accredited standards committee c63 ® - emc

22
1 Accredited Standards Committee C63 ® - EMC ASC C63® Committee on EMC SC2: E3 Terminology Definitions Marcus Shellman, Jr. Chair , SC2 14 November 2013

Upload: alton

Post on 23-Feb-2016

38 views

Category:

Documents


0 download

DESCRIPTION

Accredited Standards Committee C63 ® - EMC. ASC C63® Committee on EMC SC2: E3 Terminology Definitions. Marcus Shellman, Jr. Chair , SC2 14 November 2013. Accredited Standards Committee C63 ® - EMC. SC2 Scope. Scope Unchanged E3 Terminology Definitions - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Accredited Standards Committee  C63 ®  - EMC

1

Accredited Standards Committee C63® - EMC

ASC C63® Committee on EMC SC2: E3 Terminology Definitions

Marcus Shellman, Jr. Chair , SC2

14 November 2013

Page 2: Accredited Standards Committee  C63 ®  - EMC

2

Accredited Standards Committee C63® - EMC

SC2 ScopeScope Unchanged E3 Terminology Definitions

Subcommittee 2 is responsible for developing, updating, and/or modifying definitions and terminology related to electromagnetic compatibility (EMC) including electromagnetic environmental effects (E3).  The subcommittee will also recommend and/or consider definitions for ratification and harmonization with the U.S. military and international standardization bodies as needed. The subcommittee will maintain ANSI C63.14, “American National Standard, Dictionary of Electromagnetic Compatibility (EMC) including Electromagnetic Environmental Effects (E3).”

Page 3: Accredited Standards Committee  C63 ®  - EMC

3

Accredited Standards Committee C63® - EMC

Approved Membership RosterMarcus Shellman SC2 Chair, (WG1) DISA/Joint Spectrum CenterJanet O’Neil SC2 Vice-Chair ETS-LindgrenMichael Duncanson SC2 Secretary, (WG1) URSChris Dilay SC2 Web Coor., (WG1) SPAWARSYSCENDan Hoolihan C63® Chair Hoolihan EMC ConsultingDon Heirman C63® Member Don Heirman ConsultantsEd Hare C63® Web Master ARRLDennis Camell SC1 Chair NISTPoul Andersen SC3 Chair Poul Andersen ConsultingSteve Whitesell SC5 Chair TIAAdam Gouker SC6 Chair A2LAStephen Berger SC7 Chair TEM ConsultingBob DeLisi SC8 Chair Underwriters LaboratoryDave Southworth Member (WG1) SPAWARSYSCENVictor Kuczynski Member VICAN ElectronicsBob Hofmann Member ConsultantHarry Hodes WG1 ConsultantSteve Koster WG1 Washington LaboratoriesJerry Ramie WG1 ARC Technical ResourcesDave Schaefer WG1 TUV AmericaJoseph Snyder WG1 Consultant

Page 4: Accredited Standards Committee  C63 ®  - EMC

4

Accredited Standards Committee C63® - EMC

SC2 Working Group 1 Report

• Five-Year Review of C63.14-2009 complete with revision ready for circulation

• Schedule

• SC2 Motion approved to circulate C63.14 Draft to ASC C63 Main Committee

Page 5: Accredited Standards Committee  C63 ®  - EMC

5

Accredited Standards Committee C63® - EMC

Motions• Motion to circulate C63.14 Draft to the ASC C63 Main

Committee for review• Motion for ASC C63 Main Committee to submit C63.14

Draft to the IEEE Secretariat to form a balloting group upon resolution of review comments

Page 6: Accredited Standards Committee  C63 ®  - EMC

6

Accredited Standards Committee C63® - EMC

C63 Newsletter – SC2 Tentative Input ASC C63® Subcommittee 2 (SC2), “Electromagnetic Compatibility (EMC) including Electromagnetic Environmental Effects (E3),” completed the five-year review of ANSI C63.14-2009. SC2 passed a motion to request circulation of the revised C63.14 to the ASC C63 Main Committee for review and approval to ballot. The revision is currently on schedule for August 2014 publication.

Page 7: Accredited Standards Committee  C63 ®  - EMC

7

Accredited Standards Committee C63® - EMC

Conclusions• Five-year review is currently on schedule.

