TITLE OF THE PROJECT
A Six Sigma project Report
TOTAL QUALITY MANAGEMENT
College of Management & Administrative Sciences,GOVERNMENT COLLEGE UNIVERSITY FAISALABAD
June, 2012
-
7/31/2019 AB TQM Prject
3/35
3
TITLE OF THE PROJECT
A Six Sigma project Report
Under the guidance of
Mr. Masood Nawaz Kalyar
Submitted by
Muhammad Abdullah 203Yahya Amin 205
Mah Gull 223
BBA(Hons) 2009-2013
in partial fulfilment of the subject
Total Quality Management
College of Management & Administrative Sciences,
Government College University Faisalabad
-
7/31/2019 AB TQM Prject
4/35
4
A c k n o w l e d g e m e n t :
We wish to acknowledge our regards and indebtedness to our guide and benevolent Sir. Masood
Kalyar teaching Total Quality Management in G.C. University Faisalabad. Whose kind and
precious suggestions enriched our thoughts and helped us to accomplish this Business plan. We
also want to thank our families who supported us. Thanks to Almighty ALLAH for giving us
such will and power to complete this business plan on time
A deep sense of appreciation is owed to Mr. Ikram ilahi for his kind attitude and keen interest
during my internship.
Last but not least we offer our humble heart felt gratitude and deepest affections to my great
mother and respected father for being inspired for higher ideals of life, supported morally and
financially throughout my studies, and always prayed for glorious success about my pursuits
throughout all of my life.
-
7/31/2019 AB TQM Prject
5/35
5
P r e f a c e :
We have chosen this Textile Mill to make our project on it. We had a good time while doing the
survey about our problem and gathering the information about solving our problem to increase
employee efficiency through different ways into a project.
The project is basically about the Increasing employee efficiency, skills, knowledge. We also
used the source of internet for gathering information. We think that we have done our job in
solving the problem we hope that
We have given all the complete information required by our teacher, and hope that our hard work
pays off.
-
7/31/2019 AB TQM Prject
6/35
6
Executive Summary:
YAT is the organization that deals in the manufacturing of Lawn and Cotton suits. This
organization is innovatory product in the Pakistani market. The organization name is Yasir Afzal
Textile Pvt. Ltd.
In the first phase, we had conducted the Organization survey and we found the main problem in
organization . The survey was very successful in which we observed all the procedure of
manufacturing clothe and different type of machines which helped to produce clothe and then we
get sample knowledge about employees their efficiencies, skills and knowledge about their work.
In the whole survey the main problem that we found is that there is no sufficient output as there
should be. Then with our survey report and knowledge we found the cause of this problem. The
cause is that employees are not satisfied from their job. In which we found that there is
insufficient salary, lack of commitment, no incentives and working environment which
discomforts the employees. Therefore, we decided to solve this problem and increase the
efficiency of employees.
-
7/31/2019 AB TQM Prject
7/35
7
Serial No. Topic Pg #02 Dedication 04
03 Acknowledgement 05
04 Preface 06
05 Executive Summary 6
Ch. # 1 Company Introduction 08
o Company Name 08o Slogan & Logo 08o History of organization 09o Vision & 11o Mission Statement 12o Objectives 13o Brief History of organization
Ch. # 2 Six Sigma Process 15
o DMAIC Process 17Ch. # 3 Define 19
Ch # 4 Measure 20
o Cost per meter 25o Six sigma Calculation 26o Process Flow 28o Prato Diagram 29o Time Series 30
Ch # 6 Analysis 31
Ch #7 Improvement 32
Six Sigma Calculation After improvement 33
o Prato Diagram and Time Series 34Ch # 8 Control 35
-
7/31/2019 AB TQM Prject
8/35
8
Ch # 1: Introduction
Company Name:
Yasir Afzal Textile Pvt Ltd.
Our Slogan:
Be Different
Our Logo:
-
7/31/2019 AB TQM Prject
9/35
9
History of Organization:
Yasir Afzal Textile Industries Pvt. Limited Faisalabad is the grooming industry in Faisalabad in
textile. Founded in 1991 by the most famous person, Haji Muhammad Afzal and Haji
Muhammad Islam, is now led by the young Mr. Umer Afzal and Mr. Amir Afzal , a dynamic
second generation leader of Faisalabad textile industry.
