Jim Cook & Martin Gastal 1

ACT – Fourth months later…

Prepared by:Martin Gastal

Jim Cook

22/03/2011

Jim Cook & Martin Gastal 2

Agenda→Activity Coordination Tool - Introduction→Project Status→Operational statistics & incidents→Use cases

→1. Shutdowns & Extended Technical Stops→2. Operation, Machine development periods,

Technical Stops, Short accesses→Next steps

22/03/2011

Jim Cook & Martin Gastal 3

ACT Introduction• Project started in 2009• Goals: – Provide a web based application to manage Work

Packages in the CMS Experimental Area– Build up the memory of the experiment

• Application to handle data exchange with various CERN/CMS databases

• Continuous improvement process driven by user feedback

22/03/2011

Jim Cook & Martin Gastal 4

ACT Introduction• Database created to fill all long term needs• Fourth version of the ACT is now available• Specs

– Locate on “CMS on-line” server– Back-end: Oracle– Front end: JavaScript– Development environment: JDeveloper– Portability: Optimised for Internet Explorer, Safari (mac &

iPhone), Opera, Google Chrome and FireFox• Core team:

– Software Engineer: Jim Cook– DB Administrator: Frank Glege– Application Developer: Stephane Bally

22/03/2011

Jim Cook & Martin Gastal 522/03/2011

ACTCore

module

EquipmentTraceability

module

Notification module

Engineering Integration

module

Toolingmodule

Risk Asses.module

Short Accessmodule

Documentlibrary

module IncidentManagement

module

Advancedplanningmodule

AccessControlmodule

Surveymodule

RPSurveymodule

✔✚

CompleteOn-goingPlanned

✚✚

VisitsManagement

module

Jim Cook & Martin Gastal 6

3 key functionalities: 1. request a WP 2. modify/clone a submitted WP 3. browse the list of submitted WPs

Connect to EMDbRetrieve equipment tree structuresMonitor equipment moves in/out of RP designated areasInventory managementBuffer zone management (bar code)

Radio Protection measurementsALARA analysis (Collective dose) RP measurement in buffer area

Notify group of users by Email/SMSTypical messages: Your WP request has been accepted Your WP has been modified You are requested to provide more info on your WP Short access imminent… VIC organised…

22/03/2011

ACTCore

module

EquipmentTraceability

module

Notification module

EngineeringIntegration

module

Toolingmodule

Risk Asses.module

Short Accessmodule

Documentlibrary

module IncidentManagement

module

Advancedplanningmodule

AccessControlmodule

Surveymodule

RPSurveymodule

Program PADs for General Access

Connect to CatiaDisplay 3D geographic/ configuration viewsTrack changes in integration models

Connect to MTFDisplay tooling specsCheck tooling certifications

Gantt chartDay by day schedule

Risk/location/configuration matrixList of preventive actions

PicturesWork procedures

Archive Survey reportsLink to on-line alignment community

Create and advertise new accessManage the use of operational dosimetersManage the RP sweep

Track incidentsFollow up corrective actions

Jim Cook & Martin Gastal 7

Operational Statistics• Downtime ~2.5 days– ACT in operation 119 days, ~98% availability

• 534 Work Packages processed by ACT since 24 November 2010

• 526 people named on Work Packages– From 1 to 44 Work Packages per person, average of 3.5

• 112 visits requested via ACT with at least 221 visitors– Since start of year, 121 visits plus 16 VIP visits (including

visits not requested via ACT)• Work Package requests– ~80% by PH/CMS personnel

22/03/2011

Jim Cook & Martin Gastal 8

Downtime and Incidents• Database maintenance 14 and 15 December 2010

– Portal (CMS online) not available– No Work Packages could be viewed, requested or administered

• Offline Database maintenance 19 January 2011– Access control system inoperable

• Issue with streaming 14 February 2011– Access control information lagged by ~3 days

• Portal offline for ~1 hour 4 March 2011– Though no complaints made ;0)

• Access control system slow to update 7 March 2011– Reason not fully understood– Actions being taken to diagnose future issues– Problem solved for short accesses

• Hardware faults of offline database 11 and 15 March 2011– Both main hardware and backup hardware (supervised by IT) failed

22/03/2011

Jim Cook & Martin Gastal 9

Use Case 1• Managing shutdown and extended technical stops– Flow

22/03/2011

WP declaration Insert in long term plan

Risk AssessmentALARA

Insert in short term plan

VIC Workexecution

WP completion

Jim Cook & Martin Gastal 10

Use Case 1• Managing shutdown and extended technical stops– Flow: WP declaration

22/03/2011

WP declaration Insert in long term plan

Risk AssessmentALARA

Insert in short term plan

VIC Workexecution

WP completion

Done by the CreatorCan be modified at any timeby both the Creator and theWork Supervisor

