abu srea mohammed 2016-finall 112

7
CURRICULUM VITAE Eng. Abu Sreaa Mohammed Abu Sreaa Dear Sir, I'm a Civil Engineer with a total working experience of 14 years in Construction and Consultancy industries. Currently finalizing my Master Degree of Engineering from "Faculty of Engineering, Helwan University, Egypt" in "Construction Project Management" and my Master thesis under the title of "Survey Engineering in Quality control and construction management" Through my work period in Egypt & Saudi Arabia I've worked as Civil Engineer, Senior Survey Engineer in roads projects as well as reviewing of roads design, in addition to overseeing the implementation where and Quantity Survey Cost planning and commercial management throughout the entire life cycle of the project from inception to post-completion. My tasks also included: "Value engineering, Risk management and calculation, Procurement advice and assistance during the tendering procedures, Tender analysis and agreement of the contract sum, Commercial management and contract administration, Assistance in dispute resolution, Asset capitalization, Interim valuations and payment 1

Upload: abosree3-taha

Post on 27-Jan-2017

35 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Abu Srea Mohammed 2016-finall 112

CURRICULUM VITAEEng. Abu Sreaa Mohammed Abu Sreaa

Dear Sir,

I'm a Civil Engineer with a total working experience of 14 years in

Construction and Consultancy industries. Currently finalizing my Master

Degree of Engineering from "Faculty of Engineering, Helwan University,

Egypt" in "Construction Project Management" and my Master thesis

under the title of "Survey Engineering in Quality control and construction

management"

Through my work period in Egypt & Saudi Arabia I've worked as Civil

Engineer, Senior Survey Engineer in roads projects as well as reviewing of

roads design, in addition to overseeing the implementation where and

Quantity Survey Cost planning and commercial management throughout

the entire life cycle of the project from inception to post-completion.

My tasks also included: "Value engineering, Risk management and

calculation, Procurement advice and assistance during the tendering

procedures, Tender analysis and agreement of the contract sum,

Commercial management and contract administration, Assistance in

dispute resolution, Asset capitalization, Interim valuations and payment

assessment, Cost management process, Assessing the additional costs of

design variations and Follow-up time schedule

To prepare periodic reports for the project"

I'm keen to personal development and continuous learning which

encouraged me to develop myself in the field of Construction Management

by taking many courses

KEY WORDS

1

Page 2: Abu Srea Mohammed 2016-finall 112

Planner, Quantity survey, Road works and Surveying Works

PERSONAL DETAILS

07-08-1978, 21Elola Mosque St. Saft El-Laban–Giza.Date and Place of Birth

Egyptian.Nationality

AAW Consulting Engineers &Partners Co. Company Saudi Arabia.Work address

Planner &Quantity Survey Engineer, "Design, built & upgrade of north Jeddah STP (Airport-1) Project", Jeddah, Saudi Arabia.Current Job

Excellent user for all of surveying instruments like : Level & Theodolite & Total station & G.P.SPersonal Skills

Primavera (6.8& 15.2) &AutoCAD & Microsoft office & Surfer(6,7,&8) & land desk top 3&4 & civil 3d 2013 & Arc GIS 10.2Computer Skills

00966541673079Phone

[email protected]

Arabic (Native Language) & English (excellent).Languages

Qualifications

Civil Public works, Faculty of Engineering, Banha branch Shubra Zagazig University, 2002.Surveying project.

B Sc.

Passing in the exam of qualifying courses and going to complete Thesis.The studied courses were: Planning and Schedule Using Primavera, Value Engineering, Specialized Costs, Tenders and contracts, Enterprise Resource Management, Quality and construction Management,

Engineering Construction Management Postgraduate, Helwan University, Matreya Faculty of Engineering (2014:now)

Work Experience

Quantity Survey and planner Engineer: King Abdel_Aziz National Airport Treating Planet Project, Jeddah Saudi Arabia. AAW Consulting Engineers &Partners Co. Company, (2015: now).