Page 8: Accredited Standards Committee  C63 ®  - EMC

8

Accredited Standards Committee C63® - EMC

ReferencesANSI C63.14-2009: American National Standard Dictionary of Electromagnetic Compatibility (EMC) including Electromagnetic Environmental Effects (E3)

Page 9: Accredited Standards Committee  C63 ®  - EMC

9

BACK-UP SLIDES

Page 10: Accredited Standards Committee  C63 ®  - EMC

11/14/2013 10

5-Year Update Schedule

SC2 Meetings =

C63.14 Changes Deadline

Nov ‘13 meeting C63.14 Draft submission

BACK

Page 11: Accredited Standards Committee  C63 ®  - EMC

ANSI C63® SC-2 Report on C63.14 Revision

SC2 Chair

10/25/2013 11

Page 12: Accredited Standards Committee  C63 ®  - EMC

SC2 Process

• Reviewed Military Standards– Selected terms from Active EMC Standards

• Reviewed ANSI C63® Standards– Selected terms from Published EMC

Standards

• Added Terms Requested by SC-2 Members– Developed definitions within SC-2

10/25/2013 12

Page 13: Accredited Standards Committee  C63 ®  - EMC

Military Standards• Reviewed following active Military Standards for

appropriate EMC terms:– MIL-STD-464C, -188-124B, -188-125-1, -188-141C– MIL-STD-1310H, -1605A– MIL-HDBK-220C, -235-1C, -237D, -240A– MIL-HDBK-293, -294, -419, -1857, -1512, JP 1-02

• Terms obtained from published MIL STDs– Terms added: 25– Definitions updated: 25

10/25/2013 13

Page 14: Accredited Standards Committee  C63 ®  - EMC

Military Terms Added• Terms added to C63.14:Broadband Antenna Equipment, electronic Platform

Common-mode Rejection Ground, 360 degree, peripheral Reflection Loss

Common-mode Voltage Grounding Effectiveness Space Vehicle

Computer Ground System HERO Susceptible Spectrum Dependent Systems

Continuous WaveHazards of Electromagnetic Radiation to Ordnance (HERO) Safe

High-altitude Electromagnetic Pulse (HEMP) Hardness

Co-sited Operation HERO Unsafe Static/ESD Ground

Electromagnetic Closure Mission Critical Topside Area

Electromagnetic Stress Ordnance Unintentional Emissions

Vulnerability10/25/2013 14

Page 15: Accredited Standards Committee  C63 ®  - EMC

Military Terms Modified• Terms with Modified Definitions:

Below Deck HERO Radio Frequency Interference

Compromising Signals HERO Margin Safety Consequence

Conduit Lightning Indirect Effects Safety Critical

Degradation Maximum Allowable Environment (MAE) Shielded Area

Electromagnetic Environmental Effects (E3) Maximum No-fire Stimulus Subsystem

Electromagnetic Barrier Non-Developmental Item (NDI) Susceptibility

Equipment, electrical Neutral System

Grounding Conductor Plane Wave Trunk, Wireway

Electromagnetic Vulnerability10/25/2013 15

Page 16: Accredited Standards Committee  C63 ®  - EMC

C63 Standards• Published C63 Standards Reviewed:

– C63.4-2009, C63.5-2006, C63.7-2005– C63.9-2008, C63.10-2009, C63.15-2010– C63.19-2011, C63.22-2004, C63.23-2012, C63.17-2013

• Terms obtained from published C63 standards– Terms added: 95– Definitions updated: 60

• Deleted Annex A and added new Annex– Deleted Bibliography of terms in Annex A– Added Bibliography of International terms from IEV

COMMERCIAL

TERMS

10/25/2013 16

Page 17: Accredited Standards Committee  C63 ®  - EMC

Terms Added from C63 Standards

a priori distribution

alternate test site

analysis of variance (ANOVA)

antenna factor

audio band

audio band magnetic signal—desired (ABM1)

audio band magnetic signal—undesired (ABM2)

audio coupling mode

audio frequency

band

broadband device

cognitive radio

compatibility

conformity assessment

continuous transmit mode

correction factor

coverage factor, kdBm0decibels (dBrnc)decibels (dBSPL)degrees of freedomdriftdynamic spectrum accesserror (of measurement)expanded uncertainty, Ufloor-standing equipmentfrequency accuracygigahertz transverse electromagnetic chamber (GTEM)guidelinehearing aidinfluence quantity

