abass lightning

28
CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION BALANCING RESERVOIR TITLE LIGHTNING & EARTHING INSTALLATION DETAILS ITEM DESCRIPTION UNIT QUANTITY A Copper tape installation : - tokai 25mmx3mm 1 Ground Level a Line 3 panel to point C m 12 b line 5 panel to point B m 9 c Pump panel to point D m 25 d Point C to Point E m 32 e Point E to Point J m 62 f Point J to Putrajaya Panel m 115 g Point I to Point K m 7 h Point F to Point G m 12 i Ponit G to Point H m 4 2 ESE Pole a Inner Pole m 15 b Ground Pole to Line G-F m 2 3 Panel 1-3 a Panel 1 to panel 2 m 24 b Panel 3 to Point A m 9 c Panel 3 to Ground m 7 4 Roof (Switch Room) a Air terminal ring m 26 b Ring to Test Point m 3 Total installation 364 B Air terminal Installation 1 Lightning Pole (15m) a Alltec ESE TSP60 nos 1 2 Roof Switch Room a Tokai 500mmx15mm Air terminal c/w base nos 4

Upload: afhamyl-salleh

Post on 28-Nov-2014

58 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION BALANCING RESERVOIR

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

ITEM DESCRIPTION UNIT QUANTITY REMARKS

A Copper tape installation :- tokai 25mmx3mm

1 Ground Levela Line 3 panel to point C m 12b line 5 panel to point B m 9c Pump panel to point D m 25d Point C to Point E m 32e Point E to Point J m 62f Point J to Putrajaya Panel m 115g Point I to Point K m 7h Point F to Point G m 12i Ponit G to Point H m 4

2 ESE Polea Inner Pole m 15b Ground Pole to Line G-F m 2

3 Panel 1-3a Panel 1 to panel 2 m 24b Panel 3 to Point A m 9c Panel 3 to Ground m 7

4 Roof (Switch Room)a Air terminal ring m 26b Ring to Test Point m 3

Total installation 364

B Air terminal Installation

1 Lightning Pole (15m)a Alltec ESE TSP60 nos 1

2 Roof Switch Rooma Tokai 500mmx15mm Air terminal c/w base nos 4

Page 2: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION BALANCING RESERVOIR

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

ITEM DESCRIPTION UNIT QUANTITY REMARKSTotal installation 5

B Earthing Point

1 Earth Chamber (SAG- HEAVY DUTY)a Point A nos 1b Point N nos 1c Point L nos 1d Point G nos 1e Point H nos 1f Point K nos 1G Point O nos 1

Total installation 6

2 Earth Rod a Point A nos 3b Point N nos 3c Point L nos 3d Point G nos 3e Point H nos 3f Point K nos 0 ExistingG Point O nos 3

Total installation 15

3 Rod Couplera Point A nos 2b Point N nos 2c Point L nos 2d Point G nos 2e Point H nos 2f Point K nos 0 ExistingG Point O nos 2

Total installation 12

C Termination1 Cadweld Termination (Erico)a Ground ESE to Link F-G nos 1b Point A nos 1

Page 3: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION BALANCING RESERVOIR

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

ITEM DESCRIPTION UNIT QUANTITY REMARKSc Point B nos 1d Point D nos 1e Point F nos 1f Point G nos 1g Point H nos 1h Point I nos 1i Point J nos 1j Point K nos 1k Point L nos 1l Point M nos 1

