accenture - all dms-pms input forms merged

Upload: surya-sudheer-meduri

Post on 04-Jun-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    1/40

    S.No. PAGE No.

    1 CONDITIONS PRECEDENT OF AUTHORITY 1

    2 LA1 2

    3 LA2 3,4

    4 FOREST CLEARANCE 55 ENVIRONMENT CLEARANCE 6

    6 WILDLIFE CLEARANCE 7,8

    7 ROB-RUB 9

    8 RoW- Article 10 10

    9 CONDITIONS PRECEDENT OF CONCESSIONAIRE 11

    10 APPLICABLE PERMITS AS PER CONDITIONS PRECEDENT 12

    11 REPRESENTATION AND WARRANTIES 13, 14

    12 LEGAL OPINION BY CONCESSIONAIRE 1513 APPOINTMENT OF INDEPENDENT ENGINEER 16

    14 MONITORING OF CONSTRUCTION 17, 18

    15 APPOINT SAFETY CONSULTANT 19

    16 PERFORMANCE SECURITY 20

    17 FINANCIAL CLOSURE 21, 22

    18 CHANGE IN OWNERSHIP 23

    19 ESCROW ACCOUNT 24

    20 PAY DAMAGES TO AUTHORITY 25

    21 SUBSTITUTION AGREEMENTS 26

    INDEX

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    2/40

    21 SUBSTITUTION AGREEMENTS 26

    Conditions Precedent of Authority1. Provided to the Concessionaire the Right of Way to the Site

    a. Post completion of PPPAC Approval process for Land Acquisition

    b. Land Acquisition

    2. Issued the Fee Notification

    3. Provided for the Concessionaire the Right of Way to ****

    4. Procured approval of Railway Authorities to construct road over bridges / under bridges at level crossings

    a. ROB/RUB Clearance, alongside approval for GADs for them5. Procured all Applicable Permits relating to environmental protection and conservation of the site

    a. Applicable Permits

    b. Forest clearance

    c. Environment clearance

    d. Wildlife clearance

    Conditions Precedent of Concessionaire

    1. Provided Performance Security to the Authority

    2. Executed and procured execution of the Escrow Agreement;

    3. Executed and procured execution of the Substitution Agreement;

    4. Procured all the Applicable Permits specified in Schedule-E unconditionally or if subject to conditions, then all such conditions shall have been satisfied in full and such Applicable Permits are in full force

    and effect;

    a. Conditions Precedent Obligations of Concessionaire

    5. Executed the Financing Agreements and delivered to the Authority 3 (three) true copies thereof, duly attested by a Director of the Concessionaire;

    7. Delivered to the Authority 3 (three) true copies of the Financial Package and the Financial Model, duly attested by a Director of the Concessionaire, along with 3 (three) soft copies of the Financial Model

    in MS Excel version or any substitute there

    8. Delivered to the Authority from {the Consortium Members, their respective} confirmation, in original, of the correctness of their representations and warranties setforth in Sub clauses (k), (l) and (m) of

    clause 7.1 of this Agreement; and

    9. Delivered to the Authority a legal opinion from the legal counsel of the Concessionaire with respect to the authority of the Concessionaire to enter into this Agreement and the enforceability of the

    provisions thereof

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    3/40

    Sl. No. Clause of Concess ion Agreement Descr iption Before submiss ion of proposal to

    PPPAC

    Before issue of RF P Before issue of LOA Before gi ving A ppointed Date

    1 4.1.2 (a) Availability of land Existing ROW + 3D of 60% land to

    be acquired

    + 3A of 90% land to be acquired

    Existing ROW + 3D of 80%

    land to be acquired

    Existing ROW + 3D of 80%

    land to be acquired

    Existing ROW + 3D of 90% land to be acquired and at least

    80% front of 30 Mtr for two lane paved shoulders, 45 Mtr

    for four laning and 60Mtr for six laning projects should be

    available

    Requirement Status Date Action taken and Action by Remarks/Issues

    Existing ROW + 3D of 60% land to be acquired+ 3A of

    90% land to be acquired

    Existing ROW + 3D of 80% land to be acquired

    Existing ROW + 3D of 90% land to be acquired and at

    least 80% front of 30 Mtr for two lane paved shoulders,

    45 Mtr for four laning and 60Mtr for six laning projects

    made available

    PPPAC Approval: Compliance to Condition Precedent

    Input Form LA 1

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    4/40

    Sl. No. Clause of Concession

    Agreement

    Description Before submission of

    proposal to PPPAC

    Before issue of RFP Before issue of LOA Before giving Appointed Date

    1 4.1.2 (a) Availability of land Existing ROW + 3D of 60%

    land to be acquired

    + 3A of 90% land to be

    acquired

    Existing ROW + 3D of 80%

    land to be acquired

    Existing ROW + 3D of 80% land to be

    acquired

    Existing ROW + 3D of 90% land to

    be acquired and at least 80% front

    of 30 Mtr for two lane paved

    shoulders, 45 Mtr for four laning

    and 60Mtr for six laning projects

    should be available

    From To

    1 2 3 4 5 6 7 8

    NHDP Phase Total Land required (in Hec) No. of villages in the ent ire

    stretch of Land to be acquired

    Land already in Possession Total additional land to be

    acquired (Hec)

    Length available for road

    development up to

    3A (Hec) 3D (Hec)

    9 10 11 12 13 14 15 16

    3G (Hec) Possession (Hec) 3A (Hec) 3D (Hec) 3G (Hec) Possession (Hec) Total length of critical stretches, if

    any, as per clause of 4.1.2 of MCA

    (km)

    Length of critical stretch

    available for construction

    (km)

    17 18 19 20 21 22 22A 22B

    23 24 25 26 27 28 28A 28B

    Pr iv at e L and (in Ha ct .) Go vt . L and (in Ha ct .) St re tc h c ov er ed (c ha in ag e) Da te of subm is sion of 3A

    proposal by DPR consultant

    Date of submission of 3A

    proposal to Authority's HQ

    Name(s) of villages covered in the 3A

    proposal

    3A Gazette Notification No. vide

    which the land mentioned was

    acquired

    Date of 3A Gazette

    Notification No.

    29 30 31 32 33 34 35 36

    Pr iv at e L and (in Ha ct .) Go vt . L and (in Ha ct .) St re tc h c ov er ed (c ha in ag e) Da te of subm is sion of re la te d

    3D proposal at Authority's

    HQ

    3D Notification No. vide

    which the land mentioned

    was acquired

    Date of publication of 3D

    notification No.

    Type of land Area of Land with Central

    Govt. (3D Notified) but not

    utilized (in ha)

    37 38 39 40 41 42 43 44

    PPPAC Approval: Compliance to Condition Precedent

    Chainage (in Kms.)

    % 3D completed (current 3D

    notified/total additional land

    to be acquired)

    Length available for road

    development upto end of previous

    month, (year)

    Length where entire width of ROW

    is available for Construction(km)

    Length where minimum

    required width

    (30m/45m/60m as applicable

    for 2-laning/4-laning/6-

    laning) of ROW is available

    for construction (km)

    Cumulative progress up to

    Cumulative progress up to

    Pending LA works (in Hec)

    Sl. No. Project PIU No. NH No. Stretch Length (in km)

    FORM FOR LAND ACQUISITION

    % of total land vested with

    NHAI (already in possession +

    3D notified)/Total land

    required

    % of total Land in Possession

    (Land already in possession +

    current possession

    made)/Total land required

    % of additional land in

    possession (current possession

    made/total additional land to be

    acquired)

    % 3A completed (current 3A

    notified/total additional land

    to be acquired)

    3D Particulars

    3A Particulars

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    5/40

    Reason why 3D notified land

    has not been utilized (change

    in alignment/excess land

    acquired/ mistake in

    acquisition, etc., (please

    specify)

    Date of actual possession of

    land for area notified under

    3D

    45 46 47 48 49 50 51

    From To Name of

    Tehsil/Village/District

    Stretch covered (chainage) Area of land acquired by NHAI (Ha) Area of land mutated in the name

    of NHAI (Ha)

    Area of land remaining to be

    mutated in favour of NHAI

    (Ha)

    52 53 54 55 56 57 58 59

    Designated State Authority

    responsible for mutation

    Reason for not mutating the

    area of land and action taken

    by NHAI

    Remarks on mut ation St retch of Highway

    (chainage) where

    encumbrance

    free land is not available

    Area of unavailable land (in

    ha.) in encumbrance

    Area of land under encumbrance as a

    % of total area (existing ROW +

    additional land as per proposed

    ROW)

    Reasons in brief for unavailability

    of encumbrance free land in the

    stretch

    Concerned officer who may

    resolve the issue

    60 61 62 63 64 65 66 67

    Fronts available for work

    (Total, in Km.)

    % of total length available for

    work (Length with available

    Fronts for work / Total

    project length)

    No. of days by which handing

    over is delayed w.r.t. appointed

    date

    TPC as per DPR Estimate for LA as per DPR

    (in Rs.)

