ACÇÃO: CONSTRUÇÃO 2011UM DIA DE VISÃO, PARCERIAS, PROJECTOS, NEGÓCIOS E NETWORKING
16 Fevereiro 2011FCT/UNL
MONTE DA CAPARICA
KANBIM PT: SINERGIAS BIM - LEAN EM MOVIMENTO
Prof. Nuno Cachadinha /FCT-UNL
Organização
Programa08h30 - Recepção e entrega de documentação09h00 - Sessão de Abertura ‐ Director da FCT Universidade Nova09h30 - PAINEL OPORTUNIDADES EMERGENTES
CONSTRUÇÃO 2011 - NOVAS OPORTUNIDADES E INOVAÇÃOProf. Valadares Tavares
PLANIT VALLEY (PAREDES) SMART & CONNECTED COMMUNITIESLiving PlanIT
INTERNACIONALIZAÇÃO DAS EMPRESAS DE CONSTRUÇÃO PORTUGUESAS ESTRATÉGIAS E DESAFIOSEng. Tiago Martins e Miguel Labrincha / FCT-UNL
INOVAÇÃO NA CONSTRUÇÃOEng. Ricardo Carvalho / DST
Debate Painel
11H30 - PAINEL LEAN CONSTRUCTIONKANBIM PT: SINERGIAS BIM - LEAN EM MOVIMENTOProf. Nuno Cachadinha /FCT-UNL
LEAN JUSTICE - CONSTRUCTION MEDIATIONDra. Maria da Conceição Oliveira
OPORTUNIDADES E DESAFIOS PARA A LEAN CONSTRUCTION EM PORTUGALEng. João Matias e João Martins / FCT-UNL
CLIP, LAST PLANNFlor ER, KPIDoutor António / Rumo ao Objectivo
Debate Painel
15h00 - PAINEL BIM‐BUILDING INFORMATION MODELINGVALOR BIM EM PROJECTO, CONSTRUÇÃO E EXPLORAÇÃOEng. Alvaro Sardinha / TECAD
“ARCHITECTUREOR REVOLUTION”Arq. Levi Dacosta, Arq. Bernardo Vaz Pinto / LisbonDesign Studio
BIM EM AQUECIMENTO, VENTILAÇÃO E AR CONDICIONADOEng. Miguel Ferreira / CERTITERM
IMPLEMENTAÇÃO DE BIM NA REALIDADE DA CONSTRUÇÃO NACIONALEng. Tiago Vasconcelos e Pedro Madeira / FCT-UNL
Debate Painel
17h00 - PAINEL REABILITAÇÃOREABILITAÇÃO: O FUTUROEng. Vitor Cóias / GeCORPA
REABILITAÇÃO E SUSTENTABILIDADE - NOVAS ABORDAGENSDiogo Pereira e Alexandra Rueff / FCT-UNL
REABILITAÇÃO DE CENTROS HISTÓRICOSEng. Catarina Lopes / Eastbanc
RECENTES OBRAS EMBLEMÁTICAS DE REABILITAÇÃO EM PATRIMÓNIO PROTEGIDOEng. Ana Melo / Soares da Costa
Debate Painel
18h30 - EncerramentoSubdirectora para a Inovação e Empreendedorismo da UNL‐FCT
11h00 - NETWORKING / INTERVALO PARA CAFÉ
13h00 - NETWORKING / INTERVALO PARA ALMOÇO (LIVRE)
16h30 - NETWORKING / INTERVALO PARA CAFÉ
KanBIM PT: Sinergias
BIM-Lean em movimento
Nuno CachadinhaFCT-UNL
FCT, 16FEV2011
� Motivação� Conceitos importantes� O KanBIM PT� Como podemos fazer isto acontecer?
“What´s measured, improves” Peter Drucker
Porquê sinergias?Porquê Lean?Porquê BIM?
Alguns conceitos importantes:
� Prioridade� Índice de maturidade� Análise de colisões� Last Planner System
Exit
Look ahead
plan
Weekly Plan
(Control Cards)
�Trade team leader
10
�ConstructionPlanner
�
�
Section / zone managers
�
�
Trade managers
3
Work in
Process
Detailed
Candidate Work
Packages
Master Plan
�ConstructionPlanner
�
�
Section / zone managers
2
�ConstructionPlanner
�
�
Section / zone managers
�
�
Trade managers
�
�
Trade team leaders
9
�Trade manager
�Trade team leader
1
�ConstructionPlanner
�
�
Section / zone managers
4
Material/
Equipment
Kanbans
5
�Logistics Manager
�Trade team leader
Work
Complete ?