Yasir Afzal Textile is one of the largest manufacturer of textile goods in Pakistan. It is
manufacturing high quality products. Its product brand name is Ashi and Rabi are amongst
leader in the market. Yasir Afzal Textile has designing, and printing departments. The bedding
and fabric collection of Yasir Afzal Textile are sent to the different parts of the country such as
Lahore Karachi Islamabad and Peshawar.
Yasir Afzal Industry by now is in textile cloth finishing and processing, textile product packing.
Haji Muhammad Afzal the present Chairman of the Industry, the creative and courageous man,
latter joined by second generation, making a blend of experience and modern business
knowledge, managed the business growth and development with assistance of highly qualified
team of professionals. Faith in Almighty Allah and in their own abilities & commitment to the
cause, untiring efforts and leadership qualities of the family, established the industry, which now
stands amongst Leading Industrial Industry of the Country, under the Chairmanship of Haji
Muhammad Afzal.
The daily production round about 1 lac meter and the parties of YAT are in Lahore, Karachi,
Faisalabad, and Multan through the different parties they export cloth in different Asian
countries like Seri Lanka, India, Malaysia and Thailand. Via Karachi they send cloth to Dubai.
For many years YAT working with Maria B Designer. They manufacture Maria B Lawn on
order which have many outlets inside the country Karachi, Lahore, Faisalabad etc and outside the
country like Dubai.
They start with one rotary Machine and then expand the business with the passage of time and
now working with 3 rotary machines. Start business with personal manufacture and sold their
cloth through outlet in market and later on manufacture cloth on order .Now many domestic
trader prepare their cloth from YAT on order.
-
7/31/2019 AB TQM Prject
10/35
10
-
7/31/2019 AB TQM Prject
11/35
11
Vision:
To become one of the Best brands in the country
-
7/31/2019 AB TQM Prject
12/35
12
Mission:
Satisfying ourcustomers by providing them best qualitative stuff and Unique designs keeping
in view their comforts and excellence
Excellence in quality and improved efficiency at lower operating cost by Utilizing blend of state
of art technologies.
-
7/31/2019 AB TQM Prject
13/35
13
Our Objectives:
There are two types of objectives
1-Non-Financial Objectives:
To be among the top ten favorite brands. Yasir Afzal Textile is the growing Organization in the Textile Sector ISO certified Company Having a Qualified and Experienced Staff Proper Utilization of Human Resources Having a latest Machinery to Compete Globally Friendly Environment
2-Financial Objectives:
To maintain an inflation growth in earning per year at a rate of 12%. To obtain a return on equity of at least 30%. Providing stitching facilities to other boutiques in 2010 which are Lacking this facility.
-
7/31/2019 AB TQM Prject
14/35
14
BRIEF HISTORY OF ORGANIZATION
Yasir Afzal Textile Industries Pvt. Limited Faisalabad is the grooming industry in Faisalabad in
textile. Founded in 2005 by the most famous person, Haji Muhammad Afzal and Haji
Muhammad Islam, is now led by the young Muhammad Umer and Muhammad Amir , a
dynamic second generation leader of Faisalabad textile industry.
Yasir Afzal Textile is one of the largest manufacturers of textile goods in Pakistan. It is
manufacturing high quality products. Its product brand name is Ashi and Rabi are amongst
leader in the market. Yasir Afzal Textile has designing, stitching, and printing departments. The
bedding and fabric collection of Yasir Afzal Textile are sent to the different parts of the country
such as Lahore Karachi Islamabad and Peshawar.
Yasir Afzal textile is one of the largest manufacturers of textile in Pakistan. Specializing in home
textiles, printed, dyed, bleached fabrics, an apparel and fashion garment, Yasir afzal is delivering
quality to virtually all parts of the country. With latest State-of-the-art machinery and
equipment, it is a complete printing, dyeing, finishing and stitching plant. Three huge spinning
mills, a high caliber weaving unit and a made-up / garment unit is working under one roof. The
unit is capable of producing high quality with a capacity of 75000 meters of finished cloth every
day.
