accenture - all dms-pms input forms merged
TRANSCRIPT
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
1/40
S.No. PAGE No.
1 CONDITIONS PRECEDENT OF AUTHORITY 1
2 LA1 2
3 LA2 3,4
4 FOREST CLEARANCE 55 ENVIRONMENT CLEARANCE 6
6 WILDLIFE CLEARANCE 7,8
7 ROB-RUB 9
8 RoW- Article 10 10
9 CONDITIONS PRECEDENT OF CONCESSIONAIRE 11
10 APPLICABLE PERMITS AS PER CONDITIONS PRECEDENT 12
11 REPRESENTATION AND WARRANTIES 13, 14
12 LEGAL OPINION BY CONCESSIONAIRE 1513 APPOINTMENT OF INDEPENDENT ENGINEER 16
14 MONITORING OF CONSTRUCTION 17, 18
15 APPOINT SAFETY CONSULTANT 19
16 PERFORMANCE SECURITY 20
17 FINANCIAL CLOSURE 21, 22
18 CHANGE IN OWNERSHIP 23
19 ESCROW ACCOUNT 24
20 PAY DAMAGES TO AUTHORITY 25
21 SUBSTITUTION AGREEMENTS 26
INDEX
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
2/40
21 SUBSTITUTION AGREEMENTS 26
Conditions Precedent of Authority1. Provided to the Concessionaire the Right of Way to the Site
a. Post completion of PPPAC Approval process for Land Acquisition
b. Land Acquisition
2. Issued the Fee Notification
3. Provided for the Concessionaire the Right of Way to ****
4. Procured approval of Railway Authorities to construct road over bridges / under bridges at level crossings
a. ROB/RUB Clearance, alongside approval for GADs for them5. Procured all Applicable Permits relating to environmental protection and conservation of the site
a. Applicable Permits
b. Forest clearance
c. Environment clearance
d. Wildlife clearance
Conditions Precedent of Concessionaire
1. Provided Performance Security to the Authority
2. Executed and procured execution of the Escrow Agreement;
3. Executed and procured execution of the Substitution Agreement;
4. Procured all the Applicable Permits specified in Schedule-E unconditionally or if subject to conditions, then all such conditions shall have been satisfied in full and such Applicable Permits are in full force
and effect;
a. Conditions Precedent Obligations of Concessionaire
5. Executed the Financing Agreements and delivered to the Authority 3 (three) true copies thereof, duly attested by a Director of the Concessionaire;
7. Delivered to the Authority 3 (three) true copies of the Financial Package and the Financial Model, duly attested by a Director of the Concessionaire, along with 3 (three) soft copies of the Financial Model
in MS Excel version or any substitute there
8. Delivered to the Authority from {the Consortium Members, their respective} confirmation, in original, of the correctness of their representations and warranties setforth in Sub clauses (k), (l) and (m) of
clause 7.1 of this Agreement; and
9. Delivered to the Authority a legal opinion from the legal counsel of the Concessionaire with respect to the authority of the Concessionaire to enter into this Agreement and the enforceability of the
provisions thereof
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
3/40
Sl. No. Clause of Concess ion Agreement Descr iption Before submiss ion of proposal to
PPPAC
Before issue of RF P Before issue of LOA Before gi ving A ppointed Date
1 4.1.2 (a) Availability of land Existing ROW + 3D of 60% land to
be acquired
+ 3A of 90% land to be acquired
Existing ROW + 3D of 80%
land to be acquired
Existing ROW + 3D of 80%
land to be acquired
Existing ROW + 3D of 90% land to be acquired and at least
80% front of 30 Mtr for two lane paved shoulders, 45 Mtr
for four laning and 60Mtr for six laning projects should be
available
Requirement Status Date Action taken and Action by Remarks/Issues
Existing ROW + 3D of 60% land to be acquired+ 3A of
90% land to be acquired
Existing ROW + 3D of 80% land to be acquired
Existing ROW + 3D of 90% land to be acquired and at
least 80% front of 30 Mtr for two lane paved shoulders,
45 Mtr for four laning and 60Mtr for six laning projects
made available
PPPAC Approval: Compliance to Condition Precedent
Input Form LA 1
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
4/40
Sl. No. Clause of Concession
Agreement
Description Before submission of
proposal to PPPAC
Before issue of RFP Before issue of LOA Before giving Appointed Date
1 4.1.2 (a) Availability of land Existing ROW + 3D of 60%
land to be acquired
+ 3A of 90% land to be
acquired
Existing ROW + 3D of 80%
land to be acquired
Existing ROW + 3D of 80% land to be
acquired
Existing ROW + 3D of 90% land to
be acquired and at least 80% front
of 30 Mtr for two lane paved
shoulders, 45 Mtr for four laning
and 60Mtr for six laning projects
should be available
From To
1 2 3 4 5 6 7 8
NHDP Phase Total Land required (in Hec) No. of villages in the ent ire
stretch of Land to be acquired
Land already in Possession Total additional land to be
acquired (Hec)
Length available for road
development up to
3A (Hec) 3D (Hec)
9 10 11 12 13 14 15 16
3G (Hec) Possession (Hec) 3A (Hec) 3D (Hec) 3G (Hec) Possession (Hec) Total length of critical stretches, if
any, as per clause of 4.1.2 of MCA
(km)
Length of critical stretch
available for construction
(km)
17 18 19 20 21 22 22A 22B
23 24 25 26 27 28 28A 28B
Pr iv at e L and (in Ha ct .) Go vt . L and (in Ha ct .) St re tc h c ov er ed (c ha in ag e) Da te of subm is sion of 3A
proposal by DPR consultant
Date of submission of 3A
proposal to Authority's HQ
Name(s) of villages covered in the 3A
proposal
3A Gazette Notification No. vide
which the land mentioned was
acquired
Date of 3A Gazette
Notification No.
29 30 31 32 33 34 35 36
Pr iv at e L and (in Ha ct .) Go vt . L and (in Ha ct .) St re tc h c ov er ed (c ha in ag e) Da te of subm is sion of re la te d
3D proposal at Authority's
HQ
3D Notification No. vide
which the land mentioned
was acquired
Date of publication of 3D
notification No.
Type of land Area of Land with Central
Govt. (3D Notified) but not
utilized (in ha)
37 38 39 40 41 42 43 44
PPPAC Approval: Compliance to Condition Precedent
Chainage (in Kms.)
% 3D completed (current 3D
notified/total additional land
to be acquired)
Length available for road
development upto end of previous
month, (year)
Length where entire width of ROW
is available for Construction(km)
Length where minimum
required width
(30m/45m/60m as applicable
for 2-laning/4-laning/6-
laning) of ROW is available
for construction (km)
Cumulative progress up to
Cumulative progress up to
Pending LA works (in Hec)
Sl. No. Project PIU No. NH No. Stretch Length (in km)
FORM FOR LAND ACQUISITION
% of total land vested with
NHAI (already in possession +
3D notified)/Total land
required
% of total Land in Possession
(Land already in possession +
current possession
made)/Total land required
% of additional land in
possession (current possession
made/total additional land to be
acquired)
% 3A completed (current 3A
notified/total additional land
to be acquired)
3D Particulars
3A Particulars
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
5/40
Reason why 3D notified land
has not been utilized (change
in alignment/excess land
acquired/ mistake in
acquisition, etc., (please
specify)
Date of actual possession of
land for area notified under
3D
45 46 47 48 49 50 51
From To Name of
Tehsil/Village/District
Stretch covered (chainage) Area of land acquired by NHAI (Ha) Area of land mutated in the name
of NHAI (Ha)
Area of land remaining to be
mutated in favour of NHAI
(Ha)
52 53 54 55 56 57 58 59
Designated State Authority
responsible for mutation
Reason for not mutating the
area of land and action taken
by NHAI
Remarks on mut ation St retch of Highway
(chainage) where
encumbrance
free land is not available
Area of unavailable land (in
ha.) in encumbrance
Area of land under encumbrance as a
% of total area (existing ROW +
additional land as per proposed
ROW)
Reasons in brief for unavailability
of encumbrance free land in the
stretch
Concerned officer who may
resolve the issue
60 61 62 63 64 65 66 67
Fronts available for work
(Total, in Km.)
% of total length available for
work (Length with available
Fronts for work / Total
project length)
No. of days by which handing
over is delayed w.r.t. appointed
date
TPC as per DPR Estimate for LA as per DPR
(in Rs.)
