Page 1: Acceptance Test Report 5523AWS-Ver2

ADSL VNPT

5523AWS Test Plan

Page 1 of 16

01VNPT

ED Test Date Customer Customer Representatives

Alcatel-Lucent Representative

Page 2: Acceptance Test Report 5523AWS-Ver2

Table of ContentsTABLE OF CONTENTS.............................................................................................2

INTRODUCTION........................................................................................................3

NGAWS NETWORK MANAGEMENT...................................................................5

1. FAULT MANAGEMENT TEST........................................................................5

2. SOFTWARE MANAGEMENT TEST..............................................................6

3. SYSTEM CONFIGURATION MANAGEMENT............................................7

4. PROFILE MANAGEMENT TEST....................................................................8

5. USER LOGIN TEST............................................................................................9

6. ISAM MONITORING VIA CLI CRAFT TERMINAL.....................................10

FORM 1: FAULT MANAGEMENT TEST DATA SHEET.................................12

FORM 2: SOFTWARE MANAGEMENT DATA SHEET..................................13

FORM 3: CONFIGURATION MANAGEMENT DATA SHEET......................14

FORM 4: PROFILE MANAGEMENT DATA SHEET........................................15

FORM 5: USER LOGIN TEST DATA SHEET....................................................17

Results.........................................................................................................................18

Page 2 of 16

Page 3: Acceptance Test Report 5523AWS-Ver2

INTRODUCTION

This is the acceptance test prepared for ADSL network installed in VNPT. The Acceptance Test Plan is a guide to evaluate the reliability, operability, functionality and performance of the Alcatel ISAM, and Speed Touch ATU-R.

The Acceptance Test also includes management, fault detection and provisioning capabilities of the network management station, ADSL Workstation System (AWS). This test is not a suitable replacement to educate users or to provide on-the-job training.

The procedures detailed in this test are performed on selected cards and ports in the IPDSLAM. The Acceptance Test will be carried out by at least one Alcatel engineer together with Customer engineer(s). The test setup is shown in Figure 1.

Page 3 of 16

Page 4: Acceptance Test Report 5523AWS-Ver2

Figure 1: Personal Computer with Speed Touch ADSL modem

Page 4 of 16

DSLA

Telephone lineGEPC w/ Speedtouch Modem/ NIC card

BRA

AWS

EthernetTo Internet link

Page 5: Acceptance Test Report 5523AWS-Ver2

AWS Network Management

This section will test the ISAM management and configuration using the Alcatel AWS.

1. Fault Management Test

PurposeThis section provides instructions for fault management function test.

Test Equipment AWS workstation

One person available at ISAM side.

Procedure1. Login AWS.

2. Use 5523 AWS menu > Alarm Application to begin recording alarm events.

3. Plug out a LT board.

4. Check on the AWS. The relevant slot will show ‘ missing board ‘ when putting the mouse cursor over the LT board.

5. Go to Network Element List window > View > Show Alarm. There should be a major Equipment alarm.

6. Plug in the board. The AWS will show normal status at the slot. Equipment alarm should be cleared.

7. Take out either of the optical fibers from the NT card. The rack ‘ C ’ led will turn red.

8. On AWS check the relevant ISAM. The icon should turn red. That means the AWS lost the contact to this ISAM. Also there will be a red led on the rack top.

9. Put back the optical fiber. The alarm on ISAM rack top will be cleared.

10. Perform a remote reset on the LT and NT card.

2. Software Management Test

Purpose

This procedure tests the software management’s function of AWS.

Test Equipment AWS workstation

Page 5 of 16

Page 6: Acceptance Test Report 5523AWS-Ver2

Procedure1. Go to Configuration > Software > OSWP > Show Status to get the software package which is used

by present ISAM.

2. Use Configuration > Software > OSWP > Download to NE to download software package for ISAM.

3. Use Configuration > Software > OSWP > Active to active not active software package

4. Use Configuration > Software > OSWP >Commit to remove the useless software packages.

5. Record all the software available and the results of above tests.

Page 6 of 16

Page 7: Acceptance Test Report 5523AWS-Ver2

3. System Configuration Management

Procedure

This Procedure tests the system configuration function of AWS.

Test Equipment AWS workstation.

Procedure1. From the top level (domain), zoom in the Area, ISAM, Subrack, etc. Check the hardware

configuration of each installed ISAM. Notice the ‘ Missing board ‘ and the ‘ Board Mismatch – xxxx detected‘ alarm if available.

2. Double click on the LT port to show ATM Termination and PPP Bridge Client Port

3. Highlight ATM Termination and choose Connection > Delete to delete 1 ATM Termination and PPP Bridge Client Port on the port.

4. Use Connection > Create > ATM Termination to recover the deleted ATM Termination. Verify that ATM Termination have been re-created.

5. Use Create PPP Client Port to recover the deleted PPP Client Port. Verify that PPP Client Port have been re-created.

6. Select a slot with LT board present. Use Board > Delete to delete the board on AWS.

7. The relevant slot should show ‘ Board Mismatch: NALT-C plugged but not planned ‘.

8. Use Board > Create to recover the right board.

Page 7 of 16

Page 8: Acceptance Test Report 5523AWS-Ver2

4. Profile Management Test

PurposeThis procedure tests the profile management function of AWS.

Test equipment AWS workstation.

Procedure1. At Area level, select an ISAM icon and double click on it.

2. From the USM window (where the racks are shown), choose Configuration > Profiles > Show. That is the total profiles which can be used by the ISAM.