    Value of Award approved by RO/HO Date of Approval by RO/HO Date of Deposition of Award

    Amount with CALA

    68 69 70 71 72 73 74 75

    Amount disbursed by CALA (in

    Rs.)

    Date of disbursement of

    compensation by CALA

    Status of disbursement of

    compensation by CALA

    Amount of cheque in Rs. Date of encashment of

    Cheque by Beneficiary

    Actual Land acquisition cost per ha.

    76 77 78 79 80 81

    82 83 84

    Pending with whom (Concerned

    officer the State / Central Govt.)

    Stretch affected (chainage) NH No. affected

    Date of award under section 3G

    for related 3D notification

    Status of valuation of

    structures

    Summary of issues impeding

    land acquisition for the

    project

    Date pending since (of issues)3D Particulars

    Tehsil/Village/District Wise Mutation Details

    Date of issue of LOA Appointed date Overall Remarks (if any)

    Tehsil/Village/District Wise Mutation Details Encumbrance

    Encumbrance Compensation Status for Land Acquisition

    Compensation Status for Land Acquisition

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    6/40

    Project name

    / ID

    NH No. Length Stretch State PIU Scheduled Start

    date

    Scheduled End

    date

    Whether

    requirement of

    additional land is

    more than 40m on

    existing alignment

    and 60m on new

    alignments /

    bypass ?

    Whether

    Environmental

    Clearance required

    ? [Not required if

    length is less than

    100km, or answer

    to column 9 is No]

    If environmental

    clearance required,

    fill details in

    relevant format

    Whether Forest

    Clearance required

    ? [If yes, fill details

    in the relevant

    format]

    Whether Wildlife

    clearance required

    ? [If yes, fill details

    in the relevant

    format]

    1 2 3 4 5 6 7 8 9 10 11 12 13

    Total length Total Forest area

    to be diverted (in

    ha )

    Total Length

    affected

    Forest Division and

    forest Circle

    involved

    Forest area to be

    diverted (in ha )

    in the Division

    Length affected in

    the Division

    Date of finalization

    of proposal by the

    DPR Consultant

    Date of registration

    with the Nodal

    Officer

    Date of submission

    of Diversion

    proposal to DFO

    Date of receipt of

    observations from

    DFO

    Date of sending

    replies / modified

    proposal to DFO

    Name of the Forest

    Circle involved

    14 15 16 17 18 19 20 21 22 23 24 25

    Date of

    forwarding

    the proposal

    to CF/CCF

    (officer in

    charge of the

    circle)

    Date of receipt of

    observations from

    the Circle office

    Date of sending

    replies / modified

    proposal to Circle

    office

    Date of forwarding

    the proposal to

    PCCF

    Date of receipt of

    observations from

    PCCF

    Date of sending

    replies / modified

    proposal to PCCF

    Date of forwarding

    the proposal to

    Nodal Officer

    Date of receipt of

    observations from

    Nodal Officer

    Date of sending

    replies / modified

    proposal to Nodal

    Officer

    Date of forwarding

    the proposal to

    State Government

    Date of receipt of

    observations from

    State Government

    Date of sending

    replies / modified

    proposal to State

    government

    26 27 28 29 30 31 32 33 34 35 36 37

    NPV CA and other

    amount

    38 39 40 41 42 43 44 45 46 47 48 49 50

    No. of trees

    to be cut

    Trees enumerated Length on which

    enumeration done

    Trees cut Length cleared in

    relation to affected

    length

    No. of trees to be

    cut

    Trees enumerated Length on which

    enumeration done

    Trees cut Length cleared in

    relation to affected

    length

    51 52 53 54 55 56 57 58 59 60 61 62

    Status of Grant ofStage-II clearance

    by MoEF

    Date of Depositingthe amount in

    CAMPA fund

    Status of Enumeration

    Expenditure on

    tree cuttingStatus of tree cutting In Diverted Area

    Status of tree cutting In Non-forest area

    Forest Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)

    Date of handingover of diverted

    forest land

    Fixed Fields

    Order of StateGovt.

    Remarks

    Date offorwarding

    the proposal

    to MoEF

    Compliance ofconditions laid

    down in Stage- I

    Status of inprinciple approval

    Date ofconsideration of

    proposal by MoEF

    Date of sendingreplies / modified

    proposal to MoEF

    Date of receipt ofobservations from

    MoEF

    Amount to be deposited as perclearance conditions

    Status of tree cutting In Diverted Area

    Status of Enumeration Status of tree cutting In Diverted Area

    Date of Forwardingof compliance by

    the State Govt. to

    MoEF

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    7/40

    Fixed Fields

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date

    1 2 3 4 5 6 7 8

    Whether requirement of

    additional land is more

    than 40m on existing

    alignment and 60m on new

    alignments / bypass

    Whether Environmental

    Clearance required ? [Not

    required if length is less than

    100km, or answer to column 9 is

    No]

    If environmental clearance

    required, fill details in

    relevant format

    Whether Forest Clearance

    required ? [If yes, fill

    details in the relevant

    format]

    Whether Wildlife clearance

    required ? [If yes, fill

    details in the relevant

    format]

    9 10 11 12 13

    Date of submission of draft

    TOR by Consultant

    If yes, Submission of TOR to MoEF Date of approval of TOR by

    MoEF

    Submission of draft EIA to

    SPCB for conducting public

    hearing

    Date of pubic hearing Whether CRZ clearance

    required ?

    If yes, Date of submission

    of proposal to CZMA

    Date of approval of CZMA

    14 15 16 17 18 19 20 21

    Date of submission of all

    documents required for

    clearance by the consultant

    Date of submission of EIA to

    MoEF

    Date of consideration of

    Project by MoEF

    Date and number of MoEF

    approval latter

    Date of submission of

    application for NOC of PCB

    by consultant

    Date and number of NOC

    by PCB

    Remarks

    22 23 24 25 26 27 28

    Fixed Fields

    Environment Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    8/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start

    date

    Scheduled End

    date

    Whether

    requirement of

    additional land is

    more than 40m on

    existing alignment

    and 60m on new

    alignments /

    bypass

    Whether

    Environmental

    Clearance

    required ? [Not

    required if length

    is less than

    100km, or answer

    to column 9 is No]

    If environmental

    clearance

    required, fill

    details in relevant

    format

    Whether Forest

    Clearance

    required ? [If yes,

    fill details in the

    relevant format]

    Whether Wildlife

    clearance required

    ? [If yes, fill

    details in the

    relevant format]

    1 2 3 4 5 6 7 8 9 10 11 12 13

    State Govt. MOEF

    14 15 16 17 18 19 20 21 22 23 24 25 26

    Date of Order of

    Honble Supreme

    Court.

    Date of

    registration with

    the Nodal Officer

    Date of

    submission of

    Diversion proposal

    to DFO

    Date of receipt of

    observations from

    DFO

    Date of sending

    replies / modified

    proposal to DFO

    Name of the

    Forest Circle

    involved

    Date of

    forwarding the

    proposal to

    CF/CCF (officer in

    charge of the

    circle)

    Date of receipt of

    observations from

    the Circle office

    Date of sending

    replies / modified

    proposal to Circle

    office

    Date of

    forwarding the

    proposal to PCCF

    Date of receipt of

    observations from

    PCCF

    Date of sending

    replies / modified

    proposal to PCCF

    Date of

    forwarding the

    proposal to Nodal

    Officer

    27 28 29 30 31 32 33 34 35 36 37 38 39

    NPV CA and other

    amount

    40 41 42 43 44 45 46 47 48 49 50 51 52

    No. of trees to be

    cut

    Trees enumerated Length on which

    enumeration done

    Trees cut Length cleared in

    relation to

    affected length

    53 54 55 56 57 58 59 60 61 62

    Date of filing

    Application to

    Honble Supreme

    Court

    Length Affected in

    the Division /

    wildlife area

    Date of

    submission of

    proposal to DFO /

    Wildlife Warden

    Date of

    consideration of

    proposal by SBWL

    Date of

    consideration of

    proposal by

    NBWL

    Date of

    conveyance of

    decision of MoEF

    to State Govt

    Total length Total Wi ld li fe area

    to be diverted (in

    ha)

    Total Length

    Affected

    Name of Wild Life

    Area and Division

    Wildlife area to be

    diverted (in ha) in

    the Division /

    wildlife area

    Status of Enumeration Status of tree cutting In Diverted Area

    Date of handing

    over of diverted

    forest land

    Order of State

    Govt.

