ab produce plc site location map map 1 site location

11
Map produced by MAGIC on 6 September, 2016. (c) Crown Copyright and database rights 2016. Ordnance Survey 100022861. Copyright resides with the data suppliers and the map must not be reproduced without their permission. Some information in MAGIC is a snapshot of the information that is being maintained or continually updated by the originating organisation. Please refer to the metadata for details as information may be illustrative or representative rather than definitive at this stage.

Upload: dangdien

Post on 15-Dec-2016

231 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

Map produced by MAGIC on 6 September, 2016.

(c) Crown Copyright and database rights 2016. Ordnance Survey 100022861.

Copyright resides with the data suppliers and the map must not be reproduced without their permission. Some information in MAGIC is a snapshot of the information that is being maintained or continually updated by the

originating organisation. Please refer to the metadata for details as information may be illustrative or representative rather than definitive at this stage.

Geoffrey Saul
AB PRODUCE PlcSite Location Map MAP 1
Geoffrey Saul
SITE LOCATION
Geoffrey Saul
Page 2: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION
Page 3: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

T:\2

015\

15-0

04 A

B P

rodu

ce (U

K)\0

1 La

gepl

an -

layo

ut p

lan_

Tras

senp

lan

- rou

te p

lan\

15-0

04_3

.LP

00-1

1-LP

_3.L

P26

-06-

AS

P_3

.LP

70-1

1-H

P_3

.LP

40-1

3-TP

_3.E

X10

-06-

ExL

P_3

.BE

00-0

2-B

E_3

.LP

32-0

5-B

SE

_3.L

P38

-04-

KG

P_S

F_re

cove

r.dw

g

Project team:projectmanagement:constructionmanagement:project planning:

call number:

call number:

call number:

changed:

examined:

drawn:

namedate

drawing number:

scale:

kind of the changenamedatenr.

representation:

measure:

owner:

We

poss

es a

cop

yrig

ht a

t our

des

igns

. The

se d

esig

ns m

ay b

e us

edon

ly fo

r the

per

sona

l use

. We

ask

for r

etur

n du

ring

disu

se.

Dup

licat

ion

is n

ot a

llow

ed.

page number

project number

building place:

EnviTec Anlagenbau GmbH & Co. KGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E [email protected] www.envitec-biogas.de

BGP AB Produce

Construction of biogas plant AB Produce

route plan with electrical sensors

15-004_3.LP40/1-1415-0043.LP401:100

19.01.2015 A. Ising

10.03.2016 A.Ising

F.Hansen +49 (2574) 88 88 159

A. Ising +49 (2574) 88 88 127

Ising, Andreas ISO full bleed A0 (841.00 x 1189.00 mm)

20.0

1.20

15 1

0:42

:36

1 20.01.2015 S.Selzer gas torch, trafo, street

2 26.01.2015 J. Freiberger liquid residue storage tank drawn in; platform+technical building changed

3 27.01.2015 J. Freiberger platform and agitator changed

4 06.02.2015 J. Freiberger street changed

5 24.03.2015 J. Freiberger technical building changed

6 24.03.2015 A.Ising chnage mixer typ storage tank

7 06.05.2015 A.Ising change mixer typ digester and storage tank

8 07.05.2015 J. Freiberger tank changed

9 25.11.2015 A.Ising remove pipes 8, 17, 8, 25

10 07.12.2015 S.Selzer digester updated

11 25.01.2016 Y.El Gamal tanks changed position

12 05.02.2016 Y.El Gamal new technical building

13 23.02.2016 A:Ising general modification

14 10.03.2013 A:Ising add pipe 33

Page 4: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

!!!!!! !!! !!!!!!!!

