Roof plan for roundhouse at Pen Argyl, Pa linen 5/1/1916 994296 12-3024 Elevation and fanhouse for Roundhouse at Pen Argyl, Pa. linen 5/1/1916 994297 12-3024 End elevations for roundhouse at Pen Argyl, Pa. linen 5/1/1916 994298 12-3024 Elevation and fanhouse for Roundhouse at Pen Argyl, Pa. linen 5/1/1916 994299 12-3024 Profiles of LNE and NYS&W from coal fields to tidewater linen 7/14/1916 994252x 12-3024 shop wiring diagram linen 9/7/1915 994252y 12-3024 location of lights diagram linen 9/8/1915 994262x 12-3024 New locomotive shop electrical wiring diagram for shop linen 994265c 12-3024 Map of anthracite railroad routes to tidewater and coal fields linen 7/8/1916 994268a 12-3024 No tresspassing sign - full size linen 8/1/1916 994268b 12-3024 No tresspassing sign - full size linen 8/1/1916 994303 12-3024 Tamaqua Ext. standard concrete arch. 16' x 16' linen 2/22/1911 1004307 12-3024 Tamaqua Ext. plan of masonry bridge abutments sta. 1215+21 linen 3/13/1911 1004308 12-3024 Tamaqua Ext. standard concrete arch. 16' x 16' at sta 182+36 linen 3/14/1911 1004309 12-3024 Tamaqua Ext. plan of 16' x 14' arch over highway at Sta. 148+07 linen 3/16/1911 1004310 12-3024 Tamaqua Ext. plan of masonry bridge abutments sta. 1202+18 linen 3/21/1911 1004311 12-3024 Tamaqua Ext. plan of 16' x 14' arch over highway at Sta. 1605+74 linen 3/23/1911 100

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I43814382438343844385438643874388

43894390

43914392439343944395

439643974398

4399

Page 125 of 194Page 125 of 194

4399

4400

4401440244034404440544064407

4408

440944104411

441244134414

4338 12 linen 9/12/1911

4313 12-3024 Tamaqua Ext. plan of overhead highway bridge at Sta. 172+56 linen 4/1/1911 1004314 12-3024 1621+25 linen 4/5/1911 1004315 12-3024 Tamaqua Ext. plan of 16' x 14' arch over highway at Sta. 148+07 linen 4/6/1911 1004316 12-3024 Tamaqua Ext. plan of 20' x 14' arch over highway at Sta. 1605+74 linen 4/11/1911 1004317 12-3024 Tamaqua Ext. plan of retaining wall linen 4/14/1911 1004318 12-3024 Tamaqua Ext. plan of 10 x 10' arch over Slate Ck. Sta. 288+71 linen 5/5/1911 1004319 12-3024 Tamaqua Ext. plan of 6 x 7' arch over stream at Sta. 1512+77.5 linen 5/11/1911 1004320 12-3024 Tamaqua Ext. plan of 8 x 8' arch over stream at Sta. 1603+14.5 linen 5/15/1911 100

4322 12-3024Tamaqua Ext. plan of 12 x 12' arch over private road at Sta. 1671+80.5 linen 5/23/1911 100

4323 12-3024 Tamaqua Ext. plan of concrete highway bridge at Sta. 172+56 linen 5/31/1911 100

4327 12-3024Tamaqua Ext. plan of 14 x 14' arch over private road at Sta. 1671+80.5 linen 7/11/1911 100

4328 12-3024 Tamaqua Ext. retaining wall along highway sta. 1719+50 linen 7/12/1911 1004329 12-3024 Tamaqua Ext. plan of abutments for highway bridge at sta. 172+56 linen 7/31/1911 1004332 12-3024 Tamaqua Ext. plan of masonry bridge abutments sta. 1179+00 linen 8/19/1911 1004333 12-3024 Details of floor bolts and super-elevation blocks linen 8/21/1911 100

4335 12-3024Tamaqua Ext. plan of 14 x 14' arch over private road at Sta. 1488+54 linen 8/30/1911 100

4336 12-3024 Tamaqua Ext. plan of concrete ballast floor bridge at 1471+22.3 linen 9/5/1911 1004337 12-3024 Tamaqua Ext. plan of masonry bridge abutments sta. 1736+38.5 linen 9/7/1911 100

4338 12-30243024Tamaqua Ext. plan of masonry bridge abutments over creek s1066+17

ta. linen 9/12/1911 100

4339 12-3024Tamaqua Ext. plan of masonry bridge abutments over highwasta. 1179+00

y linen 9/14/1911 100

4340 12-3024Tamaqua Ext. plan of masonry bridge abutments over Lizard sta. 685+15

creeklinen 9/15/1911 100

4342 12-3024 Tamaqua Ext. plan of 20' x 14' arch over highway at Sta. 130+83.5 linen 10/6/1911 1004343 12-3024 Tamaqua Ext. plan of concrete highway bridge at Sta. 196+50 linen 10/17/1911 1004345 12-3024 Tamaqua Ext. plan of concrete highway bridge at Sta. 1428+50 linen 11/2/1911 1004346 12-3024 Tamaqua Ext. plan of concrete highway bridge at Sta. 267+30 linen 11/7/1911 1004347 12-3024 Tamaqua Ext. plan of bridge for privat road at Sta. 1428+50 linen 11/15/1911 1004348 12-3024 Tamaqua Ext. plan of 24' x 14' arch over highway at Sta. 365+37 linen 11/20/1911 100

4349 12-3024Tamaqua Ext. plan of masonry bridge abutments over highwasta. 290+40

y linen 11/27/1911 100

4350 12-3024Tamaqua Ext. floor framing plan for bridge over highway sta. 290+40 linen 3/14/1912 100

4351 12-3024 Plat and Profile of crossing at Lehigh Gap linen 12/21/1910 1004363 12-3024 Tamaqua Ext. plan of 20' x 14' arch over highway at Sta. 231+61.5 linen 6/16/1913 100

4364 12-3024Plan of masonry bridge abutments at Sta. 231+61.5 - Catasaubranch

qua linen 7/8/1913 100

4365 12-3024 Reinforced concrete box - Catasauqua br. linen 7/14/1913 1004370 12-3024 Foundation plan for Miller and Lizard Ck. Jct water tanks linen 6/24/1912 100

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

4415

4416

4417441844194420442144224423442444254426442744284429443044314432

4433

Page 126 of 194Page 126 of 194

443344344435

4436443744384439

444044414442444344444445

4446

4447444844494450

4404 12 ) blue 5/6/1916

4371 12-3024Plan of reinforced concrete dam for storage reservoir at LizardJct.

Ck. linen 6/29/1912 100

4373 12-3024Tamaqua Ext. plan of masonry bridge abutments over highwasta. 69+20

y linen 7/20/1912 100

4374 12-3024Plan of reinforced concrete dam for storage reservoir at LizardJct.

Ck. linen 8/30/1912 100

4380 12-3024 Bridge over highway to Mary D breaker paper 1004381 12-3024 Lehigh Gap west approach paper 1004382 12-3024 Bridge over creek to Mary D breaker paper 1004384 12-3024 Track allignment Danielsville Jct. linen 1004388 12-3024 WM Ry. - General floor plan for machine shop at Hagerstown, MD blue 6/14/1912 1004390 12-3024 Plan of grade crossings in borough of Roseto linen 1/19/1915 1004391 12-3024 Structure for bridge on mailine at MP58.13 linen 2/17/1915 1004394 12-3024 Profile of original and present grade of track near Portland, Pa. paper 4/8/1915 1004395 12-3024 Map of proposed water supply from Snyders Creek paper 4/12/1915 1004399 12-3024 Design for standing desk with cupboard linen 8/25/1915 1004352A 12-3024 Plat and Profile of bridge crossing at Lehigh Gap blue 2/14/1911 1004400 12-3026 Plan of conduits in new shop at Pen Argyl, Pa. paper 1014401 12-3026 Drawing of horizontal tank blue 8/4/1915 1014402 12-3026 details of type "B" peerless operator blue 1014403 12-3026 pilot operator type "P" blue 101

4404 12-30263026drawing of Rands coal measuring loaders and apron (coal docshutes)

k blue 5/6/1916 101

4406 12-3026 Class "S" Wetzel stokers - front view blue 12/14/1915 1014407 12-3026 Class "S" Wetzel stokers - sections blue 12/14/1915 101

4408 12-3026Map showing slate properties, quarries and railroads in the PeArgyl district

n blue 3/5/1913 101

4409 12-3026 thru girder bridge over LVRR on Tamaqua ext. at sta. 647+71 blue 6/2/1911 1014410 12-3026 bridges on Tamaqua ext. at Sta. 1709+51 and 1066+33 blue 6/3/1911 1014411 12-3026 bridge on Tamaqua ext. over highway at Sta. 1726+14 blue 6/5/1911 101

4412 12-3026bridges on Tamaqua ext. over Lizard Ck. at Sta. 656+06 and 684+92 blue 6/6/1911 101

4413 12-3026 bridges on Tamaqua ext. at Sta. 1202+18 and 1251 blue 6/7/1911 1014414 12-3026 four small bridges on Tamaqua ext. blue 6/8/1911 1014415 12-3026 Design for bridges on Tamaqua ext. blue 6/6/1911 1014416 12-3026 Design for bridges on Tamaqua ext. blue 6/5/1911 1014417 12-3026 Design for bridges on Tamaqua ext.- several blue 6/5/1911 101

4418 12-3026Bridge #19.86 across Bushkill Ck. at Atlantic Mills, Pa. on Nazareth br. blue 12/12/1913 101

4420 12-3026Bridge #19.86 across Bushkill Ck. at Atlantic Mills, Pa. on Nazareth br. blue 12/12/1913 101

4421 12-3026 Welfare bldg. Pen Argyl, Pa blue 12/11/1916 1014422 12-3026 Plan of toilet room of welfare building paper 1014424 12-3026 Map of town of Delaware Water Gap blue 8/7/1918 101

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I445144524453445444554456

44574458445944604461446244634464446544664467

4468

4469

Page 127 of 194Page 127 of 194

4470

44714472447344744475

4476

4477

4478

4479

44804481448244834484

Details for rebuilding bridge 58 substructure Bangor br over

4425 12-3026 Table arrangement plan linen 1014427 12-3026 Plan for yardmasters office at Pen Argyl, Pa. linen 1/2/1917 1014429 12-3026 Standard end trucks for 1916 turntables blue 11/13/1913 1014430 12-3026 American Bridge type "H" turntable center blue 1/4/1910 1014432 12-3026 100' turntable center bearing blue 10/13/1916 1014433 12-3026 15" topo map showing proposed extension to Auburn, Pa. paper 101

4436 12-3026Reinforced concrete trestle across Walkill river east of SussexJunction

linen 8/26/1918 101

4437 12-3026 sketch map of L&NE west of Pen Argyl, Pa. linen 1014444 12-3026 Plan of coal trestle at Rittersville, Pa. blue 8/7/1919 1014445 12-3026 Penn. Dept of Highways highway standards blue 5/24/1919 1014447 12-3026 Plan details of coal trestle at Rittersville, Pa. linen 9/10/1919 1014448 12-3026 Plan of coal trestle at Rittersville, Pa. blue 11/12/1919 1014453 12-3026 Bridge over Berks st. for Crane RR. In Catasauqua, Pa. linen 2/24/1910 1014455 12-3026 Plan for proposed monitor roof of storehouse at Pen Argyl, Pa. linen 7/31/1920 1014457 12-3026 Plan for proposed freight station at Hanover Av., Allentown, Pa. linen 11/9/1920 1014458 12-3026 Location plan for proposed freight station at Allentown, Pa. linen 11/9/1920 1014462 12-3026 Map showing railroads of north Jersey linen 5/4/1921 101

4470 12-3026Details for rebuilding bridge 4.48 substructure Bethlehem br. oMonocracy Ck.

ver linen 7/25/1921 101

4471 12-3026Details for rebuilding bridge 4.63 substructure Bethlehem br. oMonocracy Ck.

ver linen 8/6/1921 101

4474 12-3026Details for rebuilding bridge 1.58 substructure Bangor br. over 1. . Martins Ck.

linen 9/6/1921 101

4478 12-3026Details for rebuilding bridge 6.67 substructure Bethlehem br. oMonocracy Ck.

ver linen 11/2/1921 101

4490 12-3026 Renewal of bridge #63.27 over Jacobys creek, Portland, Pa. blue 7/6/1921 1014491 12-3026 Renewal of bridge #93.98 cattle pass east of Pelletttown, NJ blue 7/22/1921 1014492 12-3026 Renewal of bridge #94.73 over stream at Roys, NJ blue 6/16/1921 1014493 12-3026 Renewal of bridge #95.39 over stream at Roys, NJ blue 6/16/1921 101

4494 12-3026Renewal of bridge #4.48 across Monocracy Ck., E. of ChapmQuarries, Pa.

an blue 6/22/1921 101

4495 12-3026Renewal of bridge #4.63 across Monocracy Ck., W. of ChapmQuarries, Pa.

an blue 6/16/1921 101

4496 12-3026Renewal of bridge #5.14 across Monocracy Ck., W. of ChapmQuarries, Pa.

an blue 6/16/1921 101

4497 12-3026Renewal of bridge #6.67 across Monocracy Ck., W. of ChapmQuarries, Pa.

an blue 6/16/1921 101

4499 12-3026Details of substructure for bridge 100.24 over Wallkill River E.Sussex Jct., NJ

of linen 2/28/1922 101

4490A 12-3026 Renewal of bridge #63.27 over Jacobys creek, Portland, Pa. blue 7/6/1921 1014490B 12-3026 Renewal of bridge #63.27 over Jacobys creek, Portland, Pa. blue 7/6/1921 1014491A 12-3026 Renewal of bridge #93.98 cattle pass east of Pelletttown, NJ blue 7/22/1921 1014492A 12-3026 Renewal of bridge #94.73 over stream at Roys, NJ blue 6/16/1921 101

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I4485

4486

4487

4488

4489449044914492449344944495449644974498

44994500450145024503

Page 128 of 194Page 128 of 194

4503

450445054506450745084509451045114512451345144515451645174518451945204521

4493A 12-3026 Renewal of bridge #95.39 over stream at Roys, NJ blue 6/16/1921 101

4494A 12-3026Renewal of bridge #4.48 across Monocracy Ck., E. of ChapmQuarries, Pa.

an blue 6/22/1921 101

4495A 12-3026Renewal of bridge #4.63 across Monocracy Ck., W. of ChapmQuarries, Pa.

an blue 6/16/1921 101

4496A 12-3026Renewal of bridge #5.14 across Monocracy Ck., W. of ChapmQuarries, Pa.

an blue 6/16/1921 101

4497A 12-3026Renewal of bridge #6.67 across Monocracy Ck., W. of ChapmQuarries, Pa.

an blue 6/16/1921 101

4500 12-3051 General layout of arch bridge over NYS&W - DL&W drawing blue 6/20/1908 1024501 12-3051 General layout of arch bridge over Sussex RR. - DL&W drawing blue 1/24/1908 1024502 12-3051 General layout of arch bridge over L&NE - DL&W drawing blue 1/24/1908 1024503 12-3051 Air compressor foundation plan blue 11/13/1915 1024504 12-3051 Section plan of water tank blue 1024507 12-3051 bridge abutment plan linen 1024508 12-3051 Profile of Pen Argyl branch of B&P Ry. paper 1024509 12-3051 Pa paper 1024510 12-3051 AWG&P Rwy plan showing present tracks in Portland, Pa blue 1/25/1913 102

4511 12-3051Profile of proposed change in L&NE mainline at Bangor Fideliquarry

ty paper 102

4512 12-3051 cross sections for Chestnut Ridge branch paper 3/27/1905 1024514 12-3051 sketch map of L&NE west of Pen Argyl, Pa. linen 1024515 12-3051 foundation plan for steam hammer blue 1024516 12-3051 drawing of belted motor drive blue 11/5/1913 102

4517 12-305115" topo map showing proposed extension to Middletown andUnionville RR.

paper 102

4520 12-3051 bracing for 22' water tower blue 10/7/1912 1024521 12-3051 columns for 22' water tower blue 10/7/1912 1024524 12-3051 proposed roundhouse - section thru stall paper 1024525 12-3051 proposed roundhouse - section thru stall paper 1024526 12-3051 proposed roundhouse Pen Argyl - end elevation paper 1024537 12-3051 NY. NH & H oil storage system plan blue 11/14/1911 1024538 12-3051 standard 55' turntable plan blue 1024540 12-3051 Morse bridge Co. plan - NYP&O RR blue 2/25/1905 1024542 12-3051 abutment plan blue 1024543 12-3051 elevations of bridges over Catasauqua Ck. blue 1024544 12-3051 concrete facing wall plan - Berks St blue 1024545 12-3051 bridge plan - Berks St. blue 1024548 12-3051 16' x 24' water tank plan from WM Ry blue 10/24/1911 1024550 12-3051 Map of Crane RR paper 1024555 12-3051 CRR of NJ standard roadbed cross sections blue 12/18/1903 1024557 12-3051 WM Ry Rounhouse details of drop pits and heating ducts blue 6/25/1912 1024558 12-3051 WM roundhouse at Hagerstown sketch plan blue 5/15/1912 102

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

4522

4523

4524

452545264527

4528

4529

45304531

4532453345344535453645374538

Page 129 of 194Page 129 of 194

4538453945404541454245434544454545464547454845494550455145524553455445554556

102

4559 12-3051Detail, plan and Elevation for arches #1 & #2 for DL&W Delawriver viaduct.

are blue 102

4564 12-3051Topo map showing proposed line relocation between Bath anBenders Jct.

d blue 102

4568 12-3051topo map in vicinity of road crossing at Handelong, Upper Mt. Bethel twp. linen 8/2/1915 102

4571 12-3051Sketch of plumbing in toilet room in welfare blg at new shop, PArgyl, Pa.

en linen 11/29/1916 102

4572 12-3051 Proposed station for Danielsville, Pa - plan and elevation linen 12/18/1916 1024573 12-3051 Concrete detail plans for Danielsville station blue 11/23/1916 102

4574 12-3051Proposed overhead bridge for elimination of grade crossing aAmerican St. in Catasauqua, Pa.

t linen 1/31/1917 102

4576 12-3051Plan proposed for overhead crossing at Miltons Alley and elimination of American St grade crossing, Catasauqua, Pa. linen 3/1/1917 102

4577 12-3051Plan showing details of tables in Welfare blg at new loco shopPen Argyl, Pa.

at linen 3/3/1917 102

4592 12-3051 topo map of a portion of the Allentown branch paper 102

4595 12-3051Plan and elevations for proposed addition to Nazareth freight.station

linen 12/18/1917 102

4596 12-3051 Pile trestle bridge #100.07 east of Sussex Jct. to be replaced linen 7/1/1918 1024597 12-3051 Pile trestle bridge #100.37 east of Sussex Jct. to be replaced linen 7/1/1918 1024598 12-3051 Pile trestle bridge #100.96 east of Sussex Jct. to be replaced linen 7/1/1918 1024599 12-3051 Pile trestle bridge #108.94 west of Pine Island Jct. to be replaced linen 7/1/1918 1024500A 12-3051 Detailsof arch bridge over NYS&W - DL&W drawing blue 6/20/1908 1024500B 12-3051 Detailsof arch bridge over NYS&W - DL&W drawing blue 1026/20/19084500C 12-3051 Detailsof arch bridge over NYS&W - DL&W drawing blue 6/20/1908 1024501A 12-3051 Details of arch bridge over Sussex RR. - DL&W drawing blue 1/24/1908 1024501B 12-3051 Details of arch bridge over Sussex RR. - DL&W drawing blue 1/24/1908 1024501C 12-3051 Details of arch bridge over Sussex RR. - DL&W drawing blue 1/24/1908 1024501D 12-3051 Details of arch bridge over Sussex RR. - DL&W drawing blue 1/24/1908 1024502A 12-3051 Detail plan of arch bridge over L&NE - DL&W drawing blue 1/24/1908 1024502B 12-3051 Detail plan of arch bridge over L&NE - DL&W drawing blue 1/24/1908 1024502C 12-3051 Detail plan of arch bridge over L&NE - DL&W drawing blue 1/24/1908 1024502D 12-3051 Detail plan of arch bridge over L&NE - DL&W drawing blue 1/24/1908 1024600 12-3053 sketch of switch paper 1034607 12-3053 rail joint sketch blue 1034608 12-3053 map of eastern Pennsylvania showing townships paper 6/15/1919 1034609 12-3053 cross section sketches paper 1034610 12-3053 cross section sketches for interchange yard at Lizard Creek Jct. paper 1034611 12-3053 cross section sketches for interchange yard at Lizard Creek Jct. paper 1034614 12-3053 plan of proposed coal trestle at Danielsville, Pa. linen 9/8/1914 1034615 12-3053 Pattern AS701 for cast steel driver brake head blue 9/23/1914 1034616 12-3053 Pattern AS702 for cast steel driver brake head blue 9/23/1914 103

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

45574558

45594560

4561

4562456345644565456645674568

45694570

4571

45724573

Page 130 of 194Page 130 of 194

45734574

45754576

4577

4578

457945804581

458245834584

4585

4586

4587

4656 12 g, 103

4617 12-3053elevations of bridges and topo map of drainage area, Lamberfarm N. Bangor

t linen 10/1/1914 103

4621 12-3053 Map of tracks in vicinity of East Lehigh colliery, Tamaqua, Pa. linen 11/30/1914 103

4626 12-3053Map showing topography in vicinity of Pine Island Jct., Pine IsNY

land, linen 2/26/1915 103

4628 12-3053 Concrete manhole plan at new locomotive shop, Pen Argyl, Pa. linen 3/19/1915 103

4629 12-3053cross section sketches for proposed connection with NJ Zinc,Palmerton, Pa.

Co., paper 3/18/1915 103

4632 12-3053Sections of rubbish dump, Keystone Slate Co., Chapman's Quarries, Pa. paper 10/14/1914 103

4642 12-3053 Map of Northhampton county, Siegfried - Lehigh Gap - Danielsville blue 2/12/1915 1034643 12-3053 Map of Northhampton county, Siegfried - Bethlehem blue 2/24/1915 1034644 12-3053 Map showing L&NE track and town streets - Pen Argyl (?) blue 1034645 12-3053 Cross sections, Liberty Corners, NY paper 7/24/1916 1034646 12-3053 L&NE standard section house linen 4/1/1915 1034647 12-3053 USGS 15' topo map - Hamburg quad - L&NE tracks highlighted paper 1/1/1911 103

4651 12-3053Plan showing location of water tank and pipelines abandonedBangor, Pa.

, linen 5/11/1915 103

4653 12-3053 Transverse section plan of rain gutters on platform cover linen 103

4654 12-3053Plan of location of lights in storehouse at new locomotive shopPen Argyl, Pa.

, linen 5/25/1915 103

4655 12-3053Diagram of crane clearances in main locomotive shop at Pen Argyl, Pa. linen 5/25/1915 103

4656 12-30533053 cross sections at Weider Rd. crossing, Lehigh Gap, Pag p, paper 103paper4657 12-3053 cross sections at Danielsville Junction, Pa paper 6/1/1915 103

4662 12-3053plan showing location of proposed county bridge NorthamptonBath, Pa.

St. linen 6/10/1915 103

4663 12-3053 plan showing proposed siding for J. Weidman, Portland, Pa. - A linen 6/10/1915 103

4664 12-3053plan showing proposed siding for Weidman Sand Pit, PortlandPa. - B

, linen 6/10/1915 103

4665 12-3053cross sections at proposed passing siding at DL&W connectioMt Bethel, Pa.

n, paper 6/14/1915 103

4667 12-3053Plan and profile of proposed siding to Davies and Thomasc CCatasauqua, Pa.

o., linen 6/23/1915 103

4669 12-3053 Cross sections for Parson Bros. Slate Co paper 6/28/1915 1034671 12-3053 Plan of Oil house at new locomotive shop, Pen Argyl, Pa. linen 7/12/1915 103

4672 12-3053Plan of sewage treatment plant at new locomotive shop, Pen Argyl, Pa. linen 7/10/1915 103

4673 12-3053 cross sections - Catasauqua branch paper 1034678 12-3053 estimate of fill - Swartswood Jct. paper 103

4679 12-3053cross section sketches in conjunction with siding at Howard MWest Penn

ills, paper 103

4680 12-3053Plan and profile of proposed siding to Davies and Thomasc CCatasauqua, Pa.

o., linen 8/5/1915 103

4682 12-3053Piping and tanks in Oil house for new locomotive shop, Pen APa.

rgyl, linen 10/2/1915 103

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I45884589459045914592459345944595

4596

4597

45984599460046014602

4603

460446054606

Page 131 of 194Page 131 of 194

4606

460746084609

4610

4611461246134614461546164617461846194620462146224623

4685 12-3053 Plan of proposed concrete bridge west of Wantage station blue 11/12/1915 1034689 12-3053 10" telescopic water spout blue 11/3/1915 1034691 12-3053 map linen 1034692 12-3053 sewage treatment plant plan - bidders plan blue/linen 12/22/1915 1034693 12-3053 sewage treatment plant - Hypochlorite building linen 12/23/1915 1034694 12-3053 USGS index of quadrangle maps for Pa. 1034695 12-3053 Boiler and oil house plans and sections linen 2/14/1916 1034696 12-3053 Cross sections for proposed "Millers connection" paper 2/15/1916 103

4697 12-3053Plan of layout of Blacksmith shop, new locomotive shop, Pen Argyl, Pa linen 2/14/1916 103

4698 12-3053Shelves for stationary in storehouse at new locomotive shop, Argyl, Pa.

Pen linen 2/17/1916 103

4699 12-3053Plan of sewage treatment plant at new locomotive shop, Pen Argyl, Pa. linen 10/30/1916 103

4700 12-3053 Chart showing characteristics of road for year 1914 linen 0/0/1914 1034701 12-3053 Chart of mileage of road operated for year 1914 linen 0/0/1914 1034703 12-3053 Chart of mileage of road operated linen 6/30/1915 1034704 12-3053 Chart of mileage of road operated linen 12/31/1915 103

4705 12-3053proposed renewal of bridge 1.733 on Saylorsburg br. - concredetails

te linen 10/6/1915 103

4706 12-3053proposed renewal of bridge 1.733 on Saylorsburg br. - I beamdetails

linen 10/7/1915 103

4707 12-3053 drawing of oil storage system blue 8/30/1915 1034708 12-3053 platform canopy section details blue 3/11/1915 103

4710 12-3053map showing roads and tracks near proposed siding to DavieThomas plant at Catasauqua, Pa

s & linen 1/12/1916 103

4715 12-3053 Chart of mileage of road operated linen 6/30/1916 1034716 12-3053 Proposed change of grade at Baleville, NJ - concrete arch linen 3/24/1908 103

4720 12-3053cross sections for siding along main west of LVRR connectionLizard Ck

at paper 3/23/1916 103

4721 12-3053cross sections for siding along main west of LVRR connectionLizard Ck

at paper 3/23/1916 103

4722 12-3053 USGS 15' topo map - Staten Island quad paper 9/1/1913 1034723 12-3053 USGS 15' topo map - Philadelphia quad paper 9/1/1912 1034724 12-3053 USGS 15' topo map - Harlem quad paper 6/1/1913 1034725 12-3053 USGS 15' topo map - Poughkeepsie quad paper 6/1/1913 1034726 12-3053 USGS 15' topo map - Chester quad paper 8/1/1912 1034727 12-3053 USGS 15' topo map - High Bridge quad paper 1/1/1910 1034728 12-3053 USGS 15' topo map - Mt Holly quad paper 1/1/1910 1034729 12-3053 USGS 15' topo map - Burlington quad paper 12/1/1910 1034730 12-3053 USGS 15' topo map - Bordentown quad paper 9/1/1912 1034731 12-3053 USGS 15' topo map - Lambertville quad paper 2/1/1912 1034732 12-3053 USGS 15' topo map - Princeton quad paper 12/1/1909 1034733 12-3053 USGS 15' topo map - New Brunswick quad paper 11/1/1909 103

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I462446254626462746284629463046314632463346344635

463646374638

46394640

464146424643

Page 132 of 194Page 132 of 194

464346444645

464646474648

4649465046514652465346544655465646574658465946604661

4754 12 3053 Stan ils bl ? 103

4734 12-3053 USGS 15' topo map - Tarrytown quad paper 2/1/1914 1034735 12-3053 USGS 15' topo map - Ellenville quad paper 10/1/1912 1034736 12-3053 USGS 15' topo map - Monticello quad paper 5/1/1911 1034737 12-3053 USGS 15' topo map - Pemberton quad paper 10/1/1912 1034738 12-3053 USGS 15' topo map - Coatsville quad paper 12/1/1910 1034739 12-3053 USGS 15' topo map - West Chester quad paper 8/1/1915 1034740 12-3053 USGS 15' topo map - Plainfield quad paper 3/1/1915 1034741 12-3053 USGS 15' topo map - Somerville quad paper 1/1/1910 1034742 12-3053 USGS 15' topo map - Morristown quad paper 6/1/1912 1034743 12-3053 USGS 15' topo map - Paterson quad paper 8/1/1911 1034744 12-3053 USGS 15' topo map - Lake Hopatcong quad paper 9/1/1912 1034745 12-3053 USGS 15' topo map - Allentown quad paper 7/1/1912 103

4746 12-3053USGS 15' topo map - Wallpack, NJ quad - existing L&NE trachighlighted

ks paper 1/1/1910 103

4748 12-3053 USGS 15' topo map - Port Jervis quad paper 5/1/1911 1034749 12-3053 USGS 15' topo map - Goshen quad - L&NE tracks highlighted paper 6/1/1913 103

4750 12-3053Plan of sewage treatment plant at new locomotive shop, Pen Argyl, Pa. linen 4/6/1916 103

4751 12-3053 Plan, location, profile of bridge 8.24 at Sours Mill, Nazareth branch linen 3/29/1916 103

4752 12-3053Plan, location, profile of bridge 8.24 at Sours Mill, Nazareth br- masonry

anch linen 4/8/1916 103

4753 12-3053 Standard scale details - foundation blue ? 1034754 12 3053- Standard scale detailsdard scale deta blueue ? 1034755 12-3053 Standard scale sections blue ? 1034756 12-3053 Masonry plan for bridge 7.65 at Jacobsburg on Nazareth branch linen 4/22/1916 103

4757 12-3053Plan, location, profile of bridge 7.65 at Jacobsburg, Nazareth branch linen 3/30/1916 103

4758 12-3053 Map of extension of Albion Bangor slate siding to Arvon Slate Co. linen 4/27/1916 1034759 12-3053 plan of stack base at shops, Pen Argyl blue ? 103

4762 12-3053Shaft and motor support details in new locomotive shop, Pen Argyl, Pa linen 5/31/1916 103

4764 12-3053 Floor plan of Pen Argyl YMCA linen 6/2/1916 1034765 12-3053 Proposed siding for D.E. Zehner, West Penn twp. linen 6/19/1916 1034766 12-3053 Proposed siding for D.E. Zehner, West Penn twp. linen 6/21/1916 1034767 12-3053 plan of twin dormer window in Anthracite building linen 6/23/1916 1034768 12-3053 plan of pumping station near Sussex, NJ linen 7/14/1916 1034770 12-3053 Chart of mileage of road operated linen 12/31/1916 1034771 12-3053 plan of proposed siding three miles east of Tamaqua, Pa (Zehner) linen 8/8/1916 1034772 12-3053 sectiona view of water tank roof (DL&W) blue ? 1034773 12-3053 Howe Scale plan blue 11/23/1912 1034774 12-3053 Heads for flue ratler (DL&W) blue 5/1/1911 1034775 12-3053 Flue rattler tail bearing plan (DL&W) blue 5/1/1911 1034776 12-3053 Plan of details of Crane RR arch across Second St linen ? 103

