accessing resources in the adaptation fund update to gef expanded constituency workshop in nairobi...

26
Accessing Resources in Accessing Resources in the Adaptation Fund the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Upload: harriet-french

Post on 03-Jan-2016

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Accessing Resources in the Accessing Resources in the Adaptation FundAdaptation Fund

Update to GEF Expanded Constituency Workshop in Nairobi

October 2011

Page 2: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Purpose of presentationPurpose of presentation

• Background • Current state of progress with the

Adaptation Funda) AF is fully operationalizedb) Direct access – a realityc) Funding decisions worth US$ 69.7M since 2010

• How to access funds directly

Page 3: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Background of the AFBackground of the AF

• Set up under the Kyoto Protocol of the UNFCCC

• Goal: to finance the full cost of concrete adaptation projects/programmes, whose principal and explicit aim is to adapt and increase resilience

• Financed from a 2% share of the CER proceeds on the Clean Development Mechanism (CDM) project activities and other sources of funding

Page 4: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Governing Body: the AF BoardGoverning Body: the AF Board

• Composed of 16 members and alternate members representing:– 5 UN regions– LDCs– SIDS – Annex I Parties– Non-Annex I Parties

• Equitable and balanced representation of Kyoto Protocol Parties

• Legal capacity: Germany 2011

Page 5: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Institutional ArrangementsInstitutional Arrangements• Secretariat: GEF on an interim basis• Trustee: World Bank on an interim basis

KP Parties decided that the interim institutional arrangements be reviewed in 2011

CMP

AFB

Secretariat (GEF interim basis)

Trustee (World Bank interim basis)

Page 6: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

ResourcesResources

• Proceeds from monetized CERs: US$163.2M • Annex-I parties contributions: – Spain €45M, Monaco €10k, Germany €10M, Sweden

SK100M– Pledges: Australia AU$ 15M, Brussels Capital Region

€1M• Funds allocated by September 16, 2011: US$

69.7M • Estimated funds available by end-2012:– Medium estimate US$ 373M (low: 315M;

high: 440M)

Page 7: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Access modalitiesAccess modalities

Direct Access Modality• Eligible Parties can submit their projects/programmes

directly to the AFB through an accredited National Implementing Entity (NIE).

Multilateral Access Modality• Parties can submit their proposals through an accredited

Multilateral Implementing Entity (MIE).

Regional Access Modality• A group of Parties may also nominate regional and sub-

regional entities (RIE) as implementing entities.

Page 8: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Access modalities (2)Access modalities (2)

NIE, RIE and MIE shall:a. Meet the fiduciary standards established by the AFB:

- Financial management and integrity

- Institutional capacity

- Transparency, self-investigative powers and anti-corruption measures

b. Bear full responsibility for the overall management of the projects and programmes; and

c. Carry out financial, monitoring and reporting responsibilities.

Page 9: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Access modalitiesAccess modalities

Page 10: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Access modalities: the Accreditation Access modalities: the Accreditation ProcessProcess

• Step 0: The government appoints a Designated Authority. The DA must endorse the accreditation application of Implementing Entity and all IE project/programme proposals.

• Step 1: Submit application:a. Description of how the organization meets the specific required capabilitiesb. Attachment of supporting documentation

• Step 2: Accreditation Panel Reviews Application. • Step 3: Panel can request additional information/clarification

from organization. a. Might suggest to Board that an on-site visit is requiredb. Might suggest that technical support needs to be provided to an applicant

to improve its capacity in order to attain accreditation• Step 4: Panel makes recommendation to AF Board.• Step 5: AF Board makes final decision on accreditation of

entity

Page 11: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

OperationalizationOperationalization

• Operational procedures development 2008-09

• January 2010: Accreditation Panel• March 2010: 1st accreditations (NIE/MIE)• June 2010: 1st funding decisions• January 2011: launch of 1st programme

Page 12: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Access modalities: Implementing Access modalities: Implementing EntitiesEntities

• 6 National Implementing Entities accredited:o Centre de Suivi Ecologique (Senegal)o Planning Institute of Jamaica (Jamaica)o Agencia Nacional de Investigación e Innovación (Uruguay)o Fonds national pour l'environnement (Benin)o South African National Institute for Biodiversity (South Africa)o Protected Areas Conservation Trust (Belize)

• 1 Regional Implementing Entityo Banque Ouest Africaine de Développement (BOAD)

• 9 Multilateral Implementing Entities accredited:o The World Bank, ADB, AfDB, IADB, UNDP, UNEP, IFAD, WFP,

WMO• Swift accreditation process: can be done in 3 months

Page 13: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Why aren’t there more NIEs?Why aren’t there more NIEs?Some identified issues:• The direct access modality and the role of the

fiduciary standards not fully understood?

• Identification of the most appropriate / most potential NIE within a country not simple?

• Putting together documentation to support the accreditation application not easy?

• Difficulties due to language barriers?

• Lack of self-confidence?