Yasir Afzal textiles industries private limited has proudly maintaining its leadership in 100
percent pure cotton products along with the man made fiber. The product range in pure cotton is
available as sateen both in mono cotton and poly cotton, bed sheets, pillow, quilt covers, aprons,
boxer shorts, and ready made garments are available in most exotic and fascinating designs.
A sizeable percentage of Yasir Afzal textiles, daily textile production by the meter are converted
in-house into a ready, saleable retail product. There Cut & Sew division enjoys the cuttingedge in assembling and sewing of bed sheets and sets, quilt covers, curtains, table linen, bed
spreads, comforter covers, pillow cases, kitchen linen and ready made garments as per the specs
defined by the customers.
-
7/31/2019 AB TQM Prject
15/35
15
From a fiber to a finished product, nothing gets spared from our ultra-sensitive, extra vigilant
laboratory. Equipped with the most modern and precision equipment, products are frequently
subjected to tests against most relevant international standards at every stage of manufacture.
Tests are conducted to control shrinkage (dimensional change), pilling resistance, and abrasion,
color fastness and washing fastness etc.
Much of their wide success and popularity is attributed to there technically being ahead in there
printing. There printing staff and design teams combine years of practical experience in printing
with top-of-the-range Austrian J. Zimmer rotary printing machines producing 280 cm finished
width up to 12 colors per design and maximum repeat of 91 cm. Flat bed printing facility
comprised Reggiane machine with 320 cm working width and 320 cm repeat.
Thanks to their modern and sophisticated facility, processing to finishes like chintz, silicon,
scotchgard, fire retardant down proof and raisin etc, is invariably a pleasure. With YASIR
AFZAL, their clients gets quick quality sampling on Austrian J. Zimmers latest rotary strike off
machine facilitating production of strike offs up to 15 meter length
-
7/31/2019 AB TQM Prject
16/35
16
CH # 2: SIX SIGMA PROCESS
What is six sigma?
Six sigma is a customer based approach realizing that defects are expensive. Fewer defects mean
lower costs and improved customer loyalty. The lowest cost, high value producer is the mostcompetitive provider of goods and services. Six sigma is a way to achieve strategic business
results.
Six Sigma is a business management strategy, originally developed by Motorola, USA in
1986. Six Sigma became well known after Jack Welch made it a central focus of his businessstrategy at General Electric in 1995, and today it is widely used in many sectors of industry.
Six Sigma seeks to improve the quality of process outputs by identifying and removing thecauses of defects (errors) and minimizing variability in manufacturing and business processes. It
uses a set of quality management methods, including statistical methods, and creates a special
infrastructure of people within the organization ("Black Belts", "Green Belts", etc.) who are
experts in these methods. Each Six Sigma project carried out within an organization follows adefined sequence of steps and has quantified financial targets (cost reduction and/or profit
increase).
The term Six Sigma originated from terminology associated with manufacturing, specificallyterms associated with statistical modeling of manufacturing processes. The maturity of a
manufacturing process can be described by a sigma rating indicating its yield, or the percentage
of defect-free products it creates. A six sigma process is one in which 99.99966% of the products
manufactured are statistically expected to be free of defects (3.4 defects per million). Motorolaset a goal of "six sigma" for all of its manufacturing operations, and this goal became a byword
for the management and engineering practices used to achieve it.
-
7/31/2019 AB TQM Prject
17/35
17
Ch #3: DMAIC Process
1-D= DEFINE: Define the problem, the voice of the customer, and the project goals,specifically. The objective of this phase is to define opportunities for improvement. Defining theproblem answers the questions such as "what are the problems?"
Define is the first step in our six sigma approach of DMAIC. DMAIC first asks leaders to defineour core process. It is important to define the selected project scope, expectations, resources and
timelines . The definition step in the six sigma approach identifies specially what is part of the
project and what is not, and explains the scope of the project .
2-M=MEASURE: Measure key aspects of the current process and collect relevant data.Many think when they start a journey the most important thing to know is where they are going.while we agree knowing where you want to go is very important, we believe some of the first
information you need before starting any journey is your current location. The six sigma
approach asks the black belt project manager to quantify and benchmark the process using actualdata. At a minimum consider the mean or average performance and some estimate of the
dispersion or variation.