    Status of Grant of

    Stage-II clearance

    by MoEF

    Date of

    Forwarding of

    compliance by the

    State Govt. to

    MoEF

    Date of Depositing

    the amount in

    CAMPA fund

    Date of receipt of

    observations from

    State Government

    Date of sending

    replies / modified

    proposal to State

    government

    Wildlife Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)

    Date of forwarding the proposal to

    Status of tree cutting In Diverted Area

    Fixed Fields

    Date of sending

    replies / modified

    proposal to MoEF

    Amount to be deposited as per

    clearance conditions

    Date of

    consideration of

    proposal by MoEF

    Status of in

    principle approval

    Compliance of

    conditions laid

    down in Stage- I

    Date of

    forwarding the

    proposal to MoEF

    Date of receipt of

    observations from

    MoEF

    Date of receipt of

    observations from

    Nodal Officer

    Date of sending

    replies / modified

    proposal to Nodal

    Officer

    Date of

    forwarding the

    proposal to State

    Government

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    9/40

    No. of trees to be

    cut

    Trees enumerated Length on which

    enumeration done

    Trees cut Length cleared in

    relation to

    affected length

    63 64 65 66 67 68 69

    Status of tree cutting In Non-forest area

    Status of Enumeration Status of tree cutting In Diverted Area RemarksExpenditure on

    tree cutting

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    10/40

    From To

    1 2 3 4 5 6 7 8 9 10 11 12 13

    Date of

    application on

    charges deposition

    Observati ons Reply to Rai lway Approval for

    Deposition

    Date of Deposition

    by NHAI

    14 15 16 17 18 19 20 21 22 23

    GAD prepared by

    Consultant Yes/

    No

    Date of

    Submission to

    Railway

    Observation raised

    by Railway

    Reply by NHAI Date of approval

    by Railway

    Date of approval

    of GAD as per

    Concessionaire

    Agreement

    Whether Railway

    approved GAD

    within 90 days

    from submission

    D&D prepared by

    Concessionaire

    Yes/ No

    Date of

    Submission to

    Railway

    Observation raised

    by Railway

    24 25 26 27 28 29 30 31 32 33 34

    TAD prepared by

    Concessionaire

    Yes/ No

    Date of

    Submission to

    Railway

    Observation raised

    by Railway

    Reply by NHAI Date of approval

    by Railway

    Date of

    application

    Date of approval

    by Railway

    Traffic Plan

    prepared by

    Concessionaire

    Observation raised

    by Railway

    Reply by NHAI Date of approval

    by Railway

    35 36 37 38 39 40 41 42 43 44 45

    Level crossing

    shifting plan

    prepared by

    Concessionaire

    Yes No

    Date of Submision

    to Railway

    Observation raised

    by Railway

    Reply by NHAI Date of approval

    by Railway

    Utility shifting

    plan prepared by

    Concessionaire

    Date of Submision

    to Railway

    Observation raised

    by Railway

    Status of Utility

    shifting

    46 47 48 49 50 51 52 53 54 55 56 57

    TAD CRS

    Design and DrawingGAD

    Traffic Block

    Status of approval at Railways

    Level Crossing Utility shifting

    Progress % Likely date of

    completion

    Detailed RemarksStatus of approval at Railways

    Chainge NH km ROB/RUB ID No.

    RAILWAY OVER BRIDGE / RAILWAY UNDER BRIDGES. No. Name of Project PIU NH. No NH Section NHDP Phase State of Project Description of

    ROB/RUB

    Zonal Rai lway Year of Sanction

    Status of approval at Railways At RFP, whether

    GAD approved or

    not (Yes/No)

    Deposition of codal charges to Railway(P&E, D&G, Maintenance and other)Project Status

    (Awarded/

    Progress)

    RLY Div. RLY KM LC NO. RLY Block

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    11/40

    From To From To From To

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    From To

    20 21 22 23 24 25 26 27 Chainage

    From To

    28 29 30 31 32 33 34 35 36

    From To From To From To

    37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57

    From To

    58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74

    Remarks

    No. of bus

    bays on

    LHS

    No. of

    bus bays

    on RHS

    bus bays

    not free

    from

    encumber

    ance

    cumulative

    no. of bus

    bays

    handed

    over after

    AD

    No. of

    Truck lay-

    byes on

    LHS

    No. of

    Truck lay-

    byes on

    RHS

    Whether

    handed

    over on AD

    If not, date

    of handing

    over

    75 76 77 78 79 80 81 82 83

    Input Fields Format for Right of Way - Article 10 of MCA

    Land handed over to concessionnaire after AD (cumulative) Any encumberance

    reported by

    concessionnaire on

    handed over stretch

    S. No. S. No. Chainage (in Km) Area Total ROW (in

    m)

    S. No. Chainage (in Km) Area Total ROW (in m)

    Appointe

    d Date

    Date of

    joint

    inspectio

    n

    (chainage

    wise)

    Unencumbered Land at the time of Appointed Date

    Additional Land Required for 6 laning

    S. No. Type of

    Structure

    Width (in

    m)

    Whether

    handed

    over on AD

    If not, date

    of handing

    over

    Chainage (in Km)Grade Separators

    S. No. Additional

    ROW

    required

    Additional

    area

    required

    S. No. Area

    handed

    over

    Chainage Date of handing

    over

    No. of Box

    Culverts

    Type of

    Structure

    Width (in

    m)

    Whether

    handed

    over on AD

    If not, date

    of handing

    over

    No. of major

    bridges

    Bus Bays and Truck Lay Byes

    No. of ROBs No. of Grade

    Separators

    No. of Minor

    Bridges

    No. of

    Vehicular and

    Non Vehicular

    Underpasses

    Whether

    handed

    over on AD

    If not, date of

    handing over

    Total

    ROW (in

    m)

    Extent of

    critical

    stretch

    handed

    over

    Date of

    reporting

    Chainaage-

    wise brief of

    report

    Major Bridges Railway Over BridgesIf not, date

    of handing

    over

    S. No. Chainage (in Km) Type of

    Structure

    Width (in

    m)

    S. No. Chainage (in Km) Type of

    Structure

    Minor Bridges Total No. of Structures on the Site

    S. No. Chain age ( in Km )

    Details of required land

    S. No. Chainage (in Km) Area

    Width (in m) Whether

    handed

    over on

    AD

    No. of Pipe

    Culverts

    No. of Slab

    Culverts

    Structures

    not free

    from

    encumbera

    nce

    Cumulative no. of

    structures handed

    over after AD

    Scheduled Date of 6 laning:

    Detalis of handing over

    Land not free from encumberance at the time of Appointed DateTotal land required for the project

    Chainage (in Km) Area Total ROW

    (in m)

    Reason for

    encumbera

    nce

    Is the

    encumbera

    nce critical

    ?

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    12/40

    Date of

    submission

    Date of

    acceptance

    by NHAI

    Date of

    submission

    of draft

    Escrow

    Agreement

    Date of

    acceptance

    by NHAI

    Date of

    submission

    of Executed

    Agreement

    Date of signing

    of Agreement

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

    Date of

    submissio

    n of draft

    Substitutio

    n

    Agreemen

    t

    Date of

    acceptance

    Date of

    submission of

    Executed

    Agreement

    Date of signing

    of Agreement

    Date of

    submissi

    on of

    draft

    Financing

    Agreeme

    nt

    Date of

    acceptance by

    NHAI

    Date of issue

    of sanction

    letter by

    lender/

    Bank.

    Date of approval

    by NHAI

    Date of

    Submission of

    executed

    Financing

    Agreement

    Date of

    submission of

    draft Financial

    Package &

    model

    Date of

    acceptance

    Date of

    submission

    of Financial

    Package &

    model

    Date of

    submission

    Date of

    acceptance

    Date of

    submission

    Date of

    acceptance

    16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    Date of

    permission

    granted by

    the

    concerned

    authority

    Date of

    intimation to

    NHAI by the

    Concessionai

    re

    If waived

    (yes/no)

    Date of

    permission

    granted by the

    concerned

    authority

    Date of

    intimatio

    n to

    NHAI by

    the

    Concessi

    If waived

    (yes/no)

    Date of

    permission

    granted by

    the

    concerned

    authority

    Date of

    intimation to

    NHAI by the

    Concessionaire

    If waived

    (yes/no)

    Date of

    permission

    granted by the

    concerned

    authority

    Date of

    intimation

    to NHAI by

    the

    Concession

    aire

    If waived

    (yes/no)

    Date of

    permission

    granted by

    the

    concerned

    authority

    Date of

    intimation

    to NHAI by

    the

    Concessiona

    ire

    If waived

    (yes/no)

    32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

    Date of

    permission

    granted by

    the

    concerned

    authority

    Date of

    intimation to

    NHAI by the

    Concessionai

    re

    If waived

    (yes/no)

    Date of

    permission

    granted by the

    concerned

    authority

    Date of

    intimatio

    n to

    NHAI by

    the

    Concessi

    If waived

    (yes/no)

    Date of

    permission

    granted by

    the

    concerned

    authority

    Date of

    intimation to

    NHAI by the

    Concessionaire

    If waived

    (yes/no)

    Date of

    permission

    granted by the

    concerned

    authority

    Date of

    intimation

    to NHAI by

    the

    Concession

    aire

    If waived

    (yes/no)

    Date of

    permission

    granted by

    the

    concerned

    authority

    Date of

    intimation

    to NHAI by

    the

    Concessiona

    ire

    If waived

    (yes/no)

    47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63

    Remarks

    Clearance of PCB for setting up Batching Clearance of Village Panchayats and PCB for Permission of Village Panchayat and State Permission of State Govt. for cutting of Any other permits or clearances required

    Applicable Permits (clause 4.1.3 (d) and Schedule E Appointed

    Date

    Applicable Permits (clause 4.1.3 (d) and Schedule E

    Permission for extraction of boulders; Permission of Village Panchayat & PCB for

    installation of crushers;