Value of Award approved by RO/HO Date of Approval by RO/HO Date of Deposition of Award
Amount with CALA
68 69 70 71 72 73 74 75
Amount disbursed by CALA (in
Rs.)
Date of disbursement of
compensation by CALA
Status of disbursement of
compensation by CALA
Amount of cheque in Rs. Date of encashment of
Cheque by Beneficiary
Actual Land acquisition cost per ha.
76 77 78 79 80 81
82 83 84
Pending with whom (Concerned
officer the State / Central Govt.)
Stretch affected (chainage) NH No. affected
Date of award under section 3G
for related 3D notification
Status of valuation of
structures
Summary of issues impeding
land acquisition for the
project
Date pending since (of issues)3D Particulars
Tehsil/Village/District Wise Mutation Details
Date of issue of LOA Appointed date Overall Remarks (if any)
Tehsil/Village/District Wise Mutation Details Encumbrance
Encumbrance Compensation Status for Land Acquisition
Compensation Status for Land Acquisition
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
6/40
Project name
/ ID
NH No. Length Stretch State PIU Scheduled Start
date
Scheduled End
date
Whether
requirement of
additional land is
more than 40m on
existing alignment
and 60m on new
alignments /
bypass ?
Whether
Environmental
Clearance required
? [Not required if
length is less than
100km, or answer
to column 9 is No]
If environmental
clearance required,
fill details in
relevant format
Whether Forest
Clearance required
? [If yes, fill details
in the relevant
format]
Whether Wildlife
clearance required
? [If yes, fill details
in the relevant
format]
1 2 3 4 5 6 7 8 9 10 11 12 13
Total length Total Forest area
to be diverted (in
ha )
Total Length
affected
Forest Division and
forest Circle
involved
Forest area to be
diverted (in ha )
in the Division
Length affected in
the Division
Date of finalization
of proposal by the
DPR Consultant
Date of registration
with the Nodal
Officer
Date of submission
of Diversion
proposal to DFO
Date of receipt of
observations from
DFO
Date of sending
replies / modified
proposal to DFO
Name of the Forest
Circle involved
14 15 16 17 18 19 20 21 22 23 24 25
Date of
forwarding
the proposal
to CF/CCF
(officer in
charge of the
circle)
Date of receipt of
observations from
the Circle office
Date of sending
replies / modified
proposal to Circle
office
Date of forwarding
the proposal to
PCCF
Date of receipt of
observations from
PCCF
Date of sending
replies / modified
proposal to PCCF
Date of forwarding
the proposal to
Nodal Officer
Date of receipt of
observations from
Nodal Officer
Date of sending
replies / modified
proposal to Nodal
Officer
Date of forwarding
the proposal to
State Government
Date of receipt of
observations from
State Government
Date of sending
replies / modified
proposal to State
government
26 27 28 29 30 31 32 33 34 35 36 37
NPV CA and other
amount
38 39 40 41 42 43 44 45 46 47 48 49 50
No. of trees
to be cut
Trees enumerated Length on which
enumeration done
Trees cut Length cleared in
relation to affected
length
No. of trees to be
cut
Trees enumerated Length on which
enumeration done
Trees cut Length cleared in
relation to affected
length
51 52 53 54 55 56 57 58 59 60 61 62
Status of Grant ofStage-II clearance
by MoEF
Date of Depositingthe amount in
CAMPA fund
Status of Enumeration
Expenditure on
tree cuttingStatus of tree cutting In Diverted Area
Status of tree cutting In Non-forest area
Forest Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)
Date of handingover of diverted
forest land
Fixed Fields
Order of StateGovt.
Remarks
Date offorwarding
the proposal
to MoEF
Compliance ofconditions laid
down in Stage- I
Status of inprinciple approval
Date ofconsideration of
proposal by MoEF
Date of sendingreplies / modified
proposal to MoEF
Date of receipt ofobservations from
MoEF
Amount to be deposited as perclearance conditions
Status of tree cutting In Diverted Area
Status of Enumeration Status of tree cutting In Diverted Area
Date of Forwardingof compliance by
the State Govt. to
MoEF
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
7/40
Fixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date
1 2 3 4 5 6 7 8
Whether requirement of
additional land is more
than 40m on existing
alignment and 60m on new
alignments / bypass
Whether Environmental
Clearance required ? [Not
required if length is less than
100km, or answer to column 9 is
No]
If environmental clearance
required, fill details in
relevant format
Whether Forest Clearance
required ? [If yes, fill
details in the relevant
format]
Whether Wildlife clearance
required ? [If yes, fill
details in the relevant
format]
9 10 11 12 13
Date of submission of draft
TOR by Consultant
If yes, Submission of TOR to MoEF Date of approval of TOR by
MoEF
Submission of draft EIA to
SPCB for conducting public
hearing
Date of pubic hearing Whether CRZ clearance
required ?
If yes, Date of submission
of proposal to CZMA
Date of approval of CZMA
14 15 16 17 18 19 20 21
Date of submission of all
documents required for
clearance by the consultant
Date of submission of EIA to
MoEF
Date of consideration of
Project by MoEF
Date and number of MoEF
approval latter
Date of submission of
application for NOC of PCB
by consultant
Date and number of NOC
by PCB
Remarks
22 23 24 25 26 27 28
Fixed Fields
Environment Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
8/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start
date
Scheduled End
date
Whether
requirement of
additional land is
more than 40m on
existing alignment
and 60m on new
alignments /
bypass
Whether
Environmental
Clearance
required ? [Not
required if length
is less than
100km, or answer
to column 9 is No]
If environmental
clearance
required, fill
details in relevant
format
Whether Forest
Clearance
required ? [If yes,
fill details in the
relevant format]
Whether Wildlife
clearance required
? [If yes, fill
details in the
relevant format]
1 2 3 4 5 6 7 8 9 10 11 12 13
State Govt. MOEF
14 15 16 17 18 19 20 21 22 23 24 25 26
Date of Order of
Honble Supreme
Court.
Date of
registration with
the Nodal Officer
Date of
submission of
Diversion proposal
to DFO
Date of receipt of
observations from
DFO
Date of sending
replies / modified
proposal to DFO
Name of the
Forest Circle
involved
Date of
forwarding the
proposal to
CF/CCF (officer in
charge of the
circle)
Date of receipt of
observations from
the Circle office
Date of sending
replies / modified
proposal to Circle
office
Date of
forwarding the
proposal to PCCF
Date of receipt of
observations from
PCCF
Date of sending
replies / modified
proposal to PCCF
Date of
forwarding the
proposal to Nodal
Officer
27 28 29 30 31 32 33 34 35 36 37 38 39
NPV CA and other
amount
40 41 42 43 44 45 46 47 48 49 50 51 52
No. of trees to be
cut
Trees enumerated Length on which
enumeration done
Trees cut Length cleared in
relation to
affected length
53 54 55 56 57 58 59 60 61 62
Date of filing
Application to
Honble Supreme
Court
Length Affected in
the Division /
wildlife area
Date of
submission of
proposal to DFO /
Wildlife Warden
Date of
consideration of
proposal by SBWL
Date of
consideration of
proposal by
NBWL
Date of
conveyance of
decision of MoEF
to State Govt
Total length Total Wi ld li fe area
to be diverted (in
ha)
Total Length
Affected
Name of Wild Life
Area and Division
Wildlife area to be
diverted (in ha) in
the Division /
wildlife area
Status of Enumeration Status of tree cutting In Diverted Area
Date of handing
over of diverted
forest land
Order of State
Govt.
