2

IntroductionTesting FocusTesting ApproachTimeQuality ControlMajor RisksSuccesses and Failures

Page 3: Acceptance Testing

3

Objectives of today’s presentationBackgroundProjectsExperience

Page 4: Acceptance Testing

4

Business Acceptance Testing◦ People

Organisational Structure◦ Process

Procedures, control, monitoring and risk management◦ Technology

Data integrity, system functionality, connectivity and communications

Page 5: Acceptance Testing

5

Which testing approach? Combined Functional and User Acceptance Testing Model Office

◦ Intuitive (error guessing)◦ Alpha◦ Beta

All or some Which method? Requirements based Risk based

Page 6: Acceptance Testing

6

Statement:- ‘Testing is often a matter of Time and/or Cost against Quality’

Suggested Points of discussion:- Quality and Time Quality and Cost Quality, Cost and Time Mitigating Risk

Page 7: Acceptance Testing

7

CAN WE START ACCEPTANCE TESTING? ARE WE READY?

Current Status in project lifecycle Status of Planning and Scripting documentation Has a risk assessment workshop taken place? Have the procedures been written? If previous testing phases have completed did they pass the exit and entry criteria? Has the exit and entry criteria been fully defined? Have the operational procedures been written Have the service level agreements been finalised? Has the planned test process (all phases) been agreed, reviewed and signed off. Are the required number of resources in place? Is the environment available and is it fit for purpose? Is there still enough time left in the plan to adhere to the test strategy Has any training of the Business Testers taken place? What is the status of any Third Party deliveries or internal dependencies?

Page 8: Acceptance Testing

8

Testing Quality Control is not just about testing the Software or the Business processes it is

about:- Reviewing the testing process and method The Testing Governance Audibility and visibility Documentation controls Auditing Third Party Deliveries Does the exit and entry criteria match the Business expectations

“ARE WE GETTING WHAT WE WANT FROM TESTING?”

Page 9: Acceptance Testing

9

Test environment unavailable

Ambiguous Requirements or Specifications

Test Strategy is unworkable

Exit and Entry criteria has not been fully defined

Late delivery of code

Quality of Delivered code

Exit and entry criteria for previous test phases have not been met

Absence of accurate planning and preparation

Lack of skilled resources

Overlap of test phases

Insufficient Coverage

Thorough risk assessment has not been carried out

Poor configuration management

Inadequate release management controls

Defect Management and change control processes are uncontrolled

Time

Page 10: Acceptance Testing

10

‘Things that go bump in the night’

Trying to test conversion data and functionality changes in the early stages together and in the same test environment.

Neglecting to ascertain all the set up requirements and all the necessary test data prior to commencement of testing.

Configuration of the test environment is nothing like live. Assuming that supposedly unchanged interfaces will still operate

when received by another system. Taking short cuts without performing a full risk assessment. Permitting unplanned code releases (fix and run). Ignoring Insidious faults Matrix Management

Page 11: Acceptance Testing

11

Barclays International – Global Co-operation Invesco – The pragmatic approach Barclays Global – Third Party success story Barclays – Planning paid off HSBC – No fall out