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I46624663

4664466546664667

46684669467046714672

4673467446754676467746784679

4680 p

Page 133 of 194Page 133 of 194

4680

4681468246834684

4685468646874688

4689

4690

469146924693

4694

4695

12 1/1/1910

4777 12-3053 Map of projected siding to Davies and Thomas plant linen ? 1034779 12-3053 Lettering diagram for 4-wheel caboose blue 3/23/1912 103

4783 12-3053plan showing location of proposed sewage treatment plant at Argyl, Pa

Pen linen 11/8/1916 103

4784 12-3053 proposed siding for Builders Coop Brick and tile, Bushkill twp. linen 11/20/1916 1034785 12-3053 Chart of mileage of road operated linen 6/30/1917 1034788 12-3053 Details of steel members for tables in welfare bldg linen 3/19/1917 103

4789 12-3053Plan and profile in connection with additional track at grade acBroadway in Wind Gap, Pa

ross linen 4/5/1917 103

4790 12-3053 Catasauqua branch section 1034792 12-3053 Map of Whitehall showing Ironton RR and cement mills blue 12/1/1916 1034793 12-3053 Plan of proposed location of Roseto station linen 5/18/1917 1034795 12-3053 Plan of proposed track to plant of Excelsior Slate Co. linen 6/14/1917 103

4799 12-3053Profile of proposed siding to coal trestle of Davies and ThomaCo., Catasauqua, Pa.

s linen 7/13/1917 103

4605A 12-3053 proposed frt station plan at Sittler, Pa. linen 3/4/1913 1034605B 12-3053 proposed frt station plan and elevation at Sittler, Pa. linen 3/4/1913 1034605C 12-3053 proposed frt station elevations at Sittler, Pa. linen 3/4/1913 1034605D 12-3053 proposed frt station foundation plan and at Sittler, Pa. linen 3/4/1913 1034618A 12-3053 Map showing buildings in vicinity of First st., Bangor, Pa. blue 10/15/1914 1034745A 12-3053 USGS 15' topo map - Allentown quad - L&NE tracks highlighted paper 7/1/1912 103

4746A4746A 12-30533053USGS 15' topo map - Wallpack, NJ quad - proposed L&Nerigway highlightedy g g

ht of pa erpaper 1/1/1910 103

4749A 12-3053USGS 15' topo map - Goshen quad - L&NE tracks highlightedL&HR 1906 survey shown

and paper 5/1/1910 103

4803 12-3054 Tamaqua extension plan showing connections with LV linen 2/13/1911 1044812 12-3054 Plan of form for letters for pier #3 of Lehigh Gap bridge linen 10/21/1911 1044813 12-3054 Plat (map) showing Lehigh and New England RR and connections linen 10/23/1911 104

4815 12-3054Tamaqua extension map showing proposed change of Slatingbranch

ton linen 5/8/1912 104

4825 12-3054 L&NE Chestnut Ridge branch proposed yard near Palmerton linen 10/24/1913 1044826 12-3054 L&NE proposed connection with Chestnut Ridge RR. linen 10/31/1913 1044830 12-3054 10" Mansfield water column plan linen 6/1/1912 104

4834 12-3054Plan of dam and concrete backwall for storage reservoir at LizCreek Jct.

ard linen 7/31/1912 104

4837 12-3054Plan of Dam and storage reservoir on prop. of Mary Swank, Northampton Co. linen 9/24/1912 104

4841 12-3054Map and profile proposed change of Blue Ridge traction allignment, Berlinsville linen 5/25/1911 104

4845 12-3054 untitled arcs paper 1044846 12-3054 Plan and elevation for Pen Argyl car shop linen 4-0-1912 104

4847 12-3054Santa Fe plan showing location of shop buildings and facilitiesSan Bernadino, Ca.

at blue 10/22/1907 104

4848 12-3054Cross section of machine shop showing arrangment of suppomain shafting

rting blue ? 104

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I4696469746984699470047014702470347044705470647074708

4709

471047114712471347144715

Page 134 of 194Page 134 of 194

471647174718

471947204721

472247234724472547264727

472847294730473147324733

4850 12-3054 Chart of costs of excavation, ties rail etc. per section paper ? 1044852 12-3054 blank daily freight car status form for entire railroad linen ? 1044854 12-3054 ast steel draft gear housing for rear of tender blue 3/1/1915 1044856 12-3054 Map of proposed change of alignment for East Bangor branch linen 3/11/1915 1044860 12-3054 Plan of proposed sidings and scale at East Catasauqua linen 7/15/1915 1044861 12-3054 Plan of proposed coal trestle at Saylorsburg linen 8/11/1915 1044862 12-3054 Substructure details for girder bridge 93.23 near Pellettown, NJ linen 9/17/1915 1044863 12-3054 Substructure details for girder bridge 93.44 near Pellettown, NJ linen 9/23/1915 1044864 12-3054 Substructure details for girder bridge 96.12 near Lewisburg, NJ linen 9/30/1915 1044865 12-3054 Substructure details for girder bridge 92.14 near Armstrong, NJ linen 9/28/1915 1044866 12-3054 Topographic map showing drainage, West Penn twp. linen 10/27/1915 1044867 12-3054 Plan for warehouse for reclaiming damaged cement linen 12/4/1915 1044869 12-3054 blank daily freight car status form for entire railroad linen 104

4871 12-3054Plan of superstructure for bridge 8.24 on Nazareth branch at Sours Mill linen 4/12/1916 104

4872 12-3054Plan of superstructure for bridge 7.65 on Nazareth branch at Jacobsburg linen 4/26/1916 104

4875 12-3054 S&LV map sheet 1 (traced from blue print copies) linen 5-1-1897 1044876 12-3054 S&LV map sheet 2 (traced from blue print copies) linen 5-1-1897 1044877 12-3054 S&LV map sheet 3 (traced from blue print copies) linen 5-1-1897 1044878 12-3054 S&LV map sheet 4 (traced from blue print copies) linen 5-1-1897 1044879 12-3054 S&LV map sheet 5 (traced from blue print copies) linen 5-1-1897 1044880 12-3054 S&LV map sheet 6 (traced from blue print copies) linen 5-1-1897 1044881 12-3054 S&LV map sheet 7 (traced from blue print copies) linen 5-1-1897 1044882 12-3054 S&LV map sheet 8 (traced from blue print copies) linen 5-1-1897 104

4883 12-3054USGS 15' topo map - Greenwood Lake & Goshen quads combined - L&NE prelim surveys and L&HR 1906 survey shown paper 104

4887 12-3054 Plan of Howerton branch, Lehigh twp. blue 10/29/1917 1044891 12-3054 Proposed addition to freight station at Nazareth, Pa linen 3/20/1918 104

4892 12-3054Proposed 115' turntable location and foundation plan - Pen ArPa.

gyl, linen 4/20/1918 104

4899 12-3054 Pa. linen 7/31/1920 1044900 12-3054 Standard scale details blue 6/14/1913 1044901 12-3054 Standard scale details - foundation blue 6/14/1913 1044902 12-3054 Stringer for bridge no. 8 - Morse Bridge Co. blue 1044903 12-3054 Erie RR plan for bridge #28 taken out at Meadville, Pa blue 9/00/1900 104

4904 12-3054Abutment for deck lattice girder bridge over NYS&W at Deckertown, NJ blue 1/27/1913 104

4905 12-3054 Right of Way information chart blue ? 1044910 12-3054 LVRR plan for Signal Tower - elevations blue 6/6/1907 1044911 12-3054 LVRR plan for Signal Tower - first and second floor plan blue 6/6/1907 1044915 12-3054 Meyers Scale plan elevation blue ? 1044916 12-3054 Meyers Track scale - foundation blue ? 104

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I4734473547364737473847394740474147424743474447454746474747484749475047514752475347544755

Page 135 of 194Page 135 of 194

47554756475747584759

47604761476247634764

4765

4766

4767

4768

47694770

4957 12 3054 Topo mao sho ing proposed ppl at Campbell Hall linen 104

4918 12-3054 Lehigh and New England connections map- color vellum 1-00-1912 1044921 12-3054 Rail crossing at Catasauqua blue 1/17/1911 1044923 12-3054 Map of Crane RR blue ? 1044925 12-3054 track sketch vellum ? 1044926 12-3054 track sketch vellum ? 1044929 12-3054 Piles blue 9/15/1913 1044930 12-3054 Reinforced concrete trestle blue 9/19/1913 1044931 12-3054 Reinforced concrete trestle - details blue 9/22/1913 1044933 12-3054 Plan for portable bunk house vellum 6/30/2011 1044934 12-3054 Map and profile of yard at Pen Argyl, Pa. PP&B drawing vellum 12/19/1890 1044938 12-3054 Pressed steel car truck bolster blue 6/10/1912 1044939 12-3054 PP&B Lehigh River bridge west abutment vellum 7-6-1889 1044940 12-3054 Map showing encroachments in Pen Argyl linen ? 1044941 12-3054 Map showing location of proposed Albion branch linen ? 1044944 12-3054 Map of a portion of Borough of Catasauqua linen 1/7/1917 1044945 12-3054 Plan of proposed Signal tower at Benders Jct. linen 2/5/1917 1044946 12-3054 Plan of prposed car inspector houses linen 2/23/1917 1044947 12-3054 Plan of prposed car inspector houses linen 2/23/1917 1044953 12-3054 Standard scale details - foundation blue 10/7/1913 1044955 12-3054 Standard track bolts linen 6/30/1927 1044956 12-3054 Catasauqua branch alternate track plans (routes) linen 1044957 12 3054- Topo mao showing proposed water supply at Campbell Hall w water su y linen 1044961 12-3054 track map for extension to Auburn, Pa. linen ? 1044962 12-3054 Gen dimensions for bridge piers and slabs linen 10/1/1918 1044963 12-3054 Old DL&W connection sketch - Portland, Pa. linen 1044964 12-3054 Track plan rearrangement at Sussex Junction yard linen 2/28/1919 104

4971 12-3054Proposed terminal layout Bethlehem, Pa. on Union St btw 10tand 12th

h linen 11/10/1920 104

4981 12-3054 Standard stencilling for drop bottom gondola blue 6/29/2021 1044982 12-3054 Standard stencilling for hopper bottom gondola blue 6/25/2021 1044983 12-3054 details Rebuilding substructure for bridge 94.31 east of Roys, NJ linen 7/6/2021 1044984 12-3054 details Rebuilding substructure for bridge 94.31 east of Roys, NJ linen 7/6/2021 104

4985 12-3054details Rebuilding substructure for bridge 96.7 west of LewisbNJ

urg, linen 7/6/2021 104

4986 12-3054details Rebuilding substructure for bridge 97.4 east of LewisbNJ

urg, linen 7/6/2021 104

4987 12-3054details Rebuilding substructure for bridge 97.97 west of SusseJct. NJ

x linen 7/6/2021 104

4988 12-3054details Rebuilding substructure for bridge 98.12 west of SusseJct. NJ

x linen 7/6/2021 104

4989 12-3054details substructure for I beam span for bridge 5.14 ChapmanQuarries, Pa.

linen 9/16/1921 104

4993 12-3054 renewal of bridge 1.58 on Bangor br. At Bangor, Pa. linen 11/26/1921 104

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I4771477247734774477547764777477847794780478147824783478447854786478747884789479047914792

Page 136 of 194Page 136 of 194

47924793479447954796479747984799480048014802480348044805480648074808480948104811

4851j 12 3054 Pl li 104

4995 12-3054 details to replace bridge at 100.07 east of Sussex Junction linen 2/28/2021 1044996 12-3054 details to replace bridge at 100.37 east of Sussex Junction linen 7/13/2022 1044997 12-3054 details to replace bridge at 100.96 east of Sussex Junction linen 2/28/2022 1044998 12-3054 details to replace bridge at 108.94 west of Pine Island Jct., NY linen 2/28/2022 104

4835a 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/22/1912 1044835b 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/22/1912 1044835c 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/22/1912 1044835d 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/22/1912 1044835e 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/22/1912 1044835f 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/22/1912 1044835g 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/22/1912 1044835h 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/22/1912 1044851a 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/2/1912 1044851b 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/2/1912 1044851c 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/2/1912 1044851d 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/2/1912 1044851e 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/2/1912 1044851f 12-3054 Plans for proposed frt. Station at Tamaqua, Pa. linen 8/2/1912 1044851g 12-3054 Plans for proposed passenger station at Tamaqua, Pa. linen 7/0/1912 1044851h 12-3054 Plans for proposed passenger station at Tamaqua, Pa. linen 7/0/1912 1044851i 12-3054 Plans for proposed passenger station at Tamaqua, Pa. linen 7/0/1912 1044851j 12 3054- Plans for proposed passenger station at Tamaqua Paans for proposed passenger station at Tamaqua, Pa. linen 7/0/1912nen 1047/0/19124851k 12-3054 Plans for proposed passenger station at Tamaqua, Pa. linen 7/0/1912 1044875A 12-3054 Cover sheet for Schuylkill and Lehigh Valley Railroad Maps book linen 5-1-1897 104

4909A 12-3054 Standard scale details blue 1/27/1913 1044909B 12-3054 Standard scale details blue 1/27/1913 1044909C 12-3054 Standard scale details blue 1/27/1913 1044917A 12-3054 Erection plans of scales blue 5/16/1910 1044917B 12-3054 Erection plans of scales blue 5/16/1910 1044917C 12-3054 Erection plans of scales blue 5/16/1910 1044917D 12-3054 Erection plans of scales blue 5/16/1910 1044917E 12-3054 Erection plans of scales blue 5/16/1910 1044917F 12-3054 Erection plans of scales blue 5/16/1910 1044917G 12-3054 Erection plans of scales blue 5/16/1910 1044953A 12-3054 Standard scale details - foundation blue 10/7/1913 1044954A 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 1044954B 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 1044954C 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 1044954D 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 1044954E 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 1044954F 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 104

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I481248134814481548164817481848194820

48214822

4823482448254826

48274828

4829

4830

Page 137 of 194Page 137 of 194

4830

4831

4832

4833

483448354836

4837

4838

4839

4840

48414842

110

4954G 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 1044954H 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 1044954I 12-3054 L&NE YMCA building at Pen Argyl - elevations, plans , details blue ? 1044960A 12-3054 B&O subway at 65th St Chicago blue 4/2/2017 1044960B 12-3054 B&O subway at 65th St Chicago blue 4/2/2017 1044960C 12-3054 B&O subway at 65th St Chicago blue 4/2/2017 1044960D 12-3054 B&O subway at 65th St Chicago blue 4/2/2017 1044960E 12-3054 B&O subway at 65th St Chicago blue 4/2/2017 1044960F 12-3054 B&O subway at 65th St Chicago blue 4/2/2017 104

8301 12-3039Continuous Profile paper drawing, Lake Line, Saylorsburg Br profile Paper nodate 110

8302 12-3039 Continuous Profile paper drawing, Lake Line Paper no date 110

8305 12-3039Proposed turnout for Duquesne Slag Products Co. CatasquauPA

a, Linen 2/25/1926 110

8307 12-3039 Proposed station at Pellettown, NJ 2 copies Blueprint and4/15/1926 1108310 12-3039 Plan showing tracks to be retired on the East Bangor br Linen 5/28/1926 1108311 12-3039 Proposed location of New Station at Pen Argyl, PA Linen 11/6/1916 110

8312 12-3039Plan showing proposed curbs & gutters in vicinity of main linecrossing on Broadway, Wind Gap, PA 3 copies

Blueprint and8/16/1926 110

8323 12-3039 Report on Lehigh Gap & Portland Bridge 5pages Blueprint 5/19/1923 110

8330 12-3039Masonry plan account proposed passing siding at main line bNo. 99.18 Sussex Jct., NJ 2 copies

ridge Blueprint and4/9/1927 110

8331 12-3039Masonry plan account of proposed passing siding at main linebridge No. 99.02 Sussex, Jct.,NJ 2 copies

Blueprint and 1104/20/1927

8332 12-3039Proposed passing siding steel details for bridge No. 99.18 ovecattle pass Sussex, Jct., NJ

r Linen 4/25/1927 110

8334 12-3039Drawing of Phila & Reading track top of rail 880.30 redrawn frLNE 3263

om Graph 6/4/1927 110

8341 12-3039Plan showing proposed rearrangement of tracks at SwartswooJct., NJ

d Linen 9/1/1927 110

8344 12-3039Sketch of cupboard for stationery, supplies & report files Trainmasters office at Pen argyl, PA Linen 9/15/1927 110

8345 12-3039 Sketch showing cupboard for Yardmasters office at Pen Argyl, PA Linen 9/16/1927 1108358 12-3039 Drawing of sign reading "Water Not Safe to Drink" 2 copies Blueprint andno date 110

8366 12-3039Details of C.I. Filler blocks for girder over ash conveyor pit, PeArgyl, PA

n Linen 5/24/1928 110

8369 12-3039Plan of I-beam span for replacement of bridge No. 0.64 Glenwbr over stream

ood Linen 7/14/1928 110

8370 12-3039Floor plan for replacement of bridge No. 0.64 Glenwood brancover stream

h Linen 7/14/1928 110

8371 12-3039Steel required for supporting east end of span No. 1 Bridge N6.21 Catasauqua br. over Lehigh River at Catasauqua, PA

o. Linen 7/17/1928 110

8372 12-3039Profile showing proposed change of grade to accomm. street paving on Front St. Catasauqua, PA Linen 7/24/1928 110

8375 12-3039 Bridge at Sussex, NJ, shows girder spans and stress sheet Linen 8/14/1908 110

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

4843

4844

4845

4846484748484849

4850

4851

48524853

4854

4855

4856

4857

Page 138 of 194Page 138 of 194

4857

4858

4859

4860

4861

4862

4863

4864

48654866

486748684869

110

8383 12-3039Plan of concrete pipe to replace bridge No. 1.89 Bangor br. Bangor, PA Linen 3/13/1929 110

8385 12-3039Plan & profile of drainage ditch between Nowak & Wilcox, Warwick, NY Linen 5/8/1929 110

8393 12-3039Plan showing location of proposed crossing signals for Sta. 3338.1 at Portland, PA

41 + Linen 4/9/1930 110

8396 12-3039Plan of I-beam spans to replace timber beams bridge No. 0.67Empire br. Empire Quarries, NY Void-Pipe placed

Linen 5/14/1930 110

8400 12-3039 Detail of bottom fire brick for Mahr #15 portable rivet forge Blueprint 5/3/1922 1108401 12-3039 Detail of top fire brick for Mahr #15 portable rivet forge Blueprint 5/3/1922 1108402 12-3039 Drawing of a drawing table Blueprint no date 110

8406 12-3039Plan for strengthening by welding bridge No. 63.79 over DelawRiver between Portland, PA and Columbia, NJ

are Linen 7/9/1930 110

8413 12-3039Plan showing proposed room for air compressor at car repair shop, Pen argyl, PA Linen 10/30/1930 110

8414 12-3039Plan showing proposed track changes for the Portland Sand &Gravel Co.

Linen 11/24/1930 110

8416 12-3039 Monorail hoist supports, Pen Argyl round house Linen 1/21/1931 110

8417 12-3039Scheme A Plan of proposed offices and rearrangement of secfloor of freight house, Allentown, PA

ond Linen 1/23/1931 110

8418 12-3039Scheme B Plan of proposed offices and rearrangement of secfloor of freight house, Allentown, PA 3 copies

ond Blueprint and1/23/1931 110

8419 12-3039Plan of plate girder span for replacement of bridge No. 0.41 Mbr over stream

aryd Linen 1/27/1931 110

8420 12-3039Plan of plate girder span for replacement of bridge No. 0.87 Mbr over highway

aryd Linen 1/27/ 1101931

8422 12-3039Plan of concrete pipe to replace beam spans bridge No. 1.13 Maryd br Linen 2/19/1931 110

8425 12-3039Plan showing steel shelving for first floor vault of Main St officBethlehem, PA

e Linen 4/29/1931 110

8426 12-3039Plan showing steel shelving for 2nd floor vault of Main St officBethlehem, PA

e Linen 4/29/1931 110

8427 12-3039Plan showing arrangement of steel shelving for record storageL&NE terminal warehouse Bethlehem, PA

at Linen 5/29/1931 110

8429 12-3039Plan showing completed construction of low coal trestle and facilities for ground storage at retail coal yard Pen Argyl, PA Linen 6/19/1931 110

8430 12-3039Massey Concrete Products Corp.'s drawing of standard Classoval rr culvert pipe

"B" Blueprint 7/15/1918 110

8434 12-3039Plan for extending abutments of bridge No. 93.71 over cattle peast of Pellettown, NJ

ass Linen 7/29/1931 110

8439 12-3039Plan of substructure of I-beam span to replace bridge No. 57.west of North Bangor, PA

38 Linen 10/1/1931 110

8450 12-3039 Plan showing extension of track A Mi. 66 at Hainesburg Jct., NJ Linen 11/16/1931 110

8451 12-3039

Plan of substructure for I-beam span to replace bridge No. 57North Bangor, PA Void-Span adopted that will not require anychange in substr.

.29

Linen 11/23/1931110

8454 12-3039 Whiting Corp.'s drawing of guide struts for drop pit tables Blueprint 11/9/1931 1108456 12-3039 Plan showing proposed roof for car repair shop at Pen Argyl, PA Linen 3/12/1932 110

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

4870

4871487248734874

4875

48764877

4878

4879

4880

48814882

4883

4884

Page 139 of 194Page 139 of 194

88

48854886

48874888488948904891

4892489348944895

48964897

4898

4899

/ 93

8457 12-3039Standard guard fence #2 for light type & unimproved roads onbridge approaches or curves of 16 degrees or over

Linen 3/15/1932 110

8458 12-3039Standard guard fence #3 for light type & unimproved roads ontangent & curves up to 16 degrees

Linen 3/17/1932 110

8459 12-3039 Cast iron offset attachment for standard guard fence #1 Linen 3/17/1932 1108460 12-3039 Malleable iron offset attachment for standard guard fence #1 Linen 3/18/1932 1108462 12-3039 Profile of well at Pen Argyl, PA Linen 3/24/1932 110

8465 12-3039Plan showing structural steel to be removed from bridge No. 1at West Penn, PA

7.27 Linen 6/9/1932 110

8466 12-3039Wiring diagram flashing signal and bell Bruglers Crossing NJ Route 8 Linen 7/16/1924 110

8468 12-3039 Plan showing proposed crossing frog at Sta. 91+73.6 Bangor br Linen 8/9/1932 110

8469 12-3039Plan showing proposed signal protection for proposed grade crossing on relocated Albion branch Linen 8/19/1932 110

8473 12-3039Plan showing proposed signal protection for grade crossing st2724+51.2 on Rt 166 Wind Gap, PA

a. Linen 10/20/1933 110

8475 12-3039Schematic diagram circuit wiring three phase system Pen Argengine house

yl Linen Jan 1934 110

8479 12-3039Drawing showing Monocacy Creek and Union Street-unknownlocation due to drafting block erased

Linen unknown 110

8480 12-3039 Plan showing forged steel twin hook tie plates Linen 7/6/1934 110

8482 12-3039Details of steel for temp. support of track at east abutment of bridge No. 63.79 Columbia, NJ Linen 7/27/1934 110

84838 83 12-30393039Plan of proposed plates for changing superelevation of rail onbridge No. 514 Bethlehem Branchg

Linene 5/75/ /1934 110

8485 12-3039Plan showing proposed signal protection for grade crossing st129+71.3 Bethlehem Br.

a. Linen 11/8/1934 110

8488 12-3039 Plan showing arrangement of storm guards for track scales Linen 3/21/1935 110

8489 12-3039Plan showing proposed elimination of grade crossing sta. 520Rt 23 at Sussex Jct.

3+46 Linen 4/15/1935 110

8491 12-3039 Private crossing sign drawing Linen 10/3/1935 1108494 12-3039 "End of double track" sign drawing Linen 4/24/1936 1108496 12-3039 Mary D' branch bridge No. 0.41 over stream location plan Linen 6/4/1936 1108497 12-3039 Spade for concreting detail Linen 7/10/1936 110

8499 12-3039Plan showing proposed extension of track"A" Mi. 13 and locatof proposed loading platform at Chain, PA

ion Linen 10/29/1936 110

8502 12-3039 Plan showing transfer track at Pen Argyl, PA Linen 9/26/1922 1108506 12-3039 Plan of steel spans for coal trestle at Delps, PA Linen 11/2/1936 1108507 12-3039 Typical wiring diagram rectified AC track circuit Linen no date 110

8509 12-3039Template chart reading"Daily condition and business report a…" - 4 copies

s of Linen no date 110

8510 12-3039 Proposed 12 ton sand tank for coaling station at Pen Argyl, PA Linen 1/20/1937 110

8512 12-3039Plan showing location of proposed track for Davies & ThomasCatasauqua, PA

co., Linen 3/27/1937 110

8514 12-3039Plan showing land to be leased from Davies & Thomas co. Catasauqua, PA Linen 6/3/1937 110

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

4900

4901

4902

4903

4904

49054906

4907

4908

4909

4910

4911

4912

Page 140 of 194Page 140 of 194

4913

4914

4915

4916

4917

4918

4919

4920

4921

49224923

49244925

Plan of 110

8515 12-3039Plan showing location of new state highway thru Blueridge realestate co.'s property formerly "Knepper Farm" Linen 7/12/1937 110

8517 12-3039Train dispatching telephone - Taper resistance characteristic wire data sheet

& Linen 9/23/1937 110

8521 12-3039Masonry plataes for raising grade at bridge No. 58.18 east of North Bangor, PA Linen 4/23/1938 110

8522 12-3039Plan of ties at west abutment of bridge No. 58.18 east of NortBangor, PA

h Linen 4/28/1938 110

8526 12-3039Plan of relocation of Route NO. 45007 on account of abandonof rr bridge over highway near Saylorsburg, PA

mentLinen 10/14/1938 110

8531 12-3039Diagram showing schematic wiring circuit arrangement. Teleptest and patch panel.

hone Linen 12/29/1938 110

8532 12-3039 Plan showing proposed rearrangement of siding at Roseto, PA Linen 2/4/1939 110

8533 12-3039Clearance diagram of Catasauqua, PA tunnel - composite clearance lines for seven openings 4/11/1940 110

8533 12-303914 copies of above clearance diagrams-many blank and a fewnotes

with Linen and ot 4/11/1940 110

8535 12-3039Diagram showing buzzer system in the offices of VP, GeneralManager and Superintendent Bethlehem, PA

Linen 3/28/1939 110

8537 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 21+01.9

the Linen 8/3/1939 110

8538 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 61+45.0

the Linen 8/3/1939 110

8539 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 87+08.7

the Linen 8/3/1939 110

8540 12-3039Plan showing location of grade crossing to be abandoned on showing location grade crossing to be abandoned onNazareth Branch at station 164+42.2

the theLinen 8/4 110/1939

8541 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 169+63.7

the Linen 8/5/1939 110

8542 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 239+25.4

the Linen 8/5/1939 110

8543 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 259+23.4

the Linen 8/7/1939 110

8544 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 307+64.4

the Linen 8/8/1939 110

8545 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 395+71.8

the Linen 8/8/1939 110

8546 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 422+20

the Linen 8/8/1939 110

8547 12-3039Plan showing location of grade crossing to be abandoned on Nazareth Branch at station 430+11.2

the Linen 8/8/1939 110

8550 12-3039Plan showing proposed signal protection for grade crossing aRobinson Ave Pen Argyl, PA

t Linen 12/4/1939 110

8551 12-3039Forms for flat base pipe to replace trestle at MP1.78 Bangor Branch Linen 2/19/1940 110

8552 12-3039 Plan for reinforcing parapet at left end of arch culvert at MP 34.04 Linen 7/27/1939 110

8553 12-3039Plan showing proposed extension of Tr. A Mi. 13 at Chain, PAcopies revised

-2 Linen 3/8/1940 110

8558 12-3039 Plan showing location of tracks at Chain, PA Linen 9/10/1940 110

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I492649274928

4929

4930

4931

4932

4933

4934

4935

4936

49374938

4939

4940

Page 141 of 194Page 141 of 194

4940494149424943

4944

49454946494749484949

49504951

4952

4953

49544955

110

8559 12-3039 Wiring diagram of hump signals, Pen Argyl yard Linen 11/7/1940 1108561 12-3039 Stencil for Ballast Record Linen no date 1108562 12-3039 Floor plan for bridge No. 94.73 over stream east of Roys, NJ Linen 4/7/1941 110

8563 12-3039Plan showing location of grade crossing to be abandoned on American Bangor branch at station 10+41 Linen 4/5/1941 110

8564 12-3039Plan showing location of grade crossing to be abandoned on American Bangor branch at station 35+91 Linen 4/5/1941 110

8565 12-3039Plan showing location of grade crossing to be abandoned on American Bangor branch at station 43+23 Linen 4/5/1941 110

8567 12-3039Automatic interlocking DL&WRR Sussex branch crossing Skewith track & signal layout

tch Linen 9/8/1941 110

8569 12-3039Plan showing arrangement of steel shelving for record storageAllentown freight station

at Linen 7/21/1941 110

8570 12-3039Plan showing location of grade crossing at Sta. 6+39 on trackto be abandoned Pen Argyl

#64 Linen 11/17/1941 110

8571 12-3039Plan showing location of grade crossing at Sta. 15 +82 on trac#64 to be abandoned Pen Argyl

k Linen 11/17/1941 110

8573 12-3039Plan showing location of siding constructed for the Flory MillinCompany Bangor, PA

g Blueprint and11/26/1941 110

8579 12-3039Plan showing proposed signal protection for grade crossing S59+69.4 at Point Phillip, PA

ta. Linen 1/11/1944 110

8581 12-3039 Plan of fifth floor Bethlehem Trust Co. building, Bethlehem, PA Linen 3/29/1944 110

8582 12-3039Plan showing proposed signal protection for grade crossing S2880+63 0.89 mi east of Pen Argyl, PA

ta. Linen 5/25/1944 110

8587 12-3039Typical circuit diagram single track, flashing highway signals, relays in primary secondary, etc.

track Linen 1/27 110/1937

8588 12-3039 Plan for repairs to roof of coaling station Pen Argyl, PA Linen 2/26/1945 1108589 12-3039 Bridge warnings-Plan for suspending telltales Linen 4/25/1945 1108590 12-3039 Wiring diagram for 5 ton hoist, cripple track Pen Argyl yard Linen 8/15/1944 110

8591 12-3039Plan showing proposed signal protection for grade crossing S250+87.1 at Chapman Quarries

ta. Linen 6/6/1945 110

8592 12-3039Wiring diagram for flashing highway signals Highway route 98Chapman Quarries, PA

7 Linen 12/17/1945 110

8598 12-3039 Proposed repairs to doors for locomotive shop Pen Argyl, PA Linen 1/12/1946 1108599 12-3039 Details of crane base Allentown station, Allentown, PA Linen 1/18/1946 1108601 12-3039 Details of filler plates for bridge 6.67 Bethlehem branch, Bath, PA Linen 2/14/1946 1108605 12-3039 Plan of bridge floor on bridge 4/48 Bethlehem branch Linen 6/28/1946 110

