achieving ra and maximize raid tools by ahmad fairuz ali

Upload: dakmatt

Post on 30-May-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    1/23

    Achieving RA Standards and Maximizing RAIDTools

    by

    Ahmad Fairuz Ali

    4th WeDo Technologies User Group Meeting

    May 14th and 15th, 2009Lisbon, Portugal

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    2/23

    Malaysia , Truly Asia!

    2009 Achieving RA Standards and Maximizing RAID Tools Page 1

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    3/23

    Established in 1994

    Over 7.2 million subscribers (Q1/09)

    49% owned by Telenor of Norway

    Recently launch 3G/HSPA services inMarch09.

    DiGi Journey

    2009 Achieving RA Standards and Maximizing RAID Tools Page 2

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    4/23

    DiGi Part of Telenor Worldwide

    2009 Achieving RA Standards and Maximizing RAID Tools Page 3

    DiGi,Malaysia

    DTAC,Thailand

    Grameenphone,Bangladesh

    Telenor Pakistan,Pakistan

    Telenor Norway

    Vimplecom,Rusia

    Telenor SerbiaKyivstar,Ukraine

    Promonte,Montenegro

    Sonofon,Denmark

    TelenorSweden

    Pannon,Hungry

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    5/23

    Agenda

    2009 Achieving RA Standards and Maximizing RAID Tools Page 4

    Strategic KPIs.

    Product Assessment

    RA Controls.

    RAID in the Prepaid Migration.

    Post Monitoring.

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    6/23

    Strategic KPIs : Coverage KPI Model & Maturity Model

    2009 Achieving RA Standards and Maximizing RAID Tools Page 5

    5. Continuousimprovement via feedback.

    Decentralized ownership,

    holistic control.

    4. Leakage quantitativelyunderstood and controlled.

    3. Standardized approachdeveloped. Designing-in

    control commences.

    2. Basic project/process

    management. Repeatabletasks.

    1. Ad-hoc, chaotic.

    Dependant on individualheroics.