3-=ANALYSIShave been considered. Seek out root cause of the defect under investigation.Analyze the data to investigate and verify cause-and-effect relationships. Determine what therelationships are, and attempt to ensure that all factors
Once the project is understood and the baseline performance documented and verified that there
is real opportunity, it is time with the six sigma approach to do an analysis of the process . in
this step , the six sigma approach applies statistical tools to validate root causes of problems. Anynumber of tools and tested can be used .The objective is to understand the process at a level
sufficient to be able to formulate options for improvement. We should be able to compare the
various options with each other to determine the most promising alternatives.
4-I=IMPROVE: During the improve step of the six sigma approach ideas and solutions areput to work. the six sigma black belt has discovered and validated all known root causes for the
existing opportunity. the six sigma approach requires black belt to identify solutions. few ideas
or opportunities are so good that all are an instant success. as part of the six sigma approach
there must be checks to assure that the desired results are being achieved. some experiments and
trails may be required in order to find the best solution. when making trails and experiments it isimportant that all project associates understand that these are trails and really are part of the six
sigma approach.
Improve or optimize the current process based upon data analysis using techniques such
as design of experiments, poke yoke or mistake proofing, and standard work to create a new,future state process. Set up pilot runs to establish process capability.
http://en.wikipedia.org/wiki/Poka_yokehttp://en.wikipedia.org/wiki/Process_capabilityhttp://en.wikipedia.org/wiki/Process_capabilityhttp://en.wikipedia.org/wiki/Poka_yoke -
7/31/2019 AB TQM Prject
18/35
18
5-C=CONTROL: Control the future state process to ensure that any deviations from targetare corrected before they result in defects. Implement control systems such as statistical process
control, production boards, visual workplaces, and continuously monitor the process.
Many people believe the best performance you can ever get from a process is at the very
beginning. Over time there is expectancy that slowly things will get a little worse until finally it
is time for another major effort towards improvement. Contrasted with this is the kaizen
approach that seeks to make everything incrementally better on a continuous basis. The sum of
all these incremental improvements can be quite large. As part of the six approach performance
tracking mechanism and measurement are in place to assure, at a minimum, that the gains made
in the project are not lost over a period f time.
http://en.wikipedia.org/wiki/Control_systemshttp://en.wikipedia.org/wiki/Statistical_process_controlhttp://en.wikipedia.org/wiki/Statistical_process_controlhttp://en.wikipedia.org/wiki/Statistical_process_controlhttp://en.wikipedia.org/wiki/Statistical_process_controlhttp://en.wikipedia.org/wiki/Control_systems -
7/31/2019 AB TQM Prject
19/35
19
Define
PROJECT: Yasir Afzal Textile Pvt. Ltd.
PROJECT INFORMATION :
Leader: Abdullah Shahzad
Black belt : Yahya Amin
Green Belt : Mah Gull
Project start: 28 April 2012
Project end : 28th may 2012
PROCESS START /STOP
START POINT: enter the grey into factory
END POINT: Manufacture the cloth and Dispatched
PROJECT TIME FRAME :
MILESTONE: visit and identified the problem
Data collection ANALYSIS
DATE: 28-04-12
30-04-12 07-05-12
MILESTONES: MAKE THE SOLOUTIONS
IMPLIMENTATION STUDIED THE
OUTCOMES
Critical to Quality:
Cost of poor quality:10,000-20,000 Meter.
TEAM MEMBERS :
SPONSOR: Yasir Afzal Textile (PVT LTD).
BLACK BELT: Abdullah Shahzad, identification of
problem is the main responsibility of Abdullah
Shahzad.
GREEN BELT: Yahya Amin collection , analysis of
data and implementations are the responsibilities of
Yahya Amin
PROCESS PROBLEM :
Problem is that no output from employees and no
efficiency level .there are many reasons behind this
but we took main reasons that environment is not
suite able, 2nd employees are not satisfied, 3rd lack
of motivation
PROJECT IMPORTANCE:
This project is about the increase the employees
efficiencies and increase the output of employees &through which increase the production
Provide the cloth to customer on time and
increase the daily production.
