Action plan for CNCRP Working Team-2
Md. Rafiqul Islam
Executive Engineer
PWD Design Division-III
&
Team Leader Working Team-2, CNCRP
-
7/28/2019 Action Plan for WT-2 4.08.12
2/18
Objectives of working Team -2 in the currentJapan tour under CNCRP
Condition of Existing Buildings
Various techniques for retrofitting
Research work on retrofitting
Selection/Categorization of Building for Retrofitting
Seismic vulnerability assessment and retrofitting design
Design of earthquake resistant new building
Precaution about public safety and security during retrofitting
design and works
-
7/28/2019 Action Plan for WT-2 4.08.12
3/18
Condition of Existing Buildings
Present condition in Bangladesh
Most of the existing buildings were not built by considering
seismic forces.
Without seismic detailing.
Small column size.
Plain rebar is used.
Weak Beam Column joint.
Infill masonry wall is used in frame structure.
Most of the buildings are not durable due to poor concreting.
Mixed frame structures.
-
7/28/2019 Action Plan for WT-2 4.08.12
4/18
Condition of Existing Buildings
Observation in Japan
Seismic force is considered to design the building.
Large column size is observed.
No deterioration of concrete and rebar of the existing building.
Item of activity to be considered for CNCRP
Strength of the existing building material to be tested.
Capacity of the existing building to be estimated by analyticallyand experimentally.
-
7/28/2019 Action Plan for WT-2 4.08.12
5/18
Condition of Existing Buildings
Way of Implementation
List of martial strength to be tested by period wise.
Experimental facility to be established.
Long term goal/ achievements
We have to prepare the existing building inventory for the whole
country by following the test result.
Depending on the test result we need to retrofit or demolish the
structure.
Remarks
No
-
7/28/2019 Action Plan for WT-2 4.08.12
6/18
Various techniques for retrofitting
Present condition in Bangladesh
No retrofitting work
Observation in Japan
Retrofitting by
Steel frame bracing.
Base Isolation.
RCC Column Jacketing.
Insertion of shear wall.
Seismic Slit.
Wing Wall.
Steel Column Jacketing.
-
7/28/2019 Action Plan for WT-2 4.08.12
7/18
Various techniques for retrofitting
Item of activity to be considered for CNCRP
Suitability of the different seismic retrofitting techniques should
be explored for Bangladesh .
Way of Implementation
Pilot project should be considered as retrofitting test work.
Long term goal/ achievements
We have to retrofit the existing building depending on the seismic
vulnerability.
Remarks
No
-
7/28/2019 Action Plan for WT-2 4.08.12
8/18
Research work on retrofitting
Present condition in Bangladesh
There is no research work on retrofitting techniques.
Observation in Japan
Research work is enduring in private and public sector.
Item of activity to be considered for CNCRP
Some research work need to be implemented.
-
7/28/2019 Action Plan for WT-2 4.08.12
9/18
Research work on retrofitting
Way of Implementation
Under the supervision of JICA expert, working team-2 will
do some research work by analytically and experimentally .
Long term goal/ achievements
PWD will establish a research laboratory with the help of
JICA expert.
Remarks
No
-
7/28/2019 Action Plan for WT-2 4.08.12
10/18
Selection/Categorization of Building forRetrofitting
Present condition in Bangladesh
There is no guideline for seismic retrofitting.
Observation in Japan
No specific categorization procedure in Japan.
Some top down selection procedure exist.
Item of activity to be considered for CNCRP
We have to prepare a categorization guide line for seismic
retrofitting as per direction of JET.
-
7/28/2019 Action Plan for WT-2 4.08.12
11/18
Selection/Categorization of Building forRetrofitting
Way of Implementation
CNCRP together with JET need to find out suitable technique for
implementation.
Long term goal/ achievements
We have to prepare the building inventory for the whole country
by following this categorization guideline.
Remarks
-
7/28/2019 Action Plan for WT-2 4.08.12
12/18
Seismic vulnerability assessment and retrofitting
design
Present condition in Bangladesh
Almost no such capacity.
Observation in Japan
There are specialized group of structural designer capable for
seismic assessment and retrofitting design.
Item of activity to be considered for CNCRP
Need to prepare seismic vulnerability assessment manual.
Need to retrofitting design manual.
Need to learn the way of pushover analysis.
Need to learn dynamic time history analysis.
-
7/28/2019 Action Plan for WT-2 4.08.12
13/18
Seismic vulnerability assessment andretrofitting design
Way of Implementation
Manual should be prepared with the help of JICA Expert Team.
JET will help to learn these analysis properly.
Long term goal/ achievements PWD engineer will disseminate these knowledge to the public and
private sector.
Licensing system should be developed for retrofitting design.
Remarks
No
-
7/28/2019 Action Plan for WT-2 4.08.12
14/18
Design of earthquake resistant new building
Present condition in Bangladesh
There is a lack of capable structural design engineer.
Building construction regulation is not strictly followed.
Observation in Japan
Building code is strictly followed by consultant and constructionagency.
Item of activity to be considered for CNCRP
Need to prepare seismic design manual for new building.
Need to learn the way of pushover analysis for the design of new
building.
Need to learn dynamic time history analysis for the design of new
building.
-
7/28/2019 Action Plan for WT-2 4.08.12
15/18
Design of earthquake resistant new building
Way of Implementation
PWD engineer will prepare this design manual with the help of JICAExpert Team.
PWD engineer will learn these analysis procedure with the help of
JICA Expert Team.
Long term goal/ achievements
PWD engineer will disseminate these knowledge to the public and
private sector.
Licensing system for the professional engineer for design and
construction of building should be followed strictly.
Remarks
No
-
7/28/2019 Action Plan for WT-2 4.08.12
16/18
Precaution about public safety and securityduring retrofitting design and works
Present condition in Bangladesh
Since there is no retrofitting works in Bangladesh so there is no
guideline for public safety and security.
Observation in Japan
Various steps are considered to ensure public safety and security.
Item of activity to be considered for CNCRP
Public safety and security guide line need to be prepared.
-
7/28/2019 Action Plan for WT-2 4.08.12
17/18
Precaution about public safety and securityduring retrofitting design and works.
Way of Implementation
Need to explore Japanese as well as other international guide
line to prepare the guide line.
Long term goal/ achievements Public safety need to ensure.
Need to increase Public awareness .
Remarks No
-