Page 14: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Lessons Learned: Direct AccessLessons Learned: Direct Access• Applications are evaluated by the Accreditation Panel on a

case-by-case basis• Emphasis on demonstration and evidence of the

application of policies and standards, which may pose challenges for ministries; newly established organizations

• Conditional accreditation can be used when there are a few non crucial gaps in the fiduciary standards

• Importance of the role of the Designated Authority• Temporary measures to ensure funding for vulnerable

countries given limited funds: cap per country – USD 10 M• Maintain swift processes to encourage accreditation

– Senegal case: NIE accredited and first direct access project financed within 9 months

Page 15: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Measures to encourage the Direct Measures to encourage the Direct Access ModalityAccess Modality

• Total allocation for projects/programmes submitted by MIEs at each meeting cannot exceed 50% of cumulative resources available in the trust fund

• NIE proponents can get a Project/Programme Formulation Grant for developing endorsed concepts to full proposals

• The development of an Accreditation Toolkit in all UN languages (pictured)

Page 16: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011
Page 17: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Financing CriteriaFinancing Criteria• Funding provided on full adaptation costs basis of projects

and programmes to address the adverse effects of climate change

• AF will finance projects/programmes whose principal and explicit aim is to adapt and increase climate resilience

• Projects/programmes have to be concrete: discussion on definition on-going, emphasis on impacts

• Accommodation of different country circumstances: no prescribed sectors or approaches

• Total allocation for projects/programmes submitted by MIEs at each meeting cannot exceed 50% of cumulative resources available in the trust fund

• All projects/programmes must include a knowledge component

Page 18: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Financing CriteriaFinancing Criteria• Cap per country is set at USD 10 M. No separate

project/programme cap.

• For projects/programmes larger than USD 1M, a choice of a one step (full proposal) or two step process (concept approval and project/programme document)

• For small-scale projects (below USD 1M) one-step process

• NIE proponents can get Project/Programme Formulation Grant for developing endorsed concepts to full proposals

• Proposals to be endorsed by a Designated Authority. As of today, over 70 countries have nominated one

• Proposals need to be submitted at least 9 weeks before a Board meeting

Page 19: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Project Review Criteria: emphasis on…Project Review Criteria: emphasis on…• Consistency with national sustainable development

strategies• Economic, social and environmental benefits• Meeting national technical standards• Cost-effectiveness and sustainability• Arrangements for management, financial and risk

management, M&E, impact assessment• Avoiding duplication with other funding sources for

adaptation• Stakeholder consultation: ensuring acceptance and

incorporation of community views• Consideration of gender issues in project design

Page 20: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Where are we now: OperationsWhere are we now: Operations• 11 funding approvals since September 2010:

– Coastal protection and livelihoods in Senegal (CSE, direct access, 2-step process): USD 8,619,000

– Reducing vulnerability and food security in Ecuador (WFP, 2-step process): USD 7,449,468

– Water management structures and agricultural practices in Eritrea (UNDP, 1-step process): USD 6,520,850

– Water management in Honduras (UNDP, 1-step process): USD 5,630,300– Reducing risks and vulnerability from floods and droughts in Nicaragua

(UNDP, 2-step process): USD 5,500, 950– Reducing risks and vulnerabilities from glacier lake outburst floods in

Northern Pakistan (UNDP, 2-step process): USD 3,906,000

– Strengthening food production and management systems in Solomon Islands (UNDP, 2-step process): USD 5,533,500

Page 21: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Where are we now: Operations (2)Where are we now: Operations (2)• Funding approvals (cont’d)

– Water resources management on atoll islands in Maldives (UNDP, 2-step process): USD 8,989,225

– Coastal protection measures, mangrove and EWS in Mauritius (UNDP, 2-step process): USD 9,119,240

– Ecosystem-based water resources management in Mongolia (UNDP, 2-step process): USD 5,500,000

– Water resources management in water-scarce farming systems in Turkmenistan (UNDP, 2-step process): USD 2,929,500

• Project formulation grants (direct access, 2-step)– Resilience of the Agriculture Sector and Coastal Areas in Jamaica

(Planning Institute of Jamaica)– Resilience to Climate Change in Vulnerable Smallholders in Uruguay

(Agencia Nacional de Investigación e Innovación)

Page 22: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

30 project/programme proposals30 project/programme proposals• Variety of sectors:– Water management

– Coastal management

– Food security

– Rural development

– Urban development

– Agriculture

– Disaster Risk Reduction

Page 23: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011
Page 24: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

The Adaptation Fund Project PortfolioThe Adaptation Fund Project PortfolioAfrica• Senegal• Eritrea• MauritiusAsia• Maldives• Mongolia• Pakistan• TurkmenistanLatin America and Caribbean• Ecuador• Honduras• NicaraguaPacific• Solomon Islands

Page 25: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

The Adaptation Fund Project PortfolioThe Adaptation Fund Project Portfolio

Page 26: Accessing Resources in the Adaptation Fund Update to GEF Expanded Constituency Workshop in Nairobi October 2011

Thank you!

[email protected]

www.adaptation-fund.org