10-05-12 13-05-12 25-05-12
-
7/31/2019 AB TQM Prject
20/35
20
Ch#4: Measure
No
Yes
Dying
printing
Yes
Grey
Entry in
System
Mending
Is GreyBe good
Refuses Order
check Inventory
Jigger Machine
Standard Machine
Rotary &
Boozer
Ager Machine
Finishing
Super Machine
Checker
Packing
Calendar or Press
Folding
bleaching
Wait
Resize
Mercerize
Care
Printing
or Dying
1 or 2 Hours
Dispatched
-
7/31/2019 AB TQM Prject
21/35
21
For manufacturing cloth 1st of all receive grey in factory then enter inventory of grey in recordthen check the fault about grey and if defect in grey then reject the grey but in case of acceptation
then send for bleaching in which three steps involve
Bleaching:-Bleaching improves whiteness by removing natural coloration and remaining trace
impurities from the cotton; the degree of bleaching necessary is determined by the
required whiteness and absorbency. Cotton being a vegetable fiber will be bleached using
an oxidizing agent, such as dilute sodium hypochlorite or dilute hydrogen peroxide. If the
fabric is to be However, for white bed sheeting and medical applications, the highest
levels of whiteness and absorbency are essential. dyed a deep shade, then lower levels of
bleaching are acceptable.
Desizing:-Depending on the size that has been used, the cloth may be steeped in a dilute acid and
has been used, the cloth may be steeped in a dilute acid and then rinsed, or enzymes may be used
to break down the size. Then rinsed, or enzymes may be used to break down the size.
Mercerize:-A further possibility is mercerizing during which the fabric is treated with caustic soda
solution to cause swelling of the fibres. This results in improved lustre, strength and dye
affinity. Cotton is mercerized under tension, and all alkali must be washed out before the
tension is released or shrinkage will take place. Mercerizing can take place directly on
grey cloth, or after bleaching.
Many other chemical treatments may be applied to cotton fabrics to produce low
flammability, crease resist and other special effects but four important non-chemicalfinishing treatments
Care :-This step use for whiteness of cloth
http://en.wikipedia.org/wiki/Oxidizing_agenthttp://en.wikipedia.org/wiki/Sodium_hypochloritehttp://en.wikipedia.org/wiki/Hydrogen_peroxidehttp://en.wikipedia.org/wiki/Shrinkage_(fabric)http://en.wikipedia.org/wiki/Shrinkage_(fabric)http://en.wikipedia.org/wiki/Hydrogen_peroxidehttp://en.wikipedia.org/wiki/Sodium_hypochloritehttp://en.wikipedia.org/wiki/Oxidizing_agent -
7/31/2019 AB TQM Prject
22/35
22
Drying:-After the step of bleaching the grey send for drying
Printing or Dying Printing:-
Printing, on the other hand, is the application of color in the form of a paste or ink to the
surface of a fabric, in a predetermined pattern. It may be considered as localized dyeing.
Printing designs on to already dyed fabric is also possible.
problem occur in our printing department due to defect in machinery and machinery is
stop for 1 or 2 hours and it is effect on efficiency of employees and production.
20%-25% production decrease due to defect in machinery and Total daily production is
1,30,000 Meter
Dying:-Finally, cotton is an absorbent fiber which responds readily to coloration processes.
Dyeing, for instance, is commonly carried out with an anionic direct dye by completely
immersing the fabric (or yarn) in an aqueous dye bath according to a prescribedprocedure. For improved fastness to washing, rubbing and light, other dyes such as vats
and reactive are commonly used. These require more complex chemistry during
processing and are thus more expensive to apply.
-
7/31/2019 AB TQM Prject
23/35
23
Ager MachineAger machine use for dry the cloth through heating. Depending on the size that
has been used, the cloth may be steeped in a dilute acid and then rinsed, or enzymes may be used
to break down the size
Super MachineIt use for washing the cloth
Finishing department:-For finishing the cloth use standard machine and problem can be occur in finishing
Department and may be delay the production
Calendaring:-Calendaring is the third important mechanical process, in which the fabric is passed
between heated rollers to generate smooth, polished or embossed effects depending on
roller surface properties and relative speeds.