8606 12-3039Plan showing proposed siding for Supradur Corporation WindGap, PA

Blueprint and 7/10/1946 110

8607 12-3039 Plan of proposed shelter for monorail hoist, Pen Argyl, PA Tissue 8/3/1946 110

8608 12-3039Sketches of recommended clearances for new construction bAssoc. of American Railroads

y Linen &Bluep 9/7/1946 110

8609 12-3039Plan showing proposed signal protection for grade crossing S2948+28 east of Bangor Jct.

ta. Linen 9/5/1946 110

8611 12-3039Plan of bridge floor on bridge 93/39 main line over cattle passPellettown, NJ

at Blueprint 10/25/1946 110

8607A 12-3039 Material list of proposed shelter for monorail hoist Pen Argyl, PA Tissue 8/16/1946 110

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I49564957495849594960

49614962496349644965

4966496749684969497049714972497349744975

Page 142 of 194Page 142 of 194

497649774978

497949804981498249834984498549864987498849894990499149924993

1 12-3039 List of elevation blocks for Delaware River Bridge Linen no date 1112 12-3039 Middle section of long 3/4 bolts for 60 lb. steel Linen no date 1113 12-3039 Cross section of 75 lb. rail Blueprint no date 1114 12-3039 Cross section of 58 and 76 lb. Rail-exact size Linen no date 1115 12-3039 Drawing of rail tongs Tissue no date 111

8 12-3039Map and profile of proposed coal trestle siding to LV Traction powerhouse

Co.'s Blueprint no date 111

10 12-3039 Sketch of turntable at Pen Argyl reg paper 3/23/1908 11111 12-3039 Profile of Sours Mill Siding graph no date 11112 12-3039 Middle section 7/8 bolt for 76 lb. steel Linen no date 11113 12-3039 Drawing of brake jaw Blueprint no date 111

14 12-3039Table showing calculated distance from frog to point of allowaclearance

ble Linen no date 111

27 12-3039 Drawing of specialty "security door" Blueprint no date 11131 12-3039 Map showing L&NE and siding of DL&WRR at Bangor, Pa. Linen 4/23/1908 11132 12-3039 Table showing crossing frogs from Stockertown to Nazareth Linen no date 11136 12-3039 Lehigh Valley RR standard track bolt-full scale Blueprint Nov. 1900 11137 12-3039 Grade crossing of L&NE and L&L at Benders Junction Linen no date 11148 12-3039 Detail of painting of standard signal blades Blueprint no date 11149 12-3039 Detail of painting of white pine for standard signal blades Blueprint no date 11150 12-3039 Standard 30 inch angle joint with standard boring 7/8"bolt Linen no date 11151 12-3039 Plan showing punching of joint tie plate, right and left hand Linen no date 11153 12-3039 L&NERR standard frame bent Linen no date 11154 12-3039 L&NERR standard cast iron spool packing washer Linen no date 11155 12-3039 L&NERR plan of slip for switch lamps Linen 7/23/19098 111

56 12-3039L&NERR of proposed tracks through property of Stevens Jack& CO

son graph no date 111

57 12-3039 L&NERR detail of lamp bracket for use on station signals Linen no date 11159 12-3039 Standard rail sections and drilling Linen 2/13/1911 11160 12-3039 Drawing of freight car door, present construction Blueprint no date 11161 12-3039 Drawing of freight car door, recommended construction Blueprint no date 11162 12-3039 Lehigh Coal and Navigation Co.'s standard sections of tool steel Linen no date 11163 12-3039 L&NERR sketch showing location of track sections Linen no date 11165 12-3039 L&NERR dating stamp office of Engineer M of W Bethlehem, PA Linen 12/12/1911 11167 12-3039 L&NERR Tamaqua extension list of stations Linen Jan-12 11170 12-3039 Drawing of "I" bar Linen no date 11171 12-3039 Plan showing reinforcement of Delaware River piers Linen 8/30/1910 11172 12-3039 Plan of braces for freight house at Bangor, PA Linen 6/16/1908 11173 12-3039 Plan of door and window for freight house at Bangor, PA Linen 6/16/1908 11174 12-3039 Sketch of window for Pen A rgyl store house Linen 10/19/2008 11175 12-3039 Sketch map showing Main Streeet crossing at Bath, PA. Linen no date 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

499449954996499749984999

5000

50015002500350045005

5006

5007500850095010

5011

Page 143 of 194Page 143 of 194

5011

5012

5013

5014

5015

5016

50175018501950205021

5022

5023

5024

98 12 3039 floor diagram Linen 111

76 12-3039Plan showing proposed change in Bangor freight station to prwaiting room

ovide Linen 1/10/1910 111

77 12-3039 Cross section of rails laid between MP 4 and 5 on the L&NERR Blueprint 1/26/1916 11178 12-3039 Foundation plan for Aurora drill Blueprint no date 11179 12-3039 L&NERR map showing yard at Portland, PA Linen 7/31/1908 11181 12-3039 Table showing use of telegraph and telephone for train orders Linen 1/1/1910 11186 12-3039 L&NERR and Panther Creek RR Classification of locomotives Blueprint no date 111

87 12-3039L&NERR and Panther Creek RR engine classification and numbering Blueprint no date 111

88 12-3039L&NERR and Panther Creek RR engine classification and numbering Blueprint no date 111

89 12-3039 L&NERR plan showing standard metal marker Linen no date 11190 12-3039 Tail bar L&NERR Pen Argyl, PA Blueprint no date 11191 12-3039 Riveted joints L&NE engine #7 Blueprint 3/17/1909 11192 12-3039 Table showing stations and mile posts Linen no date 111

93 12-3039Profile showing crossing at Slatington-PP&BRR over Lehigh Rand LVRR

iver graph no date 111

94 12-3039Advertisement for a roundhouse smoke jack and building ventilators Blueprint no date 111

95 12-3039 Drawing of timber hook Blueprint no date 11196 12-3039 Drawing of never slip beam clamp Blueprint no date 11197 12-3039 Example of L&NERR storehouse material records file cards Linen 8/10/1914 111

98 12 3039-Diagram of rooms Anthracite building Bethlehem, PA-basemefloor diagram

nt Linen 4/1/1913 1114/1/1913

98 12-3039Diagram of rooms Anthracite building So. Bethlehem, PA-basement floor diagram Blueprint 4/1/1913 111

99 12-3039Diagram of rooms Anthracite building So. Bethlehem, PA-firstdiagram

floor Linen 4/1/1913 111

100 12-3039Diagram of rooms Anthracite building So. Bethlehem, PA-secfloor diagram

ond Linen 4/1/1913 111

101 12-3039Diagram of rooms Anthracite building So. Bethlehem, PA-thirdfloor diagram

Linen 4/1/1913 111

102 12-3039Diagram of square spikes manufactured by American Steel &Co.

Wire Linen 4/19/1913 111

103 12-3039Drawing of reinforced angle bar No. 439 90 lb rail, Cambria SCompany

teel Linen 11/29/1909 111

104 12-3039 L&NERR details of switch stand locking bar Linen 10/4/1913 111110 12-3039 L&NERR standard telephone transpositions Main Line trunks Blueprint 1/3/1916 111110 12-3039 L&NERR standard telephone transpositions Main Line trunks Linen 1/3/1916 111111 12-3039 L&NERR Proposed designs for safety first button Linen 12/20/1913 111

114 12-3039L&NERR section of bridge & elevation near Lambert's farm NBangor, PA

. Linen 1/20/1914 111

116 12-3039L&NERR clearances suggested by the Am. Railway EngineerAssoc.

ing Linen 2/9/1914 111

117 12-3039L&NERR sketch showing details of creosoted bridge ties for Atlantic Mills bridge Linen 2/18/1914 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I50255026502750285029

5030503150325033

503450355036503750385039504050415042

50435044

Page 144 of 194Page 144 of 194

5044

5045

5046

5047

504850495050505150525053

50545055

5056505750585059

147 12 3039 100 gal Gasoline tank details Linen 111

119 12-3039 L&NERR detail plan of shelves for auditing department Linen 2/26/1914 111120 12-3039 L&NE Classification of Locomotives Blueprint 3/5/1914 111122 12-3039 L&NE winding shaft 50-ton steel hopper car Series "B" Blueprint 3/26/1914 111123 12-3039 L&NE Classification of Locomotives Blueprint 4/8/1914 111124 12-3039 Details of support for drain pipes at Florida Orange Co, NY Linen 4/22/1914 111

125 12-3039Proposed scheme of bridging L&NE tracks at slate dump of SSlate Co

tar Linen 4/24/1914 111

126 12-3039 Details of 2nd hand girders at store house Pen Argyl, PA Linen 5/4/1914 111127 12-3039 MCB standard axles 5X9 Blueprint 5/12/1914 111128 12-3039 MCB standard axles 5 1/2X10 Blueprint 5/12/1914 111

129 12-3039Diagram showing clearances on East Bangor branch-ConsolidNo. 3

ated Linen 5/26/1914 111

130 12-3039 Brake staff for box cars Blueprint 8/17/1914 111131 12-3039 Sketch plan of shelves for Auditor's Department Linen 8/21/1914 111132 12-3039 Detail of 2nd hand girders Linen 8/3/1914 111136 12-3039 Engine truck axle, engines 15-31 Blueprint 11/16/1914 111138 12-3039 Sketch of screw for tripod, 18" gurley wye level Linen 1/30/1915 111139 12-3039 Design for honor medal Linen 2/23/1915 111141 12-3039 Track nut locks-tests made at Purdue and Cornell Blueprint 2/20/1914 111145 12-3039 Standard lock washers, full size Linen 8/5/1915 111

146 12-3039 Map showing possible water supply in vicinty of Campbell Hall, NY Linen no date 111147 12 3039- 100 gal Gasoline tank details . Linen 8/20/1915 1118/20/1915

148 12-3039Diagram of rooms of Anthracite building, So. Bethlehem, PA floor

first Linen 8/26/1915 111

149 12-3039Diagram of rooms of Anthracite building, So. Bethlehem, PA second floor Linen 8/26/1915 111

150 12-3039Diagram of rooms of Anthracite building, So. Bethlehem, PA floor

third Linen 8/26/1915 111

151 12-3039Diagram showing grades proposed coal storage yard Pen ArgPA

yl, Linen 8/30/1915 111

153 12-3039 Standard concrete fence post Linen 9/8/1915 111162 12-3039 Standard rail drilling diagram-many revised sheets included Blueprint 8/3/1915 111163 12-3039 Proposed subway, Wind Gap, PA Linen 8/30/1915 111164 12-3039 Standard R.E. 100 lb. Rail, full size Linen 11/3/1915 111165 12-3039 Plan showing motor for cutter and tool grinder Linen 11/16/1915 111

167 12-3039Sketch plan of shelves for Audit Dept-room No.1, An thracite Building Linen 11/23/1915 111

169 12-3039 Details of cast iron cover plates for cross pipe duct, Pen Argyl, PA Linen 2/18/1916 111

170 12-3039Table of distances by nearest route between junction points wother RR

ith Linen no date 111

171 12-3039 Suggested a rrangement of offices, no place given Linen no date 111172 12-3039 Cast steel sheave Linen 3/18/1916 111173 12-3039 Form for Road crossing traffic record Linen no date 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I5060506150625063

50645065506650675068506950705071507250735074507550765077

50785079

Page 145 of 194Page 145 of 194

5080

5081

5082

5083

5084

50855086508750885089

50905091509250935094

175.00 12-3039 Profile of 90# rail between mile 4 and 5 on the L&NE Blueprint 1/26/1916 111176 12-3039 Profile of 97# rail between mile 4 and 5 on the L&NE Blueprint 4/29/1916 111177 12-3039 Profile of 90# rail nine miles from Bethlehem on the L&NE Blueprint 4/29/1916 111178 12-3039 Plan of present Yard Master's office, Pen Argyl, PA Linen 5/30/1916 111

180 12-3039Proposed inter-call telephone system, Pen Argyl yard and easPortland

t to Linen 11/1/1916 111

181 12-3039 Detail section of 2200 lb. Pile driver hammer Linen 1/4/1917 111183 12-3039 Map showing tracks, roads and buildings near bridge No. 108.76 Linen 4/2/1917 111184 12-3039 Map indicatingbridge No. 108.76 location Photo no date 111185 12-3039 Map showing tracks, road and buildings near bridge No. 100.226 Linen 4/20/1917 111186 12-3039 Map indicating bridge No. 100.226 location Photo no date 111187 12-3039 Map showing tracks, road and buildings near bridge No. 65.708 Linen 4/24/1917 111188 12-3039 Map showing tracks, road and buildings near bridge No. 63.8 Linen 4/20/1917 111189 12-3039 Map indicating bridges 63.8 and 65.708 locations Photo no date 111194 12-3039 Map showing tracks, roads and buildings near bridge No. 14.460 Linen 5/4/1917 111195 12-3039 Map indicating bridge No. 14.460 location Photo no date 111196 12-3039 Map showing tracks, roads, and buildings near bridge No. 5.60 Linen 5/4/1917 111197 12-3039 Map indicating bridge No. 5.60 location Photo no date 111198 12-3039 Map showing tracks, roads and buildings near bridge No. 31.954 Linen 5/7/1917 111

199 12-3039Map showing tracks, roads and buildings near bridges No. 26& 27.234

.525 Linen 5/5/1917 111

200 12-3039 Steel required for nose on pier No. 3 Lehigh River bridge Linen 7/18/1911 111201 12-3039 Plan of track bolt for 80# rail Linen 10/19/1911 111

217 12-3039Tamaqua Extension-plan and profile of grade crossing of CouRoad

nty Linen 5/26/1911 111

218 12-3039Tamaqua Extension-plan and profile of grade crossing of CouRoad

nty Linen 5/26/1911 111

219 12-3039Tamaqua Extension-plan and profile of grade crossing of CouRoad

nty Linen 5/26/1911 111

232 12-3039Sketch showing layout for proposed crossing gates at BerlinsvPA

ille, Linen 7/8/1912 111

233 12-3039Sketch showing location of engine siding at Delph's in West PTwp.

enn Linen 8/29/1912 111

236 12-3039 Sketch showing spring seat Blueprint no date 111237 12-3039 Bill of switch timber for turnouts and crossovers Linen no date 111249 12-3039 Profile of center line of reservoir at Lizard CreeK Jct. Linen 7/29/1912 111250 12-3039 Reservoir site Lizard Creek Jct. Lilnen 7/27/1912 111

275 12-3039Sketch showing contours along stream-Sta. 133 & 40 WalnutpPA

ort, Linen 9/3/1912 111

280 12-3039 Sketch showing East Bangor branch Linen no date 111287 12-3039 Profile of 90# rail on 9 mile curve Blueprint 1915 111288 12-3039 Profile of 90# rail on Keystone curve Blueprint 1914 111300 12-3039 Map indicating bridges No. 26.525, 27.234 and 31.954 locations photocopy no date 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

50955096

509750985099510051015102510351045105510651075108510951105111511251135114

Page 146 of 194Page 146 of 194

5115

511651175118

511951205121

5122

5123

5124

51255126

512751285129

301 12-3039Map showing tracks, roads and buildings near bridges No. 15and 16.823

.899 Linen 5/5/1917 111

302 12-3039 Map indicating bridges 15.899 and 16.823 locations photocopy no date 111

305 12-3039Sketch showing properties of Chas. H. Ziegenfuss to PenroseMertz

D. Linen 6/7/1917 111

306 12-3039 Indianapolis Frog at feed house-Pen Argyl 80# rail Linen 1914 111307 12-3039 Indianapolis Frog Chapmans west end of passing siding 80# rail Linen May-14 111308 12-3039 Indianapolis Frog at Fitzgerald Speer Co. 80# rail Linen Apr-14 111309 12-3039 Indianapolis Frog on L&NERR just west of shops 80# rail Linen Nov.1911 111310 12-3039 Indianapolis Frog east of storehouse 80# rail Linen Apr-14 111311 12-3039 Carlisle Frog east end Portland yard 90# rail Linen Apr-14 111312 12-3039 Carlisle Frog at Mr. Bethel 90# rail Linen Apr-14 111313 12-3039 Carlisle Frog Katellen switch 90# Linen Apr-14 111314 12-3039 Carlisle Frog at Johnsonvillle ice house Linen Apr-14 111315 12-3039 Carlisle Frog at ? No.2 90# rail Linen Apr-14 111316 12-3039 Carlisle Frog at ? 90# Linen Apr-14 111317 12-3039 Carlisle frog west end Portland yard 90# Linen Apr-14 111322 12-3039 Map showing Alliance & Cherryville St. Ry. Blueprint no date 111323 12-3039 Map showing Bath & Chapman St. Ry. Blueprint no date 111324 12-3039 Map showing Heimbach RR Blueprint no date 111325 12-3039 Map showing Alliance & Bath St. Ry. Blueprint no date 111327 12-3039 Sketch of ?, Nazareth branch Blueprint no date 111330 12-3039 Map showing tracks, roads and buildings in Pellettown Linen 4/20/1917 111

331 12-3039Map showing tracks, roads and buildings near bridge No. 89.6Augusta, NJ

54 Linen 4/20/1917 111

332 12-3039 Map showing tracks, roads and buildings near bridge No. 96.14 Linen 4/20/1917 111333 12-3039 Map showing tracks, roads and buildings near bridge No. 92.14 Linen 4/20/1917 111

336 12-3039Map showing location of proposed crossing gates at Front St.Catasauqua,PA

Blueprint 3/28/1918 111

337 12-3039 Outbound freight station, unknown location Blueprint 12/3/1917 111338 12-3039 Inbound freight station, unknown location Blueprint 12/3/1917 111

340 12-3039Details of beams for track over hopper of coaling station at SuJct., NJ

ssex Linen 6/12/1918 111

342 12-3039Map showing divisional points of maintenance with NYS&WRSwartswood Jct.,NJ

R at Linen 6/27/1918 111

351 12-3039Draft showing intersection LH&NERR with Danielsville TractioStreet RY.

n Linen Feb-03 111

352 12-3039Sketch showing maximum clearance for cars and lading Lanstunnel

ford Linen no date 111

353 12-3039 Details of rail clamp for ASCE 80# rail Linen 11/19/1919 111

354 12-3039Map of Lehigh River showing location of Lehigh Gap bridgecrossing L&SRR, LC&N Cos., Canal, Lehigh River and LVR

R Blueprints 12/18/1919 111

355 12-3039 Sketch showing rivets on boiler locomotive No. 57 Blueprint no date 111358 12-3039 Study for proposed office building, first floor Linen 3/4/1920 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I5130513151325133

513451355136

5137

51385139

5140

5141

5142

51435144

51455146

Page 147 of 194Page 147 of 194

51465147514851495150515151525153

51545155

5156515751585159

51605161

5162

111

359 12-3039 Study for proposed office building, second floor Linen 3/4/1920 111360 12-3039 Study for proposed office building, third floor Linen 3/4/1920 111361 12-3039 Study for proposed office building, fourth floor Linen 3/4/1920 111362 12-3039 Study for proposed office building, fifth floor Linen 3/4/1920 111

364 12-3039L&NERR station list with car capacity, connecting lines, locomotives, etc. Blueprint Nov-19 111

365 12-3039 L&NERR statistics miles, grades curves, clearances, etc. Blueprint Nov-19 111366 12-3039 Plan showing siding for slate products Co., Bangor Jct., PA Linen 6/4/1920 111

368 12-3039Plan showing clamp for weather vane on Anthracite building, Bethlehem, PA Linen 8/25/1920 111

370 12-3039Plan of proposed filing cabinet for Office of Engineer MOW, Bethlehem, PA Linen 10/26/1920 111

372 12-3039 Sketch indicating proper punching on records/documents Linen no date 111

373 12-3039Plan showing location of proposed automobile platform & ramBangor, PA

p at Linen 8/3/1921 111

377 12-3039Sketch showing siding leading from L&NERR to West Bangorquarry

Blueprint Oct-04 111

378 12-3039Sketch showing siding leading from L&NERR to Bangor FidelQuarry

ity Blueprint Oct-04 111

379 12-3039Sketch showing track to be shifted west of loading wharf at Bangor, PA Blueprint 3/24/1900 111

380 12-3039 Sketch with no location named but in the vicinity of Pen Argyl, PA Blueprint no date 111

386 12-3039Plan showing proposed track crossing on the connection to thtracks of the Davies&Thomas Co, Catasauqua, PA

e Linen 1/27/1922 111

388 12-3039 Section of Front St., Catasauqua, PA Linen 2/13 111/1919390 12-3039 Plan showing detail of ventilating flue for track scales Linen 3/28/1922 111400 12-3039 Showing latitude and longitude in regards to the Albion Slate Co. Card stock no date 111401 12-3039 Profile of royal switch at Wind Gap Linen 8/9/1904 111405 12-3039 Map of Albion loading siding, Pen Argyl, PA Blueprint 1/21/1903 111406 12-3039 Tracing from Pottsville sheet US Gov. Topo Map Linen 3/9/2009 111416 12-3039 Drawing showing Carnegie angles Linen no date 111418 12-3039 Pen Argyl coal trestle, design for bent, engine supply Linen no date 111

419 12-3039Plan of Slat for cattle guard to be made from sound Chestnut long leaf yellow Pine

or Linen 6/30/1911 111

420 12-3039 Plan of floor, private car #1 Linen no date 111

422 12-3039Plan showing proposed locations between the L&NERR and Catasauqua, PA Linen no date 111

424 12-3039 Drawing showing L&NERR from Danielsville Jct. to Sittler Linen no date 111427 12-3039 Drawing showing the Nazareth branch Linen no date 111428 12-3039 Map of the right of way of East Bangor branch Linen Oct-03 111

433 12-3039Diagram showing grade crossing near Pen Argyl of L&NERR Lehigh and Lackawana RR

and Linen no date 111

435 12-3039 NYC&HRRR standard single track roadbed Blueprint no date 111

438 12-3039Plan showing crossing of Delabole Br of L&NERR and AmericBangor Br of DL&WRR

an Linen 11/4/1908 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I516351645165516651675168516951705171517251735174517551765177

5178

51795180

51815182

Page 148 of 194Page 148 of 194

5182518351845185

5186518751885189

5190

51915192

51935194

51955196

5197

474 12 3039 Boiler clearance Netcong to Franklin Furnace via Sussex branch Linen F b 10 111

439 12-3039 Standard plan of State Line Board Linen Aug-08 111440 12-3039 Standard plan of Section Board Linen Aug-08 111447 12-3039 Detail plan of dipper teeth for ditching machine Linen 8/11/1913 111448 12-3039 Standard turntable locking device Linen 8/12/1914 111450 12-3039 Sketch showing track sections Linen 4/20/1912 111451 12-3039 Sketch showing location of rail and weights accordingly Linen 4/20/1912 111455 12-3039 Plan and profile of proposed turntable track west of Pen Argyl, PA Linen 5/22/1912 111459 12-3039 Plan showing angle plate for piers at Slatington bridge Linen 6/2/1909 111460 12-3039 Detail plan of anchor bolt and wedge Linen 6/9/1909 111461 12-3039 Plan and elevation of ties for Slatington bridge Linen no date 111462 12-3039 Sketch showing sliding device for loading platform Linen no date 111463 12-3039 Sketch showing signal pole, Bangor and Portland crossing Linen 12/6/1909 111464 12-3039 Plan showing concrete headwalls for 18in pipe, Baleville, NJ Linen 7/7/1908 111465 12-3039 Detail of standard rail pedestal for ash pit Linen Apr-10 111466 12-3039 Plan showing head of casting for ash pits Linen 4/20/1910 111

469 12-3039Plan and elevation of proposed coal trestle at Star Quarry, EaBangor, PA

st Linen 7/11/1911 111

470 12-3039 Plan and elevation of proposed coal dump at West Bangor Quarry Linen 11/18/1911 111471 12-3039 Detail of window for Pen Argyl engine house Linen 8/4/1908 111

473 12-3039Plan showing proposed concrete walk at Westbrook Ave, PenArgyl, PA

Linen 11/10/1909 111

474 12 3039- Boiler clearance Netcong to Franklin Furnace via Sussex branch Linen Feb 10 111e -475 12-3039 Clearance Netcong to Franklin Furnace via Sussex branch Linen Feb-10 111476 12-3039 Packing for journal box Blueprint no date 111478 12-3039 Plan of frog DL&WRR crossing, Augusta, NJ Linen 8/26/1908 111

479 12-3039Plan showing proposed siding for Fitzgerald Speer Co. and JaGold, Bushkill Center, PA

cob Linen 4/16/1909 111

480 12-3039 Plan showing proposed siding for S.A. Drew Linen 6/15/1909 111482 12-3039 Proposed extension of siding at Pellettown, NJ Linen 8/10/1909 111483 12-3039 Plan showing proposed change of Albion siding, Pen Argyl, PA Linen 1/24/1910 111

484 12-3039Plan showing proposed extension to Slate Belt Elec. St. Ry Ctrestle, Pen Argyl, PA

oal Linen 11/5/1909 111

485 12-3039Map showing proposed siding for Montgomery Slate Co near Harpers, PA Linen 12/7/1909 111

486 12-3039 Map showing proposed siding for Wm. A. Roy Linen 12/7/1909 111

491 12-3039Plan showing location of proposed concrete coal dump for Chapman Slate Co. Linen 5/16/1910 111

492 12-3039 Plan showing proposed siding for Adam H. Bruch & Son Linen 6/14/1910 111

493 12-3039Plan showing proposed local delivery siding, east of Liberty Corner, NY Linen 6/27/1910 111

497 12-3039 Map showing proposed siding to Emery's Grist Mill, Portland, PA Linen 5/1/1908 111

501 12-3039Plan showing location and clearance of casting rack at Pen APA

rgyl, Linen 4/4/1911 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5198

5199

52005201

5202

520352045205

5206

52075208

52095210

5211

5212

Page 149 of 194Page 149 of 194

5521352145215

5216

5217

5218

521952205221

5222

5223

5224

52255226

536 /

502 12-3039Plan showing proposed siding for Blue Mountain Shirt Co., Bangor, PA Linen 4/4/1911 111

504 12-3039Plan showing extension of siding to proposed coal dump at WBangor Quarry

est Linen 4/26/1911 111

505 12-3039Plan showing proposed siding and coal trestle at Star Quarry,Bangor, PA

East Linen 7/10/1911 111

507 12-3039 Plan and profile of proposed coal trestle track at Roseto, PA Linen 11/17/1911 111

508 12-3039Plan showing proposed coal trestle and track for North BangoSlate Co.

r Linen 12/19/1911 111

510 12-3039Plan showing location of bridge over Jacoby Creek, west of Portland Linen 10/31/1911 111

511 12-3039 Plan showing proposed siding for W.S. Hazen & Son Linen 3/25/1912 111515 12-3039 Profile of Provident siding, Danielsville, PA Linen no date 111

516 12-3039Plan showing proposed extension of siding for Scott Hazen, MBethel, PA

t. Linen 7/2/1908 111

517 12-3039Map showing proposed siding for Magnesia Co. of America neSussex, NJ

ar Linen 6/30/1908 111

519 12-3039 Change of grade at Danielsville graph 9/16/1912 111

523 12-3039Plan showing proposed new siding for Reiter, Curtis & Hill throproperty of Crissman, Hainesburg, Jct.,NJ

ugh Linen 10/7/1908 111

528 12-3039 Plan showing 3rd rail to be laid at Bangor Central Quarry Linen 12/11/1908 111

533 12-3039Proposed extension of siding for Lawrence & Harden Co., Pellettown, NJ Linen 5/12/1909 111

536 12-30393039Plan showing location of proposed siding for Williams, PortlanPA

d, Linene 10/10/ /1909 111909

538 12-3039 Plan showing Pen Argyl coal dump - 2 copies Linen + blue 5/24/1909 111539 12-3039 Plan showing shop coal dump, Pen Argyl, PA Linen 5/25/1909 111543 12-3039 Plan showing wire attachments on Delaware bridge, Portland, PA Linen 7/30/1909 111

631 12-3039Plan showing proposed siding for Supplee Alderney Dairy, BaPA

th, Linen 7/30/1912 111

632 12-3039Plan showing location of proposed coal trestle for Oplinger, Summit, PA Linen 9/29/1911 111

640 12-3039Plan showing proposed siding for Decker and Simmons, SussNJ

ex, Linen 8/21/1912 111

644 12-3039Plan showing proposed extension of siding for Stephens-JackCo, Pen Argyl, PA

son Linen 8/24/1912 111

647 12-3039 Plan showing train order signal blade Linen 10/3/1912 111652 12-3039 Chart of maximum clearance and weight table Linen no date 111

653 12-3039Plan and profile of proposed coal trestle and track for Comunaand Pinto

le Linen 1/7/1913 111

654 12-3039Plan showing proposed telegraph and telephone wires from Bethelehm Jct. To Anthracite Bldg. Linen 1/17/1913 111

655 12-3039Plan showing proposed extension of siding for Floy Milling CoBangor, PA

., Linen 1/27/1913 111

657 12-3039Plan showing location of track on property of Penn Bangor SlaCo., Wind Gap, PA

te Linen 2/13/1913 111

659 12-3039 Plan showing proposed "Y" track at Benders Junction, PA Linen 3/11/1913 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I5227

5228

5229

5230

5231

5232

5233

5234

52355236523752385239524052415242

Page 150 of 194Page 150 of 194

5243

5244

5245

524652475248

52495250

52515252

5253

5254

5255

il t 10'X12' id & t

662 12-3039 Plan showing proposed building for Car Inspector Linen 3/25/1913 111

665 12-3039Detail showing structural steel I-beams for standard industrial trestle Linen 4/19/1913 111

666 12-3039Detail showing structural steel I-beams for standard industrial trestle Linen 4/23/1913 111

694 12-3039Plan of proposed siding for Beck and Farnsworth 1 mile west Wantage Sta., Vernon Twp., NJ

of Linen 9/6/1913 111

695 12-3039Plan showing location of proposed new crossing frog betweenWind Gap & Pen Argyl

Linen 9/16/1913 111

703 12-3039Sketch showing make up of cables to be used at Bangor Royaand American Bangor tunnels

l Linen 9/23/1913 111

704 12-3039Map showing location & profile of siding to Johnsonville ice hoand proposed extension of siding

use Linen 9/25/1913 111

716 12-3039 Diagram showing minimum clearance required on 15 degree curve Linen 10/15/1913 111

720 12-3039Plan and profile showing proposed coal trestle for the Albion SCo., Pen Argyl, PA

late Linen 11/7/1913 111

721 12-3039 Plan of private car Blueprint 11/10/1913 111723 12-3039 Same as description plan #694 - 2 copies Linen + Blue 11/11/1913 111729 12-3039 Sketch showing track sections - 2 copies Linen + Blue 11/26/1913 111731 12-3039 Chart showing amount required for 1 cubic yard rammed concrete Linen no date 111733 12-3039 Table of safe spans for I beams bridges Linen no date 111737 12-3039 Diagram of operating department organization Linen 12/1/1913 111738 12-3039 Sketch of glass globe for enclosed arc lamp for blue print machine Linen 12/16/1913 111

745 12-3039Details of present 10'X12' wooden string bridge & abuts westDeta s of presen wooden string br ge abuts, wesWoodley Slate Cos. Siding

of of Linen 1/21/1914 111

746 12-3039General data plan of superstructure for renewal of bridge wesWoodley Slate Cos. siding

t of Linen 1/22/1914 111

748 12-3039

Diagram showing max. clearance of rolling stock as comparedwith clearances suggested by American Railway Enginering Assoc.

