Page 1: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

1

An Excellent opportunity to acquire:

Almost Brand New Power plant 210 MW

Page 2: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

2

Page 3: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

3

Main Equipment –Gas Turbines

•2 x GE PG6101FA Un-flared Gas Turbines (Dual Fuel –Gas & Distillate Oil)•Output 72 MWegross (Dry low Nox-DLN2)

•Speed 5200 rpm

•Firing Temperature –1280°C

•Exhaust Temperature –582°C

•Average Emissions -NOx23 mg/m3(60mg/m3) CO 16 mg/m3 (150mg/m3)

•2 x 11.5 kV Alstom generators (82 MVA) connected via Renkgearbox

•IED Industrial Emissions Directive –2016 (50mg/Nm3 NOxlimit) –fully compliant –no investment required.

Page 4: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

4

GT6FA inspection interval recommendations

Page 5: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

5

GT Photos

GT Co2 fire suppressant system

Page 6: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

6

GT Air filter house, generator and GT compartment

Page 7: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

7

GT Load gearbox

Page 8: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

8

Liquid fuel heating system

Page 9: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

9

Page 10: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

10

Main Equipment –HRSG’s

•2 x Stork Dual Pressure Unfired Heat Recovery Steam Generators•Vertically slung / natural circulation / no supplementary firing

•No bypass facility installed (only start up vents and steam dumps)

•Fed via common dearator(Dearatedwith LP Steam)

•AVT Chemistry Control (Ammonia / Carbohydrazide/ TSP)

•3 x 100% HP feed water pumps (3.3KV)

•2 x 100 % LP feed water pumps (400V)

•HP Steam Pressure 107 bar @ 536°C

•LP Steam Pressure 9.6 bar @ 240°C

Page 11: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

11

Main Equipment -Steam Turbine & Generator

•Alstom Two Cylinder Steam Turbine (71 MWe)•High Pressure Single flow cylinder coupled to the generator via a reduction gearbox•Output approximately 30 MW @ 9380rpm •Inlet pressure 107 bar @ 536°C •Low Pressure Single flow cylinder coupled direct to the generator•Output approximately 41 MW @ 3000rpm •Inlet pressure 9.6 bar @ 240°C

Page 12: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

12

LP Turbine and Gland steam condenser

Page 13: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

13

Steam turbine gearbox

Page 14: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

14

Page 15: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

15

HP Rotor

Page 16: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

16

Main CHP steam equipment

•Process Steam Converter –Wellman Graham •1.5 km of steam supply pipe work to UPM site (plus condensate return) •Primary steam supplied to UPM at 9.6 Bar / 240°C •Secondary steam generated at 6.5 Bar / 170°C •Reduced by UPM to 2.5 Bar / 148°C •Design capability 40kg/sec •Actual capability 28kg/sec (max supplied)

Page 17: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

17

Production Statistics

Page 18: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

18

Plant Availability

Page 19: ACE Group · GT Load gearbox . ACE Group Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, ... •No bypass facility installed (only start up vents and steam ... •2

ACE Group

Cairo Rep. Office: ACE Group 3 Samir Mokhtar St., Ard Al Golf, Cairo – Egypt Tel: 00202 26903100/200, Fax: 00202 26903500 E-mail: [email protected] website: www.aceindustry.net

19

Starts and Reliability