Status of Grant of
Stage-II clearance
by MoEF
Date of
Forwarding of
compliance by the
State Govt. to
MoEF
Date of Depositing
the amount in
CAMPA fund
Date of receipt of
observations from
State Government
Date of sending
replies / modified
proposal to State
government
Wildlife Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)
Date of forwarding the proposal to
Status of tree cutting In Diverted Area
Fixed Fields
Date of sending
replies / modified
proposal to MoEF
Amount to be deposited as per
clearance conditions
Date of
consideration of
proposal by MoEF
Status of in
principle approval
Compliance of
conditions laid
down in Stage- I
Date of
forwarding the
proposal to MoEF
Date of receipt of
observations from
MoEF
Date of receipt of
observations from
Nodal Officer
Date of sending
replies / modified
proposal to Nodal
Officer
Date of
forwarding the
proposal to State
Government
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
9/40
No. of trees to be
cut
Trees enumerated Length on which
enumeration done
Trees cut Length cleared in
relation to
affected length
63 64 65 66 67 68 69
Status of tree cutting In Non-forest area
Status of Enumeration Status of tree cutting In Diverted Area RemarksExpenditure on
tree cutting
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
10/40
From To
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
application on
charges deposition
Observati ons Reply to Rai lway Approval for
Deposition
Date of Deposition
by NHAI
14 15 16 17 18 19 20 21 22 23
GAD prepared by
Consultant Yes/
No
Date of
Submission to
Railway
Observation raised
by Railway
Reply by NHAI Date of approval
by Railway
Date of approval
of GAD as per
Concessionaire
Agreement
Whether Railway
approved GAD
within 90 days
from submission
D&D prepared by
Concessionaire
Yes/ No
Date of
Submission to
Railway
Observation raised
by Railway
24 25 26 27 28 29 30 31 32 33 34
TAD prepared by
Concessionaire
Yes/ No
Date of
Submission to
Railway
Observation raised
by Railway
Reply by NHAI Date of approval
by Railway
Date of
application
Date of approval
by Railway
Traffic Plan
prepared by
Concessionaire
Observation raised
by Railway
Reply by NHAI Date of approval
by Railway
35 36 37 38 39 40 41 42 43 44 45
Level crossing
shifting plan
prepared by
Concessionaire
Yes No
Date of Submision
to Railway
Observation raised
by Railway
Reply by NHAI Date of approval
by Railway
Utility shifting
plan prepared by
Concessionaire
Date of Submision
to Railway
Observation raised
by Railway
Status of Utility
shifting
46 47 48 49 50 51 52 53 54 55 56 57
TAD CRS
Design and DrawingGAD
Traffic Block
Status of approval at Railways
Level Crossing Utility shifting
Progress % Likely date of
completion
Detailed RemarksStatus of approval at Railways
Chainge NH km ROB/RUB ID No.
RAILWAY OVER BRIDGE / RAILWAY UNDER BRIDGES. No. Name of Project PIU NH. No NH Section NHDP Phase State of Project Description of
ROB/RUB
Zonal Rai lway Year of Sanction
Status of approval at Railways At RFP, whether
GAD approved or
not (Yes/No)
Deposition of codal charges to Railway(P&E, D&G, Maintenance and other)Project Status
(Awarded/
Progress)
RLY Div. RLY KM LC NO. RLY Block
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
11/40
From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
From To
20 21 22 23 24 25 26 27 Chainage
From To
28 29 30 31 32 33 34 35 36
From To From To From To
37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
From To
58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74
Remarks
No. of bus
bays on
LHS
No. of
bus bays
on RHS
bus bays
not free
from
encumber
ance
cumulative
no. of bus
bays
handed
over after
AD
No. of
Truck lay-
byes on
LHS
No. of
Truck lay-
byes on
RHS
Whether
handed
over on AD
If not, date
of handing
over
75 76 77 78 79 80 81 82 83
Input Fields Format for Right of Way - Article 10 of MCA
Land handed over to concessionnaire after AD (cumulative) Any encumberance
reported by
concessionnaire on
handed over stretch
S. No. S. No. Chainage (in Km) Area Total ROW (in
m)
S. No. Chainage (in Km) Area Total ROW (in m)
Appointe
d Date
Date of
joint
inspectio
n
(chainage
wise)
Unencumbered Land at the time of Appointed Date
Additional Land Required for 6 laning
S. No. Type of
Structure
Width (in
m)
Whether
handed
over on AD
If not, date
of handing
over
Chainage (in Km)Grade Separators
S. No. Additional
ROW
required
Additional
area
required
S. No. Area
handed
over
Chainage Date of handing
over
No. of Box
Culverts
Type of
Structure
Width (in
m)
Whether
handed
over on AD
If not, date
of handing
over
No. of major
bridges
Bus Bays and Truck Lay Byes
No. of ROBs No. of Grade
Separators
No. of Minor
Bridges
No. of
Vehicular and
Non Vehicular
Underpasses
Whether
handed
over on AD
If not, date of
handing over
Total
ROW (in
m)
Extent of
critical
stretch
handed
over
Date of
reporting
Chainaage-
wise brief of
report
Major Bridges Railway Over BridgesIf not, date
of handing
over
S. No. Chainage (in Km) Type of
Structure
Width (in
m)
S. No. Chainage (in Km) Type of
Structure
Minor Bridges Total No. of Structures on the Site
S. No. Chain age ( in Km )
Details of required land
S. No. Chainage (in Km) Area
Width (in m) Whether
handed
over on
AD
No. of Pipe
Culverts
No. of Slab
Culverts
Structures
not free
from
encumbera
nce
Cumulative no. of
structures handed
over after AD
Scheduled Date of 6 laning:
Detalis of handing over
Land not free from encumberance at the time of Appointed DateTotal land required for the project
Chainage (in Km) Area Total ROW
(in m)
Reason for
encumbera
nce
Is the
encumbera
nce critical
?
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
12/40
Date of
submission
Date of
acceptance
by NHAI
Date of
submission
of draft
Escrow
Agreement
Date of
acceptance
by NHAI
Date of
submission
of Executed
Agreement
Date of signing
of Agreement
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Date of
submissio
n of draft
Substitutio
n
Agreemen
t
Date of
acceptance
Date of
submission of
Executed
Agreement
Date of signing
of Agreement
Date of
submissi
on of
draft
Financing
Agreeme
nt
Date of
acceptance by
NHAI
Date of issue
of sanction
letter by
lender/
Bank.
Date of approval
by NHAI
Date of
Submission of
executed
Financing
Agreement
Date of
submission of
draft Financial
Package &
model
Date of
acceptance
Date of
submission
of Financial
Package &
model
Date of
submission
Date of
acceptance
Date of
submission
Date of
acceptance
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Date of
permission
granted by
the
concerned
authority
Date of
intimation to
NHAI by the
Concessionai
re
If waived
(yes/no)
Date of
permission
granted by the
concerned
authority
Date of
intimatio
n to
NHAI by
the
Concessi
If waived
(yes/no)
Date of
permission
granted by
the
concerned
authority
Date of
intimation to
NHAI by the
Concessionaire
If waived
(yes/no)
Date of
permission
granted by the
concerned
authority
Date of
intimation
to NHAI by
the
Concession
aire
If waived
(yes/no)
Date of
permission
granted by
the
concerned
authority
Date of
intimation
to NHAI by
the
Concessiona
ire
If waived
(yes/no)
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
Date of
permission
granted by
the
concerned
authority
Date of
intimation to
NHAI by the
Concessionai
re
If waived
(yes/no)
Date of
permission
granted by the
concerned
authority
Date of
intimatio
n to
NHAI by
the
Concessi
If waived
(yes/no)
Date of
permission
granted by
the
concerned
authority
Date of
intimation to
NHAI by the
Concessionaire
If waived
(yes/no)
Date of
permission
granted by the
concerned
authority
Date of
intimation
to NHAI by
the
Concession
aire
If waived
(yes/no)
Date of
permission
granted by
the
concerned
authority
Date of
intimation
to NHAI by
the
Concessiona
ire
If waived
(yes/no)
47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63
Remarks
Clearance of PCB for setting up Batching Clearance of Village Panchayats and PCB for Permission of Village Panchayat and State Permission of State Govt. for cutting of Any other permits or clearances required
Applicable Permits (clause 4.1.3 (d) and Schedule E Appointed
Date
Applicable Permits (clause 4.1.3 (d) and Schedule E
Permission for extraction of boulders; Permission of Village Panchayat & PCB for
installation of crushers;
License for use of explosives; Permission for drawing water from
river/reservoir;
License for setting up Batching Plant;
(c) Submission of executed Substitution Agreement (e) Submission of executed Financing Agreements (f) Submission of Financial Package &
Model
(g) Submission from
Consort. Members for
correctness of
representations and
(h) Submission of legal
opinion from the legal
counsel
Post Award Monitoring of PPP Projects
Condition Precedent of Concessionaire before Appointed DateS l. No . N am e of t he
Project
Project Stretch NH No. State Name of
Concessionaire
Date of
Award
Date of Signing
of CA
Due Date for
Fulfillment of
Condition
Precedent
(a) Performance Security
(Cl. 4.1.3 (a) & Cl 9.1)
(b) Submission of executed Escrow Agreement
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
13/40
Project name /
IDNH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement
1 2 3 4 5 6 7 8 9 10
Sl. No. Approval Required for Approval Type Date Status/ Remarks
A State Government Permits/ Quarrying Permits:
1Permits for extraction of boulder from quarry from Additional District
Magistrate (ADM) Mines
2Permit for installation of crusher from village Panchayat and
State/Central Pollution Control Board
3 License for explosives from the office of Explosive controller
4 E xp losi ve li cense f or st or ing d iese l
B Electricity:
1Permission required from State Electricity Board (SEB) for installation of
Diesel Generator (DG)
2 Permission for electrical connection, if power source is available
C Water:
1If water has to be taken from river/ reservoir, permission to be
obtained from State Irrigation Department
D Batching Plant:
1 L icense from inspecti on of fact or ies
2NOC consent/Clearance required from village panchayat &
State/Central Pollution Control Board/Dept.