Jim Cook & Martin Gastal 1122/03/2011

Cables to be installed between theUXC55 and the USC55

Example – PLT work declaration

Jim Cook & Martin Gastal 1222/03/2011

Predefined accesses

Jim Cook & Martin Gastal 1322/03/2011

List of personnelPartial information Enough at that stage

WP number

To keep track of the max number of keysTo be used

Jim Cook & Martin Gastal 1422/03/2011

State of CMS magnet

All locations to beaccessed during installation

Location tree is experiment specific

Jim Cook & Martin Gastal 1522/03/2011

Systems affectedby WP

System tree is experiment specific

Jim Cook & Martin Gastal 1622/03/2011

Equipment needed toexecute the WP

Jim Cook & Martin Gastal 1722/03/2011

RP traceabilityinventory items are identified and assignedto a move typeIn, Out, Relocate

Item IDLinked to EMDbusing bar code

Jim Cook & Martin Gastal 1822/03/2011

Most relevant for ALARA

Jim Cook & Martin Gastal 1922/03/2011

Basic risk matrix inplaceWill get updated withconfiguration of detector

Jim Cook & Martin Gastal 2022/03/2011

Most relevant when safety systemsor subsystems are affected

Jim Cook & Martin Gastal 2122/03/2011

Summary pageAll sections can be edited individually

Option toforward to TIOC

Notification sent to WP actors

Jim Cook & Martin Gastal 22

Use Case 1• Managing shutdowns and extended technical stops– Flow: WP acceptance and insertion in long term plan

22/03/2011

WP declaration Insert in long term plan

Risk AssessmentALARA

Insert in short term plan

VIC Workexecution

WP completion

Through Technical Coordinationmeetings, decision made to schedule the workStatus update take place throughSuper user interface

Jim Cook & Martin Gastal 23

Use Case 1• Managing shutdowns and extended technical stops– Flow: Work package analysis meeting

22/03/2011

WP declaration Insert in long term plan

Risk AssessmentALARA

Insert in short term plan

VIC Workexecution

WP completion

Review of the method of workRisk assessmentUpdate of relevant sections:

Risk, Alarms, Personnel…

Jim Cook & Martin Gastal 24

Use Case 1• Managing shutdowns and extended technical stops– Flow: Insert in short term Plan

22/03/2011

WP declaration Insert in long term plan

Risk AssessmentALARA

Insert in short term plan

VIC Workexecution

WP completion

Link to day by day scheduleMade available on ACT Main pageHyperlinks to ACT to be available shortly

Jim Cook & Martin Gastal 25

Use Case 1• Managing shutdowns and extended technical stops– Flow: Work package execution monitoring

22/03/2011

WP declaration Insert in long term plan

Risk AssessmentALARA

Insert in short term plan

VIC Workexecution

WP completion

Monitoring of WP by CMS shiftersDaily list of active WPs and authorisedpersonnelLink to access control system forUXC55 Access management

Jim Cook & Martin Gastal 26

Use Case 1• Managing shutdowns and extended technical stops– Flow: Work package completion

22/03/2011

WP declaration Insert in long term plan

Risk AssessmentALARA

Insert in short term plan

VIC Workexecution

WP completion

WP supervisor to close WP upon completionand to add a comment eg 100% complete,reduced scope, will have to be restartedduring next technical stop…

Jim Cook & Martin Gastal 27

Use Case 2• Managing Operation, Technical Stops, Machine development

periods, and short accesses– Flow:

22/03/2011

Create and advertise

access

Risk AssessmentALARA

VIC

Workexecution

WP completionWP declaration Schedule WP

Jim Cook & Martin Gastal 28

Use Case 2• Managing Technical Stops, Machine development periods, and short

accesses– Flow: Create and advertise an access/MD period

22/03/2011

Create and advertise

access

Risk AssessmentALARA

VIC

Workexecution

WP completionWP declaration Schedule WP

Edit existing access/MDP

Create access/MDPMagnet state is essential

Lifting the Radiation VetoMax Dose measured during sweep

Jim Cook & Martin Gastal 29

Use Case 2• Managing Technical Stops, Machine development periods, and short

accesses– Flow: WP declaration

22/03/2011

Create and advertise

access

Risk AssessmentALARA

VIC

Workexecution

WP completionWP declaration Schedule WP

Time window:TStop, Next short access, MDP

Duration and working hours

Foreseen impact

Jim Cook & Martin Gastal 30

Use Case 2• Managing Technical Stops, Machine development periods, and short

accesses– Flow: WP scheduling

22/03/2011

Create and advertise

access

Risk AssessmentALARA

VIC

Workexecution

WP completionWP declaration Schedule WP

Specific access/MDP

Swift editing functionalities

Acceptance done during TC meetings and TECOPA

Jim Cook & Martin Gastal 3122/03/2011

Jim Cook & Martin Gastal 32

Next steps• Complete EMDb module.

– Designed by S bally– Based on existing EMDb (using APEX)– Developed independently from other modules– Fully integrated into ACT

• Start working on Incident Management module– To be done by German Technical Student

• Complete RP Survey module– To be done by Jim based on requirements from RPEs– To handle operational dosimeters plus material in the

buffer zone

• Design the Visits module– To be done by Jim based on requirements from Dawn– To include management of key cabinet

22/03/2011