    License for use of explosives; Permission for drawing water from

    river/reservoir;

    License for setting up Batching Plant;

    (c) Submission of executed Substitution Agreement (e) Submission of executed Financing Agreements (f) Submission of Financial Package &

    Model

    (g) Submission from

    Consort. Members for

    correctness of

    representations and

    (h) Submission of legal

    opinion from the legal

    counsel

    Post Award Monitoring of PPP Projects

    Condition Precedent of Concessionaire before Appointed DateS l. No . N am e of t he

    Project

    Project Stretch NH No. State Name of

    Concessionaire

    Date of

    Award

    Date of Signing

    of CA

    Due Date for

    Fulfillment of

    Condition

    Precedent

    (a) Performance Security

    (Cl. 4.1.3 (a) & Cl 9.1)

    (b) Submission of executed Escrow Agreement

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    13/40

    Project name /

    IDNH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Sl. No. Approval Required for Approval Type Date Status/ Remarks

    A State Government Permits/ Quarrying Permits:

    1Permits for extraction of boulder from quarry from Additional District

    Magistrate (ADM) Mines

    2Permit for installation of crusher from village Panchayat and

    State/Central Pollution Control Board

    3 License for explosives from the office of Explosive controller

    4 E xp losi ve li cense f or st or ing d iese l

    B Electricity:

    1Permission required from State Electricity Board (SEB) for installation of

    Diesel Generator (DG)

    2 Permission for electrical connection, if power source is available

    C Water:

    1If water has to be taken from river/ reservoir, permission to be

    obtained from State Irrigation Department

    D Batching Plant:

    1 L icense from inspecti on of fact or ies

    2NOC consent/Clearance required from village panchayat &

    State/Central Pollution Control Board/Dept.

    E Asphalt Plant:

    1Clearance required from village panchayat & State/Central Pollution

    Control Board

    F Borrow Earth:

    1 Permission from irrigation department if land taken from irrigation land

    2Permission required from village panchayat and ADM mines for

    Government & private land

    3 Permission from Local Municipalities and Development Authorities

    G Cutting of trees and other environment clearances:

    1 Permission from Forest Department and other applicable agencies

    H S ewag e L ine s a nd Wa te r Ma in s:

    1 Permission from Local Municipalities and Development Authorities

    APPLICABLE PERMITS AS PER CONDITIONS PRECEDENT OF CONCESSIONAIRE - Clause 4.1.3 (e) and Schedule E of Model Concession Agreement (MCA)Fixed Fields

    Applicable Permits

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    14/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of

    Concessionaire

    Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Item type &

    Description

    Total No. to be

    shifted

    Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Expected s hifting

    date

    Cumulative Present Status

    1 2 3 4 5 6 7 8 9 10 11

    Item type &

    Descri tion

    Total No. to be

    shifted

    Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Expected s hifting

    date

    Cumulative Present Status

    1 2 3 4 5 6 7 8 9 10 11

    Item type &

    Description

    Total No. to be

    shifted

    Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Expected s hifting

    date

    Cumulative Present Status

    1 2 3 4 5 6 7 8 9 10 11

    Item type &

    Description

    Total No. to be

    shifted

    Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Expected s hifting

    date

    Cumulative Present Status

    1 2 3 4 5 6 7 8 9 10 11

    12 13 14 15 16 17 18 19 20 21 22

    From (km) To (km)

    23 24 25 26 27 28

    UTILITY SHIFTING

    Division Date of work order

    from concerned

    Dept.

    Amount of Estimate

    I/c S.C./ S. Tax

    as received from

    Dept. (lacs)

    Approved Amount of

    estimate by NHAI

    I/c S.C./S. Tax

    (lacs)

    Supervision Charges

    / S.Tax (Rs.)

    Approved vide letter

    no. & date by HO/RO

    Date of Deposition

    of S.C./ S. Tax

    Division Wise Particulars of Utility Shifting Estimates (Electrical / Water supply) (Within 3 months of signing Concessionaire Agreement)

    Date of Handing over work order to

    I) Status of shifting of Electric Lines (Nos.)

    Fixed Fields

    II) Status of shifting of Water Supply Pipelines (Kms.)

    III) Status of shifting of Irrigation/ Structures (Nos.)

    Date of Start of

    Work

    Status of Work Date of Completion Remarks

    IV) Status of Shifting of Other Utilities (Kms. / Nos.)

    S. No. Name of work Received from Letter no. & Date

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    15/40

    1 2 3 4 5 6 7 8 9 10

    Proprietary rights

    required

    Date of submission of

    application(s) for

    rights

    Date of acquiring

    Proprietary rights

    Concerned Govt. Dept.

    / official involved

    Current Status Agreements required Date of submi ssion of

    application(s) for

    Agreements

    Date of acquiring

    Agreements

    Concerned Govt. Dept.

    / official involved

    Current Status

    11 12 13 14 15 16 17 18 19 20

    Licenses required Date of submission of

    application(s) for

    licenses

    Date of acquiring

    Licenses

    Concerned Govt. Dept.

    / official involved

    Current Status P ermi ssions requi red Date of submi ssion of

    application(s) for

    Permissions

    Date of acquiring

    Permits

    Concerned Govt. Dept.

    / official involved

    Current Status

    21 22 23 24 25 26 27 28 29 30

    Agreements

    Licenses Permissions

    PIU Scheduled Start date Scheduled End date Name of

    Concessionaire

    Date of agreement

    Proprietary rights

    Proprietary Rights, Licenses, Agreements and P ermissions related transactional fields

    Fixed Fields

    Proprietary Rights, Licenses, Agreements and P ermissions related transactional fields

    Obligations (Concessionaire) - Article 5.1.4 (b) of Model Concession Agreement

    Form for Proprietary Rights, Licenses, Agreements and Permissions

    Project name / ID NH No. Length Stretch State

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    16/40

    Project name / ID NH No. Length Stretch State PIU Scheduled

    Start date

    Scheduled End

    date

    Name of

    Concessionaire

    Date of

    agreement

    1 2 3 4 5 6 7 8 9 10

    Clause Sub clause Key Action Point Action Responsibility Date of Submission Date of

    Acceptance by

    NHAI7.1 1 The concessionaire represents and warrants to Authority that Concessionaire

    a It is duly organized and validly existing under the laws of India and has full power

    and authority to execute and perform its obligations

    Concessionaire

    b It has taken all necessary corporate and other actions under applicable laws to

    authorize the execution and delivery of this agreement.

    Concessionaire

    c It has financial standing and the capacity to undertake the project in accordance

    with the terms of this agreement

    Concessionaire

    d Its obl igation under this agreement wil l be legal ly val id and, binding and

    enforceable obligations against it in accordance with terms thereof

    Concessionaire

    e It is subject to laws of India and irrevocably waives any immunity in any

    jurisdiction in respect of this agreement.

    Concessionaire

    f The information furnished in the bid and as updated on or before date the date of

    this agreement is true.

    Concessionaire

    g The execution, delivery and performance of this agreement will not conflict with,

    result in breach of, constitute a default under or accelerate performance required

    by any of the terms of its Memorandum and Articles of association or any other

    a l icable laws

    Concessionaire

    h There are no actions, suits, proceeding, or investigations pending or to its

    knowledge, threatened against it at law or equity before any court.

    Concessionaire

    i It has no knowledge of any violation or default w.r.t any order, writ, injunction or

    decree of any court or any legally binding order of any Gov. instrumentality.

    Concessionaire

    j It has complied with applicable laws in all material respects and has not been

    subject to any fines, penalties, or any other civil or criminal liabilities.

    Concessionaire

    k It shal l at no t ime undertake or permit any change in ownership except in

    accordance with the provision of Clause 5.3

    Concessionaire

    l The selected bidder and its associates have financial standing and resource to

    fund the required equity and raise the debt necessary for undertaking and

    implementing the project.

    Concessionaire

    m The selected bidder is duly organized and validly existing under the laws of the

    jurisdiction of its incorporation

    Concessionaire

    n All its rights and interests in project highway shall pass to and vest in the

    Authority on the transfer date free and clear of all liens, claims and

    encumbrances.

    Concessionaire

    o No representation or warranty by it contained herein or in any other document

    furnished by it to the authority or to any government instrumentality in relation

    to applicable permits contains or will any untrue or misleading statement of

    material fact.

    Concessionaire

    p No sums in cash or kind have been paid or wil l be paid by it or on its behalf to any

    person by way of fees, commissions or otherwise for securing the concession.

    Concessionaire

    q All information provided by selected bidder in response to the Request for

    Qualification and Request for proposal true and accurate in all material respects.

    Concessionaire

    REPRESENTATION AND WARRANTIES AS PER MCA CLAUSE 4.1.3 (e)

    Fixed Fields

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    17/40

    Clause Sub clause Key Action Point Action Responsibility Date of Submission Date of

    Acceptance by

    Concessionaire

    7.2 1 Represent and Warrant to Concessionaire NHAI

    a It has full power and authority to execute, deliver and perform its obligation

    under this agreement and carry out the transactions contemplated herein.