E Asphalt Plant:
1Clearance required from village panchayat & State/Central Pollution
Control Board
F Borrow Earth:
1 Permission from irrigation department if land taken from irrigation land
2Permission required from village panchayat and ADM mines for
Government & private land
3 Permission from Local Municipalities and Development Authorities
G Cutting of trees and other environment clearances:
1 Permission from Forest Department and other applicable agencies
H S ewag e L ine s a nd Wa te r Ma in s:
1 Permission from Local Municipalities and Development Authorities
APPLICABLE PERMITS AS PER CONDITIONS PRECEDENT OF CONCESSIONAIRE - Clause 4.1.3 (e) and Schedule E of Model Concession Agreement (MCA)Fixed Fields
Applicable Permits
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
14/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of
Concessionaire
Date of agreement
1 2 3 4 5 6 7 8 9 10
Item type &
Description
Total No. to be
shifted
Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Expected s hifting
date
Cumulative Present Status
1 2 3 4 5 6 7 8 9 10 11
Item type &
Descri tion
Total No. to be
shifted
Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Expected s hifting
date
Cumulative Present Status
1 2 3 4 5 6 7 8 9 10 11
Item type &
Description
Total No. to be
shifted
Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Expected s hifting
date
Cumulative Present Status
1 2 3 4 5 6 7 8 9 10 11
Item type &
Description
Total No. to be
shifted
Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Expected s hifting
date
Cumulative Present Status
1 2 3 4 5 6 7 8 9 10 11
12 13 14 15 16 17 18 19 20 21 22
From (km) To (km)
23 24 25 26 27 28
UTILITY SHIFTING
Division Date of work order
from concerned
Dept.
Amount of Estimate
I/c S.C./ S. Tax
as received from
Dept. (lacs)
Approved Amount of
estimate by NHAI
I/c S.C./S. Tax
(lacs)
Supervision Charges
/ S.Tax (Rs.)
Approved vide letter
no. & date by HO/RO
Date of Deposition
of S.C./ S. Tax
Division Wise Particulars of Utility Shifting Estimates (Electrical / Water supply) (Within 3 months of signing Concessionaire Agreement)
Date of Handing over work order to
I) Status of shifting of Electric Lines (Nos.)
Fixed Fields
II) Status of shifting of Water Supply Pipelines (Kms.)
III) Status of shifting of Irrigation/ Structures (Nos.)
Date of Start of
Work
Status of Work Date of Completion Remarks
IV) Status of Shifting of Other Utilities (Kms. / Nos.)
S. No. Name of work Received from Letter no. & Date
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
15/40
1 2 3 4 5 6 7 8 9 10
Proprietary rights
required
Date of submission of
application(s) for
rights
Date of acquiring
Proprietary rights
Concerned Govt. Dept.
/ official involved
Current Status Agreements required Date of submi ssion of
application(s) for
Agreements
Date of acquiring
Agreements
Concerned Govt. Dept.
/ official involved
Current Status
11 12 13 14 15 16 17 18 19 20
Licenses required Date of submission of
application(s) for
licenses
Date of acquiring
Licenses
Concerned Govt. Dept.
/ official involved
Current Status P ermi ssions requi red Date of submi ssion of
application(s) for
Permissions
Date of acquiring
Permits
Concerned Govt. Dept.
/ official involved
Current Status
21 22 23 24 25 26 27 28 29 30
Agreements
Licenses Permissions
PIU Scheduled Start date Scheduled End date Name of
Concessionaire
Date of agreement
Proprietary rights
Proprietary Rights, Licenses, Agreements and P ermissions related transactional fields
Fixed Fields
Proprietary Rights, Licenses, Agreements and P ermissions related transactional fields
Obligations (Concessionaire) - Article 5.1.4 (b) of Model Concession Agreement
Form for Proprietary Rights, Licenses, Agreements and Permissions
Project name / ID NH No. Length Stretch State
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
16/40
Project name / ID NH No. Length Stretch State PIU Scheduled
Start date
Scheduled End
date
Name of
Concessionaire
Date of
agreement
1 2 3 4 5 6 7 8 9 10
Clause Sub clause Key Action Point Action Responsibility Date of Submission Date of
Acceptance by
NHAI7.1 1 The concessionaire represents and warrants to Authority that Concessionaire
a It is duly organized and validly existing under the laws of India and has full power
and authority to execute and perform its obligations
Concessionaire
b It has taken all necessary corporate and other actions under applicable laws to
authorize the execution and delivery of this agreement.
Concessionaire
c It has financial standing and the capacity to undertake the project in accordance
with the terms of this agreement
Concessionaire
d Its obl igation under this agreement wil l be legal ly val id and, binding and
enforceable obligations against it in accordance with terms thereof
Concessionaire
e It is subject to laws of India and irrevocably waives any immunity in any
jurisdiction in respect of this agreement.
Concessionaire
f The information furnished in the bid and as updated on or before date the date of
this agreement is true.
Concessionaire
g The execution, delivery and performance of this agreement will not conflict with,
result in breach of, constitute a default under or accelerate performance required
by any of the terms of its Memorandum and Articles of association or any other
a l icable laws
Concessionaire
h There are no actions, suits, proceeding, or investigations pending or to its
knowledge, threatened against it at law or equity before any court.
Concessionaire
i It has no knowledge of any violation or default w.r.t any order, writ, injunction or
decree of any court or any legally binding order of any Gov. instrumentality.
Concessionaire
j It has complied with applicable laws in all material respects and has not been
subject to any fines, penalties, or any other civil or criminal liabilities.
Concessionaire
k It shal l at no t ime undertake or permit any change in ownership except in
accordance with the provision of Clause 5.3
Concessionaire
l The selected bidder and its associates have financial standing and resource to
fund the required equity and raise the debt necessary for undertaking and
implementing the project.
Concessionaire
m The selected bidder is duly organized and validly existing under the laws of the
jurisdiction of its incorporation
Concessionaire
n All its rights and interests in project highway shall pass to and vest in the
Authority on the transfer date free and clear of all liens, claims and
encumbrances.
Concessionaire
o No representation or warranty by it contained herein or in any other document
furnished by it to the authority or to any government instrumentality in relation
to applicable permits contains or will any untrue or misleading statement of
material fact.
Concessionaire
p No sums in cash or kind have been paid or wil l be paid by it or on its behalf to any
person by way of fees, commissions or otherwise for securing the concession.
Concessionaire
q All information provided by selected bidder in response to the Request for
Qualification and Request for proposal true and accurate in all material respects.
Concessionaire
REPRESENTATION AND WARRANTIES AS PER MCA CLAUSE 4.1.3 (e)
Fixed Fields
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
17/40
Clause Sub clause Key Action Point Action Responsibility Date of Submission Date of
Acceptance by
Concessionaire
7.2 1 Represent and Warrant to Concessionaire NHAI
a It has full power and authority to execute, deliver and perform its obligation
under this agreement and carry out the transactions contemplated herein.
NHAI
b It has taken all necessary actions under the applicable laws to authorise the
execution, delivery and performance of this agreement.
NHAI
c It has financial standing and capacity to perform its obligations NHAI
d This agreement constitutes a legal, valid, and binding obligation enforceable
a ainst it in accordance with terms thereof.