    Cumulated scores per revenue streamProduct

    managementSales and

    provisioningOperation and

    usageRating and

    BillingCollection

    Weights score sale through dealers 1.3 4.0 3.0 3.0

    Sale of SIM 1.5 3.0 3.0 2.0

    Sale of airtime for prepaid 1.3 4.0 3.0

    Postpaid 3.5 3.7 4.0 3.5 4.0

    Prepaid 2.0 4.0 4.0 3.0

    Partner/3rd party revenues 3.3 4.0 4.0 4.0

    Other 0.0 0.0 0.0

    Costs and revenue sharing 0.0 0.0 0.0

    Product

    management

    Sales and

    provisioning

    Operation and

    usage

    Rating and

    BillingCollection

    Cumulated results revenues 1.8 3.9 4.0 3.1 3.2

    Cumulated results revenues and COGs N/A N/A N/A N/A N/A

    Over all scores

    Overall KPI revenue streams 3.4

    Overal l KPI revenue st reams and COGS N/A

    Cumulated results per stream

    Sale through dealers 3.0Sale of SIM 2.6

    Sale of airtime for prepaid 3.1

    Postpaid services 3.7

    Prepaid services 3.4

    Partner/3rd party revenues 3.6

    Other 0.0

    Costs and revenue sharing 0.0

    Source : TMF Maturity Model :GB941-B

    Source : TRAP Coverage KPI Model

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    7/23

    DiGis Position Based On Coverage KPI and

    Matury Model

    2009 Achieving RA Standards and Maximizing RAID Tools Page 8

    DiG

    i

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    8/23

    Integrate RAID CM to Achieve KPIs

    2009 Achieving RA Standards and Maximizing RAID Tools Page 9

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    9/23

    Integrate RAID CM and RA Impact Report to

    Achieve KPIs

    2009 Achieving RA Standards and Maximizing RAID Tools Page 10

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    10/23

    RA In Product Assessment

    2009 Achieving RA Standards and Maximizing RAID Tools Page 11

    NewPrepaid

    System

    Product

    Assessment

    RA Control

    Migration

    Post

    Monitoring

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    11/23

    RAID For Product Assessment

    2009 Achieving RA Standards and Maximizing RAID Tools Page 12

    New

    PrepaidSystem

    ProductAssessm

    ent

    RAControl

    Migrati

    on

    PostMonito

    ring

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    12/23

    Platform Migration

    2009 Achieving RA Standards and Maximizing RAID Tools Page 13

    NewPrepaid

    System

    Product

    Assessment

    RA Control

    Migration

    Post

    Monitoring

    P d t

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    13/23

    88% of companys subscriber

    base are prepaid subscribers.

    Project code NASA.

    From Alcatel IntelligentNetwork(AIN) into NokiaSiemens Network IN.

    700 people involved through outthe project.

    150 people on shift mode(day/night) during the 2 days ofmigration.

    15 people from RevenueAssurance group.

    Prepaid System Migration

    2009 Achieving RA Standards and Maximizing RAID Tools Page 14

    New

    PrepaidSystem

    ProductAssessm

    ent

    RAControl

    Migrati

    on

    Postmonito

    ring

    Product

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    14/23

    5 days of vouchermigration.

    2 days of subscribermigration.

    1 mil of subscriber onthe 1st day ofmigration.

    6 mil of subscriber onthe 2nd day of

    migration.

    Migration Strategy

    2009 Achieving RA Standards and Maximizing RAID Tools Page 15

    New

    PrepaidSystem

    ProductAssessm

    ent

    RAControl

    Migrati

    on

    Postmonito

    ring

    Product

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    15/23

    Limited time frame provided for RAID validation.

    Complex data mapping from Alcatel to Nokia

    Siemens.

    Concern over data accuracy due to data

    manipulation, change of data type and data

    enrichment to suits the new field format.

    Therefore its important to ensure no revenue

    leakages happen due to wrong mapping profiles.

    Challenges

    2009 Achieving RA Standards and Maximizing RAID Tools Page 18

    New

    PrepaidSystem

    ProductAssessm

    ent

    RAControl

    Migrati

    on

    Postmonito

    ring

    Product

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    16/23

    24 validations.

    Validations took 2-3 hours to

    complete.

    Examples of validations are.Total subscriber

    migrated.

    Number of incorrect

    balance.

    Total status.

    Number of subs withaccuracy of package

    name.

    Number of subs with

    accuracy of voice

    freebie.

    Verifications Facts

    2009 Achieving RA Standards and Maximizing RAID Tools Page 19

    New

    PrepaidSystem

    ProductAssessm

    ent

    RAControl

    Migrati

    on

    Postmonito

    ring

    Product

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    17/23

    Completed during the time

    provided by the migration team.

    Alarms detected are under thethreshold value.

    xxx alarms detected for the1st night.

    Xxxx alarms detected onthe 2nd night.

    The result give a GO decisionsto the management team toproceed with the next step ofmigration.

    Results from RAID verifications

    2009 Achieving RA Standards and Maximizing RAID Tools Page 20

    New

    PrepaidSystem

    Assessm

    ent

    RAControl

    Migrati

    on

    Postmonito

    ring

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    18/23

    Post monitoring

    2009 Achieving RA Standards and Maximizing RAID Tools Page 21

    NewPrepaid

    System

    Product

    Assessment

    RA Control

    Migration

    Post

    Monitoring

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    19/23

    RAID used for Traffic Monitoring

    2009 Achieving RA Standards and Maximizing RAID Tools Page 22

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    20/23

    Images during the migration night

    2009 Retrain the business way Page 27

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    21/23

    Images during the migration night

    2009 Retrain the business way Page 28

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    22/23

    Images during the migration night

    2009 Retrain the business way Page 29

  • 8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali

    23/23

    2009 Retrain the business way Page 27

    Ahmad Fairuz Ali Yang Yung Wei