m Point N nos 1n Point O nos 1

Total installation 14

D Pole 1 Highmast Pole 15m 1 Bq 10m pole

Total installation 1

Page 4: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION GENSET

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

ITEM DESCRIPTION UNIT QUANTITY REMARKS

A Copper tape installation :- tokai 25mmx3mm

1 Ground Levela Point A to B m 0 Existing Tapeb Point B to C m 5c Point D to E m 3

2 ESE Pole 3M (Roof)a ESE point to Point A m 4.5

Total installation 12.5

B Air terminal Installation

1 Lightning Pole (15m)a Alltec ESE TSP60 nos 1

Total installation 1

B Earthing Point

1 Earth Chamber (SAG- HEAVY DUTY)a Point B nos 0 Exisiting b Point C nos 1c Point D nos 0 Exisiting d Point E nos 1

Total installation 2

2 Earth Rod a Point B nos 0 Exisiting b Point C nos 3c Point D nos 0 Exisiting d Point E nos 3

Total installation 6

Page 5: Abass Lightning

3 Rod Couplera Point B nos 0 Exisiting b Point C nos 2c Point D nos 0 Exisiting d Point E nos 2

Total installation 4

C Termination1 Cadweld Termination (Erico)a Point A nos 1b Point B nos 1c Point C nos 1d Point D nos 1e Point E nos 1g Point F nos 1

Total installation 6

D Pole 1 Galvanised Pole 3m 1 Bq 2m pole

Total installation 1

Page 6: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION FLOWMETER ROOM

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

ITEM DESCRIPTION UNIT QUANTITY

A Copper tape installation :- tokai 25mmx3mm

1 Ground Levela Point A to C m 5.6b Point B to D m 13c Point C to Internal PA System m 4d Point D to E m 12e Point F to G m 11

2 ESE Pole 2 M (Water tank)a ESE point to Point G m 22

3 Roof (Surau)a Point M to L m 7

Total installation 74.6

B Air terminal Installation

1 Lightning Pole (15m)a Alltec ESE TSP60 nos 1

2 Roof (Surau)a Tokai 500mmx16mm Air terminal c/w base nos 5

Total installation 6

B Earthing Point

1 Earth Chamber (SAG- HEAVY DUTY)a Point A nos 1b Point B nos 0c Point D nos 0d Point F nos 1e Point G nos 1f Point I nos 1

Total installation 4

2 Earth Rod

Page 7: Abass Lightning

a Point A nos 3b Point B nos 0c Point D nos 0d Point F nos 3e Point G nos 3f Point I nos 3

Total installation 12

3 Rod Couplera Point A nos 2b Point B nos 0c Point D nos 0d Point F nos 2e Point G nos 2f Point I nos 2

Total installation 8

C Termination1 Cadweld Termination (Erico)b Point A nos 1c Point B nos 1d Point C nos 1e Point D nos 1f Point E nos 1g Point F nos 1h Point G nos 1i Point I nos 1

Total installation 8

Page 8: Abass Lightning

REMARKS

Exisiting Exisiting

Page 9: Abass Lightning

Exisiting Exisiting

Exisiting Exisiting

Page 10: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION SURAU / WATER TANK

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

ITEM DESCRIPTION UNIT QUANTITY REMARKS

A Copper tape installation :- tokai 25mmx3mm

1 Ground Levela Point A to B m 5b Point B to D m 13c Point C to Internal PA System m 4d Point D to E m 12e Point F to G m 13

2 ESE Pole 2 M (Water tank)a ESE point to Point G m 26

3 Roof (Surau)a Point M to L m 7

Total installation 80

B Air terminal Installation

1 Lightning Pole (15m)a Alltec ESE TSP60 nos 1

2 Roof (Surau)a Tokai 500mmx16mm Air terminal c/w base nos 1

Total installation 2

B Earthing Point

1 Earth Chamber (SAG- HEAVY DUTY)a Point A nos 1b Point B nos 0 Exisiting c Point D nos 0 Exisiting d Point F nos 1e Point G nos 1f Point I nos 1

Page 11: Abass Lightning

Total installation 4

2 Earth Rod a Point A nos 3b Point B nos 0 Exisiting c Point D nos 0 Exisiting d Point F nos 3e Point G nos 3f Point I nos 3

Total installation 12

3 Rod Couplera Point A nos 2b Point B nos 0 Exisiting c Point D nos 0 Exisiting d Point F nos 2e Point G nos 2f Point I nos 2