7
�Inspector
�SiteEngineers
�Section / zone manager
�Health & Safety
�Health & Safety
8
End
Start
�Client
�User�User
�User
Detailed
Tasks
Work packages Task
s Tas
ksTas
ks
KanBIM – Production Control
Framing West side
Basement 1
Framing for false
ceiling Entrance floor
Lobby
Lintels and ring
beams Basement 1
Complete to
ceiling Basement 1
Partitions
Basement 2
Main ducts –
Ducts 20-31
Main ducts –
Ducts 33-42
Secondary ducts –
Ducts 10a-20a
End Units –
Zone 1
Testing HVAC -
Zone 1
Electrical connection
HVAC end unit zone 1
Main ducts –
Ducts 20-31
Main ducts –
Ducts 53-63
Main ducts –
Ducts 33-42
Secondary ducts –
Ducts 10a-20a
End Units –
Zone 1
Testing HVAC -
Zone 1
Sprinkler pipes
Floor 3
Install main lines
Basement 3 Fire fighting
pump room
Pipe installation in drywalls
West side basement 1
Install main lines
Basement 2 Fire fighting
pump room
Sprinkler pipes
Floor 4
Main distribution board –
Wiring Entrance floor
Lobby
Support installation of
hoist South side
facade
Duct installation in drywalls
West side Basement 1
Electrical connection
HVAC end unit zone 1
Framing West side
Basement 1
Side A West side
Basement 1
Framing East side
Basement 1
Framing for false
ceiling Entrance floor
Lobby
Side A East side
Basement 1
Fix cracks West
side basement 3
W12
Partitions
Basement 1
Lintels and ring
beams Basement 1
Complete to
ceiling Basement 1
Partition walls
Storerooms Basement
3
Close openings above
HVAC Stairwell 2
Basement 1
Partitions
Basement 2Lintels and ring
beams Basement 2
Complete to
ceiling Basement 2
Erect Hollowcore
Floor 5 Grids A1 to D4
Erect Hollowcore
Floor 5 Grids A5 to D8
Prepare and pour topping
Floor 5 Grids A1 to D8
Strip and clean Floor
5 Grids A1 to D8
Erect columns
Floor 6 Grids E5 to
H8
Erect columns
Floor 6 Grids E1 to
H4
Cut HVAC access
holes Floor 4 Grid B3-
C4
Exit
Task List
Floor Plan
Section
���� ����
Stop
Complete
Start
Control
Card
Filters
Side A-
internal
4”
partition
GO�
�
�
Side A-
internal
4”
partition
STOP
Framing-
internal 4”
partition
Side B-
internal
4”
partition
C �
Side B-
internal
4”
partition
1
d
Framing-
internal 4”
partition
2d
Framing-
internal 4”
partition
�
Framing-
internal 4”
partition
0
d
Side A-
internal
4”
partition
1
d
50
%
10
%
85
%
85
%
100
%
70
%
10
%
Control
Card
Stop
Complete
Start
John Smith
Drywalls Team
Exit
Task List
Floor Plan
Section
Task List
Floor Plan
Section
���� ����
Stop
Complete
Start
Control
Card
Filters
Side A-
internal
4”
partition
GO�
�
�
Side A-
internal
4”
partition
STOP
Framing-
internal 4”
partition
Side B-
internal
4”
partition
C �
Side B-
internal
4”
partition
1
d
Framing-
internal 4”
partition
2d
Framing-
internal 4”
partition
�
Framing-
internal 4”
partition
0
d
Side A-
internal
4”
partition
1
d
50
%
10
%
85
%
85
%
100
%
70
%
10
%
Control
Card
Stop
Complete
Start
Status Type Task Location
Framing Internal 4” partition Apartments 24-26
Side A Internal 4” partition Apartments 22-23
Framing Internal 4” partition Apartments 20-21
Side B Internal 4” partition Apartments 18-19
Framing Internal 4” partition Apartments 16-17
Side B Internal 4” partition Apartments 14-15
Side A Internal 4” partition Apartments 12-13
Side A Internal 4” partition Apartments 10-11
Framing Internal 4” partition Apartments 08-09
GO�
�
�
�
1
d0
dC
�
�
�
�STOP
1
d2d
John Smith
Drywalls Team
Exit
Task List
Floor Plan
Section
���� ����
Stop
Complete
Start
Control
Card
Filters
Side A-
internal
4”
partition
GO�
�
�
Side A-
internal
4”
partition
STOP
Framing-
internal 4”
partition
Side B-
internal
4”
partition
C �
Side B-
internal
4”
partition
1
d
Framing-
internal 4”
partition
2d
Framing-
internal 4”
partition
�
Framing-
internal 4”
partition
0
d
Side A-
internal
4”
partition
1
d
50
%
10
%
85
%
85
%
100
%
70
%
10
%
Control
Card
Stop
Complete
Start
John Smith
Drywalls Team
Exit
Task List
Floor Plan
Section
���� ����
Stop
Complete
Start
Control
Card
Filters
Framing-
internal 4”
partition
Side B-
internal
4”
partition
1
d
Framing-
internal 4”
partition
�
Framing-
internal 4”
partition
0
d
Stop
Start
Side A-
internal
4”
partition
1
d
Complete
You chose to report task:
Side B – Internal 4” partition at apartment 18-19
as complete.