Linen 2/9/1914111

751 12-3039Plan showing proposed relocation of connecting tracks with Nfrog layout between Wind Gap & Pen Argyl

o 10 Linen 2/14/1914 111

770 12-3039 Location plan of proposed coal pockets, Slatington, PA Linen 4/22/1914 111773 12-3039 Plan showing rear bumper bar for engines 34 to 46 - 2 copies Blueprint 4/30/1914 111

781 12-3039Plan showing proposed building for car inspector, Campbell HNY

all, Linen 6/15/1914 111

787 12-3039 Diagram o;f signal protection at Lehigh Gap Linen 7/9/1914 111

788 12-3039Plan showing location of crossing frog between Wind Gap & PArgyl, PA

en Linen 7/18/1914 111

795 12-3039 Sketch map of Roseto office of Engineer MOW Linen 7/6/1914 111

829 12-3039Plan showing location of temporary track at bridge 100.24 acrWallkill River, east of Sussex Jct., NJ

oss Linen 1/29/1923 111

836 12-3039Plan showing location of proposed platform & ramp at Wind GPA

ap, Linen 3/20/1923 111

842 12-3039Plan showing proposed extension of track at the Davies & Thoplant, Catasauqua, PA

mas Linen 5/11/1923 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5256

525752585259

5260526152625263

52645265

52665267

526852695270

5271

Page 151 of 194Page 151 of 194

52725273

5274

527552765277527852795280

5281

5282528352845285

5286

5287

846 12-3039

Plan showing location of cattle pass to be abandoned at the property of John Gustus on the Glenwood branch, town of Warwick, NY Linen 9/4/1923

111

851 12-3039Plan showing location of turnout of track D leading to Gardnergravel bank proposed to be removed near Portland, PA

s Linen 9/27/1923 111

866 12-3039 Plan showing location of proposed ramp at Slatington, PA Linen 1/8/1924 111867 12-3039 Plan showing tracks to be removed at Slatington, PA Linen 1/9/1924 111

868 12-3039Plan showing proposed extension of track #10 in Pen Argyl yaPen Argyl, PA

rd, Linen 1/12/1924 111

869 12-3039 Plan showing collar joint for Prizer Globe #22B stove - 2 copies Linen + blue 2/1/1924 111876 12-3039 Sketch showing water tank float Linen 4/9/1924 111877 12-3039 Sketch showing 6" iron staple Linen 4/14/1924 111

881 12-3039Plan showing location of proposed LCL unloading platform at Gap, PA

Wind Linen 4/29/1924 111

888 12-3039 Sketch showing galvanized iron stack Linen 6/13/1924 111

894 12-3039Plan showing proposed schemes for additional coal storage, PArgyl, PA

en Linen 7/15/1924 111

908 12-3039 Plan showing proposed additional coal storage, Pen Argyl, PA Linen 8/22/1924 111

909 12-3039Plan showing proposed siding for Pen Argyl lumber Co., Pen Argyl, PA Linen 8/23/1924 111

917 12-3039 6" CI blow-off riser for water tank near Portland, PA Linen 10/9/1924 111924 12-3039 Profile of Lehigh River Crossing, Lehigh Gap, PA Linen 10/30/1924 111

942 12-3039Plan showing proposed extension of siding in Rahn & West PTwps., PA

enn Blueprint 4/17/1925 111

942 12-3039 Plan showing location of track in Rahn & West Penn Twps., PA Linen 4/28/1925 111955 12-3039 Plan shoiwng track A1a to be removed at Slatington, PA Linen 6/4/1925 111

956 12-3039Sketch showing arrangement & dimensions of Master Mechan& general storekeepers' offices at Pen Argyl, PA

ics' Linen 8/8/1925 111

958 12-3039Plan showing proposed concrete bumping blocks for tracks #22E at Sussex, NJ

& Linen 6/11/1925 111

962 12-3039 Plan showing rearrangement of tracks A2 and A3 at Slatington, PA Linen 7/8/1925 111966 12-3039 Plan showing proposed #10 crossover at Quarry Jct., PA Linen 8/14/1925 111984 12-3039 Plan showing track to be retired near Portland, PA Linen 4/27/1926 111

1000 12-3039 Detail of brake shaft Blueprint 3/13/1922 1111001 12-3039 Detail of brake mast and ring Blueprint 3/13/1922 111

1002 12-3039Plan showing location of tracks at Davies & Thomas plant, Catasauqua, PA Linen 6/22/1922 111

1004 12-3039Plan showing location of building for storing & sorting scrap atArgyl, PA

Pen Linen 7/17/1922 111

1005 12-3039 Plan showing location of local freight siding at Sussex, Jct., NJ Linen 1/29/1923 1111007 12-3039 Plan showing location of siding for Pioneer Distributing Co. Linen 7/26/1923 1111009 12-3039 Plan showing extension of track B MI 5 at Saylorsburg, PA Blueprint, Lin 5/7/1924 111

1010 12-3039Plan showing location of track A Mile 3 on Slatington branch proposed to be abandoned near Edgemont, PA Linen 8/27/1924 111

1011 12-3039Plan showing location of siding for Bonner Trading in SchuylkCo., PA

ill Linen 11/6/1924 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I52885289

52905291

5292

5293

5294

52955296

52975298

529953005301530253035304

Page 152 of 194Page 152 of 194

5304530553065307

53085309

53105311

5312

5313

5314531553165317531853195320

1139 12 g p , Linen 111

1020 12-3039 Sketch of standard pole roofing & gains Linen 2/20/1929 1111020 12-3039 Sketch of standard pole Linen 7/27/1951 111

1030 12-3039Plan showing gear covers for rolling doors at Pen Argyl roundhouse Linen 5/31/1929 111

1047 12-3039 Plan showing track #80 to be retired near Bushkill Jct. Linen 9/19/1929 111

1064 12-3039173 specimens of metal arc welds tested at RPI, Troy, NY curof results

ves Van Dyke 2/14/1929 111

1065 12-3039Plan showing proposed change of tracks at Mary D. Colliery, Schuylkill Co., PA Linen 3/5/1930 111

1066 12-3039Plan showing proposed extension of siding at Snyders, SchuyCo., PA

lkill Linen 3/5/1930 111

1080 12-3039Plan showing siding & platform to be retired at Lauchnors, CaCo., PA

rbon Linen 5/8/1930 111

1081 12-3039 Plan showing track A Mile 102 to be retired , Sussex, Co., NJ Linen 5/8/1930 111

1103 12-3039Plan showing proposed extension of siding for the Lewisburg Creamery Co. at Lewisburg, NJ Linen 8/31/1926 111

1112 12-3039 Chart showing thickness of shims to be used for laying rail 8/8/1925 111

1124 12-3039Plan and profile of canal, railroads, Lehigh River at CatasauquPA

a, Linen 3/24/1927 111

1127 12-3039 Plan showing track A Mile 54 to be retired at Pen Argyl, PA Linen 4/18/1927 1111128 12-3039 Clearance diagram of private car "Jersey Central" No. 99 Linen 4/5/1927 1111135 12-3039 Step or compromise joints of rolled steel Linen no date 1111135 12-3039 Step or compromise joints of rolled steel Van Dyke (reversed) 1111139 12-30393039 Plan showing portion of track #61 to be retired at Pen Argyl, Pgy A Linen 6/14/1927 1116/14/19271146 12-3039 Bill of Switch timber for No. 8 turnout Linen 7/21/1927 1111147 12-3039 Plan of lamp tip for switch stands (marked void) Linen 7/22/1927 1111150 12-3039 Plan showing track to be retired near Wantage, Sussex, Co., NJ Linen 9/7/1927 111

1159 12-3039Plan showing proposed additional tracks at turntable, Pen ArgPa

yl, Linen 11/22/1927 111

1162 12-3039 Standard 7 1/2 "X11" canted tie plate (intermediate) Blueprint, Lin 1/11/1928 111

1165 12-3039Plan showing portion of track B Mile 52 to be retired at Wind GPA

ap, Linen 1/30/1928 111

1169 12-3039 Plan showing track A Mile 54 to be retired at Pen Argyl, PA Linen 4/20/1928 111

1176 12-3039Plan showing location of proposed siding for W.H. Anthony, Northampton Co., PA Linen, 2 blue 5/31/1928 111

1180 12-3039Plan showing plates to be used with 130# rail at Front St. Catasauqua, PA Linen 7/3/1928 111

1183 12-3039Plan showing land to be leased to Fedor & Collins Coal co. atSlatington, PA

Blueprint 7/20/1928 111

1188 12-3039 Chart and diagram showing rail clamps, cast steel Blueprint no date 1111189 12-3039 Chart and diagram showing hook bolts Blueprint no date 1111199 12-3039 Branding for cross-ties from Nov. 1, 1928 Linen 1111200 12-3039 Sketch of LVRR standard tie plate made by Dilworth, Porter & Co. Linen 10/11/1911 1111201 12-3039 Diagram of rail grabs 1/2 size Linen no date 1111202 12-3039 Diagram of a fence Linen no date 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I53215322

5323

5324

53255326532753285329

533053315332533353345335533653375338

5339

Page 153 of 194Page 153 of 194

533953405341

534253435344

5345

534653475348534953505351

5352535353545355

111

1203 12-3039 Drilling of 60 and 80 # rail Linen 4/2/1912 1111280 12-3039 Diagram of poles to stay and to be removed near Walnutport, PA Linen, Bluep no date 111

1293 12-3039Plat showing location of freight siding at West Penn, SchuylkilCo., PA

l Linen 7/27/1912 111

1294 12-3039Plat showing location of freight siding at Snyders, Schuylkill CPA

o., Linen 7/27/1912 111

1295 12-3039Plat showing location of freight siding near Berlinsville, Northampton Co., PA Linen 7/30/1912 111

1301 12-3039 PA Linen 8/27/1912 1111304 12-3039 Sketch of standard tank float Linen 8/13/1912 1111306 12-3039 Plan showing siding at Chain, Schuylkill Co., PA Linen 8/16/1912 1111307 12-3039 Nesquehoning Valley RR-standard roadbed cross sections Linen 8/8/1912 111

1318 12-3039Plan and profile showing proposed location of spur track, Northampton Co., PA Linen 8/23/1912 111

1345 12-3039 Sketch showing brake hanger Blueprint no date 1111346 12-3039 Sketch showing truck lever connection Blueprint no date 1111347 12-3039 Sketch showing MCB spring for pedestal truck 100,000# cap. Cars Blueprint no date 1111348 12-3039 Sketch showing arch bars Blueprint no date 1111363 12-3039 Temporary freight station, Tamaqua, PA Linen 8/27/1912 1111364 12-3039 Cross section Hells Mt. Road Graph no date 1111369 12-3039 Electric transfer table, two wire trolley arrangement Blueprint 4/26/1909 1111370 12-3039 Electric transfer table, list of Parts Blueprint no date 111

1377 12-3039Plat showing land to be transferred to Mary Frantz, Schuylkill PA

Co., Linen 2/29 111/1912

1392 12-3039 Detail of 2nd hand girders at store house, Pen Argyl, PA Linen 8/11/1914 1111393 12-3039 Detail of 2nd hand girders at store house, Pen Argyl, PA Linen 8/11/1914 111

1395 12-3039Plan showing proposed extension of siding south of Lizard CrJunction

eek Blueprint 7/14/1914 111

1398 12-3039 Sketch showing location of rail Linen 8/31/1914 1111400 12-3039 Draft gear key for locomotive tenders Blueprint 10/6/1914 111

1401 12-3039Plan showing proposed change of siding for Albion Bangor SlCo.

ate Linen 10/16/1914 111

1408 12-3039Plan and cross sections showing proposed ditch & sump Pen Argyl yard Linen 10/22/1914 111

1414 12-3039 Train dispatching telephone, variable resistance data sheet Linen 11/6/1914 1111418 12-3039 Standard lantern tip for high & intermediate switch stands Linen 11/12/1914 1111421 12-3039 Cost est, single track branches,Snyder to Catasauqua 1111427 12-3039 Map showing tracks in the vicinity of Augusta, NJ Linen 12/3/1914 1111428 12-3039 Map showing tracks etc. in the vicinity of Main St., Bath, PA Linen 12/3/1914 111

1429 12-3039Map showing tracks in the vicinity of Delaware River Road Portland Linen 12/3/1914 111

1430 12-3039 Map showing tracks in the vicinity of Sussex Jct., NJ Linen 12/3/1914 1111436 12-3039 Detail of steel frost pin Linen 12/23/1914 1111440 12-3039 Anthracite bldg. Second floor, proposed re arrangement of rooms Linen no date 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

53565357

5358

53595360

5361

5362

5363

5364536553665367536853695370

5371

Page 154 of 194Page 154 of 194

5372

5373

53745375537653775378

5379

5380

53815382

53835384

5385

& l PA

1442 12-3039Plan showing main and Northampton Sts. In the vicinity of L&NERR, Bath, PA Linen 1/7/1915 111

1443 12-3039 Plan showing RR crossing at Main and Race Sts., Bath, PA Linen 1/8/1915 111

1448 12-3039Sketch for table to support duplicating machine, car accountaoffice

nts Linen 1/22/1915 111

1449 12-3039Single track crossing alarm bell and visible flashing signal withbattery control

Linen 1/29/1915 111

1450 12-3039 Cast steel push pole socket Blueprint 1/30/1915 111

1451 12-3039Road crossing (Garibaldi ST) traffic record - Borough of RoseJan 29, 1915

to - Linen 2/5/1915 111

1452 12-3039Road crossing (Garibaldi ST) traffic record - Borough of RoseJan 30, 1915

to - Linen 2/5/1915 111

1453 12-3039Road crossing (Columbus ST) traffic record - Borough of RosJan 29, 1915

eto - Linen 2/5/1915 111

1454 12-3039Road crossing (Columbus ST) traffic record - Borough of RosJan 30, 1915

eto - Linen 2/15/1915 111

1456 12-3039 Plan for closing in coal trestle, Portland, PA Linen 3/12/1915 1111458 12-3039 Road crossing (Weiders RD) traffic record - Jan 19, 1915 Linen 10/16/1914 1111459 12-3039 Road crossing (Weiders RD) traffic record - Jan 20, 1915 Linen 10/16/1914 1111460 12-3039 Main Loco shop - plan showing location of reinforced curtain walls Linen 3/19/1915 1111461 12-3039 Profile of Montgomery branch Blueprint no date 1111462 12-3039 Anthracite Bldg. Desk room for cashier 2nd floor Linen no date 111

1464 12-3039Storehouse & offices, Pen Argyl, PA - to accompany weekly progress report on foundations Linen 3/31/1915 111

1465 12-3039New shop & yard Pen Argyl PA to accompany weekly progressNew shop yard, Pen Argy , - to accompany weekly progreport on drains and pipes

ress Linen 3/30/1915 111

1466 12-3039Main loco shop, Pen Argyl, PA - to accompany weekly progrereport on foundations

ss Linen 3/30/1915 111

1469 12-3039New Loco shop, Pen Argyl, PA - to accompany weekly progrereport on side walls, sash and doors

ss Linen 3/31/1915 111

1473 12-3039 Diagram of bridge warning, single track Linen no date 1111476 12-3039 Details of switch plates Linen 4/20/1915 1111477 12-3039 Details of switch plates Linen 4/20/1915 1111478 12-3039 Details of support for 2-36" drain pipes under track Linen 4/20/1915 111

1480 12-3039New Loco erecting and repair shop, Pen Argyl, PA, fan houseplan, section, elevation

- Linen 5/19/1915 111

1485 12-3039Comparison of waterway area and clearance lines of present proposed thru girder bridge, Bangor, PA

and Linen 6/8/1915 111

1488 12-3039Draft showing location of an old county bridge in the Borough Bath

of Linen 6/14/1915 111

1490 12-3039 Map showing tracks in the vicinity of Baleville, NJ Linen 6/17/1915 111

1493 12-3039Diagram showing clearances at boiler house of Genuine Washington Slate Quarry , Berlinsville, PA Linen 7/3/1915 111

1496 12-3039 New locomotive erecting and repair shop Pen Argyl, PA Linen 7/13/1915 111

1500 12-3039New storehouse and office, Pen Argyl, PA - to accompany weprogress report on sidewalls, sash and doors

ekly Linen 5/14/1914 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5386

5387

5388

5389

5390

5391

539253935394

53955396

53975398

5399

5400

Page 155 of 194Page 155 of 194

54005401540254035404540554065407

54085409541054115412

54135414

541554165417

111

6

1501 12-3039Welfare building, Pen Argyl, PA - to accompany weekly progrereport on foundations

ss Linen 5/14/1915 111

1502 12-3039Welfare building, Pen Argyl, PA - to accompany weekly progrereport on side, partitions, sash and doors

ss Linen 5/14/1915 111

1503 12-3039Oil House, Pen Argyl, PA - to accompany weekly progress repon foundations

ort Linen 3/15/1915 111

1504 12-3039Oil House, Pen Argyl, PA - to accompany weekly progress repon sidewalls, sash and doors

ort Linen 5/17/1915 111

1505 12-3039Transfer table, Pen argyl, PA - to accompany weekly progressreport on foundations, walls, and drains

Linen 5/17/1915 111

1506 12-3039New loco erecting and repair shop, boiler house and coal tresto accompany weekly progress report on foundations

tle - Linen 5/20/1915 111

1507 12-3039Boiler House, Pen argyl, PA - to accompany weekly progress report on sidewalls, wash and doors Linen 5/21/1915 111

1508 12-3039 New storehouse, Pen Argyl, PA plan showing equipment Linen 1/17/1916 1111509 12-3039 Column section Linen no date 111

1525 12-3039General data plan of superstructure for renewal of Bridge No.Beth. Br, at Chapman Quarries

4.62 Linen 11/18/1915 111

1543 12-3039 Maximum clearance and weight table Linen 11/12/1915 111

1552 12-3039Plan showing proposed extension of siding at Chain, schuylkiCo., PA

ll Linen 12/10/1915 111

1560 12-3039 Road crossing traffic record (overlay for the above, 2 copies) Linen Jan-16 111

1562 12-3039Office of Superintendent, So. Bethlehem, PA - condition Repoof 7AM

rt as Linen no date 111

1565 12-3039Office of Superintendent, So. Bethlehem, PA - condition Repo

f (2)of 7AM (2)rt as

Linen no da 111te1567 12-3039 Diagram of operating department organization Linen 2/23/1916 1111575 12-3039 Diagram of elevation of Bushkill Br. Linen no date 1111577 12-3039 Diagram of cast steel chafing iron Blueprint 3/15/1916 1111578 12-3039 Diagram of cast steel buffer (female) Blueprint 3/15/1916 1111580 12-3039 Foundations for power and lighting transformers, Pen Argyl, PA Linen 3/15/1916 1111589 12-3039 Details of cap for safety valve Linen 4/14/1916 1111590 12-3039 Water supply, detailis of stool for 50,000 gal. Tank, Pen Argyl, PA Linen 4/18/1916 111

A-void see #1376 12-3039Plat showing land required for right of way through property oMary Frantz in Schuylkill Co., PA

f Linen 4/13/1911 111

1398A 12-3039 Sketch showing location of rail Blueprint rev. 6/9/191 1111398B 12-3039 Sketch showing location of rail - 2 copies Blueprint rev. 1/14/19 1111398C 12-3039 Sketch showing location of rail - 10 copies Blueprint rev. 6/30/19 1111398D 12-3039 Sketch showing location of rail Blueprint rev. 11/14/1 111

1430A 12-3039Map showing tracks in the vicinity of Sussex Jct., NJ - a locatichanged (2)

on Blueprint rev. 1/8/191 111

1443A 12-3039 Plan showing RR crossing at Main and Race Sts., Bath, PA Blueprint 1/8/1915 111

150A 12-3039Diagram of rooms of Anthracite building, So. Bethlehem, PA floor

third Blueprint 8/26/1915 111

1536A 12-3039 Road crossing (Broadway) - Wind Gap, PA, Oct. 1, 1915 Linen 10/11/1915 1111536B 12-3039 Road crossing (Broadway) - Wind Gap, PA, Oct. 2, 1915 Linen 10/11/1915 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I54185419

5420

5421

5422

5423

5424

5425

5426

5427

5428

5429

5430

5431

Page 156 of 194Page 156 of 194

5431

5432

5433

5434

5435

5436

54375438543954405441

5442544354445445

1558F 12 Jan 8 1916 overprint on form #1560 Linen 111

1536C 12-3039 Road crossing (Broadway) - Wind Gap, PA, Oct. 3, 1915 Linen 10/11/1915 1111536D 12-3039 Road crossing (Broadway) - Wind Gap, PA, Oct. 4, 1915 Linen 10/12/1915 111

1557A 12-3039Road crossing (Onoko) traffic record - Catasauqua, PA Dec. 1915 - overprint on form #1560

30, Linen 1/13/1916 111

1557B 12-3039Road crossing (Onoko) traffic record - Catasauqua, PA Dec. 1915 - overprint on form #1560

31, Linen 1/13/1916 111

1557C 12-3039Road crossing (Onoko) traffic record - Catasauqua, PA Jan 31916 - overprint on form #1560

, Linen 1/13/1916 111

1557D 12-3039Road crossing (Onoko) traffic record - Catasauqua, PA Jan 41916 - overprint on form #1560

, Linen 1/13/1916 111

1557E 12-3039Road crossing (Onoko) traffic record - Catasauqua, PA Jan 51916 - overprint on form #1560

, Linen 1/13/1916 111

1557F 12-3039Road crossing (Onoko) traffic record - Catasauqua, PA Jan 81916 - overprint on form #1560

, Linen 1/13/1916 111

1558A 12-3039Road crossing (16 Ft. Alley) traffic record - Catasauquaua, PADec 30, 1915 - overprint on form #1560

Linen 1/13/1916 111

1558B 12-3039Road crossing (16 Ft. Alley) traffic record - Catasauquaua, PADec 31, 1915 - overprint on form #1560

Linen 1/13/1916 111

1558C 12-3039Road crossing (16 Ft. Alley) traffic record - Catasauquaua, PAJan 3, 1916 - overprint on form #1560

Linen 1/13/1916 111

1558D 12-3039Road crossing (16 Ft. Alley) traffic record - Catasauquaua, PAJan 4, 1916 - overprint on form #1560

Linen 1/13/1916 111

1558E 12-3039Road crossing (16 Ft. Alley) traffic record - Catasauquaua, PAJan 5, 1916 - overprint on form #1560

Linen 1/13/1916 111

1558F 12-3039-3039Road crossing (16 Ft. Alley) traffic record - Catasauquaua, PAJan 8 1916 - overprint on form #1560 , -

Linen 1/13/1916 1111/13/1916

1559A 12-3039Road crossing (Tenth St Road) traffic record - Catasauquaua,Dec 30, 1915

PA Linen 1/13/1916 111

1559B 12-3039Road crossing (Tenth St Road) traffic record - Catasauquaua,Dec 31, 1915

PA Linen 1/13/1916 111

1559C 12-3039Road crossing (Tenth St Road) traffic record - Catasauquaua,PAJan 3, 1916

Linen 1/13/1916 111

1559D 12-3039Road crossing (Tenth St Road) traffic record - Catasauquaua,PAJan 4, 1916

Linen 1/13/1916 111

1559E 12-3039Road crossing (Tenth St Road) traffic record - Catasauquaua,PAJan 5, 1916

Linen 1/13/1916 111

1559F 12-3039Road crossing (Tenth St Road) traffic record - Catasauquaua,PAJan 8, 1916

Linen 1/13/1916 111

168A 12-3039 Diagram of shelving-closed bins, bin-fronts and card holders Linen no date 111168B 12-3039 Diagram of shelving-closed bins, bin-fronts and card holders Linen no date 111168C 12-3039 Diagram of shelving-closed bins, bin-fronts and card holders Linen 3/29/1916 111168D 12-3039 Diagram of shelving-closed bins, bin-fronts and card holders Linen no date 111

168E 12-3039Diagram of shelving-open shelves, card holders and shelves fcastings

or Linen no date 111

168F 12-3039 Diagram of shelving-closed bins, bin-fronts and card holders Linen no date 111168G 12-3039 Diagram of shelving-closed bins, bin-fronts and card holders Linen 3/29/1916 111168H 12-3039 Diagram of shelving-closed bins, bin-fronts and card holders Linen 2/24/1916 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I5446

54475448544954505451545254535454

5455

5456

5457

5458

5459

546054615462

Page 157 of 194Page 157 of 194

5462

5463

5464546554665467

5468

54695470547154725473547454755476547754785479

12 Tissue 111

168J 12-3039 Diagram of shelving-open shelves and card holders Linen no date 111

168K 12-3039Diagram of shelving-open shelves, card holders and shelves fcastings

or Linen 8/28/1924 111

173A 12-3039 Results using above form Linen no date 111173B 12-3039 Results using above form Linen no date 111173C 12-3039 Results using above form Linen no date 111173D 12-3039 Results using above form Linen no date 111173E 12-3039 Results using above form Linen no date 111173F 12-3039 Results using above form Linen no date 111175A 12-3039 Profile of 90# rail between mile 4 and 5 on the L&NE Blueprint 1/26/1916 111

182A 12-3039Chart with RR property descriptions and insurance applying uclause

nder Blueprint no date 111

182B 12-3039Chart with RR property descriptions and insurance applying uclause

nder Blueprint no date 111

182C 12-3039Chart with RR property descriptions and insurance applying uclause

nder Blueprint no date 111

182D 12-3039Chart with RR property descriptions and insurance applying uclause

nder Blueprint no date 111

182E 12-3039Chart with RR property descriptions and insurance applying uclause

nder Blueprint no date 111

182F 12-3039Chart with RR property descriptions and insurance applying uclause

nder Blueprint no date 111

183A 12-3039 Territory surrounding bridge No. 108.76 near Pine Island, NY Tissue no date 111185A185A 12-30393039 Territory surrounding bridge No. 100.226 east of Sussec Jct., y g g , NY Tissue no dano te 111date

187A 12-3039Territory surrounding bridge No. 65.708 west of Hainesburg JNJ

ct., Tissue no date 111

188A 12-3039Territory surrounding bridge No. 63.8 between Portland, PA &Columbia, NJ

Tissue no date 111

194A 12-3039 Territory surrounding bridge No. 14.460 at Catasauqua Tissue no date 111196A 12-3039 Territory surrounding bridge No. 5.60 near Slatington Tissue no date 111198A 12-3039 Territory surrounding bridge 31.954 at Lehigh Gap Tissue no date 111

199A 12-3039Territory surrounding bridges 26.525 & 27.234 between Semmand Ashfield, PA

el Tissue no date 111

301A 12-3039Territory surrounding bridge No. 15.899 & 16.823 between WPenn & Leibyville, PA

. Tissue no date 111

371, 2 copies 12-3039 Sketch showing location of date nails in ties Linen 4/15/1921 111402A 12-3039 Paperwork for Beams for 22' water tower - 2 copies Blueprint 5/31/1912 111402B 12-3039 Paperwork for Beams for 22' water tower - 2 copies Blueprint 5/31/1912 111402C 12-3039 Paperwork for Beams for 22' water tower - 2 copies Blueprint 5/31/1912 111402D 12-3039 Paperwork for Beams for 22' water tower - 2 copies Blueprint 5/31/1912 111402E 12-3039 Paperwork for Beams for 22' water tower - 2 copies Blueprint 5/31/1912 111420F 12-3039 Paperwork for Beams for 22' water tower - 2 copies Blueprint 5/31/1912 111729A 12-3039 Sketch showing track sections Linen 2/25/1916 111729B 12-3039 Sketch showing track sections Blueprint 4/28/1919 111729C 12-3039 Sketch showing track sections Blueprint 2/15/1929 111

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I54805481548254835484548554865487548854895490549154925493

5494549554965497

54985499

Page 158 of 194Page 158 of 194

5500

55015502

5503

5504

5505

550655075508

55095510

5511

55125513

729C 12-3039 Sketch showing track sections Linen 7/16/1932 111729D 12-3039 Sketch showing track sections Linen 2/1/1935 111729E 12-3039 Sketch showing track sections Blueprint 1/1/1938 111729E 12-3039 Sketch showing track sections Blueprint 8/16/1938 111729F 12-3039 Sketch showing track sections - 3 copies Linen 7/16/1954 111729F 12-3039 Sketch showing track sections Blueprint 5/1/1948 111729F 12-3039 Sketch showing track sections Blueprint 9/1/1949 111729F 12-3039 Sketch showing track sections Blueprint 1948 111729F 12-3039 Sketch showing track sections Blueprint 5/16/1940 111729F 12-3039 Sketch showing track sections - 2 copies Blueprint 1/1/1952 111729F 12-3039 Sketch showing track sections - 2 copies Linen + blue 2/1/1954 111729F 12-3039 Sketch showing track sections - 3 copies Linen no date 111729F 12-3039 Sketch showing track sections Blueprint 11/22/1960 111

page 1 12-3039 Capacity of engines & tenders Blueprint 8/21/1940 111

page 2 12-3039General information on cars (hoppers, gondolas, box, bulk cement) Blueprint 111

7200 12-3039 Circuit diagram crossing bell Andreas, PA Linen 6/10/1912 1127202 12-3039 Circuit diagram highway signal&bell Pellettown, NJ Linen 7/13/1921 1127207 12-3039 Pellettown Linen 8/31/1934 112

7208 12-3039Plan showing location of track "B" mile 94 leading to plant of tBorden's Farm products Pellettown

he Linen 9/12/1934 112

7214 12-3039 Plan showing locomotive repair shops Pen Argyl, PA Linen 3/28/1935 1127215 12-3039 Plan showing car repair shops Pen Argyl, PA Linen 3/28/1935 112

7219 12-3039Plan showing proposed parking facilities at Pen Argyl, PA - 2 copies Linen & blue 8/21/1935 112

7232 12-3039 L&NERR and DL&WRR crossing interlocking - sheet 1 Linen 9/1/1911 112

7232 12-3039Circuit diagram, signal controls, locking relay and lever locks fabove - sheet 2

or Linen 9/1/1911 112

7232 12-3039August interlock pole line - pin position of circuit wires of abovsheet 3

e - Linen 9/1/1911 112

7234 12-3039Plan of plates for raising girders over bents Nos. 1 & 2, bridge63.79 over Delaware River

No. Linen 6/24/1936 112

7235 12-3039Plan showing location of driveway's in vicinity of Main & E StrPen Argyl, PA

eets, Linen 7/31/1936 112

7239 12-3039 Plan showing location of trestle at Wind Gap, PA Blueprint 1/21/1937 1127241 12-3039 Organization Diagram Linen 3/1/1937 112

7243 12-3039Plan showing additional tracks jointly operated and maintainethe CRR Co. Catasauqua, PA - 2 copies

d by Linen & blue 6/7/1937 112

7245 12-3039 Sketch of coal storage grounds of Pen Argyl, PA Linen 7/1/1937 112

7252 12-3039Plan showing connection with S&LVRR Pottsville branch at LiCreek Jct. - 2 copies

zard Linen & blue 11/9/1937 112

7261 12-3039Plan showing grade crossing to be abandoned route #165 WiGap, PA

nd Linen 12/19/1938 112

7262 12-3039 Plan showing land to be leased to PJ McCall at Tamaqua, PA copier paper 1/13/1939 112