    NHAI

    b It has taken all necessary actions under the applicable laws to authorise the

    execution, delivery and performance of this agreement.

    NHAI

    c It has financial standing and capacity to perform its obligations NHAI

    d This agreement constitutes a legal, valid, and binding obligation enforceable

    a ainst it in accordance with terms thereof.

    NHAI

    e It has no knowledge of any violation or default w.r.t any order, writ, injunction or

    any decree of any court of any legally binding order of any governmentinstrumentalit .

    NHAI

    f It has complied with applicable laws in all material aspects. NHAI

    g It has right, power, and authority to manage and operate the project highway

    upto the appointed date

    NHAI

    h It has good and val id right to the site and has power and authority to grant a

    license in respect there to the concessionaire.

    NHAI

    Clause Sub clause Key Action Point Action Responsibility Date of Disclosure Action by

    Authority /

    Concessionaire

    7.3 1 Disclose to other party if any representations or warr anties are untrue or

    incorrect

    NHAI/Concessionaire

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    18/40

    Project name /

    ID

    NH No. Length Stretch State PIU Scheduled Start

    date

    Scheduled End

    date

    1 2 3 4 5 6 7 8 9 10

    Fixed Fields Date of receipt

    of Legal Opinion

    by Authority

    Name of

    Concessionaire's

    Legal Counsel

    Legal Opinion by Concessionaire - Conditions Precedent Clause 4.1.3 (h)

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    19/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of

    Concessionaire

    Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Date of Appointment Name of selected

    IE/Firm

    Address of IE / Firm Contact person / PM

    of IE

    Contract start date Contract end date IE Contract amount Remarks

    11 12 13 14 15 16 17 18

    Fixed Fields

    Appointment of IE

    Appointment of Independent Engineer by Authority - Article 23 of Model Concession Agreement

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    20/40

    1 2 3 4 5 6 7 8

    Target Achieved Up to previous FY During CFY Cumm. Expenditure

    9 10 11 12 13 14 15 16

    Date of submission of

    Monthly Progress

    Report (MPR)

    Brief description of

    Delays, Slippages from

    approved Work

    Programme

    17 18 19 20 21 22 23

    27 28 29 30

    31 32 33 34 35 36 37

    38 39 40 41 42 43

    44 45 46 47 48 49

    Completed Length

    during month (DBM:

    Km / BC : Km)

    Cummu. Completed

    Length (DBM: Km /BC :

    Km )

    Monthly Progress ReportGrant/Premium/Annui

    ty Payment

    Date of submission of

    Work Programme by

    Concessionaire

    Date of approval Work

    Programme by

    Authority

    Name of EPC

    Contractor

    Date of approval of EPC

    Contractor

    Physical Progress ExpenditureTPC - Grant/Premium

    Fixed Fields

    Construction Delay

    LengthNH No.Project name / ID Scheduled End date (as

    per Contract)

    Scheduled Start date

    (as per Contract)

    PIUStateStretch (From and To)

    Maintenance of Existing Road Force Majeure Event Accident Reporting

    Casualties if anyFrequency of Events Delay caused to Force

    Majeure event

    Remarks on Milestones

    (If "N" responded to

    Milestones)

    Date of Inspection by

    Engineer

    Date of submission of

    Inspection Report

    Date of Test for Quality

    Assurance

    Frequecy of monitoring

    of road

    Numbers of boards &

    barricades deployed

    Number of Diversion

    Roads

    Inspection Tests for Quality Assurance

    Milestone-I (Achieved) -

    (Y/N)

    Milestone-II (Achieved)

    - (Y/N)

    Milestone-III

    (Achieved) - (Y/N)

    Monitoring of Construction

    Date of submission of

    report for delay by

    Concessionaire

    Action to be taken by Date of Corrective

    Action

    Date of Issue of Notice

    for delay to

    Concessionaire

    Sample Size taken for

    Test

    Date of Test Report

    submission

    Cost incurred on Test

    Construction Delay

    Status (Y/N)

    Reason for delay

    Frequency of Accidents

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    21/40

    50 51 52 53 54 55 56

    From To

    57 58 59 60 61 62 63 64

    Cost incurred by

    Concessionaire during

    work suspension

    Cost incurred by

    Authority during work

    suspension

    Construction Works

    Extension Status

    Date of Issue of

    Extension for

    Construction Works

    Term of Extension for

    Construction Works

    Work Suspension

    Status (Y/N)

    Work suspension due

    to Authority (Y/N)

    Work suspension due

    to Concessionaire (Y/N)

    Date of Issue of notice

    for suspension of work

    by Authority to

    concessionaire

    Date of Issue of notice

    by Concessionaire for

    remedial actions taken

    Construction Works Extension Photo & Video Recording

    Date of Submission of

    Video Recording by

    Concessionaire

    Length covered in

    Video Recording

    S tr et ch cov er ed in Vid eo Re cor ding N um be r o f s it es

    covered in photos

    Work Suspension

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    22/40

    Project name /

    ID

    State PIU NH No. Length Name of

    Concessionaire

    Date of

    agreement

    Total Project of

    Cost in Crore

    Scheduled

    Commentement date

    Scheduled

    Completion date

    Anticipate

    Completion date

    Name of I/E

    1 2 3 4 5 6 7 8 9 10 11 12

    Name of

    selected Safety

    Consultant

    Address of

    Safety

    Consultant

    Contact person

    / PM

    Scheduled

    Commencemen

    t date

    Scheduled

    Completion

    date

    Safety

    Consultant's

    Contractamount in

    Lakhs

    Remarks

    13 14 15 16 17 18 19

    Fixed Fields

    Appointment of Safety Consultant

    Appointment of Safety Consultant by Authority - Article 18.1.2 of Model Concession Agreement

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    23/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of

    Concessionaire

    Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Name of Personnel Date of start of

    Employment

    Authority's Regulatory

    approval

    Citizenship country of

    Personnel

    Passport No. of

    Personnel

    Employment valid till

    date

    Work permit granted ? V ISA No. VISA valid till date Remarks

    11 12 13 14 15 16 17 18 19 20

    Fixed Fields

    Employment of Foreign National

    Employment of Foreign Nationals by Concessionaire - Article 5.4 of Model Concession Agreement

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    24/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Date of submission of

    Draft Project

    Agreements

    Name of Person

    submitting Draft Project

    Agreements

    Status Date of submission of

    True copy of Project

    Agreements

    Name of Person

    submitting True copy of

    Project Agreements

    True copy of Project

    Agreements attested by

    Director of

    Concessionaire

    Status Right of substitution

    allowed to Authority in

    True copy of

    Agreements

    11 12 13 14 15 16 17 18

    Fixed Fields

    Project Agreements

    Obligations (Concessionaire) related to Project Agreements - Article 5.2 of Model Concession AgreementInput Form for Project A greements Submission by Concessionnaire

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    25/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Date of submission Change in scope

    notice

    Name of Person

    submitting Change in

    scope notice

    Impact and effects of Change in

    scope as per Concessionaire

    Date of submission of

    impact and effects due

    to Change in scope to

    Authority

    Change in Scope

    cost as per

    Concessionaire

    Change in Scope cost as

    per IE

    Agreed to Change in

    Scope cost

    Date of issuance of Change in

    scope Order by Authority

    Party paying for Change

    in scope cost

    11 12 13 14 15 16 17 18 19

    Failure to complete Construction

    Works under Change of scope

    Advance payment

    amount received by

    Concessionaire for

    Change in scope

    Damages amount paid to

    Authority for failure to complete

    Construction Works under

    Change of scope

    Remarks (if any) Status

    20 21 22 23 24

    Fixed Fields

    Change in Scope (for Concessionaire)

    Change in Scope (for Concessionaire)

    Change in Scope Notice (to/by Concessionaire) - Article 16 of Model Concession Agreement

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    26/40

    Project name / ID NH No. Length Stretch State PIU Scheduled

    Start date

    Scheduled End

    date

    TPC

    1 2 3 4 5 6 7 8 9

    Date of submission Date of Confirmation

    by issuing Bank

    PBG No. Date on PBG Date of reply by the

    Compliance by

    Concessionaire/ Bank

    Date of

    acceptance by

    NHAI

    10 11 12 13 14 15

    Name of Concessionaire Date of Concession

    Agreement

    Amount of PBG Issuing Bank Branch and address of

    Bank

    Status Remarks (if

    any)

    16 17 18 19 20 21 22

    Action Date Amount (where

    applicable)

    Status Remarks/Issues

    Provided

    Invoked

    Encashed

    Terminated

    Released

    Appropriated (partial)

    Replenished

    Returned

    Performance Security

    (a) Performance Security (Cl. 4.1.3 (a) & Cl 9.1)

    Fixed Fields

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    27/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date

    1 2 3 4 5 6 7 8

    Original Lenders In case of Substiution

    9 10 11 12 13 14 15 16 17 18 19

    20 21 22 23 24

    Action Date Amount (if applicable) Action by Status Remarks/Issues

    Procure execution of Escrow

    Agreement

    Retention of reserves

    Deposits & Receipts

    Payments from account

    Appropriation after termination

    Escrow

    Account

    creation due

    date

    Actual Escrow

    Account

    creation date

    Extended Escrow Account creation date

    Form for EscrowFixed Fields

    Date of Escrow AgreementName of Concessionaire Escrow Bank Account

    No.