Key Responsibility

Check and Review the current contractor's Payments and submit them to the project manager

Review documents contract the contractor& Bill of Quantities For the project

Preparation and work payments for the Consulting Engineers AAW and submit them to the project manager

calculation of quantities of design drawings& executed

Quantity Survey and Planner Engineer

2

Page 3: Abu Srea Mohammed 2016-finall 112

accomplishment Review Quality Management Plan Review Risk Management Plan Reviewing the time schedule of the contractor and the work of daily,

weekly and monthly reportsCivil Engineer: supervising of oversee the implementation of the Survey Works and road works, Housing Project of the National Guard ,Madina El Monawara Saudi Arabia,

AAW Consulting Engineers &Partners Co. Company, (2012:2015).Key Responsibility

Make Traverse between ground control points and closing error correction

Receipt of RFI and review the attached data and filling Directing the surveyors team on how to check the work in site Follow-up calibration of surveying instruments Write daily report for the work that has been done in site make update drawing for project activities every week Review the as built drawing and match them with what has been

received by RFI Supervising the implementation of road works& asphalt mix design

review and follow-up tests for layers Supervising the implementation fences villa precast concrete Review of cross-sections and elevations between roads and fences

Supervising Engineer

Survey Engineer: Sulaymaniyah Village Company, Cairo-Alexandria Desert Road, Km 55, (2011:2012)

Key Responsibility

Make Traverse between ground control points and closing error correction

Receipt of RFI and review the attached data and filling Directing the surveyors team on how to check the work in site Follow-up calibration of surveying instruments Write daily report for the work that has been done in site make update drawing for project activities every week Supervising the implementation fences villa Review of cross-sections and elevations between roads and fences

Survey Engineer: Private business, graphic design, estimated quantities for cutting and filling and supervisor of the implementation (2010:2012, as a part time).

Survey and technical office Engineer: General Contracting Office (FAA), (2007:2010):

Up town Cairo project, Emmar Misr, Elmokatm Road. Earthwork: 7 ـMm3 cut & 7M m3 fill..Marasy project, Sedy Abd Alrhman. Earthwork & Villas construction ـ

Key Responsibility

Make Traverse between ground control points and closing error

Surveying Works

3

Page 4: Abu Srea Mohammed 2016-finall 112

correction Receipt of RFI and review the attached data and filling Directing the surveyors team on how to check the work in site Follow-up calibration of surveying instruments Write daily report for the work that has been done in site make update drawing for project activities every week Preparation and work payments for Road & calculation of quantities of

design drawings& executed

Survey Manger: Arab Contractor, Tunnel dep., Contract 13 A, Dar EL Salam, El Jazeera and EL Khiala pipe jacking, diameter 2.5m & 1.50 m, (2006:2007).

Key Responsibility

Make Traverse between ground control points and closing error correction

Receipt of RFI and review the attached data and filling Directing the surveyors team on how to check the work in site Follow-up calibration of surveying instruments Write daily report for the work that has been done in site make update drawing for project activities every week

Survey Engineer: Industrial Construction & Engineering Co. (SIAC), (2006):

1- Sugar factory Project, Ain El Skhona port.2- Grand Mouzem Project, Medan Elremaia, Cairo-Alexandria desert road.

Key Responsibility Make Traverse between ground control points and closing error

correction Receipt of RFI and review the attached data and filling Directing the surveyors team on how to check the work in site Follow-up calibration of surveying instruments Write daily report for the work that has been done in site make update drawing for project activities every week calculation of quantities of design drawings & executed(Cutting and

filling volumes )

Survey Engineer: General Contracting Office (FAA), (2003:2006):

- Sheikh Zaid city: Land scape (General Garden), internal road ( road construction ), earth moving and the major road of city

- EI-Khamael city: Land scape for 76 Fadden- ELwahat -ElFayom road for 200km length.- New Qena city: External and internal road for 26 km length. Key Responsibility

Make Traverse between ground control points and closing error correction

Receipt of RFI and review the attached data and filling Directing the surveyors team on how to check the work in site Follow-up calibration of surveying instruments Write daily report for the work that has been done in site

4

Page 5: Abu Srea Mohammed 2016-finall 112

make update drawing for project activities every week

Training Courses, Seminars

No. Title Institution Date

1 PMP Exam Preparation course V5 Aldarayn Academy 2016

2 Planning and Schedule Using Primevera Saudi Council of Engineer 2016

3 Planning , Control and EVM Using Primevera Saudi Council of Engineer 2016

4Participate as VE team, Value Eng. study of Master Planning of Water& Sewage Systems in Khulais city, Jeddah

National Water Company and Al Kuwaiter Value Engineering 2016

5Project Management Science & Technology Institute for

Training 2015

6Planning and Follow-up Science & Technology Institute for

Training 2015

7 Project Management Professional (PMP) Saudi Council of Engineer 2015

8 Total Quality Management Science & Technology Institute for Training 2015

9 Enterprise Resource Management Science & Technology Institute for Training 2014

10 Value Engineering Science & Technology Institute for Training 2014

11 Specialized Costs Science & Technology Institute for Training 2014

5