10/25/2013 17

Page 18: Accredited Standards Committee  C63 ®  - EMC

Terms Added from C63 Standards

input referenced ambient noise (IRAN)input referenced interference level (IRIL)interceptinterpretationmaximum hold functionmeasurandmeasurement bandmeasurement reference pointmodulation interference factor (MIF)modulenear-endnear-field regionpersonal communications service devicepersonal computerradiated emissions test siterecommended practicereference ground plane

scan ratescanning receiversignal identificationsitesoftware-defined radiosound pressure level (SPL)specificationstandardsweep timetele-coil (T-Coil)test equipmenttransfer switchUnlicensed National Information Infrastructure (U-NII) deviceunlicensed wireless devicewavelength (λ)wideband transverse electromagnetic (WB TEM) cellmeasurement uncertainty

10/25/2013 18

Page 19: Accredited Standards Committee  C63 ®  - EMC

Terms Added from C63 Standards

operational failureradiated emission and monitoring testsreaction timereceived signal strength indication (RSSI)responding deviceRSSI monitoring meansspectrum windowsteady statethermal noise powerthreshold limit (TL)time window

unlicensed personal communications service (UPCS) device

10/25/2013 19

activateButler matrixchannelcommunications channelconducted emission and monitoring testscontrol and signaling channeldifferent collocated antennasdigital modulationframe jitterframe periodfrequency administration commandsidentical collocated antennasinitiateinitiating deviceleast interfered channel (LIC)listen before transmit (LBT)

Page 20: Accredited Standards Committee  C63 ®  - EMC

Terms Modifiedcounterpoise (antenna)line impedance stabilization network (LISN)electromagnetic environment (EME)electromagnetic disturbanceemissionconducted emissions test sitecalibrationconducted interference (CI, disturbance)disturbance levelelectromagnetic compatibilityfar-field regionintentional radiatorindustrial, scientific, and medical (ISM) equipmentopen-area test site (OATS)semi-anechoic chamber

transverse electromagnetic (TEM) cellbandwidth (BW)site attenuationanechoic enclosure [radio frequency (RF)]broadband interference (disturbance)common-mode (CM) circuitdegradation of performanceeffective radiated power (ERP)electromagnetic interference (EMI)electromagnetic noiseelectromagnetic radiationforward powerimage rejectionindustrial, scientific, medical (ISM) (qualifier)intermodulation interference (IMI)

10/25/2013 20

Page 21: Accredited Standards Committee  C63 ®  - EMC

Terms Modifiednarrowband interference (disturbance)normalized site attenuation (NSA)peak detectorpulse rise timeradiated interference (disturbance)radio noisereceiver overloadreference test siteroot-mean-square (rms) detectorstriplineshielded enclosureambient level (electromagnetic)information technology equipment (ITE)directional couplerdigital wireless telephone

tabletop deviceground planewireless communications device (WD)net powersystemequipment arrangementequipment configurationequipment under test (EUT)field disturbance sensorlow-voltage electrical and electronic equipmentperipheral devicerestricted bandsstandard antenna calibration siteclickpeak transmit power (PEUT)

10/25/2013 21

Page 22: Accredited Standards Committee  C63 ®  - EMC

Acronyms Added• Following added from C63 standard terms

– Analysis of variance (ANOVA)– audio band magnetic signal—desired

(ABM1)– audio band magnetic signal—undesired

(ABM2)– emission bandwidth (B)– decibels (dBrnc)– decibels (dBSPL)– expanded uncertainty (U)– input referenced ambient noise (IRAN)– input referenced interference level (IRIL)– listen before transmit (LBT)– least interfered channel (LIC)

10/25/2013 22

– modulation interference factor (MIF)– peak transmit power (PEUT)– received signal strength indication

(RSSI)– sound pressure level (SPL)– tele-coil (T-Coil)– threshold limit (TL)– Unlicensed National Information

Infrastructure (U-NII) device– wideband transverse

electromagnetic (WB TEM) cell