Total installation 8

C Termination1 Cadweld Termination (Erico)b Point A nos 1c Point B nos 1d Point C nos 1e Point D nos 1f Point E nos 1g Point F nos 1h Point G nos 1i Point I nos 1

Total installation 8

D Pole 1 Galvanised Pole 2m 1

Total installation 1

Page 12: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION CHLORINATION BUILDING

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

ITEM DESCRIPTION UNIT QUANTITY

A Copper tape installation :- tokai 25mmx3mm

1 Chlorination Control Rooma bonding of each panel inside m 12

Total installation 12

B Termination1 Cadweld Termination (Erico)a Point A nos 1b Point B nos 1

Total installation 2

Page 13: Abass Lightning

REMARKS

Page 14: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION RAW WATER PUMPING STATION

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

ITEM DESCRIPTION UNIT QUANTITY REMARKS

A Copper tape installation :- cable 35mmx1C

1 Ground Levela Busbar to PABX m 5 replace copper tape

Total installation 5

B PABX lightning protection1 Protection of Power Supplya nos 2 1 unit standbyb Novaris Telephone Surge Protector nos 40 2 unit standby

Total installation 42

Novaris Plug-in Surge filter (model no: PP13B2-19-SSP)

each unit cover up to 10 pr telephone line

Page 15: Abass Lightning

CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEM

LOCATION ALL

TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

SUBTITLE INSTALLATION SUMMARY

No Work Description Remarks

Copper tape installation :

1 BALANCING RESERVOIR 364 361 33 GENSET 12.5 21 -8.54 FLOWMETER ROOM 74.6 50 24.62 SURAU / WATER TANK 80 65 155 CHLORINATION BUILDING 12 60 -486 RAW WATER PUMPING STATION 5 5 0

(1 coil= 84m)Total 548.1 562 -13.9

Air terminal Installation

a Alltec ESE TSP60

1 BALANCING RESERVOIR 1 1 02 SURAU / WATER TANK 1 1 03 GENSET

2 2 0

b

1 BALANCING RESERVOIR 4 4 02 SURAU / WATER TANK 1 1 03 FLOWMETER ROOM 5 4 1

Total 12 11 1

Earth Chamber (SAG- HEAVY DUTY)

Installation Quantity

Contract Quantity

Quantity Varies

+/-6.5 coil of copper tape used

Tokai 500mmx15mm Air terminal c/w base

Page 16: Abass Lightning

No Work Description RemarksInstallation Quantity

Contract Quantity

Quantity Varies

1 BALANCING RESERVOIR 6 8 -22 GENSET 2 2 03 FLOWMETER ROOM 4 2 24 SURAU / WATER TANK 4 4 0

Total 16 16 0

Earth Rod

BALANCING RESERVOIR 15 40 -25GENSET 6 6 0FLOWMETER ROOM 12 6 6SURAU / WATER TANK 12 20 -8

Total 45 72 -27

Termination

BALANCING RESERVOIR 14 8 6GENSET 6 2 4FLOWMETER ROOM 8 2 6SURAU / WATER TANK 8 2 6CHLORINATION BUILDING 2 2 0

Total 24 8 16 cadweld connection

PABX lightning protection

a

RAW WATER PUMPING STATION 2 2 0

Total 2 2 0

b Novaris Telephone Surge Protector

RAW WATER PUMPING STATION 40 22 18 (1 unit 10pr)4 unit KP10

Total 40 22 18

Pole

Novaris Plug-in Surge filter (model no: PP13B2-19-SSP)

Page 17: Abass Lightning

No Work Description RemarksInstallation Quantity

Contract Quantity

Quantity Varies

BALANCING RESERVOIR 1 1 0

GENSET 1 1 0SURAU / WATER TANK 1 1 0 2 m pole

Total 3 3 0

Bq spec 10m, installed 15m

Bq spec 2m, installed 3m