ACTIVE CHILLED BEAM SYSTEMS (ACB)
![Page 2: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/2.jpg)
Air vs Water
1” dia water pipe can deliver the same cooling as duct 300-350 times its size at the
same fluid temperature
![Page 3: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/3.jpg)
Induction Process
![Page 4: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/4.jpg)
Air Flow Pattern
![Page 5: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/5.jpg)
Lower Energy Consumption(ASHRAE 90.1)
• Lower Airflow i.e. Lower Fan Power • Higher Chiller COP
100% Outside Air • i.e. Healthier Indoor Environment (ASHRAE 62.1)
Building Material Saving ( Glazing& RC)• Smaller Ductwork ; Reduction in Floor-to-Floor Slab height
• Can ‘avoid’ false ceiling and maintain aesthetics
Floor Space Saving • Smaller AHU Room• Smaller Cavity & Risers
Higher Thermal Comfort (ASHRAE 55.2)• Room Air-Velocities within band• Better distribution of temperature
Extremely Low Noise
Reduced Maintenance & Intrusion on Tenant
Key Benefits
![Page 6: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/6.jpg)
Reduced fan power :32 % from Base VAV
Reduced cooling energy :38 % from Base VAV
Energy Savings
![Page 7: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/7.jpg)
f.f.l.200mm
600mm
2900mm
3800mm
100mm
3400mm
2900mm
2’6”
Structural Height Saving
![Page 8: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/8.jpg)
ACB SCHEMATIC
![Page 9: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/9.jpg)
ACB SCHEMATIC
![Page 10: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/10.jpg)
ACB SCHEMATIC
![Page 11: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/11.jpg)
ACB SCHEMATIC
![Page 12: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/12.jpg)
ACB SCHEMATIC
![Page 13: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/13.jpg)
ACB SCHEMATIC
![Page 14: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/14.jpg)
ACB SCHEMATIC
![Page 15: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/15.jpg)
AHU ROOM
![Page 16: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/16.jpg)
Floor Space Saving
• Conventional 4 AHU design : 1596 ft2 per floor• Chilled Beam 4 AHU design : 560 ft2 per floor• For 6 floors (Typical Office), total saving
6 x ( 1596 – 560 ft2 ) : 6216 ft2
![Page 17: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/17.jpg)
DUCTING LAYOUT
ACB = 28 NOS(OFFICE 4)
![Page 18: Acb presentation](https://reader036.vdocuments.net/reader036/viewer/2022081507/58ae24591a28ab7e4a8b60eb/html5/thumbnails/18.jpg)
PIPING LAYOUT
ACB = 28 NOS(OFFICE 4)