NHAI
e It has no knowledge of any violation or default w.r.t any order, writ, injunction or
any decree of any court of any legally binding order of any governmentinstrumentalit .
NHAI
f It has complied with applicable laws in all material aspects. NHAI
g It has right, power, and authority to manage and operate the project highway
upto the appointed date
NHAI
h It has good and val id right to the site and has power and authority to grant a
license in respect there to the concessionaire.
NHAI
Clause Sub clause Key Action Point Action Responsibility Date of Disclosure Action by
Authority /
Concessionaire
7.3 1 Disclose to other party if any representations or warr anties are untrue or
incorrect
NHAI/Concessionaire
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
18/40
Project name /
ID
NH No. Length Stretch State PIU Scheduled Start
date
Scheduled End
date
1 2 3 4 5 6 7 8 9 10
Fixed Fields Date of receipt
of Legal Opinion
by Authority
Name of
Concessionaire's
Legal Counsel
Legal Opinion by Concessionaire - Conditions Precedent Clause 4.1.3 (h)
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
19/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of
Concessionaire
Date of agreement
1 2 3 4 5 6 7 8 9 10
Date of Appointment Name of selected
IE/Firm
Address of IE / Firm Contact person / PM
of IE
Contract start date Contract end date IE Contract amount Remarks
11 12 13 14 15 16 17 18
Fixed Fields
Appointment of IE
Appointment of Independent Engineer by Authority - Article 23 of Model Concession Agreement
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
20/40
1 2 3 4 5 6 7 8
Target Achieved Up to previous FY During CFY Cumm. Expenditure
9 10 11 12 13 14 15 16
Date of submission of
Monthly Progress
Report (MPR)
Brief description of
Delays, Slippages from
approved Work
Programme
17 18 19 20 21 22 23
27 28 29 30
31 32 33 34 35 36 37
38 39 40 41 42 43
44 45 46 47 48 49
Completed Length
during month (DBM:
Km / BC : Km)
Cummu. Completed
Length (DBM: Km /BC :
Km )
Monthly Progress ReportGrant/Premium/Annui
ty Payment
Date of submission of
Work Programme by
Concessionaire
Date of approval Work
Programme by
Authority
Name of EPC
Contractor
Date of approval of EPC
Contractor
Physical Progress ExpenditureTPC - Grant/Premium
Fixed Fields
Construction Delay
LengthNH No.Project name / ID Scheduled End date (as
per Contract)
Scheduled Start date
(as per Contract)
PIUStateStretch (From and To)
Maintenance of Existing Road Force Majeure Event Accident Reporting
Casualties if anyFrequency of Events Delay caused to Force
Majeure event
Remarks on Milestones
(If "N" responded to
Milestones)
Date of Inspection by
Engineer
Date of submission of
Inspection Report
Date of Test for Quality
Assurance
Frequecy of monitoring
of road
Numbers of boards &
barricades deployed
Number of Diversion
Roads
Inspection Tests for Quality Assurance
Milestone-I (Achieved) -
(Y/N)
Milestone-II (Achieved)
- (Y/N)
Milestone-III
(Achieved) - (Y/N)
Monitoring of Construction
Date of submission of
report for delay by
Concessionaire
Action to be taken by Date of Corrective
Action
Date of Issue of Notice
for delay to
Concessionaire
Sample Size taken for
Test
Date of Test Report
submission
Cost incurred on Test
Construction Delay
Status (Y/N)
Reason for delay
Frequency of Accidents
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
21/40
50 51 52 53 54 55 56
From To
57 58 59 60 61 62 63 64
Cost incurred by
Concessionaire during
work suspension
Cost incurred by
Authority during work
suspension
Construction Works
Extension Status
Date of Issue of
Extension for
Construction Works
Term of Extension for
Construction Works
Work Suspension
Status (Y/N)
Work suspension due
to Authority (Y/N)
Work suspension due
to Concessionaire (Y/N)
Date of Issue of notice
for suspension of work
by Authority to
concessionaire
Date of Issue of notice
by Concessionaire for
remedial actions taken
Construction Works Extension Photo & Video Recording
Date of Submission of
Video Recording by
Concessionaire
Length covered in
Video Recording
S tr et ch cov er ed in Vid eo Re cor ding N um be r o f s it es
covered in photos
Work Suspension
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
22/40
Project name /
ID
State PIU NH No. Length Name of
Concessionaire
Date of
agreement
Total Project of
Cost in Crore
Scheduled
Commentement date
Scheduled
Completion date
Anticipate
Completion date
Name of I/E
1 2 3 4 5 6 7 8 9 10 11 12
Name of
selected Safety
Consultant
Address of
Safety
Consultant
Contact person
/ PM
Scheduled
Commencemen
t date
Scheduled
Completion
date
Safety
Consultant's
Contractamount in
Lakhs
Remarks
13 14 15 16 17 18 19
Fixed Fields
Appointment of Safety Consultant
Appointment of Safety Consultant by Authority - Article 18.1.2 of Model Concession Agreement
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
23/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of
Concessionaire
Date of agreement
1 2 3 4 5 6 7 8 9 10
Name of Personnel Date of start of
Employment
Authority's Regulatory
approval
Citizenship country of
Personnel
Passport No. of
Personnel
Employment valid till
date
Work permit granted ? V ISA No. VISA valid till date Remarks
11 12 13 14 15 16 17 18 19 20
Fixed Fields
Employment of Foreign National
Employment of Foreign Nationals by Concessionaire - Article 5.4 of Model Concession Agreement
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
24/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement
1 2 3 4 5 6 7 8 9 10
Date of submission of
Draft Project
Agreements
Name of Person
submitting Draft Project
Agreements
Status Date of submission of
True copy of Project
Agreements
Name of Person
submitting True copy of
Project Agreements
True copy of Project
Agreements attested by
Director of
Concessionaire
Status Right of substitution
allowed to Authority in
True copy of
Agreements
11 12 13 14 15 16 17 18
Fixed Fields
Project Agreements
Obligations (Concessionaire) related to Project Agreements - Article 5.2 of Model Concession AgreementInput Form for Project A greements Submission by Concessionnaire
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
25/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement
1 2 3 4 5 6 7 8 9 10
Date of submission Change in scope
notice
Name of Person
submitting Change in
scope notice
Impact and effects of Change in
scope as per Concessionaire
Date of submission of
impact and effects due
to Change in scope to
Authority
Change in Scope
cost as per
Concessionaire
Change in Scope cost as
per IE
Agreed to Change in
Scope cost
Date of issuance of Change in
scope Order by Authority
Party paying for Change
in scope cost
11 12 13 14 15 16 17 18 19
Failure to complete Construction
Works under Change of scope
Advance payment
amount received by
Concessionaire for
Change in scope
Damages amount paid to
Authority for failure to complete
Construction Works under
Change of scope
Remarks (if any) Status
20 21 22 23 24
Fixed Fields
Change in Scope (for Concessionaire)
Change in Scope (for Concessionaire)
Change in Scope Notice (to/by Concessionaire) - Article 16 of Model Concession Agreement
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
26/40
Project name / ID NH No. Length Stretch State PIU Scheduled
Start date
Scheduled End
date
TPC
1 2 3 4 5 6 7 8 9
Date of submission Date of Confirmation
by issuing Bank
PBG No. Date on PBG Date of reply by the
Compliance by
Concessionaire/ Bank
Date of
acceptance by
NHAI
10 11 12 13 14 15
Name of Concessionaire Date of Concession
Agreement
Amount of PBG Issuing Bank Branch and address of
Bank
Status Remarks (if
any)
16 17 18 19 20 21 22
Action Date Amount (where
applicable)
Status Remarks/Issues
Provided
Invoked
Encashed
Terminated
Released
Appropriated (partial)
Replenished
Returned
Performance Security
(a) Performance Security (Cl. 4.1.3 (a) & Cl 9.1)
Fixed Fields
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
27/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date
1 2 3 4 5 6 7 8
Original Lenders In case of Substiution
9 10 11 12 13 14 15 16 17 18 19
20 21 22 23 24
Action Date Amount (if applicable) Action by Status Remarks/Issues
Procure execution of Escrow
Agreement
Retention of reserves
Deposits & Receipts
Payments from account
Appropriation after termination
Escrow
Account
creation due
date
Actual Escrow
Account
creation date
Extended Escrow Account creation date
Form for EscrowFixed Fields
Date of Escrow AgreementName of Concessionaire Escrow Bank Account
No.