    Escrow Bank Name Branch and address of

    Bank

    List of signatories to

    the Escrow Account

    Names of Lenders

    Escrow Account Operation

    Monthly Escrow

    Account

    Statement

    Report

    submitted to

    Authority by

    Financial

    Consultant ?

    Monthly Escrow

    Account Statement

    Report in order ?

    Status Remarks

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    28/40

    Project Name/ID NH NO. Length Stretch State PIU Name of the

    Selected Bidder

    Name of the

    Concessionaire

    Scheduled End date Name of

    Concessionaire

    Date of

    agreement1 2 3 4 5 6 7 8 8 9 10

    Shareholders'

    names

    % of Shares held Face value of the

    shares held

    Proposed

    Shareholders'

    % of Shares held Face value of the

    shares held

    Approved

    Shareholders'

    % of Shares held Face value of the

    shares held

    Obligations (Concessionaire) Notify Change in Ownership - Article 5.3 of Model Concession Agreement

    Status /

    Remarks (if

    any)

    Fixed Fields

    Name of the

    Shareholders in SPV

    (I)

    Original Shareholding Pattern Date of Submission

    of Request letter of

    Change in

    Revised Shareholding Pattern Proposed Revised Shareholding Pattern Approved Date of

    Approval of

    revised

    names names

    11 12 13 14 15 16 17 18 19 20 21 22 23

    Ownership Shareholding

    pattern by

    NHAI

    (Drop down) List of

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    29/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of

    Concessionaire

    Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Reasons for failure to

    achieve milestone

    (works)

    A mount pa id to A ut hori ty D at e of payment Pending am ount to be

    paid to Authority

    Date of demand sent

    for debit to Escrow

    Account

    11 12 13 14 15

    Reasons for delay in COD Amount paid to Authority Date of payment Pending amount to be

    paid to Authority

    Date of demand sent

    for debit to Escrow

    Account

    D at e of C OD E xpected D at e of

    Project Completion

    16 17 18 19 20 21 22

    Reasons for failure to

    achieve Financial Close

    A mount pa id to A ut hori ty D at e of payment Pending am ount to be

    paid to Authority

    23 24 25 26

    P un ch L is t i te ms V al ue o f P un ch L is t i te ms A ft er 1 20 d ay s

    extension, Punch List

    items not completed

    Reasons for not

    completing Punch List

    items

    Value of Punch List

    items not completed

    after 120 days

    Penalty applied

    for not

    completing PunchList items

    Amount paid to

    Authority

    Date of demand sent

    for debit to Escrow

    Account

    Date of payment

    27 28 29 30 31 32 33 34 35

    Pending amount to be

    paid to Authority

    Date of COD Project Completion

    Date

    36 37 38

    Reasons for failure to

    rectify any defect or

    deficiency

    Recti fica tion dema nd da te C ure Per iod A mount paid t o A ut hori ty D at e of dem and s ent

    for debit to Escrow

    Account

    Date of payment Pending amount to be

    paid to Authority

    39 40 41 42 43 44 45

    Reasons for failure

    material default

    Amount paid to Authority Date of demand sent

    for debit to Escrow

    Account

    D ate of p ay me nt P en di ng amo un t to be

    paid to Authority

    46 47 48 49 50

    Payment of Damages to Authority - Various Articles of Model Concession AgreementFixed Fields

    Delay in COD

    Failure to Rectify Defect

    Material Default

    Non-Completion of Punch List

    Non-Completion of Punch List

    Failure to Achieve Milestone

    Failure to Achieve Financial Close

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    30/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start

    date

    Scheduled End date Name of

    Concessionaire

    Date of Concession

    agreement

    1 2 3 4 5 6 7 8 9 10

    Date of Execution Names of Sr.

    Lenders

    Name of Lenders'

    Representative

    Branch and address

    of Lenders

    Signatories to the

    Substitution

    Agreement

    Status Remarks

    11 12 13 14 15 16 17

    Fixed Fields

    Conditions Precedent of Substitution Agreement (Concessionaire) - Article 4.1.3 (c) of Model Concession Agreement

    Input Form for Substitution Agreement

    Substitution Agreement Related Fields

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    31/40

    Project Name/ID NH No. Length Stretch State PIU Name of the Selected Bidder Name of the

    Concessionaire

    Date of Formation of

    Company (SPV) by

    Concessionaire

    Date of signing

    of the CA

    Date of opening

    of Escrow

    Account

    1 2 3 4 5 6 7 8 9 10 11

    Date of Submission

    of Draft Financing

    Agreements

    (received by NHAI)

    Date of submission of

    Banks' Sanction letter

    Scheduled date of

    Financial Close

    (Normal)

    Date of Financial Close

    with Extension

    Date of Financial Close with

    Cost

    S che dul ed A ppo int ed D at e Sc he du le d C OD S che dul ed da te

    prior to which

    Performance

    Security to be

    Format for Financial CloseFixed Fields

    submitted

    12 13 14 15 16 17 18 19

    List of Documents

    submitted, along

    with Declaration

    that these

    constitute the

    complete set of

    Project Documents

    Date of execution of

    Substitution Agreements

    Date of

    declaration of

    Financial Close

    C urrent Status) RemarksDate of final Legal

    scrutiny of draft

    documents and

    comments by

    Authority

    Date of

    acceptance of

    comments by

    Concessionaire

    Signing of the Loan /

    Project documents by

    the Concessionaire

    Date of submission by the

    Concessionaire of three

    sets of Financing

    Documents duly executed,

    along with soft copy of

    Financial Model (if

    applicable)

    Either an item by item

    verification by NHAI of

    satisfaction of all Pre-Sanction

    Conditions and Pre-

    Disbursement Conditions of

    Lenders,

    OR

    Certification from Lenders to be

    obtained by Concessionaire

    confirming that only Post-

    Disbursement conditions are

    required to be completed, and

    all Pre-Sanction and Pre-

    Disbursement conditions stand

    20 21 23 24 25 26 27 28 29 30

    S. No. Name of the

    Agreement

    Date of

    submission

    Date of forwarding to

    Financial Consultant

    (FC)

    Date of Review given by FC Date of forwarding FC's

    Comments to Concessionaire

    Remarks / Current Status

    1 Senior Common Loan

    Agreement

    2 Subordinate Common

    Loan Agreement

    3 Security Trustee

    Agreement

    List of Documents

    completely satisfied (list of Post-

    Disbursement conditions

    pending completion, to be part

    4 Lenders' Agent

    Agreement5 Deed of

    Hypothecation6 Indenture of Mortgage

    7 Mortgage Deed

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    32/40

    8 Supplementary Escrow

    Agreement

    9 Inter Creditor

    Agreement

    10 Share Pledge

    Agreement

    11 Sponsors' Support

    Agreement

    12 Accession Deed

    13 Financial Package

    14 EPC Agreement

    15 Any other document

    Refinancing

    Debt Equity Grant

    31 32 33 34 35 36 37 38 39 40

    Date of

    execution /

    submission of

    revised

    Substitution

    Agreements

    Date of execution of

    revised Escrow Account

    Date of submission

    of refinancing

    documents (if any)

    Date of final Legal

    scrutiny of draft

    documents and

    comments by

    Authority

    Date of

    acceptance of

    comments by

    Concessionaire

    Signing of the Loan /

    Project documents by

    the Concessionaire

    Date of submission by the

    Concessionaire of three

    sets of Re-Financing

    Documents duly executed,

    along with soft copy of

    Financial Model (if

    applicable)

    Revised Financing Plan

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    33/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of

    Concessionaire

    Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Appoi nted Date Condi ti ons P recedent

    achieved ?