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

551455155516

5517

5518

5519

5520

5521

5522

5523

5524

55255526

5527

Page 159 of 194Page 159 of 194

5528

5529

5530

5531

5532

5533

5534

5535

5536

5537553855395540

Pl k

7265 12-3039Plan showing portion of siding used by Len's Petroleum servicWest Penn Twp

e Linen 2/21/1939 112

7266 12-3039 Plan showing portion of siding used by NA Seligman West Penn Linen 2/21/1939 1127270 12-3039 Plan showing portion of siding used by Warne West Penn Linen 4/15/1939 112

7273 12-3039Plan showing location of grade crossing to be abandoned on Nazareth branch at Sta. 9 + 57.6 Linen 8/4/1939 112

7274 12-3039Plan showing location of grade crossing to be abandoned on Nazareth branch at Sta. 218 + 71.4 Linen 8/4/1939 112

7275 12-3039Plan showing location of grade crossing to be abandoned on Nazareth branch Sta. 286 + 24 Linen 8/8/1939 112

7276 12-3039Plan showing location of grade crossing to be abandoned on Nazareth branch at Sta. 324 + 93.8 Linen 8/7/1939 112

7277 12-3039Plan showing location of grade crossing to be abandoned on Nazareth branch at Sta. 327 + 04.9 Linen 8/8/1939 112

7278 12-3039Plan showing location of grade crossing to be abandoned on Nazareth branch at Sta. 336 + 85 Linen 8/8/1939 112

7281 12-3039Plan of plates for raising girders over bents of viaduct bridge N63.79 over Delaware River

o. Linen 9/23/1939 112

7286 12-3039Sketch showing proposed highway signals Lobb, Robinson, Schank & Westbrook Ave's Pen Argyl, PA Sketch pape 11/30/1939 112

7287 12-3039Struts for bracing purlins for lifting drums in scraper operator'shouse coaling station Pen Argyl, PA

Linen 12/18/1939 112

7288 12-3039 Track wrench diagram Linen 12/20/1939 112

7292 12-3039Plan showing proposed extension of track E1 for Pritchard CoBangor, PA

al Linen 7/12/1940 112

7294 12-3039Plan of beams for track over hopper at coaling station Sussexan of beams for trac over hopper at coaling station SussexJunction, NJ

Linen 8/1/1940 112

7305 12-30397 3/4"X12" double shoulder canted tie plate punched for 112#rail section

R.E. Linen 5/24/1941 112

7310 12-3039Plan showing arrangement of steel shelving for record storageDanielsville freight station

at Linen 10/15/1941 112

7311 12-3039Plan showing location of grade crossing at Sta. 8 + 04 on trac#64 to be abandoned Pen Argyl, PA

k Linen 11/17/1941 112

7312 12-3039Plan showing location of grade crossing at sta. 10 + 79 on tra#64 to be abandoned Pen Argyl, PA

ck Linen 11/17/1941 112

7315 12-3039L&NERR and DL&WRR automatic interlocking Augusta, NJ - sheets 1-9 Linen 1/31/1942 112

7322 12-3039Plan showing location of proposed siding for Charles D. ManbWest Penn Twp.

eck Linen 19/6/1942 112

7327 12-3039Plan showing location of proposed siding 0.26 mi. west of MPClarence Warne West Penn Twp. - 2 copies

9 for Linen 6/24/1943 112

7332 12-3039Plan showing right of way & tracks over former Albion Slate Cnow Stephens-Jackson Co Pen Argyl, PA

o. Linen 12/10/1943 112

7346 12-3039Plan showing location of proposed siding for Vincent Kosuga Wilcox Warwick, NY - 3 copies

at Linen & blue 4/5/1945 112

7348 12-3039 Plates for wall of transfer table Pen Argyl, PA Linen 5/31/1945 1127349 12-3039 State of New Jersey State Highway Department boring logs Blueprint 1/11/1940 1127350 12-3039 Clearance diagram for steam engine graph paper 3/25/1941 112

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5541

5542

5543

5544

5545

5546

55475548

5549

5550

5551

555255535554

Page 160 of 194Page 160 of 194

55555556

5557

55585559

556055615562556355645565556655675568

5569

5570

Circu di Hi gna St 3341 1

7360 12-3039Details of filler plates for bridge No. 659 over Monocacy CreekBath, PA

Linen 12/3/1945 112

7364 12-3039Layout flashing highway signals Main, Race and NorthamptonBath, Pa Sheets 1-4

Sts. Linen 7/15/1945 112

7366 12-3039Plan showing property to be conveyed to David C. BergenstocNorth Catasauqua, PA - Noted as void - tracing not used

k at Linen 3/23/1946 112

7376 12-3039Typical section of timber cribbing at Chapman quarries BethlePA

hem, Tissue 7/27/1946 112

7377 12-3039Plan showing land to be leased to Thomas C. Rottet at Greenwood St Tamaqua, PA paper 9/5/1946 112

7381 12-3039Plan showing siding to trestle of Wind Gap Coal & Lumber CoWind Gap, PA

, Linen & blue 3/7/1947 112

7384 12-3039Schematic circuit train dispatching telephone loud speaker andesk set arrangement

d Linen 2/24/1947 112

7385 12-3039 Circuit diagram time locking signal Lever No.2 Linen 1/24/1947 112

7386 12-3039Plan showing portion of track 83 to be used by Pen Argyl GasPen Argyl, PA

Co. Linen 4/25/1947 112

7389 12-3039Circuit diagram highway signals at grade crossing New Jerseyroute 8 Brugler's crossing station

Linen 7/16/1924 112

7390 12-3039Plan showing portion of track A1 to be used by Collins & MaxwInc. Allentown, PA

ell Linen 9/1/1953 112

7391 12-3039Layout automatic signals Delaware River bridge and highway crossing signals Delaware Ave Portland,PA - page 1 Linen Dec-09 112

7391 12-3039 Schematic ciruit arrangement bridge automatic signals - page 2 Linen 3/15/1934 1127391 12-3039 Circuit arrangement Hi-way signals - page 3 Linen Jul-14 112

7393 12-3039Circuit diagram Hi way signals at grade crossing Sta 3341+38it agram -way si ls at grade crossing a. +at Portland, PA

138. Linen 3/15/1934 112

7400 12-3039 Baldwin Locomotive consolidation freight class 10-4-E Linen 10//6/1911 112

7401 12-3039Route comparison map including Catasauqua, Portland, Bethlehem and Nazareth Linen no date 112

7408 12-3039Plan showing location of proposed trestle and extension of trafor the Flory Milling Co., Bangor, PA

ck E Linen 8/29/1922 112

7410 12-3039 Plan showing proposed extension of track "A" at Summit, PA Linen 9/20/1922 112

7423 12-3039Plan showing location of proposed anthracite coal track at coastation Pen Argyl, PA

ling Linen 1/27/1923 112

7425 12-3039 Sketch showing location of rail as of Nov 1, 1938 on the L&NERR Blueprint 11/1/1938 1127425 12-3039 Sketch showing location of rail as of July 1, 1939 on the L&NERR Blueprint 7/1/1939 1127425 12-3039 L&NERR Blueprint 12/31/1939 1127425 12-3039 L&NERR Blueprint 5/16/1940 1127425 12-3039 L&NERR Blueprint 12/31/1942 1127425 12-3039 Sketch showing location of rail as of Sept 1, 1943 on the L&NERR Blueprint 9/1/1943 1127425 12-3039 L&NERR Blueprint 12/31/1943 1127425 12-3039 Sketch showing location of rail as of July 1, 1944 on the L&NERR Blueprint 7/1/1944 112

7426 12-3039Plan showing location of proposed siding for the Orange DairySussex, NJ

Co. Linen 2/27/1923 112

7428 12-3039Plan showing location of proposed building and change of trathe Emanuel Slag Co at Catasauqua, PA

ck for Linen 3/5/1923 112

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5571

5572

5573

5574

5575

5576

5577

5578

5579

55805581

5582

55835584

Page 161 of 194Page 161 of 194

55845585558655875588

5589

5590

55915592

5593

5594

5595

5596

5597

7491 12 Sign reading Smoking in the vault prohibited Linen & blue no date 112

7447 12-3039Plan showing location of proposed siding at Mary "D" Colliery Schuylkill Co., PA Linen & blue 6/29/1923 112

7449 12-3039Plan showing location of proposed siding for the Tamaqua development Co. West Penn Twp. Linen 7/24/1923 112

7458 12-3039Plan showing proposed lumber unloading track in car repair yat Pen Argyl, PA

ard Linen 8/31/1923 112

7462 12-3039Map showing L&NERR connection with the Schuylkill Valley Branch of the Phila & Reading at Tamaqua, PA Linen 10/17/1923 112

7470 12-3039Road crossing traffic record from Johnsonville to Tott Gap DeDec 9 1923

c 2-Linen Dec-23 112

7471 12-3039Road crossing traffic record Bangor to Portland Road with theBethel to Tott Gap Road Dec 2-Dec 9 1923

Mt. Linen Dec-23 112

7472 12-3039Road crossing traffic record Bangor to Portland Road with theBethel to Tott Gap Road Dec 2-Dec 9 1923

Mt. Linen Dec-23 112

7473 12-3039Road crossing traffic record Mt. Bethel to Tott Gap Dec 2- De1923

c9 Linen Dec-23 112

7477 12-3039Road crossing traffic record Mt. Bethel to Slateford Dec 9 - De1923

c 16 Linen Dec-23 112

7478 12-3039Road crossing traffic record Portland to Tott Gap Dec 9-Dec 11923

6 Linen Dec-23 112

7480 12-3039 Plan showing proposed extension of track #73 in Pen Argyl yard Linen 1/14/1924 112

7483 12-3039Reversed main charts (7) for road crossing traffic record and regular chart Blueprint no date 112

7485 12-3039Plan showing location of proposed siding for the Washed Sanand Gravel Co. Mt. Bethel, PA

d Linen 1/31/1924 112

7491 12-3039-3039 Sign reading "Smoking in the vault prohibited" Linen & blue no date 1127499 12-3039 Plan of lamp tip for #30 century switch stands Linen 4/22/1924 1127569 12-3039 Plan showing proposed sewer connections at Nazareth, PA Linen 3/26/1930 1127572 12-3039 Drawing of a standard highway crossing warning sign Linen 4/9/1930 1127574 12-3039 Plan showing turnout to be retired at Catasauqua, PA Linen 5/7/1930 112

7581 12-3039Drawing of 5-ton hand pillar crane of the Brown Hoisting Machinery Company Cleveland, OH Blueprint 1/20/1921 112

7582 12-3039Drawing of foundation for pillar crane of the Brown Hoisting Machinery Company Cleveland, OH Blueprint 1/20/1921 112

7584 12-3039Road crossing traffic record American Street Sta. 299+39.5 AAug 11 1930

ug 4-Linen Aug-30 112

7425D 12-3039 Sketch showing location of rail as of Dec 31, 1923 on the L&NERR Blueprint 12/31/1923 112

7381A 12-3039Plan showing portion of track B1 to be used by James D. MorWind Gap, PA

risey Linen 7/31/1959 112

7386A 12-3039Plan showng portion of track 83 to be used by Bangor Gas CoPen Argyl, PA

. Linen 8/27/1956 112

7386B 12-3039Plan showing portion of track 83 to be used by Herbert R. ImbInc. Pen Argyl, PA

t, Linen 8/27/1956 112

7386C 12-3039Plan showing portion of track 83 to be used by Robert F. PerinPen Argyl, PA

Linen 10/10/1956 112

7386D 12-3039Plan showing portion of track 83 to be used by S. White and SPen Argyl, PA

on Linen 3/20/1957 112

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5598

5599

560056015602560356045605560656075608560956105611561256135614561556165617

Page 162 of 194Page 162 of 194

561756185619562056215622

5623

5624

5625

5626

562756285629

56305631

7425Q 12 3039 Sketch showing location of rail as of Dec 31 1933 on the L&NERR Bluepr 112

7386E 12-3039Plan showing portion of track 83 to be used by Goodman CindBlock Co. Pen Argyl, PA

er Linen 6/13/1957 112

7386F 12-3039Plan showing portion of track 83 to be used by John J. WeidnPen Argyl, PA

er Linen 7/19/1957 112

7386G 12-3039Plan showing portion of track 83 to be used by James D. MorrInc. Pen Argyl, PA

isey, Linen 7/31/1959 112

7425A 12-3039 Sketch showing location of rail as of Jan 31, 1923 on the L&NERR Blueprint 1/31/1923 1127425B 12-3039 L&NERR Blueprint 6/30/1923 1127425C 12-3039 Sketch showing location of rail as of Oct 31, 1923 on the L&NERR Blueprint 10/31/1923 1127425E 12-3039 Sketch showing location of rail as of Dec 31, 1924 on the L&NERR Blueprint 12/31/1924 1127425F 12-3039 Sketch showing location of rail as of Dec 31, 1925 on the L&NERR Blueprint 12/31/1925 1127425G 12-3039 Sketch showing location of rail as of Dec 31, 1926 on the L&NERR Blueprint 12/31/1926 1127425H 12-3039 Sketch showing location of rail as of Nov 1, 1927 on the L&NERR Blueprint 11/1/1927 1127425I 12-3039 Sketch showing location of rail as of Dec 31, 1927 on the L&NERR Blueprint 12/31/1927 1127425J 12-3039 Sketch showing location of rail as of Dec 31, 1928 on the L&NERR Blueprint 12/31/1928 1127425K 12-3039 Sketch showing location of rail as of Dec 31, 1929 on the L&NERR Blueprint 12/31/1929 1127425K 12-3039 L&NERR Blueprint 4/19/1930 1127425K 12-3039 L&NERR Blueprint 5/20/1930 1127425L 12-3039 Sketch showing location of rail as of Dec 31, 1930 on the L&NERR Blueprint 12/31/1930 1127425M 12-3039 Sketch showing location of rail as of May 9, 1931 on the L&NERR Blueprint 5/9/1931 1127425N 12-3039 Sketch showing location of rail as of Dec 9, 1931 on the L&NERR Blueprint 12/31/1931 1127425P 12-3039 Sketch showing location of rail as of Dec 31, 1932 on the L&NERR Blueprint 12/31/1932 1127425Q 12 3039- Sketch showing location of rail as of Dec 31 1933 on the L&NERR , Blueprint 12/31/1933int 11212/31/19337425R 12-3039 Sketch showing location of rail as of Oct 31, 1934 on the L&NERR Blueprint 10/31/1934 1127425S 12-3039 Sketch showing location of rail as of Dec 31, 1934 on the L&NERR Blueprint 12/31/1934 1127425T 12-3039 L&NERR Blueprint 5/31/1936 1127425T 12-3039 Sketch showing location of rail as of April 1, 1937 on the L&NERR Blueprint 4/1/1937 1127425U 12-3039 L&NERR Linen & blue 6/24/1937 112

7441A-H 12-3039Road crossing traffic record from Pen Argyl to Wind Gap MayMay 27 1923

20-Linen May-23 112

7446A-H 12-3039Road crossing traffic record from Pen Argyl to North Bangor J17-June 24 1923

une Linen Jun-23 112

7452A-H 12-3039Road crossing traffic record from Johnsonville to Fox Gap JulAug5 1923

y 29-Linen Jul/Aug 192 112

7455A-H 12-3039Road crossing traffic record Wind Gap to Saylorsburg Aug 1623 1923

-Aug Linen Aug-23 112

7456-H 12-3039Road crossing traffic record from Wind Gap to Saylorsburg AuAug 23 1923

g 16-Linen Aug-23 112

6505 12-3039 Detail of Tariff filing case Linen 5/19/1916 1136507 12-3039 Plan of present freight house, Pen Argyl, PA Linen 5/30/1916 113

6518 12-3039Plan showing proposed rearrangement of track at bridge 93.4Pellettown, NJ

4 Linen 8/8/1916 113

6526 12-3039 Detail of 2nd hand girders at store house, Pen Argyl, PA Linen 9/8/1916 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5632563356345635

5636

56375638

5639

5640

5641

5642564356445645

56465647

Page 163 of 194Page 163 of 194

5648

5649

5650

5651

5652

5653

5654

5655

5656

5657

5658

5659

ti ti d l PA

6529 12-3039Plan showing track at connection with the Catasauqua and Fogelsville RR at Catasauqua, PA Linen 10/20/1916 113

6534 12-3039 Reinforced box culvers for extension Danielsville to Tamaqua Linen no date 1136540 12-3039 Detail plan of ticket case Linen 11/13/1916 1136547 12-3039 Plan of glass rack for storehouse, Pen Argyl, PA Linen 12/19/1916 113

6548 12-3039 Plan of proposed tool room & shop foreman's office, Pen Argyl, PA Linen 12/6/1916 113

6549 12-3039Diagram showing clearance at storage building of Quarry at Berlinsville, PA Linen 12/30/1916 113

6551 12-3039 MOW road crossing traffic record Linen 1/3/1917 113

6558 12-3039Detail plan of gratings for sumps and manholes for locomotiverepair shop, Pen Argyl, PA

and Linen 1/15/1916 113

6563 12-3039Map showing location of timber siding for real estate co. near Palmerton East, PA Linen 2/23/1917 113

6567 12-3039Map showing location of stakes by freight transfer platform, PArgyl yard

en Linen 3/16/1917 113

6569 12-3039Proposed layout of passengers wait room, ticket office and baggage, YMCA building, Pen Argyl, PA Linen 3/20/1917 113

6573 12-3039 Road crossing traffic record (field sheet) Linen 3/31/1917 1136573 12-3039 Road crossing traffic record (field sheet) - 2 copies Van Dyke no date 1136575 12-3039 Sketch showing location of rail (by lbs.) Linen 12/31/1916 113

6593 12-3039Plan showing proposed siding for Beck & Farmsworth near Wantage, NJ Linen 6/29/1917 113

6598 12-3039 Detail of 2nd hand girders at store house, Pen Argyl, PA Linen 7/10/1917 113

6600 12-3039New locomotive erecting and repair shop Pen Argyl PANew locomo ve erec ng an repair shop, Pen Argy , foundation for machine No.1 Linen 12/13/1915 113

6601 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.2 Linen 12/13/1915 113

6602 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.4 Linen 12/13/1915 113

6603 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.5 Linen 12/13/1915 113

6604 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.6 Linen 12/14/1915 113

6605 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.8 Linen 12/14/1915 113

6606 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.9 Linen 12/14/1915 113

6607 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.10 Linen 12/15/1915 113

6608 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.3 Linen 12/30/1915 113

6609 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.15 Linen 12/30/1915 113

6610 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.11 - slotter Linen 12/30/1915 113

6611 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.14 - landis stay bolt machine Linen 12/30/1915 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5660

5661

5662

5663

5664

5665

5666

5667

5668

5669

5670

5671

5672

Page 164 of 194Page 164 of 194

5673

5674

5675

5676

5677

5678

5679

5680

5681

5682

5683

6612 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.? - 5' radial drill Linen 1/4/1916 113

6613 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.? - universal standard milling machine Linen 1/10/1915 113

6614 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.? - double No. 0 punch Linen 1/13/1916 113

6615 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.? - flanging clamp Linen 1/14/1916 113

6616 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.? - plate bending rolls Linen 1/17/1916 113

6617 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.? - 100 ton hydraulic press Linen 1/17/1916 113

6618 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.76 - forging machine furnace Linen 2/17/1916 113

6619 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.78 - flue furnace Linen 2/17/1916 113

6620 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.? - 28" aurora drill Linen 2/17/1916 113

6621 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No.77 - Hartz super-heater welder Linen 2/17/1916 113

6622 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - welding set Linen 2/18/1916 113

6623 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - 26" planer Linen 2/23/1916 113

6624 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - cold saw Linen 3/3/1916 113

6625 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - 60" planoidal exhauster Linen 3/24/1916 113

6626 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. 6 - S.P. pressure blower Linen 3/24/1916 113

6627 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - furnace Linen 2/18/1916 113

6628 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. 30 - 42" boring mill Linen & Blue 2/18/1916 113

6629 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - 3000 pound steam hammer Linen 2/21/1916 113

6630 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - 800 pound steam hammer Linen 2/21/1916 113

6631 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. 32 - 90" driving wheel lathe Linen 3/4/1916 113

6632 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. 31 - 600 ton wheel press Linen 3/4/1916 113

6633 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. 33 - Oster pipe threading machine Linen 3/4/1916 113

6634 12-3039

New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - two feather valve air compressand motors

ors Linen 3/28/1916

113

6635 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. 75 - 3" forging machine Linen 4/21/1916 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5684

5685

5686

5687

5688

56895690

569156925693

569456955696569756985699

Page 165 of 194Page 165 of 194

56995700570157025703570457055706570757085709571057115712

571357145715

5716

6651 di tion i t 113

6636 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. 13 - flat turret lathe Linen 5/5/1916 113

6637 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. 7 - 21" Snyder drill press Linen 5/5/1916 113

6638 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - No.5 tool grinder Linen 5/6/1916 113

6639 12-3039

New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - No. 1 1/2 universal cutter in tooroom

l Linen 5/8/1916

113

6640 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - lathe in tool room Linen 5/8/1916 113

6641 12-3039New locomotive erecting and repair shop, Pen Argyl, PA foundation for machine No. ? - drill grinder in tool room Linen 5/8/1916 113

6642 12-3039 Foundation plan for P-2017-Y Blueprint 7/17/1912 113

6643 12-3039from Fairbanks-Morse-Type B back geared induction motors atable

nd Blueprint 7/9/1913 113

6644 12-3039 Foundation plan for P-2029-Y Blueprint 7/17/1912 1136645 12-3039 Foundation plan for P-974-Y Blueprint no date 113

6646 12-3039Foundation plan for drill grinder and motor, the Washburn ShoWPI

ps, Blueprint no date 113

6647 12-3039 Column section diagram - unknown location Blueprint no date 1136648 12-3039 Column section diagram - unknown location Blueprint no date 1136649 12-3039 Column section diagram - unknown location Blueprint no date 1136650 12-3039 Column section diagram - unknown location Blueprint no date 1136651 12 303912-3039 Column section diagram unknown locationColumn section agram - unknown loca BlBluepri tn d t 113no date6652 12-3039 Column section diagram - unknown location Blueprint no date 1136653 12-3039 Column section diagram - unknown location Blueprint no date 1136654 12-3039 Column section diagram - unknown location Blueprint no date 1136655 12-3039 Column section diagram - unknown location Blueprint no date 1136657 12-3039 Locomotive No. 201, class A, 4-wheel switcher, marked retired Blueprint 2/21/1922 1136658 12-3039 Locomotive No. 203 class B2, 6-wheel switcher, marked retired Blueprint 2/21/1922 1136659 12-3039 Locomotive No. 204, class B-3, 6-wheel switcher, marked retired Blueprint 2/21/1922 1136660 12-3039 Locomotive No. 205, class B-4, 6-wheel switcher, maked retired Blueprint 2/21/1922 1136661 12-3039 Locomotive No. 5 and 6, class C, American, marked retired Blueprint 2/21/1922 1136662 12-3039 Locomotive No. 7, class D, Mogul, marked retired Blueprint 2/21/1922 1136663 12-3039 Locomotive No. 8, claass E-1, Consolidation, marked retired Blueprint 2/21/1922 1136664 12-3039 Locomotive No. 51, class E-3, Consolidation, marked retired Blueprint 2/21/1922 1136665 12-3039 Locomotive No. 11, class E-4, Consolidation, marked retired Blueprint 2/21/1922 113

6666 12-3039Locomotives Nos. 15,16,17, class E-5, Consolidation, markedretired

Blueprint 2/21/1922 113

6667 12-3039 Locomotives Nos. 35 to 46 inclu, class E-6, Consolidation Blueprint 2/21/1922 1136668 12-3039 Locomotive No. 34, class E-S-6, Consolidation, marked retired Blueprint 2/21/1922 113

6669 12-3039Locomotives No. 18,19,20, class E-7, Consolidation, marked retired 1928 Blueprint 2/21/1922 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I571757185719572057215722

57235724572557265727

5728572957305731

5732573357345735

Page 166 of 194Page 166 of 194

5736

573757385739

57405741574257435744

5745

5746

574757485749

5750

113

6670 12-3039 Locomotive No. 28, class E-8, Consolidation, marked retired Blueprint 2/21/1922 1136671 12-3039 Locomotives Nos. 21,22,23,24,25, class E-S-8, Consolidated Blueprint 2/21/1922 1136672 12-3039 Locomotives Nos. 26, 27;, class E-S-8, Consolidation Blueprint 2/21/1922 1136673 12-3039 Locomotive No. 31, class E-9, Consolidation Blueprint 2/21/1922 1136674 12-3039 Locomotives Nos. 29,30, class E-S-9, Consolidation Blueprint 2/21/1922 1136675 12-3039 Locomotive No. 58, class E-S-10, Consolidation Blueprint 2/21/1922 113

6676 12-3039Locomotives Nos. 54,55,59, class E-S-11, Consolidation, marretired

ked Blueprint 2/21/1922 113

6677 12-3039 Locomotives Nos. 56,57,class E-S-11, Consolidation Blueprint 2/21/1922 1136678 12-3039 Locomotive Nos. 153,154, class E-S-12, Consolidation Blueprint 2/21/1922 1136679 12-3039 Locomotive Nos. 151, 152, class E-13, Consolidation - 3 copies Blueprint 4/3/1939 1136680 12-3039 Locomotive No. 101, class I-S-1, 8-wheel switcher - 2 copies Blueprint 2/21/1922 113

6681 12-3039Locomotives Nos. 111,112, 113, class I-S-2, 8-wheel switchercopies

- 2 Blueprint 2/21/1922 113

6682 12-3039 copies Blueprint 2/21/1922 1136683 12-3039 Locomotives Nos. 116,117,118,119, class I-S-3, 8-wheel switcher Blueprint 2/21/1922 1136684 12-3039 Steam wrecking crane No. 698 Blueprint 8/20/1919 113

6685 12-3039 Snow plow No. 603 Linen 3/11/1922 1136686 12-3039 Snow plow No. 602 Linen 8/8/1922 1136687 12-3039 Locomotive Nos. 301-307, class E-14, Type 2-8-0 Linen & Blue 10/7/1922 1136688 12-3039 Locomotive No. 402, Baldwin class 12-54-F, Decapod Blueprint no date 113

6689 12-3039Locomotives Nos. 131, 132, 133, Baldwin class 8-48-E, 8-whe, , , ,switcher

el Blueprint 11311/15/1927

6690 12-3039Locomotives Nos. 134,135,136, Baldwin class 8-48-E, 8-wheeswitcher

l Blueprint no date 113

6691 12-3039 Locomotive No. 401, Baldwin class 12-54-F, Decapod Blueprint no date 1136692 12-3039 Locomotive crane No.697 Blueprint 4/14/1927 113

6693 12-3039L&NERR Co. Clearance Dimension & Engine Specifications diagram book Blueprint 113

6724 12-3039 Street Traffic Record - Peach St. Catasauqua, PA Linen 9/25/1917 1136725 12-3039 Street Traffic Record Blueprint 9/25/1917 1136726 12-3039 Street Traffic Record - Wood Street in Catasauqua, PA Linen 9/25/1917 1136731 12-3039 Standard clearance diagram for materials along sidings Blueprint 10/2/1917 113

6733 12-3039Map showing location of siding to be abandoned at JacobsbuNorthampton Co., PA

rg, Linen 10/23/1917 113

6734 12-3039Showing location of siding to be abandoned at Aluta, NorthamCo., PA

pton Linen 10/23/1917 113

6736 12-3039Showing proposed location of car repair track in eastbound yaPen Argyl, PA

rd, Linen 10/24/1917 113

6743 12-3039 Diagram of Baldwin Locomotive works Mallet steam engine Blueprint no date 1136744 12-3039 Wheel load diagram of mallet locomotive - 2 copies Blueprint 1/23/1918 113

6748 12-3039Sketch showing height available for pit of proposed turntable PArgyl yard

en Linen+2 blue 2/4/1918 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I5751

5752

5753

5754

575557565757

5758

5759

5760

576157625763

5764

5765

Page 167 of 194Page 167 of 194

5 65

57665767

5768

5769

5770

5771

57725773

5774

57755776

57775778

68 / 9 9

6750 12-3039 Design of bridge over highway sta. 1387+70 Tamaqua Ext. Blueprint 6/8/1911 113

6751 12-3039Design of bridge over highway sta. 1735+20 & sta. 1404+00 Tamaqua Ext. Blueprint 6/8/1911 113

6752 12-3039Design of deck plate girder bridge over Lizzard Creek-sta. 684Tamaqua Ext.

