achieving ra and maximize raid tools by ahmad fairuz ali
TRANSCRIPT
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
1/23
Achieving RA Standards and Maximizing RAIDTools
by
Ahmad Fairuz Ali
4th WeDo Technologies User Group Meeting
May 14th and 15th, 2009Lisbon, Portugal
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
2/23
Malaysia , Truly Asia!
2009 Achieving RA Standards and Maximizing RAID Tools Page 1
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
3/23
Established in 1994
Over 7.2 million subscribers (Q1/09)
49% owned by Telenor of Norway
Recently launch 3G/HSPA services inMarch09.
DiGi Journey
2009 Achieving RA Standards and Maximizing RAID Tools Page 2
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
4/23
DiGi Part of Telenor Worldwide
2009 Achieving RA Standards and Maximizing RAID Tools Page 3
DiGi,Malaysia
DTAC,Thailand
Grameenphone,Bangladesh
Telenor Pakistan,Pakistan
Telenor Norway
Vimplecom,Rusia
Telenor SerbiaKyivstar,Ukraine
Promonte,Montenegro
Sonofon,Denmark
TelenorSweden
Pannon,Hungry
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
5/23
Agenda
2009 Achieving RA Standards and Maximizing RAID Tools Page 4
Strategic KPIs.
Product Assessment
RA Controls.
RAID in the Prepaid Migration.
Post Monitoring.
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
6/23
Strategic KPIs : Coverage KPI Model & Maturity Model
2009 Achieving RA Standards and Maximizing RAID Tools Page 5
5. Continuousimprovement via feedback.
Decentralized ownership,
holistic control.
4. Leakage quantitativelyunderstood and controlled.
3. Standardized approachdeveloped. Designing-in
control commences.
2. Basic project/process
management. Repeatabletasks.
1. Ad-hoc, chaotic.
Dependant on individualheroics.
Cumulated scores per revenue streamProduct
managementSales and
provisioningOperation and
usageRating and
BillingCollection
Weights score sale through dealers 1.3 4.0 3.0 3.0
Sale of SIM 1.5 3.0 3.0 2.0
Sale of airtime for prepaid 1.3 4.0 3.0
Postpaid 3.5 3.7 4.0 3.5 4.0
Prepaid 2.0 4.0 4.0 3.0
Partner/3rd party revenues 3.3 4.0 4.0 4.0
Other 0.0 0.0 0.0
Costs and revenue sharing 0.0 0.0 0.0
Product
management
Sales and
provisioning
Operation and
usage
Rating and
BillingCollection
Cumulated results revenues 1.8 3.9 4.0 3.1 3.2
Cumulated results revenues and COGs N/A N/A N/A N/A N/A
Over all scores
Overall KPI revenue streams 3.4
Overal l KPI revenue st reams and COGS N/A
Cumulated results per stream
Sale through dealers 3.0Sale of SIM 2.6
Sale of airtime for prepaid 3.1
Postpaid services 3.7
Prepaid services 3.4
Partner/3rd party revenues 3.6
Other 0.0
Costs and revenue sharing 0.0
Source : TMF Maturity Model :GB941-B
Source : TRAP Coverage KPI Model
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
7/23
DiGis Position Based On Coverage KPI and
Matury Model
2009 Achieving RA Standards and Maximizing RAID Tools Page 8
DiG
i
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
8/23
Integrate RAID CM to Achieve KPIs
2009 Achieving RA Standards and Maximizing RAID Tools Page 9
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
9/23
Integrate RAID CM and RA Impact Report to
Achieve KPIs
2009 Achieving RA Standards and Maximizing RAID Tools Page 10
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
10/23
RA In Product Assessment
2009 Achieving RA Standards and Maximizing RAID Tools Page 11
NewPrepaid
System
Product
Assessment
RA Control
Migration
Post
Monitoring
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
11/23
RAID For Product Assessment
2009 Achieving RA Standards and Maximizing RAID Tools Page 12
New
PrepaidSystem
ProductAssessm
ent
RAControl
Migrati
on
PostMonito
ring
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
12/23
Platform Migration
2009 Achieving RA Standards and Maximizing RAID Tools Page 13
NewPrepaid
System
Product
Assessment
RA Control
Migration
Post
Monitoring
P d t
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
13/23
88% of companys subscriber
base are prepaid subscribers.
Project code NASA.
From Alcatel IntelligentNetwork(AIN) into NokiaSiemens Network IN.
700 people involved through outthe project.
150 people on shift mode(day/night) during the 2 days ofmigration.
15 people from RevenueAssurance group.
Prepaid System Migration
2009 Achieving RA Standards and Maximizing RAID Tools Page 14
New
PrepaidSystem
ProductAssessm
ent
RAControl
Migrati
on
Postmonito
ring
Product
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
14/23
5 days of vouchermigration.
2 days of subscribermigration.
1 mil of subscriber onthe 1st day ofmigration.
6 mil of subscriber onthe 2nd day of
migration.
Migration Strategy
2009 Achieving RA Standards and Maximizing RAID Tools Page 15
New
PrepaidSystem
ProductAssessm
ent
RAControl
Migrati
on
Postmonito
ring
Product
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
15/23
Limited time frame provided for RAID validation.
Complex data mapping from Alcatel to Nokia
Siemens.
Concern over data accuracy due to data
manipulation, change of data type and data
enrichment to suits the new field format.
Therefore its important to ensure no revenue
leakages happen due to wrong mapping profiles.
Challenges
2009 Achieving RA Standards and Maximizing RAID Tools Page 18
New
PrepaidSystem
ProductAssessm
ent
RAControl
Migrati
on
Postmonito
ring
Product
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
16/23
24 validations.
Validations took 2-3 hours to
complete.
Examples of validations are.Total subscriber
migrated.
Number of incorrect
balance.
Total status.
Number of subs withaccuracy of package
name.
Number of subs with
accuracy of voice
freebie.
Verifications Facts
2009 Achieving RA Standards and Maximizing RAID Tools Page 19
New
PrepaidSystem
ProductAssessm
ent
RAControl
Migrati
on
Postmonito
ring
Product
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
17/23
Completed during the time
provided by the migration team.
Alarms detected are under thethreshold value.
xxx alarms detected for the1st night.
Xxxx alarms detected onthe 2nd night.
The result give a GO decisionsto the management team toproceed with the next step ofmigration.
Results from RAID verifications
2009 Achieving RA Standards and Maximizing RAID Tools Page 20
New
PrepaidSystem
Assessm
ent
RAControl
Migrati
on
Postmonito
ring
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
18/23
Post monitoring
2009 Achieving RA Standards and Maximizing RAID Tools Page 21
NewPrepaid
System
Product
Assessment
RA Control
Migration
Post
Monitoring
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
19/23
RAID used for Traffic Monitoring
2009 Achieving RA Standards and Maximizing RAID Tools Page 22
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
20/23
Images during the migration night
2009 Retrain the business way Page 27
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
21/23
Images during the migration night
2009 Retrain the business way Page 28
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
22/23
Images during the migration night
2009 Retrain the business way Page 29
-
8/14/2019 Achieving RA and Maximize RAID Tools by Ahmad Fairuz Ali
23/23
2009 Retrain the business way Page 27
Ahmad Fairuz Ali Yang Yung Wei