    Total completed length

    of the Project

    Date of issuance of

    Provisional Certificate

    Date of issuance of

    Completion Certificate

    COD extended to Date

    (if applicable)

    Date of achievement of

    COD

    Amount of Damages

    paid to Authority (if

    any)

    Status

    11 12 13 14 15 16 17 18 19

    Project Name/ID NH NO. Length Stretch State PIU Name of the Selected

    Bidder

    Name of the

    Concessionaire

    Date of signing of the

    CA

    Scheduled Appointed

    Date1 2 3 4 5 6 7 8 9 10

    Date of Submission of

    PS

    Date of Submission of

    Executed of Executed &

    Substitution

    Agreement

    Date of procurement of

    Applicable permits

    Date of submission of

    Financial Package

    Scheduled Date of

    Submission of Financial

    Close

    Actual Date of

    Submission of Financial

    Close

    Current Status /

    Remarks

    11 12 13 14 15 16 17

    Project Name/ID NH NO. Length Stretch State PIU Name of the Selected

    Bidder

    Name of the

    Concessionaire

    Date of signing of the

    CA

    Scheduled date of FC

    1 2 3 4 5 6 7 8 9 10

    Equity Debt Grant

    11 12 13 14 15 16 17

    Equity Debt Grant Equity Debt

    18 19 20 21 22

    TPC at the time of Project Completion

    Form for Commercial Opening Date Article 15.1 of Model Concession Agreement

    Fixed Fields

    Fixed Fields

    COD (Concessionaire)

    Appointed DateFixed Fields

    Concessionaire's Obligation

    Appointed Date

    Total Project Cost (TPC) Details [As per MCA]

    Lenders' TPC at the time of Novation

    Authority's TPC at the

    time of RFP/Bid (in

    Crores)

    Lenders' TPC at the time of Financial CloseNHAI' Grant (if there is

    any)

    Debt portion in TPC as

    per CA

    Equity portion in TPC as

    per CA

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    34/40

    Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement

    1 2 3 4 5 6 7 8 9 10

    Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status

    11 12 13 14 15 16 17 18 19

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    20 21 22 23 24 25 26 27 28

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    29 30 31 32 33 34 35 36 37

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    38 39 40 41 42 43 44 45 46

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    47 48 49 50 51 52 53 54 55

    Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status

    56 57 58 59 60 61 62 63 64

    Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    65 66 67 68 69 70 71 72 73

    Date of issue

    recording/reporting

    Date of replacement Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status

    74 75 76 77 78 79 80 81 82

    Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    83 84 85 86 87 88 89 90 91

    Operations & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)Fixed Fields

    Breach / Blockade Roughness Pot Holes

    Cracking in more than 5% of road surface in a stretch of 1 km Rutting exceeding 10 mm in more than 2% of road surface in a stretch of 1 Rutting exceeding 10 mm in more than 2% of road surface in a stretch of 1

    Bleeding/skidding Ravelling/Stripping of bitumen surface exceeding 10 sq m Damage to pavement edges exceeding 10 cm

    R em ova l o f d eb ri s V ari at io n b y m or e t ha n 2% in th e p re sc ri be d s lo pe of ca mb er /c ro ss fa ll H ar d/ ea rt h s ho ul de rs , s id e s lo pe s, dr ai ns an d c ul ve rt s

    Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status Edge drop at shoulders exceeding 40 mm

    Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    St at us D am ag e t o s ha pe or po si ti on ; p oo r vi sib il it y o r l os s o f r et ro -r ef le ct iv it y A ny ma jo r f ail ur e o f t he sy st em

    Street lighting and telecom (ATMS) Trees and plantation

    Hard/earth shoulders, side slopes, drains and culverts

    V ar ia ti on by mo re th an 15 % i n t he pr es cr ib ed si de (e mb an km en t) sl op es R ai n c ut s/ gu ll ie s i n s lo pe D am ag e t o o r s il tin g o f c ul ve rt s a nd si de dr ain s d ur in g a nd im me di at el y

    preceding the rainy season

    D es il ti ng of dr ai ns in ur ba n/ se mi -u rb an ar ea s R oa d s id e f ur ni tu re in clu di ng ro ad si gn s a nd pa ve me nt ma rk in g St re et li gh ti ng an d t el ec om (A TM S)

    Rest areas Toll plaza[s]

    Defects in electrical, water and sanitary installations Failure of toll collection equipment or lighting Damage to toll plaza

    F au lt s a nd m in or f ai lu re s O bs tr uc ti on i n a m in im um h ea d- ro om o f 5 m a bo ve c ar ri ag ew ay o r D et er io ra ti on i n h ea lt h o f t re es a nd b us he s

    Trees and plantation Rest areas

    Replacement of trees and bushes Removal of vegetation affecting sight line and road structures Cleaning of toilets

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    35/40

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date & Time of issue

    recording/reporting

    Date & Time of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    92 93 94 95 96 97 98 99 100

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    101 102 103 104 105 106 107 108 109

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    110 111 112 113 114 115 116 117 118

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    119 120 121 122 123 124 125 126 127

    Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status Date of issue

    recording/reporting

    Date of repair /

    rectification

    Status

    128 129 130 131 132 133 134 135 136

    Date of submission of 5

    copies of Maintenance

    Manual to Authority

    Consulted with IE Date of submission of 2

    copies of Maintenance

    Manual to IE

    Compliance with

    Specifications and

    Standards, MaintenanceRequirements, Safety

    Requirements and Good

    Industry Practices

    Status Notification by

    Concessionaire

    Review By IE Suggestion Date of submission of

    Maintenance

    Programme toAuthority

    Consulted with IE Status Date of Revision after 3

    Years

    137 138 139 140 141 142 143 144 145 146 147 148

    Includes preventive

    maintenance schedule?

    Includes arrangements

    and procedures for

    carrying out urgent

    repairs?

    Includes criteria to be

    adopted for deciding

    maintenance needs?

    Includes intervals and

    procedures for carrying

    out inspection of all

    elements of the Project

    Hi h wa ?

    Includes intervals at

    which the

    Concessionaire shall

    carry out periodic

    maintenance?

    Includes arrangements

    and procedures for

    carrying out safety

    related measures?

    Includes intervals for

    major maintenance

    works and the scope

    thereof?

    149 150 151 152 153 154 155

    Date of Notification to

    Authority

    Date of response of

    Authority to the

    Notification

    Modifictations

    suggested/approved

    Deviation from

    Specifications and

    Standards ?

    Status Date & Time of issue

    recording/reporting

    Date & Time of

    remedial action

    Date & Time of

    restoration

    Does it follow the

    relevant operating

    procedures including

    the setting up of

    temporary traffic cones

    and lights, and removal

    of obstruction and

    debris without delay?

    Is maintaining and

    operating a round-the-

    clock vehicle rescue

    post with one mobile

    crane having the

    capacity to lift a truck

    with a Gross Vehicle

    Weight of 20,000 KG

    Is maintaining and

    operating two such

    vehicle rescue posts,

    with one crane each,

    and this posts is located

    at each of the Toll

    Plaza(s)

    156 157 158 159 160 161 162 163 164 165 166

    Other Project Facilities and Approach roads Superstructure of bridges

    Spalling/scaling Scouring and/or cavitation Cracks and damages including settlement and tilting

    Bearings (metallic) of bridges Joints in bridges Other items relating to bridges

    D am ag e o r d et er io ra ti on i n A pp ro ac h R oa ds , -[ pe de st ri an f ac il it ie s, tr uc k C ra ck s - T em po ra ry m ea su re s C ra cks - P er ma ne nt m ea su re s

    Superstructure of bridges Foundations of bridges Piers, abutments, return walls and wing walls of bridges

    Other items relating to bridges

    Damage to wearing coat Damage or deterioration in approach slabs, pitching, apron, toes, floor or Growth of vegetation affecting the structure or obstructing the waterway

    Maintenance Manual Maintenance Programme

    Deformation Loosening and malfunctioning of joints Deforming of pads in elastomeric bearings

    Other items relating to bridges

    Gathering of dirt in bearings and joints; or clogging of spouts, weep holes Damage or deterioration in parapets and handrails Rain-cuts or erosion of banks of the side slopes of approaches

    Maintenance Programme shall include

    Modifications to Project Highway Safety, vehicle breakdowns and accidents

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    36/40

    Date of reporting a

    decommissioning

    Date & Time of issue

    recording/reporting

    Date & Time of

    remedial action

    Date & Time of

    restoration

    From To

    167 168 169 170 171 172 173 174 175 176 177

    Reason for Lane Closure

    From To

    178 179 180 181 182 183 184 185

    Remarks (if any)

    Amount Paid Unpaid Amount Paid Unpaid Concessionaire Authority

    186 187 188 189 190 191 192 193 194 195

    Fee Collection and its

    Rules

    Date of approval of Fee

    Notification by

    Authority

    Collection of Fee as per

    MCA ?

    Date of submission of

    O&M Inspection Report

    to Authority

    Consulted with IE Status Items identified for Risk &

    Cost

    Cost of Such Items Status Date of Issue of Fee

    Notification

    196 197 198 199 200 201 202 203 204

    205 206 207 208 209 210 211 212 213 214

    Date of submission of

    Monthly Status Report

    by Concessionaire

    f or (M on th ) D at e o f I ns pe ct io n b y I E D at e o f S ub mi ss io n o f

    Inspection report by IE

    Conducted tests as per

    IE and MCA ?

    Carried out remedial

    measures as per

    Maintenance

    Requirements/Manual /

    Programme ?

    M on th R ep or te d D at e of f ur ni sh in g

    Monthly Fee Statement

    Date of not submission

    of Reports of unusual

    occurrences (Dates on

    which not Reported)

    Brief description of

    unusual occurrences

    reported

    215 216 217 218 219 220 221 222 223 224 225 226

    F in an ci al Im pa ct P ar ty Im pa ct ed

    227 228 229 230 231 232 233 234 235 236

    Defect identified in

    O&M Inspection Report

    Date Date of Rectification If not Completed within

    15 Days

    Status of Rectification Whether further tests

    proposed by IE

    If yes, Then Status

    237 238 239 240 241 242 243

    Div ersion or interruption of t raffic S tretch being decommissioned Reason for

    decommissioning

    Date of Approval of

    Authority for

    decommissioning

    Date of request for

    recommissioning by

    Concessionaire

    Date of Approval of

    Authority for

    recommissioning

    Agreed date of

    recommissioning

    Clausewise Damages

    Head/Clause of

    Damages

    Damages to be paid by Concessionaire Damages to be paid by Authority Final Status

    O&M Inspection Report

    Actual date of

    recommissioning

    Date Lane closure

    Request sent to

    Authority

    Date of approval from

    Authority / IE on Lane

    Closure

    Stretch of Lane closure Agreed date of re-

    opening lane

    Acutal date of re-

    opening lane

    Name of fee collector

    and user fee list should

    be displayed at the

    collection point ?