+92 Blueprint 6/8/1911 113

6753 12-3039Design of deck pl. girder bridge over Lizzard Creek-sta 1251+Tamaqua Ext.

or- Blueprint 6/8/1911 113

6754 12-3039Design of bridge over Lehigh Valley RR-sta 647+71.1 TamaqExt.

ua Blueprint 6/8/1911 113

6755 12-3039 Design of bridge over Lizzard creek-sta 656+06 Tamaqua Ext. Blueprint 6/8/1911 1136764 12-3039 Showing a 2-10-2 drawing from Baldwin Locomotive works Blueprint no date 113

6765 12-3039Location of loading dock of the Serfass Lumber Co., NorthamCo., PA

pton Blueprint 3/23/1918 113

6768 12-3039Map of 'Slateland View' - plan of building lots borough of Pen Argyle, PA paper no date 113

6772 12-3039Map showing location of proposed crossing gates at Front St,Catasauqua, PA

Linen 5/23/1918 113

6777 12-3039Map showing proposed siding for Mervine & Johnson, MonroeCo., PA

Linen 9/6/1918 113

6778 12-3039 Map showing location of proposed sigin at boiler houses Blueprint 10/1/1918 1136780 12-3039 Standard branding for accepted cross-ties Blueprint no date 113

6798 12-3039Proposesd siding for the Washed Sand & Gravel Co., Northampton Co., PA Linen 10/15/1917 113

68155 12-30393039Plan of proposed siding for Roseto Company, Northampton CPA

o., Linene 8/148/ /1919 113

6822 12-3039Plan of abutments for bridge on new siding for Chapman SlateCo., Bethlehem, PA

Linen 11/11/1919 113

6824 12-3039 Plan and profile of Lehigh Gap Bridge + 3 copies Blueprint 12/18/1919 113

6825 12-3039Sketch showing application of cab handholds and steps to L&engines

NE Blueprint 12/18/1919 113

6834 12-3039Plan showing proposed locations of siding about .5 west of Ashfield, Carbon Co., PA Linen 4/8/1920 113

6841 12-3039Plan showing proposed extension of siding for Sussex Mill Sussex, NJ Linen 5/19/1920 113

6844 12-3039Proposed rebuilding of trestle at Keystone Clay & Reduction CSaylorsburg, PA

o., profile paper 5/26/1920 113

6859 12-3039Showing crossing angle of L&NERR's track with C.I. Co.'s tracCinder tip, Catasauqua, PA

k to Linen 7/30/1920 113

6864 12-3039 Sketch showing proposed floor plan of M.W. car No. 681 Linen 8/9/1920 113

6872 12-3039Plan showing location of proposed temporary siding for Mac ABro's Co., Pen Argyl, PA

rthur Linen 9/17/1920 113

6875 12-3039Floor plan of proposed yardmasters office at westbound scalePen Argyl, PA

, Linen 10/2/1920 113

6876 12-3039 Road Crossing Traffic Record - North Main at Bangor, PA Linen 10/13/1920 113

6893 12-3039Plan showing proposed siding for the Miner-Edgar Co., Saylorsburg, PA Linen 4/5/1921 113

6894 12-3039 Local delivery siding at Lauchnor's crossing, Carbon Co., PA Linen 4/9/1921 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I5779

578057815782

578357845785

5786

5787

5788

578957905791

5792579357945795

Page 168 of 194Page 168 of 194

579557965797

57985799

58005801580258035804580558065807580858095810581158125813

6967 12 9/13/1910 113

6897 12-3039 Proposed change of alignment of East Bangor branch Linen 4/27/1921 113

6906 12-3039Plan showing wood trunking and capping for signal and interlocking plants Linen 5/24/1921 113

6926 12-3039 Plan showing proposed extension of siding at Delps, PA Linen 11/3/1921 1136928 12-3039 Location of proposed siding for Joel F. Batt, Northampton Co., PA Linen 12/3/1921 113

6929 12-3039proposed location of trestle and extension of track for Will. MaPen Argyl, PA

le Linen 12/3/1921 113

6935 12-3039 Shoemaker-Satterthwait Bridge Co. plan of Bridge #63.27 Blueprint 2/21/1921 1136936 12-3039 Shoemaker-Satterthwait Bridge Co. plan of Bridge #93.98 Blueprint 2/21/1921 113

6937 12-3039Shoemaker-Satterthwait Bridge Co. plan of Bridge #94.73 - 2 copies Blueprint 2/21/1921 113

6938 12-3039Shoemaker-Satterthwait Bridge Co. plan of Bridge #95.39 - 2 copies Blueprint 2/19/1921 113

6939 12-3039Shoemaker-Satterthwait Bridge Co. plan of Bridge #4.48 ChaQuarries, PA

pmanBlueprint 2/18/1921 113

6940 12-3039Shoemaker-Satterthwait Bridge Co. plan of Bridge #4.63 ChaQuarries, PA

pmanBlueprint 2/18/1921 113

6941 12-3039 copies Blueprint 2/21/1921 1136942 12-3039 copies Blueprint 2/21/1921 113

6964 12-3039Location plan of projected L&NERR line alternate Line "B" & "Catasauqua, PA

C", Blueprint 11/11/1910 113

6965 12-3039 Office floor plan on Lehigh Street - attic Blueprint 9/13/1910 1136966 12-3039 Office floor plan on Lehigh Street - second floor Blueprint 9/13/1910 1136967 12-30393039 Office floor plan on Lehigh Street - first floorp g BluepBlueprintrint 9/13/1910 1136968 12-3039 Office floor plan on Lehigh Street - basement Blueprint 12/14/1910 1136981 12-3039 Sketch of bumping block Linen 3/22/1922 113

6990 12-3039Plan showing location of proposed siding and crossing near RCommon, PA

oss Linen 6/15/1922 113

6994 12-3039 Wheel base diagram Locomotive type 2-8-0 American Loco. Co Linen 6/26/1922 113

6995 12-3039Sketch showing house for lockers for conductors & trainmen aPen Argyl, PA

t Linen 7/1/1922 113

6996 12-3039 Sketch showing standard C.I. smoke stack for small buildings Linen 7/11/1922 1137000 12-3039 Standard tools - Tie Adze Linen 7/31/1914 1137001 12-3039 Standard tools - spiking hammer Linen 7/31/1914 1137002 12-3039 Standard tools - lining bar Linen 7/31/1914 1137003 12-3039 Standard tools - claw bar Linen 8/14/1914 1137004 12-3039 Standard tools - track chisel Linen 7/31/1914 1137005 12-3039 Standard tools - rail tongs Linen 7/31/1914 1137006 12-3039 Standard tools - tie tongs Linen 7/31/1914 1137007 12-3039 Standard tools - clay pick Linen 7/31/1914 1137008 12-3039 Standard tools - folding metal flag Linen 7/31/1914 1137009 12-3039 Standard tools - step level board Linen 8/15/1914 1137010 12-3039 Standard tools - track gauge for 80 & 90 lb. Rail Linen 7/31/1915 1137011 12-3039 Standard tools - track (3/4") wrrench Linen 7/31/1914 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I5814581558165817581858195820582158225823582458255826

5827

582858295830

5831

5832

Page 169 of 194Page 169 of 194

583258335834

583558365837

5838

583958405841584258435844584558465847

5848

7070 12 Linen

7012 12-3039 Standard tools - track (7/8") wrench Linen 7/31/1914 1137013 12-3039 Standard tools - track (1") wrench Linen 7/31/1914 1137014 12-3039 Standard - water can Linen 3/27/1915 1137015 12-3039 Standard - cross arms Linen 7/26/1915 1137016 12-3039 Standard tools - duplex tie tongs Linen 4/26/1916 1137017 12-3039 Standard tools - tie inspector's hammer Linen 6/15/1916 1137021 12-3039 Diagram of Operating Department organization Blueprint 12/8/1930 1137021 12-3039 Diagram of Operating Department organization Blueprint 2/20/1931 1137021 12-3039 Diagram of Operating Department organization Linen 7/6/1933 1137021 12-3039 Diagram of Operating Department organization Linen 12/19/1930 1137021 12-3039 Diagram of Operating Department organization Linen 1931,33,36 1137027 12-3039 Hook bolt for flat sections by Bethlehem Construction Co. Blueprint 3/25/1931 1137028 12-3039 Bolt for guard timber by Bethlehm Construction Co. Blueprint 3/27/1931 113

7038 12-3039Plan of concrete pipe for replace timber beams bridge No. 57.North Bangor, PA

48 Linen 9/24/1931 113

7039 12-3039Proposed drainage improvement on east side of Lobb Ave. PeArgyl, PA

n Linen 9/24/1931 113

7047 12-3039 Plan showing tracks to be retired at Pen Argyl, PA Linen 11/9/1931 1137053 12-3039 Standard tools - track wrench Linen 2/4/1932 113

7062 12-3039Road Crossing Traffic Record - Pen Argyl, Sta. 41+82 Albion Branch Linen no date 113

7070 12-30393039Plan showing grade crossings to be eliminated at sta. 3001+29.2&3013+08.4 at Handelong-2copies& g p Linen 9/21/1933 1139/21/1933

7074 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+24.4 Linen no date 1137075 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+64.4 Linen no date 113

7079 12-3039Plan for rebuilding seat of west abutment bridge NO. 6.21 Catasauqua, PA Linen 11/23/1932 113

7089 12-3039 Plan showing of Pochuck RR to be retired, Warwick, NY Linen 9/13/1933 1137094 12-3039 Plan of gage rod Linen 2/21/1934 113

7095 12-3039Wiring diagram automatic control & starter water treating chempump Sussex Jct. NJ

ical Linen 2/26/1934 113

7101 12-3039Plan showing track to be retired on Saylorsburg branch in RosTwp.

s Linen 9/4/1930 113

7106 12-3039 Plan showing portion of track "A" mi. 41 to be retired at Arndts, PA Linen 10/11/1930 1137113 12-3039 Plan showing track #81 to be retired at Bushkill Jct. PA Linen 12/12/1930 1137117 12-3039 Drawing of end frog - No. 6 Blueprint no date 1137118 12-3039 Drawing of end frog - No. 8 Blueprint no date 1137119 12-3039 Drawing of end frog - No. 10 Blueprint no date 1137127 12-3039 Siding to be retired at Sta. 250+50.6 Slatington branch Linen 5/5/1931 1137133 12-3039 Plan showing track "A" mile 47 to be retired at Katellen, PA Linen 7/3/1931 1137141 12-3039 Proposed changes to water line at car shops Pen Argyl, PA Linen 8/27/1931 113

7144 12-3039Track "A" Mi. 3 on East Bangor branch proposed to be retiredEast Bangor, PA

at Linen 10/19/1931 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5849

58505851

5852585358545855

5856

5857

585858595860586158625863586458655866

Page 170 of 194Page 170 of 194

58665867586858695870587158725873587458755876587758785879588058815882588358845885

6550G 12 3039 MOW road crossing traffic record American ST Linen 113

7146 12-3039Plan showing location of proposed scrap storage bin at Pen APA

rgyl, Linen 11/5/1931 113

7154 12-3039Portion of American Bangor br. (TR.B) and TR. B3 to be retireWashington Twp.

d in Linen 12/29/1931 113

7159 12-3039 Plan showing track C mi 6 to be retired at Catasauqua, PA Linen 3/10/1932 113

7177 12-3039Plan showing loction of proposed concrete wall at Loco. HousPen Argyl, PA

e Linen 5/23/1932 113

7188 12-3039 Retirement of portion of track B Mi 7 at Tamaqua, PA Linen 11/25/1932 1137190 12-3039 Portion of tracks A & A1 Mi. 55 to be retired at Pen Argyl, PA Linen 12/15/1932 1137195 12-3039 Plan showing change of tracks in erecting shop Pen Argyl, PA Linen 1/30/1933 113

6539A 12-3039Maintenance of Way dept. Road crossing traffic record-Berlinsto Lehigh Gap,PA

ville Blueprint 10/31/1916 113

6539B 12-3039Maintenance of Way dept. Road crossing traffic record-Berlinsto Lehigh Gap,PA

ville Blueprint 11/1/1916 113

6539C 12-3039Maintenance of Way dept. Road crossing traffic record-Berlinsto Lehigh Gap,PA

ville Blueprint 11/2/1916 113

653A 12-3039 Plan and profile of proposed siding for Comunale and Pinto Linen 4/5/1913 1136550A 12-3039 MOW road crossing traffic record - American ST Linen 12/17/1916 1136550B 12-3039 MOW road crossing traffic record - American ST Linen 12/18/1916 1136550C 12-3039 MOW road crossing traffic record - American ST Linen 12/19/1916 1136550D 12-3039 MOW road crossing traffic record - American ST Linen 12/20/1016 1136550E 12-3039 MOW road crossing traffic record - American ST Linen 12/21/1916 1136550F 12-3039 MOW road crossing traffic record - American ST Linen 12/22/1916 1136550G 12 3039- MOW road crossing traffic record - American ST - Linen 12/23/1916 11312/23/19166550H 12-3039 MOW road crossing traffic record - American ST Linen 12/24/1916 1136566A 12-3039 Standard cast steel pedestals, details. Blueprint no date 1136566B 12-3039 Standard cast steel pedestals, details. Blueprint no date 1136566C 12-3039 Standard cast steel pedestals No.1 Blueprint no date 1136566D 12-3039 Standard cast steel pedestals No.2 Blueprint no date 1136566E 12-3039 Standard cast steel pedestals No.3 Blueprint no date 1136566F 12-3039 Standard cast steel pedestals No.4 Blueprint no date 1136566G 12-3039 Standard cast steel pedestals No.5 Blueprint no date 1136566H 12-3039 Standard cast steel pedestals No.6 Blueprint no date 1136566I 12-3039 Standard cast iron pedestals - details & capacity Blueprint no date 1136574A 12-3039 Road crossing traffic record - Broadway at Wind Gap, PA Linen 4/3/1917 1136574B 12-3039 Road crossing traffic record - Broadway at Wind Gap, PA Linen 4/4/1917 1136574C 12-3039 Road crossing traffic record - Broadway at Wind Gap, PA Linen 4/5/1917 1136574D 12-3039 Road crossing traffic record - Broadway at Wind Gap, PA Linen 4/6/1917 1136574E 12-3039 Road crossing traffic record - Broadway at Wind Gap, PA Linen 4/7/1917 1136574F 12-3039 Road crossing traffic record - Broadway at Wind Gap, PA Linen 4/8/1917 1136574G 12-3039 Road crossing traffic record - Broadway at Wind Gap, PA Linen 4/9/1917 1136574H 12-3039 Road crossing traffic record - Broadway at Wind Gap, PA Linen 4/10/1917 1136575A 12-3039 Sketch showing location of rail (by lb.) Blueprint 12/31/1916 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I5886588758885889589058915892589358945895589658975898589959005901590259035904590559065907

Page 171 of 194Page 171 of 194

59075908590959105911591259135914591559165917591859195920592159225923592459255926

6589E 12 3039 Road crossing traffic record Tenth St Road at Catasa PA Linen 113

6575B 12-3039 Sketch showing location of rail (by lb.) Blueprint rev.12/15/19 1136587A 12-3039 Road crossing traffic record - Onoko St at Catasauqua, PA Linen 6/11/1917 1136587B 12-3039 Road crossing traffic record - Onoko St at Catasauqua, PA Linen 6/12/1917 1136587C 12-3039 Road crossing traffic record - Onoko St at Catasauqua, PA Linen 6/13/1917 1136587D 12-3039 Road crossing traffic record - Onoko St at Catasauqua, PA Linen 6/14/1917 1136587E 12-3039 Road crossing traffic record - Onoko St at Catasauqua, PA Linen 6/15/1917 1136587F 12-3039 Road crossing traffic record - Onoko St at Catasauqua, PA Linen 6/16/1917 1136587G 12-3039 Road crossing traffic record - Onoko St at Catasauqua, PA Linen 6/17/1917 1136587H 12-3039 Road crossing traffic record - Onoko St at Catasauqua, PA Linen 6/18/1917 1136588A 12-3039 Road crossing traffic record - 16Ft. Alley at Catasauqua, PA Linen 6/11/1917 1136588B 12-3039 Road crossing traffic record - 16Ft. Alley at Catasauqua, PA Linen 6/12/1917 1136588C 12-3039 Road crossing traffic record - 16Ft. Alley at Catasauqua, PA Linen 6/13/1917 1136588D 12-3039 Road crossing traffic record - 16Ft. Alley at Catasauqua, PA Linen 6/14/1917 1136588E 12-3039 Road crossing traffic record - 16Ft. Alley at Catasauqua, PA Linen 6/15/1917 1136588F 12-3039 Road crossing traffic record - 16Ft. Alley at Catasauqua, PA Linen 6/16/1917 1136588G 12-3039 Road crossing traffic record - 16Ft. Alley at Catasauqua, PA Linen 6/17/1917 1136588H 12-3039 Road crossing traffic record - 16Ft. Alley at Catasauqua, PA Linen 6/18/1917 1136589A 12-3039 Road crossing traffic record - Tenth St. Road at Catasauqua, PA Linen 6/11/1917 1136589B 12-3039 Road crossing traffic record - Tenth St. Road at Catasauqua, PA Linen 6/12/1917 1136589C 12-3039 Road crossing traffic record - Tenth St. Road at Catasauqua, PA Linen 6/13/1917 1136589D 12-3039 Road crossing traffic record - Tenth St. Road at Catasauqua, PA Linen 6/14/1917 1136589E 12 3039- Road crossing traffic record Tenth St Road at Catasauqua - . uqua, PA Linen 6/15/1917 1136/15/19176589F 12-3039 Road crossing traffic record - Tenth St. Road at Catasauqua, PA Linen 6/16/1917 1136589G 12-3039 Road crossing traffic record - Tenth St. Road at Catasauqua, PA Linen 6/17/1917 1136589H 12-3039 Road crossing traffic record - Tenth St. Road at Catasauqua, PA Linen 6/18/1917 1136590A 12-3039 Road crossing traffic record template Linen Jun-17 1136590B 12-3039 Road crossing traffic record template Linen Jun-17 1136590C 12-3039 Road crossing traffic record template Linen Jun-17 1136749A 12-3039 Notes from American Bridge Company Blueprint no date 1136749B 12-3039 Notes from American Bridge Company - sheet 5 Blueprint no date 1136749C 12-3039 Notes from American Bridge Company - sheet 4 Blueprint no date 1136749D 12-3039 Notes from American Bridge Company - sheet3 Blueprint no date 1136749E 12-3039 Notes from American Bridge Company - sheet 2 Blueprint no date 1136749F 12-3039 Notes from American Bridge Company sheet 1 Blueprint no date 1136780A 12-3039 Standard branding for accepted cross-ties Llinen no date 1136788A 12-3039 Sketch showing location of rail Blueprint 5/1/1919 1136788C 12-3039 Sketch showing location of rail Blueprint rev.10/10/19 1136788E 12-3039 Sketch showing location of rail Blueprint rev.11/11/19 1136788F 12-3039 Sketch showing location of rail Blueprint+lin rev.12/31/19 1136876A 12-3039 Road Crossing Traffic Record - North Main at Bangor, PA Linen 10/4/1920 1136876B 12-3039 Road Crossing Traffic Record - North Main at Bangor, PA Linen 10/5/1920 113

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I59275928592959305931

593259335934

5935

5936

5937

5938

5939

5940

594159425943

Page 172 of 194Page 172 of 194

594359445945594659475948594959505951595259535954595559565957595859595960

5961

113

6876C 12-3039 Road Crossing Traffic Record - North Main at Bangor, PA Linen 10/6/1920 1136876D 12-3039 Road Crossing Traffic Record - North Main at Bangor, PA Linen 10/7/1920 1136876E 12-3039 Road Crossing Traffic Record - North Main at Bangor, PA Linen 10/8/1920 1136876F 12-3039 Road Crossing Traffic Record - North Main at Bangor, PA Linen 10/9/1920 1136936A 12-3039 Shoemaker-Satterthwait Bridge Co. plan of Bridge #93.98 Blueprint 2/21/1921 113

6940A 12-3039Shoemaker-Satterthwait Bridge Co. plan of Bridge #4.63 ChaQuarries, PA

pmanBlueprint 2/18/1921 113

6976A-G 12-3039 Folder containing sheets listing standard sizes & kind of lumber Typing pape 1922-1924 1137008A 12-3039 plan showing steel plate to be used for folding metal flag Linen 5/22/1951 113

7062A 12-3039Road Crossing Traffic Record - Pen Argyl, Sta. 41+82 Albion Branch Linen 6/1/1932 113

7062B 12-3039Road Crossing Traffic Record - Pen Argyl, Sta. 41+82 Albion Branch Linen 6/2/1932 113

7062C 12-3039Road Crossing Traffic Record - Pen Argyl, Sta. 41+82 Albion Branch Linen 6/3/1932 113

7062D 12-3039Road Crossing Traffic Record - Pen Argyl, Sta. 41+82 Albion Branch Linen 6/4/1932 113

7062E 12-3039Road Crossing Traffic Record - Pen Argyl, Sta. 41+82 Albion Branch Linen 6/5/1932 113

7062F 12-3039Road Crossing Traffic Record - Pen Argyl, Sta. 41+82 Albion Branch Linen 6/6/1932 113

7062G 12-3039Road Crossing Traffic Record - Pen Argyl, Sta. 41+82 Albion Branch Linen 6/7/1932 113

7074A 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+24.4 Linen 11/9/1932 1137074B 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+24.4 Linen 11/1 1130/19327074C 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+24.4 Linen 11/11/1932 1137074D 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+24.4 Linen 11/12/1932 1137074E 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+24.4 Linen 11/13/1932 1137074F 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+24.4 Linen 11/14/1932 1137074G 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+24.4 Linen 11/15/1932 1137075A 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+64.4 Linen 11/9/1932 1137075B 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+64.4 Linen 11/10/1932 1137075C 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+64.4 Linen 11/11/1932 1137075D 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+64.4 Linen 11/12/1932 1137075E 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+64.4 Linen 11/13/1932 1137075F 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+64.4 Linen 11/14/1932 1137075G 12-3039 Road Crossing Traffic Record - Bath, PA Sta. 349+64.4 Linen 11/15/1932 1137900 12-3039 Drawing of column section-for lathe drawing no. 7904? Blueprint no date 1147901 12-3039 Drawing of column section Blueprint no date 1147902 12-3039 Drawing of column section Blueprint no date 1147903 12-3039 Drawing of column section Blueprint no date 1147904 12-3039 Foundation plan for lathe Blueprint 1/14/1915 114

7905 12-3039Foundation for double No.0 punch 48" throat Covington MachCo., VA

ine Blueprint 10/19/1915 114

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I596259635964

5965596659675968

5969

5970

5971

5972

597359745975

59765977

5978

Page 173 of 194Page 173 of 194

5978

59795980

5981598259835984

59855986

5987

59885989

5990

59915992

114

7906 12-3039 Plan of forge made by Buffalo Forge CO. Buffalo, NY Blueprint 3/11/1903 1147907 12-3039 Drawing of double plate wheels Blueprint no date 1147908 12-3039 Foundation for No. 0 flanging clamp Covington Machine Co.,VA Blueprint 10/18/1915 114

7909 12-3039Foundation for No. 1 plate bending rolls, Covington Machine CVA

o., Blueprint 10/18/1915 114

7910 12-3039 Plan floor for mill machine Blueprint 4/29/1913 1147911 12-3039 Drawing of Pine Island branch (elevation) Blueprint no date 1147912 12-3039 Drawing of Hartz super-heater welder foundation plan Blueprint no date 114

7915 12-3039List of drawing numbers referring to 30-ton steel underframe bcars

ox Blueprint 4/8/1911 114

7916 12-3039List of drawing numbers referring to 30-ton steel underframe bcars

ox Blueprint 4/8/1911 114

7918 12-3039Drawing of trusses by Trussed Concrete Steel Co., Detroit, Michigan Blueprint no date 114

7919 12-3039Drawing of trusses by Trussed Concrete Steel Co., Detroit, Michigan Blueprint no date 114

7920 12-3039Detail of Coburn Trolley and Hangers for large sliding door, Trussed Concrete Steel Co., Detroit, MI Blueprint no date 114

7928 12-3039 Cover sheet named "Lehigh & New England RR Rail Chart" Linen 1907 1147929 12-3039 Drawing of drawer arrangement - unknown location Linen nodate 114

7931 12-3039Proposed plan for renewal-bridge No 34-06 317 West Johnsonville, PA Linen 4/1/1913 114

7932 12-3039 Detail plan showing bridge No 34-06 Linen 4/3/1913 114

7934 12-3039Detail plan showing abutments for 25' span at sta. 173 SlatingDivision

ton Linen 8/3/1 114889

7935 12-3039Chart showing section, excavation, foundation, concrete and masonry numbers Linen no date 114

7939 12-3039 Plan of filing case of office of master mechanic Pen Argyl, PA Linen 12/9/1916 114

7941 12-3039Plan showing proposed extension of station siding at LewisbuNJ

rg, Linen 12/29/1916 114

7944 12-3039 Drawing of the Lundie tie plate-for 100 lb. rail Linen 1/9/1917 1147945 12-3039 Drawing of standard tie plates for 90 lb. rail Linen 1/10/1917 1147947 12-3039 Drawing of the Lundie tie plate-for 90 and 100 lb. Rail Linen 1/15/1917 114

7948 12-3039Details of braces required at panel points P1 and P2 of north girder of span No. 2 bridge over Lehigh River at Catasauqua, PA Linen 1/16/1917 114

7950 12-3039 Details of rail easer for track scales for use with 80 lb. ASCE rail Linen 1/18/1917 114

7951 12-3039Plan showing location and profile of proposed sewer for YMCbuilding Pen Argyl, PA

A Linen 2/12/1917 114

7952 12-3039Map showing drainage conditions at property of JC Mackes oSaylorsburg branch

n the Linen 2/13/1917 114

7953 12-3039 Plan of station at Saylorsburg Linen 2/17/1917 114

7954 12-3039Plan showing proposed relocation of sidings for the Genuine Washington Slate Co., Berlinsville, PA Linen 2/19/1917 114

7955 12-3039Six reduced charts showing info on spans, shears, etc. regardgirders

ing Blueprint no date 114

7956 12-3039 Six reduced charts showing info on girders, bridges, etc. Blueprint no date 114

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

5993

59945995

5996

5997

59985999

6000

600160026003600460056006

6007

6008

Page 174 of 194Page 174 of 194

6008

6009

6010

6011

6012

6013

60146015

6016

6017

6018

60196020

8006 12 3039 1066+33 5 Blueprint 114

7961 12-3039Plan showing location of proposed water tank and 4" pipeline Sussex, Jct.

at Blueprint 4/2/1917 114

7962 12-3039Plan showing proposed extension of siding at plant of the HazSand Co. Mt. Bethel, PA

en Linen 114

7965 12-3039 Map of the branch of the L&NERR to the American Bangor Quarry Blueprint 9/6/1904 114

7968 12-3039Details of racks for bar iron, pipes, etc. for storehouse, Pen ArPA

gyl, Linen 5/17/1917 114

7970 12-3039Details of braces required for south girder of span No 4 of bridover Lehigh River at Catasauqua, PA

ge Linen 6/5/1917 114

7977 12-3039Plan showing proposed relocation of track connecting with theCatasauqua and Fogelsville RR at Catasauqua, PA

Linen 7/9/1917 114

7980 12-3039 Plan showing proposed siding west of station, Danielsville, PA Linen 7/17/1917 114

7989 12-3039Diagram showing automatic signal protection of Catasauqua tunnel Linen 8/27/1917 114

7994 12-3039Plan showing cross section of foundation alongside Hammer Building-unknown location Blueprint no date 114

7997 12-3039 Plan showing standard cast iron washers for floor bolts Blueprint 2/9/1912 1147998 12-3039 Plan showing standard floor bolts Blueprint 2/9/1912 1147999 12-3039 Standard clearance diagram Blueprint 6/27/1906 1148003 12-3039 Plan showing bridge over highway at station 290+40 Blueprint 12/22/1911 1148004 12-3039 Plan showing Tamaqua extension crossing at sta. 647+71.1 Blueprint 6/30/1911 114

8005 12-3039Plan showing Tamaqua extension bridge over Lizard Creek a684+92

t sta. Blueprint 6/8/1911 114

8006 12 3039-Plan showing Tamaqua extension bridge over Creek at sta. 1066+33 5. Blueprint 7/14/1911 1147/14/1911

8007 12-3039Plan showing Tamaqua extension bridge over Creek at station1202+18

Blueprint 6/8/1911 114

8008 12-3039Plan showing Tamaqua extension bridge over highway at stat1215+21

ion Blueprint 6/8/1911 114

8009 12-3039Plan showing Tamaqua extension bridge over Lizard creek atstation 1251+

Blueprint 6/8/1911 114

8010 12-3039Plan showing Tamaqua extension crossing over highway at s1387+70

ta. Blueprint 6/8/1911 114

8011 12-3039Plan showing Tamaqua extension crossing over highway at s1709+51

ta. Blueprint 6/8/1911 114

8012 12-3039Plan showing Tamaqua extension bridge over highway at sta.1726+14

Blueprint 6/8/1911 114

8013 12-3039 Plan showing Tamaqua extension bridge over high at 1179+00 Blueprint 8/28/1911 114

8014 12-3039Plan showing Tamaqua extension bridge over highway at stat1736+38.5

ion Blueprint 10/4/1911 114

8030 12-3039Plan showing Tamaqua extension crossing of Lizard Creek at656+06

sta. Blueprint 6/8/1911 114

8031 12-3039Plan showing Tamaqua extension bridge over highway at stat1404+00-D1728

ion Blueprint+Lin 6/8/1911 114

8032 12-3039Proposed design of bridge no. 19.86 Bushkill Creek, Atlantic MPA

ills, Blueprint 10/13/1913 114

8033 12-3039 Drawing of Catasauqua, PA Linen 3/12/1917 114

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

6021602260236024602560266027

6028

6029

6030

6031

6032

60336034

6035

6036

Page 175 of 194Page 175 of 194

60366037

6038

6039

6040

6041

6042

6043

6044

6045

6046

6047

6048

8073 12 3039 and tender journal boxes page2 Blueprint no date 114

8035 12-3039Plan of proposed concrete culvert to replace timber trestle at bridge no. 1.78 Bangor branch Linen 3/29/1916 114

8036 12-3039 Drawing show the Lundie tie plate for 90 and 100 lb. Rail Blueprint 5/23/1916 1148037 12-3039 Drawing show the Lundie tie plate for 90 and 100 lb. Rail Blueprint 5/23/1916 1148038 12-3039 Plan of abutment at station 99 + 50 Blueprint 8/1/1889 1148039 12-3039 Drawing showing side elevation of Pier 0 Lehigh River bridge Linen nodate 1148040 12-3039 Masonry for completing Pier 1 Delaware River bridge Linen 5/17/1889 1148041 12-3039 Plan of abutments at station 174 Slatington Division Linen 8/2/1889 114

8056 12-3039Map showing proposed siding for the Serfass Lumber Co neaSaylorsburg

r Linen 8/27/1918 114

8058 12-3039General plan of proposed roof over storehouse platform Pen APA

rgyl, Linen 10/14/1918 114

8059 12-3039 Plan showing proposed siding for Woodward & Ely at Baleville, NJ Linen 11/18/1918 114

8067 12-3039Diagram of live load used in designing L&NERR bridges at Columbia and Baleville, NJ Linen 1/25/1908 114

8068 12-3039Plan showing bolt placement for unknown location-draftsman'covered up

s box Blueprint no date 114

8069 12-3039Plan showing bolt placement for unknown location-draftsman'covered up

s box Blueprint no date 114

8071 12-3039 Location plan of proposed coal pockets at Rittersville, PA Linen 4/22/1919 114

8072 12-3039Instructions for care of packing and lubrication of locomotive tand tender journal boxes-page 1

railer Blueprint no date 114

8073 12 3039-Instructions for care of packing and lubrication of locomotive tand tender journal boxes-page2 -

railer Blueprint no date 114

8077 12-3039 Plan showing proposed extension of trestle at Pellettown, NJ Linen 9/15/1919 114

8080 12-3039Plan showing curvature of track at connection with P&R RY Catasauqua, PA Linen 10/21/1919 114

8090 12-3039 Proposed change of grade of bridge over canal at Catasauqua, PA Linen 4/19/1920 114

8104 12-3039Plan showing proposed relocation of sidings for Genuine Washington Slate Co. and local delivery at Berlinsville, PA Blueprint 10/29/1920 114

8107 12-3039General data plan of superstructure for renewal of bridge #63over Jacobys creek Portland, PA

.27 Linen 12/31/1920 114

8108 12-3039General data plan of superstructure for renewal of bridge #93over cattle pass east of Pellettown, NJ

.98 Linen 12/31/1920 114

8109 12-3039General data plan of superstructure for renewal of bridge #94over stream at Roys, NJ

.73 Linen 12/31/1920 114

8110 12-3039General data plan of superstructure for renewal of bridge #95over stream east of Roys. NJ

.39 Linen 12/31/1920 114

8111 12-3039General data plan of superstructure for renewal of bridge #4.4across Monocacy Creek Chapman Quarries, PA

8 Linen 12/31/1920 114

8112 12-3039General data plan of superstructure for renewal of bridge #4.6over Monocacy creek Chapman Quarries, PA

3 Linen 12/31/1920 114

8113 12-3039General data plan of superstructure for neweal of bridge #5.14across Monocacy Creek Chapman Quarries, PA

Linen 12/31/1920 114

8116 12-3039General data plan of superstructure for renewal of bridge #1.5across Martins Creek Bangor, PA

8 Linen 12/31/1920 114

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

6049

6050

60516052

6053

60546055605660576058

6059

6060

6061

6062

6063

Page 176 of 194Page 176 of 194

6063

6064

6065

6066606760686069

607060716072

6073607460756076

6077

6078

8120 12-3039Details of rail girders for renewal of bridge #93.39 over cattle pwest of Pellettown, NJ

ass Blueprint+Lin 2/18/1921 114

8121 12-3039Plan showing location of proposed automobile platform & ramSussex, NJ

p at Linen 3/11/1921 114

8122 12-3039Plan showing location of proposed loading platform and extenof siding for the Keenan Structural Slate Co. Pen Argyl, PA

sion Linen 3/16/1921 114

8123 12-3039 Plan showing proposed siding for Roy&Mills Sussex, NJ Linen 3/29/1921 114

8128 12-3039Profile showing proposed change in grade for the coal trestle siding at Augusta, NJ Linen 6/17/1921 114