Escrow Bank Name Branch and address of
Bank
List of signatories to
the Escrow Account
Names of Lenders
Escrow Account Operation
Monthly Escrow
Account
Statement
Report
submitted to
Authority by
Financial
Consultant ?
Monthly Escrow
Account Statement
Report in order ?
Status Remarks
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
28/40
Project Name/ID NH NO. Length Stretch State PIU Name of the
Selected Bidder
Name of the
Concessionaire
Scheduled End date Name of
Concessionaire
Date of
agreement1 2 3 4 5 6 7 8 8 9 10
Shareholders'
names
% of Shares held Face value of the
shares held
Proposed
Shareholders'
% of Shares held Face value of the
shares held
Approved
Shareholders'
% of Shares held Face value of the
shares held
Obligations (Concessionaire) Notify Change in Ownership - Article 5.3 of Model Concession Agreement
Status /
Remarks (if
any)
Fixed Fields
Name of the
Shareholders in SPV
(I)
Original Shareholding Pattern Date of Submission
of Request letter of
Change in
Revised Shareholding Pattern Proposed Revised Shareholding Pattern Approved Date of
Approval of
revised
names names
11 12 13 14 15 16 17 18 19 20 21 22 23
Ownership Shareholding
pattern by
NHAI
(Drop down) List of
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
29/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of
Concessionaire
Date of agreement
1 2 3 4 5 6 7 8 9 10
Reasons for failure to
achieve milestone
(works)
A mount pa id to A ut hori ty D at e of payment Pending am ount to be
paid to Authority
Date of demand sent
for debit to Escrow
Account
11 12 13 14 15
Reasons for delay in COD Amount paid to Authority Date of payment Pending amount to be
paid to Authority
Date of demand sent
for debit to Escrow
Account
D at e of C OD E xpected D at e of
Project Completion
16 17 18 19 20 21 22
Reasons for failure to
achieve Financial Close
A mount pa id to A ut hori ty D at e of payment Pending am ount to be
paid to Authority
23 24 25 26
P un ch L is t i te ms V al ue o f P un ch L is t i te ms A ft er 1 20 d ay s
extension, Punch List
items not completed
Reasons for not
completing Punch List
items
Value of Punch List
items not completed
after 120 days
Penalty applied
for not
completing PunchList items
Amount paid to
Authority
Date of demand sent
for debit to Escrow
Account
Date of payment
27 28 29 30 31 32 33 34 35
Pending amount to be
paid to Authority
Date of COD Project Completion
Date
36 37 38
Reasons for failure to
rectify any defect or
deficiency
Recti fica tion dema nd da te C ure Per iod A mount paid t o A ut hori ty D at e of dem and s ent
for debit to Escrow
Account
Date of payment Pending amount to be
paid to Authority
39 40 41 42 43 44 45
Reasons for failure
material default
Amount paid to Authority Date of demand sent
for debit to Escrow
Account
D ate of p ay me nt P en di ng amo un t to be
paid to Authority
46 47 48 49 50
Payment of Damages to Authority - Various Articles of Model Concession AgreementFixed Fields
Delay in COD
Failure to Rectify Defect
Material Default
Non-Completion of Punch List
Non-Completion of Punch List
Failure to Achieve Milestone
Failure to Achieve Financial Close
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
30/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start
date
Scheduled End date Name of
Concessionaire
Date of Concession
agreement
1 2 3 4 5 6 7 8 9 10
Date of Execution Names of Sr.
Lenders
Name of Lenders'
Representative
Branch and address
of Lenders
Signatories to the
Substitution
Agreement
Status Remarks
11 12 13 14 15 16 17
Fixed Fields
Conditions Precedent of Substitution Agreement (Concessionaire) - Article 4.1.3 (c) of Model Concession Agreement
Input Form for Substitution Agreement
Substitution Agreement Related Fields
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
31/40
Project Name/ID NH No. Length Stretch State PIU Name of the Selected Bidder Name of the
Concessionaire
Date of Formation of
Company (SPV) by
Concessionaire
Date of signing
of the CA
Date of opening
of Escrow
Account
1 2 3 4 5 6 7 8 9 10 11
Date of Submission
of Draft Financing
Agreements
(received by NHAI)
Date of submission of
Banks' Sanction letter
Scheduled date of
Financial Close
(Normal)
Date of Financial Close
with Extension
Date of Financial Close with
Cost
S che dul ed A ppo int ed D at e Sc he du le d C OD S che dul ed da te
prior to which
Performance
Security to be
Format for Financial CloseFixed Fields
submitted
12 13 14 15 16 17 18 19
List of Documents
submitted, along
with Declaration
that these
constitute the
complete set of
Project Documents
Date of execution of
Substitution Agreements
Date of
declaration of
Financial Close
C urrent Status) RemarksDate of final Legal
scrutiny of draft
documents and
comments by
Authority
Date of
acceptance of
comments by
Concessionaire
Signing of the Loan /
Project documents by
the Concessionaire
Date of submission by the
Concessionaire of three
sets of Financing
Documents duly executed,
along with soft copy of
Financial Model (if
applicable)
Either an item by item
verification by NHAI of
satisfaction of all Pre-Sanction
Conditions and Pre-
Disbursement Conditions of
Lenders,
OR
Certification from Lenders to be
obtained by Concessionaire
confirming that only Post-
Disbursement conditions are
required to be completed, and
all Pre-Sanction and Pre-
Disbursement conditions stand
20 21 23 24 25 26 27 28 29 30
S. No. Name of the
Agreement
Date of
submission
Date of forwarding to
Financial Consultant
(FC)
Date of Review given by FC Date of forwarding FC's
Comments to Concessionaire
Remarks / Current Status
1 Senior Common Loan
Agreement
2 Subordinate Common
Loan Agreement
3 Security Trustee
Agreement
List of Documents
completely satisfied (list of Post-
Disbursement conditions
pending completion, to be part
4 Lenders' Agent
Agreement5 Deed of
Hypothecation6 Indenture of Mortgage
7 Mortgage Deed
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
32/40
8 Supplementary Escrow
Agreement
9 Inter Creditor
Agreement
10 Share Pledge
Agreement
11 Sponsors' Support
Agreement
12 Accession Deed
13 Financial Package
14 EPC Agreement
15 Any other document
Refinancing
Debt Equity Grant
31 32 33 34 35 36 37 38 39 40
Date of
execution /
submission of
revised
Substitution
Agreements
Date of execution of
revised Escrow Account
Date of submission
of refinancing
documents (if any)
Date of final Legal
scrutiny of draft
documents and
comments by
Authority
Date of
acceptance of
comments by
Concessionaire
Signing of the Loan /
Project documents by
the Concessionaire
Date of submission by the
Concessionaire of three
sets of Re-Financing
Documents duly executed,
along with soft copy of
Financial Model (if
applicable)
Revised Financing Plan
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
33/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of
Concessionaire
Date of agreement
1 2 3 4 5 6 7 8 9 10
Appoi nted Date Condi ti ons P recedent
achieved ?