GHSCE AB Produce plc Present Waste Water Flow Sheets

FRESH WATER

Washers Peelers PrepRoom

Soil

ClassifierScreen

PackHouse

ScrewPress

Animal FeedCentrifuge

Transfer Pump & Line

LAGOONS

To Land ThroughSpray Bar <45,000 cu.m./annum

Fig 1 EXISTING SYSTEM

Treatment

Page 5: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

GHSCE AB Produce plc Present Waste Water Flow Sheets

HoldingTanks

Pasteurisers

DIGESTER

To Export

Solids Return

Centrifuge

Digestate Tank

Existing Transfer Line with Meters Added

PAS110: 2014 Fertiliser

Fig 2 SYSTEM WITH DIGESTER

To Land and Export40/48,000 cu.m./annum

Macerator

Condenser

Gas to EngineSystem

Condensate

Vegetable Trimming

Page 6: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

Contra Flow Heat Exchanger

To Digester 35/40oC

Transfer Pump

From Feedstock TanksAmbient Temperature

Hot Cooling WaterFrom CHP Plant

Return ToCHP Plant

To PasteuriserTanks >70oC

From Pasteuriser Tanks >70oC

Pasteuriser Tanks With Agitators

Fig 3 PASTEURISATION SYSTEM AB Produce Plc AD Plant

Page 7: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

T:\2

015\

15-0

04 A

B P

rodu

ce (U

K)\0

1 La

gepl

an -

layo

ut p

lan_

Tras

senp

lan

- rou

te p

lan\

15-0

04_3

.LP

00-1

1-LP

_3.L

P26

-06-

AS

P_3

.LP

70-1

1-H

P_3

.LP

40-1

3-TP

_3.E

X10

-06-

ExL

P_3

.BE

00-0

2-B

E_3

.LP

32-0

5-B

SE

_3.L

P38

-04-

KG

P_S

F.dw

g

Project team:projectmanagement:constructionmanagement:project planning:

call number:

call number:

call number:

changed:

examined:

drawn:

namedate

drawing number:

scale:

kind of the changenamedatenr.

representation:

measure:

owner:

We

poss

es a

cop

yrig

ht a

t our

des

igns

. The

se d

esig

ns m

ay b

e us

edon

ly fo

r the

per

sona

l use

. We

ask

for r

etur

n du

ring

disu

se.

Dup

licat

ion

is n

ot a

llow

ed.

page number

project number

building place:

EnviTec Anlagenbau GmbH & Co. KGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E [email protected] www.envitec-biogas.de

BGP AB Produce

Construction of biogas plant AB Produce

route plan with electrical sensors

15-004_3.LP40/1-1415-0043.LP401:100

19.01.2015 A. Ising

10.03.2016 A.Ising

F.Hansen +49 (2574) 88 88 159

A. Ising +49 (2574) 88 88 127

Ising, Andreas ISO full bleed A0 (841.00 x 1189.00 mm)

20.0

1.20

15 1

0:42

:36

1 20.01.2015 S.Selzer gas torch, trafo, street

2 26.01.2015 J. Freiberger liquid residue storage tank drawn in; platform+technical building changed

3 27.01.2015 J. Freiberger platform and agitator changed

4 06.02.2015 J. Freiberger street changed

5 24.03.2015 J. Freiberger technical building changed

6 24.03.2015 A.Ising chnage mixer typ storage tank

7 06.05.2015 A.Ising change mixer typ digester and storage tank

8 07.05.2015 J. Freiberger tank changed

9 25.11.2015 A.Ising remove pipes 8, 17, 8, 25

10 07.12.2015 S.Selzer digester updated

11 25.01.2016 Y.El Gamal tanks changed position

12 05.02.2016 Y.El Gamal new technical building

13 23.02.2016 A:Ising general modification

14 10.03.2013 A:Ising add pipe 33

Page 8: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

T:\2

015\

15-0

04 A

B P

rodu

ce (U

K)\0

3 Te

chni

kgeb

äude

- te

chni

cal b

uild

ing\

15-0

04_3

.TG

00-0

9-TG

_3.T

G01

-12-

AS

P_3

.TG

02-0

0_A

I.dw

g

Project team:projectmanagement:constructionmanagement:project planning:

call number:

call number:

call number:

changed:

examined:

drawn:

namedate

drawing number:

scale:

kind of the changenamedatenr.

representation:

measure:

owner:

We

poss

es a

cop

yrig

ht a

t our

des

igns

. The

se d

esig

ns m

ay b

e us

edon

ly fo

r the

per

sona

l use

. We

ask

for r

etur

n du

ring

disu

se.