8130 12-3039Plan showing location of proposed siding & platform at LongaPA

cre, Linen 6/30/1921 114

8132 12-3039 Plan showing location of proposed transfer track at Pen Argyl, PA Linen 8/2/1921 1148134 12-3039 Details for framing ties for bridge #5.14 Chapman Quarries, PA Linen 9/16/1921 1148135 12-3039 Details for framing ties for bridge #95.39 over stream at Roys, NJ Linen 9/17/1921 1148144 12-3039 Sketch showing MOW tool car LNE #685 Linen 12/24/1921 114

8145 12-3039Profile showing proposed change of grade of track to coal tresat Chapman Quarries, PA

tle Linen 1/7/1922 114

8146 12-3039General data plan of superstructure for renewal of bridge #10across flood-channel Sussex Junction, NJ

0.07 Linen 1/26/1922 114

8147 12-3039General data plan of superstructure for renewal of bridge #10across Wallkill River Sussex Junction, NJ

0.24 Linen 1/26/1922 114

8148 12-3039General data plan of superstructure for renewal of bridge #10across flood-channel Sussex Junction, NJ

0.37 Linen 1/26/1922 114

81498 9 12-30393039General data plan of superstructure for renewal of bridge #10across stream Sussex Junction, NJ,

0.96 Linene 1/26/1922 114/ 6/ 9

8150 12-3039General data plan of superstructure for renewal of bridge #10across Pochuck Creek Pine Island Junction, NY

8.76 Linen 1/26/1922 114

8151 12-3039General data plan of superstructure for renewal of bridge #10across Commissioners ditch at Pine Island Junction, NY

8.94 Linen 1/26/1922 114

8168 12-3039Plan showing proposed change of narrow guage RR in the northwest part of Old Bangor Slate Quarry Blueprint 1/6/1902 114

8171 12-3039 Shafting assembly for coaling station for the L&NE RR Linen 3/13/1918 1148173 12-3039 Details of roof section and stack Linen no date 1148174 12-3039 Standard figures for bridge number Linen 5/6/1919 114

8182 12-3039Plan showing proposed siding for Franklin Goldsmith at Catasauqua, PA Linen 5/27/1922 114

8187 12-3039 Chart showing "Moments for Cooper's E-60 Loading" 2 copies Linen &brow no date 1148194 12-3039 Plan showing proposed siding at Summit, PA Linen 9/26/1922 114

8195 12-3039Plan showing location of proposed siding for the Lewisburg Creamery Co., NJ Linen 10/5/1922 114

8205 12-3039 Sketch map of grades at Allentown freight station, Allentown, PA Linen 11/16/1922 1148209 12-3039 Plan showing method of adzing and boring of ties 3 copies Blueprint 1/26/1923 1148209 12-3039 Plan showing method of adzing and boring of ties 2 copies Linen 8/9/1956 114

8210 12-3039Plan showing location of proposed siding and trestle for Casciole&Son, Bangor Jct., PA 2 copies Linen &Bluep3/10/1923 114

8214 12-3039Plan showing proposed site for slate dump for the Bangor CenSlate Co. at East Bangor, PA

tral Linen 4/21/1923 114

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

6079

6080

6081

6082

608360846085

60866087

6088608960906091

6092

6093

Page 177 of 194Page 177 of 194

6094

6095

6096

6097

6098

6099

6100

6101

6102

6103

6104

6105

Plan No. 99 over114

8221 12-3039Eastern Pa. Light, Heat, & Power Co.'s drawing (2775-F-2) showing crossing of 2300 volt series lighting line over L&NE Blueprint 3/27/1923 114

8223 12-3039Plan showing proposed track changes for the Amalgamated SQuarries Co., Berlinsville, PA

late Linen 8/18/1923 114

8234 12-3039Plan of I-beam spans for replacement of bridge No. 91.72 ovePapakating Creek, East of Plains, NJ

r Linen 1/5/1924 114

8235 12-3039Plan of I-beam span for replacement of bridge No. 92.32 overstream Armstrong, NJ

Linen 1/5/1924 114

8238 12-3039Plan showing proposed siding for Alvin F. Frantz at SaylorsbuMonroe, Co., PA

rg, Linen 1/14/1924 114

8241 12-3039 Flow chart showing L&NE railroad tonnage Linen 1916-1923 1148242 12-3039 Flow chart showing L&NE railroad statistics Linen 19161923 114

8251 12-3039Floor plan for replacement of bridge No. 92.32 at Armstrong, NVoided

J Linen 6/16/1924 114

8251 12-3039 Floor plan for replacement of bridge No. 92.32 at Armstrong, NJ Linen 7/29/1954 114

8257 12-3039Plan showing proposed roof over racks for bar iron at Pen ArgPA

yl, Linen 8/25/1924 114

8259 12-3039 Plan showing standard crossing sign for New Jersey Linen 8/30/1924 1148260 12-3039 Plan of dam for storage reservoir at Mr. Bethel, PA 2 copies Blueprint and9/16/1924 1148265 12-3039 Plan showing proposed renewal of crossing frog at Bangor, PA Linen 9/30/1924 114

8269 12-3039Plan of I-beam span for replacement of bridge No. 93.57 overPapakating Creek, Pellettown, NJ

Linen 11/28/1924 114

8270 12-3039Plan of I-beam span for replacement of bridge No. 93.71 overPapakating Creek, Pellettown, NJ

Linen 11/28/1924 114

8273 12-3039Plan for reconstruction span to replace bridge No. 99.18 over for reconstruction span to replace bridge .18cattle pass, Sussex Junction, NJ

Linen 1/29/ 1141925

8274 12-3039Plan for reconstruction span to replace bridge No. 93.71 over cattle pass, Sussex Junction, NJ Linen 1/21/1925 114

8275 12-3039Plan for reconstruction of bridge No. 99.02 over cattle pass, Sussex Junction, NJ Linen 1/22/1925 114

8276 12-3039Floor plan for replacement of bridge No. 99.18 over cattle pasSussex Junction, NJ

s, Linen 1/7/1925 114

8277 12-3039Floor plan for replacement of bridge No. 4.85 west of ChapmaQuarries, PA

n Linen 1/27/1925 114

8280 12-3039Plan showing proposed relocation of turnouts of Track B in MiBenders Jct., PA

le 46 Blueprint and3/11/1925 114

8289 12-3039Plan showing proposed steel shelter over pipe racks at Pen APA

rgyl, Linen 6/26/1925 114

8290 12-3039Details of substructure for replacement of bridge No. 99.02 ovcattle pass, Sussex Junction, NJ

er Linen 7/14/1925 114

8291 12-3039Details of substructure fro replacement of bridge No. 99.18 ovcattle pass, Sussex Junction, NJ

er Linen 7/14/1925 114

8292 12-3039Plan showing proposed siding for Allison, Eddy & Co. Inc. Schuylkill Co., PA Linen 8/10/1925 114

8296 12-3039Plan showing location of proposed siding for Calvin T. ShellhaTamaqua, PA 2 copies

mer Blueprint and11/12/1925 114

7924A 12-3039General order to manufacture beams (for water tower) by the Phoenix Iron Company Invoice 6/7/1912 114

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

6106

6107

6108

6109

6110

6111

6112

6113

611461156116

6117611861196120

Page 178 of 194Page 178 of 194

6 061216122612361246125612661276128

6129

6130

6131

6132613361346135

6136

114

7924B 12-3039General order to manufacture beams (for water tower) by the Phoenix Iron Company Invoice 6/7/1912 114

7924C 12-3039General order to manufacture columns (for water tower) by thPhoenix Iron Co.

e Invoice 6/10/1912 114

7924D 12-3039General order to manufacture bracing (for water tower) by thePhoenix Iron Co.

Invoice 6/10/1912 114

7924E 12-3039General order to manufacture bracing (for water tower) by thePhoenix Iron Co.

Invoice 6/10/1912 114

7925A 12-3039General order to manufacture beams (for water tower) by the Phoenix Iron Co. Invoice 10/10/1912 114

7925B 12-3039General order to manufacture beams (for water tower) by the Phoenix Iron Co. Invoice 10/10/1912 114

7925C 12-3039General order to manufacture bracing (for water tower) by thePhoenix Iron Co.

Invoice 10/10/1912 114

7925D 12-3039General order to manufacture bracing (for water tower) by thePhoenix Iron Co.

Invoice 10/10/1912 114

7925E 12-3039General order to manufacture columns (for water tower) by thPhoenix Iron Co.

e Invoice 10/10/1912 114

7926A 12-3039 Timetable of mainline Hauto to Bangor Jct. (eastward) Linen no date 1147926B 12-3039 Timetable of mainline Hauto to Bangor Jct. (westward) Linen no date 114

7926C 12-3039Timetable of mainline Bangor Jct. To Campbell Hall (west andeastward)

Linen no date 114

7926D 12-3039 Timetable of Bethlehem branch (west and eastward) Linen no date 1147926E 12-3039 Timetable of Nazareth branch (west and eastward) Linen no date 1147928A9 8 12-30393039 Rail chart from Slatington to Hainesburg Jct.g g Linene 1907 114907928B 12-3039 Rail chart from Slatington to Hainesburg Jct. Linen 1907 1147928C 12-3039 Rail chart from Bethlehem to Bangor Linen 1907 1147928D 12-3039 Rail chart from Bethlehem to Bangor Linen 1907 1147928E 12-3039 Rail chart from Martins Creek to Bath Portland Linen 1907 1147928F 12-3039 Rail chart at American Bangor branch Linen 1907 1147928G 12-3039 Rail chart at Saylorsburg branch Linen 1907 1147928H 12-3039 Rail chart from Pen Argyl to Northampton Jct., Nazareth branch Linen 1907 1147957A 12-3039 Chart showing info on deck plate girders for single track Blueprint no date 114

7957B 12-3039Chart showing info on through plate girders (10 ft. panels) for single track Blueprint no date 114

7957C 12-3039Chart showing info on through plate girders (15 ft. panels) for single track Blueprint no date 114

7958A 12-3039Chart showing info on riveted & pin connected through trussesingle track

s for Blueprint no date 114

7958B 12-3039Chart showing info on riveted & pin connected through trussedouble track

s for Blueprint no date 114

8003A 12-3039 Plan showing bridge over highway at station 290+40 Blueprint 12/22/1911 1148004A 12-3039 Plan showing Tamaqua extension crossing at sta. 647+71.1 Blueprint 6/8/1911 1148004A 12-3039 Plan showing Tamaqua extension crossing at sta. 647+71.1 Blueprint 6/8/1911 114

8005A 12-3039Plan showing Tamaqua extension bridge over Lizard Creek a684+92

t sta. Blueprint 6/8/1911 114

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

6137

6138

6139

6140

6141

6142

6143

6144

6145

6146

61476148

6149

Page 179 of 194Page 179 of 194

6150

6151

6152

6153

6154

6155

6156

6157

615861596160616161626163

Eastern Pa. ) 114

8005B 12-3039Plan showing Tamaqua extension bridge over Lizard Creek a684+92

t sta. Blueprint 6/8/1911 114

8006A 12-3039Plan showing Tamaqua extension bridge over Creek at sta. 1066+33.5 Blueprint 7/14/1911 114

8006B 12-3039Plan showing Tamaqua extension bridge over Creek at sta. 1066+33.5 Blueprint 6/8/1911 114

8007A 12-3039Plan showing Tamaqua extension bridge over Creek at station1202+18

Blueprint 6/8/1911 114

8008A 12-3039Plan showing Tamaqua extension bridge over highway at stat1215+21

ion Blueprint 6/8/1911 114

8008B 12-3039Plan showing Tamaqua extension bridge over highway at stat1215+21

ion Blueprint 6/8/1911 114

8009A 12-3039Plan showing Tamaqua extension bridge over Lizard creek atstation 1251+

Blueprint 6/8/1911 114

8010A 12-3039Plan showing Tamaqua extension crossing over highway at s1387+70

ta. Blueprint 6/8/1911 114

8011A 12-3039Plan showing Tamaqua extension crossing over highway at s1709+51

ta. Blueprint 6/8/1911 114

8012A 12-3039Plan showing Tamaqua extension bridge over highway at sta.1726+14

Blueprint 6/8/1911 114

8012B 12-3039Plan showing Tamaqua extension bridge over highway at sta.1726+14

Blueprint 6/8/1911 114

8013A 12-3039 Plan showing Tamaqua extension bridge over high at 1179+00 Blueprint 8/28/1911 114

8031A 12-3039Plan showing Tamaqua extension bridge over highway at stat1404+00-D1728

ion Blueprint 6/8/1911 114

8221A 12-3039Eastern Pa. Light, Heat, & Power Co.'s drawing (2776-F-2) Light, Heat, & Power Co. s drawing (2776 F 2showing crossing of 2300 volt series lighting line over L&NE Blueprint 1143/27/1923

8221B 12-3039Eastern Pa. Light, Heat, & Power Co.'s drawing (2779-F-2) showing crossing of 2300 volt series lighting line over L&NE Blueprint 3/27/1923 114

8221C 12-3039Eastern Pa. Light, Heat & Power Co.'s drawing (2780-F-2) showing Standard type of construction Township Lighting Projects Blueprint 3/29/1923 114

8427-A 12-3039Plan showing arrangement of steel shelving for record storageL&NE terminal warehouse Bethlehem, PA

at Linen 10/7/1938 114

8490A 12-3039General info for railroad bridges on distances from base of raiunderclearance.

l to Blueprint 11/1/1926 114

8490B 12-3039Chart showing approx.cost of solid floor highway bridges to eliminate grade crossings. Blueprint 7/2/1925 114

8490C 12-3039Chart showing info for highway bridges on distances from croroadway to underclearance.

wn of Blueprint 11/1/1926 114

8517A 12-3039Train dispatching telephone - Taper resistance & wire characteristic sheet Linen &Bluep 1/30/1948 114

8517B 12-3039Train dispatching telephone - Selector taper resistance characteristic & wire data Linen 5/1/1949 114

8525 1 of 4 12-3039 Drawing of rivets and holes for bridge 58.17 North Bangor, PA Blueprint 3/20/1938 1148525 2 of 4 12-3039 Drawing of rivets and holes for bridge 58.17 North Bangor, PA Blueprint 6/20/1938 1148525 3 of 4 12-3039 Sample chart to be used listing rods, nuts and mill order Blueprint 6/20/1938 1148525 4 of 4 12-3039 Sample chart to be used lisiting rivets, bolts and nuts Blueprint 6/20/1938 114

1600 12-3039 Profile of proposed coal track at Bangor Royal slate Co. paper 4-00-1903 115

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I6164616561666167616861696170617161726173617461756176617761786179618061816182618361846185

Page 180 of 194Page 180 of 194

6185

618661876188618961906191619261936194619561966197619861996200620162026203

1702 12 3039 LNE DL&W interlocking locking and dog sheet sta NJ blue 115

1605 12-3039 List of elev. Blocks for Delaware River bridge linen 12/14/1908 1151606 12-3039 Details for bridge at Friedensthal, Pa. linen 1151607 12-3039 Profile of proposed coal track at Harpers paper 5-00-03 1151612 12-3039 Cross sections at Hainesburg Jct. 1151633 12-3039 Detail plans for rail clamp on 60# rail linen 4/28/1913 1151637 12-3039 Profile of Bushkill creek and raceway, Friedensthal, Pa. linen 1151653 12-3039 LVRR plan for rail clip to fasten to ash pit wall blue 4-00-1906 1151654 12-3039 LVRR plan of cast iron column for supporting track over ash pit 9-00-1906 1151655 12-3039 LVRR plan of pedestal casting for ash pit blue 4-00-1902 1151658 12-3039 Plan of siding to power plant at Pen Argyl 1151659 12-3039 Profile of branch to old Delabole quarry paper 1151663 12-3039 Plan of trestle bent at Danielsville, Pa. blue 1151665 12-3039 Floor plan changes to Wind Gap station linen 3/12/1914 1151675 12-3039 Sketch of Sours Mill siding paper 4/19/1902 1151679 12-3039 Masonry plans for Hainesburg bridge linen 2-00-1902 1151682 12-3039 Profile of proposed undercrossing at Heller Av., Pen Argyl, Pa. linen 5/29/1911 1151689 12-3039 Slatington Lehigh river bridge piers linen 1151695 12-3039 Timber bent at American Bangor Slate Co. linen 8/4/1913 1151699 12-3039 Profile of coal dump track @ American Bangor quarry paper 1151700 12-3039 Diagram of interlocking levers in lever room, Augusta, NJ blue 3/6/1911 1151701 12-3039 LNE - DL&W interlocking signal protection diagram, Augusta, NJ blue 3/4/1911 1151702 12 3039- LNE DL&W interlocking locking and dog sheet Augusta NJ - , Augu , blue 3/7/1911 1153/7/1911

1703 12-3039Plan and profile of proposed siding to J.M. Kress Co. quarry, WBangor, Pa.

. blue 115

1709 12-3039 Details of Albion branch trestle linen 1151710 12-3039 Details of pier, Albion branch linen 1151713 12-3039 Proposed coal trestle at Sours Mill linen 1151714 12-3039 Fehr's bridge foundation plan linen 1151715 12-3039 Clearance diagram for Bangor Royal tunnel linen 6/10/1912 1151720 12-3039 Plan of LNE - BRT grade crossing at Danielsville, Pa. blue 1151723 12-3039 Section showing roof truss, Pen Argyl shop linen 1151724 12-3039 Details showing floor bolts for railroad bridges linen 3/02/1908 1151725 12-3039 List of elevation blocks for Delaware river bridge linen 9/15/1908 1151737 12-3039 Detail for bridge of Papakating Creek, Sussex, NJ blue 1151738 12-3039 Detail for bridge of Papakating Creek, Sussex, NJ blue 1151740 12-3039 Foundation plan for Sours Mill bridge linen 1151743 12-3039 Plan of Delaware river bridge pier concrete reinforcement linen 11/13/1909 1151744 12-3039 Plan showing proposed overhead bridge at Berlinsville, Pa. linen 3/19/1910 1151746 12-3039 Sketch of ties for Sussex bridge linen 10/13/1908 1151747 12-3039 Plan for temp. bridge seats for bridge at Slatington, Pa. linen 6/24/1909 1151750 12-3039 List of elevation blocks for Delaware river bridge linen 9/15/1908 115

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

6204

6205620662076208

6209621062116212

6213

6214

6215621662176218621962206221

Page 181 of 194Page 181 of 194

62216222622362246225622662276228622962306231623262336234623562366237623862396240

1799 12 3039 Diagram showing sizes and numbers for drawings linen 115

1751 12-3039Timber bracing plan for Slate bank @ Bangor Royal crossing,Bangor branch

E. linen 11/04/1907 115

1753 12-3039Plan of concrete abutments for siding at Meyers Gardner Co. Portland, Pa. linen 6/21/1908 115

1754 12-3039 Plan for reinforced concrete bridge slab linen 4/28/1911 1151755 12-3039 Plan of folding door to Bangor freight house linen 7/15/1908 1151756 12-3039 Detail of door to Pen Argyl store house linen 10/19/1908 115

1757 12-3039Plan of concrete caps & sills for doors and windows of Pen Arstore house

gyl linen 115

1758 12-3039 Plan for horizontal folding door on Bangor freight house linen 7/03/1909 1151759 12-3039 Plan of proposed location of Bangor freight house linen 7/30/1908 1151762 12-3039 Proposed change in Keystone switch near Chapmans Quarries linen 6/18/1909 115

1764 12-3039Propose change of track at Bangor Consolidated No. 3, BangPa.

or, linen 8/24/1909 115

1765 12-3039Plan of proposed location of Pen Argyl transfer platform and freight house linen 10/30/1909 115

1768 12-3039Map showing calcite limestone deposits along L&NE in town oWarwick, NY

f linen 115

1772 12-3039 Map of proposed siding to pumping station of Standard Oil of NJ linen 1151774 12-3039 Map of L&NE (prior to Tamaqua extension) linen 1151775 12-3039 Map of proposed extension of siding at Harpers linen 9/14/1917 1151779 12-3039 Map of Bushkill township linen 1151780 12-3039 DL&W map of proposed spur to Albion Slate Co. linen 3/15/1912 1151799 12 3039- Diagram showing sizes and numbers for drawings linen 3/20/1912 1153/20/19121800 12-3039 Plan of bridge No. 22 at Pellettown, NJ linen 3/04/1909 1151803 12-3039 drawing of Alpha Slate Co. linen 1151804 12-3039 Diagram of hanger blue 5/16/1912 1151805 12-3039 Cattle pass, 6' span bridge #2 (85.94) linen 12/21/1908 1151807 12-3039 Cattle pass, 6' span bridge #3 (86.26) linen 12/12/1908 1151808 12-3039 Cattle pass, 8' span bridge #4 (86.83) linen 12/12/1908 1151809 12-3039 Box culvert 4' span bridges #8 & #9 (90.83) linen 12/12/1908 1151810 12-3039 Cattle pass, 6' span bridge #10 (90.92) linen 12/12/1908 1151811 12-3039 Cattle pass, 8' span bridge #11 (91.04) linen 12/12/1908 1151812 12-3039 Pipe culvert, 2 - 36" pipes, bridge #12 (91.43) linen 12/14/1908 1151813 12-3039 Pile trestle, rebuild standard bridge #13 (91.72) linen 12/18/1908 1151814 12-3039 Box culvert 7' 5" span, bridge #14 (91.86) linen 12/18/1908 1151815 12-3039 Pile trestle, rebuild standard bridge #15 (92.14) linen 12/18/1908 1151816 12-3039 Pile trestle, rebuild standard bridge #16 (92.32) linen 12/18/1908 1151817 12-3039 plan for proposed line across Brushy Meadow Creek valley linen ? 1151818 12-3039 Cattle pass 6' 6" span, bridge #20 (93.39) linen 12/17/1908 1151819 12-3039 Pile trestle, rebuild standard bridge #21 (93.44) linen 12/18/1908 1151820 12-3039 Thru girder 80' span bridge #22 at Pellettown (93.57) linen 12/21/1908 1151821 12-3039 Cattle pass, 6' span bridge #23 (93.71) linen 12/21/1908 115

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I6241624262436244624562466247624862496250625162526253625462556256625762586259626062616262

Page 182 of 194Page 182 of 194

6262

6263626462656266626762686269627062716272

627362746275627662776278

6279

1843 12 3039 trestle bridge standard reb ilt bridge #52 (104 7) linen 115

1822 12-3039 Present bridge #24 (93.98) linen 12/21/1908 1151823 12-3039 two-span reinforced bridge #25 (94.73) linen 12/21/1908 1151824 12-3039 double span reinforced bridge #26 (95.39) linen 12/17/1908 1151825 12-3039 Plan for abutments first bridge west of Berlinsville linen ? 1151826 12-3039 Cattle pass, 7' span bridges #28,#30, #31, #32 (96.30-98.12) linen 12/17/1908 1151827 12-3039 Pipe culvert, 2 - 36" pipes, bridge #29 (97.15) linen 12/28/1908 1151828 12-3039 Box culvert 15' 6" span, bridge #34 (98.47) linen 12/21/1908 1151829 12-3039 Pipe culvert, 2 - 20" pipes, bridge #35 (98.73) linen 12/21/1908 1151830 12-3039 Cattle pass - reinforced floor, bridge #37 (99.02) linen 12/29/1908 1151831 12-3039 Cattle pass - reinforced floor, bridge #38 (99.18) linen 12/29/1908 1151832 12-3039 Cattle pass, 6' span bridge #40 (99.57) linen 12/30/1908 1151833 12-3039 trestle bridge, rebuild standard, bridge #41 (100.07) linen 12/28/1908 1151834 12-3039 Plan for proposed dam e. of upper water tank, Bath, Pa. linen 6/18/1909 1151835 12-3039 trestle bridge, rebuild standard, bridge #43 (100.37) linen 12/29/1908 1151836 12-3039 pipe culvert 2 - 36" pipes, bridge #44 (100.49) linen 12/29/1908 1151837 12-3039 pipe culvert 36" pipe, bridge #45 (100.78) linen 12/26/1908 1151838 12-3039 trestle bridge, standard rebuilt, bridge #46 (100.96) linen 12/24/1908 1151839 12-3039 pipe culvert 2 - 36" pipes, bridge #47 (101.19) linen 12/23/1908 1151840 12-3039 pipe culvert 2 - 36" pipes, bridge #48 (102.72) linen 12/26/1908 1151841 12-3039 concrete box, parapet walls, bridge #49 (103.11) linen 12/26/1908 1151842 12-3039 trestle bridge, standard rebuilt, bridge #51 (104.31) linen 12/26/1908 1151843 12 3039- trestle bridge standard rebuilt bridge #52 (104 7) , u , . linen 12/24/1908 11512/24/1908

1844 12-3039trestle bridge, standard rebuilt, bridges #53, #54, #56 (105.3 -106.06)

linen 12/24/1908 115

1845 12-3039 pipe culvert 2 - 36" pipes, bridge #55 (105.8) linen 12/21/1908 1151846 12-3039 trestle bridge, standard rebuilt, bridge #57 (106.53) linen 12/24/1908 1151847 12-3039 trestle bridge, standard rebuilt, bridge #58 (108.2) linen 12/24/1908 1151849 12-3039 trestle bridge, standard rebuilt, bridge #60 (108.94) linen 12/29/1908 1151850 12-3039 trestle bridge - filled in, bridge #61 (109.26) linen 12/23/1908 1151851 12-3039 masonry plan, through girder bridge, Sussex, NJ (98.38) linen 01/21/1909 1151852 12-3039 grade crossing buck diagram blue 4/15/1912 1151859 12-3039 blue print washing pan linen 8/31/1910 1151860 12-3039 proposed coal trestle for John Young, Wind Gap, Pa. linen 4/8/1912 115

1861 12-3039proposed siding extension Genuine Washington Slate Co., Berlinsville, Pa. linen 12/12/1912 115

1862 12-3039 grade crossing buck diagram blue 4/15/1912 1151863 12-3039 Extension of siding at Danielsville, Pa linen 8/8/1912 1151875 12-3039 Tonnage rating chart for locomotives at 10 mph linen ? 1151878 12-3039 proposed coal trestle, Stephens - Jackson Co., Pen Argyl, Pa linen 3/03/1913 1151879 12-3039 proposed extension of siding at Handelong, Pa. linen 4/10/1913 115

1880 12-3039proposed siding extension Genuine Washington Slate Co., Berlinsville, Pa. linen 7/22/1913 115

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I6280628162826283628462856286628762886289629062916292629362946295629662976298629963006301

Page 183 of 194Page 183 of 194

6301630263036304630563066307630863096310631163126313631463156316

631763186319

1939 12 3039 Proposed crossing DL&W at Bangor Pa linen 115

1881 12-3039 proposed "Y" track at Benders Jct., Pa. paper 5/27/1913 1151882 12-3039 proposed commercial siding at Handelong, Pa linen 5/29/1913 1151884 12-3039 proposed siding to Sun Slate Co., Wind Gap, Pa linen 6/17/1913 1151885 12-3039 Disc for rollers for turntable at Pen Argyl, Pa linen 7/30/1914 1151886 12-3039 Proposed extension of siding at Sittler, Pa. linen 7/23/1913 1151887 12-3039 Details of bridge 12.94, 4.8 mi east of Bath station linen 7/24/1913 1151889 12-3039 Creamery buildings at Baleville, NJ linen 9/10/1913 1151890 12-3039 Proposed reservoir, Pipe and stand pipe, Horn's Spring, Pa linen 8/21/1913 1151893 12-3039 Proposed crossing gates at Robinson St., Pen Argyl, Pa linen 9/17/1913 1151901 12-3039 Proposed siding to Sequine & Co., Portland, Pa linen 11/7/1913 1151912 12-3039 Standard toilet linen 1/9/1911 1151913 12-3039 Propose drain for W.G. Little near Sussex Jct., NJ linen 12/9/1908 1151918 12-3039 PC winding shaft, 50 ton steel hopper cars blue 1/14/1914 1151919 12-3039 Station, sidings, and coal pockets at Slatington, Pa linen 1/19/1914 1151926 12-3039 Location of culvert on MaryD colliery branch, Schuylkill Co., Pa linen 2/17/1914 1151928 12-3039 Proposed extension of engine storage tracks, Pen Argyl, Pa linen 2/23/1913 1151931 12-3039 Standard rail sections and drillings linen 4/16/1913 1151935 12-3039 Bridge #19.86 over Bushkill Ck. Atlantic Mills, Pa linen 2/6/1914 1151936 12-3039 Bolts, nuts and washers for bridge #19.86, Atlantic Mills, Pa paper 2/6/1914 1151937 12-3039 Rivets for bridge #19.86, Atlantic Mills, Pa paper 2/9/1914 1151938 12-3039 Rivet utilization for bridge #19.86, Atlantic Mills, Pa paper 2/7/1914 1151939 12 3039- Proposed crossing with DL&W at Bangor Pa with , . linen 4/14/1914 1154/14/19141940 12-3039 Proposed Wye near Lehigh Gap, Pa linen 4/21/1914 1151942 12-3039 Plan of water cooler for coaches and combine cars blue 6/27/1914 1151944 12-3039 Proposed siding and coal trestle for Rehrig & Balliet, Ashfield, Pa linen 5/16/1914 1151945 12-3039 Proposed siding for J. C. Brown, Snyder, Pa. linen 5/18/1914 1151948 12-3039 Diagram for clearance at Bangor Royal tunnel, E. Bangor, PA linen 5/26/1918 1151949 12-3039 Proposed addition to station at Augusta, NJ linen 6/2/1914 1151950 12-3039 Proposed location of freight shelter, Augusta, NJ (scheme A) linen 6/4/1914 1151951 12-3039 Proposed location of freight shelter, Augusta, NJ (scheme B) linen 6/4/1914 1151953 12-3039 Brake shaft for 50 ton gondola blue 7/8/1914 1151954 12-3039 Proposed extension of Flory Milling Co. siding, Bangor, Pa. linen 7/13/1914 1151956 12-3039 Proposed coal trestle for Rehrig Balliet, Ashfield, Pa. linen 7/31/1914 1151957 12-3039 Proposed paving Pen Argyl Av., Pen Argyl, Pa. linen 7/29/1914 1151958 12-3039 Proposed paving Pennsylvania Av., Pen Argyl, Pa. linen 7/31/1914 1151966 12-3039 Plan of station, Danielsville, Pa linen 8/24/1914 1151968 12-3039 Standard insulated switch rods linen 8/29/1914 115

1969 12-3039Map proposal Blue Ridge Traction for joint use of track in Slatington and Palmerton, Pa. linen 9/4/1914 115

1970 12-3039 Catch basins for Schanck and Westbrook Av., Pen Argyl, Pa. linen 8/26/1914 1151973 12-3039 Proposed office building, Campbell Hall, NY blue 9/16/1914 115

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I63206321

63226323632463256326632763286329

6330633163326333633463356336633763386339

Page 184 of 194Page 184 of 194

63406341634263436344634563466347634863496350635163526353635463556356635763586359

1974 12-3039 Turntable center bearing (bottom) linen 9/22/1914 1151975 12-3039 Turntable center bearing (top) linen 9/22/1914 115

1977 12-3039Plan for rubbish dump removal, Keystone Slate Co., ChapmaQuarry, Pa.