Total completed length
of the Project
Date of issuance of
Provisional Certificate
Date of issuance of
Completion Certificate
COD extended to Date
(if applicable)
Date of achievement of
COD
Amount of Damages
paid to Authority (if
any)
Status
11 12 13 14 15 16 17 18 19
Project Name/ID NH NO. Length Stretch State PIU Name of the Selected
Bidder
Name of the
Concessionaire
Date of signing of the
CA
Scheduled Appointed
Date1 2 3 4 5 6 7 8 9 10
Date of Submission of
PS
Date of Submission of
Executed of Executed &
Substitution
Agreement
Date of procurement of
Applicable permits
Date of submission of
Financial Package
Scheduled Date of
Submission of Financial
Close
Actual Date of
Submission of Financial
Close
Current Status /
Remarks
11 12 13 14 15 16 17
Project Name/ID NH NO. Length Stretch State PIU Name of the Selected
Bidder
Name of the
Concessionaire
Date of signing of the
CA
Scheduled date of FC
1 2 3 4 5 6 7 8 9 10
Equity Debt Grant
11 12 13 14 15 16 17
Equity Debt Grant Equity Debt
18 19 20 21 22
TPC at the time of Project Completion
Form for Commercial Opening Date Article 15.1 of Model Concession Agreement
Fixed Fields
Fixed Fields
COD (Concessionaire)
Appointed DateFixed Fields
Concessionaire's Obligation
Appointed Date
Total Project Cost (TPC) Details [As per MCA]
Lenders' TPC at the time of Novation
Authority's TPC at the
time of RFP/Bid (in
Crores)
Lenders' TPC at the time of Financial CloseNHAI' Grant (if there is
any)
Debt portion in TPC as
per CA
Equity portion in TPC as
per CA
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
34/40
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement
1 2 3 4 5 6 7 8 9 10
Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status
11 12 13 14 15 16 17 18 19
Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
20 21 22 23 24 25 26 27 28
Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
29 30 31 32 33 34 35 36 37
Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
38 39 40 41 42 43 44 45 46
Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
47 48 49 50 51 52 53 54 55
Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status
56 57 58 59 60 61 62 63 64
Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
65 66 67 68 69 70 71 72 73
Date of issue
recording/reporting
Date of replacement Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status
74 75 76 77 78 79 80 81 82
Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
83 84 85 86 87 88 89 90 91
Operations & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)Fixed Fields
Breach / Blockade Roughness Pot Holes
Cracking in more than 5% of road surface in a stretch of 1 km Rutting exceeding 10 mm in more than 2% of road surface in a stretch of 1 Rutting exceeding 10 mm in more than 2% of road surface in a stretch of 1
Bleeding/skidding Ravelling/Stripping of bitumen surface exceeding 10 sq m Damage to pavement edges exceeding 10 cm
R em ova l o f d eb ri s V ari at io n b y m or e t ha n 2% in th e p re sc ri be d s lo pe of ca mb er /c ro ss fa ll H ar d/ ea rt h s ho ul de rs , s id e s lo pe s, dr ai ns an d c ul ve rt s
Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status Edge drop at shoulders exceeding 40 mm
Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
St at us D am ag e t o s ha pe or po si ti on ; p oo r vi sib il it y o r l os s o f r et ro -r ef le ct iv it y A ny ma jo r f ail ur e o f t he sy st em
Street lighting and telecom (ATMS) Trees and plantation
Hard/earth shoulders, side slopes, drains and culverts
V ar ia ti on by mo re th an 15 % i n t he pr es cr ib ed si de (e mb an km en t) sl op es R ai n c ut s/ gu ll ie s i n s lo pe D am ag e t o o r s il tin g o f c ul ve rt s a nd si de dr ain s d ur in g a nd im me di at el y
preceding the rainy season
D es il ti ng of dr ai ns in ur ba n/ se mi -u rb an ar ea s R oa d s id e f ur ni tu re in clu di ng ro ad si gn s a nd pa ve me nt ma rk in g St re et li gh ti ng an d t el ec om (A TM S)
Rest areas Toll plaza[s]
Defects in electrical, water and sanitary installations Failure of toll collection equipment or lighting Damage to toll plaza
F au lt s a nd m in or f ai lu re s O bs tr uc ti on i n a m in im um h ea d- ro om o f 5 m a bo ve c ar ri ag ew ay o r D et er io ra ti on i n h ea lt h o f t re es a nd b us he s
Trees and plantation Rest areas
Replacement of trees and bushes Removal of vegetation affecting sight line and road structures Cleaning of toilets
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
35/40
Date of issue
recording/reporting
Date of repair /
rectification
Status Date & Time of issue
recording/reporting
Date & Time of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
92 93 94 95 96 97 98 99 100
Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
101 102 103 104 105 106 107 108 109
Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
110 111 112 113 114 115 116 117 118
Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
119 120 121 122 123 124 125 126 127
Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status Date of issue
recording/reporting
Date of repair /
rectification
Status
128 129 130 131 132 133 134 135 136
Date of submission of 5
copies of Maintenance
Manual to Authority
Consulted with IE Date of submission of 2
copies of Maintenance
Manual to IE
Compliance with
Specifications and
Standards, MaintenanceRequirements, Safety
Requirements and Good
Industry Practices
Status Notification by
Concessionaire
Review By IE Suggestion Date of submission of
Maintenance
Programme toAuthority
Consulted with IE Status Date of Revision after 3
Years
137 138 139 140 141 142 143 144 145 146 147 148
Includes preventive
maintenance schedule?
Includes arrangements
and procedures for
carrying out urgent
repairs?
Includes criteria to be
adopted for deciding
maintenance needs?
Includes intervals and
procedures for carrying
out inspection of all
elements of the Project
Hi h wa ?
Includes intervals at
which the
Concessionaire shall
carry out periodic
maintenance?
Includes arrangements
and procedures for
carrying out safety
related measures?
Includes intervals for
major maintenance
works and the scope
thereof?
149 150 151 152 153 154 155
Date of Notification to
Authority
Date of response of
Authority to the
Notification
Modifictations
suggested/approved
Deviation from
Specifications and
Standards ?
Status Date & Time of issue
recording/reporting
Date & Time of
remedial action
Date & Time of
restoration
Does it follow the
relevant operating
procedures including
the setting up of
temporary traffic cones
and lights, and removal
of obstruction and
debris without delay?
Is maintaining and
operating a round-the-
clock vehicle rescue
post with one mobile
crane having the
capacity to lift a truck
with a Gross Vehicle
Weight of 20,000 KG
Is maintaining and
operating two such
vehicle rescue posts,
with one crane each,
and this posts is located
at each of the Toll
Plaza(s)
156 157 158 159 160 161 162 163 164 165 166
Other Project Facilities and Approach roads Superstructure of bridges
Spalling/scaling Scouring and/or cavitation Cracks and damages including settlement and tilting
Bearings (metallic) of bridges Joints in bridges Other items relating to bridges
D am ag e o r d et er io ra ti on i n A pp ro ac h R oa ds , -[ pe de st ri an f ac il it ie s, tr uc k C ra ck s - T em po ra ry m ea su re s C ra cks - P er ma ne nt m ea su re s
Superstructure of bridges Foundations of bridges Piers, abutments, return walls and wing walls of bridges
Other items relating to bridges
Damage to wearing coat Damage or deterioration in approach slabs, pitching, apron, toes, floor or Growth of vegetation affecting the structure or obstructing the waterway
Maintenance Manual Maintenance Programme
Deformation Loosening and malfunctioning of joints Deforming of pads in elastomeric bearings
Other items relating to bridges
Gathering of dirt in bearings and joints; or clogging of spouts, weep holes Damage or deterioration in parapets and handrails Rain-cuts or erosion of banks of the side slopes of approaches
Maintenance Programme shall include
Modifications to Project Highway Safety, vehicle breakdowns and accidents
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
36/40
Date of reporting a
decommissioning
Date & Time of issue
recording/reporting
Date & Time of
remedial action
Date & Time of
restoration
From To
167 168 169 170 171 172 173 174 175 176 177
Reason for Lane Closure
From To
178 179 180 181 182 183 184 185
Remarks (if any)
Amount Paid Unpaid Amount Paid Unpaid Concessionaire Authority
186 187 188 189 190 191 192 193 194 195
Fee Collection and its
Rules
Date of approval of Fee
Notification by
Authority
Collection of Fee as per
MCA ?
Date of submission of
O&M Inspection Report
to Authority
Consulted with IE Status Items identified for Risk &
Cost
Cost of Such Items Status Date of Issue of Fee
Notification
196 197 198 199 200 201 202 203 204
205 206 207 208 209 210 211 212 213 214
Date of submission of
Monthly Status Report
by Concessionaire
f or (M on th ) D at e o f I ns pe ct io n b y I E D at e o f S ub mi ss io n o f
Inspection report by IE
Conducted tests as per
IE and MCA ?
Carried out remedial
measures as per
Maintenance
Requirements/Manual /
Programme ?
M on th R ep or te d D at e of f ur ni sh in g
Monthly Fee Statement
Date of not submission
of Reports of unusual
occurrences (Dates on
which not Reported)
Brief description of
unusual occurrences
reported
215 216 217 218 219 220 221 222 223 224 225 226
F in an ci al Im pa ct P ar ty Im pa ct ed
227 228 229 230 231 232 233 234 235 236
Defect identified in
O&M Inspection Report
Date Date of Rectification If not Completed within
15 Days
Status of Rectification Whether further tests
proposed by IE
If yes, Then Status
237 238 239 240 241 242 243
Div ersion or interruption of t raffic S tretch being decommissioned Reason for
decommissioning
Date of Approval of
Authority for
decommissioning
Date of request for
recommissioning by
Concessionaire
Date of Approval of
Authority for
recommissioning
Agreed date of
recommissioning
Clausewise Damages
Head/Clause of
Damages
Damages to be paid by Concessionaire Damages to be paid by Authority Final Status
O&M Inspection Report
Actual date of
recommissioning
Date Lane closure
Request sent to
Authority
Date of approval from
Authority / IE on Lane
Closure
Stretch of Lane closure Agreed date of re-
opening lane
Acutal date of re-
opening lane
Name of fee collector
and user fee list should
be displayed at the
collection point ?
