active target multistatic receiver preliminary design review
DESCRIPTION
Active Target Multistatic Receiver Preliminary Design Review. Group D: Sam Buchanan Haiji Wang Robby Willer. System analysis. ATMR calibration mode diagram (Level 0). System analysis. ATMR bistatic receiver mode diagram (Level 0). System analysis. ATMR system diagram (Level 1). - PowerPoint PPT PresentationTRANSCRIPT
Project Renovatio
Joshua FraserAlastair FraserRuofei FuChao JiangCheng ZhenDacheng ZhengTien Truong
System-Level Schematic
WBS: System Decomposition
WBS: System Decomposition
WBS: System Decomposition
Testing PlansPower (Current/Volt meter & Management systems)
-Battery discharge and recharge rate and duration-Verify power conversion efficiencies
Motor (G sensors, GPS, Speedometer and/or Dynamometer)-Top speed, acceleration, duration, etc.
-Acceleration/Speed sustainability
Heat (Temperature sensors and IR Camera)-Max temperature of motor and charger-Water/coolant temperature-Temperature range of batteries
Testing PlansWater/Rain Susceptibility (Hose or Sprinkler)
-Power/battery systems are water tight-Wiring is properly insulated-No large potential differences between chassis and ground
Safety Shutoffs (Crash, Ground Fault, and Hand Switches)-Crash sensor works properly
-GFI’s properly detect current imbalances and shut off power-Hand switches properly disconnect power systems
Component Specifications
Risk Mitigation Plan
WBS: Project Organization
Organization Chart
Project Schedule
Questions?● Project Site:
o project-renovatio.bitballoon.com