n's linen 10/14/1914 115

1980 12-3039 Bids for new locomotive repair and erecting shop, Pen Argyl, Pa linen 10/26/1914 1151984 12-3039 Cast steel center pin on tenders of locos #26 - 153 blue 11/27/1914 1151985 12-3039 Loco performance daily sheet - master linen 1151986 12-3039 Plan for commercial siding at Johnsonville (Scheme A) linen 1/2/1915 1151987 12-3039 Plan for commercial siding at Johnsonville (Scheme B) linen 1/6/1915 1151988 12-3039 detail of cast iron rail clip linen 2/10/1915 1151989 12-3039 Bridge abutment plan for bridge #58.18 linen 2/11/1915 115

1990 12-3039Rail fastenings on transfer table and pit walls at main shop, PArgyl, Pa.

en linen 2/19/1915 115

1991 12-3039 Standard tie plate for 100# rail linen 2/20/1915 1151992 12-3039 Plan for commercial siding at Johnsonville (Scheme C) linen 3/11/1915 1151993 12-3039 General plan for bridge 89.66 east of Augusta, NJ linen 3/26/1915 1151994 12-3039 General plan for bridge 92.14 west of Armstrong, NJ linen 3/25/1915 1151995 12-3039 General plan for bridge 93.44 west of Pellettown, NJ linen 3/23/1915 1151996 12-3039 General plan for bridge 96.12 west of Lewisburg, NJ linen 3/25/1915 1151997 12-3039 General plan for bridge 93.23 west of Pellettown, NJ linen 3/25/1915 1151998 12-3039 Plan & profile proposed coal trestle @ Katellen, Pa linen 4/1/1915 1152000 12-3039 Marking of journal bearing and wedge blue 4/13/1922 1152001 12-3039 Standard rivet set blue 3/2/1911 1152002 12-3039 Rivet diagram blue ? 1152003 12-3039 Back bumper for engines #21 to #31 blue 4/4/1911 1152004 12-3039 Cast steel striking plate - CS #52 blue 5/31/1911 1152005 12-3039 Cast steel striking plate - CS #51 blue 5/31/1911 1152006 12-3039 Route cause diagram for hot boxes blue ? 1152007 12-3039 Same as #2003 engines #18 to #20 blue 9/19/1911 1152008 12-3039 Details of brake connection spreader blue 3/4/1922 1152009 12-3039 Engine #32 and #33 axle drawing blue 1/23/1913 1152010 12-3039 Engine #32 and #33 wheel drawing blue 1/23/1913 1152011 12-3039 Engine #34 and #35 wheel drawing blue 1/23/1913 1152012 12-3039 Engine #34 and #35 axle drawing blue 1/23/1913 1152013 12-3039 Engine #15 to #31 axle drawing blue 1/23/1913 1152014 12-3039 Engine #15 to #31 wheel drawing blue 1/23/1913 1152015 12-3039 Engine truck frame - engines #5 and #6 blue 1/23/1913 1152016 12-3039 Details of spring plank filler - 12" blue 3/3/1922 1152017 12-3039 Details of spring plank filler - 13" blue 3/3/1922 1152018 12-3039 Cast steel striking plate blue 2/27/1912 1152019 12-3039 LNE cars #4101 to #4173 center plate drawing blue 10/10/1921 1152020 12-3039 Cast chafing iron blue 1/8/1912 115

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I6360636163626363636463656366636763686369637063716372637363746375637663776378637963806381

Page 185 of 194Page 185 of 194

6381638263836384638563866387638863896390639163926393639463956396639763986399

2042 12 3039 Diagram of grab handle blue ? 115

2021 12-3039 Diagram book of equipment - snow plow #603 blue 11/1/1906 1152022 12-3039 Diagram book of equipment - coach #11 blue 11/1/1906 1152023 12-3039 Diagram book of equipment - coach #12 blue 11/1/1906 1152024 12-3039 Diagram book of equipment - combination #1 blue 11/1/1906 1152025 12-3039 Diagram book of equipment - combination #4 blue 11/1/1906 1152026 12-3039 Diagram book of equipment - coach #10 blue 11/1/1906 1152027 12-3039 Diagram book of equipment - combination #2 blue 11/1/1906 1152028 12-3039 Diagram book of equipment - combination #3 blue 11/1/1906 1152029 12-3039 Diagram book of equipment - locomotives #2 & #3 blue 11/1/1906 1152030 12-3039 Diagram book of equipment - locomotives #6 blue 11/1/1906 1152031 12-3039 Diagram book of equipment - locomotives #7 & #8 blue 11/1/1906 1152032 12-3039 Diagram book of equipment - locomotives #15 - 17 blue 11/1/1906 1152033 12-3039 Diagram book of equipment - locomotives #18 - 20 blue 11/1/1906 1152034 12-3039 Diagram book of equipment - locomotives #26 - 31 blue 11/1/1906 1152035 12-3039 Diagram book of equipment - locomotives #32 & #33 blue 11/25/1911 1152036 12-3039 Diagram book of equipment - locomotives #34 & #35 blue 11/25/1911 1152037 12-3039 Diagram book of equipment - locomotives class H4 blue 11/25/1911 1152038 12-3039 Diagram of grab handle blue ? 1152039 12-3039 Diagram of ladder step blue ? 1152040 12-3039 Diagram of grab handle - roof blue ? 1152041 12-3039 Diagram of grab handle blue ? 1152042 12 3039- Diagram of grab handle blue ? 1152043 12-3039 Cast steel driving box plan blue 2/8/1913 1152044 12-3039 Cast steel striking plate for boxcars blue 2/13/1913 1152045 12-3039 Coupler yoke filler block for boxcars blue 2/15/1913 1152046 12-3039 Iron hand brake wheel plan blue 2/18/1913 1152047 12-3039 Boiler front ring diagram blue 7/8/1913 1152048 12-3039 Grinding wheel diagrams blue 8/24/1921 1152049 12-3039 Plan of spider and roller for turntable at Pen Argyl blue ? 1152050 12-3039 Same as # 2046 (15") blue 8/22/1913 1152051 12-3039 Diagram of grab handle blue 8/21/1913 1152052 12-3039 Diagram of grab handle blue 8/21/1913 1152053 12-3039 Diagram of grab handle blue 8/21/1913 115

1666A 12-3039 B&P Railway milage sheet 2 blue 6/12/1903 1151666B 12-3039 B&P Railway milage sheet 1 blue 6/12/1903 1151666C 12-3039 B&P Railway map blue 6/12/1903 1151702A 12-3039 LNE - DL&W interlocking plan, Augusta, NJ linen 1/11/1933 1151875A 12-3039 Tonnage rating chart for locomotives at 10 mph linen 4/26/1913 1151919-A 12-3039 Station, sidings, and coal pockets at Slatington, Pa blue 1/19/1914 1151922-A 12-3039 Bridge #19.86 over Bushkill Ck. Atlantic Mills, Pa blue 10/10/1913 115

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

640064016402640364046405640664076408640964106411641264136414641564166417641864196420

Page 186 of 194Page 186 of 194

642064216422642364246425

64266427

64286429643064316432643364346435643664376438

2542 Benders Jct. 23

12 sht 5 1183 12-0145Girders for Highway Bridge Crossing on Tamaqua Extension Sheet 1

- Blueprint 10/6/1911 28 or 29

76 sht 88 1925 12-3428 Bolster Bottom Flange Angle for 50 Ton Hopper Car Blueprint 7/29/1909 two drawings have same number

Still Being Processed

2461 Bangor and Portland Railroad track plan2462 Proposed mainline change Lehigh and Lackawanna Br 7-7-19052463 Three spans reinforced bridge Paulins Kill 2-2-19092465 Culvert detail Friedensthal2467 Bill of Material for warning post 11-17-19102468 Track profile Portland2473 Track profile vic. Bangor2476 Smoke stack blueprint2477 Track profile vic Bridge 34.06 4-1-19132478 Proposed siding Bangor Union Quarry 9-?-19032483 Track profile vicinity Bridge 33-19 3-31-19132485 Proposed change highway crossing vic. Liberty Corner2487 Floor for Deckertown Crossing 8-17-18882488 Albian Branch Profile Sta. 36-712491 Proposed Coal Dump Bangor 7-12-19052542 Proposed passing siding, Benders Jct. 11-23-1909Proposed passing siding, 11 19092543 Proposed siding, Mt. Bethel 1-3-19102544 Proposed track changes, Swartswood Jct NJ 6-3-19102547 Proposed siding, Freight station, Pen Argyl 3-6-19062548 L&NE property at Saylorsburg 6-6-19072549 Proposed Ash Pit, Pen Argyl 5-22-1908

2550Proposed siding, Meyers Gardner & Co. near Portland, PA 6-5-1908

2567 Unidentified track plan

2571Proposed siding Genuine Washington Slate Co., Berlinsville 10-3-1910

2572 Proposed siding W. Scott Hazen & Son, Mt. Bethel, 1-31-19112573 Proposed siding, Power House, Pen Argyl 3-15-19112574 Profile of Power House siding, Pen Argyl 3-14-19112576 Proposed siding, Pen Argyl Silk Co. , Pen Argyl 7-17-19112579 Proposed industrial track, Portland Cement 11-15-19112581 Proposed siding, Sussex, NJ 2-16-19122582 Proposed catch basins and drains, Pen Argyl 2-21-19122586 LV standard steel signal blades 10-21-19112588 Proposed track, Albian Branch 5-2-19132591 Proposed siding, Longacre Schuylkill County 8-29-1913

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I643964406441644264436444

6445

6446

6447

64486449

6450

64516452

645364546455

Page 187 of 194Page 187 of 194

6455

64566457

6458

64596460

64616462

646364646465646664676468646964706471

2798

2597 Field Profile Chestnut Ridge Branch 5-5-19142598 Standard tie plates, 100 lb rail 5-20-19142599 Diagram of signal protection, Lehigh Gap 6-19-19142766 Tamaoua extension plan & profile, Berlinsville, 4/12/19112768 Track curvature, MP 314.76 - 356.572770 Track dia,MP 257 - 293

2777Plan for loc of proposed bridge,Leicester Rubber Co., East Catasauqua, 7/17/1914

2778Map, siding for Craig Est., Chetnut Ridge RR & con. to L&NE.Palmerton, 3/6/1914

2779Map, siding for Craig Est., Chetnut Ridge RR & con. to L&NE.Palmerton, 3/6/1914

2780Map, siding for Craig Est., Chetnut Ridge RR & con. to L&NE.Palmerton, 3/6/1914

2783 Plan of sidings & sdurs, Maryd Colliery, LC&N Co., 5/25/1915

2785Plan & profile, proposed siding, Parson Bros. Slate Co., Pen Argyl, 6/28/1915

2787Topographical map, public road crossing of proposed siding, Parson Bros. Slate Co., Pen Argyl, 7/29/1915

2789 Plan, Augusta Station, Augusta, NJ, 8/12/1915

2796Plan & profile, drainage ditch, Tamaqua Extension nr Slate Jct., 10/1/1915

2797 Plan, siding, Banner Slate Co. Dump, 10/9/19152798 Tonnage rating, locomotives at 10 MPH, 10/16/1915g g, ,

2799Plan, location of 5 bridges E of Bath, w. profile & cross sectigns of track, 11/19/1915

2800 Standard crossing warning sign, 11/29/1915

2801Details, plan & sections, Pl. girder bridge, Bethlehem branch, Monocacy Creek, Bath,PA

2802Plan, extension of siding, Miller & Dilliard sand screening plant, Mt. Bethel, PA, 12/7/1915

2808 Plan of siding, Bangor Jct.,2/7/1916

2809Plan & cross section, transfer table foundation, loco erecting & repair shop, Pen Argyl PA yard, 2/9/1916

2810 Plan, siding & "Miller's Connection" w. DL&W at Mt. Bethel, PA

2813Details, plan & sections of pl. girder bridge, Monocacy Creek,1/28/1916

3600 See Brian 3600-37997045 Bath traffic survey8301 Cut and fill profile8302 Cut and fill profile8305 Turnout plan - Dusquesne Slag, Catasaugua, PA8307 Pellettown, NJ station8310 Track retire. East Bangor br.8311 DL&W (B&P) location for new station in Pen Argyl, PA

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I6472647364746475647664776478647964806481648264836484648564866487648864896490649164926493

Page 188 of 194Page 188 of 194

6493

6494649564966497

64986499650065016502650365046505650665076508650965106511

2020B Cast chafing iron blue 11/23/1915

8312 Curb and gutter plan, Wind Gap, PA8323 Report on Lehigh Gap & Portland bridges8330 Masonry Plan - cattle pass, Sussex, NJ8331 Masonry Plan - cattle pass, Sussex, NJ8332 Pass. Siding details Br. #99.18 Sussex, NJ8334 Cut and fill profile8341 Rearrange tracks at Swartswood Jct8344 Trainmaster cupboard for stationary8345 Yardmasters cupboard cabinet8358 Sign - Water not safe to drink8369 Br. #.64 on Glenwood branch , detail8370 Br. #.64 on Glenwood branch , detail8371 Br. detail on Catasauqua br over Lehigh R.8372 Street crossing Catasauqua8375 Steel br., Sussex, NJ8383 Plan to replace br on Bangor Br.8385 Drain ditch btw Nowak and Wilcox8393 Track plan - Portland, PA8396 Steel br.#0.67 details, Empire branch8475 Wiring dia. Pen Argyl enginehouse

2020A Cast chafing iron blue 8/12/19132020B Cast chafing iron blue 11/23/1915

47 sht 35 2128 12-3442Coupling Guards for Electric Transfer Table, FW&DC RR, Childress, TX 4/27/1907

6214A 3253 12-3136 Timber required for railroad track scale (sheet 2 of 2 sheets)missing 489 Proposed line revision of Bethlehem branch Graph Paperno datemissing 842 Test Borings for Turnpike Engineers Wind Gap to Saylorsburg Blueprint 4/26/1957

missing 862Abutment & Wingwall Sections for Steel Bridge in Northampton County 5/14/1958

missing 900 Details for 121' Span on Delaware River Bridge (PP&B) Blueprint 5/23/1889missing 902 Details for Delaware River Bridge (PP&B) Blueprint 7/10/1889missing 933 Deck Plate Girder Bridge Over the Delaware River on the PP&B Blueprint 5/2/1889missing 1168 12-3396 Bridge over Highway on Tamaqua Extension Blueprint 6/8/1911missing 1233 Profile of L&NE from Bangor to Hadwlong Graph paper ?missing 1246 Property Owned in Wind Gap Borough Northampton County ?missing 1264 Property Acquired for Extension of L&NE RR Tracing ?missing 1272 Basket Adjustment Rod for Interlocking Switch 5/1/1944missing 1273 Switch Stand Connecting Rod for Use With Basket 11/23/1944missing 1276 Bolts for Jacoby Creek Bridge - PP&B RR Blueprint 6/8/1889missing 1308missing 1314 Structural Platform for Drop Table at Pen Argyl Enginehouse 12/12/1931missing 1330 Elimination of Grade Crossing at Wind Gap in Wind Gap Borough Tracing 2/20/1935

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I65126513651465156516651765186519652065216522

6523652465256526652765286529653065316532

Page 189 of 194Page 189 of 194

65326533653465356536653765386539654065416542654365446545

65466547

6548

6549

1864 Plan Sheet Butt Ton 3/2/1911

missing 1333 Standard Front Rod for Standard Basket (Paper) 8/?/1906missing 1401 12-3411 Gate and Apron Facilities for Coaling Station at Sussex, N.J. 4/1/1918missing 1414 12-3411 Details for Plan of Unnamed Passenger Station & Freight Station ?missing 1434 12-3411 Plan for Twin Span Turntable Built by Bethlehem Steel 9/?/1925missing 1581 US Topographic Map of Pemberton Quadrangle 10/?/1912missing 1622 US Topographic Map of Pottsville, Pa. Quadrangle 6/?/1909missing 1626 US Topographic Map of Sunbury, Pa. Quadrangle 5/?/1909missing 1628 US Topographic Map of Rampo, N.J. Quadrangle 11/?/1902missing 1640 Tamaqua Extension - Span No 2 - Cast Steel Pedestal 12/14/1911missing 1642 Material Required for Bridge on Tamaqua Extension - Span No 2 12/9/1911missing 1647 Detail of Span No 2 ?

missing 1659Summary of Field Rivets and Bolts for Bridge Over Delaware at Portland, Pa. 6/11/1937

missing 1667 Station and Track Map of the L&NE RR at Wind Gap Blueprint 3/26/1914missing 1672 Blue Print for Main Locomotive Shop at Pen Argyl, Pa. 3/27/1915missing 1759 12-3426 Detail of Posts to be Used at the Pen Argyl Enginehouse 4/17/1915missing 1767 12-3426 Types of Girts to be Used on Main Locomotive Shop at Pen Argyl 4/17/1915missing 1847 Housing for Heating Pipe at Pen Argyl Enginehouse ?missing 1856 Bolster Center Brace for 50 Ton Hopper Car ?missing 1857 Door Operating Lever for 50 Ton Hopper Car ?missing 1858 Door Operating Lever for 50 Ton Hopper Car ?missingmissing 1864 Plan for Side Sheet Butt Strap for 50 Ton Hopper Car for Side Strap for 50 Hopper Car 3/2/1911missing 1866 Lever Guide for Use at 50 Ton Hopper Car 8/5/1909missing 1867 Bottom Rod for Use at 50 Ton Hopper Car 1/11/1910missing 1868 Multiple Bartlay Nut Lock for Use on 50 Ton Hopper Car ?missing 1872 Journal Bearing Wedge for Use on 50 Ton Hopper Car 7/3/1925missing 1877 Uncoupling Lever for 50 Ton Hopper Car 8/22/1912missing 1878 Dust Guard for 50 Ton Hopper Cars 8/22/1912missing 1880 Brake Mast Yoke for 50 Ton Hopper Car 8/22/1912missing 1883 MCB G Spring for 50 Ton Hopper Car 8/22/1912missing 1891 Hook and Bolt Pipe Clamp for Use on 50 Ton Hopper Cars 8/22/1912missing 1909 Pawls Required for Use on 50 Ton Hopper Cars 3/29/1910missing 1917 Bolster and Center Sill Connection Angle for 50 Ton Hopper Cars 7/29/1909missing 1946 Connection Rod for 50 Ton Hopper Car on L&NE RR ?missing 1993 General Arrangement of Trucks for 50 Ton 3/9/1911

missing 2011Three Place Girder Span Bridge Over Lehigh River at Slatington, Pa. 8/11/1909

missing 2014 Girder Bridge Over Lehigh River at Slatington, Pa. 8/11/1909

missing 2073Portal and Top Struts for Single Track Through Bridge at Baleville, N.J. 6/20/1883

missing 2123Field Rivets and Bolts for Electric Transfer Table, PRR, Indianapolis, IN 6/23/1913

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I6550655165526553655465556556

65576558

6559

6560

6561

6562

6563

656465656566

Page 190 of 194Page 190 of 194

65666567656865696570657165726573657465756576657765786579658065816582

658365846585

2316 12

missing 2126 Gear Case for Electric Transfer Table, B&LE RR, Greenville, Pa. 4/18/1907missing 2129 Brake Wheel for Electric Transfer Table 6/3/1907missing 2131 Two Wire Trolley Arrangement for Electric Transfer Table 4/26/1909missing 2132 List of Parts for Electric Transfer Table at Pen Argyl, Pa. ?missing 2146 Hollow Metal for Storage House and Office Building at Pen Argyl 4/28/1915missing 2163 CNJ Brake Shoes to be Used on Locomotive 5/7/1904missing 2166 CNJ Brake Shaft Equalizer Lifting Block for Scale Test Car 11/21/1910

missing 2175NYS&W proposed reconstruction of bridge no. 83/14 at Blairstown, NJ 4/15/1914

missing 2208 Skew deck pin spans for bridges 4 and 5 - sheet no. 434 7/21/1911

missing 2220Skew deck pin spans for spans 4 and 5 crossing Lehigh River - sheet 422 7/21/1911

missing 2257Anchor connections for 66KV double circuit steel transmission tower 11/22/1922

missing 2263Elevation diagram for 66KV double circuit transmission tower - PP&L 12/28/1926

missing 2283Foundation plan, anchor bolts etc. for bridge between Portland and Columbia ?

missing 2288Erecting, steam - tender erecting - elevation & section - WMRR 4-8-4 ?

missing 2290Bureau of Information of Eastern Region pertaining to L&NE M of W ?

missing 2297 Plan for abutments for bridge in upper Northampton Township 15/02/1937missingmissing 2316 12-32233223 Girder bolts and nuts description for Poughkeepsie bridgep g p g 12/26/188812/26/1888missing 2317 12-3223 Sheet #1 for station #725 for new Poughkeepsie bridge ?missing 2326 12-3223 Plan and profile for Lehigh River crossing near Lehigh Gap 2/14/1911missing 2352 DL&W spring seat for freight cars 4/15/1912missing 2356 DL&W wrought iron details for scale car 8/26/1909missing 2363 DL&W wrought iron details for scale car 08/?/1909missing 2387 Dimensions of P&R hopper car 9/17/1912missing 2389 Property plan of Nazareth Cement Co. along L&NE 7/17/1925missing 2391 Plan and located line of L&NE to Acme Slate Co. Quarry 4/3/1919missing 2395 Plan for new branch line to serve the Acme Slate Quarry 4/3/1919missing 2401 Drawing showing crossing over LV on Tamaqua extension 9/9/1911missing 2427 Plan showing proposed extension of track in Pen Argyl yard 10/21/1925missing 2434 Written circuits for highway crossing protection - standard AAR 6/24/1952missing 2441 Floor Plan for bridge over Monocacy Creek East of Bath 3/3/1953missing 2442 Plan of floor on bridges 100.07 and 4108.94 main line 6/25/1953missing 2469 Plan showing repairs to coal hopper at Pen Argyl coaling station 5/12/1930missing 2479 Steel manufacturers heat number for rail castings (Van Dyke) ?

missing 2491Stress sheet for bridge over DL&W, Delaware River and NYS&W at Portland 3/1/1923

missing 2507 Temporary track support for bridge in Schuylkill County ?missing 2564 Floor span for new bridge over Lehigh River at Catawissa 1/31/1933

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

65866587

658865896590

659165926593

6594

6595

65966597

65986599660066016602

Page 191 of 194Page 191 of 194

66026603660466056606

6607

6608660966106611

6612

661366146615661666176618

2911 ?

missing 2567Highway crossing protection at Snyders, West Penn Township - revised 1/23/1957

missing 2588 Plan showing change of alignment at Chapman Quarries, PA 10/19/1927

missing 2629Reconstruction of L&NE bridge no. 63.79 in Knowlton Township, Warren County ?

missing 2639 Proposed reconstruction of underpass 9.18 on West Penn branch ?missing 2644 12-3251 Trackage map of the L&NE in the vicinity of MP 53 ?

missing 2658Details of bridge over creek at station 1066+33.5 - Tamaqua extension 9/27/1911

missing 2667 Location of the L&NE with respect to the Little Schuylkill River ?missing 2696 Girders 4-47-6 track through P1 grade spans 5/14/1922

missing 2716Sketch illustrating ditch dimensions in West Penn and Rahn Township 12/20/1935

missing 2794L&NE tonnage and car interchange chart submitted to ICC - exhibit #5 6/1/1923

missing 2815Plat showing properties between lands of Bowman Estate and I Bachart 4/19/1912

missing 2817 Map showing topography in vicinity of Portland and Columbia 6/?/1927

missing 2820Floor plan for through bridges on the Penna, Poughkeepsie & Boston RR 06/18/1889

missing 2837 Details of span #6 on Tamaqua extension crossing Lehigh River 9/9/1911missing 2866 12-3264 Masonry and floor beams required for span #6 Lehigh crossing 9/30/1911missing 2897 12-3264 Profile map showing connection with P&R Alliance branch ?missingmissing 2911 Route of the L&NE through the village of Belvidereg g ?missing 2942 Standard plan for reinforced concrete plan 4/26/1940missing 2954 Iron fastened with carriage bolts for L&NE locomotive #853 ?missing 2970 Plan showing tracks of the L&NE in Pen Argyl Borough ?missing 2996 First floor tracing for freight & passenger station at Lansford, PA 4/24/1925

missing 3010Detail of standard mouth inlets prescribed by State of Pennsylvania 6/5/1929

missing 3036 State of PA - standard types and methods of placing reinforcement 9/3/1935missing 3039 State of PA - standard concrete arches - series 6' - 16' 6/30/1926missing 3055 Rocker nests, washers and stud bolts for bridge over Lizard Creek 9/13/1911missing 3057 Standard guard rail bolts and hook bolts for Lizard Creek bridge 10/11/1911

missing 3083Drainage statistics - main line to Hainesburg Jct. to Pine Island, NY ?

missing 3096Drainage statistics - main line - Danielsville - Hainesburg Jct. - sheet 11 ?

missing 3120 Drainage statistics - main line - Hauto - Tamaqua, PAmissing 3191 Right of way through lands of Mrs. Eliza Daniels ?missing 3263 Profile of railroad track scale at Pen Argyl, PA ?missing 3264 Plan for proposed interchange with LVRR at Lizard Creek 4/10/1914missing 3280 Plan for railroad track scales to be erected at Pen Argyl ?

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I

661966206621

66226623

66246625662666276628

66296630

6631

66326633

6634

6635

Page 192 of 194Page 192 of 194

6635

6636663766386639

6640664166426643

664466456646664766486649665066516652

missing 3281Plan of the Blue Ridge Traction Company from Slatington to Danielsville ?/?/1902

missing 3283 Detail of mechanical post to be erected at Pen Argyl shops ?missing 3325 Index 5730 - excavation diagram for various sections of the L&NE ?

missing 3326Index 5325 - excavation diagram for various places along the L&NE ?

missing 3337 Index 5238 - preliminary survey of L&NE from Slatington West ?

missing 3354Plan showing proposed addition of West bound departure track at Pen Argyl 4/5/1930

missing 3356 Plan showing facilities of the AT&T on L&NE right of way 12/31/1934missing 3357 Map of branches of the L&NE to the American Bangor Quarry 9/6/1904missing 3381 Profile of change in alignment at Summit, PA 7/11/1907missing 3384 Map of branch lines of the L&NE to the American Bangor Quarry 9/6/1904

missing 3386Plan of proposed house for private line (car) to be located at Pen Argyl 6/16/1910

missing 3423 Lehigh Navigation Electric Co transmission lines along L&NE RR 3/29/1914

missing 3431Plan showing tracks in the vicinity of Chestnut Ridge RR connection 3/25/1916

missing 3435Preliminary survey - Bangor to Portal and traversing land of R.S. Brown 6/1/1905

missing 3446 Plan showing land required through property of John A Semmel 4/24/1911

missing 3486Plan showing proposed extension of Saylorsburg branch in Northampton County 9/16/1911

missing 3494Profile of the L&NE and NYS&W between Tamaqua and Jersey City, NJ ?

missing 3515Proposed siding for Andreas Quarry at West Penn Twp., Schuylkill County 7/10/1948

missing 3532 Details of 16 pt reinforced split switch 3/29/1928missing 3540 Profile along edge of stone paving ?missing 3553 Detail of wrought iron fence with 3" I beams ?

missing 3558Map of Wind Gap and Delaware Railroad in Plainfield & Washington Twp. 07/?/1904

missing 3562 Street map of Allentown showing L&NE sidings 1/14/1960missing 3565 Street map of Tamaqua showing L&NE sidings 1/13/1960missing 3575 Map showing tracks of DL&W RR and Alpha Portland Cement Co. ?

missing 3601Preliminary location of proposed railroad between Catasauqua andWeaversville 01/?/1905

missing 3608 Map of proposed connection with the L&NE RR 02/?/1906missing 3609 Map of the L&NE between Douglasville and Moorestown ?missing 3617 Floor beams and stringers for bridge to be built for L&NE 5/10/1922missing 3641 Map of the L&NE indicating various properties in Slatington area ?missing 3659 Required list of material for fill between stations 899+95 to 910+00 8/8/1929missing 3744 DL&W 5/26/1911missing 3749 Map of the L&NE through the Borough of Nazareth ?missing 3759 Relocation of the L&NE between MP 8 and MP 18 11/4/1935

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I6653665466556656665766586659666066616662666366646665666666676668666966706671667266736674

Page 193 of 194Page 193 of 194

667466756676667766786679

6680668166826683668466856686

6687

6688

66896690

1017 Tooth & St Bolts Req ired for Tamaq a tension Sheet 301 uepr t 11/22/1911

missing 2477A Equipment plan and elevation for Pen Argyl enginehouse 6/22/1925missing? 3110 Drainage statistics - main line - Tamaqua, PA to Danielsville, PA ?

no. not used 2645no. not used 2646no. not used 2647no. not used 2648no. not used 2649no. not used 2650no. not used 2651no. not used 2653no. not used 2654no. not used 2708

none 1719none 1740

not found 568 Bridge Over Lizard Creek - Tamaqua Extension Blueprint 8/14/19151011 Internal Posts Required for Lehigh Gap Bridge - Sheet 306 Blueprint 11/30/19111012 Diagonals Required for Lehigh Gap Bridge - Sheet 305 Blueprint 11/3/19111013 Diagonals Required for Lehigh Gap Bridge - Sheet 304 Blueprint 11/3/19111014 Bolt Chords & Splice Plates for Lehigh Gap Bridge - Sheet 303 Blueprint 10/10/19111015 Top Chord for Lehigh Gap Bridge Over Lehigh River - Sheet 302 10/6/19111016 Sway Braces & Brackets for Lehigh Gap Bridge - Sheet 317 Blueprint 11/6/19111017 Tooth & Stud Bolts Required for Tamaqua Extension Sheet ud u u Ex - 301 BlBlueprint 11/22/1911in1018 Pins & Nuts Required for Tamaqua Extension - Sheet 302 Blueprint 11/22/19111019 Swedged Stone Bolts for Tamaqua Extension - Sheet 303 Blueprint 11/22/19111020 Cast Steel Anchor Clips for Tamaqua Extension - Sheet 304 Blueprint 11/28/19111021 Top Chord & Splice Plates for Tamaqua Extension - Sheet 301 Blueprint 10/5/19111022 Masonry Plan for Tamaqua Extension - Sheet 301 Blueprint 10/31/1911

1023Bolt Chords & Plates Required for Tamaqua Extension - Sheet 322 10/17/1911

1024 Cross Frame Required for Bridge at Lehigh Gap - Sheet 323 Blueprint 11/29/19111025 Stringers, Lateral, Plate & Filler for Lehigh Gap Bridge - Sheet 321 11/29/19111026 Roller Shoes & masonry Piling for Lehigh Bridge - Sheet 320 Blueprint 11/7/19111371 Bethlehem Hook Flange Guardrail Switch Point 2/28/19411372 Details of Timbers for Circle Wall of Turntable at Pen Argyl 4/9/19421373 Plan of Steel Spans for Coal Trestle at Wind Gap 3/9/1937

1374Plan Showing Proposed Rearrangement of Tracks at Portland Sand Co 3/18/1937

1375Plan Showing Topography in Vicinity of Grade Crossing at Wilcox, N.Y. 9/11/1941

1376Plan Showing Topography in Vicinity of Warwick, Orange County, N.Y. 9/11/1941

1377 Plan Showing Relocations of Grade Crossing at Augusta, N.J. 8/13/1941

Lehigh Coal and Navigation Co. MG311 Lehigh and New England RR drawings

A B C D E F G H I6691

6692

1378 Plan Showing Automatic Crossing Interlocking at Augusta, N.J. 8/11/1941

1379Abandonment of Grade Crossing at Upper Mt Bathel, Northampton County 6/21/1937

Page 194 of 194Page 194 of 194