Planned duration: 2 days; Actual duration: 1 day
Please report any problems you encountered during execution:
Complete Cancel
Preceding activities not finished
Workspace was not ready
Lack of information
Safety issues
Lack of materials
Equipment was not available
Team issues
No problems
Preceding activities not finished
Workspace was not ready
Lack of information
Safety issues
Lack of materials
Equipment was not available
Team issues
No problems
Side B-
internal
4”
partition
�
Management InstructionManagement Instruction
WeatherWeather
John Smith
Drywalls Team
Exit
Task name
GOTask name
GO
Task name
Task name
Task name
Task name
STOP
Framing
Apartment 24-26
Preceding activities
Workspace
Information
Safety
Materials
Equipment
Team
Task Location Planned Duration Task Maturity Priority
Framing internal 4” partition Level 1 Apartment 24-26 1 day 30%
Close
Last Events
+ Preceding Activities
• Flooring Apartment 25 was stopped
+ Workspace
• Apartment 25 is clear
+ Information
• Changes plan was approved
+ Safety
• Nothing to report
+ Materials
• Rails delivered
• Studs – 30 meters missing
+ Equipment
• Nothing to report
+ Team
• Nothing to report
Task List
Floor Plan
Section
���� ����
Stop
Complete
Start
Control
Card
Filters
John Smith
Drywalls Team
Exit
Framing-
internal 4”
partition
�
You chose to stop task:
Framing – Internal 4” partition at apartment 16-17
Please provide the reason for stopping this task
Stop Cancel
Previous work
Workspace
Missing information Safety issues
Missing materialsUnavailable
Equipment
Team
Select
objects
completed
Design ErrorsDesign Errors
Faulty materials Equipment Fault
Wrong Equipment
Weather
Management
Instruction
Management
Instruction
ID-L-73-1-R2
DW-D-6-R1
E-W-23
A-L-43-R5
Exit
Task name
GOTask name
GO
Task name
Task name
Task name
Task name
STOP
Framing
Apartment 24-26
Task Location Planned Duration Task Maturity Priority
Framing internal 4” partition Level 1 Apartment 24-26 1 day 30%
Preceding activities
Workspace
Information
Safety
Materials
Equipment
Team
Task List
Floor Plan
Section
���� ����
Stop
Complete
Start
Control
Card
Filters
Information
Name Description StatusExpecte
d
Reliabili
tySource
A-L-43-R5Architectural
layout
Approve
dHOK
Interior design
layout
Under
revisionThursday 80%
Barak &
Partners
DW-D-6-
R1
Dry wall detail
sheet #6Available Arup
E-W-23Electrical wiring
diagram
Waiting
approval
Tomorro
w90% Mace
Show DetailsShow Details
ID-L-73-1-R2
Interior design layoutDry wall detail sheet #6
ID-L-73-1-R2A-L-43-R5 DW-D-6-R1 E-W-23
John Smith
Drywalls Team
Close
Exit
Task name
GOTask name
GO
Task name
Task name
Task name
Task name
STOP
Framing
Apartment 24-26
Task Location Planned Duration Task Maturity Priority
Framing internal 4” partition Level 1 Apartment 24-26 1 day 30%
Preceding activities
Workspace
Information
Safety
Materials
Equipment
Team
Task List
Floor Plan
Section
���� ����
Stop
Complete
Start
Control
Card
Filters
Safety
Safety Preconditions Status ExpectedReliabili
ty
Responsibl
e
Safety instruction given
to crewConfirmed
Eduard
Wise
Crew qualified ConfirmedEduard
Wise
Personal safety
equipment availableAvailable
Eduard
Wise
Work zone cleared of
hazardsConfirmed
Eduard
Wise
Fall protection in place ConfirmedEduard
Wise
John Smith
Drywalls Team
Close
Exit
PlannerProject Server
Smart Board
Data View
Smart Board
Model View
Trade 2
Trade 3
Trade 4
Trade 1
Como podemos fazer isto acontecer?
� Boa tecnologia� Parceiros certos� “Fazer-se ao mar”
A melhor forma de termos o futuro que queremos é criá-lo
Obrigado