CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION BALANCING RESERVOIR
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
ITEM DESCRIPTION UNIT QUANTITY REMARKS
A Copper tape installation :- tokai 25mmx3mm
1 Ground Levela Line 3 panel to point C m 12b line 5 panel to point B m 9c Pump panel to point D m 25d Point C to Point E m 32e Point E to Point J m 62f Point J to Putrajaya Panel m 115g Point I to Point K m 7h Point F to Point G m 12i Ponit G to Point H m 4
2 ESE Polea Inner Pole m 15b Ground Pole to Line G-F m 2
3 Panel 1-3a Panel 1 to panel 2 m 24b Panel 3 to Point A m 9c Panel 3 to Ground m 7
4 Roof (Switch Room)a Air terminal ring m 26b Ring to Test Point m 3
Total installation 364
B Air terminal Installation
1 Lightning Pole (15m)a Alltec ESE TSP60 nos 1
2 Roof Switch Rooma Tokai 500mmx15mm Air terminal c/w base nos 4
CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION BALANCING RESERVOIR
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
ITEM DESCRIPTION UNIT QUANTITY REMARKSTotal installation 5
B Earthing Point
1 Earth Chamber (SAG- HEAVY DUTY)a Point A nos 1b Point N nos 1c Point L nos 1d Point G nos 1e Point H nos 1f Point K nos 1G Point O nos 1
Total installation 6
2 Earth Rod a Point A nos 3b Point N nos 3c Point L nos 3d Point G nos 3e Point H nos 3f Point K nos 0 ExistingG Point O nos 3
Total installation 15
3 Rod Couplera Point A nos 2b Point N nos 2c Point L nos 2d Point G nos 2e Point H nos 2f Point K nos 0 ExistingG Point O nos 2
Total installation 12
C Termination1 Cadweld Termination (Erico)a Ground ESE to Link F-G nos 1b Point A nos 1
CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION BALANCING RESERVOIR
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
ITEM DESCRIPTION UNIT QUANTITY REMARKSc Point B nos 1d Point D nos 1e Point F nos 1f Point G nos 1g Point H nos 1h Point I nos 1i Point J nos 1j Point K nos 1k Point L nos 1l Point M nos 1
m Point N nos 1n Point O nos 1
Total installation 14
D Pole 1 Highmast Pole 15m 1 Bq 10m pole
Total installation 1
CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION GENSET
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
ITEM DESCRIPTION UNIT QUANTITY REMARKS
A Copper tape installation :- tokai 25mmx3mm
1 Ground Levela Point A to B m 0 Existing Tapeb Point B to C m 5c Point D to E m 3
2 ESE Pole 3M (Roof)a ESE point to Point A m 4.5
Total installation 12.5
B Air terminal Installation
1 Lightning Pole (15m)a Alltec ESE TSP60 nos 1
Total installation 1
B Earthing Point
1 Earth Chamber (SAG- HEAVY DUTY)a Point B nos 0 Exisiting b Point C nos 1c Point D nos 0 Exisiting d Point E nos 1
Total installation 2
2 Earth Rod a Point B nos 0 Exisiting b Point C nos 3c Point D nos 0 Exisiting d Point E nos 3
Total installation 6
3 Rod Couplera Point B nos 0 Exisiting b Point C nos 2c Point D nos 0 Exisiting d Point E nos 2
Total installation 4
C Termination1 Cadweld Termination (Erico)a Point A nos 1b Point B nos 1c Point C nos 1d Point D nos 1e Point E nos 1g Point F nos 1
Total installation 6
D Pole 1 Galvanised Pole 3m 1 Bq 2m pole
Total installation 1
CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION FLOWMETER ROOM
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
ITEM DESCRIPTION UNIT QUANTITY
A Copper tape installation :- tokai 25mmx3mm
1 Ground Levela Point A to C m 5.6b Point B to D m 13c Point C to Internal PA System m 4d Point D to E m 12e Point F to G m 11
2 ESE Pole 2 M (Water tank)a ESE point to Point G m 22
3 Roof (Surau)a Point M to L m 7
Total installation 74.6
B Air terminal Installation
1 Lightning Pole (15m)a Alltec ESE TSP60 nos 1
2 Roof (Surau)a Tokai 500mmx16mm Air terminal c/w base nos 5
Total installation 6
B Earthing Point
1 Earth Chamber (SAG- HEAVY DUTY)a Point A nos 1b Point B nos 0c Point D nos 0d Point F nos 1e Point G nos 1f Point I nos 1
Total installation 4
2 Earth Rod
a Point A nos 3b Point B nos 0c Point D nos 0d Point F nos 3e Point G nos 3f Point I nos 3
Total installation 12
3 Rod Couplera Point A nos 2b Point B nos 0c Point D nos 0d Point F nos 2e Point G nos 2f Point I nos 2
Total installation 8