3. All profiles are local and has to be downloaded to ISAM. Go to Network Element List window.

4. To create a profile select Templates > Profile > Create. Choose the type of profiles that you want to create.

5. List all created profiles in table on Form 4.

Page 8 of 16

Page 9: Acceptance Test Report 5523AWS-Ver2

5. User Login Test

PurposeThis procedure provides a test to list logged users and creating and deleting login user.

Test Equipment AWS workstation.

Procedure

1. Open Administration menu from main window

2. Choose Sessions > List Logged in users to show logged in user.

3. Choose Users > Create User to create user. You can choose different user profiles.

4. Exit and log out of CDE window.5. Login with the newly created user and start Network Elements Window.

Page 9 of 16

Page 10: Acceptance Test Report 5523AWS-Ver2

6. ISAM Monitoring via CLI Craft Terminal

The objective of this test is to verify that alarms occurred on the ISAMs and card status can be displayed and monitored with Craft Terminal CLI commands. A PC with a serial console cable is needed to connect to the Craft port on the ISAM.

Procedure

1. Retrieve alarms on the ISAM and verify that alarm to be tested is empty.2. Remove a working LT card from the ISAM.3. Perform Show Equipment LT and verify that the affected slot is not plugged .4. Perform a show Alarm and verify that a Major – Board Missing alarm has occurred.5. The following procedure is for ISAMs configured with GE links. Remove a working GE link from

NANT-A card.6. Perform a retrieve port and verify that the affected GE is down (out of service).7. Remove all working GE links and verify that all GE are down.8. Retrieve alarm and verify that ISAM is isolated from the network.

Expected Results

CLI shows the correct status of the ISAM.

ISAM Name Board Alarm Status (OK/ NOK)

GE Alarm Status (OK/NOK)

ISAM Isolation Status (OK/NOK)

Page 10 of 16

Page 11: Acceptance Test Report 5523AWS-Ver2

Actual Results

______________________________________________________________________________

______________________________________________________________________________

______________________________

Comments:

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

______________

Project Name:

Client:

ALCATEL Representative: _____________________ Equipment Type: AWS

: ____________________________

Customer Representative : ____________________________

____________________________

Date : __________________________

Page 11 of 16

Page 12: Acceptance Test Report 5523AWS-Ver2

Form 1: Fault Management Test Data Sheet

ISAM:

Action Results

Major Alarm when Board removed

Recover Major Alarm

Missing Board Alarm

Recover Missing Board Alarm

Lost ISAM Contact Due to Opt Fiber disconnected

Recover Opt Fiber and then Recover ISAM Contact

Remote reset of LT/NT boards

Project Name:

Client:

ALCATEL Representative: _________________________ Equipment Type: AWS

: ____________________________

Customer Representative : __________________________

: ____________________________

Date : ____________________

Page 12 of 16

Page 13: Acceptance Test Report 5523AWS-Ver2

Form 2: Software Management Data Sheet

Available Software Package Name Currently Used

Action Results

Show current OSWP

Download OSWP

Active OSWP

Delete Software Package from ISAM (if needed)

Project Name:

Client:

ALCATEL Representative: _____________________________ Equipment Type: AWS

: ____________________________

Customer Representative : _____________________________

: ____________________________

Date : ____________________

Form 3: Configuration Management Data Sheet

Action Result

Missing Board

Not-Planned-Board

Show ATM Termination and PPP Client Port

Delete ATM Termination and PPP Client Port

Create ATM Termination and PPP Client Port

Delete Board

Create Board

Page 13 of 16

Page 14: Acceptance Test Report 5523AWS-Ver2

Create New ISAM

Show ISAM

Modify ISAM

Delete ISAM

Show xDSL port

Project Name:

Client:

ALCATEL Representative: _______________________________ Equipment Type: AWS

: ____________________________

Customer Representative : ____________________________

: ____________________________

Date : __________________

Form 4: Profile Management Data Sheet

ISAM:

XDSL Service Profiles

Downstream Upstream

Profile Name Min. Bit Rate

Kbits/s

Planned Bit Rate

Kbits/s

Max. Bit Rate

Kbits/s

Target Noise Margin

dB

Min. Bit Rate

Kbits/s

Planned Bit Rate

Kbits/s

Max. Bit Rate

Kbits/s

Target Noise Margin

dBMega Easy

(1024/512 Kbps)

Mega Family (1536/512 Kbps)

Mega Extra (2048/512K bps)

Mega Maxi (3072/640 Kbps)

Mega Pro (4096/640 Kbps)

Page 14 of 16

Page 15: Acceptance Test Report 5523AWS-Ver2

Mega For Game (6000/640 Kbps)

Mega Dreaming (8000/640 Kbps)

Project Name:

Client:

ALCATEL Representative: ___________________________ ____ Equipment Type: AWS

: ____________________________

Customer Representative : _________________________________

: ____________________________

Date : ____________________________

Form 5: User Login Test Data Sheet

ISAM:

Action Results

Show Logged Operators

Create New Operator

Login As New Operator

Accessible Windows Match to the Limitation

Page 15 of 16

Page 16: Acceptance Test Report 5523AWS-Ver2

Results

Comments:

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

Overall Test PASS: o FAIL: o

Approval: __________________________ Date:___/___/___ (Name/Signature)

Approval: __________________________ Date:___/___/___(Name/Signature)

Alcatel

Page 16 of 16