Dup

licat

ion

is n

ot a

llow

ed.

page number

project number

building place:

EnviTec Anlagenbau GmbH & Co. KGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E [email protected] www.envitec-biogas.de

BGP AB Produce

construction of a biogas plant

technical buildinginstallation planground floor plan and section A-A

15-004_3.TG01/1-1215-0043.TG011:50

13.01.2015 J. Freiberger

16.03.2016 A.Ising

A. Ising +49 (2574) 88 88 127

Ising, Andreas ISO expand A0 (841.00 x 1189.00 mm)

13.0

1.20

15 1

5:49

:21

1 26.01.2015 J. Freiberger complete revision

2 27.01.2015 J. Freiberger ceiling height changed

3 30.01.2015 J. Freiberger block out and air-conzept drawn in

4 24.03.2015 J. Freiberger walls and foundation changed; concrete column drawn in

5 08.10.2015 Y.El Gamal block outs changed, datail A, B , C

6 13.10.2015 S.Selzer block outs and details changed

8 17.11.2015 S. Herbert door and window changed

9 05.02.2016 Y.El Gamal complete revison

10 11.03.2016 A.Ising add gascooling system and pipes

11 16.03.2016 A.Ising modification ventilation hygenisation

12 16.03.2016 A.Ising changing EMSR numbers CHP A & B

Page 9: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

el

el

el

el

el

el

el

el

el

el

el

el

el

el

elel

el

el

el

el

K:\P

roje

ktab

wic

klun

g\P

roje

kte\

2015

\15-

004

AB

Pro

duce

(UK

)\11

Zeic

hnun

gen\

08 R

+I _

F-M

atrix

\15-

004_

3.V

T01-

13_A

I__.

dwg

Project team:projectmanagement:constructionmanagement:project planning:

call number:

call number:

call number:

changed:

examined:

drawn:

namedate

drawing number:

scale:

kind of the changenamedatenr.

representation:

measure:

owner:

We

poss

es a

cop

yrig

ht a

t our

des

igns

. The

se d

esig

ns m

ay b

e us

edon

ly fo

r the

per

sona

l use

. We

ask

for r

etur

n du

ring

disu

se.

Dup

licat

ion

is n

ot a

llow

ed.

page number

project number

building place:

EnviTec Biogas AGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E [email protected] www.envitec-biogas.de

FO 14 KP 02.4 AB Produce R+I

Construction of abiogas plant AB Produce

R + I

15-004_3.VT01/0-1315-0043.VT01without

12.01.2015 A.Ising

19.07.2016 A.Ising

Frank Hansen +49 (172) 4596408

+49 (172)

Andreas Ising +49 (2574)8888-127

Ising, Andreas ISO full bleed A0 (841.00 x 1189.00 mm)

09.0

8.20

12 1

2:54

:21

1 09.02.2015 A.Ising general changes

2 24.03.2015 A.Ising add transmitter ch4 & h2s in hyg. room/condensat from technical building

3 06.05.2015 A.Ising add bull eyes and ex lamp storage tank

4 19.11.2015 A.Ising general changes

5 25.11.2015 A.Ising remove pipes 8,17,25,26

6 09.12.2015 A.Ising modification pneumatik compressor

7 08.02.2016 A.Ising add second chp (B)

8 23.02.2016 A.Ising remove pump P4106 & P1715

9 09.03.2016 A.Ising V2106 now Mapro CL 220HS

10 14.03.2016 A.Ising modification separtion and lagoon

11 16.03.2016 A.Ising modification ventilation hygenisation

12 04.04.2016 A.Ising add A_171404 ,B_171404, A171508,B_170408, B_170409

13 19.07.2016 A.Ising modification heating system

Page 10: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

CombustionAir

Gas1192 kW

Gas Engine

HeatExchanger

ExhaustStack

Generator

EngineCooler

499kW toGrid

EmergencyCooler

516 kWto DigesterPasteurisersEtc

Exhaust Gas

Fig 5 Combined Heat & Power Plant Flow Sheet

AB Produce PLC AD Plant

Page 11: AB PRODUCE Plc Site Location Map MAP 1 SITE LOCATION

Pump ControlLevels

Condensate

Liquid Seal

Intermittent condensate Discharge to Digestate System from Submersible Pump

Fig 6 Condensate Collection ! & Disposal System

AB Produce PLC AD Plant