An Excellent opportunity to acquire:
Almost Brand New Power plant 210 MW
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
2
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
3
Main Equipment –Gas Turbines
•2 x GE PG6101FA Un-flared Gas Turbines (Dual Fuel –Gas & Distillate Oil)•Output 72 MWegross (Dry low Nox-DLN2)
•Speed 5200 rpm
•Firing Temperature –1280°C
•Exhaust Temperature –582°C
•Average Emissions -NOx23 mg/m3(60mg/m3) CO 16 mg/m3 (150mg/m3)
•2 x 11.5 kV Alstom generators (82 MVA) connected via Renkgearbox
•IED Industrial Emissions Directive –2016 (50mg/Nm3 NOxlimit) –fully compliant –no investment required.
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
4
GT6FA inspection interval recommendations
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
5
GT Photos
GT Co2 fire suppressant system
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
6
GT Air filter house, generator and GT compartment
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
7
GT Load gearbox
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
8
Liquid fuel heating system
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
9
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
10
Main Equipment –HRSG’s
•2 x Stork Dual Pressure Unfired Heat Recovery Steam Generators•Vertically slung / natural circulation / no supplementary firing
•No bypass facility installed (only start up vents and steam dumps)
•Fed via common dearator(Dearatedwith LP Steam)
•AVT Chemistry Control (Ammonia / Carbohydrazide/ TSP)
•3 x 100% HP feed water pumps (3.3KV)
•2 x 100 % LP feed water pumps (400V)
•HP Steam Pressure 107 bar @ 536°C
•LP Steam Pressure 9.6 bar @ 240°C
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
11
Main Equipment -Steam Turbine & Generator
•Alstom Two Cylinder Steam Turbine (71 MWe)•High Pressure Single flow cylinder coupled to the generator via a reduction gearbox•Output approximately 30 MW @ 9380rpm •Inlet pressure 107 bar @ 536°C •Low Pressure Single flow cylinder coupled direct to the generator•Output approximately 41 MW @ 3000rpm •Inlet pressure 9.6 bar @ 240°C
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
12
LP Turbine and Gland steam condenser
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
13
Steam turbine gearbox
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
14
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
15
HP Rotor
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
16
Main CHP steam equipment
•Process Steam Converter –Wellman Graham •1.5 km of steam supply pipe work to UPM site (plus condensate return) •Primary steam supplied to UPM at 9.6 Bar / 240°C •Secondary steam generated at 6.5 Bar / 170°C •Reduced by UPM to 2.5 Bar / 148°C •Design capability 40kg/sec •Actual capability 28kg/sec (max supplied)
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
17
Production Statistics
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
18
Plant Availability
ACE Group
Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net
19
Starts and Reliability