Sufficient change / coins
should be available with
the toll collector ?
Addition fee for
overloaded vehicles ?
Overloading allowed to
pass through the toll
after paying the over
charged fee ?
Date of submission of
Traffic Census
Bi-annual or annual
traffic survey
conducted by the Field
Authority ?
Monitoring O&M
Appropriation of Fee as
per MCA ?
Date of revision of fee New revised fee Fee exemption for local
traffic ?
Free use of service lane
?
Re-appropriation of
excess fee as per MCA ?
Status
Remedial measures
Advertising on the Site Force Majeure
No. of advertisements
Non compliant to normsLocations
Date of Notice to
Concessionaire forNature of advertisement Date of Removal Date of occurrence Type of Force Majeure
Nature of hindrance
due to Force Majeure
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
37/40
AuthorityTermination for failure to complete four-
laning within the specified period (Cl.
12.4.3
Setting up of Safety Fund (Cl. 18.2) Safety Fund set up as per
Concessionaire A reement ?
Date of Safety Fund set up ?
1 2
Disbursing Grant (Cls. 25.2 and 25.3) Date of Grant request fromConcessionaire
Recommended by IE ? Equity met ? Financing plan approved byAuthority ?
Date of Financingplan approval by
Authority
As per ConcessionaireAgreement
1 2 3 4 5 6
Issuing notice for a Force Majeure Event
(Cls. 34.5.1 and 34.5.2)
Need to issue notice for a Force
Majeure Event
Date of issuing notice for a Force
Majeure Event1 2
Taking action for Force Majeure after
Appointed Date (Cl. 34.6.2)
Allocation of costs arising out of Force
Majeure (Cl. 34.7)
Date of issue notice for a Force
Majeure Event
Allocation of Cost done as per
Concessionaire Agreement?
Costs arising out of Force
Majeure (INR)
1 2 3
Informing Concessionaire regarding
intention to terminate (Cl. 34.8)
Has termination been approved
by Authority ?
Informed Concessionaire regarding
intention to terminate ?
Date of informing
Concessionaire regarding
intention to terminate
Approved / Expected date of
termination
1 2 3 4
Termination Payment for Force
Majeure(Cl. 34.9)
Compensating for Additional Tollway/
Competing Road (Cl. 35.4)
Compensation as per
Concessionaire Agreement ?
Compensation recommended by IE
?
Compensation paid (INR) Escrow A/C utilized for payments
?
Status (if any)
1 2 3 4 5
Informing Concessionaire of intent to
terminate (Cl. 34.8)
Informing Lenders of the intent to
Terminate (Cl. 37.1.3)
Has termination been approved
by Authority ?
Informed Lenders regarding
intention to terminate ?
Date of informing Lenders
regarding intention to terminate
Approved / Expected date of
termination
1 2 3 4
Termination Payment for Authority
Default (Cls. 37.3.2 and 37.3.3)
Miscellaneous
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
38/40
Exercising rights and obligations upon
Termination (Cl. 37.4)
Issuing a Divestment Certificate (Cl.
38.3)
Divestment Certificate approved
by IE
Divestment Certificate approved by
Authority
Date of issue of Divestment
Certificate1 2 3
Adjusting the costs arising out of
Change in Law (Cl. 41.1)
Change in Law as per
Concessionaire Agreement ?
Demand for costs arising out of
Change in Law raised by
Concessionaire ?
Date of demand from
Concessionaire
Cost adjustment recommended
by IE ?
Costs to be
adjusted (INR)
Escrow A/C utilized for
payments ?
Status (if any)
1 2 3 4 5 6 7
Complying with General Indemnityrequirements (Cl. 42.1)
Indemnification as perConcessionaire Agreement ?
1
Amicably resolving disputes (Cl. 44.1
and 44.2)
Any pending disputes not
amicably resolved ?
List of such disputes Cont act Person in Authority for
dispute
Status of each dispute
1 2 3 4
Any other observation, complaint or
suggestion
Observation, complaint or
suggestion received
Date of observation, complaint or
suggestion
Action / Response on the
observation, complaint or
suggestion
Status / Remarks (if any)
1 2 3 4
Suspension upon occurrence of
Concessionaire Default (Cl. 36.1)
Termination Payment for aConcessionaire Default (Cl. 37.3.1)
Termination Payment for Authority
Default (Cls. 37.3.2 and 37.3.3)
Exercising rights and obligations upon
Termination (Cl. 37.4)
Have rights and obligations been
exercised by Authority upon
Termination ?
Remarks (if any)
1 2
Is the complaint redressal mechanism
working satisfactorily (Cl. 46.2)
Is complaint redressal mechanism
working ?
Remarks (if any)
1 2
ConcessionaireCrediting the balance to the Safety Fund
(Cl. 16.3.2)
Credit due to excess of Traffic
related revenue collections or
differential from change in Scope
of work a ments
Credited the balance to the Safety
Fund ?
Amount credited (INR) Date of credit Status / Remarks
(if any)
1 2 3 4 5
Effecting and maintaining insurance
cover (Cls. 32.1 and 32.2)
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
39/40
Depositing and using the proceeds from
insurance claims Cl. 32.7
Maintaining books of accounts (Cl. 33.1) Have book of Accounts been
maintained as per Auditor's
Re ort ?
Date of receipt by NHAI of Auditor's
Report ?
1 2
Appointing Statutory Auditors (Cl.
33.2.1)
Date of Appointment of Statutory
Auditors
Name of Firm/Persons as Statutory
Auditors
Tenure for Statutory Auditors
1 2 3
Issuing notice for Force Majeure Event
(Cls. 34.5.1and 34.5.2)
Informing the Authority regarding
intent to Terminate Cl. 34.8
Complying with the Divestment
Requirements (Cl. 38.1)
Do Divestment requirements
comply as per Concessionaire
A reement ?1
Paying all costs incidental to divestment
(Cl. 38.5)
Costs incidental to
divestmentapproved by IE ?
Date of payment for all costs
incidental to divestment
Amount paid to Authority for
costs incidental to divestment
1 2 3
Paying to the Authority the benefits
arising out of Change in Law (Cl. 41.2)
Change in Law as per
Concessionaire Agreement ?
Cost adjustment recommended by
IE ?
Costs to be adjusted (INR) Escrow A/C utilized for payments
?
Status (if any)
1 2 3 4 5
Complying with General Indemnity
requirements (Cls. 42.1 and 42.2)
Do Indemnity requirements
comply as per Concessionaire
A reement ?1
Allowing free access to the Site at all
times to the Authority (Cl. 43.2)
Is free access allowed to the Site
at all times to the Authority ?
1
Amicably resolving disputes (Cl. 44.1and
44.2)
Any pending disputes not
amicably resolved ?
List of such disputes Cont act Person in Authority for
dispute
Status of each dispute
1 2 3 4
Availability of Specified Documents and
documents for inspection (Cls. 45.1 and
45.2
Is there availability of Specified
Documents and documents for
ins ection ?
List of unavailable Specified
Documents and documents for
ins ection
Remarks (if any)
1 2 3
-
8/13/2019 Accenture - All DMS-PMS Input Forms Merged
40/40
Maintaining public relations office and
Complaints Register (Cl. 46.1)
Have public relations office and
Complaints Register been
maintained as per Concessionaire
A reement1
Inspecting Complaints Register every
day and taking prompt and reasonable
action (Cl. 46.2)
Has Complaints Register been
inspected every day ?
Have prompt and reasonable action
been taken ?
Resolution status of Complaints
1 2 3
Any other observation, complaint or
suggestion
Observation, complaint or
suggestion received
Date of observation, complaint or
suggestion
Action / Response on the
observation, complaint or
suggestion
Status / Remarks (if any)
1 2 3 4