-
7/31/2019 AB TQM Prject
24/35
24
Folding :-Folding machine use for rolling the cloth on role
Checker:-After preparing the cloth then check for overview about defects .
Packing:-After the checking and clearance of clothe then we will pack the cloth.
Dispatched:-Dispatching is the last step of the manufacturing cloth.
-
7/31/2019 AB TQM Prject
25/35
25
Cost per Meter
Daily Production 130,000 Meter
Grey per Meter Rs.63
Grey cost Daily 63*130,000 81,90,000
Daily Wages 1,10,000
Electricity per Day 14000 Unit*8 1,12,000
Sui Gas Per Day 62,500 Units*4 300,000
Chemical Per Day 550,000
Other Expense 40,000
Total Expense per day 93,02,000
Per Meter Cost = Total Expense/ Daily Production
= 93,02,000/130,000
= 71.55 Rs. Per Meter Cost
-
7/31/2019 AB TQM Prject
26/35
26
Six Sigma Calculations Before Improvement
Daily Production = 130,000 Meter
NO of Defects = 10,000
Size Of the Sample = 130,000
Defects per million = 76923
Sigma Metric = 3.00
-
7/31/2019 AB TQM Prject
27/35
27
Problem is that there is no output of employee and no efficiency of employee, and there are three main
causes
Defect in machinery Environment is not suite able for employee Employee not satisfied from job
-
7/31/2019 AB TQM Prject
28/35
28
-
7/31/2019 AB TQM Prject
29/35
29
Pareto Diagram
Daily Production =130,000 Meter Problem=10,000
Following are the problem in % of 10,000
working environment 5000 m, Employee Dissatisfaction 3000 m, Defect in Machinery 2000 m
Problem: Employees are not satisfied from job.
Y-axis: Percentage of problem
X-axis: Causes of problem
50%
30%
20%
0%
10%
20%
30%
40%
50%
60%
Employee Inefficiency
Working Environmeent
Employee Dis Satisfaction
Defect in Machinery
-
7/31/2019 AB TQM Prject
30/35
30
Time Series
Employee Inefficiency
0%
10%
20%
30%
40%
50%
60%
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7
Working Environment
Employee inefficiency
Defect in machinery
-
7/31/2019 AB TQM Prject
31/35
31
Ch # 5 3-Analysis
Skills Competition
Laziness Prejudice
Drug addiction Politics
Top management Load shedding
Communication Financial problem
Human Resource
Employees Environment
Commitment Resources
Employees are n
satisfied from j
-
7/31/2019 AB TQM Prject
32/35
32
Ch # 6:
Improvement
we discussed many causes above that were reason of inefficiency of employees and employees
not showing performance so we think that delay in printing department
due to defect in printing machine so we repaired our machinery and replaced ourmachinery then problem is minimized
for maintain and providing good environment to employees we delivered lecture oncooperation, collaboration and mutual understanding and it is helpful for good
environment. for the satisfaction of employees we give incentives to employees and increase the
satisfaction level
we appreciate and motivate the employees work and performance
-
7/31/2019 AB TQM Prject
33/35
33
Six Sigma Calculations After Improvement
Daily Production = 130,000 Meter
NO of Defects = 1550 Meter
Size Of the Sample = 130,000
Defects per million = 11923
Sigma Metric = 3.8
-
7/31/2019 AB TQM Prject
34/35
34
After the implementation, the improvement in production and deficiency in error.
0%
5%
10%
15%
20%
25%
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
Working environment
Employee Dis Satisfaction
Defect in Machinery
20%
15%
5%
0%
5%
10%
15%
20%
25%
employees inefficiency
working enviorenment
emloyee dis satisfaction
defect in machinery
-
7/31/2019 AB TQM Prject
35/35
Control:
After implementing the solution, we concluded that improvement implementation brought
significant benefit to YAT. That is why, we standardized these solutions to further avoid such
problems.
Standardized Solution:
Repair and replace our machinery and install some new plants and machinery that works more
efficiently.
Put emphasis on co-operation and collaboration in the organization to make environment
friendly.
Provide incentives and allowances to satisfy employees.
Appreciate employees to increase motivation.