    Sufficient change / coins

    should be available with

    the toll collector ?

    Addition fee for

    overloaded vehicles ?

    Overloading allowed to

    pass through the toll

    after paying the over

    charged fee ?

    Date of submission of

    Traffic Census

    Bi-annual or annual

    traffic survey

    conducted by the Field

    Authority ?

    Monitoring O&M

    Appropriation of Fee as

    per MCA ?

    Date of revision of fee New revised fee Fee exemption for local

    traffic ?

    Free use of service lane

    ?

    Re-appropriation of

    excess fee as per MCA ?

    Status

    Remedial measures

    Advertising on the Site Force Majeure

    No. of advertisements

    Non compliant to normsLocations

    Date of Notice to

    Concessionaire forNature of advertisement Date of Removal Date of occurrence Type of Force Majeure

    Nature of hindrance

    due to Force Majeure

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    37/40

    AuthorityTermination for failure to complete four-

    laning within the specified period (Cl.

    12.4.3

    Setting up of Safety Fund (Cl. 18.2) Safety Fund set up as per

    Concessionaire A reement ?

    Date of Safety Fund set up ?

    1 2

    Disbursing Grant (Cls. 25.2 and 25.3) Date of Grant request fromConcessionaire

    Recommended by IE ? Equity met ? Financing plan approved byAuthority ?

    Date of Financingplan approval by

    Authority

    As per ConcessionaireAgreement

    1 2 3 4 5 6

    Issuing notice for a Force Majeure Event

    (Cls. 34.5.1 and 34.5.2)

    Need to issue notice for a Force

    Majeure Event

    Date of issuing notice for a Force

    Majeure Event1 2

    Taking action for Force Majeure after

    Appointed Date (Cl. 34.6.2)

    Allocation of costs arising out of Force

    Majeure (Cl. 34.7)

    Date of issue notice for a Force

    Majeure Event

    Allocation of Cost done as per

    Concessionaire Agreement?

    Costs arising out of Force

    Majeure (INR)

    1 2 3

    Informing Concessionaire regarding

    intention to terminate (Cl. 34.8)

    Has termination been approved

    by Authority ?

    Informed Concessionaire regarding

    intention to terminate ?

    Date of informing

    Concessionaire regarding

    intention to terminate

    Approved / Expected date of

    termination

    1 2 3 4

    Termination Payment for Force

    Majeure(Cl. 34.9)

    Compensating for Additional Tollway/

    Competing Road (Cl. 35.4)

    Compensation as per

    Concessionaire Agreement ?

    Compensation recommended by IE

    ?

    Compensation paid (INR) Escrow A/C utilized for payments

    ?

    Status (if any)

    1 2 3 4 5

    Informing Concessionaire of intent to

    terminate (Cl. 34.8)

    Informing Lenders of the intent to

    Terminate (Cl. 37.1.3)

    Has termination been approved

    by Authority ?

    Informed Lenders regarding

    intention to terminate ?

    Date of informing Lenders

    regarding intention to terminate

    Approved / Expected date of

    termination

    1 2 3 4

    Termination Payment for Authority

    Default (Cls. 37.3.2 and 37.3.3)

    Miscellaneous

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    38/40

    Exercising rights and obligations upon

    Termination (Cl. 37.4)

    Issuing a Divestment Certificate (Cl.

    38.3)

    Divestment Certificate approved

    by IE

    Divestment Certificate approved by

    Authority

    Date of issue of Divestment

    Certificate1 2 3

    Adjusting the costs arising out of

    Change in Law (Cl. 41.1)

    Change in Law as per

    Concessionaire Agreement ?

    Demand for costs arising out of

    Change in Law raised by

    Concessionaire ?

    Date of demand from

    Concessionaire

    Cost adjustment recommended

    by IE ?

    Costs to be

    adjusted (INR)

    Escrow A/C utilized for

    payments ?

    Status (if any)

    1 2 3 4 5 6 7

    Complying with General Indemnityrequirements (Cl. 42.1)

    Indemnification as perConcessionaire Agreement ?

    1

    Amicably resolving disputes (Cl. 44.1

    and 44.2)

    Any pending disputes not

    amicably resolved ?

    List of such disputes Cont act Person in Authority for

    dispute

    Status of each dispute

    1 2 3 4

    Any other observation, complaint or

    suggestion

    Observation, complaint or

    suggestion received

    Date of observation, complaint or

    suggestion

    Action / Response on the

    observation, complaint or

    suggestion

    Status / Remarks (if any)

    1 2 3 4

    Suspension upon occurrence of

    Concessionaire Default (Cl. 36.1)

    Termination Payment for aConcessionaire Default (Cl. 37.3.1)

    Termination Payment for Authority

    Default (Cls. 37.3.2 and 37.3.3)

    Exercising rights and obligations upon

    Termination (Cl. 37.4)

    Have rights and obligations been

    exercised by Authority upon

    Termination ?

    Remarks (if any)

    1 2

    Is the complaint redressal mechanism

    working satisfactorily (Cl. 46.2)

    Is complaint redressal mechanism

    working ?

    Remarks (if any)

    1 2

    ConcessionaireCrediting the balance to the Safety Fund

    (Cl. 16.3.2)

    Credit due to excess of Traffic

    related revenue collections or

    differential from change in Scope

    of work a ments

    Credited the balance to the Safety

    Fund ?

    Amount credited (INR) Date of credit Status / Remarks

    (if any)

    1 2 3 4 5

    Effecting and maintaining insurance

    cover (Cls. 32.1 and 32.2)

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    39/40

    Depositing and using the proceeds from

    insurance claims Cl. 32.7

    Maintaining books of accounts (Cl. 33.1) Have book of Accounts been

    maintained as per Auditor's

    Re ort ?

    Date of receipt by NHAI of Auditor's

    Report ?

    1 2

    Appointing Statutory Auditors (Cl.

    33.2.1)

    Date of Appointment of Statutory

    Auditors

    Name of Firm/Persons as Statutory

    Auditors

    Tenure for Statutory Auditors

    1 2 3

    Issuing notice for Force Majeure Event

    (Cls. 34.5.1and 34.5.2)

    Informing the Authority regarding

    intent to Terminate Cl. 34.8

    Complying with the Divestment

    Requirements (Cl. 38.1)

    Do Divestment requirements

    comply as per Concessionaire

    A reement ?1

    Paying all costs incidental to divestment

    (Cl. 38.5)

    Costs incidental to

    divestmentapproved by IE ?

    Date of payment for all costs

    incidental to divestment

    Amount paid to Authority for

    costs incidental to divestment

    1 2 3

    Paying to the Authority the benefits

    arising out of Change in Law (Cl. 41.2)

    Change in Law as per

    Concessionaire Agreement ?

    Cost adjustment recommended by

    IE ?

    Costs to be adjusted (INR) Escrow A/C utilized for payments

    ?

    Status (if any)

    1 2 3 4 5

    Complying with General Indemnity

    requirements (Cls. 42.1 and 42.2)

    Do Indemnity requirements

    comply as per Concessionaire

    A reement ?1

    Allowing free access to the Site at all

    times to the Authority (Cl. 43.2)

    Is free access allowed to the Site

    at all times to the Authority ?

    1

    Amicably resolving disputes (Cl. 44.1and

    44.2)

    Any pending disputes not

    amicably resolved ?

    List of such disputes Cont act Person in Authority for

    dispute

    Status of each dispute

    1 2 3 4

    Availability of Specified Documents and

    documents for inspection (Cls. 45.1 and

    45.2

    Is there availability of Specified

    Documents and documents for

    ins ection ?

    List of unavailable Specified

    Documents and documents for

    ins ection

    Remarks (if any)

    1 2 3

  • 8/13/2019 Accenture - All DMS-PMS Input Forms Merged

    40/40

    Maintaining public relations office and

    Complaints Register (Cl. 46.1)

    Have public relations office and

    Complaints Register been

    maintained as per Concessionaire

    A reement1

    Inspecting Complaints Register every

    day and taking prompt and reasonable

    action (Cl. 46.2)

    Has Complaints Register been

    inspected every day ?

    Have prompt and reasonable action

    been taken ?

    Resolution status of Complaints

    1 2 3

    Any other observation, complaint or

    suggestion

    Observation, complaint or

    suggestion received

    Date of observation, complaint or

    suggestion

    Action / Response on the

    observation, complaint or

    suggestion

    Status / Remarks (if any)

    1 2 3 4