acf.cw.la3.s06.1

2
ACF.CW.LA3.S06.1 LEMBAGA PEPERIKSAAN MALAYSIA KEMENTERIAN PELAJARAN MALAYSIA ASSESSMENT CHECKLIST FORM LEARNING AREA : COMPUTER NETWORKS AND COMMUNICATIONS Name of Candidate IC No Index No Construct : S06 Network Facilities Setup Aspect : LA3.S06. 1 Crimp and Test UTP Cables Instrumen t : Demonstration Assessmen t : 1 / 2 / 3 / _ No. Criterion Evidence (to be filled by candidate if necessary) Assessor tick () if complete d Remarks by assessor 1 Crimp a Straight Cable a. Skin off the cable jacket. b. Untwist and straighten each wire. c. Arrange the wires according to the 568B wiring schematic order for both ends. d. Cut and insert the wires into a RJ45 connector. e. Crimp the cable using a crimping tool. 2. Check the straight cable is crimped successfully using a cable tester. 3. Crimp a Crossed Cable a. Skin off the cable jacket. b. Untwist and straighten each wire. c. Arrange the wires according to

Upload: smkengkilili2011

Post on 20-Jan-2015

165 views

Category:

Business


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Acf.cw.la3.s06.1

ACF.CW.LA3.S06.1

LEMBAGA PEPERIKSAAN MALAYSIAKEMENTERIAN PELAJARAN MALAYSIA

ASSESSMENT CHECKLIST FORM

LEARNING AREA : COMPUTER NETWORKS AND COMMUNICATIONS

Name of Candidate

IC No

Index No

Construct : S06 Network Facilities Setup

Aspect : LA3.S06.1 Crimp and Test UTP Cables

Instrument : Demonstration

Assessment : 1 / 2 / 3 / _

No. Criterion

Evidence

(to be filled by candidate if necessary)

Assessor tick () if completed

Remarks by assessor

1 Crimp a Straight Cablea. Skin off the cable jacket.b. Untwist and straighten each wire.c. Arrange the wires according to the 568B

wiring schematic order for both ends.d. Cut and insert the wires into a RJ45

connector.e. Crimp the cable using a crimping tool.

2. Check the straight cable is crimped successfully using a cable tester.

3. Crimp a Crossed Cablea. Skin off the cable jacket.b. Untwist and straighten each wire.c. Arrange the wires according to the 568A

wiring schematic order for one end AND 568B wiring schematic order for the other end.

d. Cut and insert the wires into a RJ45 connector.

e. Crimp the cable using a crimping tool.

4. Check the crossed cable is crimped successfully using a cable tester.

SCORE

Candidate’s Signature

------------------------------

Assessor’s Signature

----------------------------------

Name :

Date :