C Termination1 Cadweld Termination (Erico)b Point A nos 1c Point B nos 1d Point C nos 1e Point D nos 1f Point E nos 1g Point F nos 1h Point G nos 1i Point I nos 1
Total installation 8
REMARKS
Exisiting Exisiting
Exisiting Exisiting
Exisiting Exisiting
CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION SURAU / WATER TANK
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
ITEM DESCRIPTION UNIT QUANTITY REMARKS
A Copper tape installation :- tokai 25mmx3mm
1 Ground Levela Point A to B m 5b Point B to D m 13c Point C to Internal PA System m 4d Point D to E m 12e Point F to G m 13
2 ESE Pole 2 M (Water tank)a ESE point to Point G m 26
3 Roof (Surau)a Point M to L m 7
Total installation 80
B Air terminal Installation
1 Lightning Pole (15m)a Alltec ESE TSP60 nos 1
2 Roof (Surau)a Tokai 500mmx16mm Air terminal c/w base nos 1
Total installation 2
B Earthing Point
1 Earth Chamber (SAG- HEAVY DUTY)a Point A nos 1b Point B nos 0 Exisiting c Point D nos 0 Exisiting d Point F nos 1e Point G nos 1f Point I nos 1
Total installation 4
2 Earth Rod a Point A nos 3b Point B nos 0 Exisiting c Point D nos 0 Exisiting d Point F nos 3e Point G nos 3f Point I nos 3
Total installation 12
3 Rod Couplera Point A nos 2b Point B nos 0 Exisiting c Point D nos 0 Exisiting d Point F nos 2e Point G nos 2f Point I nos 2
Total installation 8
C Termination1 Cadweld Termination (Erico)b Point A nos 1c Point B nos 1d Point C nos 1e Point D nos 1f Point E nos 1g Point F nos 1h Point G nos 1i Point I nos 1
Total installation 8
D Pole 1 Galvanised Pole 2m 1
Total installation 1
CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION CHLORINATION BUILDING
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
ITEM DESCRIPTION UNIT QUANTITY
A Copper tape installation :- tokai 25mmx3mm
1 Chlorination Control Rooma bonding of each panel inside m 12
Total installation 12
B Termination1 Cadweld Termination (Erico)a Point A nos 1b Point B nos 1
Total installation 2
REMARKS
CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEMLOCATION RAW WATER PUMPING STATION
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
ITEM DESCRIPTION UNIT QUANTITY REMARKS
A Copper tape installation :- cable 35mmx1C
1 Ground Levela Busbar to PABX m 5 replace copper tape
Total installation 5
B PABX lightning protection1 Protection of Power Supplya nos 2 1 unit standbyb Novaris Telephone Surge Protector nos 40 2 unit standby
Total installation 42
Novaris Plug-in Surge filter (model no: PP13B2-19-SSP)
each unit cover up to 10 pr telephone line
CLIENT KONSORTIUM ABASS SDN BHDPROJECT UPGRADING LIGHTNING PROTECTION SYSTEM
LOCATION ALL
TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
SUBTITLE INSTALLATION SUMMARY
No Work Description Remarks
Copper tape installation :
1 BALANCING RESERVOIR 364 361 33 GENSET 12.5 21 -8.54 FLOWMETER ROOM 74.6 50 24.62 SURAU / WATER TANK 80 65 155 CHLORINATION BUILDING 12 60 -486 RAW WATER PUMPING STATION 5 5 0
(1 coil= 84m)Total 548.1 562 -13.9
Air terminal Installation
a Alltec ESE TSP60
1 BALANCING RESERVOIR 1 1 02 SURAU / WATER TANK 1 1 03 GENSET
2 2 0
b
1 BALANCING RESERVOIR 4 4 02 SURAU / WATER TANK 1 1 03 FLOWMETER ROOM 5 4 1
Total 12 11 1
Earth Chamber (SAG- HEAVY DUTY)
Installation Quantity
Contract Quantity
Quantity Varies
+/-6.5 coil of copper tape used
Tokai 500mmx15mm Air terminal c/w base
No Work Description RemarksInstallation Quantity
Contract Quantity
Quantity Varies
1 BALANCING RESERVOIR 6 8 -22 GENSET 2 2 03 FLOWMETER ROOM 4 2 24 SURAU / WATER TANK 4 4 0
Total 16 16 0
Earth Rod
BALANCING RESERVOIR 15 40 -25GENSET 6 6 0FLOWMETER ROOM 12 6 6SURAU / WATER TANK 12 20 -8
Total 45 72 -27
Termination
BALANCING RESERVOIR 14 8 6GENSET 6 2 4FLOWMETER ROOM 8 2 6SURAU / WATER TANK 8 2 6CHLORINATION BUILDING 2 2 0
Total 24 8 16 cadweld connection
PABX lightning protection
a
RAW WATER PUMPING STATION 2 2 0
Total 2 2 0
b Novaris Telephone Surge Protector
RAW WATER PUMPING STATION 40 22 18 (1 unit 10pr)4 unit KP10
Total 40 22 18
Pole
Novaris Plug-in Surge filter (model no: PP13B2-19-SSP)
No Work Description RemarksInstallation Quantity
Contract Quantity
Quantity Varies
BALANCING RESERVOIR 1 1 0
GENSET 1 1 0SURAU / WATER TANK 1 1 0 2 m pole
Total 3 3 0
Bq spec 10m, installed 15m
Bq spec 2m, installed 3m