ACCELERATED BRIDGE REPLACEMENT

Christopher Beck Chief Engineer: Bridge & Structures Northern Indiana Commuter Transportation District 601 North Roeske Avenue Michigan City, IN [email protected]

Page 2: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Accelerated Bridge Replacement (ABR) or Accelerated Bridge Construction(ABC) involves various methods during project planning, design, contracting, and construction to significantly reduce the time to construct or replace a bridge.

Page 3: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Page 4: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Successful ABC requires detailed planning

Page 5: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Planning Steps – Owner’s Objectives Reduce social impact to customers and Neighbors Reduce road closure periods to reduce Traffic impacts & associated economic impact

Page 6: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Planning Steps – Owner’s Objectives Control project costs & keep project on schedule

Page 7: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Planning Steps – Owner’s Objectives Higher product quality & contractor productivity

Page 8: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Planning Steps – Owner’s Objectives Higher product quality & contractor productivity

Page 9: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Detailed Planning Check list for go/no go meeting Detailed outage schedule

Page 10: Accelerated Bridge Construction - Purdue University

11 p.m. Friday

Removal of the West Panel of the Existing Truss

Bridge

12 a.m. Saturday

Lowering of the West End 8 a.m. Saturday

Nearly Complete Demolition

of the Superstructure

4 a.m. Sunday

Setting of the New Precast East Abutment

Cap

12 a.m. Sunday

Demolition of the Existing East Abutment Cap

1 p.m. Sunday

New Bridge Rolled Half Distance

11a.m. Sunday

Trackwork Required

for the Roll in

4 p.m. Sunday

Bridge Rolled into Final Position

7 p.m. Sunday

NICTD Train Crossing

the New Structure

Start - Roll in Mobilization at 3 a.m. Friday, November 3, 2000

Finished - Railroad Opens for Normal Operation 7 p.m. Sunday, November 5, 2000

NICTD “Rapid Insertion” Bridge Replacement

Page 11: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Site Constraints – Construction Easements Right-of-Way Utilities Wetlands

Page 12: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Site Constraints – Utilities Temporary or Permanent Relocations

Page 13: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Site Constraints –Local Ordinances & Permits

Page 14: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Constructability/Design – Meet with contractors to develop potential ABC techniques Allow ABC techniques to be flexible in project specifications

Recommended Construction Sequence

Roll-In

Page 15: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Constructability/Design – Meet with contractors to develop potential ABC techniques Allow ABC techniques to be flexible in project specifications

Page 16: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Constructability/Design – Transportation routes for bridge components and equipment to site.

Industrial Steel Construction (ISC)

Project Site

Page 17: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Constructability/Design – Transportation routes for bridge components and equipment to site.

Page 18: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Constructability/Design – Transportation routes for bridge components and equipment to site. 11’-9”

Page 19: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Constructability/Design – Transportation routes for bridge components and equipment to site.

Northbound on Clark

Road

Eastbound on Rte 12/20 through Gary, IN

Page 20: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Constructability/Design – Transportation routes for bridge components and equipment to site.

Crossing NICTD at Gary

Airport Station

14’ - 2” vs 11’

- 9”

Page 21: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Constructability/Design – Transportation routes for bridge components and equipment to site.

“What the

_________?”

Page 22: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Material Procurement

Page 23: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Geotechnical Solutions Soil bearing capacity for heavy lifts

Site Stabilization for High Capacity Crane

Page 24: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Geotechnical Solutions Foundations & Walls

Page 25: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Geotechnical Solutions Advance Pile Driving

Page 26: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Abutment Solutions Tie Back Anchors

Page 27: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Abutment Solutions Abutment Sawcutting

Page 28: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Abutment Solutions Abutment Modifications

Beam Seat Extension for New Span

Beam Seat Extension for New Span

Page 29: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Prefab Bridge Elements & Systems Abutment Caps

Page 30: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Prefab Bridge Elements & Systems Abutment Caps

Precast Bridge Seat Loading

Page 31: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Prefab Bridge Elements & Systems Abutment Caps

Page 32: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Prefab Bridge Elements & Systems Deck Panels: concrete & steel

Page 33: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Prefab Bridge Elements & Systems Bridge Superstructure

Page 34: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement Skidding (roll-in)

Page 35: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement Skidding (roll-in)

Page 36: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement SPMT – self propelled modular transports

(27’- 6” )

(5’ +/- 1’)

(2’- 3 1/2” ) (5 x 4 ’- 7” =

23’ ) ELEVATION

PLAN

Page 37: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement SPMT – self propelled modular transports

Page 38: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement SPMT – self propelled modular transports

Page 39: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement SPMT – self propelled modular transports

Bridge Jacking – Final Stages

Page 40: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement Heavy Lifts

Page 41: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement Heavy Lifts

Page 42: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement Heavy Lifts

Page 43: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Components of ABC – Structural Placement Heavy Lifts

Page 44: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Benefits of ABC – reduce construction time improved safety improved productivity improved community relationships improved construction quality improved construction costs

Page 45: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Future of ABC: According to FHWA 40% of bridges were built over 40 years ago with a 50 year design life - 25% require rehabilitation, repair or replacement

Page 46: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Future of ABC: Increased awareness on motorist delay and environmental impact

Page 47: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Future of ABC: General public is more demanding and public officials are taking notice

Page 48: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Lessons Learned: Don’t be afraid to think outside the box Team Composition – involve contractors with ABC experience during design process Plan for unexpected problems Have extra equipment on standby

Page 49: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Upcoming NICTD ABC Projects August 5, 2012 – 400’ double track truss span using SPMT’s NICTD bridge over Torrence Avenue, Chicago 2013 – roll-in 65’ thru-girder span over Trail Creek, Michigan City build new abutments behind existing

Page 50: Accelerated Bridge Construction - Purdue University

ACCELERATED BRIDGE REPLACEMENT

Thank you